NATIONAL WATER RESOURCES MANAGEMENT PROJECT – PHASE 1 1. Procurement for the NWRMP-1 would be carried out in accordance with the World Bank’s "Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Procurement Guidelines); "Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers" dated January 2011 (Consultant Guidelines); and the provisions stipulated in the Financing Agreement. The World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credit and Grants dated October 15, 2006 and revised on January 2011, would also apply. Procurement Implementation and Arrangements 2. Procurement Arrangements: The implementation responsibility of the NWRMP-1 will lie with the DWRLI through the PIU. The main activities to be procured under the NWRMP-1 will include procurement of a digital information exchange system between DWRLI central, regional and district offices; development and implementation of a WIS; and procurement of IT hardware and software at the district irrigation offices. TA will include an assessment and strengthening of 481 WUAs; strengthening of WUA Supports Units to provide better training to WUAs; and strengthening around 29 FWUAs. 3. Shortlists composed entirely of national consultants. Short lists of consultants for services estimated to cost less than U$100,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The Bank's Standard Request for Proposal Document would be used as a base for all procurement of consultancy services to be procured under the NWRMP-1. Some of the PIU staff hired under previous projects (2OIP and WMIP would continue working for implementation of the NWRMP-1). One International consultant for basin planning and management hired under WMIP will also continue to work under NWRMP-1 as this is a natural continuation of a previous assignment. 4. Training: Training program will focus on strengthening capacity of DWRLI to use new digital information exchange system and WIS; strengthening of 481 WUAs as well WUA Supports Units and around 29 FWUAs. Training and study tours will be carried out in accordance with the training plan prepared annually and submitted to IDA for review and no-objection prior to implementation. Substantial revisions during the year will also be submitted to IDA. 5. Operating Costs: The grant will finance incremental operating costs. Operating costs will cover vehicle maintenance for PIU, fuel, utility and communication costs, translation costs, travel expenses, bank charges, office supplies, advertisement costs, printing, mail, as well as other reasonable expenditures directly associated with the implementation of the NWRMP-1. Such costs would be financed by the NWRMP-1 as per an annual budget approved by the Bank and incurred using the implementing agency’s administrative procedures. Operating cost will not include salaries of civil servants. 6. Advance Procurement: In view of short implementation period of the project, all new procurement activities will be advanced as feasible as possible in line with the agreed procurement plan. 7. Procurement Supervision and Ex-post Review: Routine procurement reviews and supervision will be provided by the procurement analyst based in the country office. In addition, two supervision missions are expected to take place per year during which ex-post reviews will be conducted for the contracts that are not subject to Bank prior review on a sample basis (20 percent in terms of number of contracts). One ex-post review report will be prepared per fiscal year, including findings of physical inspections for not less than 10 percent of the contracts awarded during the review period. 8. Procurement Thresholds and Methods of Procurement: The following methods of procurement shall be used for procurement under the NWRMP-1. It has been agreed that if a particular invitation for bid comprises of several packages, lots or slices, and invited in the same invitation for bid, then the aggregate value of the whole package determines the applicable threshold amount for procurement and also for the review by the Bank. The National Competitive Bidding (NCB) conditions will be part of Financing Agreement. 