PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Angola : Smallholder Agriculture Development and Commercialization Project PLAN General Information Country: Angola Banks Approval Date of the Original Procurement Plan: 2016-11-14 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-09 Project ID: P154447 GPN Date: Project Name: Smallholder Agriculture Development and Commercialization Project Loan / Credit No: IBRD / 86260 Executing Agency(ies): Ministry of Agriculture - Agrarian Development Institute WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Project AO-ADI-3001-CW-DIR / PIU Pending IBRD / 86260 Management, Monitoring and Post Direct Selection Direct 12,000.00 0.00 2017-04-03 2017-04-08 2017-05-13 2017-11-09 Minor rehabilitation Luanda Implementation Evaluation AO-ADI-3002-CW-DIR / Minor Component 3: Project Pending rehabilitation of PPIU Office in IBRD / 86260 Management, Monitoring and Post Direct Selection Direct 26,000.00 0.00 2017-02-15 2017-02-20 2017-03-27 2017-09-23 Implementation Bié Evaluation AO-ADI-3003-CW-DIR / Minor Component 3: Project Pending rehabilitation of PPIU Office in IBRD / 86260 Management, Monitoring and Post Direct Selection Direct 12,000.00 0.00 2017-04-26 2017-05-01 2017-06-05 2017-12-02 Implementation Malange Evaluation Component 3: Project AO-ADI-15389-CW-DIR / Office Request for Single Stage - One Pending IBRD / 86260 Management, Monitoring and Post Limited 55,000.00 0.00 2017-05-31 2017-07-26 2018-01-22 rehabilitation UPIP Huambo Quotations Envelope Implementation Evaluation AO-ADI-48215-CW-RFB / Construction of 20 extensionist's Component 1. Capacity Building Single Stage - One Pending IBRD / 86260 Post Request for Bids Open - National 4,500,000.00 0.00 2018-11-15 2018-11-20 2019-01-01 2019-01-31 2019-03-07 2020-08-28 houses and 5 EDA offices in and Institutional Development Envelope Implementation Huambo, Malange and Bie AO-ADI-48218-CW-RFQ / Rehabilitation of EDAS's houses Component 1. Capacity Building Request for Single Stage - One Pending IBRD / 86260 Post Limited 70,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 and offices in Malange and Institutional Development Quotations Envelope Implementation (Replacement of wood columns) AO-ADI-48264-CW-RFQ / Rehabilitation/Construction of Component 1. Capacity Building Request for Single Stage - One Pending IBRD / 86260 Post Open - National 300,000.00 0.00 2018-11-05 2018-12-31 2019-12-31 irrigation infrastructures for three and Institutional Development Quotations Envelope Implementation subprojects AO-ADI-51344-CW-RFQ / Component 2. Support for Rehabilitation of the conference Request for Single Stage - One Pending IBRD / 86260 Increased Production and Post Limited 100,000.00 0.00 2018-05-21 2018-07-16 2019-01-12 room for Institute for Agriculture Quotations Envelope Implementation Commercialization Development AO-ADI-51109-CW-RFB / Component 3: Project Single Stage - One Pending Rehabilitation of the Institute for IBRD / 86260 Management, Monitoring and Post Request for Bids Open - National 100,000.00 0.00 2019-02-28 2019-03-05 2019-04-16 2019-05-16 2019-06-20 2019-12-17 Envelope Implementation Agriculture Research offices Evaluation AO-ADI-73463-CW-RFQ / Component 1. Capacity Building Request for Single Stage - One Pending Construction of IIA surrounding IBRD / 86260 Post Limited 100,000.00 0.00 2018-10-30 2018-12-25 2019-06-23 and Institutional Development Quotations Envelope Implementation wall GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1. Capacity Building AO-ADI-2999-GO-RFQ / Supply and Institutional Development Single Stage - One Under of Computers equipment and IBRD / 86260 Component 