Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 May 05, 2017 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packag Domesti Review Comments No. n d es c by Bank Cost Prefere (Prior / US$ nce Post) million (yes/no) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract the NCB for Prior (Goods) Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date For the Support for the 1 Post first year preparation of 20,000 IC 21/08/15 24/09/15 Statutory Instruments (30 days) 2 Study on the definition 40,000 Post 22/04/16 of a planning CQS 25/01/16 (03 methodology at months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the (03 communes and urban months) communities 4 Study for the 20,000 IC Post 19/02/16 24/03/16 establishment of local (30 days) public service in communes 5 Study on the 40,000 CQS Post 11/04/16 18/07/16 sustainability of the (03 PNDP months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization (03 process in months) Cameroon/supports to the finalization of the national strategy for decentralization 7 Selection of a 20,000 IC Post 20/11/15 30/12/15 consultant to develop (30 days) the practitioner's manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Conventio n) 9 Training of 100,000 SSS Prior NA Service procurement provided commissions by ARMP (Conventio n) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract project for the first 2 for 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date 12 Design and 90,000 CQS Post 12/02/16 22/08/16 development of an (06 internet portal on the months) PNDP and communes 13 Translation of 90,000 CQS Post 11/05/16 20/08/16 documents (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and 70,000 QCBS Post 13/12/16 26/06/17 Social Assessment (06 months) 17 Service Follow-up of training SSS Prior NA provided deployment and by AIMF 70,000 technical assistance to expert Sim_ba software in (Conventio communes n) 18 IC Post 27/05/15 Annual contract (the 10,000 current contract ends June Insurance advice 30, 2015) 19 QCBS Post 01/12/16 16/04/16 Preparation of CDPs for 80,000 (06 the 31 communes months) May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-05-30 2021-07-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144637 GPN Date: 2016-09-06 Project Name: Community Development Program Support Project-Phase III Loan / Credit No: IDA / 57180, IDA / 62240 CELLULE REGIONALE DE COORDONATION - NORD Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CM-CRC NORD-8660-CW- RFQ / Exécution des travaux Component B: Support to Single Stage - One 2017-03- 2017-05- 2017-09- de réalisation d'un forage IDA / 57180 A posteriori Demande de prix Limited 17,000.00 0.00 Annulé the decentralization process Envelope 20 02 04 équipé de PMH au Centre de Santé Intégré de Rey Bouba CM-CRC NORD-9682-CW- RFQ / réalisation d'un forage équipé de PMH au Centre de Component B: Support to Single Stage - One 2017-03- 2017-03- 2017-05- 2017-07- 2017-07- IDA / 57180 A posteriori Demande de prix Limited 17,000.00 12,265.97 Achevé Santé Intégré de Rey Bouba, the decentralization process Envelope 20 24 02 03 03 dans la Commune de Bouba Région du Nord CM-CRC NORD-9683-CW- RFQ / construction d'un bâtiment à usage de bloc sanitaire et d'un bloc de Component B: Support to Single Stage - One 2017-04- 2017-10- 2017-05- 2018-03- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 102,000.00 93,823.74 Signé latrines à quatre the decentralization process Envelope 20 18 25 26 22 compartiments au Centre de Santé Intégré de Dembo, dans la Commune de Dembo CM-CRC NORD-9684-CW- RFQ / réalisation d'un mini AEP alimenté de Pompe à Energie Solaire au Centre de Component B: Support to Single Stage - One 2017-04- 2017-11- 2017-05- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 38,600.00 0.00 Annulé Santé Intégré de Dembo, et the decentralization process Envelope 20 15 25 22 la réalisation d'un forage équipé de PMH à l'EP de TAPAWA dans la Commune de DEMBO CM-CRC NORD-9685-CW- RFQ / construction d'un bloc de deux (02) salles de classe équipées (de 60 tables bancs, de 02 bureaux Component B: Support to Single Stage - One 2017-04- 2017-07- 2017-05- 2018-12- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 90,000.00 55,189.95 Achevé d'enseignants, 02 placards) the decentralization process Envelope 20 24 25 21 22 et d'un bloc de latrine à trois compartiments dans les écoles publiques de Laindé Tchakoum, et Tapawa dans la Commune de Dembo CM-CRC NORD-9686-CW- RFQ / construction d'un bloc de trois (03) salles de classe équipés ( de 90 tables bancs, de 03 bureaux Component B: Support to Single Stage - One 2017-04- 2017-04- 2017-04- 2017-05- 2017-05- 2017-05- 2017-05- 2017-06- 2017-07- 2017-09- IDA / 57180 A posteriori Appel d'offres Open - National 248,000.00 193,362.60 Signé d'enseignants, 03 placards) the decentralization process Envelope 17 27 20 11 24 18 31 22 19 20 et d'un bloc de latrine à trois compartiments dans les établissement suivants : 'EP de Torroye, lycee de badjouma centre,(lot 1 CM-CRC NORD-9687-CW- RFQ / construction d'un bloc de 02 salles de classes équipées ( de 60 tables bancs, de 02 bureaux Component B: Support to Single Stage - One 2017-04- 2017-10- 2017-06- 2018-04- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 98,000.00 82,806.98 Signé d'enseignants, 02 placards) the decentralization process Envelope 20 18 15 27 13 et d'un bloc de latrine à trois compartiments à l'EP DOGBA et au Lycée de GOP REY dans la Commune de Tcholliré CM-CRC NORD-9701-CW- RFQ / construction de deux forages EPMH dans les Component B: Support to Single Stage - One 2017-06- 2017-08- 2017-12- IDA / 57180 A posteriori Demande de prix Limited 35,000.00 0.00 Annulé villages de NBIEN DOLE et the decentralization process Envelope 25 20 18 BALDJOUK dans la Commune de Madingring CM-CRC NORD-9703-CW- RFQ / construction 2 blocs de 3 boutiques au marché de Component B: Support to Single Stage - One 2017-06- 2017-08- 2017-12- GOR et sorobéo et d'un bloc IDA / 57180 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé the decentralization process Envelope 25 20 18 de latrines à 6 compartiments dans la Commune de Madingring CM-CRC NORD-9707-CW- RFQ / travaux de Component B: Support to Single Stage - One 2017-06- 2017-08- 2017-12- l'aménagement de la piste IDA / 57180 A posteriori Demande de prix Limited 80,000.00 0.00 Annulé the decentralization process Envelope 25 20 18 agricole BIBEMI-MBELLA (4Km) dans la Commune de Bibémi CM-CRC NORD-9709-CW- RFQ / Construction de 04 forages EPMH à l'abattoir, Component B: Support to Single Stage - One 2017-06- 2017-08- 2017-12- IDA / 57180 A posteriori Demande de prix Limited 64,000.00 0.00 Annulé municipal, Mbaou et Mbissiri the decentralization process Envelope 25 20 18 et au lycée de GOP REY dans la Commune de Tcholliré CM-CRC NORD-9710-CW- RFQ / construction d'un Component B: Support to Single Stage - One 2017-06- 2017-11- 2017-08- 2018-04- 2017-11- forage pastoral équipé de IDA / 57180 A posteriori Demande de prix Limited 30,000.00 33,547.59 Achevé the decentralization process Envelope 25 09 20 09 18 Pompe à énergie solaire dans la commune de BASCHEO, CM-CRC NORD-9693-CW- RFQ / construction d'un magasin de stockage des Component B: Support to Single Stage - One 2017-09- 2017-06- 2017-11- 2017-12- 2018-02- IDA / 57180 A posteriori Demande de prix Limited 47,600.00 34,453.36 Achevé denrées agricoles à the decentralization process Envelope 27 02 22 20 23 DJALINGO KAPSIKI dans la Commune de Lagdo CM-CRC NORD-9692-CW- RFQ / Construction de deux blocs de 03 salles équipés et d'un bloc de latrine à 04 compartiments de l'EP GII Component B: Support to Single Stage - One 2017-04- 2017-09- 2017-06- 2018-01- 2017-09- Rabingha, (LOT 1) IDA / 57180 A posteriori Demande de prix Limited 204,000.00 144,996.25 Signé the decentralization process Envelope 22 11 17 26 18 Construction de 04 blocs de latrines dans les Ecole Publique de Gounougou, Ouro Kessoum, Nelbi, Bamé (LOT 2) et Construction un bl CM-CRC NORD-29589-CW- RFQ / Exécution des travaux de construction d'un bloc de trois (03) salles de classe Component B: Support to Single Stage - One 2017-09- 2017-09- 2017-11- 2018-01- 2018-05- équipées (de 90 tables IDA / 57180 A posteriori Demande de prix Limited 108,000.00 93,515.18 Signé the decentralization process Envelope 30 16 25 04 24 bancs, de 03 bureaux d'enseignants, 03 placards) au CES de BE et au CES de PENE dans la commune de Pitoa CM-CRC NORD-29599-CW- RFQ / Exécution des travaux de construction d'un bloc de deux salles de classe équipées et d'un bloc de Component B: Support to Single Stage - One 2017-09- 2017-11- 2018-05- latrines à trois IDA / 57180 A posteriori Demande de prix Limited 192,000.00 0.00 Annulé the decentralization process Envelope 30 25 24 compartiments dans chacune des Ecoles Publiques suivantes: EP BASSIRA, EP BOUBA DJARA, EP KOINA MAIGARI et EP MAYO MALAO dans la Commune CM-CRC NORD-29602-CW- RFQ / Exécution des travaux de construction d'un bloc de deux salles de classe équipées et d'un bloc de Component B: Support to Single Stage - One 2017-09- 2017-11- 2018-05- latrines à trois IDA / 57180 A posteriori Demande de prix Limited 62,400.00 0.00 Annulé the decentralization process Envelope 30 25 24 compartiments dans chacune des Ecoles Publiques suivantes: EP BASSIRA, EP BOUBA DJARA, EP KOINA MAIGARI et EP MAYO MALAO dans la Commune CM-CRC NORD-29603-CW- RFQ / Exécution des travaux de réalisation d'un forage Component B: Support to Single Stage - One 2017-09- 2018-01- 2017-11- 2018-07- 2018-05- équipés de PMH au CES de IDA / 57180 A posteriori Demande de prix Limited 14,800.00 24,111.47 Signé the decentralization process Envelope 30 03 25 19 24 Sanguéré Ngal dans la Commune de d'arrondissement de Garoua III CM-CRC NORD-29604-CW- RFQ / Exécution des travaux de construction d'un bloc de deux salles de classes Component B: Support to Single Stage - One 2017-09- 2018-01- 2017-11- 2018-07- 2018-05- équipées et d'un bloc de IDA / 57180 A posteriori Demande de prix Limited 44,000.00 33,971.83 Signé the decentralization process Envelope 30 03 25 23 24 latrines à quatre cabines au CES de Sangueré Ngal dans la Commune de d'arrondissement de Garoua III Page 1 CM-CRC NORD-29605-CW- RFQ / Exécution des travaux de construction d'un bloc de deux salles de classe équipées et d'un bloc de Component B: Support to Single Stage - One 2017-10- 2017-11- 2017-11- 2018-05- 2018-05- IDA / 57180 A posteriori Demande de prix Limited 48,000.00 77,820.57 Signé latrine à trois compartiments the decentralization process Envelope 01 09 26 18 25 dans les écoles publiques suivantes : EP Wouro Godjé et CES de Kerzing dans la Commune de Baschéo CM-CRC NORD-29606-CW- RFQ / Exécution des travaux de réalisation d'un forage équipé de pompe à motricité Component B: Support to Single Stage - One 2017-09- 2017-11- 2017-11- 2018-01- 2018-05- humaine à Djallou Baschéo, IDA / 57180 A posteriori Demande de prix Limited 60,800.00 63,373.17 Signé the decentralization process Envelope 30 09 25 29 24 Carrefour Baschéo , Wouro Kessoum et à EP de Wouro Godjé dans la Commune de Baschéo CM-CRC NORD-29620-CW- RFQ / Exécution des travaux réalisation d'un forage équipé de Pompe à Motricité Component B: Support to Single Stage - One 2017-10- 2017-12- 2017-11- 2018-06- 2018-05- Humaine dans chacune des IDA / 57180 A posteriori Demande de prix Limited 79,000.00 53,255.14 Signé the decentralization process Envelope 01 07 26 11 25 localités de: Ouro Siddiki, Djabawa, Djamtari, Waffango, Boumré, Tcharatché Gadamayo dans la commune de Barndaké CM-CRC NORD-29621-CW- RFQ / Exécution des travaux de construction d'un bloc de Component B: Support to Single Stage - One 2017-10- 2017-12- 2017-11- 2018-05- 2018-05- deux salles de classe IDA / 57180 A posteriori Demande de prix Limited 48,000.00 69,024.52 Signé the decentralization process Envelope 01 07 26 11 25 équipés à EP de Guibdjol et à EP de Guereté dans la Commune de Barndaké CM-CRC NORD-29623-CW- RFQ / Exécution des travaux de construction d'un bloc de deux salles de classe Component B: Support to Single Stage - One 2017-10- 2017-11- 2018-05- équipées et et d'un bloc de IDA / 57180 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé the decentralization process Envelope 02 27 26 latrines à trois compartiments à Ecole Publique de DOUBBI et à l'Ecole Publique de SORA dans la Commune de Mayo- Oulo CM-CRC NORD-49988-CW- RFQ / Exécution des travaux de réalisation d'un forage Component A: Local Single Stage - One 2018-03- 2018-04- 2018-03- 2018-06- IDA / 57180 A posteriori Demande de prix Open - National 14,759.00 12,898.09 Signé équipé de pompe à motricité development support Envelope 03 28 26 27 humaine à l'EP de Tapawa dans la Commune de Dembo CM-CRC NORD-29581-CW- RFQ / Exécution des travaux de construction d'un bloc de Component A: Local Single Stage - One 2018-03- 2018-04- 2018-05- 2018-07- 2018-08- deux (02) salles de classe IDA / 57180 A posteriori Demande de prix Limited 72,000.00 31,905.69 Signé development support Envelope 06 07 01 28 29 équipées à l'EP Bilingue de Badjouma dans la commune de Pitoa CM-CRC NORD-9696-CW- RFQ / construction d'un bâtiment à usage de Centre Component A: Local Single Stage - One 2018-03- 2018-08- 2018-04- 2018-10- 2018-08- de Santé Intégré avec latrines IDA / 57180 A posteriori Demande de prix Limited 106,000.00 94,823.67 Signé development support Envelope 05 24 30 18 28 à quatre Compartiments à DOUNDEHI dans la Commune de Touroua, Région du Nord CM-CRC NORD-9690-CW- RFQ / réalisation d'un mini AEP alimenté de Pompe à Component A: Local Single Stage - One 2018-03- 2018-03- 2018-04- 2018-09- 2018-08- Energie Solaire au Centre de IDA / 57180 A posteriori Demande de prix Limited 28,000.00 25,100.37 Signé development support Envelope 05 14 30 24 01 Santé Intégré de