9. Procurement plan. For each contract to be financed by the Bank, the different procurement methods or consultant selection methods, the need for prequalification, estimated costs, prior review requirements, and time frame are agreed between the Government and the Bank project team in the Procurement Plan. A procurement plan has been developed covering the above procurement activities and will be agreed during negotiations. Thereafter, the plan will be updated periodically, at least once per year, and each update will be subject to the Bank’s prior review. The initial procurement plan plus the subsequent updates will be published on the Bank’s external web site in line with the requirements of Bank Guidelines. PROCUREMENT Kyrgyz Republic : NATIONAL WATER RESOURCES MANAGEMENT PROJECT PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2018-04-13 2021-03-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144336 GPN Date: 2020-10-01 Project Name: NATIONAL WATER RESOURCES MANAGEMENT PROJECT Loan / Credit No: TF / 16315 D Executing Agency(ies): epartment of Water Resources and Land Improvement WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/G/S/C.2/05 / Device Strengthening national water Request for for measuring water flow rate TF / 16315 Prior Open - International 72,235.35 Completed 2016-03-16 2016-06-09 management capacity Quotations in the canals NWRMP/G/ICB/C.1/01 / Procurement of IT equipment Strengthening national water Single Stage - One and Office equipment with TF / 16315 Prior Request for Bids Open - International 431,245.39 Completed 2016-05-25 2016-07-14 2017-04-28 management capacity Envelope preinstalled MS Office and Providing Trainings NWRMP/G/S/C1/05 / providing additional Pending equipment for server rooms Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2018-08-10 2018-09-20 2018-12-20 in north region (Air management capacity Quotations Envelope on conditioning, alarm, sensors, communication equipment) NWRMP/G/S/C1/10 / providing additional Pending equipment for server rooms Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2018-08-10 2018-09-20 2018-12-20 in south region (Air management capacity Quotations Envelope on conditioning, alarm, sensors, communication equipment) NWRMP/G/S/C1/06 / Under Instalation of digital network Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2018-08-29 2018-09-21 2018-10-15 2019-01-11 in the south region management capacity Quotations Envelope on (installation of DIN) NWRMP/G/S/C1/06-1 / Under Instalation of digital network Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2018-08-29 2018-09-21 2018-10-15 2019-01-11 in the north region management capacity Quotations Envelope on (installation of DIN) NWRMP/C3/G/S/03 / Improving irrigation Pending Purchase of 50 computers and Request for Single Stage - One TF / 16315 management by Water Users Post Open - National 0.00 Implementati 2018-08-28 2018-10-12 2018-11-12 multifunction printers for 40 Quotations Envelope Associations on RVKs, 7 OVKs and 3 AHEs NWRMP/G/S/C3/04 / Office Improving irrigation furniture and computer or Request for Single Stage - One TF / 16315 management by Water Users Post Open - National 13,755.91 Completed 2018-08-10 2018-09-20 2018-08-08 2018-11-05 2018-10-08 educational equipment for Quotations Envelope Associations WUA OSUs and RSUs NWRMP/G/S/C3/05 / Improving irrigation Request for Single Stage - One Publications_Issue of the TF / 16315 management by Water Users Post Open - National 11,520.22 Completed 2019-04-04 2019-05-11 2019-05-06 2019-06-09 2019-06-17 Quotations Envelope journal "Vestnik AVP" Associations NWRMP/G/S/C4/08 / Video Request for Single Stage - One TF / 16315 Project Management Post Open - National 66,854.92 Completed 2019-08-05 2019-08-23 2019-08-22 2019-08-29 2019-08-28 conference equipment Quotations Envelope Pending NWRMP/G/S/C1/12 / server Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2019-03-18 2019-05-02 2019-06-02 room equipment management capacity Quotations Envelope on NWRMP/G/S/C3/01-1 / Production of special clothes Improving irrigation Pending (vests, T-shirts, caps) and Request for Single Stage - One TF / 16315 management by Water Users Post Open - National 0.00 