STRENGTHENING THE SCIENCE, TECHNOLOGY AND INNOVATION SYSTEM IN PERU(P156250) - BIRF 8682 – PE PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan: 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Peru : Strengthening the Science, Technology and Innovation System in Peru PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2017-09-21 2020-01-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156250 GPN Date: 2017-09-21 Project Name: Strengthening the Science, Technology and Innovation System in Peru Loan / Credit No: IBRD / 86820 Executing Agency(ies):Fondo Nacional de Desarrollo Cientifico, Tecnologico y de Innovación Tecnológica WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-FONDECYT-57366-GO- RFQ / Adquisición de Project Management and Solicitud de Single Stage - equipos de computo y IBRD / 86820 Posterior Limited 49,500.00 39,189.82 Finalizado 2018-04-12 2018-04-25 2018-05-25 Monitoring & Evaluation cotizaciones One Envelope licencias para la Gestión Administrativa del Proyecto PE-FONDECYT-87591-GO- Improving the RFQ / Adquisición de Institutional Framework Solicitud de Single Stage - En IBRD / 86820 Posterior Limited 48,000.00 0.00 2018-12-01 2018-12-14 2019-01-13 equipos de laptops y PCs of the National STI cotizaciones One Envelope ejecución para monitores y la DPP System PE-FONDECYT-70409-GO- RFQ / Adquisición de equipos audiovisuales, Project Management and Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Limited 20,000.00 0.00 2019-04-08 2019-06-03 2020-03-29 fotográficos y otros Monitoring & Evaluation cotizaciones One Envelope pendiente accesorios de cómputo para el proyecto PE-FONDECYT-88715-GO- Research and Innovation Solicitud de Open - Single Stage - RFB / Adquisición de IBRD / 86820 Previa 6,700,000.00 0.00 Cancelado 2018-12-21 2018-12-26 2019-02-06 2019-03-08 2019-04-12 2019-10-09 Capacity ofertas International One Envelope equipos de laboratorio PE-FONDECYT-120650- GO-RFQ / Adquisición de Project Management and Solicitud de Single Stage - Ejecución mobiliario para sala de IBRD / 86820 Posterior Limited 36,239.00 0.00 2019-06-29 2019-08-24 2020-02-20 Monitoring & Evaluation cotizaciones One Envelope pendiente usos múltiples del local de San Borja. PE-FONDECYT-120679- GO-RFQ / Suministro e instalacion de equipos de Project Management and Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Limited 48,000.00 0.00 2019-06-29 2019-08-24 2020-02-20 aire acondicionado para la Monitoring & Evaluation cotizaciones One Envelope pendiente sala de usos múltiples del local de San Borja. PE-FONDECYT-59685-GO- RFQ / Adquisición de Project Management and Solicitud de Single Stage - Caja Fuerte para el IBRD / 86820 Posterior Limited 2,500.00 0.00 Cancelado 2019-04-08 2019-04-21 2019-05-16 Monitoring & Evaluation cotizaciones One Envelope equipo de Tesorería de la Gestión Administrativa del Proyecto PE-FONDECYT-59689-GO- RFQ / Adquisición de Project Management and Solicitud de Single Stage - Mobiliario para las IBRD / 86820 Posterior Limited 10,000.00 0.00 Cancelado 2019-04-07 2019-04-19 2019-05-15 Monitoring & Evaluation cotizaciones One Envelope oficinas del equipo de Gestión Administrativa del Proyecto PE-FONDECYT-34224-GO- RFB / Adquisición de equipos de cómputo para Improving the la adecuación de la Institutional Framework Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Open - National 406,969.00 0.00 2019-12-30 2020-01-04 2020-02-03 2020-02-18 2020-03-17 2020-05-16 infraestructura tecnológica of the National STI ofertas One Envelope pendiente del sistema de Gestión de System CONCYTEC y FONDECYT (Componentes 1.2.2 y 4) NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strategic Programs: PE-FONDECYT-15888-NC- Productivity & Innovation RFQ / Eventos de Solicitud de Single Stage - IBRD / 86820 Fund and Posterior Open - National 25,000.00 6,029.63 Finalizado 2018-02-10 2018-03-04 2018-03-19 lanzamiento del Proyecto cotizaciones One Envelope Competitiveness 2018 Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-55194-NC- RFQ / Operador logístico Improving the para la producción y Institutional Framework Solicitud de Single Stage - IBRD / 86820 Posterior Open - National 49,200.00 49,615.60 Finalizado 2018-04-30 2018-05-14 2018-06-30 organización del Congreso of the National STI cotizaciones One Envelope Nacional de Gestión de la System Información en CTI PE-FONDECYT-34233-NC- RFB / Agencia Research and Innovation Solicitud de Open - Single Stage - Administradora de IBRD / 86820 Previa 4,524,800.00 0.00 Cancelado 2018-02-22 2018-02-27 2018-04-10 2018-05-10 2018-06-14 2021-12-31 Capacity ofertas International One Envelope recursos de las subvenciones para investigadores PE-FONDECYT-73920-NC- Strategic Programs: RFQ / Servicio de Productivity & Innovation producción para el evento Fund and Solicitud de Single Stage - IBRD / 86820 Posterior Limited 35,800.00 18,487.97 Finalizado 2018-08-20 2018-09-09 2018-10-09 de lanzamiento de las Competitiveness cotizaciones One Envelope iniciativas vinculación Reinforcement Initiatives academia industria for Productive Innova tion PE-FONDECYT-73750-NC- Improving the DIR / Acceso a base de Institutional Framework Adquisición datos bibliográficos de IBRD / 86820 Previa Direct 6,629,238.20 4,479,215.00 Firmado 2018-08-20 2018-10-04 2018-11-08 2022-02-09 of the National STI directa revistas científicas System especializadas PE-FONDECYT-63421-NC- RFB / SERVICIOS DE OPERACIÓN LOGÍSTICA PARA EL Improving the CUMPLIMIENTO DE LAS Institutional Framework Solicitud de Single Stage - ACTIVIDADES QUE SE IBRD / 86820 Posterior Open - National 490,000.00 0.00 Cancelado 2018-09-10 2018-09-15 2018-10-15 2018-10-22 2018-11-12 2020-12-21 of the National STI ofertas One Envelope REALICEN EN EL System MARCO DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DEL SINACYT. PE-FONDECYT-77293-NC- RFQ / Organización y Improving the ejecución del Taller de Institutional Framework Solicitud de Single Stage - Estándares de IBRD / 86820 Posterior Limited 49,500.00 18,563.15 Firmado 2018-09-15 2018-10-20 2018-11-19 of the National STI cotizaciones One Envelope Representación de la System Información sobre Investigación Page 1 PE-FONDECYT-79614-NC- RFQ / SERVICIO PARA LA ORGANIZACIÓN Y Improving the EJECUCION DEL Institutional Framework Solicitud de Single Stage - TALLER IBRD / 86820 Posterior Limited 49,000.00 16,751.75 Firmado 2018-10-03 2018-10-21 2018-11-15 of the National STI cotizaciones One Envelope "LÍNEA DE BASE DEL System GASTO PÚBLICO EN CIENCIA TECNOLOGÍA E INNOVACION (CTI) EN EL PERU" PE-FONDECYT-73752-NC- Improving the RFB / Desaarrollo de la Institutional Framework Solicitud de Open - Single Stage - En plataforma de gestión del IBRD / 86820 Previa 900,000.00 0.00 2019-03-07 2019-03-12 2019-04-23 2019-04-30 2019-05-21 2020-05-20 of the National STI ofertas International One Envelope ejecución conocimiento del System CONCYTEC PE-FONDECYT-67001-NC- RFQ / Agenciamiento de pasajes aéreos nacionales Project Management and Solicitud de Single Stage - Ejecución e internacionales para el IBRD / 86820 Posterior Open - National 48,000.00 0.00 2019-03-19 2019-05-07 2020-05-06 Monitoring & Evaluation cotizaciones One Envelope pendiente Proyecto Ampliación y Mejoramiento de los Servicios del SINACYT PE-FONDECYT-59697-NC- RFQ / Servicio de adecuación de la red e Project Management and Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Limited 20,000.00 0.00 2019-04-15 2019-04-29 2019-05-22 instalaciones informáticas Monitoring & Evaluation cotizaciones One Envelope pendiente para la oficina Gestión Administrativa del Proyecto. PE-FONDECYT-59698-NC- RFQ / Servicio de Línea Dedicada para acceso a Project Management and Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Limited 20,000.00 0.00 2019-04-23 2019-05-10 2020-05-29 internet para la Oficina Monitoring & Evaluation cotizaciones One Envelope pendiente de Gestión Administrativa del Proyecto PE-FONDECYT-34198-NC- Improving the RFB / Adecuación de la Institutional Framework Solicitud de Single Stage - Ejecución infraestructura tecnológica IBRD / 86820 Posterior Open - National 100,000.00 0.00 2019-04-04 2019-04-07 2019-05-07 2019-05-12 2019-05-16 2019-07-01 of the National STI ofertas One Envelope pendiente del sistema de Gestión del System CONCYTEC PE-FONDECYT-55683-NC- Improving the RFQ / Alquiler de local Institutional Framework Solicitud de Single Stage - Ejecución para el desarrollo software IBRD / 86820 Posterior Open - National 49,000.00 0.00 2019-04-06 2019-04-29 2021-04-28 of the National STI cotizaciones One Envelope pendiente de Línea de Base y System gestión administrativa. PE-FONDECYT-34404-NC- Improving the Solicitud de Single Stage - Ejecución RFQ / Modelado