3: Project Post Request for Bids Open - National 245,000.00 0.00 2017-01-26 2017-09-21 2017-01-31 2017-03-14 2017-10-20 2017-04-13 2017-05-18 2017-11-14 Envelope Implementation Communication System (TC/IT) Management, Monitoring and Evaluation Component 1. Capacity Building and Institutional Development AO-ADI-3000-GO-UN / IBRD / 86260 Component 3: Project Prior UN Agencies (Direct) Direct 900,000.00 666,600.29 Signed 2017-01-12 2017-05-05 2017-01-17 2017-02-21 2017-06-09 2017-08-20 Procurement of Vehicles Management, Monitoring and Evaluation Component 3: Project AO-ADI-15381-GO-RFQ / Request for Single Stage - One Pending IBRD / 86260 Management, Monitoring and Post Limited 200,000.00 0.00 2017-05-30 2017-07-25 2018-01-21 Compra de viaturas UIP e UPIPs Quotations Envelope Implementation Evaluation AO-ADI-15390-GO-RFQ / Component 1. Capacity Building Request for Single Stage - One Motorbikes for support of farm IBRD / 86260 Post Limited 120,000.00 0.00 Canceled 2017-06-07 2017-07-20 2017-08-02 2018-01-29 and Institutional Development Quotations Envelope field schools AO-ADI-24495-GO-UN / Component 1. Capacity Building IBRD / 86260 Prior UN Agencies (Direct) Direct 190,000.00 108,626.19 Signed 2017-08-11 2017-08-16 2017-09-20 2017-11-15 2018-03-19 Purchase of 80 motorbikes and Institutional Development AO-ADI-48209-GO-UN / Purchase of six pick up vehicles Component 1. Capacity Building Pending IBRD / 86260 Prior UN Agencies (Direct) Direct 180,000.00 0.00 2018-08-31 2018-09-05 2018-10-10 2019-04-08 for Institute for Agronomic and Institutional Development Implementation Research AO-ADI-48213-GO-RFQ / Merchandising: Purchase of Component 1. Capacity Building Request for Single Stage - One Pending IBRD / 86260 Post Limited 60,000.00 0.00 2018-04-21 2018-06-16 2018-12-13 Caps, Vests and T-shirts with the and Institutional Development Quotations Envelope Implementation project logo AO-ADI-48212-GO-RFQ / Component 2. Support for Request for Single Stage - One Pending Purchase of office furniture for IBRD / 86260 Increased Production and Post Limited 25,000.00 0.00 2018-05-07 2018-07-02 2018-12-29 Quotations Envelope Implementation UPIP Malange Commercialization Page 1 Component 2. Support for AO-ADI-51107-GO-RFB / Increased Production and Purchase of six pick up double Commercialization cab vehicles for the Institute for IBRD / 86260 Prior Direct Selection Direct 900,000.00 0.00 Canceled 2018-03-30 2018-04-04 2018-05-09 2018-11-05 Component 3: Project Agriculture Research and 13 pick Management, Monitoring and up double cab vehicles for EDAs Evaluation AO-ADI-60244-GO-RFQ / Purchase of IT and Audio-Visual Component 2. Support for Request for Single Stage - One Pending equipment for Institute for IBRD / 86260 Increased Production and Post Limited 20,000.00 0.00 2018-05-21 2018-07-16 2018-09-14 Quotations Envelope Implementation Agriculture Development Commercialization conference room. AO-ADI-60247-GO-RFQ / Component 2. Support for Purchase of furniture for the Request for Single Stage - One Pending IBRD / 86260 Increased Production and Post Limited 15,000.00 0.00 2018-05-21 2018-07-16 2018-09-14 Institute for Agriculture Quotations Envelope Implementation Commercialization Development conference room AO-ADI-60330-GO-RFQ / Component 2. Support for Request for Single Stage - One Pending Purchase of office furniture for IBRD / 86260 Increased Production and Post Limited 25,000.00 0.00 2018-05-07 2018-07-02 2018-08-31 Quotations Envelope Implementation UPIP Huambo Commercialization AO-ADI-60332-GO-RFQ / Component 2. Support for Request for Single Stage - One Pending Purchase of office furniture for IBRD / 86260 