Uganda - Additional Financing for the Second Energy for Rural Transformation Adaptable Program Loan Project : resettlement plan : Resettlement action plan for the Masindi-Waki-Buliisa, and Nkonge-Kashozi 33kV power distribution line and associated low voltage networks (English)

Abstract

The objective of the Additional Financing for the Second Energy for Rural Transformation Adaptable Program Loan Project is to increase access to energy and information and communication technologies (ICTs) in rural Uganda. These objectives will be achieved... See More +

Details

  • 2013/03/01
  • Resettlement Plan
  • RP1420
  • 1
  • 4 (See all volumes)
  • Uganda
  • Africa
  • 2013/03/19
  • Disclosed
  • Resettlement action plan for the Masindi-Waki-Buliisa, and Nkonge-Kashozi 33kV power distribution line and associated low voltage networks
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation