Page 1 CONFORMED COPY LOAN NUMBER 4023 SLO Loan Agreement (Environment Project - Geographic Information System) between REPUBLIC OF SLOVENIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated June 18, 1996 LOAN NUMBER 4023 SLO LOAN AGREEMENT AGREEMENT, dated June 18, 1996, between REPUBLIC OF SLOVENIA (the Borrower) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (the Bank). WHEREAS the Borrower, having satisfied itself as to the feasibility and priority of the Project described in Schedule 2 to this Agreement, has requested the Bank to assist in the financing of the Project; and WHEREAS the Bank has agreed, on the basis, inter alia, of the foregoing, to extend the Loan to the Borrower upon the terms and conditions set forth in this Agreement; NOW THEREFORE the parties hereto hereby agree as follows: ARTICLE I General Conditions; Definitions Section 1.01. The "General Conditions Applicable to Loan and Guarantee Agreements for Single Currency Loans" of the Bank, dated May 30, 1995, (the General Conditions) constitute an integral part of this Agreement. Section 1.02. Unless the context otherwise requires, the several terms defined in the General Conditions have the respective meanings therein set forth and the following additional terms have the following meanings: Page 2 (a) “MEPP” means the Ministry of Environment and Physical Planning of the Borrower; (b) “PIT” means the Project Implementation Team referred to in Section 3.02 of this Agreement; (c) “Deutsche Mark” and “DEM” each means the lawful currency of the Federal Republic of Germany; and (d) “Special Account” means the account referred to in Section 2.02 (b) of this Agreement. ARTICLE II The Loan Section 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in the Loan Agree\1fment, an amount equal to four million six hundred thousand Deutsche Mark (DEM 4,600,000). Section 2.02. (a) The amount of the Loan may be withdrawn from the Loan Account in accordance with the provisions of Schedule 1 to this Agreement for expenditures made (or, if the Bank shall so agree, to be made) in respect of the reasonable cost of goods and services required for the Project described in Schedule 2 to this Agreement and to be financed out of the proceeds of the Loan. (b) The Borrower may, for the purposes of the Project, open and maintain in Deutsche Mark a special deposit account in its Central Bank on terms and conditions satisfactory to the Bank. Deposits into, and payments out of, the Special Account shall be made in accordance with the provisions of Schedule 5 to this Agreement. Section 2.03. The Closing Date shall be June 30, 2001 or such later date as the Bank shall establish. The Bank shall promptly notify the Borrower of such later date. Section 2.04. The Borrower shall pay to the Bank a commitment charge at the rate of three-fourths of one percent (3/4 of 1%) per annum on the principal amount of the Loan not withdrawn from time to time. Section 2.05. (a) The Borrower shall pay interest on the principal amount of the Loan withdrawn and outstanding from time to time, at a rate for each Interest Period equal to LIBOR Base Rate plus LIBOR Total Spread. (b) For the purposes of this Section: (i) “Interest Period” means the initial period from and including the date of this Agreement to, but excluding, the first Interest Payment Date occurring thereafter, and after the initial period, each period from and including an Interest Payment Date to, but excluding the next following Interest Payment Date. (ii) “Interest Payment Date” means any date specified in Section 2.06 of this Agreement. (iii) “LIBOR Base Rate” means, for each Interest Period, the London interbank offered rate for six-month deposits in Deutsche Mark for value the first day of such Interest Period (or, in the case of the initial Interest Period, for value the Interest Payment Date occurring on or next preceding the first day of such Interest Period), as reasonably determined by the Bank and expressed as a percentage per annum. (iv) “LIBOR Total Spread” means, for each Interest Period: (A) one half of one percent (1/2 of 1%); (B) minus (or plus) the weighted average margin, for such Interest Period, below (or above) the London interbank offered rates, or other reference rates, for six-month deposits, in respect of the Bank’s outstanding borrowings or portions thereof allocated by the Bank to fund single currency loans Page 3 or portions thereof made by it that include the Loan, as reasonably determined by the Bank and expressed as a percentage per annum. (c) The Bank shall notify the Borrower of LIBOR Base Rate and LIBOR Total Spread for each Interest Period, promptly upon the determination thereof. (d) Whenever, in light of changes in market practice affecting the determination of the interest rates referred to in this Section 2.05, the Bank determines that it is in the interest of its borrowers as a whole and of the Bank to apply a basis for determining the interest rates applicable to the Loan other than as provided in said Section, the Bank may modify the basis for determining the