Increased Production and Post Limited 25,000.00 0.00 2018-05-07 2018-07-02 2018-12-29 Quotations Envelope Implementation UPIP Bie Commercialization Component 2. Support for AO-ADI-70192-GO-UN / Increased Production and Purchase of six pick up double Commercialization Under cab vehicles for the Institute for IBRD / 86260 Prior UN Agencies (Direct) Direct 900,000.00 0.00 2018-07-22 2018-07-27 2018-07-27 2018-08-31 2019-02-27 Component 3: Project Implementation Agriculture Research and 13 pick Management, Monitoring and up double cab vehicles for EDAs Evaluation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AO-ADI-3010-CS-QCBS / Component 1. Capacity Building Design of Rehabilitation of feeder and Institutional Development Quality And Cost- Pending Roads and rivers crossing points, IBRD / 86260 Component 2. Support for Prior Open - International 1,200,000.00 0.00 2017-09-25 2017-10-16 2017-11-29 2017-12-27 2018-01-26 2018-03-02 2018-04-06 2019-04-06 Based Selection Implementation including work supervision in the Increased Production and Provinces Commercialization AO-ADI-3022-CS-LCS / Component 3: Project Under Financial External Audits 2017- IBRD / 86260 Management, Monitoring and Prior Least Cost Selection Open - National 120,000.00 0.00 2017-11-24 2017-06-06 2017-12-15 2018-01-28 2018-02-25 2018-03-27 2018-05-01 2018-06-05 2019-12-02 Implementation 2018 Evaluation AO-ADI-3004-CS-UN / Strengthening the Field Farmer's Component 1. Capacity Building IBRD / 86260 Prior UN Agencies (Direct) Direct 10,000,000.00 7,800,091.00 Signed 2017-01-17 2017-09-05 2017-07-16 Schools and Extensive and Institutional Development Agriculture Services AO-ADI-3005-CS-QCBS / Value Chain Services Provider for Component 2. Support for investment feasibility and design Quality And Cost- Under IBRD / 86260 Increased Production and Prior Open - International 3,000,000.00 0.00 2017-04-05 2017-11-28 2017-04-26 2018-01-19 2017-06-09 2018-05-23 2017-07-07 2017-08-06 2017-09-10 2017-10-15 2018-10-15 of small scales earth dams and Based Selection Implementation Commercialization irrigation systems in Bié, Huambo and Malange Provinces AO-ADI-3021-CS-QCBS / Survey on agricultural statistics Component 1. Capacity Building Quality And Cost- Pending IBRD / 86260 Post Open - National 380,000.00 0.00 2017-05-21 2017-06-11 2017-07-25 2017-08-22 2017-09-21 2017-10-26 2017-11-30 2018-11-30 (monitoring of crops, production, and Institutional Development Based Selection Implementation productivity, prices and markets) AO-ADI-24235-CS-QCBS / Component 1. Capacity Building Quality And Cost- Under IBRD / 86260 Post Open - National 250,000.00 0.00 2017-09-25 2017-11-24 2017-10-16 2018-01-01 2017-11-29 2018-04-10 2017-12-27 2018-04-10 2018-01-26 2018-04-16 2018-03-02 2018-04-30 2018-04-06 2019-04-06 Literacy Services Provider and Institutional Development Based Selection Implementation AO-ADI-48266-CS-QCBS / Recruitment of a consultancy firm for the design update and Component 1. Capacity Building Quality And Cost- Under IBRD / 86260 Post Open - National 100,000.00 0.00 2018-03-15 2018-02-28 2018-04-05 2018-03-28 2018-05-19 2018-06-16 2018-07-16 2018-08-20 2018-09-24 2018-12-23 supervision for the construction of and Institutional Development Based Selection Implementation 20 extensionist's houses and 05 EDA offices AO-ADI-48267-CS-QCBS / Technical Assistance support for Component 1. Capacity Building Quality And Cost- IBRD / 86260 Prior Open - International 2,300,000.00 0.00 Under Review 2018-04-30 2018-03-02 2018-05-21 2018-04-10 2018-07-04 2018-08-01 2018-08-31 2018-10-05 2018-11-09 2019-11-09 implementation of Irrigation and Institutional