de Mayo Galké dans la commune de tchollire CM-CRC NORD-9698-CW- RFQ / construction d'un mini AEP à Energie solaire au Component A: Local Single Stage - One 2018-03- 2018-08- 2018-04- 2018-10- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 26,000.00 24,063.06 Signé Centre de Santé de development support Envelope 05 24 30 17 28 DOUNDEHI dans la commune de Touroua CM-CRC NORD-9699-CW- RFQ / construction et équipement d'un bloc de Component A: Local Single Stage - One 2018-05- 2018-12- 2018-07- 2019-01- 2018-11- deux (02) salles de classe IDA / 57180 A posteriori Demande de prix Limited 96,000.00 41,565.99 Signé development support Envelope 16 14 11 23 08 avec latrines EP BIYAOU,moudouk,dans la Commune de Madingring CM-CRC NORD-9695-CW- RFQ / Electrification des quartiers Mboum Aviation et Component A: Local Single Stage - One 2018-03- 2018-07- 2018-04- 2018-11- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 62,000.00 49,210.48 Signé Ouro Alhadji dans la development support Envelope 05 31 30 27 01 Commune de Garoua 2, Région du Nord CM-CRC NORD-8659-CW- RFQ / Exécution des travaux de construction et équipement d'un bâtiment à Component A: Local Single Stage - One 2018-03- 2018-02- 2018-04- 2018-05- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 113,000.00 96,974.25 Signé usage de bloc sanitaire et development support Envelope 13 23 24 28 24 d'un bloc de latrines à quatre compartiments au Centre de Santé Intégré de Rey Bouba CM-CRC NORD-9688-CW- RFQ / construction et équipement d'un bâtiment à usage de bloc sanitaire et Component A: Local Single Stage - One 2018-03- 2018-03- 2018-04- 2018-09- 2018-08- IDA / 57180 A posteriori Demande de prix Limited 117,000.00 97,185.28 Signé d'un bloc de latrine à quatre development support Envelope 05 22 30 24 29 compartiments au Centre de Santé Intégré à Mayo GALKE dans la Commune de Tcholliré CM-CRC NORD-9706-CW- RFQ / construction d'un bloc Component A: Local Single Stage - One 2018-03- 2018-06- 2018-05- 2018-10- 2018-08- de 02 salles de classes avec IDA / 57180 A posteriori Demande de prix Limited 46,000.00 56,066.58 Achevé development support Envelope 11 18 06 08 04 latrines au CES Bilingue de Bibémi CM-CRC NORD-9705-CW- RFQ / réalisation d'un forage au CES Bilingue de Bibémi, et exécution des travaux de la Component A: Local Single Stage - One 2018-03- 2018-08- 2018-04- 2018-10- 2018-07- IDA / 57180 A posteriori Demande de prix Limited 39,000.00 49,494.54 Signé construction d'un forage de development support Envelope 05 15 30 30 29 pastoral équipé de PMH et 04 abreuvoirs à BIDE HAMADICKO dans la commune de Bibémi, CM-CRC NORD-59279-CW- RFQ / Exécution des travaux de Aménagement du stade par la Construction d’une Component A: Local Single Stage - One 2018-06- 2018-12- 2018-08- 2019-01- 2018-12- IDA / 57180 A posteriori Demande de prix Limited 82,503.16 65,773.46 Signé tribune et d’un bloc de development support Envelope 16 14 11 23 09 latrine a six compartiment au stade municipal de BEKA dans la Commune de BEKA CM-CRC NORD-58618-CW- RFQ / Construction d’un Component A: Local Single Stage - One 2018-06- 2018-12- 2018-08- 2019-01- 2019-02- forage équipé de PMH au IDA / 57180 A posteriori Demande de prix Limited 15,535.77 13,156.06 Signé development support Envelope 16 14 11 28 07 stade de BEKA dans la Commune de BEKA CM-CRC NORD-59518-CW- RFQ / Construction d’un bloc de deux (02) salles de Component A: Local Single Stage - One 2018-06- 2018-10- 2018-08- 2019-02- 2019-02- classes équipées de (60) IDA / 57180 A posteriori Demande de prix Limited 43,531.88 39,288.10 Signé development support Envelope 16 02 11 19 07 tables bancs à l' Ecole Publique de BADIA, dans la Commune de Figuil, Région du Nord CM-CRC NORD-58626-CW- RFQ / Réalisation d'un forage productif équipé de pompe à motricité humaine dans Component A: Local Single Stage - One 2018-06- 2018-12- 2018-08- 2019-03- 2019-02- chacune des Ecoles IDA / 57180 A posteriori Demande de prix Limited 44,935.00 40,626.37 Signé development support Envelope 18 20 13 12 09 Publiques de BADIA, DAWALA-BIDZAR , et DIKTINGUE dans la Commune de Figuil, Région du Nord CM-CRC NORD-59275-CW- RFQ / Construction d’un bloc de deux salles de classe équipées et d'un bloc de Component A: Local Single Stage - One 2018-06- 2019-02- 2018-08- 2019-05- 2019-02- latrine à 3 compartiments IDA / 57180 A posteriori Demande de prix Limited 90,346.09 33,161.33 Signé development support Envelope 18 04 13 06 09 dans les écoles publiques de HOSSERE FAOUROU et de YARMI dans la Commune de Gaschiga CM-CRC NORD-58482-CW- RFQ / Construction d’un forage équipé de PMH dans Component B: Support to Single Stage - One 2018-05- 2019-02- 2018-07- 2019-05- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 29,404.80 41,238.34 Signé les Ecoles publique de the decentralization process Envelope 12 04 07 07 03 HOSSERE FAOUROU et de YARMI dans la Commune de Gaschiga Page 2 CM-CRC NORD-58525-CW- RFQ / Construction et équipement d'un bloc de deux salles de classe et Component A: Local Single Stage - One 2018-05- 2018-10- 2018-07- 2018-11- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 45,976.76 36,240.00 Signé d'un bloc de latrine à trois development support Envelope 12 26 07 20 03 compartiments à l'EP de BASSIRA, dans la Commune de Guider CM-CRC NORD-59257-CW- RFQ / Réalisation d'un forage Component A: Local Single Stage - One 2018-05- 2018-09- 2018-07- 2018-12- 2019-01- équipé de PMH à l'EP de IDA / 57180 A posteriori Demande de prix Limited 15,193.13 12,050.51 Signé development support Envelope 14 25 09 27 05 BASSIRA, dans la Commune de Guider CM-CRC NORD-59271-CW- RFQ / Construction d’un magasin de stockage des Component A: Local Single Stage - One 2018-05- 2018-12- 2018-07- 2019-02- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 48,500.00 32,878.55 Achevé produits agricoles à LAINDE development support Envelope 14 14 09 05 05 KEREWA dans la Commune de NGONG CM-CRC NORD-58662-CW- RFQ / Construction d’un Component A: Local Single Stage - One 2018-05- 2018-12- 2018-07- 2019-01- 2019-01- hangar de 28 comptoirs au IDA / 57180 A posteriori Demande de prix Limited 53,000.00 28,139.32 Signé development support Envelope 16 14 11 31 07 marché de LANGUI dans la Commune de NGONG CM-CRC NORD-59522-CW- RFQ / Electrification par les lampadaires solaires de Component A: Local Single Stage - One 2018-05- 2018-07- 2018-07- 2018-09- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 57,000.00 55,154.88 Signé certains artères de la ville de development support Envelope 16 19 11 25 07 POLI dans la Commune de POLI CM-CRC NORD-59256-CW- RFQ / Achèvement des travaux de réhabilitation des Component A: Local Single Stage - One 2018-05- 2018-07- 2018-07- 2018-10- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 87,000.00 60,325.65 Signé piste agricoles dans la development support Envelope 16 31 11 23 07 Commune de d'Arrondissement de Garoua II CM-CRC NORD-59253-CW- RFQ / Construction d'un bâtiment à usage de CSI au Component A: Local Single Stage - One 2018-05- 2018-03- 2018-07- 2018-09- 2019-01- IDA / 57180 A posteriori Demande de prix Limited 120,000.00 98,796.18 Signé Centre de Santé Intégré de development support Envelope 16 22 11 24 07 de Mayo Galké dans la Commune de Tchollire CM-CRC NORD-58546-CW- RFQ / Réalisation d'un mini AEP alimenté de Pompe à Component A: Local Single Stage - One 2018-05- 2018-03- 2018-07- 2018-09- 2019-01- Energie Solaire au Centre de IDA / 57180 A posteriori Demande de prix Limited 40,000.00 24,130.18 Signé development support Envelope 16 14 11 24 07 Santé Intégré de de Mayo Galké dans la Commune de Tchollire CM-CRC NORD-59525-CW- RFQ / Exécution des travaux de construction et Component A: Local Single Stage - One 2018-05- 2018-06- 2018-07- 2018-10- 2019-01- équipement d'un bloc de 03 IDA / 57180 A posteriori Demande de prix Limited 60,000.00 55,881.25 Signé development support Envelope 16 18 11 03 07 salles de classes avec latrines au CES Bilingue de Bibémi dans la Commune de Bibemi CM-CRC NORD-59248-CW- RFQ / Réalisation d'un forage au CES Bilingue de Bibémi, et exécution des travaux de la Component A: Local Single Stage - One 2018-05- 2018-08- 2018-07- 2018-10- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 58,000.00 49,135.91 Signé construction d'un forage de development support Envelope 16 15 11 30 08 pastoral équipé de PMH et abreuvoir à BIDE HAMADICKO dans la Commune de Bibémi CM-CRC NORD-58639-CW- RFQ / Exécution des travaux de construction et équipement d'un bloc de Component A: Local Single Stage - One 2018-05- 2018-12- 2018-07- 2019-01- 2019-01- deux (02) salles de classe IDA / 57180 A posteriori Demande de prix Limited 67,500.00 83,407.69 Signé development support Envelope 16 14 11 23 07 avec latrines à trois compartiments à EP BIYAOU,et à EP de Moudouk- Frontière dans la Commune de Madingring CM-CRC NORD-72837-CW- RFQ / Exécution des travaux de construction d'un bloc de deux (02) salles de classes équipées avec un bloc de Component A: Local Single Stage - One 2018-06- 2018-02- 2018-07- 2018-05- 2019-01- latrines à trois (03) IDA / 57180 A posteriori Demande de prix Limited 84,999.00 72,293.29 Achevé development support Envelope 03 23 29 10 25 compartiments dans les Ecoles Publiques d'Oumoua et Mbor dans la Commune de Pitoa, Département de la Bénoué, Région du Nord CM-CRC NORD-72839-CW- RFQ / Travaux de construction d'un bloc de 02 salles de classes équipées dans les EP de Tcharatche Component A: Local Single Stage - One 2018-07- 2018-08- 2018-09- 2018-10- 2019-02- IDA / 57180 A posteriori Demande de prix Limited 84,000.00 70,848.41 Signé Gadamayo et Patara et d'un development support Envelope 07 24 01 04 28 bloc de latrines à 03 compartiments à l'EP de Patara dans la Commune de Barndaké, Département de la Bénoué, Région du Nord CM-CRC NORD-114176-CW- RFQ / Construction de 02 Component A: Local Single Stage - One 2019-05- 2019-07- 2019-11- 2019-10- salles de classes et latrine IDA / 57180 A posteriori Demande de prix Open - National 46,640.00 37,846.33 Signé development support Envelope 18 03 21 31 à EP de LARIA dans la commune Bascheo CM-CRC NORD-114270-CW- RFQ / construction d'un Component A: Local Single Stage - One 2019-05- 2019-06- 2019-11- 2019-10- forage équipé à energie IDA / 57180 A posteriori Demande de prix Open - National 27,200.00 25,269.16 Signé development support Envelope 17 22 21 20 solaire au CSI de KOBOSSI dans la Commune de Baschéo, CM-CRC NORD-114286-CW- RFQ / Construction d'un bloc Component A: Local Single Stage - One 2019-05- 2019-06- 2019-11- 2019-10- de deux salle de classe IDA / 57180 A posteriori Demande de prix Open - National 46,640.00 39,959.17 Signé development support Envelope 17 18 12 16 tables bancs et d'un bloc latrine EP KOMA BATAO CM-CRC NORD-114289-CW- RFQ / Const d'un bloc de trois (03) salles de classes Component A: Local Single Stage - One 2019-05- 2019-06- 2019-07- 2019-10- équipées de (60) tables IDA / 57180 A posteriori Demande de prix Open - National 100,000.00 84,467.24 Signé development support Envelope 17 18 29 16 bancs et de latrine à EP de FORTY (LOT 1) et EP Bilingue PITOA (LOT2) CM-CRC NORD-114297-CW- RFQ / Construction d'un bloc Component A: Local Single Stage - One En cours 2019-05- 2019-06- 2019-10- IDA / 57180 A posteriori Demande de prix Open - National 5,580.00 0.00 de latrine à l'EP Sabongari development support Envelope d'exécution 17 18 16 Ouro Garga Barndaké CM-CRC NORD-116015-CW- RFQ / Construction d'un forage équipe de pompe à motricité humaine à l'EP de Component A: Local Single Stage - One 2019-05- 2019-07- 2019-11- 2019-11- IDA / 57180 A posteriori Demande de prix Open - National 21,000.00 16,963.81 Signé Kobossi, et Construction development support Envelope 28 16 21 13 d'un bloc de latrine à trois compartiments à l'EP de Kobossi CM-CRC NORD-197147-CW- RFQ / Travaux de construction de deux salles Component A: Local Single Stage - One 2020-10- 2020-11- 2021-01- 2021-03- IDA / 57180 A posteriori Demande de prix Open - National 100,000.00 86,053.31 Signé de classe équipés à l'EP de development support Envelope 22 29 20 29 BADOUKI, GUEBAKE et MAYO LEBRI dans la Commune de PITOA CM-CRC NORD-197155-CW- RFQ / Travaux réalisation de 07 (sept) forages Equipés de PMH dans les localités de Component A: Local Single Stage - One En cours 2020-10- 2020-12- 2021-04- HAMAKOUSSOU, OURO IDA / 57180 A posteriori Demande de prix Open - National 100,000.00 0.00 development support Envelope d'exécution 22 04 10 NAOUNDE, OURO BOUHARI, LARIA, MAPOUTKI, MBOULKI, PEMGOU dans la Commune de BASCHEO CM-CRC NORD-197162-CW- RFQ / Travaux de réalisation de (03) trois forages PMH Component A: Local Single Stage - One En cours 2020-10- 2020-12- 2021-04- IDA / 57180 A posteriori Demande de prix Open - National 50,000.00 0.00 dans les localités de KARBA development support Envelope d'exécution 22 04 10 BABA MBILLARE, GAKRI dans la Commune de TCHOLLIRE CM-CRC NORD-197170-CW- RFQ / Travaux d'extension du réseau électrique BT 3X70 Component A: Local Single Stage - One En attente 2020-11- 2020-12- 2021-04- mm² d'un linéaire de 600 ml IDA / 57180 A posteriori Demande de prix Open - National 28,000.00 0.00 development support Envelope d'exécution 04 17 23 dans le quartier BOCKLE MASSA dans la commune de Garoua 3 CM-CRC NORD-197175-CW- RFQ / Travaux de réalisation Component A: Local Single Stage - One En cours 2020-11- 2020-12- 2021-03- d'un forage Equipé de PMH à IDA / 57180 A posteriori Demande de prix Open - National 14,000.00 0.00 development support Envelope d'exécution 04 17 24 OURO MALLOUM dans la Commune de GASCHIGA Page 3 CM-CRC NORD-197189-CW- RFQ / Travaux de construction d'un bloc de Component A: Local Single Stage - One En cours 2020-11- 2020-12- 2021-04- IDA / 57180 A posteriori Demande de prix Open - National 43,844.00 