I Table of Contents RP202 VOL. 7 i Volume 2 Policy Attached Table -Attached Table 2.4.9 -Attached Table 2.4 Volume 5 Affached Table of Chapter 2 to 11 (Continued) -Dashadi -2.1.4.2AC -2.1 .4.2ACBD -2.1 .4.2BD -2.1 .5.2AC -2.1 .5.2ACBD -2.1 .5.2BD -3.1.1.1 -3.1.1.2 -3.1.1.3 -3.1.1 -3.1.2.1 -3.1.2.2 -3.1.2.3 -3.1.2 -3.1.3.1 -3.1.3.2 -3.1.3.3 -4.1.1.2 -4.1.2.2 -4.1.3.2 -5.1.1.2 -5.1.2.2 -5.1.3.2 -6.1.1.2 -7.1.1ACBD -7.1.4 -7.1.5 -7.1.6 -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Liede WWTS (phase l1l) -1.7.1 -1.71 Area of land borrowed -1.7.1 Area of land equisition -1.7.2 -1.7.3 -1.7.4 2 ;I -10.1 -1 1.1 -2.1.3.2AC -Liede WWTS (phase 111) -- continued -2.1.3.2ACBD -2.1.3.2BD -2.1.4.2AC -2.1.4.2ACBD -2.1.4.2BD -2.1.5.2AC -2.1.5.2ACBD -2.1.5.2BD -3.1.1.1 -3.1.1.2 -3.1.1.3 -3.1.1 -3.1.2.1 -3.1.2.2 -3.1.2.3 -3.1.2 -3.1.3.1 -3.1.3.2 -3.1.3.3 -4.1.1.2 -4.1.2.2 -4.1.3.2 -5.1.1 -5.1.2 -5.1.3 -6.1.1 -7.1.1ACBD -7.1.4 -7.1.5 -7.1.6 -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Sewage Networks -1.7.1 -1.7.2 -1.7.3 -1.7.4 -10.1.1 3 -Sewage Networks (continued) -10.1.2 -10.1.3 -10.1.4 -11.1 -2.1.3.1.1BD -2.1.3.2.1AC -2.1.3.2.2BD -2.1.3.2AC -2.1.3.2BD -2.1.3.4.AC -2.1.3.4.BD -2.1.3.AC -2.1.3.BC -2.1.4 AC -2.1.4 BD -2.1.4.1.AC -2.1.4.1.BD -2.1.4.2.AC -2.1.4.2.BD -2.1.4.3AC -2.1.4.3BD -2.1.4.4.AC -2.1.4.4.BD -2.1.5.1.BD -2.1.5.2.AC -2.1.5.2.BD -2.1.5.3AC -2.1.5.3BD -2.1.5.4.BD -3.1.1.2.1 -3.1.1.2.2 -3.1.1.2.3 -3.1.1.3.1 -3.1.1.3.2 -3.1.1.3.3 -3.1.1.4.1 -3.1.1.4.2 -3.1.1.4.3 -3.1.1 -3.1.2.1.1 -3.1.2.1.2 -3.1.2.1.3 -3.1.2.2.1 -3.1.2.2.2 4 -3.1.2.2.3 -3.1.2.3.1 -3.1.2.3.2 -Sewage Networks (continued) -3.1.2.3.3 -3.1.2.4.1 -3.1.2 -3.1.3.1.2 -3.1.3.2.2 -3.1.3.2.3 -3.1.3.3.1 -3.1.3.3.2 -3.1.3.3.3 -3.1.3.4.1 -3.1.3.4.2 -3.1.3.4.3 -4.1.1.1.2 -4.1.1.2 -4.1.1.3 -4.1.1.4 -4.1.2.2 -4.1.2.3 -4.1.2.4 -4.1.3.2 -4.1.3.3 -4.1.3.4 -5.1.1.1 -5.1.1.2 -5.1.1.3 -5.1.1.4 -5.1.2.2 -5.1.2.3 -5.1.2.4 -5.1.3.1 -5.1.3.2 -5.1.3.3 -5.1.3.4 -6.1.1.1 -6.1.1.2 -6.1.1.3 -6.1.1.4 -7.1.1.2 -7.1.1.3 -7.1.4 -7.1.5 -7.1.6 5 -Sewage Networks (continued) -7.1.7 -8.1.4 -8.1.5 -8.1.6 -8.1.7 -Solid Waste Disposal Center Project -Compensation Standard For Land -Indices For Cost Of Works (Pipeline) -Other Compensation 1 Volume 6 Attached Table of Chapter 18 -Dashadi -Dashadi AC -18.1.11AC -18.1.2.4AC -18.1.2.7.1.1 AC -18.1.2.7.1.2AC -18.1.2.7.1AC -18.1.2.8AC -18.1AC -1 8.3.2.10.1AC-1 -18.3.2.10.1 AC-2 -18.3.2.10.2.AC -18.3.2,13.AC -1 8.3.2.7.2.AC -1 8.3.2.9AC -Dashadi BD -18.1.11 BD -18.1.2.4.BD -18.1.2.7.1.1 BD -18.1.2.7.1.2BD -18.1.2.7.1.BD -18.1.2.8BD -18.1.BD -18.3.2.10.1 BD-1 -1 8.3.2.10.1 BD-2 -1 8.3.2.10.2.1BD -18.3.2.13BD -1 8.3.2.7.2.BD 6 -Liede WWTS (Phase 11I) Project -Liede WWTS (Phase 11i) Project AC -18.1.1 1AC -18.1.2.4AC -18.1.2.7.1.1 AC -18.1.2.7.1.2AC -18.1.2.7.1AC -18.1.2.8AC -18.1AC -18.3.2.10.1AC-1 -18.3.2.10.1 AC-2 -18.3.2.10.2.AC -1 8.3.2.13AC -18.3.2.7.2.AC -1 8.3.2.9AC -Liede WWTS (Phase 11I) Project BD -18.1.11BD -18.1.2.4BD -18.1.2.7.1.1BD -18.1.2.7.1.2BD -18.1.2.7.1 BD -18.1.2.8BD -18.1 BD -18.3.2.10.1 BD-1 -18.3.2.10.1BD-2 -18.3.2.10.2.BD -18.3.2.13BD -18.3.2.7.2.BD -Sewage Networks -Datansha -Datansha AC -18.1.1 1ACO -18.1.2.4AC -18.1.2.7.1.1AC1 -18.1.2.7.1.2AC -18.1.2.7.1 AC -18.1.2.8AC -18.1AC -18.3.2.10.1.1AC-1 -18.3.2.10.1.1AC-2 -18.3.2.10.2.1 AC -18.3.2.13AC - 1 8.3.2.7.2.1 AC 7 -Datansha AC (continued) -18.3.2.9.1 AC -Datansha BD -18.1.11.1BD -18.1.1 BD -18.1.2.4.1 BD -18.1.2.7.1.1.1 BD -18.1.2.7.1.1BD -18.1.2.7.1.2.1 BD -18.1.2.8.1 BD -18.3.2.10.1.1 BD-1 -18.3.2.10.1.1 BD-2 -18.3.2.10.2.1 BD -18.3.2.13.1 BD -18.3.2.7.2.1 BD -Liede WWTS Phase I and 11 -Liede WWTS Phase I and 11 AC -18.1.11.4AC -18.1.2.4.4AC - 18.1.2.7.1.1.4AC - 18.1.2.7.1.2.4AC -18.1.2.7.1.4AC -18.1.2.8.4AC -18.1.4AC -18.3.2.10.1.4AC-1 -18.3.2.10.1.4AC-2 -18.3.2.10.2.4AC -18.3.2.13.4AC -1 8.3.2.7.2.4AC -1 8.3.2.9.4AC -Liede WWTS Phase I and 11 BD -18.1.11.4BD -18.1.2.4.4BD -18.1.2.7.1.1.4BD -18.1.2.7.1.2.4BD -18.1.2.7.1.4BD -18.1.2.8.4BD -18.1.4BD -18.3.2.10.1.4BD-1 -18.3.2.10.1.4BD-2 -18.3.2.10.2.4BD -18.3.2.13.4BD 8 -Liede WWTS Phase I and 11 BD (continued) -18.3.2.7.2.4BD -Lijiao -Lijiao AC -18.1.11.2AC -18.1.2.4.2AC -18.1.2.7.1.1.2AC -18.1.2.7.1.2.2AC -18.1.2.7.1.2AC -18.1.2.8.2AC -18.1.2AC -18.3.2.10.1.2AC-1 -18.3.2.10.1.2AC-2 -18.3.2.10.2.2AC -18.3.2.13.2AC -1 8.3.2.7.2.2AC -1 8.3.2.9.2AC -Lijiao BD -18.1.11.2BD -18.1.2.4.2B0D -18.1.2.7.1.1.2BD -18.1.2.7.1 .2.2BD -18.1.2.7.1..2BD -18.1.2.8.2BD -18.1.2BD -18.3.2.10.1.2BD-1 -18.3.2.10.1.2BD-2 -18.3.2.10.2.2BD -18.3.2.103.2BD -18.3.2.7.2.2BD -Xilang -Xilang AC -18.1.11.3AC -18.1.2.4.3AC -18.1.2.7.1.1.3AC - 18.1.2.7.1 .2.3AC -18.1.2.7.1..3AC -18.1.2.8.3AC -18.1..3AC -18.3.2.10.13.3AC-1 -18.3.2.10.1.3AC-2 -18.3.2.10.2.3AC -18.3.2.103.3AC 9 -Xilang AC (continued) -1 8.3.2.7.2.3AC -1 8.3.2.9.3AC -Xilang BD -18.1.11.3BD -1 8.1 .2.4.3BD -18.1.2.7.1.1 .3BD -18.1 .2.7.1 .2.3BD -18.1.2.7.1 .3BD -1 8.1 .2.8.3BD -1 8.1 .3BD -18.3.2.10.1 .3BD-1 -18.3.2.10.1 .3BD-2 -18.3.2.1 0.2.3BD -18.3.2.1 3.3BD -1 8.3.2.7.2.3BD Volume 7 Attached Table of Chapter 13 -Dashadi -Compensation standard for land -Compensation standard for building -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensation1 -Other Compensation2 -Liede WWTS Phase (III) -Compensation standard for land -Compensation standard for building -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensationl -Other Compensation2 -Sewage networks -Compensation standard for land -Compensation standard for building-datansha -Compensation standard for building-Liede WWTS (phase I and 11) -Compensation standard for building-Lijiao -Compensation standard for building-Xilang -Compensation standard for the pitch of buildings -Indices for cost of works (pipeline) -Other Compensationl -Other Compensation2 10 General table of the total quantity of the land requisition and land borrowing by . ta-c-ed table 2. 4.9. 