Development Based Selection component AO-ADI-51112-CS-QCBS / Design and supervision services Component 3: Project Quality And Cost- Pending for the rehabilitation of the IBRD / 86260 Management, Monitoring and Post Open - National 100,000.00 0.00 2018-04-27 2018-05-18 2018-07-01 2018-07-29 2018-08-28 2018-10-02 2018-11-06 2019-11-06 Based Selection Implementation Institute for Agriculture Research Evaluation offices AO-ADI-59825-CS-QCBS / Consultancy for regularization of Component 2. Support for Quality And Cost- Pending land rights (irrigation schemes) IBRD / 86260 Increased Production and Post Open - International 420,000.00 0.00 2018-05-31 2018-06-21 2018-08-04 2018-09-01 2018-10-01 2018-11-05 2018-12-10 2019-03-10 Based Selection Implementation and natural resources Commercialization management AO-ADI-65423-CS-QCBS / Consultoria para Apoiar os Component 1. Capacity Building Quality And Cost- Under Produtores de Agricultura IBRD / 86260 Post Open - National 200,000.00 0.00 2018-06-18 2018-06-14 2018-07-09 2018-08-22 2018-09-19 2018-10-19 2018-11-23 2018-12-28 2019-12-28 and Institutional Development Based Selection Implementation ã Familiar na Comercializaço da ã Produço INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Project AO-MOSAP-2951-CS-CDS / Under IBRD / 86260 Management, Monitoring and Prior Direct Selection Direct 200,000.00 380,418.25 2016-11-04 2016-11-15 2016-11-04 2016-10-21 2016-12-09 2016-11-25 2017-12-08 Project Coordinator - PIU Implementation Evaluation Component 3: Project AO-ADI-2958-CS-CDS / Finance Individual Consultant IBRD / 86260 Management, Monitoring and Prior Open 190,000.00 363,744.61 Signed 2016-11-04 2016-11-15 2016-12-23 2016-12-13 2017-01-13 2016-12-22 2017-02-17 2016-12-26 2017-08-16 Management Specialist Selection Evaluation AO-ADI-3007-CS-INDV / Component 2. Support for Individual Consultant Pending Consultant to design the markets IBRD / 86260 Increased Production and Post Open 60,000.00 0.00 2017-08-30 2017-10-18 2017-11-08 2017-12-13 2018-06-11 Selection Implementation information system Commercialization AO-ADI-3008-CS-INDV / Consultant to develop the TORs for the study and update the Component 1. Capacity Building design of houses for and Institutional Development Extensionists and design of Individual Consultant Pending IBRD / 86260 Component 2. Support for Post Open 25,000.00 0.00 2017-02-20 2017-04-10 2017-05-01 2017-06-05 2017-12-02 200km of Feeder Roads and Selection Implementation Increased Production and rivers crossing points with small Commercialization brigdes spot improvements, including respective work supervision in the Provinces AO-ADI-3011-CS-CDS / Consultant to prepare Action Component 1. Capacity Building Under Plan to serve as the basis for the IBRD / 86260 Prior Direct Selection Direct 50,000.00 0.00 2017-02-22 2017-04-11 2017-03-04 2017-04-21 2017-05-08 2017-11-04 and Institutional Development Implementation Memorandum of Understanding (MoU) between ADI and IIA. AO-ADI-3014-CS-INDV / Consultant to develop Technical Component 1. Capacity Building Individual Consultant Pending IBRD / 86260 Post Open 25,000.00 0.00 2017-04-19 2017-06-07 2017-06-28 2017-08-02 2018-01-29 Specification for IIA Malange and and Institutional Development Selection Implementation Huambo Lab equipment AO-ADI-3016-CS-INDV / Training of extensionists on Integrated Component 1. Capacity Building Individual Consultant Pending Management of Pests and safe IBRD / 86260 Post Open 40,000.00 0.00 2017-05-30 2017-07-18 2017-08-08 2017-09-12 2018-03-11 and Institutional Development Selection Implementation and secure use of chemical Pesticides AO-ADI-3018-CS-INDV / Project