interest rates applicable to amounts of the Loan not yet withdrawn, upon not less than six (6) months’ notice to the Borrower of the new basis. The basis shall become effective on the expiry of the notice period unless the Borrower notifies the Bank during said period of its objection thereto, in which case said modification shall not apply to the Loan. Section 2.06. Interest and other charges shall be payable February 15 and August 15 in each year. Section 2.07. The Borrower shall repay the principal amount of the Loan in accordance with the amortization schedule set forth in Schedule 3 to this Agreement. ARTICLE III Execution of the Project Section 3.01. The Borrower declares its commitment to the objectives of the Project as set forth in Schedule 2 to this Agreement, and, to this end, shall carry out the Project through the MEPP with due diligence and efficiency and in conformity with appropriate administrative, financial and environmental practices, and shall provide, promptly as needed, the funds, facilities, services and other resources required for the Project. Section 3.02. The Borrower shall establish and thereafter maintain the PIT, within the MEPP, with qualified and experienced staff satisfactory to the Bank, including a team leader and one professional, for purposes of administering the Project. Section 3.03. Except as the Bank shall otherwise agree, procurement of the goods and consultants' services required for the Project and to be financed out of the proceeds of the Loan shall be governed by the provisions of Schedule 4 to this Agreement. Section 3.04. The Borrower shall: (a) maintain policies and procedures adequate to enable it to monitor and evaluate on an ongoing basis, in accordance with indicators satisfactory to the Bank, the carrying out of the Project and the achievement of the objectives thereof; (b) prepare, under terms of reference satisfactory to the Bank, and furnish to the Bank, on or about March 31 of each calendar year, a report integrating the results of the monitoring and evaluation activities performed pursuant to paragraph (a) of this Section, on the progress achieved in the carrying out of the Project during the period preceding the date of said report and setting out the measures recommended to ensure the efficient carrying out of the Project and the achievement of the objectives thereof during the period following such date; and (c) review with the Bank, by March 31, 1997, or such later date as the Bank shall request, the report referred to in paragraph (b) of this Section, and, thereafter, take all measures required to ensure the efficient completion of the Project and the achievement of the objectives thereof, based on the conclusions and recommendations of said report and the Bank’s views on the matter. Section 3.05. For the purposes of Section 9.07 of the General Conditions and without limitation thereto, the Borrower shall: Page 4 (a) prepare, on the basis of guidelines acceptable to the Bank, and furnish to the Bank not later than six (6) months after the Closing Date or such later date as may be agreed for this purpose between the Borrower and the Bank, a plan for the future operation of the Project; and (b) afford the Bank a reasonable opportunity to exchange views with the Borrower on said plan. ARTICLE IV Financial Covenants Section 4.01. (a) The Borrower shall maintain or cause to be maintained records and accounts adequate to reflect in accordance with sound accounting practices the operations, resources and expenditures in respect of the Project of the departments or agencies of the Borrower responsible for carrying out the Project or any part thereof. (b) The Borrower shall: (i) have the records and accounts referred to in paragraph (a) of this Section including those for the Special Account for each fiscal year, audited, in accordance with appropriate auditing principles consistently applied, by independent auditors acceptable to the Bank; (ii) furnish to the Bank as soon as available, but in any case not later than six months after the end of each such year, the report of such audit by said auditors, of such scope and in such detail as the Bank shall have reasonably requested; and (iii) furnish to the Bank such other information con\1fcerning said records and accounts and the audit thereof as the Bank shall from time to time reasonably request. (c) For all expenditures with respect to which withdrawals from the Loan Account were made on the basis of statements of expenditure, the Borrower shall: (i) maintain or cause to be maintained, in accordance with paragraph (a) of this Section, records and accounts reflecting such expenditures; (ii) retain, until at least one year after the Bank has received the audit report for the fiscal year in which the last withdrawal from the Loan Account was made, all records (contracts, orders, invoices, bills, receipts and other documents) evidencing such expenditures; (iii) enable the Bank's representatives to examine such records; and (iv) ensure that such records and accounts are included in the annual