Procurement Plan I. General 1. Project Information Project Name: ENTERPRISE REVITALIZATION AND EMPLOYMENT PILOT (EREP) PROJE Country: Repuplic of yemen Project ID: Loan/Credit Numbers: 2. Bank's approval date of Procurement Plan Original: Revision 1: Revision 2: Revision 3: 3. Date of General Procurement Notice II. Goods, Work and Non-Consulting Services Thresholds 1. Prior Review Threshold. Procurement Decisions subject to Prior Review by the Bank will be as follows Prior Review 1a. Procurement Category Threshold (USD) Goods ≥500,000 Works NA Direct contract Procurement Method Threshold 1b. Procurement Method (USD) ICB (Goods) >= 500,000 NCB (Goods) < 500,000 Shopping (Goods) < = 50,000 ICB (Works) NA NCB (Works) NA NCB (Non-Consultant Services) Include all methods authorized by the loan agreement 2. Prequalification. Bidders for bid NA shall be prequlified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components NA 4. Reference to (if any) Project Operational/Procurement Manual: under approval process 5. Any Other Special Procurement Arrangements: [ncluding advance procurement and retroactive 6. Procurement Packages with Methods and Time Schedule: See attached "Goods and Works" sheet 9/9/2015 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Prior Review 1a. Procurement Category Threshold (USD) Consulting Firms (Competitive) > = 200,000 Consulting Firms (QBS) Individual Consultants (Competitive) > 50,000 Individual Consultants (Sole Source) Consulting Firms (Sole Source) Procurement Method Threshold 1b. Procurement Method (USD) QCBS > = 200,000 QBS <200,000 LCS <200,000 CQS < 200,000 Consulting Firms (Competitive) Consulting Firms (Sole Source) Individual Consultants (Competitive) Individual Consultants (Sole Source) NCB (Non-Consultant Services) Direct Contracting Include all methods authorized by the Grant agreement 2. Note: procurement following DC and SS will be under taken only if these are agreed to by IDA based on OPCPR listfrom justification Note: the project, of ceilings other can be found waise here: acompititive method will be followed. http://go.worldbank.org/MKXO98RY40 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: See attached "Consulting Services" sheet IV. Implementing Agency Capacity Building Activities with Time Schedule: See attached "Capacity 9/9/2015 NTERPRISE REVITALIZATION AND EMPLOYMENT PILOT (EREP) PROJECT Repuplic of yemen 