Component 3: Project Individual Consultant Pending Indicators outcomes' IBRD / 86260 Management, Monitoring and Post Open 60,000.00 0.00 2017-11-17 2018-01-05 2018-01-26 2018-03-02 2018-08-29 Selection Implementation assessement Evaluation AO-ADI-3019-CS-INDV / SADCP Component 3: Project Individual Consultant Pending Communication Strategies IBRD / 86260 Management, Monitoring and Post Limited 50,000.00 0.00 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 Selection Implementation development Evaluation Component 3: Project AO-ADI-3024-CS-INDV / Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 60,000.00 0.00 2017-03-20 2017-03-25 2017-04-15 2017-05-20 2019-11-16 Financial Internal Auditor Selection Implementation Evaluation AO-ADI-3025-CS-INDV / Component 3: Project Individual Consultant Monitoring and Evaluation (M&E) IBRD / 86260 Management, Monitoring and Post Open 110,000.00 180,767.99 Completed 2017-02-27 2017-02-27 2017-04-17 2017-05-08 2017-02-22 2017-06-12 2017-04-01 2017-12-09 2018-03-31 Selection Specialist Evaluation Component 3: Project AO-ADI-3026-CS-INDV / Project Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 120,000.00 0.00 2017-02-17 2017-02-22 2017-03-15 2017-04-19 2018-10-16 Agronomy Specialist Selection Implementation Evaluation Component 3: Project AO-ADI-3028-CS-INDV / Under IBRD / 86260 Management, Monitoring and Prior Direct Selection Direct 126,000.00 0.00 2016-11-24 2016-12-22 2016-12-04 2017-01-24 2017-02-07 2018-08-06 Provincial Coordinator UPIP/Bié Implementation Evaluation AO-ADI-3029-CS-INDV / Component 3: Project Individual Consultant Provincial Coordinator IBRD / 86260 Management, Monitoring and Post Limited 126,000.00 100,281.09 Signed 2017-01-16 2016-11-21 2017-01-21 2017-06-16 2017-02-11 2017-06-20 2017-03-18 2017-07-03 2018-09-14 Selection UPIP/Huambo Evaluation AO-ADI-3031-CS-INDV / Component 3: Project Individual Consultant Provincial Coordinator IBRD / 86260 Management, Monitoring and Post Limited 126,000.00 100,281.09 Completed 2017-01-17 2016-11-22 2017-01-22 2017-01-31 2017-02-12 2017-02-22 2017-03-19 2017-03-01 2018-09-15 2018-02-28 Selection UPIP/Malanje Evaluation Component 3: Project AO-ADI-3032-CS-INDV / Project Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 90,000.00 0.00 2017-02-13 2017-02-18 2017-03-11 2017-04-15 2018-10-12 Accountant for PIU Selection Implementation Evaluation AO-ADI-3034-CS-INDV / Component 3: Project Individual Consultant Assistant Project Accountant - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 51,988.95 Signed 2017-02-13 2017-02-17 2017-02-18 2017-02-19 2017-03-11 2017-02-22 2017-04-15 2017-03-01 2018-04-10 Selection Bié Evaluation AO-ADI-3035-CS-INDV / Component 3: Project Individual Consultant Pending Assistant Project Accountant - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 0.00 2017-02-13 2017-02-18 2017-03-11 2017-04-15 2018-04-10 Selection Implementation Malange Evaluation AO-ADI-3036-CS-INDV / Component 3: Project Individual Consultant Assistant Project Accountant - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 51,988.95 Signed 2017-03-13 2017-02-17 2017-03-18 2017-02-19 2017-04-08 2017-02-22 2017-05-13 2017-03-01 2018-05-08 Selection Huambo Evaluation AO-ADI-3037-CS-INDV / Component 3: Project Individual Consultant Under Procurement Assistant PIU - IBRD / 86260 Management, Monitoring and Post Limited 90,000.00 0.00 2017-02-14 2017-02-19 2017-02-27 2017-03-12 2017-04-16 2018-04-11 Selection Implementation Luanda Evaluation AO-ADI-3038-CS-INDV / Component 3: Project Individual Consultant Procurement Assistant PPIU - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 60,037.64 Terminated 