1 area for the sewage pipe network of the project District Baiyun District Fangcun District Haizhu District Hu ngpu District Area of Area of Area of land Area of Area of Area of Area of Area of land land requisitio land land land land land requisition borrowing Total area n borrowing Total area requisition borrowing Total area requisition borrowing Total area Grade 1 1,043.85 3,136.98 4,180.83 - - - 4,124.37 10,488.78 14,613.15 Grade I - - - 2,612.68 8,405.56 11,018.24 18,170.72 58,458.78 76,629.50 Grade 1 47,592.97 140,875.44 188,468.41 821.67 2,055.43 2,877.11 33,251.26 109,816.23 143,067.49 85,586.40 278,532.73 364,119.13 Grade 1 31,156.06 92,285.93 123,441.99 17,599.33 40,325.41 57,924.74 15,630.03 50,027.76 65,657.79 35,406.62 104,374.53 139,781.16 Grade I - - - 16,611.62 51,054.99 67,666.61 21,625.57 71,052.68 92,678.24 41,809.06 127,489.49 169,298.55 Grade 1 66,434.35 219,222.09 285,656.44 - - - 37,579.59 120,635.59 158,215.19 5,342.78 16,796.22 22,139.00 Total 146,227.23 455,520.44 601,747.67 37,645.31 101,841.40 139,486.70 130,381.54 420,479.82 550,861.36 168,144.86 527,192.98 695,337.84 Page I of 2 General table of the total quantity of the land requisition and land borrowing by f e t k d ti . t ~~~~~~~~~~~~~~~~~~~~~attached table 2. 4. 9. 1 ----area- -far h-eh -s-evag -p-ipe- e-tlmwork---f --th-e projec t atce al .. Tianhe District Total Area of Area of Area of land land land Area of land requisition borrowing Total area requisition borrowing Total area 502.58 1,642.98 2,145.56 14,411.75 41,801.52 56,213.27 24,960.72 71,313.02 96,273.74 45,744.12 138,177.36 183,921.47 38,082.08 .117,471.74 155,553.81 205,334.38 648,751.57 854,085.95 36,293.95 108,802.11 145,096.06 136,086.00 395,815.75 531,901.75 48,257.96 152,498.50 200,756.46 128,304.20 402,095.66 530,399.86 55,738.76 185,662.00 241,400.76 165,095.48 542,315.91 707,411.39 203,836.04 637,390.35 841,226.39 694,975.92 2,168,957.77 2,863,933.69 Page 2 of 2 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode for': MJ%eRepe2.iRe2 , 1 , .1 Total Number of Number of Floor area Floor area of Total household PAPs demolished land demolished Project use Type of demolished Quantity borrowed floor area Wholly demolished 887 962 3012 93230.5289 3 932 0.5289 Partially demolished 933 993 2615 56022.6021 n 560 2.6021 Partially Partially demolished/part demolished ially borrowed 683 1058 4110 85299.2966 29923.146 115 22.443 Pertially demolished/who Ily borrowed 387 445 1742 44031.3801 33326.0792 77 57.4593 Pertially Land borrowed 508 509 1098 C 6998.82813 69 8.82813 borrowing Wholly borrowed 27 27 50 C 358.102142 358.102142 Housing Subtotal 3425 3994 12627 278583.808 70606.1554 34 189.963 Wholly demolished 113 205 1030 9056.52101 7- 90 6.52101 Partially demolished 109 149 624 4856.72258 n 48 6.72258 Partially Partially demolished/part demolished ially borrowed 168 476 2887 20142.9745 7043.79625 27 86.7708 Pertially demolished/who lly borrowed 70 121 713 4021.59743 2904.15447 69q5.75191 Pertially Land borrowed 57 57 103 C 857.380908 857.380908 borrowing Wholly borrowed 2 3 12 El 114.26195 1 14.26195 shop Subtotal 