25-Apr-13 25-Jul-13 6-Jul-14 6-Nov-14 ubject to Prior Review by the Bank will be as follows Comments All Contracts+ first two contracts less than the threshold NA Allcontracts Comments All Contracts First two Contracts First two Contracts NA NA First two Contracts lified in accordance with the provisions of paragraphs ement Manual: under approval process ncluding advance procurement and retroactive Schedule: See attached "Goods and Works" sheet 9/9/2015 ect to Prior Review by Bank as stated in Appendix 1 to ltants: Comments All contracts First two Contracts First two contracts All SS contracts All SS contracts Comments under taken only if these are agreed to by IDA based ompititive method will be followed. rldbank.org/MKXO98RY40 uding advance procurement and retroactive financing, ds and Time Schedule: See attached "Consulting with Time Schedule: See attached "Capacity 9/9/2015 EREP Procurement Plan Updated Date:10/12/2014 Bank for TOR (Date)** Country of Contractor Bank to the Technical Proposal Submission Expenses Incurred to Contract Award Date (incl. Zip Code if US) Advertising for Short Services Completion RFP Final Draft to be Method of Selection No Objection by the No Objection by the TOR/Shortlist to be Contract Currency Type of Consultant Bank for Final RFP Evaluation Report RFP Issued (Date) No Objection from No Objection from No Objection from Contract) (Date)** Bank for Shortlist #Combined/ Draft (Firm/ Individual) Bank (Technical/ forwarded to the Finalized (Date) Review by Bank Deadline (Date) Name, City, and Contract Value Contract/ Final listing (Date) (Prior/ Post) Bank (Date) Remarks (Date)** (Date)** (Date)** SL No. Date $ (Date) Description of Services Prior Individual IC 14/Feb/13 22/Feb/13 N/A 11-Feb-13 24-Feb-13 N/A N/A N/A N/A 05-Apr-13 15-Apr-13 Planned Revised Prior Individual IC 14/Feb/13 22/Feb/13 N/A 11-Feb-13 24-Feb-13 N/A N/A N/A N/A 05-Apr-13 15-Apr-13 Recruitment of Project Manager ‫محمد عبدالخير‬ 1 Prior Individual IC 11/Feb/13 11/Mar/13 N/A 23/Mar/13 28/Mar/13 N/A N/A N/A N/A 29-Apr-13 11-May-13 39,468 $ ‫سالم العويني‬ 5/11/2014 Actual 38,037 completed ‫محمد عبدالخير‬ extension for one year Prior Individual IC N/A N/A N/A N/A N/A N/A N/A N/A N/A 20-May-14 12-May-14 39,468 $ Actual ‫سالم العويني‬ 5/12/2015 20,066 after the approval of the TTL Planned Post Individual IC N/A 20-May-13 NA 28-May-13 NA NA NA N/A N/A N/A 01-Jul-13 