0.00 deux salles de classe development support Envelope d'exécution 04 17 23 équipés à l'Ecole Publique de Karlaye dans la Commune de Touroua CM-CRC NORD-197195-CW- RFQ / Travaux de construction d’un bloc de Component A: Local Single Stage - One En cours 2020-11- 2020-12- 2021-03- IDA / 57180 A posteriori Demande de prix Open - National 5,580.00 0.00 latrines à deux (02) cabines development support Envelope d'exécution 04 17 23 à l’EP de Sabongari Ouro Garga dans la Commune de Barndaké CM-CRC NORD-197372-CW- RFQ / Travaux de construction d'un bloc Component A: Local Single Stage - One 2020-10- 2020-11- 2020-12- 2021-03- IDA / 62240 A posteriori Demande de prix Open - National 57,611.00 52,042.48 Signé maternel équipé à l'Ecole development support Envelope 22 19 18 26 Maternelle Publique de WALDE dans la Commune de Touboro CM-CRC NORD-197395-CW- RFQ / Travaux de réalisation d'un forage équipé de Pompe Component A: Local Single Stage - One 2020-10- 2020-11- 2020-12- 2021-03- à énergie solaire à l'Abattoir IDA / 62240 A posteriori Demande de prix Open - National 48,468.00 45,390.34 Signé development support Envelope 22 19 18 26 Municipal de Mbaimboum et d'un forage PMH à l'EP groupe I B Commune de Touboro CM-CRC NORD-197406-CW- RFQ / Travaux de construction de deux salles de classe équipés et latrines Component A: Local Single Stage - One 2020-10- 2020-11- 2020-12- 2021-03- à trois compartiments à l'EP IDA / 62240 A posteriori Demande de prix Open - National 86,890.00 86,097.86 Signé development support Envelope 22 19 18 26 Groupe 1 B de Touboro (lot N°1) et à l'EP Bilingue de Mbaiboum ( LOT N°2) Commune de Touboro CM-CRC NORD-213661-CW- RFQ / Construction d’un abattoir avec clôture et d'un Component A: Local Single Stage - One 2021-02- 2021-03- 2021-04- 2021-09- bloc de latrines à trois IDA / 62240 A posteriori Demande de prix Open - National 112,000.00 117,807.85 Signé development support Envelope 03 10 21 06 compartiments à Mbaiboum dans la Commune de TOUBORO CM-CRC NORD-213666-CW- RFQ / Construction d’une Clôture et aménagement de Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- IDA / 62240 A posteriori Demande de prix Open - National 50,000.00 0.00 l’aire de jeu à l'Ecole development support Envelope d'exécution 03 10 06 Maternelle de WALDE dans la Commune de TOUBORO CM-CRC NORD-213669-CW- RFQ / Réalisation d’un forage équipé de Pompe à Energie solaire à l'Ecole Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- IDA / 62240 A posteriori Demande de prix Open - National 36,000.00 0.00 maternelle de WALDE et d'un development support Envelope d'exécution 03 10 06 forage équipé de PMH au CES de NGOUMI dans la Commune de TOUBORO CM-CRC NORD-213671-CW- RFQ / Construction de 02 blocs de 03 salles de classes Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- équipées et d’un bloc de IDA / 62240 A posteriori Demande de prix Open - National 123,500.00 0.00 development support Envelope d'exécution 03 10 06 latrines à 04 compartiments à l'Ecole Publique de HELBAO dans la Commune de Touboro CM-CRC NORD-213675-CW- RFQ / Construction de 02 blocs de 03 salles de classes équipées et d’un bloc de Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- IDA / 62240 A posteriori Demande de prix Open - National 66,500.00 0.00 latrines à 04 compartiments development support Envelope d'exécution 03 10 06 à l'Ecole Publique de Mbaimboum Groupe 2 dans la Commune de Touboro CM-CRC NORD-213678-CW- RFQ / Réalisation d'un forage équipé de Pompe à Enegie Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- Solaire à l'Ecole Publique de IDA / 57180 A posteriori Demande de prix Open - National 70,000.00 0.00 development support Envelope d'exécution 03 10 06 Mbaimboum Groupe 2 et l'Ecole Publique de Laoudjara dans la Commune de Touboro CM-CRC NORD-213679-CW- RFQ / Construction de 02 blocs de 03 salles de classes Component A: Local Single Stage - One En attente 2021-02- 2021-03- 2021-09- équipées et d’un bloc de IDA / 62240 A posteriori Demande de prix Open - National 123,500.00 0.00 development support Envelope d'exécution 03 10 06 latrines à 04 compartiments à l'Ecole Publique de Laoudjara dans la Commune de Touboro CM-CRC NORD-243776-CW- RFQ / Travaux de construction et équipement Request for d'un bloc de deux (02) salles Quotations - Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- de classe et un bloc de deux IDA / 62240 A posteriori Demande de prix Open - National Small Works 100,932.00 0.00 development support Envelope d'exécution 14 16 16 (02) salle de classe avec (Emergency) SPD bureau du directeur à L’EP -Competitive GII de MBAIMBOUM dans la Commune de Touboro CM-CRC NORD-243747-CW- RFQ / Travaux de Request for construction et équipement Quotations - d'un bloc de deux (02) Salles Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- IDA / 62240 A posteriori Demande de prix Open - National Small Works 112,766.00 0.00 de Classes et deux (02) SDC development support Envelope d'exécution 14 16 16 (Emergency) SPD avec bureau du directeur, -Competitive d'un bloc de latrine à 3 compartiments à l'EP de Barka Lamou; Touboro CM-CRC NORD-243871-CW- RFQ / Travaux de construction et équipement Request for d'un bloc de deux (02) salles Quotations - Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- de classe et d'un bloc de IDA / 62240 A posteriori Demande de prix Open - National Small Works 112,766.00 0.00 development support Envelope d'exécution 14 16 16 deux 02 SDC avec bureau du (Emergency) SPD directeur et d'un bloc de -Competitive latrines à 3 compartiments à l'EPGP2 BITOU 2 Touboro CM-CRC NORD-243821-CW- RFQ / Travaux de construction et équipement Request for d'un bloc de deux (02) salle Quotations - de classe et un bloc de deux Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- IDA / 62240 A posteriori Demande de prix Open - National Small Works 58,000.00 0.00 (02) salle de classe avec development support Envelope d'exécution 14 16 16 (Emergency) SPD bureau du directeur et d'un -Competitive bloc de latrines à l'Ecole Publique de Kombo-Village dans la Commune de Touboro CM-CRC NORD-243825-CW- RFQ / Travaux de Request for construction d'un forage Quotations - Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- équipé de Pompe à Energie IDA / 62240 A posteriori Demande de prix Open - National Small Works 71,808.00 0.00 development support Envelope d'exécution 14 16 16 Solaire dans les villages (Emergency) SPD Barka Lamou et MBODO -Competitive dans la Commune de Touboro CM-CRC NORD-243873-CW- RFQ / Travaux de construction et équipement Request for d'un bloc de 02 salle de Quotations - Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- classe et d'un bloc de deux IDA / 62240 A posteriori Demande de prix Open - National Small Works 112,766.00 0.00 development support Envelope d'exécution 14 16 16 02 salles de classe avec (Emergency) SPD bureau du directeur et d'un -Competitive bloc de latrines à l'EP de Mbodo dans la Commune de Touboro CM-CRC NORD-243880-CW- RFQ / Travaux de Request for construction et équipement Quotations - d'un bloc de 02 salle de Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- IDA / 62240 A posteriori Demande de prix Open - National Small Works 112,766.00 0.00 classe et d'un bloc de 02 development support Envelope d'exécution 14 16 16 (Emergency) SPD salle de classe avec bureau -Competitive directeur et d'un bloc de latrines à l'EP de LOUMO DOLE dans la Commune de Touboro CM-CRC NORD-243739-CW- Request for RFQ / Travaux de Quotations - construction d'un bloc Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- IDA / 62240 A posteriori Demande de prix Open - National Small Works 61,081.00 0.00 maternel à l'Ecole Maternelle development support Envelope d'exécution 14 09 09 (Emergency) SPD Publique de Mbang-Rey dans -Competitive la commune de Touboro CM-CRC NORD-243877-CW- RFQ / Travaux de réalisation Request for d'un forage équipé de Pompe Quotations - Component A: Local Single Stage - One En attente 2021-09- 2021-11- 2022-03- à Energie Solaire à KOMBO IDA / 62240 A posteriori Demande de prix Open - National Small Works 54,766.00 0.00 development support Envelope d'exécution 14 16 16 VILLAGE et un forage équipé (Emergency) SPD de Pompe à Motricité -Competitive Humaine à EM BANG REY Touboro GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 CM-CRC NORD-8085-GO- Component C: Coordination, RFQ / Acquisition de management, monitoring Single Stage - One 2017-03- 2017-09- 2017-05- 2017-12- 2017-05- 2018-03- IDA / 57180 A posteriori Demande de prix Limited 19,600.00 8,251.45 Achevé fournitures de bureaux et and evaluation and Envelope 20 19 15 22 29 09 divers à la CRC Nord communication CM-CRC NORD-8105-GO- Component C: Coordination, RFQ / Acquisition de management, monitoring Single Stage - One 2017-04- 2017-11- 2017-06- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 19,600.00 0.00 Annulé fournitures pour véhicules à and evaluation and Envelope 17 22 12 26 la CRC NORD communication CM-CRC NORD-8116-GO- Component C: Coordination, RFQ / Acquisition des management, monitoring Single Stage - One 2017-03- 2017-05- 2017-09- 2017-05- 2017-10- IDA / 57180 A posteriori Demande de prix Open - National 19,600.00 8,566.99 Achevé consommables and evaluation and Envelope 20 15 27 29 30 informatiques à la CRC Nord communication CM-CRC NORD-8120-GO- Component C: Coordination, RFQ / Acquisition de management, monitoring Single Stage - One 2017-04- 2017-06- 2017-06- matériels relatifs à IDA / 57180 A posteriori Demande de prix Limited 4,000.00 0.00 Annulé and evaluation and Envelope 17 12 26 l'archivage des documents communication dans les 21 Communes du Nord CM-CRC NORD-8536-GO- RFQ / fourniture de service Component C: Coordination, de transport pour collecte management, monitoring Single Stage - One 2017-03- 2017-09- 2017-04- 2018-01- 2017-12- IDA / 57180 A posteriori Demande de prix Limited 1,560.00 10.16 Signé transport et distribution de and evaluation and Envelope 20 19 24 02 31 courriers et colis de la CRC communication NORD Component C: Coordination, CM-CRC NORD-8537-GO- management, monitoring Single Stage - One 2017-04- 2017-05- 2017-06- RFQ / ACQUISITION KIT CCI IDA / 57180 A posteriori Demande de prix Limited 1,500.00 0.00 Annulé and evaluation and Envelope 17 29 29 CRC NORD communication CM-CRC NORD-8538-GO- Component C: Coordination, RFQ / Fourniture des management, monitoring Single Stage - One 2017-04- 2017-05- 2017-12- IDA / 57180 A posteriori Demande de prix Limited 4,800.00 0.00 Annulé services de maintenance du and evaluation and Envelope 17 29 31 groupe électrogène à la CRC communication Nord CM-CRC NORD-8539-GO- RFQ / Fourniture du petit matériel médical et du Component B: Support to Single Stage - One 2017-03- 2017-04- 2017-05- mobilier en bois au au CSI de IDA / 57180 A posteriori Demande de prix Limited 9,800.00 0.00 Annulé the decentralization process Envelope 20 20 22 OURO ARDO dans la Commune de BARNDAKE, Région du Nord CM-CRC NORD-8540-GO- RFQ / Fourniture du petit matériel médical et du Component B: Support to Single Stage - One 2017-06- 2017-07- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 9,000.00 0.00 Annulé mobilier en bois au CSI DE the decentralization process Envelope 20 20 18 Rey-Bouba dans la Commune de Rey Bouba, Région du Nord CM-CRC NORD-8541-GO- RFQ / Fourniture du petit matériel médical et du Component B: Support to Single Stage - One 2017-06- 2017-07- 2017-09- IDA / 57180 A posteriori Demande de prix Limited 9,000.00 0.00 Annulé mobilier en bois au CSI de the decentralization process Envelope 20 20 18 Mayo Galké dans la Commune de Tcholliré, CM-CRC NORD-8544-GO- RFQ / Equipement en mobilier ( tables bancs, Component B: Support to Single Stage - One 2017-03- 2017-04- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 9,000.00 0.00 Annulé bureaux, chaises et the decentralization process Envelope 20 19 19 armoires) aux lycée de FIGNOLE, Lycée technique de POLI CM-CRC NORD-29626-GO- RFQ / Fourniture de 60 tables bancs , un bureau, Component B: Support to Single Stage - One 2017-10- 2018-01- 2017-11- 2018-05- 2018-05- 2019-03- IDA / 57180 A posteriori Demande de prix Limited 4,000.00 3,264.12 Achevé deux chaises, et deux the decentralization process Envelope 01 29 26 24 25 05 armoires à l'Ecole Publique de NELBI dans la Commune de Lagdo CM-CRC NORD-8542-GO- RFQ / Fourniture du petit matériel médical et du Component A: Local Single Stage - One 2018-03- 2019-01- 2018-04- 2019-04- 2018-06- 2019-07- IDA / 57180 A posteriori Demande de prix Limited 9,000.00 10,551.30 Achevé mobilier en bois au au CSI de development support Envelope 17 22 16 24 15 18 DEMBO dans le Commune de Dembo CM-CRC NORD-8543-GO- RFQ / Fourniture du petit matériel médical et du Component A: Local Single Stage - One 2018-03- 2018-04- 2018-06- IDA / 57180 A posteriori Demande de prix Limited 9,000.00 0.00 Annulé mobilier en bois au au CSI de development support Envelope 05 04 06 DOUNDEHI dans la Commune de Touroua CM-CRC NORD-59254-GO- Component C: Coordination, RFQ / Acquisition de management, monitoring Single Stage - One 2018-09- 2018-10- 2018-10- 2018-12- 2018-11- 2019-02- IDA / 57180 A posteriori Demande de prix Limited 6,917.00 5,610.31 Achevé fournitures de bureaux et and evaluation and Envelope 01 18 27 15 16 05 divers à la CRC Nord communication CM-CRC NORD-59255-GO- Component C: Coordination, RFQ / Acquisition de management, monitoring Single Stage - One 2018-09- 2018-10- 2018-11- IDA / 57180 A posteriori Demande de prix Limited 4,727.00 0.00 Annulé fournitures pour véhicules à and evaluation and Envelope 01 27 16 la CRC NORD ( LOT 1 et LOT communication 2) CM-CRC NORD-59251-GO- Component C: Coordination, RFQ / Acquisition des management, monitoring Single Stage - One 2018-08- 2018-09- 2018-10- IDA / 57180 A posteriori