Implementati 2020-06-21 2020-07-29 2020-08-15 other information materials Quotations Envelope Associations on (backpacks, mugs, pens) with the logo Pending NWRMP-AF/C1/G/RFQ/01 / Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 Computer equipment management capacity Quotations Envelope on Pending NWRMP-AF/C1/G/RFQ/02 / Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-08-10 2020-09-21 2020-11-20 Publication management capacity Quotations Envelope on Pending NWRMP-AF/C1-1/G/RFQ/01 Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 / IT equipment and VPN management capacity Quotations Envelope on Pending NWRMP-AF/C1-1/G/RFQ/02 Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 / Vehicles for permit officers management capacity Quotations Envelope on NWRMP-AF/C1-1/G/RFQ/03 Pending Strengthening national water Request for Single Stage - One / Computers, software, TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 management capacity Quotations Envelope printers for permitting on Page 1 Pending NWRMP-AF/C1-1/G/RFQ/04 Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 / Communication campaign management capacity Quotations Envelope on NWRMP-AF/C1-2/G/RFQ/01 Pending / Monitoring equipement Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-06-25 2020-08-06 2020-10-05 (water quality, goundwater management capacity Quotations Envelope on and glaciers) NWRMP-AF/C1-2/G/RFQ/02 Pending Strengthening national water Request for Single Stage - One / Hydrological modeling TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 management capacity Quotations Envelope software on Pending NWRMP-AF/C1-2/G/RFQ/03 Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-09-18 2020-10-30 2020-12-29 / Publication of the 5 RBMP's management capacity Quotations Envelope on Pending NWRMP-AF/C1-2/G/RFQ/04 Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2021-07-26 2021-09-09 2021-11-08 / Water Atlas of Kyrgyzstan management capacity Quotations Envelope on NWRMP-AF/C1-2/G/RFQ/06 / providing additional Pending equipment for server rooms Strengthening national water Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2021-07-22 2021-09-09 2021-11-08 (Air conditioning, alarm, management capacity Quotations Envelope on sensors, communication equipment) Pending NWRMP-AF/C4/G/RFB/01 / Irrigation and Drainage Request for Single Stage - One TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 Computer equipment Management Quotations Envelope on NWRMP-AF/C4/G/RFQ/01 / Pending Irrigation and Drainage Request for Single Stage - One Inventories and digital mapas TF / 16315 Post Open - National 0.00 Implementati 2020-08-22 2020-10-20 2021-02-17 Management Quotations Envelope for 30 off-farm I&D systems on NWRMP-AF/C4/G/RFB/02 / Pending Irrigation and Drainage Single Stage - One Inventories and digital maps TF / 16315 Post Request for Bids Open - National 0.00 Implementati 2020-05-15 2020-06-05 2020-07-05 2020-07-19 2020-08-12 2020-12-10 Management Envelope for 101 WUAs on NWRMP-AF/C1-2/G/RFQ/05 Pending Strengthening national water Request for Single Stage - One / Remote Sensing Software, TF / 16315 Post Open - National 0.00 Implementati 2021-07-25 2021-09-08 2021-11-07 management capacity Quotations Envelope Hardware, Data on NWRMP-AF/C1-1/G/RFQ/05 Pending Strengthening national water Request for Single Stage - One / Remote sensing software, TF / 16315 Post Open - National 0.00 Implementati 2020-07-01 2020-08-12 2020-10-11 management capacity Quotations Envelope hardware, data on Pending NWRMP-AF/C4/G/RFB/04 / Irrigation and Drainage Single Stage - One TF / 16315 Post Request for Bids Open - International 0.00 Implementati 2021-03-31 2021-04-05 2021-05-17 2021-06-16 2021-07-21 2022-01-17 Computer equipment Management Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP-AF/C4/G/RFB/03 / Pending Inventories and digital maps Irrigation and Drainage Single Stage - One TF / 16315 Post Request for Bids Open - International 0.00 Implementati 2021-03-31 2021-04-05 2021-05-17 2021-06-16 2021-07-21 2022-01-17 for 101 WUAs and 30 off- Management Envelope on farm I&D systems CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/CS/QBS/C.1/01 / Planning, designing and Consultant implementation supervision of Strengthening national water TF / 16315 Prior Qualification Open - International 247,789.00 Completed 2015-04-13 2015-04-15 2016-02-03 a National Water Information management capacity Selection System for the Kyrgyz Republic NWRMP/C4/TR/CQS/04 / Strengthening the relationship Consultant with universities to integrate TF / 16315 Project Management Post Qualification Open - National 28,295.49 Completed 2018-08-03 2018-08-10 2018-08-10 2018-09-07 2018-10-16 2018-09-14 2018-10-18 2018-10-01 2018-10-24 2018-12-31 2018-12-10 the experience of the NWRMP- Selection 1 into university courses NWRMP-AF/CS/C1- Consultant 1/CQS/02 / TA for water Strengthening national water Pending TF / 16315 Post Qualification Open - National 0.00 2020-06-13 2020-07-04 2020-08-08 2020-08-15 2020-09-18 2021-01-16 resources fee, permits and management capacity Implementation Selection billing NWRMP-AF/CS/C1- 1/CQS/01 / Inventory of Consultant Strengthening national water Pending existing permits, water TF / 16315 Post Qualification Open - National 0.00 2020-07-10 2020-07-31 2020-08-28 2020-09-11 2020-10-15 2021-02-12 management capacity Implementation abstractions & waste water Selection discharge NWRMP-AF/CS/C1- Consultant 2/CQS/01 / Review of all Strengthening national water Pending TF / 16315 Post Qualification Open 0.00 2020-05-14 2020-06-04 2020-07-02 2020-07-29 2020-08-12 2020-11-10 existing water monitoring management capacity Implementation Selection systems (quantity & quality) NWRMP-AF/CS/C1- Strengthening national water Quality And Cost- Pending 2/CQS/02 / Feasability TF / 16315 Post Open 0.00 2020-05-18 2020-06-01 2020-06-18 2020-06-28 2020-07-08 2020-07-20 2020-08-12 2022-12-31 management capacity Based Selection Implementation studies NWRMP-AF/TR/C1-1/02 / Trainings capacity building Consultant Strengthening national water Pending and training for river basin TF / 16315 Post Qualification Open - International 0.00 2022-03-02 2022-03-23 2022-05-06 2022-06-05 2022-07-10 2022-12-31 management capacity Implementation plans; permits; water Selection accounting Page 2 NWRMP-AF/CS/C1- Consultant 2/CQS/03 / Inventory of Strengthening national water Pending TF / 16315 Post Qualification Open 0.00 2020-05-20 2020-06-10 2020-07-06 2020-07-30 2020-08-12 2020-12-10 transboundary water management capacity Implementation Selection management objects NWRMP-AF/CS/C1- Strengthening national water Quality And Cost- Pending TF / 16315 Post Open - International 0.00 2020-06-19 2020-07-10 2020-08-21 2020-09-04 2020-09-18 2020-10-05 2020-10-22 2023-02-08 1/QCBS/01 / WIS Service management capacity Based Selection Implementation NWRMP-AF/CS/C5/LCS/01 / Least Cost Pending TF / 16315 Project Management Post Open - International 0.00 2020-06-26 2020-07-17 2020-07-29 2020-08-03 2020-08-10 2020-09-14 2020-10-15 2022-12-31 Project audit Selection Implementation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NWRMP/CS/IC/C.4/01 / Individual International Team Leader for Strengthening national water TF / 16315 Prior Consultant Open 371,333.33 Completed 2015-08-21 2015-09-21 2017-12-31 National Water Resource management capacity Selection Management Project NWRMP/CS/IC/C.3/02 / Chief Individual Advisor Component 3 - Strengthening national water TF / 16315 Prior Consultant Open 186,540.80 Completed 2015-08-26 2015-09-21 2019-06-30 International Water Users management capacity Selection Association Specialist CANCELLED1 / PIU DEPUTY Strengthening national water TF / 16315 Prior Direct Selection Direct 13,443.67 Terminated 2015-04-24 DIRECTOR management capacity NWRMP/CS/SSS/C.2/01 / National Consultant Component 2 - Maintenance, Strengthening national water TF / 16315 Prior Direct Selection Direct 22,872.73 Completed 2015-12-02 2019-12-31 Operation and Management of management capacity off-farm Irrigation & Drainage systems Individual NWRMP/CS/IC/C.4/03_1 / Strengthening national water TF / 16315 Prior Consultant Open 26,426.62 Completed 2015-12-11 2015-12-16 2019-12-31 WIS Coordinator management capacity Selection NWRMP/CS/IC/C.1/01 / Chief Individual Advisor Component 1 - Strengthening