Contracting consultant to Revised Post Individual IC N/A 01-Jul-13 NA 15-Jul-13 NA NA NA N/A N/A N/A 20-Jul-13 20-Aug-13 detremine the CRM 2 specifications and TOR ‫ادريس عبداهلل محمد‬ Extended till 03/04/2014 and Post Individual IC N/A 12-Jun-13 N/A 25-Jun-13 N/A N/A N/A N/A N/A N/A 29-Jun-13 2,000 $ ‫المقرمي‬ Actual 8/12/2013 2,000 completed Planned Post Individual IC N/A 20-May-13 NA 28-May-13 NA NA NA N/A N/A N/A 01-Jul-13 Contracting consultant to design Revised Post 01-Jul-13 NA 15-Jul-13 NA 20-Jul-13 20-Aug-13 3 the M&E System Individual IC N/A NA NA N/A N/A N/A This activity has been absorved Actual 0 in the CRM system Planned Prior Firm CQS N/A 20-May-13 N/A 28-May-13 N/A N/A 16-Jun-13 28-Jun-13 N/A N/A 08-Jul-13 Contracting a firm for designing Revised Prior 10-Jul-13 N/A 24-Jul-13 N/A 29-Jul-13 12-Aug-13 N/A N/A 22-Aug-13 22-Sep-13 4 and developing Website Firm CQS N/A N/A completed/Variation Order in Actual Prior Firm CQS N/A 25-May-13 N/A 07-Jun-13 N/A N/A 26-Jun-13 3-Jul-13 N/A N/A 20-Jul-13 5,785 $ ‫برسبكتيÙ?‬ 8/20/2014 8,674 amount 2,889$ Planned Post Individual IC N/A 23-May-13 N/A 31-May-13 N/A N/A N/A N/A N/A N/A 07-Jun-13 Revised Post Individual IC N/A 15-Jul-13 N/A 29-Jul-13 N/A N/A N/A N/A N/A N/A 04-Aug-13 31-Aug-15 Recruitment of 11 Internship 5 Advisors (multicontract) Post Individual IC N/A 8-Jun-13 N/A 9-Jul-13 N/A N/A N/A N/A N/A N/A 1-Sep-13 200,200 $ 11 singed contract For more details Actual (multicontract) 8/31/2015 92,216 ongoing see Annex A Planned Post Individual IC N/A 23-May-13 N/A 31-May-13 N/A N/A N/A N/A N/A N/A 07-Jun-13 Revised Recruitment of 10 Business Post Individual IC N/A 10-Jul-13 N/A 24-Jul-13 N/A N/A N/A N/A N/A N/A 29-Jul-13 31-Aug-15 Development plan 6 dvisors(multicontract) Post Individual IC N/A 8-Jun-13 N/A 2-Jul-13 N/A N/A N/A N/A N/A N/A 22-Aug-13 246,000 $ 10 singed contract For more details Actual (multicontract) 8/30/2015 42,666 ongoing see Annex A Planned prior Firm SSS N/A N/A 20-Oct-13 27-Oct-13 N/A 27-Oct-13 02-Nov-13 20-Nov-13 N/A 25-Nov-13 01-Dec-13 Revised Selected institutes for internship prior Firm SSS N/A 05-Oct-13 10-Oct-13 24-Oct-13 N/A 24-Oct-13 29-Oct-13 12-Nov-13 N/A 30-Nov-13 05-Dec-13 05-Feb-14 7 training in Sana'a (first round) completed/ Actual prior Firm SSS N/A 20-Nov-14 20-Nov-14 20-Dec-14 N/A 20-Dec-14 22-Dec-14 29-Dec-14 N/A 28-Jan-14 30-Jan-14 24,450 $ ‫سييدز للتعليم‬ 3/3/2014 25,210 Variation Order in amount 760$ Planned prior Firm SSS N/A N/A 20-Oct-13 27-Oct-13 N/A 27-Oct-13 02-Nov-13 20-Nov-13 N/A 25-Nov-13 01-Dec-13 Revised Selected institutes for internship prior Firm SSS N/A 05-Oct-13 10-Oct-13 24-Oct-13 N/A 24-Oct-13 29-Oct-13 12-Nov-13 N/A 30-Nov-13 05-Dec-13 05-Feb-14 8 training in Aden (first round) Actual prior Firm SSS N/A 22-Dec-14 22-Dec-14 2-Jan-14 N/A 2-Jan-14 6-Jan-14 13-Jan-14 N/A 16-Feb-14 18-Feb-14 22,080 $ ‫مثابرون‬ 3/22/2014 22,080 completed Planned prior Firm SSS N/A N/A 26-Mar-14 05-Apr-14 N/A N/A 02-Apr-14 20-Apr-14 N/A 01-May-14 01-May-14 Revised Selected institutes for internship Prior Firm SSS N/A 05-Oct-14 10-Oct-14 24-Oct-14 N/A 24-Oct-14 29-Oct-14 12-Nov-14 N/A 30-Nov-14 05-Dec-14 05-Feb-15 9 training in Sana'a (Second round) Actual 0 Line No 9&10 had been marged in line No19 Planned prior Firm SSS N/A N/A 26-Mar-14 05-Apr-14 N/A N/A 02-Apr-14 20-Apr-14 N/A 01-May-14 01-May-14 Selected institutes for internship 10 05-Feb-15 Revised training in Aden (Second round) prior Firm SSS N/A 05-Oct-14 10-Oct-14 24-Oct-14 N/A 24-Oct-14 29-Oct-14 12-Nov-14 N/A 30-Nov-14 05-Dec-14 Actual 0 Planned Post Individual IC N/A 18-May-13 N/A 10-May-13 N/A N/A N/A N/A N/A N/A 15-May-13 Revised Post Individual IC N/A 20-Jul-13 N/A 04-Aug-13 N/A N/A N/A N/A N/A N/A 09-Aug-13 31-Aug-15 11 Contracting Legal Consultant ‫عبدالكريم عبدالرحمن‬ Post Individual IC N/A 29-Jun-13 N/A 2-Jul-13 N/A N/A N/A N/A N/A N/A 31-Jul-13 10,000 $ ‫عبداهلل الشيباني‬ Actual 7/30/2015 5,000 ongoing Planned Post Individual IC N/A 26-May-13 N/A 15-May-13 N/A N/A N/A N/A N/A N/A 25-May-13 Revised Post Individual IC N/A 25-Jul-13 N/A 09-Aug-13 N/A N/A N/A N/A N/A N/A 14-Aug-13 05-Sep-13 12 Contracting Branding Consultant ‫رامي خالد ابراهيم‬ Post Individual IC N/A 27-May-13 N/A 07-Jun-13 N/A N/A N/A N/A N/A N/A 15-Jun-13 2,500 $ ‫العبسي‬ Actual 7/6/2013 2,500 completed 13 Contracting Marketing Firm Prior Firm CQS N/A N/A 1-Jun-13 06-Jun-13 N/A N/A 1-Jul-13 8-Jul-13 N/A N/A 22-Jul-13 Planned Extended till 31/05/2014 and Revised Prior Firm CQS N/A 01-Sep-13 6-Sep-13 20-Sep-13 N/A N/A 25-Sep-13 8-Oct-13 N/A N/A 18-Oct-13 completed/ Actual Prior Firm CQS N/A 18-Jul-13 N/A 26-Jul-13 N/A N/A 24-Sep-13 29-Sep-13 N/A N/A 31-Oct-13 38,145 $ ‫سنونو‬ 2/15/2014 38,535 Variation Order in amount 390$ Planned post Individual IC N/A 01-Oct-13 N/A 15-Oct-13 N/A N/A N/A N/A N/A N/A 20-Oct-13 