PROCUREMENT Bangladesh : BD Private Sector Development PLAN General Information Country: Bangladesh Banks Approval Date of the Original Procurement Plan: 2016-08-11 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-01-23 Project ID: P120843 GPN Date: Project Name: BD Private Sector Development Loan / Credit No: IDA / 48660, TF / 99730, IDA / 57690 Executing Agency(ies): Bangladesh Export Processing Zones Authority, Bangladesh Hi-Tech Park Authority, Bangladesh Economic Zones Authority WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEZA/WD-15 / BEZA/WD-15: Technical Assistance and Pumping Main and Related Capacity Building Accessories, Construction of IDA / 48660 Public Investment Facility (PIF) Prior N 0.00 2,593,565.02 Signed Underground reservoir and Pump Business Linkages and House for Mongla Economic Product/Process Improvement Zone, Bagerhat BEZA/NW-16 / BEZA/NW-16: Technical Assistance and Construction of 33KV Overhead Capacity Building Transmission Line 33/11 KV IDA / 48660 Public Investment Facility (PIF) Prior N 0.00 1,339,910.41 Signed Main receiving Sub-Station Business Linkages and (MRSS) for Mongla Economic Product/Process Improvement Zoe, Bagerhat Technical Assistance and BEZA WD-04 / BEZA WD-04: Capacity Building Site development work for IDA / 48660 Public Investment Facility (PIF) Prior N 0.00 2,847,453.07 Signed Mirsarai EZ, Dist. Chittagong. Business Linkages and Product/Process Improvement BEZA-WD22 / BEZA-WD22: Technical Assistance and Formation of Embankment and Capacity Building Construction of Bridge with Wall IDA / 48660 Public Investment Facility (PIF) Prior N 0.00 2,926,786.66 Signed Mounted Sluice Gate at the Business Linkages and Icchakhale Channel at Mirsarai Product/Process Improvement EZ under Chittagong District. BHTP-WD-1001A / Solar Panel Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 37,500.00 0.00 2016-11-30 2016-12-05 2017-01-16 2017-02-15 2017-03-22 2017-09-18 at Rajshahi Hi-Tech Park Envelope Implementation BEZA WD-2105 / Construction Single Stage - One Pending of Bridge at Jaliardip Economic IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 3,000,000.00 0.00 2016-10-20 2016-11-03 2016-12-03 2017-01-02 2017-02-13 2018-02-02 Envelope Implementation Zone BEZA WD-2301 / Topographical Request for Single Stage - One Pending Survey of Mirsorai, Sabrang & IDA / 57690 Public Investment Facility (PIF) Post Limited 11,500.00 0.00 2016-10-05 2016-11-12 2016-12-02 Quotations Envelope Implementation Jaliardip EZ BHTP-WD-1007 / Internal Road Single Stage - One including Land Development in IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 1,062,500.00 205,020.95 Signed 2016-09-25 2016-10-16 2016-09-30 2016-11-11 2016-11-21 2016-12-11 2016-12-26 2017-01-15 2017-01-10 2017-07-14 Envelope Rajshahi BHTP-WD-1002A / Installation of Single Stage - One Under street Light in Rajshahi Hi-Tech IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 112,500.00 0.00 2016-09-18 2016-08-16 2016-09-20 2016-10-20 2016-09-19 2016-10-27 2016-11-02 2016-11-06 2017-04-15 Envelope Implementation Park BHTP-WD-1010A / Construction Single Stage - One Under of Boundary wall and gate at IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 625,000.00 0.00 2016-10-02 2016-12-15 2016-10-07 2016-11-07 2016-12-07 2017-01-11 2018-01-06 Envelope Implementation Rajshahi Hi-Tech Park BHTP-WD-1003 / Construction of Incubation and training center Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 1,656,250.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-01-17 2017-02-21 2018-08-25 and others facilities at Rajshahi Envelope Implementation Hi-Tech Park. BHTP-WD-1013A / Construction Single Stage - One Pending of Water Supply system at IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 12,500.00 0.00 2016-12-04 2016-12-09 2017-01-08 2017-02-07 2017-03-14 2017-06-12 Envelope Implementation Rajshahi Hi-Tech Park. BEZA WD-1802 / Mirsorai Single Stage - One Pending Economic Zone- Construction of IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 3,940,000.00 0.00 2016-10-16 2016-10-30 2016-12-01 2017-01-01 2017-02-12 2018-02-12 Envelope Implementation Administrative Building BEZA WD-2101 / Jaliardip- Single Stage - One Pending Construction