Demande de prix Limited 5,963.00 0.00 Annulé consommables and evaluation and Envelope 01 26 16 informatiques à la CRC Nord communication CM-CRC NORD-58486-GO- Component C: Coordination, RFB / Acquisition des management, monitoring Single Stage - One 2018-06- 2018-08- 2019-02- étagères en bois pour IDA / 57180 A posteriori Demande de prix Limited 2,862.00 0.00 Annulé and evaluation and Envelope 30 25 21 rangement des documents communication dans les bureaux de la CRC Nord CM-CRC NORD-58543-GO- Component C: Coordination, RFB / Fourniture des services management, monitoring Single Stage - One 2018-06- 2018-07- 2018-08- 2019-03- 2019-02- IDA / 57180 A posteriori Demande de prix Limited 4,800.00 5,943.18 Signé de gardiennage des locaux and evaluation and Envelope 16 12 11 01 07 de la CRC Nord communication CM-CRC NORD-59269-GO- Component C: Coordination, RFQ / Acquisition et management, monitoring Single Stage - One 2018-06- 2018-08- 2018-09- IDA / 57180 A posteriori Demande de prix Limited 14,000.00 0.00 Annulé installation de deux (02) and evaluation and Envelope 30 25 24 climatiseurs à la CRC Nord communication CM-CRC NORD-59270-GO- RFQ / Fourniture des services de maintenance Component C: Coordination, électrique du bâtiment, du management, monitoring Single Stage - One 2018-06- 2018-05- 2018-08- 2019-08- IDA / 57180 A posteriori Demande de prix Limited 4,320.00 0.00 Annulé groupe électrogène, de la and evaluation and Envelope 16 25 11 06 climatisation, de plomberie, communication et petit travaux de maçonnerie, menuiserie à la CRC Nord CM-CRC NORD-58551-GO- RFQ / Fourniture des services de maintenance du Component C: Coordination, matériel informatique management, monitoring Single Stage - One 2018-06- 2018-05- 2018-08- 2019-01- 2019-02- IDA / 57180 A posteriori Demande de prix Limited 6,000.00 3,305.83 Signé (ordinateurs, copieurs, and evaluation and Envelope 16 25 11 02 07 scanners, imprimantes, communication serveurs, réseaux informatiques à la CRC CM-CRC NORD-59246-GO- RFQ / Equipement d’un bloc de deux (02) salles de classe par la fourniture de 60 tables Component A: Local Single Stage - One 2017-12- 2018-01- 2018-01- 2018-05- 2018-04- 2019-03- IDA / 57180 A posteriori Demande de prix Limited 3,809.68 3,283.64 Achevé bancs , un bureau, deux development support Envelope 05 29 30 28 30 05 chaises, et deux armoire à l’Ecole Publique de NELBI dans la Commune de Lagdo CM-CRC NORD-72842-GO- RFQ / Equipement de deux (02) salles de classe en soixante (60) tables bancs de deux places avec un (01) Component A: Local Single Stage - One 2018-07- 2018-08- 2018-09- 2018-10- 2019-02- 2018-10- bureau et une (01) chaise IDA / 57180 A posteriori Demande de prix Limited 7,037.00 5,847.75 Achevé development support Envelope 07 27 01 04 28 26 pour enseignants dans les EP de Bangli et Ouro Ardo Rey dans la Commune de Barndaké, Département de la Bénoué, Région du Nord CM-CRC NORD-119057-GO- Component A: Local Single Stage - One 2019-07- 2019-08- 2019-11- 2020-08- RFQ / Production des IDA / 57180 A posteriori Demande de prix Open - National 21,000.00 16,828.43 Signé development support Envelope 06 31 18 30 bulletins trimestriels des Communes NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-CRC NORD-9714-CS- Sélection fondée CQS / élaboration du PCD de Component A: Local sur les 2018-01- 2018-03- 2018-05- 2018-03- 2018-06- 2018-07- 2018-07- 2018-11- 2019-05- IDA / 57180 A posteriori Open - National 101,000.00 60,565.75 Signé 2018-02-26 la Commune development support qualifications des 30 19 02 17 01 11 06 29 02 d'arrondissement de consultants GAROUA III, Page 5 CM-CRC NORD-9713-CS- Sélection fondée CQS / élaboration du PCD de Component A: Local sur les 2018-01- 2018-03- 2018-05- 2018-03- 2018-06- 2018-07- 2018-07- 2018-11- 2019-05- IDA / 57180 A posteriori Open - National 101,000.00 42,471.37 Signé 2018-02-26 la Commune development support qualifications des 31 19 02 19 01 11 06 29 02 d'arrondissement de consultants GAROUA II, Sélection fondée CM-CRC NORD-9715-CS- Component A: Local sur les 2017-12- 2018-03- 2018-04- 2018-03- 2018-05- 2018-07- 2018-07- 2018-11- 2019-04- CQS / Elaboration du PCD de IDA / 57180 A posteriori Open - National 80,200.00 66,560.83 Signé 2018-02-23 development support qualifications des 20 16 29 17 29 12 03 16 29 la Commune de TOUBORO, consultants CM-CRC NORD-9365-CS- Sélection fondée INDV / Elaboration du PCD Component A: Local sur les 2018-01- 2018-03- 2018-04- 2017-03- 2018-05- 2018-07- 2018-07- 2018-12- 2019-04- de la Commune IDA / 57180 A posteriori Open - National 101,000.00 44,873.23 Signé 2018-02-23 development support qualifications des 21 16 29 17 29 11 03 20 29 d'arrondissement de consultants GAROUA Ier, Région du Nord CM-CRC NORD-58640-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les En cours 2018-08- 2018-05- 2018-07- 2018-11- 2018-08- 2018-11- 2018-09- 2019-03- et de la mise en œuvre des IDA / 57180 A posteriori Open - National 13,000.00 10,231.74 2018-05-07 development support qualifications des d'exécution 10 28 11 01 10 20 14 13 solutions endogènes de la consultants Commune de Dembo, Région du Nord CM-CRC NORD-59263-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'élaboration du PCD Component A: Local sur les 2018-01- 2017-04- 2017-06- 2018-03- 2017-07- 2018-07- 2017-08- 2018-12- 2018-02- IDA / 57180 A posteriori Open - National 101,000.00 53,045.63 Signé 2017-04-03 de la Commune development support qualifications des 30 24 07 17 07 11 11 20 07 d'arrondissement de consultants GAROUA Ier, Région du Nord CM-CRC NORD-59249-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'élaboration du PCD Component A: Local sur les 2018-01- 2017-04- 2017-06- 2018-03- 2017-07- 2018-07- 2017-08- 2018-11- 2018-02- IDA / 57180 A posteriori Open - National 101,000.00 50,903.13 Signé 2017-04-03 de la Commune development support qualifications des 30 24 07 17 07 11 11 29 07 d'arrondissement de consultants GAROUA II, Région du Nord CM-CRC NORD-59277-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'élaboration du PCD Component A: Local sur les 2018-01- 2017-04- 2017-06- 2018-03- 2017-07- 2018-07- 2017-08- 2018-11- 2018-02- IDA / 57180 A posteriori Open - National 101,000.00 59,986.85 Signé 2017-04-03 de la Commune development support qualifications des 30 24 07 17 07 11 11 29 07 d'arrondissement de consultants GAROUA III, Région du Nord CM-CRC NORD-59267-CS- Sélection fondée CQS / Sélection d'un OAL en Component A: Local sur les 2018-01- 2017-04- 2017-06- 2018-03- 2017-07- 2018-07- 2017-08- 2018-11- 2018-02- vue de l'élaboration du PCD IDA / 57180 A posteriori Open - National 8,200.00 66,835.25 Signé 2017-04-03 development support qualifications des 30 24 07 17 07 12 11 16 07 de la Commune consultants d'arrondissement de Touboro, Région du Nord CM-CRC NORD-114320-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-08- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 de la Commune Lagdo à development support qualifications des 25 30 13 12 16 13 travers une approche de consultants planification légère CM-CRC NORD-114326-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-08- 2019-09- 2020-02- de la Commune de Pitoa à IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 development support qualifications des 25 30 13 12 16 13 travers une approche de consultants planification légère , Région du Nord CM-CRC NORD-114300-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-08- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 de la Commune de Barndaké development support qualifications des 25 30 13 12 16 13 à travers une approche de consultants planification légère, CM-CRC NORD-114317-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- de la Commune de Guider à IDA / 57180 A posteriori Open - National 25,000.00 0.00 Annulé 2019-05-21 development support qualifications des 16 30 13 10 12 10 16 13 travers une approche de consultants planification légère , Région du Nord CM-CRC NORD-114323-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 à travers une approche de development support qualifications des 25 30 13 11 12 10 16 13 planification légère de la consultants Commune de Mayo-Oulo CM-CRC NORD-114328-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 12,000.00 0.00 Annulé 2019-05-21 de la Commune de Touroua development support qualifications des 15 30 13 11 12 12 16 13 à travers une approche de consultants planification légère CM-CRC NORD-114322-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-11- 2019-08- 2019-12- 2019-09- 2020-02- de la Commune Madingring IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 development support qualifications des 17 30 13 12 12 13 16 13 à travers une approche de consultants planification légère , Région du Nord CM-CRC NORD-114325-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 17,000.00 0.00 Annulé 2019-05-21 de la Commune de Poli, à development support qualifications des 18 30 13 10 12 10 16 13 travers une approche de consultants planification légère CM-CRC NORD-114330-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- de la Commune de BEKA à IDA / 57180 A posteriori Open - National 15,000.00 0.00 Annulé 2019-05-21 development support qualifications des 25 30 13 11 12 12 16 13 travers une approche de consultants planification légère , Région du Nord CM-CRC NORD-114310-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- de la Commune de Bibemi à IDA / 57180 A posteriori Open - National 16,000.00 0.00 Annulé 2019-05-21 development support qualifications des 25 30 13 10 12 16 16 13 travers une approche de consultants planification légère , Région du Nord CM-CRC NORD-114316-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-06- 2019-08- 2019-12- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 12,000.00 0.00 Annulé 2019-05-21 de la Commune de Figuil à development support qualifications des 15 30 13 01 12 04 16 13 travers une approche de consultants planification légère CM-CRC NORD-114327-CS- CQS / Sélection d'un OAL en Sélection fondée vue de l'actualisation du PCD Component A: Local sur les 2019-07- 2019-05- 2019-07- 2019-10- 2019-08- 2019-12- 2019-09- 2020-02- IDA / 57180 A posteriori Open - National 13,000.00 0.00 Annulé 2019-05-21 de la Commune de Tcholliré, development support qualifications des 25 30 13 11 12 12 16 13 à travers une approche de consultants planification légère CM-CRC NORD-213749-CS- CQS / Consultant /OSC pour Sélection fondée la mise en œuvre du Component A: Local sur les En attente 2021-08- 2021-10- 2021-11- 2021-12- 2022-06- IDA / 62240 A posteriori Open - National 30,000.00 0.00 2021-08-06 SCORCARD dans six (06) development support qualifications des d'exécution 27 10 09 14 12 Communes de la zone 1 consultants dans la Région du Nord CM-CRC NORD-213750-CS- CQS / Consultant /OSC pour Sélection fondée la mise en œuvre du Component A: Local sur les En attente 2021-08- 2021-10- 2021-11- 2021-12- 2022-06- IDA / 62240 A posteriori Open - National 30,000.00 0.00 2021-08-06 SCORCARD dans six (06) development support qualifications des d'exécution 27 10 09 14 12 Communes de la zone 2 consultants dans la Région du Nord INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-CRC NORD-9716-CS- INDV / Etude de faisabilité technique et socio- Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- environnementale pour la IDA / 57180 A posteriori Individuel Limited 800.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 réhabilitation de la maison des jeunes de Gaschiga dans la commune de gaschiga CM-CRC NORD-9717-CS- INDV / Etude de faisabilité technique et socio- environnementale pour la Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- IDA / 57180 A posteriori Individuel Limited 1,600.00 0.00 Annulé 2017-05-05 réhabilitation de la piste the decentralization process 10 31 05 04 rurale NGOUTCHOUMI- TONTOGO (15 km) dans la commune de gaschiga, Page 6 CM-CRC NORD-9720-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- socio-environnementale IDA / 57180 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 pour la réhabilitation de la mare artificielle de NGALABA dans la Commune de Gaschiga CM-CRC NORD-9721-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- socio-environnementale IDA / 57180 A posteriori Individuel Limited 1,900.