31-Aug-15 Revised post Individual IC N/A Oct 14 - Aug15 N/A N/A N/A N/A N/A N/A N/A N/A Oct 14 - Aug15 Oct 14 - Aug15 14 Individual consultant's contracts For more details Actual post Individual IC N/A Oct 14 - Aug15 N/A N/A N/A N/A N/A N/A N/A N/A Oct 14 - Aug15 17,439 $ (multicontract) Oct 14 - Aug15 930 ongoing see Annex F Planned post Firm CQS N/A N/A 01-Jun-13 10-Jun-13 N/A N/A 15-Jun-13 01-Jul-13 N/A N/A 15-Jul-13 15 Revised Contracting Audit Consultancy post Firm CQS N/A 01-Jul-13 06-Jul-13 20-Jul-13 N/A N/A 25-Jul-13 09-Aug-13 N/A N/A 19-Aug-13 31-Aug-15 Actual post Firm CQS N/A 20-Jun-13 N/A 27-Jun-13 N/A N/A 2-Sep-13 15-Sep-13 N/A N/A 8-Oct-13 19,000 $ KPMG 12/31/2015 10,000 ongoing Planned post Individual IC N/A Jun 13 - Jun 14 N/A N/A N/A N/A N/A N/A N/A N/A Jun 13 - Jun 15 31-Aug-15 Revised post Individual IC N/A Jun 13 -Aug 15 N/A N/A N/A N/A N/A N/A N/A N/A Jun 13 -Aug 15 Jun 13 -Aug 15 Short term contracts (Develop post Individual IC N/A Aug13-May 14 N/A N/A N/A N/A N/A N/A N/A N/A Aug13-May 14 10,272 $ sep13-May 14 13 For more details Actual ToR and (multicontract) 10,272 contracts /13 completed see Annex B 16 Planned specifications,evaluation of post Individual IC N/A May 14-Aug 15 N/A N/A N/A N/A N/A N/A N/A N/A May 14-Aug 15 May 14-Aug 15 This line has been Revised Proposals/Offers,…etc ) added after the approval of the TTL/ post Individual IC N/A May 14-Aug 15 N/A N/A N/A N/A N/A N/A N/A N/A May 14-Aug 15 14,654 $ May 14-Aug 15 1 ongoing contracts , and 6 For more details Actual (multicontract) 13,304 completed. see Annex D Planned post Individual IC N/A 15-Jul-13 N/A N/A N/A N/A N/A N/A N/A N/A 20-Jul-13 Contracting Consultant to design 31-Aug-15 17 Revised N/A N/A N/A N/A N/A N/A N/A N/A N/A the ToR for selecting Market firm Actual post Individual IC N/A 12-Jun-13 N/A 25-Jun-13 N/A N/A N/A N/A N/A N/A 26-Jun-13 560 $ ‫خالد محمد عبداهلل عامر‬ 7/4/2013 560 completed Planned Prior Firm SSS N/A 17-Sep-14 18-Sep-14 19-Sep-14 N/A N/A 29-Sep-14 N/A N/A 26-Oct-14 01-Nov-14 $ Contracting a firm for 18 Revised developing wathba's Website Actual Prior Firm SSS N/A 24-Sep-14 24-Sep-14 N/A 6-Nov-14 10-Nov-14 1880 $ ‫برسبكتيÙ?