del IBRD / 86820 Institutional Framework Posterior Open - National 14,545.00 0.00 2019-04-30 2019-06-25 2019-09-23 cotizaciones One Envelope pendiente proceso de software of the National STI System PE-FONDECYT-34407-NC- Improving the RFQ / Servicio en la nube Institutional Framework Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Open - National 36,364.00 0.00 2019-04-27 2019-06-22 2020-03-18 para el almacenamiento of the National STI cotizaciones One Envelope pendiente de datos System PE-FONDECYT-33456-NC- Research and Innovation Solicitud de Single Stage - Ejecución RFQ / Promoción y IBRD / 86820 Posterior Limited 50,000.00 0.00 2019-05-01 2019-06-26 2019-12-23 Capacity cotizaciones One Envelope pendiente difusión para los concursos PE-FONDECYT-120675- NC-RFQ / Mejoramiento Project Management and Solicitud de Single Stage - Ejecución de ambiente para la sala IBRD / 86820 Posterior Limited 48,326.00 0.00 2019-06-29 2019-08-24 2020-02-20 Monitoring & Evaluation cotizaciones One Envelope pendiente de usos múltiples del local de San Borja. PE-FONDECYT-125745- NC-RFQ / Improving the CONTRATACIÓN DE Institutional Framework Solicitud de Single Stage - En IBRD / 86820 Posterior Limited 50,000.00 0.00 2019-10-21 2020-10-20 SERVICIO PARA LA of the National STI cotizaciones One Envelope ejecución PRODUCCIÓN DEL System EVENTO "ENTRE PARES PERÚ 2019" PE-FONDECYT-125786- NC-RFQ / CONTRATACIÓN DE Improving the SERVICIO DE Institutional Framework Solicitud de Single Stage - En IBRD / 86820 Posterior Limited 50,000.00 0.00 2019-10-21 2020-10-20 TRASLADO Y of the National STI cotizaciones One Envelope ejecución ALOJAMIENTO DE System PONENTES PARA EL EVENTO "ENTRE PARES PERÚ 2019" PE-FONDECYT-124582- NC-RFB / Improving the CONTRATACIÓN DEL Institutional Framework Solicitud de Single Stage - SERVICIO DE GESTIÓN IBRD / 86820 Posterior Open - National 50,000.00 0.00 Cancelado 2019-07-30 2019-09-24 2020-03-22 of the National STI cotizaciones One Envelope DE PONENTES Y System PARTICIPANTES PARA EL EVENTO "ENTRE PARES PERÚ 2019" PE-FONDECYT-128064- NC-RFQ / SERVICIO DE SOPORTE TÉCNICO EN MATERIA MIGRATORIA Y TRIBUTARIA PARA Research and Innovation Solicitud de Single Stage - Ejecución EXTRANJEROS CUYOS IBRD / 86820 Posterior Limited 2,700.00 0.00 2019-08-24 2019-10-19 2020-04-16 Capacity cotizaciones One Envelope pendiente PROYECTOS RESULTEN GANADORES DEL CONCURSO DE INCORPORACIÓN DE INVESTIGADORES. PE-FONDECYT-128169- NC-RFQ / SERVICIO DE ARRENDAMIENTO DE INMUEBLE PARA EL DESARROLLO DE LAS Project Management and Solicitud de Single Stage - Ejecución ACTIVIDADES DEL IBRD / 86820 Posterior Limited 10,000.00 0.00 2019-10-19 2019-10-31 2021-10-31 Monitoring & Evaluation cotizaciones One Envelope pendiente EQUIPO IMPLEMENTADOR Y OTROS DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-109642- NC-RFQ / SERVICIO DE PLANO DE REPLANTEO Project Management and Solicitud de Single Stage - IBRD / 86820 Posterior Limited 2,000.00 0.00 Cancelado 2019-05-01 2019-06-26 2019-12-23 DETALLADO DE SALA Monitoring & Evaluation cotizaciones One Envelope DE USOS MÚLTIPLES DE LOCAL DE SAN BORJA Strategic Programs: PE-FONDECYT-15890-NC- Productivity & Innovation Solicitud de Single Stage - RFQ / Publicaciones de IBRD / 86820 Fund and Posterior Open - National 20,000.00 0.00 Cancelado 2019-04-30 2019-06-06 2020-06-05 cotizaciones One Envelope avisos en los diarios Competitiveness Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-128063- NC-RFQ / SERVICIO DE COORDINACIÓN Y ACOMPAÑAMIENTO EN MATERIA MIGRATORIA Improving the Y TRIBUTARIA PARA Institutional Framework Solicitud de Single Stage - IBRD / 86820 Posterior Limited 8,000.00 0.00 Cancelado 2019-08-24 2019-10-19 2020-04-16 EXTRANJEROS CUYOS of the National STI cotizaciones One Envelope PROYECTOS RESULTEN System GANADORES DEL CONCURSO DE INCORPORACIÓN DE INVESTIGADORES. Page 2 PE-FONDECYT-145333- NC-RFQ / Contratación de servicio de Gestión de Entrevistas,Cobertura e Project Management and Solicitud de Single Stage - Ejecución Impacto en Medios de IBRD / 86820 Posterior Limited 27,142.86 0.00 2019-11-17 2020-01-12 2020-07-10 Monitoring & Evaluation cotizaciones One Envelope pendiente Comunicación Tradicional,Digital e Impreso de Alcance Nacional y Regional. PE-FONDECYT-147052- NC-RFQ / Servicio de Elaboración de planos y Project Management and Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Limited 6,000.00 0.00 2019-11-30 2020-01-25 2020-07-23 distribución de voz y data Monitoring & Evaluation cotizaciones One Envelope pendiente : Eléctrica ( Teléfono e Internet) PE-FONDECYT-136580- NC-RFB / CONTRATACIÓN DE UNA EMPRESA ENCARGADA DEL Improving the SERVICIO DE Institutional Framework Solicitud de Single Stage - Ejecución APLICACIÓN DEL IBRD / 86820 Posterior Open - National 54,263.57 0.00 2020-01-13 2020-02-12 2020-02-13 2020-02-28 2020-04-03 2020-09-30 of the National STI ofertas One Envelope pendiente CUESTIONARIO A System TRAVÉS DE ENTREVISTAS ESTRUCTURADAS EN LA ETAPA DE ANÁLISIS DE FUNCIONALIDAD Y GOBERNANZA. PE-FONDECYT-136597- NC-RFB / CONTRATACIÓN DE LOS SERVICIOS DE UNA Improving the EMPRESA ENCARGADA Institutional Framework Solicitud de Single Stage - Ejecución IBRD / 86820 Posterior Open - National 86,304.91 0.00 2020-01-06 2020-02-05 2020-02-07 2020-02-22 2020-03-28 2020-09-24 DE LA EJECUCIÓN Y of the National STI ofertas One Envelope pendiente SUPERVISIÓN DE LA System ENCUESTA NACIONAL DE PERCEPCIÓN SOCIAL DE LA CIENCIA Y TECNOLOGÍA - 2019 PE-FONDECYT-152102- NC-DIR / OFICINA PARA EL PROYECTO Project Management and Adquisición Ejecución IBRD / 86820 Posterior Direct 287,000.00 0.00 2020-01-06 2020-01-11 2020-02-15 2021-01-01 MEJORAMIENTO Y Monitoring & Evaluation directa pendiente AMPLIACIÓN DEL SINACYT CONSULTING FIRMS Activity Reference No. Actual Short List and Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of / Description Component Review Type Method Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual Strategic Programs: PE-FONDECYT-15886-CS- Productivity & Innovation Selección Ejecución LCS / Evaluación de IBRD / 86820 Fund and Posterior basada en el Open - National 151,515.00 0.00 2020-04-23 2020-05-14 2020-06-27 2020-07-25 2020-08-24 2020-09-28 2020-11-02 2021-01-31 pendiente Resultados del Proyecto Competitiveness menor costo Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-15826-CS- QCBS / Capacitación en Improving the metodología de análisis Selección Institutional Framework del gasto público (PER) - IBRD / 86820 Previa basada en Open - National 259,500.00 0.00 Cancelado 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-03-19 of the National STI Operador que realizará los calidad y costo System 3 Talleres de capacitación 2018-2019 PE-FONDECYT-15701-CS- QCBS / Diagnóstico y Improving the planificación de definición Selección Institutional Framework Open - de politicas, de la IBRD / 86820 Posterior basada en 405,000.00 0.00 Cancelado 2019-01-04 2019-01-25 2019-03-10 2019-04-07 2019-05-07 2019-06-11 2019-07-16 2020-01-15 of the National STI International coordinación calidad y costo System interinstitucional y la regulación del sistema I+D+i PE-FONDECYT-15828-CS- Improving the Selección QCBS / Capacitación en Institutional Framework IBRD / 86820 Posterior basada en Open - National 270,000.00 0.00 Cancelado 2021-02-10 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2021-12-23 monitoreo y evaluación of the National STI calidad y costo (incluye certificación) System PE-FONDECYT-73861-CS- Strategic Programs: CQS / Servicio de Productivity & Innovation Selección expositor para el evento Fund and basada en IBRD / 86820 Posterior Open - National 22,336.00 26,357.07 Finalizado 2018-08-14 2018-08-28 2018-09-03 2018-09-06 2018-09-12 2018-10-12 de lanzamiento de las Competitiveness calificaciones de iniciativas de vinculación Reinforcement Initiatives consultores academia-industria for Productive Innova tion PE-FONDECYT-75202-CS- Strategic Programs: QCBS / Servicio de Productivity & Innovation capacitación, Fund and Selección acompañamiento y Open - IBRD / 86820 Competitiveness Previa basada en 2,500,000.00 0.00 En ejecución 2018-09-06 2018-09-27 2018-10-11 2018-11-25 2018-12-02 2018-12-16 2019-01-13 2020-09-24 asistencia técnica para la International Reinforcement Initiatives calidad y costo formulación e for Productive Innova identificación de las tion iniciativas de vinculación academia industria (IVAI) Strategic Programs: PE-FONDECYT-15884-CS- Productivity & Innovation Selección LCS / Línea de Base del IBRD / 86820 Fund and Posterior basada en el Open - National 106,061.00 0.00 Cancelado 2018-02-09 2018-03-02 2018-04-15 2018-05-13 2018-06-12 2018-07-17 2018-08-21 2018-11-19 Proyecto Competitiveness