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 pour la réhabilitation du pont de OURO- IYA dans la Commune de Gashiga, CM-CRC NORD-9722-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- socio-environnementale IDA / 57180 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 pour la Construction d'un bloc de maternité au CMA de BEKA dans la Commune de Béka, CM-CRC NORD-9723-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-02- socio-environnementale IDA / 57180 A posteriori Individuel Limited 800.00 5,304.32 Achevé 2017-05-05 the decentralization process 19 10 21 31 25 05 14 04 13 pour la Construction d'une clôture à l'Ecole primaire de BEKA dans la Commune de BEKA CM-CRC NORD-9724-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-02- IDA / 57180 A posteriori Individuel Limited 5,000.00 2,854.41 Achevé 2017-05-05 socio-environnementale the decentralization process 19 10 21 31 26 05 11 04 13 pour la Construction d'un campement Municipal à BEKA CM-CRC NORD-9725-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2019-01- 2017-09- 2019-03- socio-environnementale IDA / 57180 A posteriori Individuel Limited 3,600.00 2,040.96 Achevé 2017-05-05 the decentralization process 21 10 21 31 25 05 10 04 02 pour la Construction et aménagement d'un stade à BEKA CM-CRC NORD-9727-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale pour la Construction d'un Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- IDA / 57180 A posteriori Individuel Limited 3,600.00 4,651.97 Signé 2017-05-05 bloc de deux salles de classe the decentralization process 19 10 21 31 25 05 04 04 équipé et d'un bloc de latrine à l'Ecole Publique de MARKA, CES de WATE, CES de POLI RURAL dans la commune de POLI CM-CRC NORD-9729-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-01- socio-environnementale IDA / 57180 A posteriori Individuel Limited 4,000.00 5,446.21 Achevé 2017-05-05 the decentralization process 19 10 21 31 25 05 11 04 24 pour la Construction d'un dalot quintuples sur le Mayo Zati dans la commune de POLI CM-CRC NORD-9730-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale pour la Construction d'un Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-03- bloc de trois salles de classe IDA / 57180 A posteriori Individuel Limited 2,400.00 4,606.59 Achevé 2017-05-05 the decentralization process 19 10 21 31 26 05 11 04 12 équipé et d'un bloc de latrine à trois compartiments au lycée bilingue de Ngong, au lycée de Tchéboua, et au CES de langui CM-CRC NORD-9731-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-03- pour la Construction d'un IDA / 57180 A posteriori Individuel Limited 3,000.00 5,271.14 Achevé 2017-05-05 the decentralization process 19 10 21 31 25 05 14 04 12 centre de Santé intégré et d'un bloc de latrine à ADAMAOUA et à ZERA dans la commune de NGONG CM-CRC NORD-9732-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale pour la construction des Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-06- IDA / 57180 A posteriori Individuel Limited 2,400.00 3,235.28 Achevé 2017-05-05 hangars de 28 places et the decentralization process 19 10 21 31 25 05 14 04 06 d'un bloc de latrines à trois compartiments dans les marchés des localités de: Tcheboa, langui, laindé massa, et ZERA CM-CRC NORD-9733-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale pour la construction des Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2018-03- IDA / 57180 A posteriori Individuel Limited 3,600.00 4,606.59 Achevé 2017-05-05 magasins de stockage des the decentralization process 19 10 21 31 26 05 11 04 12 produits agricoles dans les localités de DOUKA longo, Mafa tchéboa, laindé karewa dans la commune de NGONG, CM-CRC NORD-9734-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- IDA / 57180 A posteriori Individuel Limited 2,400.00 2,378.68 Signé 2017-05-05 pour la construction des the decentralization process 19 10 21 31 25 05 11 04 forages pastoraux dans les localités de HURUM SABONGARI KALFAI 1 BAGADJI ET KALGUE CM-CRC NORD-9735-CS- INDV / Etude de faisabilité Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- pour l'électrification du IDA / 57180 A posteriori Individuel Limited 800.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 quartier Mboum aviation dans la Commune de Garoua II CM-CRC NORD-9736-CS- INDV / étude de faisabilité Component B: Support to 2017-05- 2017-05- 2017-07- 2017-09- pour l'électrification du IDA / 57180 A posteriori Individuel Limited 800.00 0.00 Annulé 2017-05-05 the decentralization process 10 31 05 04 quartier ouro Alahdji dans la Commune de Garoua II CM-CRC NORD-9737-CS- INDV / contrôle des travaux Component B: Support to 2017-03- 2017-03- 2018-03- 2017-04- 2017-04- 2017-05- 2017-09- 2017-09- de la construction d'un IDA / 57180 A posteriori Individuel Limited 2,000.00 3,446.48 Signé 2017-03-13 the decentralization process 24 18 24 08 03 13 11 10 stade mltisport à Rey Bouba dans la Commune de Rey Bouba, CM-CRC NORD-9738-CS- INDV / contrôle des travaux de la construction d'un bâtiment à Usage du CSI, et d'un bloc de latrine à 6 Component B: Support to 2017-03- 2017-03- 2017-03- 2017-04- 2017-07- 2017-05- 2018-01- 2017-09- 2017-10- compartiments à Rey Bouba IDA / 57180 A posteriori Individuel Limited 3,000.00 3,707.00 Achevé 2017-03-13 the decentralization process 24 18 24 08 18 13 09 11 19 et la réalisation d'un forage équipé de pompe à Motricité humaine au CSI de Rey Bouba dans la Commune de Rey Bouba CM-CRC NORD-9740-CS- INDV / contrôle des travaux de la construction d'un centre de Santé Intégré avec bloc de latrines au Centre de Component B: Support to 2017-09- 2017-04- 2017-09- 2017-05- 2018-01- 2017-06- 2018-01- 2017-10- 2018-12- IDA / 57180 A posteriori Individuel Limited 5,940.00 2,207.60 Achevé 2017-04-20 Santé de Dembo, et la the decentralization process 20 25 25 16 22 20 30 18 01 construction d'un bloc de deux (02) salles de classe équipé et d'un bloc de latrines dans les écoles publique de Laindé Tchakou CM-CRC NORD-9741-CS- INDV / contrôle des travaux de des travaux de la construction et équipement 04 bloc de trois (03) salles Component B: Support to 2018-07- 2017-04- 2017-05- 2018-05- 2017-06- 2018-08- 2017-09- IDA / 57180 A posteriori Individuel Limited 19,840.00 3,246.54 Signé 2017-04-20 de classe avec latrines dans the decentralization process 10 25 16 14 20 27 18 les établissement suivants : 'EP de Torroye, lycee de badjouma centre, lycée bilingue Pitoa, EP badejengo loperé, EP djalingo CM-CRC NORD-9742-CS- INDV / contrôle des travaux de la construction d'un bloc Component B: Support to 2017-03- 2017-04- 2017-03- 2017-05- 2018-09- 2017-06- 2018-09- 2017-10- 2018-10- de 02 salles de classes avec IDA / 57180 A posteriori Individuel Limited 3,920.00 3,869.32 Achevé 2017-04-20 the decentralization process 24 25 24 16 17 20 25 18 23 latrines à l'EP DOGBA et Lycée GOP REY dans la Commune de Tcholliré, CM-CRC NORD-9743-CS- INDV / contrôle des travaux de la construction d'un Component B: Support to 2017-09- 2017-04- 2017-10- 2017-05- 2017-11- 2017-06- 2018-09- 2017-10- 2020-08- IDA / 57180 A posteriori Individuel Limited 4,320.00 3,877.17 Achevé 2017-04-20 centre de santé avec latrines the decentralization process 20 25 27 16 02 20 25 18 19 à Mayo GALKE dans la Commune de Tcholliré Page 7 CM-CRC NORD-9744-CS- INDV / contrôle des travaux Component B: Support to 2017-04- 2017-05- 2017-06- 2017-12- de la réalisation d'un forage IDA / 57180 A posteriori Individuel Limited 1,120.00 0.00 Annulé 2017-04-20 the decentralization process 25 16 20 17 équipé de Pompe à Energie Solaire au CSI de Mayo Galké CM-CRC NORD-9748-CS- INDV / contrôle des travaux de la construction de deux Component B: Support to 2017-06- 2017-07- 2017-08- 2017-12- IDA / 57180 A posteriori Individuel Limited 1,400.00 0.00 Annulé 2017-06-20 forages EPMH dans les the decentralization process 25 16 20 18 villages de nbien dolé et baldjouk frontière CM-CRC NORD-9749-CS- INDV / construction 2 blocs de 3 boutiques au marché de Component B: Support to 2017-06- 2017-07- 2017-08- 2017-12- GOR, sorobéo et d'un bloc de IDA / 57180 A posteriori Individuel Limited 2,400.00 0.00 Annulé 2017-06-20 the decentralization process 25 16 20 18 latrines à 6 compartiments dans la Commune de Madingring CM-CRC NORD-9752-CS- INDV / contrôle des travaux Component B: Support to 2017-06- 2017-07- 2017-08- 2017-12- de l'aménagement de la IDA / 57180 A posteriori Individuel Limited 3,200.00 0.00 Annulé 2017-06-20 the decentralization process 25 16 20 18 piste agricole BIBEMI-MBELLA (4Km) dans la Commune de Bibémi CM-CRC NORD-9753-CS- INDV / contrôle des travaux Component B: Support to 2017-06- 2017-07- 2017-08- 2017-12- de Construction de 03 IDA / 57180 A posteriori Individuel Limited 2,560.00 0.00 Annulé 2017-06-20 the decentralization process 25 16 20 18 forages EPMH à l'abattoir municipal de Tcholliré, Mbaou et Mbissiri CM-CRC NORD-9739-CS- INDV / contrôle des travaux de la réalisation d'un mini AEP équipé de Pompe à Component B: Support to 2017-04- 2017-05- 2017-06- 2017-10- IDA / 57180 A posteriori Individuel Limited 1,584.00 0.00 Annulé 2017-04-20 Energie Solaire au Centre de the decentralization process 25 16 20 18 Santé de Dembo, et d'un forage équipé de PMH à l'EP de TAPAWA CM-CRC NORD-9719-CS- INDV / réalisation de l'étude de faisabilité technique et socio-environnementale Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- pour la réalisation d'un IDA / 57180 A posteriori Individuel Limited 1,200.00 9,609.85 Signé 2017-05-05 the decentralization process 19 10 21 31 25 05 14 04 forage EPMH dans les écoles maternelles suivantes: Demsa, Pomla Manga et Mayami dans la commune de Gaschiga CM-CRC NORD-9726-CS- INDV / réalisation de l'étude de faisabilité technique et Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- 2019-04- socio-environnementale IDA / 57180 A posteriori Individuel Limited 1,400.00 1,977.54 Achevé 2017-05-05 the decentralization process 19 10 21 31 25 05 04 04 08 pour la Construction d'une tribune au stade municipale de Poli dans la Commune de Poli CM-CRC NORD-9718-CS- INDV / Etude de faisabilité technique et socio- environnementale pour la réalisation de six (06) Component B: Support to 2017-07- 2017-05- 2017-07- 2017-05- 2017-08- 2017-07- 2017-09- 2017-09- forages équipé de PMH dans IDA / 57180 A posteriori Individuel Limited 2,200.00 9,609.85 Signé 2017-05-05 the decentralization process 19 10 21 31 25 05 14 04 les établissements suivants: EP Bolki, EP Ouro Barka- Kolléré, EP Djirladjé, EP Hosséré Faourou, EP Ouro- Tchaka et EP Yarmi dans la commune CM-CRC NORD-29630-CS- INDV / Sélection d'un consultant en vue de l'étude de faisabilité pour la Component B: Support to 2017-10- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2018-05- 2017-12- 2019-01- réalisation de six (05) IDA / 57180 A posteriori Individuel Limited 1,600.00 3,729.76 Achevé 2017-09-22 the decentralization process 20 27 22 18 14 22 02 22 18 forages EPMH dans les localités de: Mayo karlaye, Badang, Maliki Longo, Borongo, Mayo Oulo dans la commune de Touroua CM-CRC NORD-29634-CS- INDV / Sélection d'un consultant en vue de l'étude de faisabilité pour la construction d'un bloc de Component B: Support to 2017-10- 2017-09- 2017-07- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- deux salles de classe IDA / 57180 A posteriori Individuel Limited 2,200.00 517.17 Signé 2017-09-25 the decentralization process 20 30 21 21 14 25 20 25 équipés et d'un bloc de latrine à trois compartiments dans les localités de: Mayo karlaye, Badang, Maliki Longo, Borongo, Mayo Oulo dan CM-CRC NORD-29638-CS- INDV / Sélection d'un consultant en vue de l'étude Component B: Support to 2017-10- 2017-09- 2017-10- 2017-10- 2018-02- 2017-11- 2018-08- 2017-12- 2019-01- de faisabilité pour la IDA / 57180 A posteriori Individuel Limited 2,200.00 1,190.56 Achevé 2017-09-25 the decentralization process 20 30 28 21 08 25 22 25 18 réalisation d'un forage Pastoral à MSAGA dans la commune de Touroua CM-CRC NORD-29640-CS- INDV / Sélection d'un consultant en vue de l'étude de faisabilité pour la construction d'un bloc de Component B: Support to 2018-11- 2017-09- 2017-08- 2017-10- 2017-09- 2017-11- 2018-02- 2017-12- 2018-04- deux salles de classe et d'un IDA / 57180 A posteriori Individuel Limited 2,500.00 3,055.95 Achevé 2017-09-25 the decentralization process 29 30 28 21 23 25 27 25 21 bloc de latrine dans les écoles publique de: DAHAL, DAWALA-BIDZAR, BADIA, DIKTINGUE, KARBA, et MORE- SINGAI dans la commune de Fig CM-CRC NORD-29645-CS- INDV / Sélection d'un consultant en vue de l'étude de faisabilité pour la réalisation de (cinq) 5 Component B: Support to 2017-08- 2017-09- 2017-08- 2017-10- 2017-09- 2017-11- 2018-03- 2017-12- 2018-04- forages équipés de Pompe à IDA / 57180 A posteriori Individuel Limited 2,100.00 1,190.56 Achevé 2017-09-22 the decentralization process 25 27 28 18 23 22 08 22 25 Motricité Humaine dans les écoles publique de: DAHAL, DAWALA-BIDZAR, BADIA, DIKTINGUE, KARBA, et MORE- SINGAI dans la commune de Figui CM-CRC NORD-29647-CS- INDV / Sélection d'un consultant en vue de l'étude de faisabilité pour la Component B: Support to 2017-08- 2017-09- 2017-08- 2017-10- 2017-09- 2017-11- 2018-05- 2017-12- 2019-07- IDA / 57180 A posteriori Individuel Limited 1,400.00 6,685.45 Achevé 2017-09-25 réalisation d'un forage the decentralization process 25 30 28 21 23 25 04 25 16 pastoral avec abreuvoir à Biou et Ngorowa dans la commune de Figuil CM-CRC NORD-29649-CS- INDV / Sélection d'un consultant en vue de l'étude Component B: Support to 2017-08- 2017-09- 2017-08- 2017-10- 2017-09- 2017-11- 2018-03- 2017-12- 2018-04- de faisabilité pour le IDA / 57180 A posteriori Individuel Limited 2,000.00 1,358.20 Achevé 2017-09-25 the decentralization process 25 30 28 21 23 25 08 25 26 reprofilage et compactage de la route Tchaka Ndoudehe dans la Commune de Figuil CM-CRC NORD-29652-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de construction d'un bloc de Component B: Support to 2017-09- 2017-09- 2017-09- 2017-10- 2018-01- 2017-11- 2018-02- 2018-05- 2018-07- IDA / 57180 A posteriori Individuel Limited 4,320.00 2,871.90 Achevé 2017-09-25 trois (03) salles de classe the decentralization process 11 30 16 10 03 07 09 06 26 équipées (de 90 tables bancs, de 03 bureaux d'enseignants, 03 placards) au CES de BE et au CES de PENE dans la commune de Pitoa CM-CRC NORD-29659-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de deux salles de classe Component B: Support to 2017-11- 2017-11- 2018-01- 2018-06- IDA / 57180 A posteriori Individuel Limited 7,680.00 0.00 Annulé 2017-11-01 équipées et d'un bloc de the decentralization process 06 27 01 30 latrines à trois compartiments dans chacune des Ecoles Publiques suivantes: EP BASSIRA, EP BOUBA DJARA, EP KOINA MA CM-CRC NORD-29660-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réalisation de quatre forages Component B: Support to 2017-11- 2017-11- 2018-01- 2018-06- IDA / 57180 A posteriori Individuel Limited 2,496.00 0.00 Annulé 2017-11-01 équipés de PMH à l'EP de the decentralization process 06 27 01 30 BASSIRA, BOUBA DJARA, KOINA MAIGARI et MAYO MALAO dans la Commune de Guider CM-CRC NORD-29668-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component B: Support to 2017-11- 2017-11- 2017-12- 2018-06- deux salles de classe IDA / 57180 A posteriori Individuel Limited 