519 1011 5369 38077.8156 10919.5936 48 397.4092 Wholly demolished 47 71 440 3724.38226 37]4.38226 Partially s demolished 50 75 462 2837.23557 E 28 7.23557 Partially e Partially demolished/part W demolished ially borrowed 42 167 1395 8401.6628 2932.97232 11334.6351 a Pertially g demolished/who e lly borrowed 8 12 96 480.051932 240.782519 720.834451 Pertially Land borrowed 23 23 42 C 204.302209 204.302209 P borrowing Wholly i _borrowed 1 1 2 n 10.5588001 10.5588001 p office Subtotal 171 349 2437 15443.3326 3388.61585 18831.9484 e Wholly demolished 96 125 409 6756.83865 El 6756.83865 Partially demolished 90 116 478 8331.37284 Li 8331.37284 e Partially Partially ePartially demolished/part t demolished ially borrowed 323 806 4556 53687.8878 20287.739 73975.6269 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode foratQahc,egie2Ai W Pertialf4 e LW O demolished/who r Illy borrowed 35 71 260 2425.16363 1712.75923 4137.92287 k Pertially Land borrowed 49 53 80 O 1029.36712 102S36712 S borrowing Wholly borrowed 2 2 2 [1 22.8831 Z|81 tory build Subtotal 595 1173 5785 71201.263 23052.7485 94254.0115 Wholly demolished 85 92 228 3231.12671 O 323 .12671 Partially demolished 26 45 216 1403.85414 O 140E .85414 Partially Partially demolished/part demolished ially borrowed 34 92 534 3518,14472 1326.7913 4844z.93601 Pertially demolished/who lly borrowed 11 18 77 647.461321 584.302877 123 1.7642 Pertially Land borrowed 15 15 25 O 190.920211 190.920211 borrowing Wholly borrowed 4 4 6 O 53.1419709 53.1419709 Other uses Subtotal 175 266 1086 8800.58689 2155.15636 109;5.7432 Wholly demolished 1228 1455 5119 115999.398 O 115099.398 Partially demolished 1208 1378 4395 73451.7872 l 734$ 1.7872 Partially Partially demolished/part demolished ially borrowed 1250 2599 13482 171049.967 61514.4449 232 64.411 Pertially demolished/who Ily borrowed 511 667 2888 51605.6544 38768.0783 903 3.7327 Pertially Land borrowed 652 657 1348 O 9280.79858 928 .79858 borrowing Wholly borrowed 36 37 72 O 558.947963 558 p47963 Subtotal Subtotal 4885 6793 27304 412106.806 110122.27 522229.075 Wholly demolished 502 630 1961 59729.29 C 5'729.29 Partially demolished 471 499 1430 27580.1554 C 27580.1554 Partially Partially demolished/part demolished ially borrowed 407 626 2203 44858.7353 18790.9677 63649.7029 Pertially demolished/who lly borrowed 236 303 1109 28483.7705 21230.0238 497.3.7942 Pertially Land borrowed 259 259 645 O 4291.849 4 .849 borrowing Wholly borrowed 10 11 1 9 C 301.7365 301.7365 Housing Subtotal 1885 2328 7367 160651.951 44614.5769 205: 66.528 Wholly demolished 52 59 247 2899.31795 O 289'.31795 Partially demolished 77 82 179 2062.90611 _ D° 2062.90611 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode foritXahqjege Partiale t W Partially demolished/part demolished ially borrowed 70 99 458 3784.25967 1619.79836 5404.05803 Pertially demolished/who lly borrowed 32 38 170 1291.98262 939.648163 223 1.63079 Pertially Land borrowed 26 26 34 o 292.631079 292 631079 borrowing