Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) GEF Mainstreaming Integrated Water and Environment Management (P145897) EAST ASIA AND PACIFIC | China | Water Global Practice | Global Environment Project | Investment Project Financing | FY 2016 | Seq No: 10 | ARCHIVED on 25-Jun-2021 | ISR47148 | Implementing Agencies: The People's Republic of China, The Ministry of Water Resources (MWR), The Ministry of Econogical Environment (MEE), Water Resources Department in Hebei Province, Chengde Ecological Environment Bureau Key Dates Key Project Dates Bank Approval Date: 09-May-2016 Effectiveness Date: 27-Mar-2017 Planned Mid Term Review Date: 30-Nov-2020 Actual Mid-Term Review Date: 24-Nov-2020 Original Closing Date: 31-Dec-2021 Revised Closing Date: 31-Dec-2021 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to increase water productivity and reduce pollution discharges in the project areas to mainstream and scale up an innovative approach to integrated water and environmental management in the three river basins entering the Bohai Sea. The PDO will be achieved through: (a) increasing irrigation water use efficiency and all other ways possible to effectively use water under a cap of water consumption; (b) reducing water pollution discharges under a cap of environment capacity and (c) increasing ecological river flows. The above measures will minimize the negative impacts on the ecosystem of Bohai Sea, contributing to the achievement of global environmental benefits (GEBs). Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Mainstreaming of Innovative Approach on Integrated Water and Environment Management:(Cost $3.45 M) Component 2: Demonstration in Hai Basin on Integrated Water and Environment Management:(Cost $90.10 M) Component 3: Scaling up the Integrated Water and Environment Management Approach in Three River Basins:(Cost $7.30 M) Component 4: Institutional Capacity Building and Project Management:(Cost $3.65 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions 6/25/2021 Page 1 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) As a result of the strengthened project management for the PMOs in MWR, MEE, Chengde and Shijiazhuang, good progress has been made in achieving the Project Objectives and implementing the four components, which are supported by the key performance indicators updated on May 31, 2021: PDO - Most of the PDO indicators have been reached or exceeded based on the M&E report updated on May 31, 2021: The PDO target 1- all four policy recommendations (on water consumption control and on environment capacity control) have been made by the Project and included in the documents issued by MWR and MEE respectively; The PDO target 2 – COD and NH3-N reduced in demonstration areas have exceeded the targets, and the reduced TN and TP reached about 75% of the targets, respectively; The PDO target 3: Water productivity increased from the baseline 1.1 kg/m3 to 1.97 kg/m3 far exceeded the target 1.26 kg/m3 in the demonstration areas, a similar increase has been achieved in the replication areas; The PDO target 4: Groundwater overdraft reduced from baseline zero to 169.29 million tons exceeded the target of 72.93 million tons in the two demonstration areas; and the PDO target 5 - the IWEM approach developed under the project has covered about 80% of problem areas defined by MWR and MEE. So far only two indicators have not reached the targets, but they are expected to be met by October 31, 2021. Component 1 - Mainstreaming of Innovative Approach on Integrated Water and Environment Management (IWEM): 80% of the study reports for this component has been completed. All 14 studies have been under preparation including preparation of Manual/Guidelines for IWEM. All four policy recommendations based on the results of the studies have been included in the policy papers issued by MWR and MEE. Component 2 - Demonstration in Hai Bain on IWEM: about 75% of the demonstration activities for this component has been completed. In the demonstration areas of Cheng-De and Shi-Jia-Zhuang, there have been reductions of 13,892 tons of COD and 1,471 tons of NH3-N from zero baseline; the average water productivity increased from 1.10 baseline to 1.97 kg/m3; and reduction of 169.28 million cubic meters of groundwater overdraft from zero baseline; Component 3 - Scaling up the IWEM Approach in Three River Basins: 80% of the project activities for this component has been completed. This component has been implemented with IWEM approach managed by MWR in Shi-Jin Irrigation Scheme of Hai River Basin and He-Tao Irrigation Scheme of Yellow River Basin, and by MEE PMO in Xing-Tai, Tang-Shan and Lang-Fang of Hai River Basin. The scaling up activities in Liao River Basin have been started by MEE PMO; and Component 4 - Institutional Capacity Building and Project Management: About 75% of the project activities has been completed for this component. Training, workshops and domestic and overseas study tours have been conducted to strengthen the institutional capacity in the PMOs of MEE, MWR and Hebei Province as planned. The next mission or the 8th supervision mission is tentatively planned in October/November 2021. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Low Low Low Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Moderate Substantial Moderate Sustainability Fiduciary Moderate Substantial Moderate Environment and Social Moderate Moderate Moderate Stakeholders Moderate Moderate Moderate Other -- Moderate Moderate Overall Moderate Moderate Moderate Results PDO Indicators by Objectives / Outcomes 6/25/2021 Page 2 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) PDO Indicators IN01005606 ►1. Policy Recommendations made under the project incorporated into the policies on water consumption control issued by MWR, and on pollution control issued by MEP, respectively (measuring unit: the (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 4.00 4.