2,000.00 0.00 Annulé 2017-10-31 the decentralization process 05 26 31 29 équipées et et d'un bloc de latrines à trois compartiments à Ecole Publique de DOUBBI et à l'Ecole Publique de SORA dans la Commune de Mayo- Oul Page 8 CM-CRC NORD-9745-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de des travaux de pour les travaux Component B: Support to 2017-09- 2017-04- 2017-09- 2017-05- 2018-01- 2017-06- 2018-02- 2017-09- 2018-10- de Construction de 02 blocs IDA / 57180 A posteriori Individuel Limited 10,064.00 6,445.35 Achevé 2017-04-20 the decentralization process 25 25 27 16 16 20 02 18 02 de 03 salles de classes équipées et d'un bloc de latrines à 04 compartiments de l'EP GII Rabingha (LOT 01), Construction d'un mag CM-CRC NORD-29658-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-09- 2018-03- 2018-09- 2018-03- 2018-10- 2018-04- 2018-10- 2018-08- 2019-11- IDA / 57180 A posteriori Individuel Limited 4,240.00 3,848.03 Achevé 2018-02-27 construction d'un centre de development support 20 04 20 25 01 29 05 27 06 santé intégré au Centre de Santé Intégré de DOUNDEHI dans la Commune de Touroua CM-CRC NORD-29666-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réalisation d'un forage EPMH Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-06- 2018-05- 2018-06- 2018-09- 2019-01- IDA / 57180 A posteriori Individuel Limited 3,160.00 1,937.80 Achevé 2018-03-14 dans chacune des localités development support 28 19 06 09 04 14 07 11 09 de: Ouro Siddiki, Djabawa, Djamtari, Waffango, Boumré, Tcharatché Gadamayo dans la commune de Barndaké CM-CRC NORD-29665-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-04- 2018-05- 2018-04- 2018-08- deux salles de classe IDA / 57180 A posteriori Individuel Limited 1,920.00 2,859.82 Signé 2018-03-12 development support 28 17 06 07 06 12 06 10 équipées et d'un bloc de latrine à trois compartiments dans les écoles publiques suivantes : EP Wouro Godjé et CES de Kerzing dans la Commune CM-CRC NORD-29661-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- 2018-08- 2018-07- 2018-09- réalisation d'un forage IDA / 57180 A posteriori Individuel Limited 592.00 485.67 Achevé 2018-03-14 development support 28 19 06 09 12 14 06 13 06 équipés de PMH au CES de Sanguéré Ngal dans la Commune de d'arrondissement de Garoua III CM-CRC NORD-29662-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- 2018-08- 2018-09- 2019-05- deux salles de classes IDA / 57180 A posteriori Individuel Limited 1,760.00 1,017.05 Achevé 2018-03-14 development support 28 19 06 09 12 14 07 11 15 équipées et d'un bloc de latrines à quatre cabines au CES de Sangueré Ngal dans la Commune de d'arrondissement de Garoua III CM-CRC NORD-29664-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réalisation d'un forage Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-02- 2018-05- 2018-07- 2018-07- 2018-09- IDA / 57180 A posteriori Individuel Limited 2,432.00 2,302.31 Achevé 2018-03-14 équipé de pompe à motricité development support 28 19 06 09 15 14 06 13 06 humaine à Djallou Baschéo, Carrefour Baschéo , Wouro Kessoum et à EP de Wouro Godjé dans la Commune de Baschéo CM-CRC NORD-29667-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-02- 2018-03- 2018-04- 2018-04- 2018-05- 2018-05- 2018-05- 2018-09- construction d'un bloc de IDA / 57180 A posteriori Individuel Limited 1,920.00 2,521.70 Signé 2018-03-14 development support 28 19 06 09 05 14 07 11 deux salles de classe équipés à EP de Guibdjol et à EP de Guereté dans la Commune de Barndaké CM-CRC NORD-29657-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-09- 2018-03- 2018-09- 2018-04- 2018-10- 2018-05- 2019-01- 2018-11- 2019-03- construction d'une mini IDA / 57180 A posteriori Individuel Limited 1,040.00 1,059.51 Achevé 2018-03-14 development support 20 19 20 09 01 14 22 10 07 Adduction d'Eau Potable à Energie solaire au Centre de Santé Intégré de DOUNDEHI dans la Commune de Touroua CM-CRC NORD-29656-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de Component A: Local 2018-04- 2018-03- 2018-05- 2018-04- 2018-05- 2018-05- 2018-08- 2018-09- IDA / 57180 A posteriori Individuel Limited 2,880.00 3,258.46 Signé 2018-03-26 construction d'un bloc de development support 27 31 11 10 18 08 28 05 deux (02) salles de classe équipées à l'EP Bilingue de Badjouma dans la commune de Pitoa CM-CRC NORD-9746-CS- INDV / contrôle des travaux des travaux de la construction d'un Centre de Component A: Local 2018-07- 2018-03- 2018-09- 2018-04- 2018-10- 2018-05- 2019-01- 2018-09- 2019-11- Santé Intégré avec latrines à IDA / 57180 A posteriori Individuel Limited 5,280.00 4,821.75 Signé 2018-03-26 development support 16 31 20 21 01 26 22 23 06 DOUNDEHI , construction d'une mini AEP équipé de Pompe à Energie solaire au Centre de Santé de DOUNDEHI CM-CRC NORD-9751-CS- INDV / contrôle des travaux de construction d'un bloc de Component A: Local 2018-03- 2018-04- 2018-05- 2018-08- IDA / 57180 A posteriori Individuel Limited 1,600.00 0.00 Annulé 2018-03-26 02 salles de classes avec development support 31 21 26 24 latrines au CES Bilingue de Bibémi, CM-CRC NORD-9750-CS- INDV / contrôle des travaux de réalisation d'un forage au CES Bilingue de Bibémi, et Component A: Local 2018-03- 2018-04- 2018-05- 2018-08- IDA / 57180 A posteriori Individuel Limited 1,560.00 0.00 Annulé 2018-03-19 exécution des travaux de la development support 24 14 19 17 construction d'un forage de pastoral équipé de PMH et 04 abreuvoirs à BIDE HAMADICKO CM-CRC NORD-9747-CS- INDV / contrôle des travaux de la construction et Component A: Local 2018-11- 2018-06- 2018-12- 2018-07- 2019-01- 2018-08- 2019-01- 2018-12- IDA / 57180 A posteriori Individuel Limited 3,840.00 3,849.14 Signé 2018-06-06 équipement d'un bloc de development support 28 11 28 02 23 06 31 04 deux (02) salles de classe avec latrines EP BIYAOU,moudouk, CM-CRC NORD-9755-CS- INDV / contrôle des travaux de construction d'un Forage Component A: Local 2018-02- 2018-03- 2018-02- 2018-03- 2018-05- 2018-05- 2018-07- 2018-08- 2019-01- IDA / 57180 A posteriori Individuel Limited 1,200.00 1,345.23 Achevé 2018-03-05 pastoral équipé de Pompe à development support 26 10 28 31 02 05 06 03 24 énergie solaire dans la commune de BASCHEO, CM-CRC NORD-58547-CS- INDV / Sélection consultant pour de la réalisation de l'étude de faisabilité pour les forages équipés de PMH à Component A: Local 2018-07- 2018-01- 2018-08- 2018-02- 2018-10- 2018-03- 2018-10- 2018-09- Lokossamba, Soukoundé, IDA / 57180 A posteriori Individuel Limited 16,000.00 1,176.66 Signé 2018-01-08 development support 18 13 01 03 01 10 12 06 Ouro Bei, Dinssi, Koolou, Nadere Koma, Kassala Voma, Denou Manga, Djampeou, Sinkola Less et Rabo dans la Commune de Béka CM-CRC NORD-59261-CS- INDV / Sélection d'un consultant en vue de la réalisation de l'étude de faisabilité pour Component A: Local 2018-03- 2018-02- 2018-03- 2018-03- 2018-05- 2018-04- 2018-06- 2018-10- 2019-11- l'aménagement des terrains IDA / 57180 A posteriori Individuel Open 2,400.00 2.73 Achevé 2018-01-08 development support 02 26 08 19 30 23 25 20 13 de Hand ball, de Basket ball et de Volley ball au stade multisports de Rey Bouba, Département du Mayo Rey, Région du Nord CM-CRC NORD-58491-CS- INDV / Sélection d'un consultant en vue de la réalisation de l'étude de faisabilité pour la construction d'un bloc de Component A: Local 2018-03- 2018-01- 2018-04- 2018-02- 2018-05- 2018-03- 2018-05- 2018-09- 2019-04- IDA / 57180 A posteriori Individuel Limited 2,200.00 1,423.65 Achevé 2018-01-08 deux (02) salles de classes development support 08 13 10 03 30 10 30 06 05 équipées dans les Ecoles Publiques de Tcharatché Gadamayo et Patara dans la Commune de Barndaké, Région du Nord Page 9 CM-CRC NORD-59274-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux Construction d’un bloc de Component A: Local 2018-12- 2018-02- 2018-12- 2018-03- 2019-05- 2018-04- 2019-05- 2018-10- 2019-12- deux salles de classe IDA / 57180 A posteriori Individuel Open 1,680.00 2,344.90 Achevé 2018-01-08 development support 10 26 28 19 24 23 28 20 06 équipées et d'un bloc de latrine à 3 compartiments dans les écoles publiques de HOSSERE FAOUROU et de YARMI dans la Commune de Gaschiga CM-CRC NORD-58622-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de l'Aménagement du stade par Component A: Local 2018-12- 2018-01- 2019-01- 2018-02- 2019-01- 2018-03- 2019-01- 2018-09- la Construction d’une tribune IDA / 57180 A posteriori Individuel Limited 1,000.00 3,175.80 Signé 2018-01-15 development support 28 20 02 10 23 17 29 13 et d’un bloc de latrine a six compartiment et d'un forage équipé de PMH au stade municipal de BEKA dans la Commune de BEKA CM-CRC NORD-58660-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux Component A: Local 2018-08- 2017-12- 2018-08- 2018-01- 2018-08- 2018-02- 2018-09- 2018-08- 2019-03- d'Electrification par les IDA / 57180 A posteriori Individuel Limited 2,280.00 2,302.48 Achevé 2017-12-21 development support 27 26 30 16 31 20 03 19 11 lampadaires solaires de certains artères de la ville de POLI dans la Commune de POLI CM-CRC NORD-59282-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Construction d’un magasin Component A: Local 2018-12- 2018-02- 2019-01- 2018-03- 2019-01- 2018-04- 2019-03- 2018-10- 2019-10- de stockage des produits IDA / 57180 A posteriori Individuel Open 2,120.00 2,002.38 Achevé 2017-12-27 development support 10 14 17 07 10 11 28 08 22 agricoles à LAINDE KEREWA et de Construction d'un hangars de 28 comptoirs au marché de LANGUI dans la Commune de Ngong, CM-CRC NORD-58536-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-07- 2018-01- 2018-09- 2018-02- 2018-10- 2018-03- 2019-03- 2018-09- 2019-07- IDA / 57180 A posteriori Individuel Limited 1,800.00 1,187.35 Achevé 2018-01-08 construction d'un bloc de development support 18 13 28 03 05 10 12 06 31 deux salles de classe équipées à l'Ecole Publique de BADIA dans la commune de Figuil CM-CRC NORD-58530-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réalisation de trois (03) Component A: Local 2018-12- 2018-01- 2018-02- 2019-01- 2018-03- 2019-03- 2018-09- 2019-10- forages équipés de Pompe à IDA / 57180 A posteriori Individuel Limited 2,200.00 1,211.59 Achevé 2018-01-08 development support 04 13 03 23 10 12 06 21 Motricité Humaine dans les écoles publique de : DAWALA- BIDZAR, BADIA, DIKTINGUE dans la commune de Figuil, Région du Nord CM-CRC NORD-58630-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component A: Local 2018-07- 2018-01- 2018-02- 2018-10- 2018-03- 2018-10- 2018-09- 2019-11- deux (02) salles de classes IDA / 57180 A posteriori Individuel Limited 2,300.00 2,764.09 Achevé 2018-01-08 development support 24 13 03 02 10 09 06 05 équipées dans les EP de Tcharatche Gadamayo et Patara dans la Commune de Barndaké, Département de la Bénoué, Région du Nord CM-CRC NORD-58665-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de deux (02) salles de classes Component A: Local 2018-02- 2018-01- 2018-02- 2018-02- 2018-05- 2018-03- 2018-08- 2018-09- 2018-09- IDA / 57180 A posteriori Individuel Limited 2,350.00 4,932.32 Achevé 2018-01-08 équipées avec un bloc de development support 16 13 23 03 18 10 28 06 21 latrines à trois (03) compartiments dans les EP d'Oumoua et Mbor dans la Commune de Pitoa, Région du Nord CM-CRC NORD-59523-CS- INDV / Sélection d'un Consultant en charge du Contrôle des travaux des travaux de la construction Component A: Local 2018-02- 2018-03- 2018-04- 2018-10- d'un Centre de Santé Intégré IDA / 57180 A posteriori Individuel Open 10,000.00 0.00 Annulé 2018-01-08 development support 26 19 23 20 avec latrines à DOUNDEHI , construction d'une mini AEP équipé de Pompe à Energie solaire au Centre de Santé de DOUNDEHI CM-CRC NORD-58656-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de Component A: Local 2018-04- 2018-01- 2018-05- 2018-02- 2018-05- 2018-03- 2018-08- 2018-09- 2018-11- construction d'un bloc de IDA / 57180 A posteriori Individuel Limited 1,190.00 3,258.46 Achevé 2018-01-08 development support 27 13 11 03 18 10 28 06 13 deux (02) salles de classe équipées à l'EP Bilingue de Badjouma dans la commune de Pitoa, Région du Nord CM-CRC NORD-59504-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de réalisation d'un forage au Component A: Local 2018-02- 2018-03- 2018-04- 2018-10- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-01-08 CES Bilingue de Bibémi, et la development support 26 19 23 20 réalisation d'un forage de pastoral équipé de PES à BIDE HAMADICKO dans la Commune de BIBEMI, Région du Nord CM-CRC NORD-58633-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de Component A: Local 2018-01- 2018-02- 2018-03- 2018-09- IDA / 57180 A posteriori Individuel Limited 1,300.00 0.00 Annulé 2018-01-08 construction d'un bloc de 03 development support 13 03 10 06 salles de classes Equipée avec latrines au CES Bilingue de Bibémi, Région du Nord CM-CRC NORD-59512-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de Component A: Local 2018-12- 2018-02- 2019-01- 2018-03- 2019-01- 2018-04- 2018-10- IDA / 57180 A posteriori Individuel Open 2,700.00 0.00 Annulé 2018-01-08 construction de deux forages development support 20 26 11 19 22 23 20 EPMH dans les villages de nbien dolé et baldjouk frontière, dans la commune de Madingring CM-CRC NORD-59280-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux de travaux de la construction et Component A: Local 2018-12- 2018-02- 2019-01- 2018-03- 2019-01- 2018-04- 2019-01- 2018-10- IDA / 57180 A posteriori Individuel Open 3,200.00 1,846.08 Signé 2018-01-08 équipement d'un bloc de development support 28 26 18 19 23 23 25 20 deux (02) salles de classe avec latrines EP BIYAOU,moudouk, dans la commune de Madingring, Région du Nord CM-CRC NORD-59509-CS- INDV / Sélection d'un consultant en vue du contrôle des travaux travaux Component A: Local 2018-02- 