of Land IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 6,300,000.00 0.00 2016-09-25 2016-10-09 2016-11-09 2016-12-10 2017-01-14 2018-01-14 Envelope Implementation Development & Embankment BEZA GD-04 / Office Equipment Request for Single Stage - One Pending (Fax-2, Telephone Set- 5, Spiral IDA / 48660 Public Investment Facility (PIF) Post Limited 2,500.00 0.00 2016-11-02 2016-12-07 2016-12-27 Quotations Envelope Implementation Binding Machine-1) BEZA WD-1604 / Subrang Single Stage - One Pending Tourism Park- Construction of IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 7,500,000.00 0.00 2016-10-25 2016-11-08 2016-12-08 2017-01-07 2017-02-11 2017-03-19 Envelope Implementation Embankment BEZA WD-1301 / Mirsarai Economic Zone (2B)- Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Prior Request for Bids Open - International 19,660,500.00 0.00 2016-09-22 2016-10-06 2016-11-20 2017-01-04 2017-02-08 2018-05-04 Construction of Land Envelope Implementation Development & Embankment BEZA WD-1203 / Mirsorai Single Stage - One Pending Economic Zone (2A)- Water IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 1,530,000.00 0.00 2016-11-02 2016-11-09 2016-12-08 2017-01-08 2017-02-12 2017-08-11 Envelope Implementation Supply BEZA WD -1204 / Mirsorai Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 1,914,000.00 0.00 2016-10-06 2016-10-27 2016-11-24 2016-12-24 2017-02-04 2017-11-01 Economic Zone- Electric Supply Envelope Implementation BEZA WD -1302 / Mirsorai Single Stage - One Pending Economic Zone- Construction of IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 3,723,000.00 0.00 2016-09-25 2016-10-02 2016-11-01 2016-12-01 2017-01-05 2018-01-05 Envelope Implementation sluice gate at ichakhali canal Page 1 BEZA WD-1207 / Construction (widening) of access road including 1(one) no. 51m bridge Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 3,720,000.00 0.00 2016-12-29 2016-12-29 2017-01-29 2017-02-28 2017-04-04 2018-04-04 & 1 (one) no. 18m culvert for Envelope Implementation Mirsarai EZ (Chainage : 3+500 km to 7+000 km). BEZA WD-1201 / Site Single Stage - One Pending Development & consruction of IDA / 57690 Public Investment Facility (PIF) Prior Request for Bids Open - International 33,085,651.26 0.00 2017-01-24 2017-01-29 2017-03-15 2017-07-08 2017-08-12 2019-02-03 Envelope Implementation embankment for Mirsarai - 2A EZ BEZA WD-1202 / Construction (widening) of access road including 1(one) no. 56m bridge Single Stage - One Pending IDA / 57690 Public Investment Facility (PIF) Post Request for Bids Open - National 3,364,674.58 0.00 2016-12-22 2016-12-22 2017-01-23 2017-02-22 2017-03-29 2018-03-29 & 1 (one) no. 6m culvert for Envelope Implementation Mirsarai EZ (Chainage : 0+000 km to 3+500 km). GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance and BEPZA G-7 / CC TV Capacity Building Surveillance System at BEPZA IDA / 48660 Public Investment Facility (PIF) Prior N 1,250,000.00 1,173,985.59 Signed Executive Office, DEPZ, AEPZ, Business Linkages and ComEPZ BEPZA G-7 Product/Process Improvement Technical Assistance and BEPZA G-5A / Supply and Capacity Building Installation of Solar Panel for IDA / 48660 Public Investment Facility (PIF) Prior N 1,692,221.00 947,220.26 Signed Street Lights for Green Initiatives TF / 99730 Business Linkages and at Chittagong EPZ Product/Process Improvement BEZA GD-02 / Camara & Request for Single Stage - One Pending IDA / 48660 Public Investment Facility (PIF) Post Limited 1,875.00 0.00 2016-10-23 2016-11-27 2016-12-15 Accessiories Quotations Envelope Implementation BEZA GD-06 / Furniture (Table- Request for Single Stage - One Pending IDA / 48660 Public Investment Facility (PIF) Post Limited 5,000.00 0.00 2016-12-11 2017-01-09 2017-01-29 14 nos & Chair-14 nos) Quotations Envelope Implementation BEZA G -114 / Procurement of Technical Assistance and Single Stage - One Interior Decoration of New Office IDA / 48660 Post Request for Bids Open - National 90,000.00 0.00 Canceled 2016-12-20 2016-12-27 2017-01-17 2017-01-27 2017-02-17 2017-03-25 Capacity Building Envelope Space BEZA G -25 / Tally.ERP9 Technical Assistance and Request for Single Stage - One Release 5.1.3 or later Software IDA / 48660 Post Limited 