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005607 ►2-A. Water pollution (COD) discharged into the Hutuo and Luan Rivers reduced in the two demonstration areas Chengde and Shijiazhuang (measuring unit: tons of COD) (Metric tons/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 10,320.10 13,892.00 8,074.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005608 2-B. Water pollution (NH3-N) discharged into the Hutuo and Luan Rivers reduced in the two demonstration areas Chengde and Shijiazhuang (measuring unit: tons of NH3-N). (Metric tons/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,073.94 1,471.00 547.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005609 2-C. Water pollution discharged into the Hutuo and Luan Rivers reduced in the two demonstration areas Chengde and Shijiazhuang (measuring unit: tons of TN). (Metric tons/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 200.00 500.00 670.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005610 2-D. Water pollution discharged into the Hutuo and Luan Rivers reduced in the two demonstration areas Chengde and Shijiazhuang (measuring unit: tons of TP). (Metric tons/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 20.00 64.00 85.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005611 ►3-A. Water productivity increased in two demonstration rural areas Gaocheng and Jinzhou (measuring unit: kg of grain production per/m3). (Cubic Meter(m3), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1.10 1.34 1.97 1.26 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005612 3-B. Water productivity increased in scaling-up areas in Shijin irrigation areas (measuring unit: kg of grain production /m3) (Cubic Meter(m3), Custom Breakdown) 6/25/2021 Page 3 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) Baseline Actual (Previous) Actual (Current) End Target Value 1.19 1.35 1.98 1.29 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005613 3-C. Water productivity increased in scaling-up areas in Hetao irrigation areas (measuring unit: kg of grain production /m3) (Cubic Meter(m3), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 1.10 1.40 1.98 1.26 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005614 ►4. Reductions achieved in overdraft of groundwater in 2 demonstration sites in Hai River Basin (Gaocheng and Jinzhou) (measuring unit: million m3/year). (Cubic meters/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 108.58 169.28 72.93 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 Government has been making greater efforts on reduction of groundwater exploitation in the project Comments: areas. IN01005615 ►5-A. IWEMP approach demonstrated and scaled up to cover the MWR defined problem areas in 3 river basins (measuring unit: km2) (Square kilometer(km2), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 12,835.20 22,736.00 28,420.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005616 5-B. IWEMP approach demonstrated and scaled up to cover the MEP defined problem areas in 3 river basins (measuring unit: km2) (Square kilometer(km2), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 110,000.00 110,000.00 125,380.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 Intermediate Results Indicators by Components Component 1: Mainstreaming of Innovative Approach on Integrated Water and Environment Management IN01005617 ►1-A. All study reports prepared and completed as planned with good quality (measuring unit: the number of study reports prepared, revised and completed with good quality) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 3.00 4.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005624 6/25/2021 Page 4 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) 1-B. All study reports prepared and completed as planned with good quality (measuring unit: the number of study report prepared, revised and completed with good quality) (Government Financed) (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 3.00 5.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005625 ►2. Operational manuals/guidelines completed and accepted with good quality (measuring unit: the number of operational manuals prepared, revised and completed with good quality) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 5.00 Date 30-Jan-2017 20-May-2020 15-Jun-2021 30-Jun-2021 Component 2: Demonstration in Hai Basin on Integrated Water and Environment Management IN01005618 ►3-A. All study reports prepared and completed as planned with good quality (measuring unit: the number of study reports prepared, revised and completed with good quality) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 7.00 10.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005622 3-B. All study reports prepared and completed as planned with good quality (measuring unit: the number of study reports prepared, revised and completed with good quality) (Government Financed) (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5.00 7.00 10.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005626 ►4-A. RS/ET/EC-based TVAPs prepared and implemented with good quality for Luan sub-river basin and Hutuo sub-river basin, respectively (TVAP GEF Financed). (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 2.00 2.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005629 4-B. RS/ET/EC-based the IWEMPs prepared and implemented for Chengde Municipal City and Shijazhuang Municipal City and extension plans prepared for scaling-up areas (the IWEMP, MTR and ICR GEF Financed (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 3.00 6.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 31-Dec-2021 IN01005632 ►5. Capacity building for citizen engagement in preparation of TVAPs and IWEMPs - Channels are institutionalized for citizens to engage with government agencies and other stakeholders. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/25/2021 Page 5 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) Value 0.00 2.00 6.00 8.