Wholly borrowed 3 3 O 3 3 _ shop Subtotal 257 304 1088 10038.4663 2852.07761 12890.544 Wholly demolished 12 14 53 703.295755 o 703 .295755 Partially demolished 18 18 28 247.14174 o 24 .14174 Partially Partially demolished/part D demolished ially borrowed 21 39 250 2472.32843 759.367479 32 1.69591 Pertially a demolished/who S lly borrowed 9 9 28 205 .58722 146.43694 3 2.02416 h Pertially a Land borrowed 3 3_ 3 El 13.144723913 ____ d borrowing Wholly .borrowed O O 3 O_ O El office Subtotal 63 83 362 3628.35315 918.949142 45 7.30229 Wholly demolished 30, 31 122 2003.53882 2 023.53882 Partially r demolished 31 31 68 1226.73882 3 126.73882 0 Partially i Partially demolished/part e demolished ially borrowed 71 94 921 11068.5199 3628.71344 14697.2334 Pertially . demolished/who t lly borrowed 9 9 47 395.353521 311.876385 707.229906 Pertially Land borrowed 15 15 19 E 226.413203 226.413203 borrowing Wholly _borrowed O l O 3 O 3 tory build Subtotal 156 180 1177 14694.1511 4167.00303 18861.1541 Wholly demolished 29 30 68 1140.51786 13 1140.51786 Partially demolished 15 15 21 271.457308 El 271.457308 Partially Partially demolished/part demolished ially borrowed 16 31 116 1781.84177 617.409484 2399.25125 Pertially demolished/who lly borrowed 4 10o 36 578.09794 273.416884 851.514824 Pertially Land borrowed 5 5 7 o 86.6100714 86,6100714 borrowing Wholly borrowed l 1 2 1 O O Other uses Subtotal 69 91 248 3771.91488 977.436439 4749.35132 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode foratQehjetpAe Wholly demois U W( 625 764 2451 66475.9604 LI 66475.9604 Partially demolished 612 645 1726 31388.3994 3 31388.3994 Partially Partially demolished/part demolished ially borrowed 585 889 3948 63965.6851 25416.2564 893$1.9415 Pertially demolished/who Ily borrowed 290 369 1390 30954.7918 22901.4021 53856.1939 Pertially Land borrowed 308 308 708 3 4910.64807 4910.64807 borrowing Wholly borrowed 10 11 19 3_ 301.7365 301.7365 Subtotal Subtotal 2430 2986 10242 192784.837 53530.0431 2 6314.88 Wholly demolished 151 173 555 20149.0321 El 49.0321 Partially demolished 106 111 337 7045.57629 705.57629 Partially Partially demolished/part demolished ially borrowed 91 130 482 11590.5197 4899.09697 16489.6167 Pertially demolished/who lly borrowed 41 52 186 5363.74587 4234.43906 9598.18494 Pertially Land borrowed 98 98 243 o 1650.0769 1650.0769 borrowing Wholly borrowed 1 1 1 1 15.8857999 15l.8857999 Housing Subtotal 488 565 1804 44148.874 10799.4987 54948.3727 Wholly demolished 32 49 265 2670.97916 _ 2G70.97916 Partially demolished 25 34 169 1488.80272 3 1488.80272 Partially Partially demolished/part demolished ially borrowed 52 143 886 5324.97698 2335.14109 7660.11807 Pertially demolished/who Ily borrowed 5 18 112 678.310191 476.084958 1154.39515 Pertially Land borrowed 20 20 29 1 190.307981 190.307981 borrowing Wholly borrowed . 