‬ 11/17/2014 0 completed Planned Selected institutes for internship Post Firm QCBS N/A 28-Dec-14 N/A N/A N/A N/A 04-Jan-15 03-Feb-15 N/A N/A 01-Mar-15 19 Revised training in Sana'a/Aden (Second Actual round) Procurement Plan for Goods/Works/Non-Consulting Services Updated 10/12/2014 ** Applicable in case of Bank's prior review Document (Date)** Bid Opening (Date) Contract Currency Bid Closing (Date) No Objection from Preparation of Bid Document (Date) Evaluation Report incurred to Date Contract Signed Contractor (incl. Objection to Bid Review by Bank Name, City, and Decision (Date) Contract (Date) Prequalification Contract Award Zip Code if US) Contract Value Award (Date)** Goods/ Works/ Reference No. Completion of Bid Invitation Evaluation of and Contract (Prior/ Post) Objection to Expenditure Application Country of Bank’s No Bank’s No Method of Selection Remarks Package/ Bank for Bidding SL No. (Date) (Date) NCS Description of Goods/ Works Planned prior Shopping N/A 20-Mar-13 27-Mar-13 06-Apr-13 20-Apr-13 20-Apr-13 24-Apr-13 29-Apr-13 01-May-13 Revised prior Shopping N/A 8/25/2013 9/9/2013 9/14/2013 9/28/2013 9/28/2013 10/9/2013 10/23/2013 10/28/2013 1 CRM System goods Actual prior Shopping 21-Aug-13 28-Oct-13 10-Nov-13 20-Nov-13 04-Dec-13 12/6/2013 09-Dec-13 26,215 Extended till 01/05/2014 and N/A 9/30/2013 $ ‫Ù?وكاس سوÙ?ت نت يمن‬ 1/9/2014 26,215 Completed Planned Post Shopping N/A 20-Mar-13 27-Mar-13 06-Apr-13 20-Apr-13 20-Apr-13 24-Apr-13 29-Apr-13 01-May-13 Revised Post Shopping N/A Jun13-Sep13 N/A Jun13-Sep13 Jun13-Sep13 Jun13-Sep13 Jun13-Sep13 N/A Jun13-Sep13 11 contract/ For more Actual Purchase orders details see Post Shopping N/A Jun13 -May 14 N/A Jun13 -May 14 Jun13 -May 14 Jun13 -May 14 Jun13 -May 14 N/A Jun13 -May 14 29,814 $ (multicontract) Jun13 -May 14 29,814 Completed Annex C The line 3 has 2 Computer & office equipment/goods goods Planned been added after the approval of the Post Shopping N/A May 14-Aug 15 N/A N/A N/A N/A N/A N/A May 14-Aug 15 (multicontract) TTL Revised For more Actual 3 Purchase orders details see Post Shopping N/A Jun14 -Aug 15 N/A N/A N/A N/A N/A N/A Jun14 -Aug 15 2,585 $ (multicontract) Jun14 -Aug 15 2,585 Completed Annex E Contract Contract Completion N. Name of Consultant Award Date Contract Value $ Date Remarks Internship Advisors 1 ‫محمد خالد محمد سالم‬ 9/1/2013 18,200.00 8/31/2015 2 ‫محمد أحمد محمد العقربي‬ 9/1/2013 18,200.00 8/31/2015 3 ‫سعيد محمد سعيد حميد‬ 9/1/2013 18,200.00 8/31/2015 4 ‫محمد أحمد صالح علي‬ 9/1/2013 18,200.00 8/31/2015 ‫محمد قادري صالح محضار البان‬ 5 9/1/2013 18,200.00 8/31/2015 6 ‫أسامة عبداللطيÙ? الÙ?