national water TF / 16315 Prior Consultant Open 149,897.78 Completed 2016-04-18 2016-04-15 2018-12-31 International Water Policy & management capacity Selection Institutional expert NWRMP/CS/SSS/C.3/03 / INTERNATIONAL Strengthening national water TF / 16315 Prior Direct Selection Direct 119,830.00 Completed 2016-11-29 2018-06-30 AGRICULTURE AND WATER management capacity SECTOR ECONOMIST AND M&E Individual CANCELLED 2 / Database Strengthening national water TF / 16315 Prior Consultant Open 18,934.77 Terminated 2015-07-06 2015-06-20 Management Specialist management capacity Selection Individual NWRMP/CS/IC/C.4/03 / WIS Strengthening national water TF / 16315 Prior Consultant Open 8,310.08 Completed 2015-07-06 2015-07-01 2019-12-31 Coordinator management capacity Selection NWRMP/CS/IC/C.2/01 / Chief Advisor Component 2 - Improving irrigation service Individual International off-farm TF / 16315 delivery to Water Users Prior Consultant Open 242,681.00 Completed 2015-08-21 2015-09-21 2018-12-31 Irrigation & Drainage Associations Selection Management, Operation and Maintenance (MOM) expert Individual NWRMP/CS/IC/C.4/22 / Strengthening national water TF / 16315 Prior Consultant Open 13,672.50 Completed 2015-09-28 2015-09-28 2017-08-31 Procurement Specialist management capacity Selection Individual NWRMP/CS/IC/C.4/21 / Strengthening national water TF / 16315 Prior Consultant Open 11,954.87 Completed 2015-09-28 2015-09-28 2016-09-01 Procurement Specialist management capacity Selection NWRMP/CS/SSS/C.4/01 / Strengthening national water TF / 16315 Prior Direct Selection Direct 27,733.00 Completed 2015-12-30 2017-05-31 Contract for audit services management capacity NWRMP/CS/SSS/C.3/06 / ON- FARM IRRIGATION SYSTEM Strengthening national water MANAGEMENT, OPERATION TF / 16315 Prior Direct Selection Direct 10,784.33 Completed 2016-01-19 2019-06-30 management capacity AND MAINTENANCE SPECIALIST NWRMP/CS/SSS/C.3/06-1 / Strengthening national water ASSETS MANAGEMENT TF / 16315 Prior Direct Selection Direct 10,784.33 Completed 2016-01-19 2019-06-30 management capacity SPECIALIST NWRMP/CS/IC/C.4/06 / Individual Information Technology and Strengthening national water TF / 16315 Prior Consultant Open 20,616.39 Completed 2016-02-21 2016-02-22 2018-07-31 Local Area Network Specialist management capacity Selection (IT/LAN Specialist) NWRMP/CS/IC/C.1/05/1-1 / National Water Resources Strengthening national water Management & River Basin TF / 16315 Prior Direct Selection Direct 7,155.46 Completed 2016-09-29 2019-12-31 management capacity Management expert (River Basin Advisor) NWRMP/CS/SSS/C.1/13 / NATIONAL WATER OBJECTS Strengthening national water TF / 16315 Prior Direct Selection Direct 4,502.96 Completed 2016-10-12 2017-03-31 AND WATER SCHEMES management capacity CODING EXPERT NWRMP/CS/IC/C.1/03 / Individual International Water Resources Strengthening national water TF / 16315 Prior Consultant Open 99,647.11 Completed 2016-04-18 2016-04-15 2018-12-31 Management & River Basin management capacity Selection Management expert Page 3 NWRMP/CS/IC/C.3/05 / International On-farm Individual Irrigation and Drainage (I&D) Strengthening national water TF / 16315 Prior Consultant Open 174,403.67 Completed 2016-09-13 2016-09-19 2017-02-13 Management, Operation & management capacity Selection Maintenance (MOM) and Asset Management Expert NWRMP/CS/IC/C.1/05/1 / NATIONAL WATER RESOURCES Strengthening national water MANAGEMENT AND RIVER TF / 16315 Prior Direct Selection Direct 5,399.86 Completed 2016-09-30 2019-12-31 management capacity BASIN MANAGEMENT EXPERT (river basin modeling) NWRMP/CS/IC/C.1/04 / Individual Strengthening national water International Environmental TF / 16315 Prior Consultant Open 38,998.55 Completed 2016-07-26 2016-07-27 2018-06-18 management capacity expert Selection NWRMP/CS/SSS/C.1/12 / Strengthening national water TF / 16315 Prior Direct Selection Direct 56,395.00 Completed 2016-10-20 2018-12-31 International Water Law Expert management capacity NWRMP/CS/SSS/C.2/20 / Strengthening national water INTERNATIONAL TRAINING TF / 16315 Prior Direct Selection Direct 126,173.33 Completed 2016-10-19 2017-10-09 management capacity EXPERT