2018-03- 2018-04- 2018-10- IDA / 57180 A posteriori Individuel Open 5,500.00 0.00 Annulé 2018-01-08 d'électrification des quartiers development support 26 19 23 20 Mboum Aviation et Ouro hamayel dans la Commune de Garoua 2, Région du Nord CM-CRC NORD-58659-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component A: Local 2018-02- 2018-01- 2018-04- 2018-02- 2018-05- 2018-03- 2018-08- 2018-09- 2019-05- deux salles de classes IDA / 57180 A posteriori Individuel Limited 1,600.00 1,017.05 Achevé 2018-01-08 development support 28 13 06 03 12 10 07 06 15 équipées et d'un bloc de latrines à quatre cabines au CES de Sangueré Ngal dans la Commune de d'arrondissement de Garoua III CM-CRC NORD-59281-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-02- 2018-02- 2018-04- 2018-03- 2018-05- 2018-04- 2018-08- 2018-10- réalisation d'un forage IDA / 57180 A posteriori Individuel Open 1,300.00 484.15 Signé 2018-01-08 development support 28 26 06 19 05 23 06 20 équipés de PMH au CES de Sanguéré Ngal dans la Commune de d'arrondissement de Garoua III Page 10 CM-CRC NORD-59265-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de la Component A: Local 2018-02- 2018-03- 2018-04- 2018-10- réalisation d'un forage IDA / 57180 A posteriori Individuel Open 2,560.00 0.00 Annulé 2018-01-08 development support 26 19 23 20 équipé de Pompe à Energie Solaire au CSI de Mayo Galké dans la Commune de Tcholliré, Région du Nord CM-CRC NORD-58537-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2017-09- 2018-01- 2017-10- 2018-02- 2018-09- 2018-03- 2018-09- 2018-09- 2020-08- IDA / 57180 A posteriori Individuel Limited 5,600.00 3,918.78 Achevé 2018-01-08 construction d'un centre de development support 27 13 11 03 10 10 25 06 19 santé intégré à Mayo Galké dans la Commune de Tcholliré, Région du Nord CM-CRC NORD-59252-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-09- 2018-02- 2018-03- 2018-09- 2018-04- 2019-01- 2018-10- 2019-11- construction d'un centre de IDA / 57180 A posteriori Individuel Open 4,500.00 3,833.96 Achevé 2018-01-08 development support 04 26 19 26 23 21 20 06 santé intégré au Centre de Santé Intégré de DOUNDEHI dans la Commune de Touroua, Région du Nord CM-CRC NORD-59516-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux construction d'un bloc de Component A: Local 2018-11- 2018-02- 2018-11- 2018-03- 2018-11- 2018-04- 2019-01- 2018-10- deux salles de classe IDA / 57180 A posteriori Individuel Open 2,900.00 2,128.66 Signé 2018-01-08 development support 01 26 01 19 12 23 21 20 équipées et d'un bloc de latrines à trois compartiments à l'Ecole Publique de EP BASSIRA, dans la Commune de GUIDER, Région du Nord CM-CRC NORD-59250-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-10- 2018-02- 2018-11- 2018-03- 2018-11- 2018-04- 2019-01- 2018-10- 2019-03- IDA / 57180 A posteriori Individuel Open 800.00 2,092.18 Achevé 2018-01-08 réalisation d'un 'forage EPMH development support 19 26 01 19 12 23 21 20 03 à l'Ecole Publique de EP BASSIRA, dans la Commune de GUIDER, Région du Nord CM-CRC NORD-58521-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réalisation d'un forage EPMH Component A: Local 2018-02- 2018-01- 2018-04- 2018-02- 2018-04- 2018-03- 2018-06- 2018-09- 2019-01- IDA / 57180 A posteriori Individuel Limited 3,100.00 1,929.43 Achevé 2018-01-08 dans chacune des localités development support 28 13 06 03 06 10 07 06 09 de: Ouro Siddiki, Djabawa, Djamtari, Boumré, Tcharatché Gadamayo dans la commune de Barndaké, Région du Nord CM-CRC NORD-58650-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-01- 2018-02- 2018-04- 2018-03- 2018-05- 2018-09- construction d'un bloc de IDA / 57180 A posteriori Individuel Limited 3,000.00 902.97 Signé 2018-01-08 development support 13 03 13 10 07 06 deux salles de classe dans les EP de Guibdjol et de Guereté dans la commune de Barndaké, Région du Nord CM-CRC NORD-59526-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de Component A: Local 2018-05- 2018-02- 2018-09- 2018-03- 2018-09- 2018-04- 2018-10- 2018-10- 2019-01- deux (02) salles de classes IDA / 57180 A posteriori Individuel Open 3,000.00 2,764.09 Achevé 2018-01-08 development support 23 26 20 19 28 23 07 20 10 équipées dans les Ecoles Publiques de Tcharatché Gadamayo et Patara dans la Commune de Barndaké, Région du Nord CM-CRC NORD-114332-CS- INDV / Sélection d'un consultant en vue de la réalisation de l'étude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour la IDA / 57180 A posteriori Individuel Open 2,700.00 2,014.66 Signé 2019-05-10 development support 24 01 10 22 10 02 20 16 Construction et équipement d'un bloc de deux (02) salles de classe équipé et d'un bloc de latrine à l'Ecole Publique de de Poka dans l CM-CRC NORD-114333-CS- INDV / Sélection d'un consultant pour l'étude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour la IDA / 57180 A posteriori Individuel Open 1,800.00 1,913.92 Signé 2019-05-10 development support 24 01 01 22 10 02 20 16 Construction d'un Forage équipé de PMH à Nyam (quartier Lomthere) et à l'Ecole Publique de de Poka CM-CRC NORD-114339-CS- INDV / Sélection d'un consultant Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- IDA / 57180 A posteriori Individuel Open 1,800.00 2,069.56 Signé 2019-05-10 environnementale pour la development support 19 01 03 22 10 02 20 16 fabrication de l'équipement dans les 06 (six) écoles à BIBEMI CM-CRC NORD-114341-CS- INDV / Sélection d'un consultant pour l'étude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-11- 2019-07- 2019-07- 2019-08- IDA / 57180 A posteriori Individuel Open 1,800.00 3,352.66 Signé 2019-05-10 environnementale pour la development support 24 01 03 22 11 02 08 16 Construction d'un Forage équipé de PMH dans les EP de OURO et KARI bibemi CM-CRC NORD-114342-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 2,400.00 3,378.88 Signé 2019-05-10 development support 20 01 01 22 10 02 20 16 la construction de la clôture des CSI de Garoua Winde, CSI de Barmari, CSI de Djamboutou, CSI d'Ouro Mal Amadou CM-CRC NORD-114343-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 1,400.00 3,021.99 Signé 2019-05-10 development support 24 01 03 22 10 02 20 16 la construction d'un Forages équipé de PMH à Ouro Kanadi (Derrière terrain CICAM) et au CSI de Garoua Winde dans la Commune d'arrondissemen CM-CRC NORD-114344-CS- INDV / Sélection d'un consultant en vue de la réalisation de L'étude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- 2020-03- IDA / 57180 A posteriori Individuel Open 1,200.00 -200.36 Achevé 2019-05-10 environnementale pour development support 24 01 01 22 10 02 21 16 31 la construction d'un Forage équipé de PMH à Babla Lakare, Harande Mbororo Sanguere Ngal Chefferie et Mayo DADI CM-CRC NORD-114345-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 1,000.00 2,400.36 Signé 2019-05-10 development support 24 01 10 22 20 02 10 16 l'extension du réseau électrifique de Bocklé dans le quartier Bocklé Massa, dans la Commune d'arrondissement de Garoua IIIème CM-CRC NORD-114346-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 6,200.00 7,180.12 Signé 2019-05-10 development support 24 01 10 22 03 02 05 16 la construction d'un bloc de deux salles de classe équipées à l'EP de Ouro Hourso 1 et l'EP de Ouro Hourso 2 , l'EP de Ouro Hourso 3 A et CM-CRC NORD-114348-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 4,000.00 1,461.25 Signé 2019-05-10 development support 20 01 01 22 10 02 20 16 la Construction de 04 hangars aux marchés de Bogdibo et Mayo Ngemzek (02 BOGDIBO et 02 MAYO- NGUEMZEK) dans la commune de Touboro Page 11 CM-CRC NORD-114350-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- environnementale pour Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- IDA / 57180 A posteriori Individuel Open 1,000.00 3,928.58 Signé 2019-05-10 la Réalisation de 06 forages development support 22 01 01 22 10 02 20 16 à (01 à Bogdibo foulbéré, 01 à Bogdibo Est, 01 à OURO DALA, 01 à OURO HAIROU, 01 à NDANGA-LAONINGA et au CES N CM-CRC NORD-114349-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 3,000.00 2,027.33 Signé 2019-05-10 development support 24 01 10 22 10 02 20 16 la Construction et équipement en table -banc de 02 blocs de 02 salles de classe à EP FLAYE et à KOMBO GOUDRON et d'un bloc Maternel à l'EMP CM-CRC NORD-114351-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- environnementale pour IDA / 57180 A posteriori Individuel Open 3,200.00 3,354.80 Signé 2019-05-10 development support 24 01 04 22 10 02 20 16 la Construction de 04 forages équipés de PMH dans les localités de : Rey Bouba, Bere, Baikwa, Lesdi Mboderi dans la commune de Rey Bouba CM-CRC NORD-114352-CS- INDV / Sélection d'un consultant en vue de la réalisation de Etude de faisabilité technique et socio- Component A: Local 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- IDA / 57180 A posteriori Individuel Open 2,400.00 3,198.44 Signé 2019-05-10 environnementale pour development support 01 01 03 22 08 02 08 16 la Construction de la cloture du Stade multi sport de Rey Bouba dans la commune de Rey Bouba CM-CRC NORD-114354-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Construction d'un bloc de Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-10- 2019-07- 2019-11- 2019-10- 2020-06- deux (02) salles de classes IDA / 57180 A posteriori Individuel Open 1,865.60 1,726.83 Achevé 2019-05-10 development support 20 01 01 22 12 02 12 30 18 équipées de (60) tables bancs et d'un bloc de latrine à trois compartiments à l' Ecole Publique de KOMA, et d'un bloc de latrine à BATAO CM-CRC NORD-114355-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de construction d'un bloc de (02) salles de classes Component A: Local 2019-04- 2019-06- 2019-06- 2019-06- 2019-11- 2019-07- 2019-11- 2019-10- 2020-06- IDA / 57180 A posteriori Individuel Open 1,865.60 1,498.00 Achevé 2019-05-10 équipées de (60) tables development support 20 01 01 22 11 02 21 30 05 bancs et d'un bloc de latrine à trois compartiments à l' Ecole Publique de LARIA, dans la Commune de Baschéo Région du CM-CRC NORD-114356-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de réhabilitation du Bâtiment du CSI de KOBOSSI et de Component A: Local 2019-04- 2019-06- 2019-06- 2019-07- 2019-10- 2019-07- 2019-11- 2019-11- 2020-06- IDA / 57180 A posteriori Individuel Open 2,128.00 1,031.58 Achevé 2019-05-10 construction d'un forage development support 19 11 01 02 12 12 21 09 05 équipé de Pompe à energie solaire avec borne fontaine au CSI de KOBOSSI dans la Commune de Baschéo Région du Nord CM-CRC NORD-114359-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Construction d'un bloc de Component A: Local 2019-06- 2019-06- 2019-07- 2019-10- IDA / 57180 A posteriori Individuel Open 640.00 0.00 Annulé 2019-05-10 latrines à trois (03) cabines à development support 01 22 02 30 l'Ecole Publique de Sabongari Ouro Garga dans la Commune de Barndaké, Département de la Bénoué, Région du Nord CM-CRC NORD-9754-CS- INDV / contrôle des travaux d'électrification des Component A: Local 2018-03- 2018-04- 2018-05- 2018-08- IDA / 57180 A posteriori Individuel Limited 1,860.00 0.00 Annulé 2018-03-19 quartiers Mboum Aviation et development support 24 14 19 17 Ouro Alhadji dans la Commune de Garoua 2 CM-CRC NORD-114358-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Construction et équipement Component A: Local 2019-06- 2019-06- 2019-07- 2019-10- d'un bloc de trois salles de IDA / 57180 A posteriori Individuel Open 3,846.12 0.00 Annulé 2019-05-10 development support 01 22 02 30 classes de 60 tables bancs et bloc de latrine à trois 03 compartiments à l' EP FORTY (LOT 1) et bloc de 03 classes équipées de (60) t CM-CRC NORD-59273-CS- INDV / Sélection d'un Consultant en charge du contrôle des travaux de Component A: Local 2018-12- 2018-02- 2019-01- 2018-03- 2019-05- 2018-04- 2018-10- Construction d’un forage IDA / 57180 A posteriori Individuel Open 1,200.00 0.00 Annulé 2018-01-08 development support 28 26 13 19 24 23 20 équipé de PMH dans les Ecoles publique de HOSSERE FAOUROU et de YARMI dans la Commune de Gaschiga CM-CRC NORD-59259-CS- INDV / Sélection d'un consultant en vue de la réalisation de l'étude de faisabilité pour la Component A: Local 2018-02- 2018-03- 2018-04- 2018-06- construction d'un bloc 02 IDA / 57180 A posteriori Individuel Open 3,000.00 0.00 Annulé 2018-01-08 development support 26 19 23 22 salles de classes équipées avec un 01 de latrines dans les EP de Djalingo Verre et Lokossamba dans la Commune de Béka CM-CRC NORD-197199-CS- INDV / Suivi-Contrôle des travaux de construction de Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-03- deux salles de classes IDA / 57180 A posteriori Individuel Open 3,000.00 0.00 2020-10-20 development support d'exécution 20 14 21 28 28 équipées à l'EP de BADOUKI GUEBAKE et de MAYO LEBRI dans la Commune de PITOA CM-CRC NORD-197237-CS- INDV / Suivi-Contrôle des travaux réalisation de sept forages PMH dans les Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-03- localités de HAMAKOUSSOU, IDA / 57180 A posteriori Individuel Open 4,000.00 0.00 2020-10-20 development support d'exécution 20 14 21 28 28 OURO NAOUNDE, OURO BOUHARI, LARIA, MAPOUTKI, MBOULKI, PEMGOU Commune de BASCHEO CM-CRC NORD-197241-CS- INDV / Suivi-Contrôle des travaux de réalisation de Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-03- trois forages PMH dans les IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 2020-10-20 development support d'exécution 20 14 21 28 28 localités de KARBA BABA MBILLARE, GAKRI Commune de TCHOLLIRE CM-CRC NORD-197313-CS- INDV / Suivi-Contrôle des travaux de construction d'un Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-04- IDA / 57180 A posteriori Individuel Open 1,753.74 0.00 2020-10-20 bloc de deux salles de classe development support d'exécution 20 14 21 28 27 équipés à l'EP de