4,000.00 0.00 Canceled 2016-12-31 2017-01-22 2017-02-01 Capacity Building Quotations Envelope including providing users training BEZA G -057 / Procurement of Materials for Investment Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-27 2017-01-11 2017-01-18 Promotion Road-Show at Capacity Building Quotations Envelope Chittagong/Cox's Bazar BEZA G -054 / Procurement of Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2017-01-01 2017-01-29 2017-02-08 Photocopier toner and spares Capacity Building Quotations Envelope BEZA G -052 / Procurement of Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-22 2017-01-11 2017-01-21 Computer Consumable Capacity Building Quotations Envelope BEZA G -053 / Procurement of Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-31 2017-01-24 2017-02-03 Cleaning items Capacity Building Quotations Envelope BEZA G -051 / Procurement of Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-12-18 2017-01-12 2017-01-22 Office Stationery items Capacity Building Quotations Envelope BEZA G -055 / Procurement of Technical Assistance and Request for Single Stage - One Materials for Investment IDA / 57690 Post Limited 6,250.00 0.00 Canceled 2016-12-25 2017-01-14 2017-01-21 Capacity Building Quotations Envelope Promotion Road-Show at Khulna BEZA G -056 / Procurement of Materials for Investment Technical Assistance and Request for Single Stage - One IDA / 57690 Post Limited 6,250.00 0.00 Canceled 2017-01-27 2017-02-20 2017-03-02 Promotion Road-Show at Capacity Building Quotations Envelope Rajshahi/Bogra/Sirajgonj BEZA G-26 / Printing & Binding of BEZA Map, Calendar/Diary Technical Assistance and Request for Single Stage - One IDA / 48660 Post Limited 5,000.00 0.00 Canceled 2016-09-30 2016-10-22 2016-11-01 and a Document on Project Capacity Building Quotations Envelope Progress and Future Plan (4827) BEZA G-29 / Procurement of Technical Assistance and Request for Single Stage - One Materials for Investment IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-29 2016-11-22 2016-12-02 Capacity Building Quotations Envelope Promotion Road-Show at Dhaka BEZA G-30 / Procurement of Technical Assistance and Request for Single Stage - One Materials for Investment IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-11-25 2016-12-21 2016-12-31 Capacity Building Quotations Envelope Promotion Road-Show at Sylhet BEZA G -27 / Procurement of Technical Assistance and Request for Single Stage - One Computer Consumable (non- IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-04 2016-10-30 2016-11-09 Capacity Building Quotations Envelope stationery) BEZA G-28 / Procurement of Printing Materials (Investors Technical Assistance and Request for Single Stage - One guide, Annual Report, Telephone IDA / 48660 Post Limited 6,250.00 0.00 Canceled 2016-10-08 2016-10-30 2016-11-09 Capacity Building Quotations Envelope guide, etc.) for Investment Promotion NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Public Investment Facility (PIF) NS-101 / Investment Promotion Pending IDA / 57690 Technical Assistance and Post Direct Selection Direct 39,500.00 0.00 2017-01-08 2017-01-18 2017-03-30 2017-04-29 and Study Tour to UAE and UK Implementation Capacity Building CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Technical Assistance and PSDSP-BHTPA-34-SBCC-CF- Capacity Building IDA / 48660 Quality And Cost- BHTP-S1 / Transaction Advisory Public Investment Facility (PIF) Prior Open - International N 966,830.00 1,876,862.54 Signed 2014-06-18 2014-06-30 TF / 99730 Based Selection Services Business Linkages and Product/Process Improvement Technical Assistance and Capacity Building S7 / Process Development for IDA / 48660 Quality And Cost- Public Investment Facility (PIF) Prior Open - International N 0.00 379,242.87 Signed 2015-06-15 2015-06-25 Firms TF / 99730 Based Selection Business Linkages and Product/Process Improvement Technical Assistance and PSDSP-BEZA-39-SBCC-CF- Capacity Building IDA / 48660 Quality And Cost- BEZA S-12 / Transaction Public Investment Facility (PIF) Prior Open - International N 2,500,000.00 2,556,483.89 Signed 2014-05-28 2014-08-05 TF / 99730 Based Selection Advisory Services Firm (TASF) Business Linkages and Product/Process Improvement