Skip to Main Navigation

Africa's first bus rapid transit scheme : the Lagos BRT-Lite system (English)

Africa's first bus rapid transit (BRT) scheme began operations on March 17, 2008, in Lagos, Nigeria. Called 'BRT-Lite', it is a form of the BRT system, but it is not of the highest specification like the TransMilenio in Bogota or the Brisbane South East Busway, both of which cost about $6 million per kilometer. This new form of the BRT scheme is aimed at delivering a transport system that will meet the needs of local users, while improving citizens'...
See More

Document also available in : French

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Mobereola, Dayo.

Africa's first bus rapid transit scheme : the Lagos BRT-Lite system (English). Sub-Saharan Africa Transport Policy Program (SSATP) discussion paper ; no. 9 Washington, DC: World Bank. http://documents.worldbank.org/curated/en/874551467990345646

This document is being processed or is not available.