audit referred to in paragraph (b) of this Section and that the report of such audit contains a separate opinion by said auditors as to whether the statements of expenditure submitted during such fiscal year, together with the procedures and internal controls involved in their preparation, can be relied upon to support the related withdrawals. ARTICLE V Effectiveness; Termination Section 5.01. For purposes of Section 12.03 of the General Conditions, the following event is specified as a condition to the effectiveness of the Loan Agreement, namely, that the Borrower shall have appointed the staff for the PIT referred to in Section 3.02 of this Agreement. Section 5.02. The date ninety (90) days after the date of this Agreement is hereby specified for the purposes of Section 12.04 of the General Conditions. Page 5 ARTICLE VI Representative of the Borrower; Addresses Section 6.01. The Minister of Finance of the Borrower is designated as representative of the Borrower for the purposes of Section 11.03 of the General Conditions. Section 6.02. The following addresses are specified for the purposes of Section 11.01 of the General Conditions: For the Borrower: Ministry of Finance Zupanciceva 3 Ljubljana Republic of Slovenia Telex: 86231284 For the Bank: International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United States of America Cable address: Telex: INTBAFRAD 197688 (TRT), Washington, D.C. 248423 (RCA), 64145 (WUI) or 82987 (FTCC) IN WITNESS WHEREOF, the parties hereto, acting through their duly authorized representatives, have caused this Agreement to be signed in their respective names in the District of Columbia, United States of America, as of the day and year first above written. REPUBLIC OF SLOVENIA By /s/ Ernest Petric Authorized Representative INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Jean-Michel Severino Regional Vice President Europe and Central Asia SCHEDULE 1 Withdrawal of the Proceeds of the Loan Page 6 1. The table below sets forth the Categories of items to be financed out of the proceeds of the Loan, the allocation of the amounts of the Loan to each Category and the percentage of expenditures for items so to be financed in each Category: Amount of the Loan Allocated % of (Expressed in Expenditures Category DEM Equivalent) to be Financed (1) Goods 620,000 100% of foreign expenditures, 100% of local expenditures (ex-factory cost) and 85% of local ex- penditures for other items pro- cured locally (2) Consultants' 3,980,000 100% services and training ________ TOTAL 4,600,000 ========= 2. For the purposes of this Schedule: (a) the term "foreign expenditures" means expenditures in the currency of any country other than that of the Borrower for goods or services supplied from the territory of any country other than that of the Borrower; and (b) the term "local expenditures" means expenditures in the currency of the Borrower or for goods or services supplied from the territory of the Borrower. 3. Notwithstanding the provisions of paragraph 1 above, no withdrawals shall be made in respect of payments made for expenditures prior to the date of this Agreement. 4. The Bank may require withdrawals from the Loan Account to be made on the basis of statements of expenditure for expenditures for goods and services under contracts costing less than the equivalent of DEM 200,000 each, under such terms and conditions as the Bank shall specify by notice to the Borrower. SCHEDULE 2 Description of the Project The objective of the Project is to collect, organize and manage information for improved development and land-use planning. The Project consists of the following parts, subject to such modifications thereof as the Borrower and the Bank may agree upon from time to time to achieve such objective: Part A: Geographic Information System (GIS) Establishment of a central Geographic Information System in Ljubljana to be administered by the Geographic Information Center (GIC) of the Borrower and expanding and upgrading the existing GIS of the Borrower. Part B: Market Development Group Establishment of a market development group by the GIC of the Borrower to provide training in the use of the GIS and assistance to the personnel of regional Page 7 administrations, agencies and departments of the Borrower and industrial, commercial and service users. Part C: Quality Control Establishment of formal international standards and a quality assurance group within the MEPP to ensure that the GIS operates in accordance with said international standards. Part D: Local Training Center Establishment of a local training center in cooperation with local universities with an experienced international geometrics organization, with the authority to grant internationally-recognized certifications in the GIS. * * * The Project is expected to be completed by December 31, 2000. SCHEDULE 3 Amortization Schedule Payment of Principal Date Payment Due (expressed in Deutsche Mark)* On each February 15 and August 15 beginning February 15, 2002 through August 15, 2011 230,000 ___________________ * The figures in