menor costo Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-88728-CS- QCBS / ESTUDIO DE Strategic Programs: LINEA DE BASE Y Productivity & Innovation SISTEMA DE Fund and Selección SEGUIMIENTO DE IBRD / 86820 Competitiveness Posterior basada en Open - National 151,600.00 0.00 En ejecución 2018-12-07 2018-12-28 2019-02-10 2019-03-10 2019-04-09 2019-05-14 2019-06-18 2020-06-17 INDICADORES PARA EL Reinforcement Initiatives calidad y costo PROYECTO for Productive Innova MEJORAMIENTO Y tion AMPLIACION DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-52154-CS- QCBS / Servicio para el Improving the control de calidad del Selección Institutional Framework Ejecución código del software para IBRD / 86820 Posterior basada en Open - National 250,000.00 0.00 2019-04-01 2019-04-15 2019-05-13 2019-06-12 2019-06-26 2019-07-24 2019-08-21 2020-08-20 of the National STI pendiente las Líneas de Bases calidad y costo System regionales, presupuesto público y de vigilacia de I+D+i PE-FONDECYT-15713-CS- Improving the Selección QCBS / Línea de base IBRD / 86820 Institutional Framework Posterior basada en Open - National 270,000.00 0.00 En ejecución 2019-04-18 2019-05-09 2019-06-22 2019-07-20 2019-08-19 2019-09-23 2019-10-28 2020-03-17 para seguimiento de gasto of the National STI calidad y costo público System PE-FONDECYT-15707-CS- Improving the QCBS / Análisis de la Selección Institutional Framework Ejecución Gobernanza de las IBRD / 86820 Posterior basada en Open - National 180,000.00 0.00 2019-04-30 2019-05-21 2019-07-04 2019-08-01 2019-08-31 2019-10-05 2019-11-09 2020-11-08 of the National STI pendiente instituciones que calidad y costo System participan en el sistema de CTI PE-FONDECYT-15709-CS- Improving the QCBS / Diseño de un Selección Institutional Framework Ejecución sistema de análisis y IBRD / 86820 Posterior basada en Open - National 276,061.00 0.00 2019-04-26 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-11-04 of the National STI pendiente seguimiento del gasto calidad y costo System público en CTI PE-FONDECYT-15712-CS- Improving the Selección Ejecución QCBS / Línea de base de IBRD / 86820 Institutional Framework Posterior basada en Open - National 256,364.00 0.00 2019-04-26 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-05-03 pendiente vigilancia de I+D+i of the National STI calidad y costo System Page 3 Strategic Programs: PE-FONDECYT-15885-CS- Productivity & Innovation Selección Ejecución LCS / Evaluación de IBRD / 86820 Fund and Posterior basada en el Open - National 90,909.00 0.00 2019-05-02 2019-05-23 2019-07-06 2019-08-03 2019-09-02 2019-10-07 2019-11-11 2020-02-09 pendiente Término del Proyecto Competitiveness menor costo Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-15820-CS- QCBS / Capacitación en Improving the Selección el uso de la aplicación Institutional Framework Open - Ejecución IBRD / 86820 Previa basada en 373,000.00 0.00 2019-09-02 2019-09-16 2019-10-10 2019-11-07 2019-11-17 2019-12-08 2020-01-12 2020-07-10 para el seguimiento de of the National STI International pendiente calidad y costo gasto público en CTI System (Sectores, GRs, GLs, solo para operarios). PE-FONDECYT-15704-CS- QCBS / Elaboración de 03 Improving the Selección documentos de análisis del Institutional Framework Ejecución IBRD / 86820 Posterior basada en Open - National 137,000.00 0.00 2019-04-08 2019-04-29 2019-06-12 2019-07-10 2019-08-09 2019-09-13 2019-10-18 2020-10-17 gasto público en CTI of the National STI pendiente calidad y costo (Funcionalidad, Efectividad System y Eficiencia). PE-FONDECYT-108596- Strategic Programs: CS-QCBS / Productivity & Innovation Selección CONSULTORIA PARA LA Fund and basada en ELABORACIÓN E IBRD / 86820 Competitiveness Posterior Open - National 90,000.00 0.00 En ejecución 2019-04-26 2019-05-17 2019-06-30 2019-07-30 2019-09-03 2020-03-01 calificaciones de COMPLEMENTACIÓN DE Reinforcement Initiatives consultores UNA ESTRATEGIA DE for Productive Innova COMUNICACIÓN PARA tion EL SUB COMPONENTE 2 PE-FONDECYT-120559- CS-QCBS / Strategic Programs: CONTRATACIÓN DE Productivity & Innovation UNA FIRMA Fund and Selección CONSULTORA PARA Open - IBRD / 86820 Competitiveness Previa basada en 3,220,000.00 0.00 En ejecución 2019-06-24 2019-07-15 2019-08-28 2019-09-25 2019-10-25 2019-11-29 2020-01-03 2021-01-02 ELABORAR UN International Reinforcement Initiatives calidad y costo PROGRAMA DE for Productive Innova CAPACITACIÓN EN tion EMPRENDIMIENTO GLOBAL Y EVENTOS DE PITCH Y MENTORING. PE-FONDECYT-128062- CS-LCS / AUDITORIA FINANCIERA DEL PROYECTO MEJORAMIENTO Y Selección Project Management and Ejecución AMPLIACIÓN DE LOS IBRD / 86820 Posterior basada en el Open - National 117,000.00 0.00 2019-08-19 2019-09-09 2019-10-23 2019-11-20 2019-12-20 2020-01-24 2020-02-28 2020-08-26 Monitoring & Evaluation pendiente SERVICIOS DEL menor costo SISTEMA NACIONAL DE CIENCIA, TECNOLOGÍA E INNOVACIÓN TECNOLÓGICA Strategic Programs: PE-FONDECYT-15887-CS- Productivity & Innovation Selección LCS / Auditoría al IBRD / 86820 Fund and Posterior basada en el Open - National 72,727.00 0.00 Cancelado 2019-04-29 2019-05-20 2019-07-03 2019-07-31 2019-08-30 2019-10-04 2019-11-08 2023-03-01 Proyecto Competitiveness menor costo Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-63422-CS- Strategic Programs: QCBS / Organización y Productivity & Innovation ejecución del curso de Fund and Selección capacitación y Open - IBRD / 86820 Competitiveness Previa basada en 1,665,426.00 0.00 Cancelado 2018-06-15 2018-07-06 2018-08-19 2018-09-16 2018-10-16 2018-11-20 2018-12-25 2020-05-18 acompañamiento para los International Reinforcement Initiatives calidad y costo monitores del ecosistema for Productive Innova de las iniciativas de tion vinculación academia industria - IVAI Strategic Programs: PE-FONDECYT-68643-CS- Productivity & Innovation Selección LCS / Diseño de la IBRD / 86820 Fund and Posterior basada en el Open - National 110,000.00 0.00 Cancelado 2019-04-01 2019-04-15 2019-04-29 2019-05-27 2019-06-03 2019-06-17 2019-07-15 2020-01-11 estrategia comunicacional Competitiveness menor costo del componente 2 Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-34253-CS- QCBS / Monitoreo y Selección Project Management and Open - evaluación independiente a IBRD / 86820 Posterior basada en 425,000.00 0.00 Cancelado 2018-01-05 2018-01-26 2018-03-11 2018-04-08 2018-05-08 2018-06-12 2018-07-17 2019-07-17 Monitoring & Evaluation International los indicadores del calidad y costo componente 2 INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-FONDECYT-15821-CS- INDV / Seguimiento y Improving the asesoramiento para la Institutional Framework Ejecución IBRD / 86820 Posterior Individual Limited 27,000.00 0.00 2020-07-02 2020-07-09 2020-07-16 2020-07-30 2021-04-21 capacitación de gasto of the National STI pendiente público en CTI (Asistencia System Técnica y acompañamiento) PE-FONDECYT-15878-CS- Strategic Programs: INDV / Especialista Productivity & Innovation Coordinador de área en la IBRD / 86820 Fund and Posterior Individual Limited 163,636.00 33,956.94 Firmado 2018-01-12 2018-01-17 2018-01-24 2018-02-05 2022-02-21 Unidad de Seguimiento y Competitiveness Monitoreo Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-15881-CS- Productivity & Innovation INDV / Especialista de IBRD / 86820 Fund and Posterior Individual Limited 65,455.00 33,502.40 Finalizado 2017-11-21 2017-11-26 2017-12-03 2017-12-22 2019-12-31 Evaluación y Selección Competitiveness Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-15705-CS- Improving the INDV / Taller de cierre IBRD / 86820 Institutional Framework Posterior Individual Limited 5,000.00 0.00 Cancelado 2018-08-15 2018-08-22 2018-08-29 2018-09-12 2018-10-02 de la consultoría of the National STI System PE-FONDECYT-15877-CS- Strategic Programs: INDV / Esp. Coord. de Productivity & Innovation área en Seguimiento y IBRD / 86820 Fund and Posterior Individual Limited 127,273.00 35,820.90 Firmado 2018-01-30 2018-02-02 2018-02-09 2018-02-16 2021-12-31 Monitoreo responsable del Competitiveness componente 1 Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-15870-CS- Project Management and INDV / Coordinador IBRD / 86820 Posterior Individual Open 237,273.00 53,928.40 Firmado 2018-01-24 2018-02-11 2018-02-18 2018-03-01 2019-03-01 Monitoring & Evaluation Adjunto del Proyecto Strategic Programs: PE-FONDECYT-15871-CS- Productivity & Innovation INDV / Especialista en IBRD / 86820 Fund and Posterior Individual Limited 180,000.00 40,947.37 Rescindido 2017-11-21 2017-11-26 2017-12-03 2017-12-22 2022-01-07 Gestión Administrativa Competitiveness (Contabilidad) Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-15872-CS- Productivity & Innovation INDV / Especialista