3 O 3 ]i El shop Subtotal 134 264 1461 10163.0691 3001.53403 13164.603' Wholly demolished 22 42 205 1557.5501 1 1557.55C Partially demolished 21 23 70 597.270684 o 597.270( Partially Partially demolished/part demolished ially borrowed 19 49 320 2172.93144 640.723822 2813.6 . Pertially demolished/who i_________ lly borrowed 8 10o 50 316.027089 241.838511 5s e Pertially d Land borrowed 6 6 11 o 87.9884324 87. General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode foiatta,eOepge2Ai borrowing FWhollelt uW . e lborrowed 2 2 7 D 51.2421998 51.2421998 P office Subtotal 78 132 663 4643.77932 1021.79296 5665.57228 Wholly demolished 60 79 251 3973.05095 2 3973.05095 r Partially 0 demolished 62 62 172 2765.41363 L 276$.41363 i Partially e Partially demolished/part demolished ially borrowed 129 197 1361 17840.2717 6428.29361 24268.5654 C Pertially t demolished/who Ily borrowed 9 1 1 71 685.628334 392.713662 1178.342 Pertially Land borrowed 22 22 23 D 144.656256 144.656256 borrowing Wholly borrowed E 1D1 U E 3 O tory build Subtotal 282 371 1878 25264.3647 6965.66353 322 0.0282 Wholly demolished 37 47 162 2305.26358 3 230 .26358 Partially demolished 9 9 25 337.345002 D 337. 45002 Partially Partially demolished/part demolished ially borrowed 14 50 246 2604.57148 991.292642 359i.86412 Pertially demolished/who lly borrowed 5 11 52 523.654504 325.122196 8'18.7767 Pertially Land borrowed 5 5 5 _ D 33.6082244 33.6082244 borrowing Wholly _borrowed D1 LI L L . L3 Other uses Subtotal 70 122 490 5770.83456 1350.02306 712 .85762 Wholly demolished 302 390 1438 30655.8759 El 306 55.8759 Partially demolished 223 239 773 12234.4083 3 122 4.4083 Partially Partially demolished/part demolished ially borrowed 305 569 3295 39533.2714 15294.5481 548 7.8195 Pertially demolished/who lly borrowed 68 102 471 7567.36599 5670.19839 132 7.5644 Pertially Land borrowed 151 151 311 El 2106.6378 21 6.6378 borrowing Wholly borrowed 3 3 8 El 67.1279997 67.1 279997 Subtotal Subtotal 1052 1454 6296 89990.9216 23138.5123 113 29.434 Wholly demolished 1540 1765 5528 173108.851 LI 173 108.851 Partially demolished 1510 1603 4382 90648.3338 L 90648.3338 Partially Partially demolished/part demolished ially borrowed 1181 1814 6795 141748.552 53613.2106 195361.762 9 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode forajXahcAeqqfie2 PertialSl l W I1( demolished/who Ily borrowed 664 800 3037 77878.8965 58790.542 136669.438 Pertially Land borrowed 865 866 1986 3 12940.754 129 0.754 borrowing Wholly borrowed 38 39 70 3 675.724442 675.7 24442 Housing Subtotal 5798 6887 21798 483384.633 126020.231 6094 4.864 Wholly demolished 197 313 1542 14626.8181 ] 1462 .8181 Partially demolished 211 265 972 8408.4314 3 840 .4314 Partially Partially demolished/part demolished ially borrowed 290 718 4231 29252.2112 10998.7357 4025 .9469 Pertially demolished/who Ily borrowed 107 177 995 5991.89025 4319.88759 1031 i.7778 Pertially Land borrowed 103 103 166 3 1340.31997 1340431997 borrowing Wholly _borrowed 2 3 12 3 114.26195 114.26195 shop Subtotal 910 1579 7918 58279.351 16773.2052 7505 2 .5562 U Wholly demolished 81 127 698 5985.22812 E 5985.22812 r Partially b demolished 89 116 560 3681.64799 3 3681. 