this column represent the amount in Deutsche Mark to be repaid, except as provided in Section 4.04 (d) of the General Conditions. SCHEDULE 4 Procurement and Consultants' Services Page 8 Section I. Procurement of Goods Part A: General Goods shall be procured in accordance with the provisions of Section I of the "Guidelines for Procurement under IBRD Loans and IDA Credits" published by the Bank in January 1995 (the Guidelines) and the following provisions of this Section, as applicable. Part B: Procurement Procedures 1. International Shopping Goods estimated to cost up to DEM 250,000 equivalent per contract, up to an aggregate amount not to exceed DEM 400,000 equivalent, may be procured under contracts awarded on the basis of international shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines. 2. Direct Contracting Goods which must be purchased from the original supplier to be compatible with existing equipment and costing up to DEM 400,000 equivalent in the aggregate, may, with the Bank's prior agreement, be procured in accordance with the provisions of paragraph 3.7 of the Guidelines. Part C: Review by the Bank of Procurement Decisions 1. Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Bank for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods shall be undertaken in accordance with such procurement plan as shall have been approved by the Bank, and with the provisions of said paragraph 1. 2. Prior Review With respect to each contract for goods estimated to cost the equivalent of DEM 200,000 or more procured in accordance with the procedures set forth in Part B.1 of this Section and all contracts procured in accordance with the procedures set forth in Part B.2 of this Section, the procedures set forth in paragraphs 2 and 3 of Appendix 1 to the Guidelines shall apply. 3. Post Review With respect to each contract not governed by paragraph 2 of this Part, the procedures set forth in paragraph 4 of Appendix 1 to the Guidelines shall apply. Section II. Employment of Consultants 1. Consultants' services shall be procured under contracts awarded in accordance with the provisions of the "Guidelines for the Use of Consultants by World Bank Borrowers and by The World Bank as Executing Agency" published by the Bank in August 1981 (the Consultant Guidelines). For complex, time-based assignments, such contracts shall be based on the standard form of contract for consultants' services issued by the Bank, with such modifications thereto as shall have been agreed by the Bank. Where no relevant standard contract documents have been issued by the Bank, other standard forms acceptable to the Bank shall be used. 2. Notwithstanding the provisions of paragraph 1 of this Section, the provisions of the Consultant Guidelines requiring prior Bank review or approval of budgets, short lists, selection procedures, letters of invitation, proposals, evaluation reports and contracts, shall not apply to: (a) contracts for the employment of consulting firms estimated to cost less than $100,000 equivalent each, or (b) contracts for the employment of individual consultants estimated to cost less than $50,000 equivalent each. However, said exceptions to prior Bank review shall not apply to: (a) the terms Page 9 of reference for such contracts; (b) single-source selection of consulting firms; (c) assignments of a critical nature, as reasonably determined by the Bank; (d) amendments to contracts for the employment of consulting firms raising the contract value to $100,000 equivalent or above; or (e) amendments to contracts for the employment of individual consultants raising the contract value to $50,000 equivalent or above. SCHEDULE 5 Special Account 1. For the purposes of this Schedule: (a) the term "eligible Categories" means Categories (1) and (2) set forth in the table in paragraph 1 of Schedule 1 to this Agreement set forth in said table in respect of the Project; (b) the term "eligible expenditures" means expenditures in respect of the reasonable cost of goods and services required for the Project and to be financed out of the proceeds of the Loan allocated from time to time to the eligible Categories in accordance with the provisions of Schedule 1 to this Agreement; and (c) the term "Authorized Allocation" means an amount equal to DEM 450,000 to be withdrawn from the Loan Account and deposited into the Special Account pursuant to paragraph 3 (a) of this Schedule, provided, however, that unless the Bank shall otherwise agree, the Authorized Allocation shall be limited to an amount equal to DEM 300,000 until the aggregate amount of withdrawals from the Loan Account plus the total amount of all outstanding special commitments entered into by the Bank pursuant to Section 5.02 of the General Conditions shall be equal to or exceed the equivalent of DEM 1,000,000. 2. Payments out of the Special Account shall be made exclusively for eligible expenditures in accordance with the provisions of this Schedule. 