en IBRD / 86820 Fund and Posterior Individual Limited 180,000.00 40,947.37 Rescindido 2017-11-21 2017-11-26 2017-12-03 2017-12-22 2022-01-07 Adquisiciones Competitiveness Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-15873-CS- Productivity & Innovation INDV / Analista de IBRD / 86820 Fund and Posterior Individual Limited 114,545.00 26,057.42 Finalizado 2018-01-19 2018-01-24 2018-01-31 2018-02-12 2021-12-31 Adquisiciones Competitiveness Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-54867-CS- Project Management and INDV / Especialista de IBRD / 86820 Posterior Individual Open 180,000.00 40,236.54 Finalizado 2017-10-13 2018-01-24 2018-01-24 2018-02-01 2019-01-31 Monitoring & Evaluation Planificación y Presupuesto Strategic Programs: PE-FONDECYT-52471-CS- Productivity & Innovation INDV / Especialista para IBRD / 86820 Fund and Posterior Individual Open 127,273.00 34,886.34 Firmado 2017-10-30 2017-12-18 2018-01-08 2018-02-12 2019-02-12 la Unidad Seguimiento y Competitiveness Monitoreo Reinforcement Initiatives for Productive Innova tion Page 4 PE-FONDECYT-55436-CS- Project Management and INDV / Especialista para IBRD / 86820 Posterior Individual Open 65,455.00 32,850.71 Firmado 2017-10-09 2018-02-07 2018-02-07 2018-02-12 2019-02-11 Monitoring & Evaluation la Unidad de Desarrollo PE-FONDECYT-15876-CS- Project Management and INDV / Especialista en IBRD / 86820 Posterior Individual Limited 122,727.00 27,641.28 Finalizado 2018-01-12 2018-01-17 2018-01-24 2018-02-05 2021-12-31 Monitoring & Evaluation Comunicaciones Strategic Programs: Productivity & Innovation PE-FONDECYT-15875-CS- IBRD / 86820 Fund and Posterior Individual Limited 147,273.00 33,502.40 Rescindido 2018-01-12 2018-01-17 2018-01-24 2018-02-05 2021-12-31 INDV / Especialista Legal Competitiveness Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-15880-CS- Productivity & Innovation INDV / Especialista de IBRD / 86820 Fund and Posterior Individual Limited 65,455.00 0.00 Cancelado 2017-11-21 2017-11-26 2017-12-03 2017-12-22 2019-12-31 Desarrollo Competitiveness Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-57479-CS- Project Management and INDV / Especialista en IBRD / 86820 Posterior Individual Limited 41,000.00 40,236.54 Finalizado 2018-04-11 2018-04-16 2018-04-23 2018-05-07 2019-05-07 Monitoring & Evaluation Presupuesto y Finanzas Strategic Programs: PE-FONDECYT-15874-CS- Productivity & Innovation INDV / Especialista en IBRD / 86820 Fund and Posterior Individual Limited 180,000.00 39,836.72 Firmado 2017-11-21 2017-11-26 2017-12-03 2017-12-22 2022-01-07 Planificación y Monitoreo Competitiveness Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-59533-CS- Project Management and INDV / Especialista en IBRD / 86820 Posterior Individual Limited 102,274.00 27,621.77 Firmado 2018-04-02 2018-04-07 2018-04-14 2018-04-28 2019-04-28 Monitoring & Evaluation Tesoreria PE-FONDECYT-54824-CS- Project Management and INDV / Especialista en IBRD / 86820 Posterior Individual Open 102,274.00 0.00 Cancelado 2018-03-31 2018-04-12 2018-04-17 2018-04-23 2019-04-22 Monitoring & Evaluation Tesorería PE-FONDECYT-34395-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 2 of the National STI System PE-FONDECYT-34396-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 3 of the National STI System PE-FONDECYT-34397-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 4 of the National STI System PE-FONDECYT-34398-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 5 of the National STI System PE-FONDECYT-34400-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 6 of the National STI System PE-FONDECYT-34393-CS- Improving the INDV / Desarrollador IBRD / 86820 Institutional Framework Posterior Individual Open 33,300.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 Senior de Software 1 of the National STI System PE-FONDECYT-35213-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-01-31 2018-05-01 software para la of the National STI recopilación de información System de Líneas de Base PE-FONDECYT-35214-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 2 PE-FONDECYT-35215-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 3 PE-FONDECYT-35216-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 4 PE-FONDECYT-35220-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 8 PE-FONDECYT-35218-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 6 PE-FONDECYT-35217-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 5 PE-FONDECYT-35219-CS- INDV / Desarrollador para Improving the la construcción de Institutional Framework IBRD / 86820 Posterior Individual Limited 16,364.00 0.00 Cancelado 2018-01-05 2018-01-10 2018-01-17 2018-02-07 2018-05-08 software para la of the National STI recopilación de información System de Líneas de Base 7 PE-FONDECYT-59545-CS- INDV / Analista Funcional Improving the para el proyecto de Institutional Framework IBRD / 86820 Posterior Individual Limited 26,561.00 31,304.67 Finalizado 2018-04-02 2018-04-07 2018-04-14 2018-04-28 2019-04-28 implementación de la of the National STI nueva plataforma de System gestión del conocimiento del SINACYT PE-FONDECYT-34402-CS- INDV / Analista Funcional Improving the para el proyecto de Institutional Framework IBRD / 86820 Posterior Individual Open 26,561.00 0.00 Cancelado 2018-04-27 2018-05-14 2018-05-19 2018-05-23 2019-05-22 implementación de la of the National STI nueva plataforma de System gestión del conocimiento del SINACYT PE-FONDECYT-59555-CS- INDV / Analista funcional Improving the para el módulo de Institutional Framework IBRD / 86820 Posterior Individual Limited 34,375.00 38,670.47 Finalizado 2018-04-16 2018-04-21 2018-04-28 2018-05-12 2019-05-12 vigilancia de I+D+i de la of the National STI nueva plataforma de System gestión del conocimiento del SINACYT Page 5 PE-FONDECYT-34403-CS- Improving the INDV / Analista funcional Institutional Framework para el proyecto de IBRD / 86820 Posterior Individual Open 34,375.00 0.00 Cancelado 2018-01-12 2018-02-02 2018-02-09 2018-03-02 2019-03-02 of the National STI implementación del System módulo de vigilancia de I+D+i PE-FONDECYT-61501-CS- Project Management and IBRD / 86820 Posterior Individual Limited 33,000.00 32,303.20 Rescindido 2018-04-23 2018-04-26 2018-05-01 2018-05-08 2019-05-08 INDV / Especialista Legal Monitoring & Evaluation PE-FONDECYT-69987-CS- INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA Improving the LA GESTIÓN DEL SUB Institutional Framework IBRD / 86820 Posterior Individual Limited 25,455.00 0.00 Cancelado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 COMPONENTE 1.1 DEL of the National STI PROYECTO DE System MEJORAMIENTO Y AMPLIACIONES DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-69990-CS- INDV / MONITOR TÉCNICO 1 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,213.75 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69992-CS- INDV / MONITOR TÉCNICO 2 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,213.75 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69993-CS- INDV / MONITOR TÉCNICO 3 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,271.46 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69994-CS- INDV / MONITOR TÉCNICO 4 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,271.46 Rescindido 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69996-CS- INDV / MONITOR FINANCIERO 1 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,271.46 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69998-CS- INDV / MONITOR FINANCIERO 2 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,271.46 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-69999-CS- INDV / MONITOR FINANCIERO 3 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,213.75 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-70000-CS- INDV / MONITOR FINANCIERO 4 DE LA Research and Innovation IBRD / 86820 Posterior Individual Limited 25,455.00 6,271.46 Firmado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 UNIDAD DE Capacity SEGUIMIENTO Y MONITOREO PE-FONDECYT-70001-CS- INDV / CONSULTORIA PARA DISEÑO Y ELABORACIÓN DE Improving the DOCUMENTOS Institutional Framework NORMATIVOS PARA LA IBRD / 86820 Posterior Individual Limited 40,000.00 39,057.88 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 of the National STI IMPLEMENTACIÓN DE System MEJORAS AL MARCO INSTITUCIONAL Y ORGANIZACIONAL DEL SINACYT PE-FONDECYT-70003-CS- INDV / DISEÑO, ELABORACIÓN Y Improving the SEGUIMIENTO DE Institutional Framework DOCUMENTOS E IBRD / 86820 Posterior Individual Limited 40,000.00 39,057.88 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 of the National STI INSTRUMENTOS DE System GESTIÓN PARA EL DESARROLLO DEL COMPONENTE 1 Y 3 PE-FONDECYT-70007-CS- INDV / GESTIÓN DEL PLAN MULTIANUAL DE ACTIVIDADES DE LA DIRECCIÓN DE Research and Innovation POLÍTICAS Y IBRD / 86820 Posterior Individual Limited 40,000.00 38,732.40 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 Capacity PROGRAMAS DEL CONCYTEC EN EL MARCO DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-15879-CS- Strategic Programs: INDV / Esp. Coord. de Productivity & Innovation área en Seguimiento y IBRD / 86820 Fund and Posterior Individual Limited 163,636.00 0.00 Cancelado 2018-01-26 2018-01-29 2018-02-05 2018-02-12 2021-12-31 Monitoreo responsable del Competitiveness componente 3 Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-15703-CS- Improving the INDV / Organización y Institutional Framework ejecución de Taller para IBRD / 86820 Posterior Individual Limited 5,000.00 0.00 Cancelado 2017-06-16 2017-06-23 2017-06-30 2017-07-14 2017-08-14 of the National STI elaboración de Términos System de Referencia PE-FONDECYT-15850-CS- INDV / ) Gestión del Project Management and fondo para la IBRD / 86820 Posterior Individual Limited 244,000.00 0.00 Cancelado 2018-07-17 2018-07-24 2018-07-31 2018-08-14 2020-07-06 Monitoring & Evaluation implementación de las iniciativas vinculación academia - empresa PE-FONDECYT-55423-CS- Improving the INDV / Consultor (1) para Institutional Framework mapeo de diagnostico IBRD / 86820 Posterior Individual Open 12,750.00 0.00 Cancelado 2018-05-07 2018-05-24 2018-05-29 2018-06-02 2018-11-19 of the National STI institucional y propuestas System de mejoras PE-FONDECYT-35395-CS- INDV / Seguimiento y Improving the asesoramiento para los Institutional Framework IBRD / 86820 Posterior Individual Limited 43,636.00 0.00 Cancelado 2018-07-06 2018-07-11 2018-07-18 2018-08-08 2019-02-04 estudios de Línea de Base of the National STI I+D+i (asistencia técnica y System acompañamiento) PE-FONDECYT-55425-CS- Improving the INDV / Consultor para la Institutional Framework IBRD / 86820 Posterior Individual Open 17,000.00 0.00 Cancelado 2018-05-07 2018-05-24 2018-05-29 2018-06-02 2018-11-19 reglamentación de la of the National STI nueva ley de SINACYT System Page 6 PE-FONDECYT-55426-CS- INDV / Asistencia técnica Improving the para revisión internacional Institutional Framework IBRD / 86820 Posterior Individual Open 10,000.00 0.00 Cancelado 2018-08-03 2018-08-20 2018-08-25 2018-08-29 2018-10-28 de modelos de of the National STI organización de sistemas System similares al SINACYT PE-FONDECYT-15817-CS- INDV / Seguimiento y Improving the asesoramiento el desarrollo Institutional Framework IBRD / 86820 Posterior Individual Limited 45,000.00 0.00 Cancelado 2018-02-16 2018-02-23 2018-03-02 2018-03-16 2019-04-17 del sistema integrado de of the National STI información (Asistencia System Técnica y acompañamiento) PE-FONDECYT-55420-CS- Improving the INDV / Consultor (2) para Institutional Framework IBRD / 86820 Posterior Individual Open 32,750.00 0.00 Cancelado 2018-04-27 2018-05-14 2018-05-19 2018-05-23 2018-11-09 sistematización y of the National STI diagnóstico rápido del System sistema de I+D+i PE-FONDECYT-15836-CS- INDV / Ejecución del curso Profesores internacionales: Selección , Project Management and IBRD / 86820 Posterior Individual Limited 196,840.00 0.00 Cancelado 2017-09-14 2017-09-21 2017-09-28 2017-10-12 2017-11-22 reclutamiento y viajes Monitoring & Evaluation internacionales de profesores internacionales (12 expertos internacionales). PE-FONDECYT-55424-CS- Improving the INDV / Consultor (2) para Institutional Framework mapeo de diagnóstico IBRD / 86820 Posterior Individual Open 12,750.00 0.00 Cancelado 2018-05-07 2018-05-24 2018-05-29 2018-06-02 2018-11-19 of the National STI institucional y propuestas System de mejoras PE-FONDECYT-55418-CS- Improving the INDV / Consultor (1) para Institutional Framework IBRD / 86820 Posterior Individual Open 32,750.00 0.00 Cancelado 2018-04-27 2018-05-14 2018-05-19 2018-05-23 2018-11-09 sistematización y of the National STI diagnóstico rápido del System sistema de I+D+i PE-FONDECYT-15702-CS- INDV / Seguimiento y Improving the asesoramiento para los Institutional Framework IBRD / 86820 Posterior Individual Limited 51,066.00 0.00 Cancelado 2018-03-30 2018-04-06 2018-04-13 2018-04-27 2018-10-24 estudios del sub of the National STI componente 1.1.1 System (Asistencia Técnica y acompañamiento) PE-FONDECYT-15706-CS- INDV / Seguimiento y Improving the asesoramiento para los 03 Institutional Framework IBRD / 86820 Posterior Individual Limited 43,636.00 0.00 Cancelado 2018-03-16 2018-03-23 2018-03-30 2018-04-13 2019-02-07 estudios de análisis del of the National STI gasto público. (Asistencia System Técnica y acompañamiento) PE-FONDECYT-15708-CS- Improving the INDV / Seguimiento y Institutional Framework asesoramiento a la IBRD / 86820 Posterior Individual Limited 20,606.00 0.00 Cancelado 2017-12-01 2017-12-08 2017-12-15 2017-12-29 2018-12-29 of the National STI consultoría de Análisis de System la Gobernanza PE-FONDECYT-15710-CS- INDV / Seguimiento y Improving the asesoramiento para el Institutional Framework IBRD / 86820 Posterior Individual Limited 10,500.00 0.00 Cancelado 2018-08-15 2018-08-22 2018-08-29 2018-09-12 2019-08-07 estudio del sistema gasto of the National STI público en CTI. System (Asistencia Técnica y acompañamiento) PE-FONDECYT-15714-CS- INDV / Seguimiento y Improving the asesoramiento para los Institutional Framework IBRD / 86820 Posterior Individual Limited 30,000.00 0.00 Cancelado 2018-01-31 2018-02-07 2018-02-14 2018-02-28 2019-01-31 estudios de Línea de Base of the National STI (Asistencia Técnica y System acompañamiento) PE-FONDECYT-15819-CS- INDV / Seguimiento y asesoramiento consultoria Improving the de de Desarrollo de la Institutional Framework IBRD / 86820 Posterior Individual Limited 45,000.00 0.00 Cancelado 2019-06-20 2019-06-27 2019-07-04 2019-07-18 2020-08-18 aplicación para el of the National STI seguimiento del Gasto System Público (Asistencia Técnica y acompañamiento) PE-FONDECYT-15827-CS- Improving the INDV / Coordinador del Institutional Framework IBRD / 86820 Posterior Individual Limited 40,500.00 0.00 Cancelado 2018-05-11 2018-05-18 2018-05-25 2018-06-08 2019-03-19 Programa de Capacitación of the National STI de análisis del gasto System público PE-FONDECYT-15829-CS- Improving the INDV / Coordinador del Institutional Framework IBRD / 86820 Posterior Individual Limited 30,000.00 0.00 Cancelado 2021-06-15 2021-06-22 2021-06-29 2021-07-13 2021-12-23 Programa de Capacitación of the National STI de M & E System PE-FONDECYT-15831-CS- Improving the INDV / Coordinador del Institutional Framework IBRD / 86820 Posterior Individual Limited 33,000.00 0.00 Cancelado 2018-01-26 2018-02-02 2018-02-09 2018-02-23 2018-12-13 programa de capacitación of the National STI de gestión de CTI System PE-FONDECYT-15832-CS- INDV / Evaluación de Improving the currícula de entidad Institutional Framework IBRD / 86820 Posterior Individual Limited 7,000.00 0.00 Cancelado 2018-01-26 2018-02-02 2018-02-09 2018-02-23 2018-03-22 capacitadora (por entidad of the National STI x curso) y dimensionar el System costo. PE-FONDECYT-15833-CS- INDV / Contratación de Project Management and expertos para IBRD / 86820 Posterior Individual Limited 7,000.00 0.00 Cancelado 2018-01-26 2018-02-02 2018-02-09 2018-02-23 2018-03-27 Monitoring & Evaluation identificación de las oportunidades tecnológicas PE-FONDECYT-15834-CS- INDV / Diseño y Project Management and IBRD / 86820 Posterior Individual Limited 14,020.00 0.00 Cancelado 2018-05-24 2018-05-31 2018-06-07 2018-06-21 2018-07-21 preparación de los Monitoring & Evaluation materiales de enseñanza PE-FONDECYT-15838-CS- INDV / Elaboración de la Project Management and IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 Cancelado 2018-01-19 2018-01-26 2018-02-02 2018-02-16 2018-06-16 matriz de evaluación de Monitoring & Evaluation sectores PE-FONDECYT-15844-CS- INDV / Consultorías especializadas Project Management and IBRD / 86820 Posterior Individual Limited 60,000.00 0.00 Cancelado 2018-06-15 2018-06-22 2018-06-29 2018-07-13 2019-01-09 internacionales de alto Monitoring & Evaluation nivel para el fortalecer las iniciativas para la competitividad PE-FONDECYT-15845-CS- INDV / Servicio de consultoría para reforma de política: Asesor senior de política para consolidar Project Management and IBRD / 86820 Posterior Individual Limited 278,400.00 0.00 Cancelado 2018-03-08 2018-03-15 2018-03-22 2018-04-05 2018-08-20 los insumos para las Monitoring & Evaluation iniciativas para la competitividad a través de reformas de política (24 días y dos viajes por año) PE-FONDECYT-15848-CS- INDV / Estudio de Project Management and dimensionamiento del IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 