4799 a Partially n Partially demolished/part demolished ially borrowed 82 255 1965 13046.9227 4333.06362 1737( .9863 Pertially E demolished/who n ly borrowed 25 31 174 1001.66624 629.057969 1630. 72421 V Pertially 1 Land borrowed 32 32 56 3 305.435365 305.435365 r borrowing Wholly O________ borrowed 3 3 9 3 61.8009999 61.80 9999 0 office Subtotal 312 564 3462 23715.465 5329.35796 290z 4.823 .. Wholly demolished 186 235 782 12733.4284 L 1273 .4284 m Partially e demolished 183 209 718 12323.5253 3 1232 .5253 n Partially t Partially demolished/part demolished ially borrowed 523 1097 6838 82596.6795 30344.7461 112941.426 p ~~~~~~~~~Pertially demolished/who r lly borrowed 53 91 378 3506.14549 2417.34928 5 . 77 O Pertially j Land borrowed 86 90 122 3 1400.43658 1400.43658 e borrowing Wholly C_ borrowed 2 2 2 O 22.8831 2 .8831 tory build Subtotal 1033 1724 8840 111159.779 34185.4151 14534 5.194 Wholly demolished 151 169 458 6676.90815 3 6676. 0815 Partially |demolished 50 69 262 2012.65645 3 2012.65645 General table of the grade and distribution of the PAPs, the use of buildings and the demolition mode forathcqe.we Partial e t W ( Partially demolished/part demolished ially borrowed 64 173 896 7904.55796 2935.49342 10840.0514 Pertially demolished/who Ily borrowed 20 39 165 1749.21377 1182.84196 2932 05572 Pertially Land borrowed 25 25 37 El 311.138507 311.] 38507 borrowing Wholly borrowed 4 4 6 E 53.1419709 53.1 19709 Other uses Subtotal 314 479 1824 18343.3363 4482.61586 2282 5.9522 Wholly demolished 2155 2609 9008 213131.234 Z 2131 31.234 Partially demolished 2043 2262 6894 117074.595 El 1170 74.595 Partially Partially demolished/part demolished ially borrowed 2140 4057 20725 274548.923 102225.249 3767 4.172 Pertially demolished/who Ily borrowed 869 1138 4749 90127.8122 67339.6788 1574 67.491 Pertially Land borrowed 1111 1116 2367 I 16298.0845 1629 .0845 borrowing Wholly borrowed 49 51 99 1 927.812463 927. 12463 Total Total 8367 11233 43842 694882.564 186790.825 8816 73.389 Total OntiV f m t-eetlemento qua S D.shUdi 9WTS R-m-tm.o-wpi t-k_ cl-if-fi-fp-j- M,~~~N an-d 2 %w Subtal of WWTS Solid-msetustfl-t-tCensu Total Classification of pusjeot Plans te i, I rup sio PiS twork Sbsotal Phase III ULie Dalansha Liji-o Xilaeg Su.lbtaSl T Toal IanI 59777 645 7366 677 88 44 56 0 86 5 40 167 06 300 40 1,0618 nes~~~~niti5i59o776f5l7 60316738 99 761 43304 068 Tempoarry lnd 187 55 187 55 134 20 2 69 12 54 112 45 3 41 13109 452 84 452 84 s o _ _ _llo 75.67700 8600 21,459.77 97,22277 19,776000 11800 6,87600 46,70900 2300 53,72600 170.72477 1,12840 171.85317 P Pipes rloction 66.23 00 53.545 00 120,068 00 33,799 00 5,058 00 984 00 11,41600 9 00 17,467 00 171,334 00 171,334 00 Noo alfeff ld 42 278 320 236 2 109 669 1 781 1,337 2 1.339 J N. Of .ffeded 820 942 1,762 1.014 286 2,312 2,605 5,381 13 5,394 . Ageissdure labon 1,220 9 82 1,311 115 3 4 135 142 1,568 253 1,821 Toddl nd _ 224.33 22433 19428 821 18533 