سيل‬ 9/1/2013 18,200.00 8/31/2015 7 ‫نوال عبداهلل أحمد اإلرياني‬ 9/1/2013 18,200.00 8/31/2015 8 ‫سمير عبداهلل قاسم الحبيشي‬ 9/1/2013 18,200.00 8/31/2015 9 ‫لميس صالح عبداهلل الحبشي‬ 9/1/2013 18,200.00 8/31/2015 10 ‫راÙ?د أمين قاسم الصبري‬ 9/1/2013 18,200.00 8/31/2015 11 ‫ميثاق عبدالرؤوÙ? أحمد الÙ?قية‬ 9/1/2013 18,200.00 8/31/2015 200,200.00 Note : 1- The consultants N. 4,9 Withdraw 2 - Variation Order for the contract N.6 Business Development plan dvisors 1 ‫محمد عمر محمد ناصر البان‬ 8/22/2013 20,000.00 8/30/2015 2 ‫وليد صالح موسى الحميري‬ 8/22/2013 20,000.00 8/31/2015 3 ‫أوسان عبدالقادر محمد سعيد‬ 8/22/2013 24,000.00 9/1/2015 4 ‫رضوان ياسين ابراهيم خان‬ 8/22/2013 20,000.00 9/1/2015 5 ‫معاذ هاشم صبري‬ 8/22/2013 30,000.00 9/1/2015 6 ‫ابراهيم هاشم يحي الشامي‬ 8/22/2013 26,000.00 9/1/2015 7 ‫لقاء عبداهلل محمد المستكا‬ 8/22/2013 25,000.00 9/1/2015 8 ‫معاذ سليم عبده قايد‬ 8/22/2013 27,000.00 9/1/2015 9 ‫انور مهيوب انعم‬ 8/22/2013 26,000.00 9/1/2015 10 ‫عبداهلل ناشر مرشد مقبل‬ 8/22/2013 28,000.00 9/1/2015 246,000.00 Note: 1- The consultants N. 7,9 Withdraw 2- The contract N. 10 has been terminated 3- The contracts below singed after some of the consultants withdraw , and added anew consltant BDP. 4 - Variation Order for the contract N.5 1 ‫أروى جار اهلل صالح جوبح‬ 2/24/2014 14,600.00 8/31/2015 Internship Advisors 2 ‫أسامة عبداهلل أحمد الجوشعي‬ 5/6/2014 23,000.00 8/31/2015 Business Development Plan Advisors 3 ‫حسين عبداهلل صالح السري‬ 5/21/2014 21,000.00 8/31/2015 Business Development Plan Advisors 4 ‫عالء محمد قائد سيÙ?‬ 6/1/2014 12,800.00 8/31/2015 Internship Advisors 5 ‫عزيز محمد سالم معاÙ?ى‬ 12/2/2014 11,280.00 8/30/2015 Business Development Plan Advisors Note: 3 - Variation Order for the contract N.3 ‫‪Contract‬‬ ‫‪Contract‬‬ ‫‪Contract‬‬ ‫‪N.‬‬ ‫‪Name of Consultant‬‬ ‫‪Completion‬‬ ‫‪Award Date‬‬ ‫‪Value $‬‬ ‫‪Date‬‬ ‫‪1‬‬ ‫اكرم جعÙ?ر احمد السقاÙ?‬ ‫‪8/22/2013‬‬ ‫‪728.00‬‬ ‫‪9/15/2013‬‬ ‫‪2‬‬ ‫ياسر محمد احمد العطاÙ?ي‬ ‫‪9/1/2013‬‬ ‫‪633.00‬‬ ‫‪9/30/2013‬‬ ‫‪3‬‬ ‫وثيق عبدالرؤوÙ? أحمد القدسي‬ ‫‪12/8/2013‬‬ ‫‪794.00‬‬ ‫‪12/21/2013‬‬ ‫‪4‬‬ ‫ياسر محمد احمد العطاÙ?ي‬ ‫‪12/8/2013‬‬ ‫‪383.00‬‬ ‫‪12/25/2013‬‬ ‫‪5‬‬ ‫وثيق عبدالرؤوÙ? أحمد القدسي‬ ‫‪1/8/2014‬‬ ‫‪564.00‬‬ ‫‪1/22/2014‬‬ ‫‪6‬‬ ‫ياسر محمد أحمد العطاÙ?ي‬ ‫‪2/25/2014‬‬ ‫‪210.00‬‬ ‫‪3/4/2014‬‬ ‫‪7‬‬ ‫يحي علي محمد االعوج‬ ‫‪12/25/2013‬‬ ‫‪600.00‬‬ ‫‪1/5/2014‬‬ ‫‪8‬‬ ‫عرÙ?ات رياض ناصر المرزوقي‬ ‫‪11/27/2013‬‬ ‫‪696.00‬‬ ‫‪12/23/2013‬‬ ‫‪9‬‬ ‫اكرم جعÙ?