BEZA S-022 / Design and Business Linkages and Quality And Cost- Pending Implementation of One Stop IDA / 57690 Prior Open - International 500,000.00 0.00 2017-01-24 2017-02-21 2017-03-28 2017-04-25 2017-05-09 2017-06-02 2017-06-30 2019-06-30 Product/Process Improvement Based Selection Implementation Service (OSS) systems BEZA S-122 / Prepare a Master Technical Assistance and Quality And Cost- Under IDA / 57690 Prior Open - International 500,000.00 0.00 2016-12-08 2017-01-23 2016-12-18 2017-01-31 2017-03-02 2017-03-16 2017-04-05 2017-04-26 2018-01-21 Plan of Mirshorai Industrial City Capacity Building Based Selection Implementation BEZA S-101 / Pre-Feasibility Technical Assistance and Quality And Cost- Pending IDA / 57690 Prior Open - International 750,000.00 0.00 2016-11-28 2016-11-28 2016-12-27 2017-01-24 2017-02-07 2017-03-03 2017-03-31 2017-09-30 Study for 5 sites Capacity Building Based Selection Implementation BEZA S-103 / Selection of Transaction Advisory Services Technical Assistance and Fixed Budget Under Firm for Engineering Design and IDA / 57690 Prior Open - National 763,270.00 0.00 2016-11-28 2016-11-28 2016-12-19 2017-01-16 2017-01-30 2017-02-13 2017-03-13 2019-06-30 Capacity Building Selection Implementation Supervision of Infrastructure Work INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BEZA S-104 / Marketing Technical Assistance and Individual Consultant Pending IDA / 57690 Post Open 200,000.00 0.00 2016-10-02 2016-11-13 2016-11-27 2016-12-18 2018-08-10 Consultant (International) Capacity Building Selection Implementation BHTP-S-1005 / Training & Technical Assistance and Pending IDA / 57690 Post Direct Selection Direct 110,625.00 0.00 2016-10-18 2016-10-28 2017-01-01 2019-12-31 Management Specialist-1 Capacity Building Implementation BHTP-S-1006 / Training & Technical Assistance and Pending IDA / 57690 Post Direct Selection Direct 110,625.00 0.00 2016-11-03 2016-11-13 2017-01-17 2019-12-31 Management Specialist-2 Capacity Building Implementation BHTP-S-1001 / Financial Technical Assistance and Pending IDA / 57690 Prior Direct Selection Direct 236,250.00 0.00 2016-10-27 2016-11-06 2017-01-10 2019-12-31 Management Specialist. Capacity Building Implementation BHTP-S-1002 / Procurement Technical Assistance and Pending IDA / 57690 Prior Direct Selection Direct 236,250.00 0.00 2016-11-07 2016-11-17 2017-01-21 2019-12-31 Specialist Capacity Building Implementation BHTP-S-1003 / Environmental Technical Assistance and Pending IDA / 57690 Post Direct Selection Direct 175,000.00 0.00 2016-10-24 2016-11-03 2017-01-07 2019-05-31 Specialist. Capacity Building Implementation BHTP-S-1007 / Supervision Technical Assistance and Pending IDA / 57690 Post Direct Selection Direct 115,625.00 0.00 2016-11-01 2016-11-11 2017-01-15 2019-07-31 Engineer. Capacity Building Implementation BHTP-S-1008 / Junior Technical Assistance and Pending IDA / 57690 Post Direct Selection Direct 64,750.00 0.00 2016-10-24 2016-11-03 2017-01-07 2019-07-31 Supervision Engineer. Capacity Building Implementation BHTP-S-1009 / Design and Technical Assistance and Individual Consultant Under IDA / 57690 Post Open 92,500.00 0.00 2016-09-22 2016-05-12 2016-11-10 2016-12-01 2016-12-22 2019-07-31 Supervision Engineer. Capacity Building Selection Implementation BHTP-S-1004 / Social Technical Assistance and Individual Consultant Pending IDA / 57690 Post Open 153,125.00 0.00 2016-11-01 2016-12-28 2017-01-11 2017-02-15 2019-05-31 Specialist. Capacity Building Selection Implementation BEZA S-115 / System IDA / 57690 Technical Assistance and Individual Consultant Pending Post Open 56,000.00 0.00 2017-01-10 2017-02-05 2017-02-12 2017-02-26 2019-06-30 Administrator IDA / 48660 Capacity Building Selection Implementation BEZA S-114 / Infrastructure Technical Assistance and Individual Consultant Pending IDA / 57690 Post Limited 45,000.00 0.00 2016-11-28 2016-11-28 2016-11-28 2016-11-28 2017-10-03 Consultant Capacity Building Selection Implementation BEZA S-121 / Project Technical Assistance and Individual Consultant Pending Management and Monitoring IDA / 57690 Post Open 90,000.00 0.00 2016-11-28 2016-11-28 2016-11-28 2016-11-28 2018-11-21 Capacity Building Selection Implementation Specialist Page 3