16390 91 18 44862 86723 86723 v ragui 793 41 793 41 629 30 22 79 58007 518 26 256 74 1,377 86 2,800.57 2,800 57 n nro-sing 224,855 11 224.855 11 93,353.00 5.47400 168,44000 276,19700 18,39200 468,50300 786,711 11 786,711 11 pee elraniaon 65,659 00 65,659.00 25,868 00 3,279 00 37,789 00 22,308 00 6,124 00 69,500 00 161,027 00 161,027 00 p 2.7~~ ~ ~~~~~~~~~~08 2,708 1,218 58 27098 35531 3 10 5.997 9,923 -9,923 00 9 300 5282 243 10,414 13.201 807 24,6635 39,247 Agei.Wt- alaboe, 341 341 521 21 203 633 74 931 1,793 1,793 Tot.] Imd 597 77 6 45 297 99 902 21 238 84 9 07 190 73 195 57 92 24 487 61 1,628 66 300 40 1,929 06 t9a itsi-on I I I I i i I _ I Tenrp.ry lnd 98096 980 96 763 50 25 48 592 61 630 71 260 15 1.508 95 3,253 41 | 3,253.41 s o demolition 75,67700 8600 246,31488 322,07788 113,12900 5,59200 175.31600 322,90600 18,41500 522,22900 957,43588 1,12840 958,56428 Pip,ereloation 66,523 00 - 119,20400 185,727000 59,667 001 8.337 00 38,77300 33,724 00 6,13300 86,967.00 332,36100 | 332.36100 No ofaffudd 42 - 2,986 3,028 1,.454 60 2.207 4,200 311 6,778 11,260 2 11,262 ghonanltoldo _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ No ofaffeIed 820 - 10,242 11,062 6,296 249 10,700 15,513 808 27,270 44.628 13 44.641 ____ AeticulnlanInboen 1,220| 9 4231 1.652| 636| 24 2071 768 74 1,73 3.361 253 3,614 Cost estimate of resettlenient Daosu-di WWTS Reco-nslution of ,e-nge pipe netnoebs | Clasification r| No . and 2 Lt| e d | L Subtotl of WWTS Solid masse Ineatmen Censu Tonal Plan site Pump -aationa Pipe ne k Subtol p.' U.d D aha Lijio ig Subtot ThisN, s | 206,199,05890 113,834,52678 320.033.585681 119,001,586 2I ll,106,30492 23,481,58499 136,420,82332 869,32107| 171,878,03430 610,913,20618 35,341,44435 666.254,6504 Remnant Pu Csleti-mate __ - 777.843,44684 777.845,44684 1 285,837,81929 20,020,75804 485,016,737.83| 679.557,356361 63,685,72802| 1,248,280,600753 2,311.965,866.8 - 2,311,963,86688 Tota--- 206,199,058901 891,679.973621 1,097,879,03252 1 404,839.405411 .127 29 508,498.342 82 Rli978179 | 4,534939 I420.15.6333 2,922,7707298 3334,44435 2,9321837.33 General table of the land and building requisition for Dashadi WWTS plant site and pump station and the Solid Waster Treatment enterattached table 2 4.9.3 Land Unit: mu Unapproved land Type Vegetable Pound Orchard Woodland occupying by Other agricultural Subtotal Frame land plant site land structure (agricultural land) Dashadi Project (plant 117.18 12.50 59.12 - 330.36 85.06 604.22 12,696.00 site and pump) Solid Waste Disposal - 2.01 139.30 113.84 42.89 2.36 300.40 Center Project I __ __ I_ I___ _ I__ _ _ _ _ _ _ _ _ I__ _ _ _ _ I__ _ _ _ _ _ _ 904. 62 Page 1 of 2 General table of the land and building requisition for Dashadi WWTS plant site and pump station and the So6idFWaster Treatment Centerattached talble 2.4.9.3 Building Unit: m2 Composite Brick and timber Simple structure Shack Subtotal structure structure 14,011.00 14,447.00 34,523.00 - 75,677.00 504.10 624.30 1,128.40 76,181.10 Page 2 of 2