Cancelado 2018-04-20 2018-04-27 2018-05-04 2018-05-18 2018-08-31 Monitoring & Evaluation fondo a otorgar , iniciativas de vinculación académica Page 7 PE-FONDECYT-15852-CS- INDV / Estudio de Research and Innovation dimensionamiento de IBRD / 86820 Posterior Individual Limited 30,000.00 0.00 Cancelado 2018-01-26 2018-02-02 2018-02-09 2018-02-23 2018-05-24 Capacity instrumentos del componente 3 PE-FONDECYT-70254-CS- INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA LA GESTIÓN DEL SUB Research and Innovation COMPONENTE 3, SUB IBRD / 86820 Posterior Individual Limited 25,455.00 24,855.01 Firmado 2018-07-30 2018-08-04 2018-08-25 2018-09-29 2019-09-24 Capacity COMPONENTES 3.1, 3.2, 3.3 DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-70387-CS- INDV / SOPORTE ADMINISTRATIVO PARA Improving the LA GESTION DEL SUB Institutional Framework COMPONENTE 1.2 DEL IBRD / 86820 Posterior Individual Limited 25,455.00 0.00 Cancelado 2018-07-31 2018-08-05 2018-08-26 2018-09-30 2019-09-25 of the National STI PROYECTO DE System MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-73712-CS- Improving the CDS / Capacitación al Institutional Framework Selección directa IBRD / 86820 Posterior Direct 68,000.00 67,808.70 Finalizado 2018-08-16 2018-08-26 2018-09-10 2018-10-10 personal de CONCYTEC y of the National STI de consultores Monitores del FONDECYT System PE-FONDECYT-76770-CS- INDV / Elaboración de una guía metodológica de negociación con los subproyectos para capacitar a los monitores Research and Innovation IBRD / 86820 Posterior Individual Limited 7,000.00 6,805.54 Finalizado 2018-09-04 2018-09-09 2018-09-23 2018-10-14 2018-10-29 de seguimiento del Capacity Proyecto Mejoramiento y Ampliación del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica-SINACYT. PE-FONDECYT-70006-CS- INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA Improving the LA GESTIÓN DEL SUB Institutional Framework COMPONENTE 1.1 DE IBRD / 86820 Posterior Individual Limited 25,455.00 24,855.01 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 of the National STI LAS ACTIVIDADES 1.1.1 System DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-70005-CS- INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA LA GESTIÓN DEL SUB Project Management and IBRD / 86820 Posterior Individual Limited 25,455.00 24,855.01 Finalizado 2018-07-17 2018-07-22 2018-08-12 2018-09-16 2019-03-15 COMPONENTE 2.2 DEL Monitoring & Evaluation PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-77285-CS- INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA Improving the LA GESTIÓN DEL SUB Institutional Framework IBRD / 86820 Posterior Individual Open 25,455.00 24,855.01 Finalizado 2018-09-07 2018-10-03 2018-10-10 2018-10-24 2019-10-24 COMPONENTE 1.1 DEL of the National STI PROYECTO DE System MEJORAMIENTO Y AMPLIACIONES DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-77290-CS- INDV / Analista de Adquisiciones para el Project Management and IBRD / 86820 Posterior Individual Open 32,800.00 31,956.45 Finalizado 2018-09-10 2018-10-06 2018-10-13 2018-10-27 2019-10-27 Proyecto Mejoramiento y Monitoring & Evaluation Ampliación de los Servicios del SINACYT PE-FONDECYT-77295-CS- INDV / Especialista en gestión de metadatos y clasificación temática para Improving the el proyecto de Institutional Framework IBRD / 86820 Posterior Individual Limited 25,455.00 24,855.01 Finalizado 2018-09-10 2018-09-15 2018-09-29 2018-10-20 2019-10-20 implementación de la of the National STI nueva plataforma de System Gestión del Conocimiento del Sistema Nacional de Ciencia, Tecnología e Innovación (SINACYT) PE-FONDECYT-77306-CS- INDV / Especialista en control de autoridades y calidad de metadatos para Improving the el proyecto de Institutional Framework implementación de la IBRD / 86820 Posterior Individual Limited 25,455.00 21,304.30 Finalizado 2018-09-10 2018-09-15 2018-09-29 2018-10-20 2019-10-20 of the National STI nueva plataforma de System Gestión del Conocimiento del Sistema Nacional de Ciencia, Tecnología e Innovación (SINACYT) PE-FONDECYT-79616-CS- INDV / CONSULTOR ESPECIALIZADO PARA Improving the CAPACITACION EN EL Institutional Framework TALLER "LÍNEA DE IBRD / 86820 Posterior Individual Limited 8,000.00 6,921.05 Finalizado 2018-10-03 2018-10-08 2018-10-15 2018-10-25 2018-11-14 of the National STI BASE DEL GASTO System PÚBLICO EN CIENCIA, TECNOLOGIA E INNOVACION (CTI) EN EL PERU PE-FONDECYT-79618-CS- INDV / CONSULTORIA PARA LA REALIZACIÓN DE LA PRIMERA FASE Improving the DEL ESTUDIO DE Institutional Framework IBRD / 86820 Posterior Individual Limited 15,000.00 14,646.70 Finalizado 2018-10-03 2018-10-08 2018-10-15 2018-10-29 2019-01-27 "LÍNEA DE BASE DEL of the National STI GASTO PÚBLICO EN System CIENCIA TECNOLOGIA E INNOVACION (CTI) EN EL PERÚ PE-FONDECYT-87590-CS- INDV / SERVICIO PARA IDENTIFICAR INVESTIGADORES Research and Innovation EXTRANJEROS PARA IBRD / 86820 Posterior Individual Limited 8,500.00 8,291.38 Finalizado 2019-02-15 2019-02-20 2019-02-27 2019-03-13 2019-07-11 Capacity LAS CONVOCATORIAS DE INCORPORACION DE INVESTIGADORES Y PROYECTOS INTEGRALES PE-FONDECYT-77282-CS- INDV / SOPORTE ADMINISTRATIVO PARA Improving the LA GESTION DEL SUB Institutional Framework COMPONENTE 1.2 DEL IBRD / 86820 Posterior Individual Open 25,455.00 24,778.76 Firmado 2019-03-08 2019-04-03 2019-04-10 2019-04-24 2020-04-23 of the National STI PROYECTO DE System MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DEL SINACYT Page 8 PE-FONDECYT-70002-CS- INDV / COORDINADOR DE ACTIVIDADES Improving the RELACIONADAS A LA Institutional Framework Ejecución IMPLEMENTACIÓN DE IBRD / 86820 Posterior Individual Limited 40,000.00 0.00 2019-03-06 2019-03-11 2019-04-01 2019-05-06 2019-11-02 of the National STI pendiente MEJORAS AL MARCO System INSTITUCIONAL Y ORGANIZACIONAL DEL SINACYT PE-FONDECYT-59677-CS- INDV / Analista Programador Senior para la implementación de Project Management and Ejecución adecuaciones al módulo de IBRD / 86820 Posterior Individual Limited 14,545.00 0.00 2019-03-29 2019-04-03 2019-04-10 2019-04-24 2019-10-21 Monitoring & Evaluation pendiente seguimiento y monitoreo de subproyectos del Sistema Integrado de Gestión del FONDECYT. PE-FONDECYT-55432-CS- Improving the INDV / Consultor para la Institutional Framework Ejecución IBRD / 86820 Posterior Individual Open 22,000.00 0.00 2019-04-04 2019-04-21 2019-04-26 2019-04-30 2019-10-17 elaboración del Plan of the National STI pendiente Estratégico de CTI System PE-FONDECYT-55414-CS- Improving the INDV / Consultor para Institutional Framework IBRD / 86820 Posterior Individual Open 38,000.00 0.00 En ejecución 2019-04-01 2019-04-18 2019-04-23 2019-04-27 2019-10-14 Supervisión y Enlace con of the National STI DPP System PE-FONDECYT-55422-CS- INDV / Consultor senior Improving the para consolidar los Institutional Framework Ejecución insumos para revisión de IBRD / 86820 Posterior Individual Open 20,100.00 0.00 2019-03-19 2019-04-05 2019-04-10 2019-04-14 2019-06-28 of the National STI pendiente propuestas de iniciativas System de política, en el marco del Diagnóstico del sistema de I+D+i PE-FONDECYT-55429-CS- Improving the INDV / Consultor para Institutional Framework Ejecución dinamización y validación IBRD / 86820 Posterior Individual Open 18,200.00 0.00 2019-03-26 2019-04-12 2019-04-17 2019-04-21 2019-06-20 of the National STI pendiente de propuesta del System reglamento del SINACYT PE-FONDECYT-55430-CS- INDV / Consultor para Improving the elaboración de propuesta Institutional Framework Ejecución IBRD / 86820 Posterior Individual Open 22,000.00 0.00 2019-04-01 2019-04-18 2019-04-23 2019-04-27 2019-10-14 de nuevo programa of the National STI pendiente presupuestal del System CONCYTEC PE-FONDECYT-45382-CS- INDV / Servicio para el Improving the modelado de los procesos Institutional Framework Ejecución IBRD / 86820 Posterior Individual Open 29,091.00 0.00 2019-04-19 2019-05-22 2019-05-29 2019-06-12 2020-06-11 de software, relacionados of the National STI pendiente al sistema de M & E y a System las líneas de Base regionales Strategic Programs: PE-FONDECYT-33435-CS- Productivity & Innovation INDV / Monitor en Ejecución IBRD / 86820 Fund and Posterior Individual Limited 109,090.00 0.00 2019-04-09 2019-04-16 2019-04-23 2019-05-07 2023-03-28 Seguimiento y Monitoreo pendiente Competitiveness 3 Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-33433-CS- Productivity & Innovation INDV / Monitor en Ejecución IBRD / 86820 Fund and Posterior Individual Limited 109,090.00 0.00 2019-04-24 2019-05-01 2019-05-08 2019-05-22 2023-04-12 Seguimiento y Monitoreo pendiente Competitiveness 2 Reinforcement Initiatives for Productive Innova tion Strategic Programs: PE-FONDECYT-15882-CS- Productivity & Innovation INDV / Monitor en IBRD / 86820 Fund and Posterior Individual Limited 109,091.00 35,788.85 Firmado 2019-03-21 2019-03-28 2019-04-04 2019-04-18 2023-04-16 Seguimiento y Monitoreo Competitiveness 1 Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-35221-CS- Improving the INDV / Recopilación de Institutional Framework Ejecución IBRD / 86820 Posterior Individual Limited 15,545.00 0.00 2019-04-19 2019-04-24 2019-05-01 2019-05-15 2019-08-13 información de las Lineas of the National STI pendiente de Base regionales System PE-FONDECYT-35222-CS- Improving the INDV / Modelado de los Institutional Framework Ejecución IBRD / 86820 Posterior Individual Limited 14,545.00 0.00 2019-04-17 2019-04-22 2019-04-29 2019-05-20 2019-08-18 procesos relacionados a las of the National STI pendiente Líneas de Base regionales System PE-FONDECYT-15863-CS- INDV / Evaluación externa, primera Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 25,000.00 0.00 2019-04-18 2019-04-25 2019-05-02 2019-05-16 2019-06-15 convocatoria para Capacity pendiente modernizar y fortalecer la infraestructura de investigación (3.2) PE-FONDECYT-15857-CS- INDV / Calificación de Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 7,500.00 0.00 2019-04-16 2019-04-23 2019-04-30 2019-05-14 2019-06-13 investigadores postulantes Capacity pendiente (Baremo) PE-FONDECYT-15856-CS- INDV / Evaluación Research and Innovation Ejecución externa de instituciones IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 2019-04-24 2019-05-01 2019-05-08 2019-05-22 2019-06-25 Capacity pendiente postulantes, subvenciones para investigadores PE-FONDECYT-15867-CS- INDV / Evaluación Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 25,000.00 0.00 2019-03-28 2019-04-04 2019-04-11 2019-04-25 2019-05-22 externa, primera Capacity pendiente convocatoria para proyectos integrales (3.4) PE-FONDECYT-15865-CS- INDV / Evaluación Research and Innovation Ejecución externa, primera IBRD / 86820 Posterior Individual Limited 60,000.00 0.00 2019-04-18 2019-04-25 2019-05-02 2019-05-16 2019-06-15 Capacity pendiente convocatoria para producción de proyectos de calidad I+D+i (3.3) PE-FONDECYT-15847-CS- INDV / Evaluación externa de planes de Project Management and Ejecución IBRD / 86820 Posterior Individual Limited 116,308.00 0.00 2019-03-20 2019-03-27 2019-04-03 2019-04-17 2019-05-07 inversión (evaluadores Monitoring & Evaluation pendiente externos) para implementar iniciativas de vinculación académica PE-FONDECYT-15858-CS- INDV / Evaluación Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 2019-03-29 2019-04-05 2019-04-12 2019-04-26 2019-05-23 externa segunda etapa, Capacity pendiente subvenciones para investigadores PE-FONDECYT-15859-CS- INDV / Evaluación externa de instituciones Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 2019-04-09 2019-04-16 2019-04-23 2019-05-07 2019-06-03 postulantes, 2da Capacity pendiente convocatoria, subvenciones para investigadores (3.1.1) PE-FONDECYT-15860-CS- INDV / Calificación de investigadores postulantes Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 7,500.00 0.00 2019-04-26 2019-05-03 2019-05-10 2019-05-24 2019-06-20 (Baremo), 2da convocatoria Capacity pendiente subvenciones para investigadores Page 9 PE-FONDECYT-15861-CS- INDV / Evaluación Research and Innovation Ejecución externa segunda etapa, IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 2019-05-02 2019-05-09 2019-05-16 2019-05-30 2019-06-26 Capacity pendiente subvenciones para investigadores, 2da convocatoria PE-FONDECYT-15862-CS- INDV / Evaluación Research and Innovation Ejecución externa de instituciones IBRD / 86820 Posterior Individual Limited 24,000.00 0.00 2019-05-03 2019-05-10 2019-05-17 2019-05-31 2019-06-27 Capacity pendiente postulantes, programas de doctorados (3.1.2) PE-FONDECYT-15864-CS- INDV / Evaluación externa, segunda Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 25,000.00 0.00 2019-05-02 2019-05-09 2019-05-16 2019-05-30 2019-06-26 convocatoria para Capacity pendiente modernizar y fortalecer la infraestructura de investigación (3.2) PE-FONDECYT-15866-CS- INDV / Evaluación Research and Innovation Ejecución externa, segunda IBRD / 86820 Posterior Individual Limited 45,000.00 0.00 2019-04-30 2019-05-07 2019-05-14 2019-05-28 2019-06-24 Capacity pendiente convocatoria para producción de proyectos de calidad I+D+i (3.3) PE-FONDECYT-15868-CS- INDV / Evaluación Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 31,000.00 0.00 2019-04-29 2019-05-06 2019-05-13 2019-05-27 2019-07-05 externa, segunda Capacity pendiente convocatoria para proyectos integrales (3.4) PE-FONDECYT-15869-CS- INDV / Evaluación Research and Innovation Ejecución externa,tercera IBRD / 86820 Posterior Individual Limited 15,000.00 0.00 2019-04-29 2019-05-06 2019-05-13 2019-05-27 2019-06-23 Capacity pendiente convocatoria para proyectos integrales (3.4) PE-FONDECYT-77327-CS- Project Management and INDV / Especialista de IBRD / 86820 Posterior Individual Limited 32,800.00 31,877.21 Firmado 2019-02-14 2019-02-19 2019-02-26 2019-03-10 2020-03-09 Monitoring & Evaluation Comunicaciones del Proyecto Strategic Programs: PE-FONDECYT-15837-CS- Productivity & Innovation INDV / Coordinador del Ejecución IBRD / 86820 Fund and Posterior Individual Limited 45,000.00 0.00 2019-04-11 2019-04-18 2019-04-25 2019-05-09 2020-04-09 componente 2 asignado al pendiente Competitiveness CONCYTEC Reinforcement Initiatives for Productive Innova tion PE-FONDECYT-59676-CS- INDV / Analista Programador Senior para la implementación de Project Management and IBRD / 86820 Posterior Individual Limited 14,545.00 0.00 Cancelado 2019-03-28 2019-04-02 2019-04-09 2019-04-23 2019-10-20 adecuaciones al módulo de Monitoring & Evaluation evaluación y selección del Sistema Integrado de Gestión del FONDECYT. PE-FONDECYT-59563-CS- INDV / Analista Programador Junior para la implementación de Project Management and IBRD / 86820 Posterior Individual Limited 10,909.00 0.00 Cancelado 2019-04-15 2019-04-20 2019-04-27 2019-05-11 2019-11-07 adecuaciones al módulo de Monitoring & Evaluation gestión de convocatorias del Sistema Integrado de Gestión del FONDECYT. PE-FONDECYT-59674-CS- INDV / Analista Programador Junior para la implementación de Project Management and IBRD / 86820 Posterior Individual Limited 10,909.00 0.00 Cancelado 2019-04-03 2019-04-08 2019-04-15 2019-04-29 2019-10-26 adecuaciones al módulo de Monitoring & Evaluation seguimiento y monitoreo del Sistema Integrado de Gestión del FONDECYT. PE-FONDECYT-59558-CS- INDV / Arquitecto de Project Management and Software para el IBRD / 86820 Posterior Individual Limited 14,545.00 0.00 Cancelado 2019-04-09 2019-04-14 2019-04-21 2019-05-05 2019-11-01 Monitoring & Evaluation desarrollo de mejoras en el SIG de FONDECYT PE-FONDECYT-59561-CS- INDV / Analista Programador Junior para la implementación de Project Management and IBRD / 86820 Posterior Individual Limited 10,909.00 0.00 Cancelado 2019-04-11 2019-04-16 2019-04-23 2019-05-07 2019-11-03 adecuaciones al módulo de Monitoring & Evaluation evaluación y selección del Sistema Integrado de Gestión del FONDECYT. PE-FONDECYT-95709-CS- INDV / Monitor Técnico 5 Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 de la Unidad de Capacity Seguimiento y Monitoreo PE-FONDECYT-95712-CS- INDV / Monitor Técnico 6 Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 de la Unidad de Capacity Seguimiento y Monitoreo PE-FONDECYT-95713-CS- INDV / Monitor Técnico 7 Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 de la Unidad de Capacity Seguimiento y Monitoreo PE-FONDECYT-95714-CS- INDV / Monitor Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 Financiero 5 de la Unidad Capacity de Seguimiento y Monitoreo PE-FONDECYT-95717-CS- INDV / Monitor Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 Financiero 6 de la Unidad Capacity de Seguimiento y Monitoreo PE-FONDECYT-95719-CS- INDV / Monitor Research and Innovation IBRD / 86820 Posterior Individual Open 24,706.00 0.00 En ejecución 2019-01-21 2019-03-11 2019-04-01 2019-05-06 2019-11-02 Financiero 7 de la Unidad Capacity de Seguimiento y Monitoreo PE-FONDECYT-92307-CS- INDV / ESPECIALISTA Project Management and IBRD / 86820 Posterior Individual Direct 40,000.00 0.00 Cancelado 2018-12-28 2019-01-07 2019-01-14 2019-01-19 2020-01-19 EN GESTION Monitoring & Evaluation ADMINISTRATIVA PE-FONDECYT-96584-CS- INDV / ESPECIALISTA Project Management and IBRD / 86820 Posterior Individual Limited 40,000.00 39,099.53 Firmado 2019-02-06 2019-02-11 2019-02-26 2019-03-08 2020-03-07 EN GESTION Monitoring & Evaluation ADMINISTRATIVA PE-FONDECYT-96585-CS- Project Management and INDV / ESPECIALISTA IBRD / 86820 Posterior Individual Limited 