Individual NWRMP/CS/IC/C.4/08 / GIS Strengthening national water TF / 16315 Prior Consultant Open 17,297.13 Completed 2016-06-03 2016-06-01 2019-12-31 SPECIALIST management capacity Selection NWRMP/CS/SSS/C.2/19 / Strengthening national water INTERNATIONAL IRRIGATION TF / 16315 Prior Direct Selection Direct 26,810.00 Completed 2016-09-29 2017-09-05 management capacity SHEDULING SPECIALIST NWRMP/CS/IC/C4 / Hiring Individual Kyrgyz language translator TF / 16315 Project Management Post Consultant Open 2,276.29 Completed 2018-08-02 2018-08-10 2018-08-31 2018-09-05 2018-09-05 2018-09-06 2018-09-10 2018-09-12 2018-12-31 2019-01-08 reminder Selection NWRMP/CS/IC/C1/8 / Individual Strengthening national water international river basin TF / 16315 Post Consultant Open 27,007.00 Completed 2018-08-03 2018-10-24 2018-08-31 2018-12-17 2018-09-04 2019-01-07 2018-09-18 2019-01-15 2018-12-31 2019-07-01 management capacity planning specialist Selection Individual NWRMP/CS/IC/C1/8-1 / Strengthening national water TF / 16315 Post Consultant Open 2,889.64 Completed 2018-08-03 2018-08-10 2018-08-29 2018-09-06 2018-09-03 2018-09-06 2018-09-11 2018-09-11 2018-12-31 2018-12-31 national GIS specialist management capacity Selection Improving irrigation service Individual NWRMP/CS/IC/C2/15-1 / TF / 16315 delivery to Water Users Post Consultant Open 2,735.52 Completed 2018-08-03 2018-08-10 2018-08-31 2018-09-07 2018-09-05 2018-09-10 2018-09-17 2018-09-17 2018-12-31 2018-12-31 National Design Engineer Associations Selection Individual NWRMP/CS/IC/C1/07 / Local Strengthening national water TF / 16315 Post Consultant Open 4,623.42 Completed 2018-08-03 2018-08-10 2018-08-28 2017-05-11 2018-09-03 2017-05-11 2018-09-17 2017-05-15 2018-12-31 2017-11-22 Environmental Expert management capacity Selection NWRMP/CS/IC/C1/8-2 / Individual Strengthening national water International expert on basin TF / 16315 Post Consultant Open 33,506.66 Completed 2018-08-20 2018-09-04 2018-09-19 2018-12-17 2018-09-26 2019-01-08 2018-10-15 2019-01-15 2018-12-31 2019-07-01 management capacity planning Selection NWRMP/CS/IC/C1/9 / Individual Strengthening national water Pending Negotiation processess TF / 16315 Post Consultant Open 0.00 2018-08-20 2018-09-19 2018-09-26 2018-10-15 2018-12-31 management capacity Implementation specialist Selection NWRMP/CS/IC/C1/10 / Individual Strengthening national water Pending Negotiation processes TF / 16315 Post Consultant Open 0.00 2018-08-20 2018-09-19 2018-09-26 2018-10-15 2018-12-31 management capacity Implementation international expert Selection NWRMP/CS/IC/C4/06 / Individual Information Technology and TF / 16315 Project Management Post Consultant Open 9,246.83 Completed 2018-08-03 2015-09-22 2018-08-27 2016-02-18 2018-08-30 2016-02-18 2018-09-13 2016-02-22 2018-12-31 2018-07-31 Local Area Network Specialist Selection (IT/LAN Specialist) NWRMP/CS/IC/C1/06-2 / Individual Strengthening national water Local specialist on Water Code TF / 16315 Post Consultant Open 6,765.60 Completed 2018-09-14 2019-02-27 2018-10-09 2017-09-26 2018-10-16 2017-09-27 2018-11-02 2017-10-03 2018-12-31 2018-07-02 management capacity and WUA Law amendments Selection NWRMP/CS/IC/C1/7 / Individual National Consultant on Strengthening national water TF / 16315 Post Consultant Limited 2,136.02 Completed 2018-10-17 2018-10-10 2018-10-19 2018-10-19 2018-10-22 2018-10-22 2018-10-26 2018-10-23 2018-12-31 2018-12-31 preparation of the meeting of management capacity Selection the National Water Council NWRMP/CS/CQS/C3/07-1 / Inventory, development of Improving irrigation asset management plans and TF / 16315 management by Water Users Post Direct Selection Direct 99,469.38 Completed 2018-08-15 2018-10-24 2018-08-31 2018-09-21 2019-02-01 2018-12-31 2019-08-22 preparation of digital maps of Associations WUAs. NWRMP/CS/IC/C1/8-3 / Individual Strengthening national water International expert on basin TF / 16315 Post Consultant Open 28,815.56 Completed 2018-11-15 2019-01-21 2018-12-14 2019-04-01 2018-12-21 2019-04-05 2019-01-11 2019-04-10 2019-06-29 2019-07-01 management capacity planning Selection NWRMP/CS/IC/C1/03 / IT Individual Strengthening national water engineer (junior specialist) TF / 16315 Post Consultant Open 2,435.00 Completed 2019-02-11 2019-02-27 2019-03-11 2019-03-25 2019-03-18 2019-03-26 2019-04-04 2019-03-27 2019-06-30 2019-07-01 management capacity and GIS Selection Individual NWRMP/CS/IC/C4/11-8 / TF / 16315 Project Management Post Consultant Open 2,875.09 Signed 2019-02-11 2019-02-27 2019-03-05 2019-02-27 2019-03-08 2019-02-27 2019-03-19 2019-02-27 2019-06-30 Translator Selection NWRMP/CS/IC/C1/7-1 / Individual National Consultant on Strengthening national water TF / 16315 Post Consultant Limited 3,992.72 Completed 2019-02-11 2019-01-16 2019-02-12 2019-02-15 2019-02-26 2019-02-15 2019-03-15 2019-02-15 2019-06-30 2019-07-02 preparation of the meeting of management capacity Selection the National Water Council NWRMP/CS/IC/C4/07 / Individual Database Management TF / 16315 Project Management Post Consultant Open 7,564.47 Completed 2015-04-14 2015-04-14 2015-06-12 2015-05-29 2015-06-12 2015-06-10 2015-07-01 2015-06-19 2019-06-30 2019-12-31 Specialist Selection Individual NWRMP/CS/IC/C4/21-1 / TF / 16315 Project Management Post Consultant Open 11,073.83 Completed 2017-01-27 2018-01-15 2017-02-28 2017-03-13 2017-03-07 2017-03-17 2017-03-29 2017-03-29 2019-06-30 2019-09-04 Procurement specialist Selection Page 4 NWRMP-AF/CS/C1/01 / Individual International Capacity Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 building and institutional management capacity Implementation Selection development expert NWRMP-AF/CS/C1/02 / Individual National Capacity building Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 and institutional development management capacity Implementation Selection expert NWRMP-AF/CS/C1/04 / Strengthening national water TF / 16315 Post Direct Selection Direct 4,950.14 Signed 2020-05-14 2020-06-19 2020-05-28 2020-06-17 2020-06-15 2020-06-29 2021-12-31 National WRM & RBM expert management capacity Individual NWRMP-AF/CS/C1-1/IC/01 / Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-15 2020-07-29 2020-08-12 2021-12-31 Remote Sensing Expert management capacity Implementation Selection NWRMP-AF/CS/C1-1/IC/02 / Individual International specialist for Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2022-12-31 Permit system design, advice, management capacity Implementation Selection software, procecures NWRMP-AF/CS/C1-2/IC/01 / Individual Strengthening national water Pending International WRM & RBM TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation expert Selection NWRMP-AF/CS/C1-1/IC/04 / Individual Strengthening national water Pending National Groundwater TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2022-12-31 management capacity Implementation specialist Selection NWRMP-AF/CS/C4/IC/04 / Irrigation and Drainage Pending TF / 16315 Post Direct Selection Direct 0.00 2020-05-14 2020-05-28 2020-06-15 2022-12-31 International MOM specialist Management Implementation NWRMP-AF/CS/C4/IC/05 / Irrigation and Drainage TF / 16315 Post Direct Selection Direct 4,950.14 Signed 2020-05-11 2020-06-19 2020-05-18 2020-06-17 2020-06-15 2020-06-29 2022-12-31 Agricultural economist Management NWRMP-AF/CS/C1-2/IC/03 / Individual Strengthening national water Pending International Hydrological TF / 16315 Post Consultant 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation modeling expert Selection NWRMP-AF/CS/C1-2/IC/04 / Individual Strengthening national water Pending International Environmental TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation expert Selection Individual NWRMP-AF/CS/C1-2/IC/05 / Strengthening national water TF / 16315 Post Consultant Open 0.00 Canceled 2020-05-14 2020-06-19 2020-06-04 2020-06-07 2020-06-15 2022-12-31 WRM & RBM expert management capacity Selection NWRMP-AF/CS/C1-2/IC/08 / Individual Strengthening national water Pending Potable and wastewater TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation expert Selection NWRMP-AF/CS/C1-2/IC/09 / Individual Strengthening national water Pending Environmental and water TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation resources monitoring expert Selection Individual NWRMP-AF/CS/C1-2/IC/10 / Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 