ر احمد السقاÙ?‬ ‫‪11/28/2013‬‬ ‫‪400.00‬‬ ‫‪12/12/2013‬‬ ‫‪10‬‬ ‫رامي خالد ابراهيم العبسي‬ ‫‪2/25/2014‬‬ ‫‪764.00‬‬ ‫‪3/17/2014‬‬ ‫‪11‬‬ ‫ياسر محمد أحمد العطاÙ?ي‬ ‫‪4/17/2014‬‬ ‫‪1,500.00‬‬ ‫‪7/17/2014‬‬ ‫‪12‬‬ ‫رامي حسين عوض عولقي‬ ‫‪4/20/2014‬‬ ‫‪1,500.00‬‬ ‫‪7/20/2014‬‬ ‫‪13‬‬ ‫عرÙ?ات رياض ناصر المرزوقي‬ ‫‪5/7/2014‬‬ ‫‪1,500.00‬‬ ‫‪7/7/2014‬‬ ‫‪10,272.00‬‬ ‫‪Contract‬‬ ‫‪Contract‬‬ ‫‪N.‬‬ ‫‪Name of supplier‬‬ ‫‪Award‬‬ ‫‪Contract Value $‬‬ ‫‪Completion‬‬ ‫‪Date‬‬ ‫‪Date‬‬ ‫‪1‬‬ ‫حديث المدينة‬ ‫‪6/2/2013‬‬ ‫‪4,342‬‬ ‫‪6/5/2013‬‬ ‫‪2‬‬ ‫المازن لمستلزمات الكمبيوتر‬ ‫‪6/12/2013‬‬ ‫‪1,680‬‬ ‫‪NA‬‬ ‫‪3‬‬ ‫الصداقة للتجارة‬ ‫‪6/15/2013‬‬ ‫‪435‬‬ ‫‪NA‬‬ ‫‪4‬‬ ‫حديث المدينة‬ ‫‪6/15/2013‬‬ ‫‪1,170‬‬ ‫‪NA‬‬ ‫‪5‬‬ ‫شركة الحظا‬ ‫‪7/6/2013‬‬ ‫‪225‬‬ ‫‪NA‬‬ ‫‪6‬‬ ‫ريم سوÙ?ت‬ ‫‪7/7/2013‬‬ ‫‪1,847‬‬ ‫‪NA‬‬ ‫‪7‬‬ ‫مؤسسة عبدالواحد‬ ‫‪7/27/2013‬‬ ‫‪750‬‬ ‫‪NA‬‬ ‫‪8‬‬ ‫المركز الرقمي للحاسوب‬ ‫‪11/17/2013‬‬ ‫‪1,470‬‬ ‫‪NA‬‬ ‫‪9‬‬ ‫مؤسسة بن ثابت للتجارة‬ ‫‪11/17/2013‬‬ ‫‪450‬‬ ‫‪NA‬‬ ‫‪10‬‬ ‫اشتري أونالين‬ ‫‪2/20/2014‬‬ ‫‪16,875‬‬ ‫‪3/19/2014‬‬ ‫‪11‬‬ ‫بي سي يونايتد‬ ‫‪4/24/2014‬‬ ‫‪570‬‬ ‫‪NA‬‬ ‫‪29,814‬‬ ‫‪Contract‬‬ ‫‪Contract‬‬ ‫‪Completion‬‬ ‫‪N.‬‬ ‫‪Name of Consultant‬‬ ‫‪Award Date‬‬ ‫‪Contract Value $‬‬ ‫‪Date‬‬ ‫‪1‬‬ ‫إدريس عبداهلل محمد حزام‬ ‫‪5/21/2014‬‬ ‫‪904.00‬‬ ‫‪6/15/2014‬‬ ‫‪2‬‬ ‫تغريد عبدالرقيب عبدالقوي العريقي‬ ‫‪7/3/2014‬‬ ‫‪3,600.00‬‬ ‫‪1/18/2015‬‬ ‫‪3‬‬ ‫ياسر محمد أحمد العطاÙ?ي‬ ‫‪7/18/2014‬‬ ‫‪1,800.00‬‬ ‫‪10/18/2014‬‬ ‫‪4‬‬ ‫رامي حسين عوض عولقي‬ ‫‪7/21/2014‬‬ ‫‪1,500.00‬‬ ‫‪10/21/2014‬‬ ‫‪5‬‬ ‫عرÙ?ات رياض ناصر المرزوقي‬ ‫‪8/10/2014‬‬ ‫‪1,500.00‬‬ ‫‪11/10/2014‬‬ ‫‪6‬‬ ‫عبداهلل علي حمود القليصي‬ ‫‪9/2/2014‬‬ ‫‪4,600.00‬‬ ‫‪9/15/2014‬‬ ‫‪7‬‬ ‫أسامة نجدي عبدالحميد أحمد‬ ‫‪9/17/2014‬‬ ‫‪750.00‬‬ ‫‪12/8/2014‬‬ ‫‪14,654.00‬‬ Contract Contract Completion N. Name of supplier Award Date Contract Value $ Date 1 ‫الذبحاني لمستلزمات الكمبيوتر‬ 6/15/2014 265 NA 2 ‫شركة الحظا لألثاث Ùˆ المÙ?روشات المحدودة‬ 6/22/2014 260 NA 3 ‫سنونو‬ 9/21/2014 2060 NA 2585 ‫‪Contract‬‬ ‫‪Contract‬‬ ‫‪N.‬‬ ‫‪Name of Consultant‬‬ ‫‪Contract Value $‬‬ ‫‪Completion‬‬ ‫‪Award Date‬‬ ‫‪Date‬‬ ‫‪1‬‬ ‫ياسر محمد أحمد العطاÙ?ي‬ ‫‪11/19/2014‬‬ ‫‪6,114.00‬‬ ‫‪8/30/2015‬‬ ‫‪2‬‬ ‫رامي حسين عوض عولقي‬ ‫‪10/23/2014‬‬ ‫‪6,140.00‬‬ ‫‪8/30/2015‬‬ ‫‪3‬‬ ‫عرÙ?ات رياض ناصر المرزوقي‬ ‫‪11/20/2014‬‬ ‫‪4,855.00‬‬ ‫‪8/30/2015‬‬ ‫‪4‬‬ ‫عبد الوهاب إسماعيل الخوالني‬ ‫‪11/11/2014‬‬ ‫‪330.00‬‬ ‫‪11/13/2014‬‬ ‫‪17,439.00‬‬