3. After the Bank has received evidence satisfactory to it that the Special Account has been duly opened, withdrawals of the Authorized Allocation and subsequent withdrawals to replenish the Special Account shall be made as follows: (a) For withdrawals of the Authorized Allocation, the Borrower shall furnish to the Bank a request or requests for deposit into the Special Account of an amount or amounts which do not exceed the aggregate amount of the Authorized Allocation. On the basis of such request or requests, the Bank shall, on behalf of the Borrower, withdraw from the Loan Account and deposit into the Special Account such amount or amounts as the Borrower shall have requested. (b) (i) For replenishment of the Special Account, the Borrower shall furnish to the Bank requests for deposits into the Special Account at such intervals as the Bank shall specify. (ii) Prior to or at the time of each such request, the Borrower shall furnish to the Bank the documents and other evidence required pursuant to para\1fgraph 4 of this Schedule for the payment or payments in respect of which replenishment is requested. On the basis of each such request, the Bank shall, on behalf of the Borrower, withdraw from the Loan Account and deposit into the Special Account such amount as the Borrower shall have requested and as shall have been shown by said documents and other evidence to have been paid out of the Special Account for eligible expenditures. All such deposits shall be withdrawn by the Bank from the Loan Account under the respective eligible Categories, and in the respective equivalent amounts, as shall have been justified by said documents and other evidence. 4. For each payment made by the Borrower out of the Special Account, the Borrower shall, at such time as the Bank shall reasonably request, furnish to the Bank such documents and other evidence showing that such payment was made exclusively for eligible expenditures. 5. Notwithstanding the provisions of paragraph 3 of this Schedule, the Bank shall Page 10 not be required to make further deposits into the Special Account: (a) if, at any time, the Bank shall have determined that all further withdrawals should be made by the Borrower directly from the Loan Account in accordance with the provisions of Article V of the General Conditions and paragraph (a) of Section 2.02 of this Agreement; (b) if the Borrower shall have failed to furnish to the Bank, within the period of time specified in Section 4.01 (b) (ii) of this Agreement, any of the audit reports required to be furnished to the Bank pursuant to said Section in respect of the audit of the records and accounts for the Special Account; (c) if, at any time, the Bank shall have notified the Borrower of its intention to suspend in whole or in part the right of the Borrower to make withdrawals from the Loan Account pursuant to the provisions of Section 6.02 of the General Conditions; or (d) once the total unwithdrawn amount of the Loan allocated to the eligible Categories, minus the total amount of all outstanding special commitments entered into by the Bank pursuant to Section 5.02 of the General Conditions with respect to the Project, shall equal the equivalent of twice the amount of the Authorized Allocation. Thereafter, withdrawal from the Loan Account of the remaining unwithdrawn amount of the Loan allocated to the eligible Categories shall follow such procedures as the Bank shall specify by notice to the Borrower. Such further withdrawals shall be made only after and to the extent that the Bank shall have been satisfied that all such amounts remaining on deposit in the Special Account as of the date of such notice will be utilized in making payments for eligible expenditures. 6. (a) If the Bank shall have determined at any time that any payment out of the Special Account: (i) was made for an expenditure or in an amount not eligible pursuant to paragraph 2 of this Schedule; or (ii) was not justified by the evidence furnished to the Bank, the Borrower shall, promptly upon notice from the Bank: (A) provide such additional evidence as the Bank may request; or (B) deposit into the Special Account (or, if the Bank shall so request, refund to the Bank) an amount equal to the amount of such payment or the portion thereof not so eligible or justified. Unless the Bank shall otherwise agree, no further deposit by the Bank into the Special Account shall be made until the Borrower has provided such evidence or made such deposit or refund, as the case may be. (b) If the Bank shall have determined at any time that any amount outstanding in the Special Account will not be required to cover further payments for eligible expenditures, the Borrower shall, promptly upon notice from the Bank, refund to the Bank such outstanding amount. (c) The Borrower may, upon notice to the Bank, refund to the Bank all or any portion of the funds on deposit in the Special Account. (d) Refunds to the Bank made pursuant to paragraphs 6 (a), (b) and (c) of this Schedule shall be credited to the Loan Account for subsequent withdrawal or for cancellation in accordance with the relevant provisions of this Agreement, including the General Conditions.