2017-02-14 2017-02-17 2017-02-19 2017-02-17 2017-03-12 2017-02-22 2017-04-16 2017-03-01 2018-04-11 Selection Bié Evaluation AO-ADI-3040-CS-INDV / Component 3: Project Individual Consultant Procurement Assistant PPIU - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 60,037.00 Signed 2017-02-14 2017-01-12 2017-02-19 2017-01-28 2017-03-12 2017-02-22 2017-04-16 2017-03-01 2018-04-11 Selection Huambo Evaluation AO-ADI-3042-CS-INDV / Component 3: Project Individual Consultant Pending Procurement Assistant PPIU - IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 0.00 2017-02-14 2017-02-19 2017-03-12 2017-04-16 2018-04-11 Selection Implementation Malange Evaluation Page 3 Component 3: Project AO-ADI-3043-CS-INDV / M&E Individual Consultant IBRD / 86260 Management, Monitoring and Post Limited 80,000.00 60,037.64 Signed 2017-02-10 2017-02-17 2017-02-15 2017-02-19 2017-03-08 2017-02-22 2017-04-12 2017-03-01 2018-04-07 Officer - UPIP Bié Selection Evaluation Component 3: Project AO-ADI-3044-CS-INDV / M&E Individual Consultant IBRD / 86260 Management, Monitoring and Post Limited 80,000.00 74,525.29 Signed 2017-02-10 2017-02-17 2017-02-15 2017-02-19 2017-03-08 2017-02-22 2017-04-12 2017-03-01 2018-04-07 Officer - UPIP Huambo Selection Evaluation Component 3: Project AO-ADI-3046-CS-INDV / M&E Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 80,000.00 0.00 2017-02-10 2017-02-15 2017-03-08 2017-04-12 2018-04-07 Officer - UPIP Malange Selection Implementation Evaluation AO-ADI-3048-CS-INDV / IT Component 3: Project Individual Consultant Under Technical Assistant to Support IBRD / 86260 Management, Monitoring and Post Limited 64,000.00 0.00 2017-01-13 2017-02-20 2017-01-18 2017-02-08 2017-03-15 2018-03-10 Selection Implementation PIU and PPIUs Evaluation AO-ADI-3049-CS-INDV / Component 3: Project Individual Consultant Environmental and Social IBRD / 86260 Management, Monitoring and Post Limited 70,000.00 68,086.33 Signed 2016-12-13 2017-02-17 2016-12-18 2017-02-20 2017-01-08 2017-03-01 2017-02-12 2018-02-28 2018-02-07 Selection Safeguard Senior Specialist Evaluation AO-ADI-3050-CS-INDV / Component 3: Project Individual Consultant Pending Environmental and Social IBRD / 86260 Management, Monitoring and Post Limited 54,000.00 0.00 2017-02-15 2017-02-20 2017-03-13 2017-04-17 2018-04-12 Selection Implementation Safeguard Assistant - UPIP Bié Evaluation AO-ADI-3051-CS-INDV / Component 3: Project Environmental and Social Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 54,000.00 0.00 2017-02-15 2017-02-20 2017-03-13 2017-04-17 2018-04-12 Safeguard Assistant - UPIP Selection Implementation Evaluation Huambo AO-ADI-3052-CS-INDV / Component 3: Project Environmental and Social Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 54,000.00 0.00 2017-02-15 2017-02-20 2017-03-13 2017-04-17 2018-04-12 Safeguard Assistant - UPIP Selection Implementation Evaluation Malange Component 3: Project AO-ADI-3054-CS-INDV / Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 80,000.00 0.00 2017-02-06 2017-02-11 2017-03-04 2017-04-08 2018-04-03 Irrigation specialist Selection Implementation Evaluation Component 3: Project AO-ADI-2989-CS-INDV / Individual Consultant IBRD / 86260 Management, Monitoring and Prior Open 190,000.00 0.00 Canceled 2016-11-04 2016-11-14 2016-12-23 2016-12-02 2017-01-13 2017-02-17 2018-02-12 Procurement Specialist for UIP Selection Evaluation Component 3: Project AO-ADI-4866-CS-INDV / Individual Consultant IBRD / 86260 Management, Monitoring and Prior Limited 190,000.00 223,800.00 Signed 2016-12-22 2016-12-22 2016-12-27 2016-12-22 2017-01-17 2017-01-03 2017-02-08 2017-02-01 2018-02-03 Procurement specialist UIP Selection Evaluation Component 3: Project AO-ADI-15384-CS-INDV / Oficial Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 40,000.00 0.00 2017-05-18 2017-05-23 2017-06-13 2017-07-18 2018-01-14 de Comunicacao UPIP-Malange Selection Implementation Evaluation Component 3: Project AO-ADI-15386-CS-INDV / Oficial Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 40,000.00 0.00 2017-05-18 2017-05-23 2017-06-13 2017-07-18 2018-01-14 de comunicacao- UPIP Bie Selection Implementation Evaluation Component 3: Project AO-ADI-15387-CS-INDV / Oficial Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 40,000.00 0.00 2017-05-18 2017-05-23 2017-06-13 2017-07-18 2018-01-14 de comunicacao-UPIP Huambo Selection Implementation Evaluation AO-ADI-15388-CS-INDV / Component 3: Project Individual Consultant Pending Gestor de Base de Dados - M & IBRD / 86260 Management, Monitoring and Post Limited 48,000.00 0.00 2017-06-22 2017-06-27 2017-07-18 2017-08-22 2018-02-18 Selection Implementation E Evaluation AO-ADI-15382-CS-CDS / Component 3: Project Under Elaboracao do inquerito de linha IBRD / 86260 Management, Monitoring and Post Direct Selection Direct 300,000.00 0.00 2017-06-04 2017-10-23 2017-06-14 2017-08-18 2018-02-14 Implementation de base do SADCP Evaluation AO-ADI-23962-CS-INDV / Component 2. Support for ã Consultoria de curta duraço Individual Consultant Under IBRD / 86260 Increased Production and Post Limited 60,000.00 0.00 2017-08-07 2017-08-14 2017-08-12 2017-09-02 2017-10-07 2018-04-05 ã para apoio a elaboraço dos Selection Implementation Commercialization Subprojectos Comunitários AO-ADI-23984-CS-INDV / Component 2. Support for Individual Consultant Pending Recruitment of Assistant IBRD / 86260 Increased Production and Post Limited 20,000.00 0.00 2017-08-07 2017-08-12 2017-09-02 2017-10-07 2018-04-05 Selection Implementation Irrigation Specialist Commercialization Component 3: Project AO-ADI-24237-CS-INDV / Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 6,000.00 0.00 2017-08-20 2017-08-25 2017-09-15 2017-10-20 2018-04-18 Recruitment of IT technician Selection Implementation Evaluation AO-ADI-24241-CS-INDV / Recruitment of Consultant for Component 1. Capacity Building Individual Consultant Pending supervision of the rehabilitation of IBRD / 86260 Post Limited 5,000.00 0.00 2017-08-11 2017-08-16 2017-09-06 2017-10-11 2018-04-09 and Institutional Development Selection Implementation Project offices in Malange Province AO-ADI-24250-CS-INDV / Recruitment of consultant for Component 1. Capacity Building Individual Consultant Pending IBRD / 86260 Post Limited 5,000.00 0.00 2017-08-11 2017-08-16 2017-09-06 2017-10-11 2018-04-09 supervision of the rehabilitation of and Institutional Development Selection Implementation project office in Huambo AO-ADI-24251-CS-INDV / Recruitment of consultant for Component 1. Capacity Building Individual Consultant Pending IBRD / 86260 Post Limited 5,000.00 0.00 2017-08-11 2017-08-16 2017-09-06 2017-10-11 2018-04-09 supervision of the rehabilitation of and Institutional Development Selection Implementation the project office in Bie AO-ADI-48271-CS-INDV / Component 1. Capacity Building Individual Consultant Pending Recruitment of a rural sociologist IBRD / 86260 Post Open 45,000.00 0.00 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-12-10 and Institutional Development Selection Implementation (Bie) AO-ADI-51097-CS-INDV / Consultancy for support for Component 1. Capacity Building Individual Consultant Pending IBRD / 86260 Post Limited 45,000.00 0.00 2018-02-26 2018-03-03 2018-03-24 2018-04-28 2018-10-25 implementation of Farmer's Field and Institutional Development Selection