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005637 ►6. Women participation to increase water productivity and reduce water pollution through WUAs during IWEMP implementation (measuring unit: increased percentage of female membership in the WUAs) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 30.00 45.00 45.00 50.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005638 ►7-A. Construction of 3 small wastewater treatment plants and pipelines, 2 in Chengde County and 1 in Kuancheng County with good quality in demonstration areas as planned (Wastewater pollution-N) (Tones/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,068.00 1,602.00 2,136.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005639 7-B. Construction of 3 small wastewater treatment plants and pipelines, 2 in Chengde County and 1 in Kuancheng County with good quality in demonstration areas as planned (Wastewater pollution-P) (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 151.80 227.00 303.60 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005640 7-C. Construction of 3 small wastewater treatment plants and pipelines, 2 in Chengde County and 1 in Kuancheng County with good quality in demonstration areas as planned (Wastewater pollution-BOD) (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,500.00 2,010.00 2,796.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005641 ►8. Improved irrigation technologies applied in 2 demonstration counties in Shijiazhuang Municipal City (measuring unit: No. of hectares of irrigated areas applied with improved irrigation technologies (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2,660.00 8,835.00 11,000.00 13,300.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 Component 3: Scaling up the Integrated Water and Environment Management Approach in Three River Basins IN01005619 ►9-A. All study reports prepared and completed as planned with good quality (measuring unit: the number of study reports prepared, revised and completed with good quality) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 6.00 7.00 Date 30-Jan-2017 11-Dec-2020 11-Dec-2020 30-Jun-2021 6/25/2021 Page 6 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) IN01005621 9-B. All study reports prepared and completed as planned with good quality (measuring unit: the number of study reports prepared, revised and completed with good quality) (Government Financed) (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 3.00 4.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005627 ►10. National Water Environment Technology Extension Platform established at the MEP (measuring unit: percentage of software development and study progress completed with good quality) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 60.00 80.00 100.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005630 ►11. National ET Monitoring and Management Platform established at the MWR (measuring unit: percentage of software development and study progress completed with good quality) (GEF Financed) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 60.00 80.00 100.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005633 ►12-A. Annual scaling-up activities carried out and inspection and assessment reports prepared and completed for the up-scaling areas for MEP (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 4.00 6.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005635 12-B. Annual scaling-up activities carried out and inspection and assessment reports prepared and completed for the up-scaling areas for the MWR (GEF Financed) (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 4.00 6.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 Component 4: Institutional Capacity Building and Project Management IN01005620 ►13. Establishment of project website according to IW: LEARN guidelines: (measuring unit: functioning website with the number of hits recorded by site) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 1.00 1.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005623 ►14. Preparation of project-related experience notes (2) and one results note (1) for IW: LEARN portal: (measuring unit: completed documents) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/25/2021 Page 7 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) Value 0.00 1.00 2.00 3.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005628 ►15. Establishment and made operational project monitoring and evaluation (M&E) system: (measuring unit: functioning M&E system capable to generate semi-annual M&E reports) (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 4.00 6.00 10.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005631 ►16. Female staff and specialists participation in the project workshops and training at the central, provincial, municipal and county levels (increased % of female staff & specialists of the total num (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 30.00 40.00 40.00 40.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005634 ►17. Cooperation Framework Agreement reached to facilitate the development and implementation of TVAP/IWEMP between the respective administrative units responsible for environment and water at all leve (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 5.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 IN01005636 ►18. Coordination meetings between the respective administrative units to support the implementation of the framework agreements at the three levels on an annual basis (GEF Financed) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4.00 18.00 20.00 24.00 Date 30-Jan-2017 11-Dec-2020 15-Jun-2021 30-Jun-2021 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P145897 TF-A2428 Effective USD 9.50 9.50 0.00 7.15 2.35 75% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P145897 TF-A2428 Effective 29-Sep-2016 29-Sep-2016 27-Mar-2017 31-Dec-2021 31-Dec-2021 6/25/2021 Page 8 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report GEF Mainstreaming Integrated Water and Environment Management (P145897) Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/25/2021 Page 9 of 9