Karlaye dans la Commune de Touroua CM-CRC NORD-197415-CS- INDV / Suivi-Contrôle des travaux de construction d'un bloc maternel à l'EMP de Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-04- WALDE et de deux salles de IDA / 62240 A posteriori Individuel Open 2,128.00 0.00 2020-10-15 development support d'exécution 20 09 16 21 20 classe équipés et d'un bloc de latrines à trois compartiments à l'EP Groupe 1 B Commune de Touboro CM-CRC NORD-197437-CS- INDV / Suivi-Contrôle des travaux de réalisation d'un Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-04- forage équipé de Pompe à IDA / 62240 A posteriori Individuel Open 1,865.60 0.00 2020-10-15 development support d'exécution 20 09 16 21 20 Energie solaire à l'Abattoir Municipal de Mbaimboum dans la Commune de Touboro Page 12 CM-CRC NORD-197440-CS- INDV / Suivi-Contrôle des travaux de construction d'un Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-04- IDA / 62240 A posteriori Individuel Open 3,731.20 0.00 2020-10-15 bloc deux salles de classe development support d'exécution 20 09 16 21 20 équipés à l'EP de Mbaiboum dans la Commune de Touboro CM-CRC NORD-197455-CS- INDV / Consultant réalisation étude de faisabilité technique et éco- Component A: Local En cours 2020-10- 2020-10- 2020-11- 2020-11- 2020-12- IDA / 62240 A posteriori Individuel Open 2,200.00 0.00 2020-10-15 environnementale pour development support d'exécution 30 29 12 19 17 Construction et équipement de deux (02) salles de classe et bloc de latrine à EP Groupe 2 Commune de Touboro CM-CRC NORD-197518-CS- INDV / Consultant réalisation étude de faisabilité technique et socio- Component A: Local En cours 2020-10- 2020-10- 2020-11- 2020-11- 2020-12- environnementale pour la IDA / 62240 A posteriori Individuel Open 3,400.00 0.00 2020-10-15 development support d'exécution 12 29 12 19 17 Construction et équipement deux (02) salles de classe et bloc de latrines à EP bilingue de MBAIBOUM dans la Commune de Touboro CM-CRC NORD-197525-CS- INDV / Consultant réalisation de l'étude de faisabilité technique et socio- Component A: Local En cours 2020-10- 2020-10- 2020-11- 2020-11- 2020-12- IDA / 62240 A posteriori Individuel Open 2,400.00 0.00 2020-10-15 environnementale pour la development support d'exécution 30 29 12 19 17 Réalisation d'un forage PMH à EP Bilingue de MBAIBOUM Commune de Touboro CM-CRC NORD-197309-CS- INDV / Suivi-Contrôle des travaux de réalisation d'un Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-11- 2021-05- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 2020-10-20 forage de PMH à OURO development support d'exécution 20 14 21 28 27 MALLOUM dans la Commune de GASCHIGA CM-CRC NORD-197314-CS- INDV / Suivi-Contrôle des travaux d'extension du Sélection de Component A: Local En attente 2020-11- 2021-01- 2021-05- réseau électrique BT 3X70 IDA / 57180 A posteriori consultants par Direct 1,400.00 0.00 2020-10-20 development support d'exécution 13 12 12 mm² d'un linéaire de 600 ml entente directe dans le quartier BOCKLE MASSA Commune de Garoua 3 CM-CRC NORD-213709-CS- INDV / Etude de faisabilité technique, socio- environnementale pour la construction d’un bloc de salles de classe équipé, d'un Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- IDA / 62240 A posteriori Individuel Open 2,400.00 0.00 2021-01-15 bloc de latrines à trois development support d'exécution 05 26 30 27 compartiments, d’un logement d’astreinte pour enseignant dans la localité de WOURO NAOUNDE Commmune de Baschéo CM-CRC NORD-213713-CS- INDV / Etude de faisabilité pour la construction de trois blocs de deux salles équipées et d’un bloc de Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- latrines à trois IDA / 62240 A posteriori Individuel Open 2,600.00 0.00 2021-01-15 development support d'exécution 05 26 30 27 compartiments ; d’un logement d’astreinte et la réalisation d'un forage PES dans la localité de SABONGARI SOUKI dans la Commmune de Baschéo CM-CRC NORD-213726-CS- INDV / Etude de faisabilité pour la construction de trois blocs de deux salles équipées et d’un bloc de Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- IDA / 62240 A posteriori Individuel Open 3,000.00 0.00 2021-01-15 latrines à trois development support d'exécution 05 26 30 27 compartiments ; d’un logement d’astreinte, réalisation d'un forage PES dans la localité de BADJABOU Commmune de Baschéo CM-CRC NORD-213728-CS- INDV / Etude de faisabilité pour construction de 3 blocs de 2 salles dont 1 avec bureau, bloc de latrines à 6 Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- IDA / 62240 A posteriori Individuel Open 2,000.00 0.00 2021-01-15 cabines, logement development support d'exécution 05 26 30 27 d’astreinte, forage PES, aménagement aire de jeu, barrière,équipement salle info,fourniture panneaux solaire à EP LAOUDJARA CM-CRC NORD-213731-CS- INDV / Etude de faisabilité pour la construction de 3 blocs de 2 salles dont un avec bureau, bloc latrines à 6 Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- cabines, logement IDA / 62240 A posteriori Individuel Open 1,600.00 0.00 2021-01-15 development support d'exécution 05 26 30 27 d’astreinte, réalisation d'un forage PES, l'aménagement d’un aire de jeu, construction d'une barrière à EP G2 de Maimboum Touboro CM-CRC NORD-213732-CS- INDV / Etude de faisabilité pour construction d'un bloc de 3 salles de classe équipés, logement Component A: Local En attente 2021-03- 2021-03- 2021-04- 2021-10- d’astreinte pour enseignant, IDA / 62240 A posteriori Individuel Open 2,000.00 0.00 2021-01-15 development support d'exécution 05 26 30 27 aménagement aire de jeu, construction barrière, équipement salle informatique avec fourniture panneaux solaires ; à EP de Helbao Touboro CM-CRC NORD-213733-CS- INDV / Suivi/contrôle des travaux de construction de 02 blocs de 03 salles de Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- IDA / 62240 A posteriori Individuel Open 4,940.00 0.00 2021-01-29 classes équipées et d’un bloc development support d'exécution 19 09 14 10 de latrines à 04 compartiments à l'Ecole Publique de HELBAO dans la Commune de Touboro CM-CRC NORD-213743-CS- INDV / Suivi/contrôle des travaux de construction de 02 blocs de 03 salles de Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- classes équipées et d’un bloc IDA / 62240 A posteriori Individuel Open 2,660.00 0.00 2021-01-29 development support d'exécution 19 09 14 10 de latrines à 04 compartiments à l'Ecole Publique de Mbaimboum Groupe 2 dans la Commune de Touboro CM-CRC NORD-213744-CS- INDV / Suivi/contrôle des travaux de réalisation d'un forage équipé de Pompe à Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- Energie Solaire à l'Ecole IDA / 62240 A posteriori Individuel Open 2,800.00 0.00 2021-01-29 development support d'exécution 19 09 14 10 Publique de Mbaimboum Groupe 2 et l'Ecole Publique de Laoudjara dans la Commune de Touboro CM-CRC NORD-213745-CS- INDV / Suivi/contrôle des travaux de construction de 02 blocs de 03 salles de Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- IDA / 62240 A posteriori Individuel Open 4,940.00 0.00 2021-01-29 classes équipées et d’un bloc development support d'exécution 19 09 14 10 de latrines à 04 compartiments à l'Ecole Publique de Laoudjara dans la Commune de Touboro CM-CRC NORD-213746-CS- INDV / Suivi/contrôle des travaux de construction d’un Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- IDA / 62240 A posteriori Individuel Open 4,480.00 0.00 2021-01-29 abattoir avec clôture à development support d'exécution 19 09 14 10 Mbaiboum dans la Commune de TOUBORO CM-CRC NORD-213747-CS- INDV / Suivi/ contrôle des travaux de construction d’une Clôture et d’une aire Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- IDA / 62240 A posteriori Individuel Open 2,000.00 0.00 2021-01-29 de jeu à l'Ecole maternelle de development support d'exécution 19 09 14 10 WALDE et aménagement de l’aire de jeu dans la Commune de TOUBORO CM-CRC NORD-213748-CS- INDV / Suivi/contrôle des travaux de réalisation d’un forage équipé de Pompe à Energie solaire à l'Ecole Component A: Local En attente 2021-03- 2021-04- 2021-05- 2021-11- IDA / 62240 A posteriori Individuel Open 1,440.00 0.00 2021-01-29 maternelle de WALDE et development support d'exécution 19 09 14 10 aménagement de l’aire de jeu et d'un forage équipé de PMH au CES de NGOUMI dans la Commune de TOUBORO Page 13 CM-CRC NORD-243933-CS- INDV / EFTSE pour la construction et équipement d'un bloc de 02 SDC et un bloc de 02 SDC avec bureau Component A: Local En attente 2021-09- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 1,900.00 0.00 2021-08-17 directeur à et d'un bloc de development support d'exécution 08 13 23 23 latrines à quatre cabines l'EP de Mbodo ; à l'EP de Barka Lamou dans la Commune de Touboro CM-CRC NORD-243894-CS- INDV / Etude de faisabilité technique et socio- environnementale pour la Component A: Local En attente 2021-09- 2021-09- 2021-09- 2021-10- réalisation d'un forage IDA / 62240 A posteriori Individuel Open 1,600.00 0.00 2021-08-17 development support d'exécution 08 15 25 25 équipé de Pompe à Energie Solaire dans les villages de Barka Lamou et Mbodo, dans la Commune de Touboro CM-CRC NORD-243947-CS- INDV / Etude de faisabilité technique et socio- environnementale pour la Component A: Local En attente 2021-09- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 1,600.00 0.00 2021-08-17 construction d'un bloc development support d'exécution 08 13 23 23 maternel à l'Ecole Maternelle Publique de Mbang-Rey dans la Commune de Touboro CM-CRC NORD-243941-CS- INDV / EFTSE pour la construction et équipement d'un bloc de 02 SDC et d'un bloc de 02 SDC avec bureau Component A: Local En attente 2021-09- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 1,400.00 0.00 2021-08-17 du directeur et d’un bloc de development support d'exécution 08 13 23 23 latrines à quatre cabines à l'EPGP2 BITOU 2 ; à l'EP LOUMO DOLE dans la Commune de Touboro CM-CRC NORD-243952-CS- INDV / Etude de faisabilité socio-environnementale pour la construction et équipement d'un bloc de 02 Component A: Local En attente 2021-09- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 1,400.00 0.00 2021-08-17 SDC et d'un bloc de 02 SDC development support d'exécution 08 13 23 23 avec bureau du directeur et d’un bloc de latrines à quatre cabines à l'EP de Kombo-Village, Commune de Touboro CM-CRC NORD-243925-CS- INDV / Suivi/contrôle des travaux de construction et équipement d'un bloc de Component A: Local En attente 2021-09- 2021-09- 2021-09- 2022-01- deux 02 salle de classe et un IDA / 62240 A posteriori Individuel Open 4,037.00 0.00 2021-08-26 development support d'exécution 17 22 28 26 bloc de deux 02 salle de classe avec bureau du directeur à L’EP GII de MBAIMBOUM, dans la Commune de Touboro CM-CRC NORD-244071-CS- INDV / Suivi/contrôle des travaux de construction et équipement d'un bloc 02 SDC et d'un bloc de 02 SDC Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-02- IDA / 62240 A posteriori Individuel Open 2,830.00 0.00 2021-08-26 avec bureau du directeur et development support d'exécution 17 22 13 10 d'un bloc de latrines à 3 compartiments à l'EP de Barka Lamou, dans la Commune de Touboro CM-CRC NORD-244072-CS- INDV / Suivi/contrôle des travaux de construction et équipement d'un bloc de 02 SDC et d'un bloc de 02 SDC Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- IDA / 62240 A posteriori Individuel Open 1,720.00 0.00 2021-08-26 avec bureau du directeur, development support d'exécution 17 22 02 30 d'un bloc de latrines à 3 compartiments à l'EPGP2 de BITOU 2, dans la Commune de Touboro CM-CRC NORD-244092-CS- INDV / Suivi/contrôle des travaux de construction et équipement d'un bloc de 02 Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- SDC et d'un bloc de 02 SDC IDA / 62240 A posteriori Individuel Open 4,345.00 0.00 2021-08-26 development support d'exécution 17 22 02 30 avec bureau du directeur et d'un bloc de latrines à l'Ecole Publique de Kombo-Village, dans la Commune de Touboro CM-CRC NORD-244074-CS- INDV / Suivi/contrôle des travaux de réalisation d'un forage équipé de Pompe à Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- IDA / 62240 A posteriori Individuel Open 1,720.00 0.00 2021-08-26 Energie Solaire dans les development support d'exécution 17 22 02 30 villages de Barka Lamou et MBODO dans la Commune de Touboro CM-CRC NORD-244032-CS- INDV / Suivi/contrôle des travaux de cnstn et éqpment Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- d'1 bl de 02 SDC et 02 SDC IDA / 62240 A posteriori Individuel Open 2,872.00 0.00 2021-08-26 development support d'exécution 17 22 02 30 avec bureau directeur et d'un bl latrine à l'EP de Mbodo, Touboro CM-CRC NORD-244023-CS- INDV / Suivi/contrôle des travaux de construction et équipement d'un bloc de 02 Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- SDC et d'un bloc de 02 SDC IDA / 62240 A posteriori Individuel Open 2,872.00 0.00 2021-08-26 development support d'exécution 17 22 02 30 avec bureau directeur et d'un bloc de latrines à l'EP à l'EP de LOUMO DOLE, dans la Commune de Touboro CM-CRC NORD-244044-CS- INDV / Suivi/contrôle des travaux de construction d'un Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- bloc maternel à l'Ecole IDA / 62240 A posteriori Individuel Open 4,120.00 0.00 2021-08-26 development support d'exécution 17 22 02 30 Maternelle Publique de Mbang-Rey, dans la Commune de Touboro CM-CRC NORD-244052-CS- INDV / Suivi/contrôle des travaux de réalisation d'un forage équipé de Pompe à Component A: Local En attente 2021-09- 2021-09- 2021-10- 2022-01- Energie Solaire à KOMBO IDA / 62240 A posteriori Individuel Open 3,120.00 0.00 2021-08-26 development support d'exécution 17 22 02 30 VILLAGE et un forage équipé de Pomlpe à Motricité Humaine à EM de BANG REY, dans la Commune de Touboro Page 14