Implementation Schools Component 3: Project AO-ADI-57764-CS-INDV / UIP- Individual Consultant Under IBRD / 86260 Management, Monitoring and Post Limited 145,000.00 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 M&A specialist Selection Implementation Evaluation Page 4 AO-ADI-60221-CS-INDV / Recruitment of a consultant for Component 2. Support for Individual Consultant Pending the design and implementation of IBRD / 86260 Increased Production and Post Limited 25,000.00 0.00 2018-04-30 2018-05-05 2018-05-20 2018-06-04 2018-09-02 Selection Implementation a revolving fund scheme - Pilot Commercialization phase AO-ADI-51540-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of the Provincial IBRD / 86260 Management, Monitoring and Post Limited 72,000.00 0.00 2018-02-28 2018-03-05 2018-03-15 2018-04-19 2019-04-19 Selection Implementation Project Coordinator for Malange Evaluation AO-ADI-48270-CS-INDV / Component 2. Support for Individual Consultant Pending Consultant for MINAGRIF Policy IBRD / 86260 Increased Production and Post Limited 100,000.00 0.00 2018-06-30 2018-07-05 2018-07-26 2018-08-30 2019-08-30 Selection Implementation analyses Commercialization AO-ADI-60234-CS-INDV / Component 3: Project Individual Consultant Recruitment of a Project IBRD / 86260 Management, Monitoring and Prior Limited 223,000.00 0.00 Canceled 2018-04-23 2018-04-28 2018-05-19 2018-06-23 2019-06-23 Selection Monitoring & Evaluation Officer Evaluation AO-ADI-48268-CS-INDV / Preparation of 4-year action plan Component 1. Capacity Building Individual Consultant Pending for institutional development and IBRD / 86260 Post Limited 190,000.00 0.00 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2019-05-10 and Institutional Development Selection Implementation an agreement with GEPE and Ministry of Trade AO-ADI-61217-CS-INDV / Component 2. Support for Individual Consultant Under Recruitment of an agrobusiness IBRD / 86260 Increased Production and Post Limited 190,000.00 0.00 2018-05-02 2018-06-14 2018-05-07 2018-05-28 2018-07-02 2019-07-02 Selection Implementation specialist Commercialization Component 3: Project AO-ADI-62224-CS-INDV / Individual Consultant Pending IBRD / 86260 Management, Monitoring and Post Limited 80,000.00 0.00 2018-05-11 2018-05-16 2018-06-06 2018-07-11 2019-01-07 Assessor técnico da UIP Selection Implementation Evaluation AO-ADI-73458-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of a Project IBRD / 86260 Management, Monitoring and Post Limited 126,000.00 0.00 2018-08-11 2018-08-16 2018-09-06 2018-10-06 2019-10-06 Selection Implementation coordinator for Bie Evaluation AO-ADI-73502-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of an Agronomist for IBRD / 86260 Management, Monitoring and Post Limited 110,000.00 0.00 2018-08-27 2018-09-01 2018-09-22 2018-10-12 2019-10-12 Selection Implementation PIU Evaluation AO-ADI-73504-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of an Agronomist for IBRD / 86260 Management, Monitoring and Post Limited 67,100.00 0.00 2018-08-27 2018-09-01 2018-09-22 2018-10-12 2019-10-12 Selection Implementation PPIU Evaluation AO-ADI-73506-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of an agronomist for IBRD / 86260 Management, Monitoring and Post Limited 67,100.00 0.00 2018-08-27 2018-09-01 2018-09-22 2018-10-12 2019-10-12 Selection Implementation PPIU (Bie) Evaluation AO-ADI-73507-CS-INDV / Component 3: Project Individual Consultant Pending Recruitment of an agronomist for IBRD / 86260 Management, Monitoring and Post Limited 67,100.00 0.00 2018-08-27 2018-09-01 2018-09-22 2018-10-12 2019-10-12 Selection Implementation PPIU (Huambo) Evaluation Page 5