Hydrological modeling expert management capacity Implementation Selection Individual NWRMP-AF/CS/C1-2/IC/11 / Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 Floodrisk management expert management capacity Implementation Selection Individual NWRMP-AF/CS/C1-2/IC/12 / Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 Dam expert management capacity Implementation Selection Individual NWRMP-AF/CS/C1-2/IC/13 / Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 Costing expert/engineer management capacity Implementation Selection Individual NWRMP-AF/CS/C4/IC/06 / Irrigation and Drainage Pending TF / 16315 Post Consultant Open 0.00 2020-06-08 2020-07-09 2020-07-23 2020-08-12 2022-12-31 Irrigation agronomy specialist Management Implementation Selection NWRMP-AF/CS/C4/IC/07 / Irrigation and Drainage Under TF / 16315 Post Direct Selection Direct 0.00 2020-05-20 2020-07-20 2020-06-01 2020-06-15 2022-12-31 WRM specialist Management Implementation NWRMP-AF/CS/C4/IC/08 / Irrigation and Drainage Under TF / 16315 Post Direct Selection Direct 0.00 2020-05-20 2020-07-20 2020-05-27 2020-06-15 2022-12-31 I&D infrastructure specialist Management Implementation NWRMP-AF/CS/C4/IC/09 / Irrigation and Drainage TF / 16315 Post Direct Selection Direct 4,950.14 Signed 2020-05-20 2020-06-19 2020-05-29 2020-06-17 2020-06-15 2020-06-29 2022-12-31 GIS specialist Management Individual NWRMP-AF/CS/C4/IC/10 / Irrigation and Drainage Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-29 2020-07-31 2020-08-12 2021-12-31 Financial Specialist Management Implementation Selection Individual NWRMP-AF/CS/C4/IC/11 / Irrigation and Drainage Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 WUA specialist/Engineer Management Implementation Selection Individual NWRMP-AF/CS/C4/IC/13 / Irrigation and Drainage Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 Environmental specialist Management Implementation Selection NWRMP-AF/CS/C4/IC/14 / Irrigation and Drainage Under TF / 16315 Post Direct Selection Direct 0.00 2020-05-20 2020-07-20 2020-06-01 2020-06-15 2021-12-31 MOM specialist Management Implementation NWRMP-AF/CS/C4/IC/15 / Irrigation and Drainage Under TF / 16315 Post Direct Selection Direct 0.00 2020-05-20 2020-07-20 2020-06-03 2020-06-15 2021-12-31 Irrigation Engineer Management Implementation Page 5 Individual NWRMP-AF/CS/C4/IC/03 / Irrigation and Drainage Pending TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-15 2020-07-22 2020-08-12 2021-12-31 Irrigation Engineer (Costing) Management Implementation Selection NWRMP-AF/CS/C4/IC/12 / Individual Irrigation and Drainage Pending International agricultural TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-15 2020-07-22 2020-08-12 2021-12-31 Management Implementation economist Selection NWRMP-AF/CS/C4/IC/02 / Individual Strengthening national water Pending International Institutional TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-22 2020-07-29 2020-08-12 2021-12-31 management capacity Implementation development/WUO specialist Selection NWRMP-AF/CS/C1/03 / Strengthening national water Under TF / 16315 Post Direct Selection Direct 5,914.98 2020-06-03 2020-06-19 2020-06-09 2020-06-25 2020-06-15 2023-01-23 National legal expert management capacity Implementation NWRMP-AF/CS/C1-2/DS/05 Strengthening national water TF / 16315 Post Direct Selection Direct 5,914.98 Completed 2020-06-29 2020-06-19 2020-06-29 2020-06-29 2020-06-30 2020-06-30 2022-06-30 2021-03-10 / WRM & RBM expert management capacity NWRMP-AF/CS/C4/IC/01 / Individual National Institutional Reform Strengthening national water Under TF / 16315 Post Consultant Open 0.00 2020-06-10 2020-07-24 2020-07-22 2020-07-29 2020-08-12 2023-01-29 Specialist management capacity Implementation Selection NWRMP AF NWRMP-AF/CS/C5/DS/01 / Under TF / 16315 Project Management Post Direct Selection Direct 0.00 2020-09-21 2020-09-29 2020-10-05 2020-11-12 2023-01-19 Project audit Implementation Individual NWRMP-AF/CS/C.1-2/IC/05- Strengthening national water Pending TF / 16315 Post Consultant Open 0.00 2021-03-29 2021-05-17 2021-06-07 2021-07-12 2022-06-30 1 / WRM & RBM expert management capacity Implementation Selection Page 6