40,000.00 39,244.83 Firmado 2019-02-06 2019-02-11 2019-02-26 2019-03-08 2020-03-07 Monitoring & Evaluation EN ADQUISICIONES PE-FONDECYT-101184- CS-INDV / Contratar los Project Management and Servicios de un consultor IBRD / 86820 Posterior Individual Limited 29,412.00 0.00 En ejecución 2019-02-15 2019-02-20 2019-03-13 2019-04-17 2019-10-14 Monitoring & Evaluation individual especializado para la selección de gerentes Page 10 PE-FONDECYT-101189- CS-INDV / Profesional para gestionar el proceso Research and Innovation de evaluación y selección IBRD / 86820 Posterior Individual Limited 14,850.00 14,524.97 Firmado 2019-02-15 2019-02-20 2019-03-13 2019-04-17 2019-10-14 Capacity del subcomponente 3.1 y 3.4 del SINACYT para propuestas de Lima y Centro del Perú PE-FONDECYT-101190- CS-INDV / Profesional para gestionar el proceso de evaluación y selección Research and Innovation IBRD / 86820 Posterior Individual Limited 14,850.00 14,524.97 En ejecución 2019-02-15 2019-02-20 2019-03-13 2019-04-17 2019-10-14 del subcomponente 3.1 y Capacity 3.4 del SINACYT para las propuestas del Sur y Norte del Perú PE-FONDECYT-101191- CS-INDV / Analista desarrollador de una Research and Innovation nueva plataforma para las IBRD / 86820 Posterior Individual Limited 24,243.00 0.00 En ejecución 2019-02-15 2019-02-20 2019-03-13 2019-04-17 2019-10-14 Capacity Unidades de Desarrollo y Evaluación y Selección del FONDECYT PE-FONDECYT-101197- CS-INDV / Consultor para la gestión y cumplimiento del Plan Multianual de Project Management and Ejecución IBRD / 86820 Posterior Individual Open 52,942.00 0.00 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 actividades de la Monitoring & Evaluation pendiente Subdirección de Innovación y Transferencia Tecnológica del CONCYTEC PE-FONDECYT-105977- Project Management and IBRD / 86820 Posterior Individual Open 32,000.00 31,947.94 En ejecución 2019-03-13 2019-05-01 2019-05-22 2019-06-26 2019-12-23 CS-INDV / Especialista Monitoring & Evaluation Legal PE-FONDECYT-107014- CS-INDV / Sensibilización de potenciales postulantes Research and Innovation a las convocatorias de IBRD / 86820 Posterior Individual Limited 5,648.00 5,748.50 Finalizado 2019-04-08 2019-04-13 2019-05-04 2019-06-08 2019-12-05 Capacity incorporación de investigadores y Proyectos integrales PE-FONDECYT-108341- CS-INDV / SERVICIO Strategic Programs: PARA LA ELABORACIÓN Productivity & Innovation DE LINEAMIENTOS Fund and TECNICOS Y Ejecución IBRD / 86820 Competitiveness Posterior Individual Open 6,500.00 0.00 2019-03-29 2019-05-03 2019-05-24 2019-06-28 2019-12-25 OPERATIVOS PARA EL pendiente Reinforcement Initiatives LANZAMIENTO Y for Productive Innova GESTIÓN DEL tion CONCURSO DE INICIATIVAS PARA LA COMPETITIVIDAD - VENTANILLA 1 PE-FONDECYT-108594- CS-INDV / CONSULTORIA PARA EL DESARROLLO DE ESTRATEGIAS PARA LA IMPLEMENTACION EFECTIVA DE UN Research and Innovation PROGRAMA DE IBRD / 86820 Posterior Individual Limited 12,350.00 12,574.85 Finalizado 2019-04-04 2019-04-09 2019-04-30 2019-06-04 2019-12-01 Capacity REPATRIACIÓN, INCORPORACIÓN Y RETENCIÓN DE INVESTIGADORES EN CIENCIAS Y TECNOLOGÍA PARA LAS UNIVERSIDADES PERUANAS PE-FONDECYT-108726- CS-INDV / Consultores para integrar el PANEL DE EVALUACIÓN TÉCNICA del Concurso Research and Innovation Ejecución IBRD / 86820 Posterior Individual Open 98,802.00 0.00 2019-04-05 2019-05-24 2019-06-14 2019-07-19 2020-01-15 E038-2019-01-BM Capacity pendiente "Incorporación de Investigadores", del Subcomponente "Incremento de la disponibilidad de capital humano en I+D+i" PE-FONDECYT-109640- CS-INDV / CONTRATACIÓN DE SERVICIO ESPECIALIZADO PARA LA REVISIÓN Y ADAPTACIÓN DEL Improving the CUESTIONARIO DE LA Institutional Framework IBRD / 86820 Posterior Individual Limited 8,000.00 0.00 Bajo Revision 2019-04-08 2019-04-13 2019-05-04 2019-06-08 2019-12-05 ENCUESTA Y LA of the National STI ELABORACIÓN DEL System MANUAL DEL ENCUESTADOR PARA LA PRIMERA ENCUESTA DE PERCEPCIÓN SOCIAL DE LA CIENCIA Y TECNOLOGÍA EN EL PERÚ 2019. PE-FONDECYT-109641- CS-INDV / CONTRATACIÓN DE SERVICIO ESPECIALIZADO PARA LA REVISIÓN Y ADAPTACIÓN DEL Improving the CUESTIONARIO DE LA Institutional Framework IBRD / 86820 Posterior Individual Limited 14,000.00 0.00 Bajo Revision 2019-04-08 2019-04-13 2019-05-04 2019-06-08 2019-12-05 ENCUESTA Y LA of the National STI ELABORACIÓN DEL System MANUAL DEL ENCUESTADOR PARA LA PRIMERA ENCUESTA DE PERCEPCIÓN SOCIAL DE LA CIENCIA Y TECNOLOGÍA EN EL PERÚ 2019. PE-FONDECYT-108342- CS-CDS / SERVICIO ESPECIALIZADO PARA EL ANÁLISIS E INTERPRETACIÓN DE RESULTADOS DEL Improving the ANEXO N° 1 FORMATO Institutional Framework Selección directa IBRD / 86820 Previa Direct 9,000.00 0.00 Cancelado 2019-03-29 2019-04-08 2019-06-12 2019-12-09 DE RECOLECCIÓN DE of the National STI de consultores DATOS , COMO PARTE System DEL ESTUDIO DE LINEA BASE DEL GASTO PUBLICO EN CIENCIA, TECNOLOGÍA E INNOVACIÓN EN EL PERÚ PE-FONDECYT-111845- CS-CDS / SERVICIO ESPECIALIZADO PARA EL ANÁLISIS E INTERPRETACIÓN DE RESULTADOS DEL Improving the ANEXO N° 1 FORMATO Institutional Framework Selección directa IBRD / 86820 Posterior Direct 9,000.00 0.00 En ejecución 2019-04-24 2019-05-04 2019-07-08 2020-01-04 DE RECOLECCIÓN DE of the National STI de consultores DATOS , COMO PARTE System DEL ESTUDIO DE LINEA BASE DEL GASTO PUBLICO EN CIENCIA, TECNOLOGÍA E INNOVACIÓN EN EL PERÚ Page 11 PE-FONDECYT-111857- CS-INDV / CONTRATACIÓN DE SERVICIO ESPECIALIZADO PARA LA ELABORACIÓN DEL Improving the PERFIL DE LA Institutional Framework EMPRESA QUE SE IBRD / 86820 Posterior Individual Limited 8,000.00 8,000.00 Finalizado 2019-04-24 2019-04-29 2019-05-20 2019-06-24 2019-12-21 of the National STI ENCARGUE DE LA System REALIZACIÓN Y SUPERVISION DE LA EJECUCIÓN DE LA ENCUESTA DE PERCEPCIÓN SOCIAL DE LA CIENCIA Y TECNOLOGÍA EN EL PERU 2019 PE-FONDECYT-116770- CS-INDV / Especialista en SIGA-MEF para el Proyecto Mejoramiento y Project Management and IBRD / 86820 Posterior Individual Limited 28,700.00 28,335.30 Firmado 2019-05-27 2019-06-01 2019-06-22 2019-07-27 2020-01-23 ampliación de los servicios Monitoring & Evaluation del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica (SINACYT) PE-FONDECYT-116779- CS-CDS / Analista de Adquisiciones 1 para el Proyecto Mejoramiento y Project Management and Selección directa ampliación de los servicios IBRD / 86820 Posterior Direct 32,300.00 31,872.51 Finalizado 2019-05-27 2019-06-01 2019-08-05 2020-02-01 Monitoring & Evaluation de consultores del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica (SINACYT) PE-FONDECYT-116791- CS-CDS / Analista de Adquisiciones 2 para el Proyecto Mejoramiento y Project Management and Selección directa ampliación de los servicios IBRD / 86820 Posterior Direct 32,300.00 31,872.51 Firmado 2019-05-28 2019-06-02 2019-08-06 2020-02-02 Monitoring & Evaluation de consultores del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica (SINACYT) PE-FONDECYT-116992- CS-INDV / Supervisor Financiero de la Unidad de Seguimiento y Monitoreo en el Marco del Research and Innovation IBRD / 86820 Posterior Individual Limited 35,900.00 35,571.36 Firmado 2019-05-28 2019-06-02 2019-06-23 2019-07-28 2020-01-24 Proyecto Mejoramiento y Capacity Ampliación del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica - SINACYT PE-FONDECYT-124589- CS-INDV / ESPECIALISTA EN DESARROLLO DE Research and Innovation SOFTWARE DE LA IBRD / 86820 Posterior Individual Limited 29,000.00 28,427.60 Firmado 2019-07-24 2019-07-29 2019-08-19 2019-09-23 2020-03-21 Capacity PLATAFORMA PARA LOS PROCESOS OPERATIVOS DE LAS UNIDADES ORGÁNICAS DEL FONDECYT PE-FONDECYT-124590- CS-INDV / ESPECIALISTA EN ANÁLISIS Y DISEÑO DE Research and Innovation SOFTWARE DE LA IBRD / 86820 Posterior Individual Limited 29,000.00 28,427.60 Firmado 2019-07-24 2019-07-29 2019-08-19 2019-09-23 2020-03-21 Capacity PLATAFORMA PARA LOS PROCESOS OPERATIVOS DE LAS UNIDADES ORGÁNICAS DEL FONDECYT PE-FONDECYT-126726- CS-INDV / Consultor Individual Especialista Ambiental para el Project Management and Proyecto Mejoramiento y IBRD / 86820 Posterior Individual Limited 36,000.00 35,413.90 Firmado 2019-08-08 2019-08-13 2019-09-03 2019-10-08 2020-04-05 Monitoring & Evaluation ampliación de los servicios del Sistema Nacional de Ciencia, Tecnología e innovación Tecnológica (SINACYT) PE-FONDECYT-128047- CS-INDV / SOPORTE Strategic Programs: ADMINISTRATIVO PARA Productivity & Innovation LA MEJORA DE LA Fund and GESTIONES DEL SUB IBRD / 86820 Competitiveness Posterior Individual Limited 21,800.00 24,789.73 Firmado 2019-08-16 2019-08-21 2019-09-11 2019-10-16 2020-04-13 COMPONENTE 2.2 DEL Reinforcement Initiatives PROYECTO DE for Productive Innova MEJORAMIENTO Y tion AMPLIACION DE LOS SERVICIOS DEL SINACYT. PE-FONDECYT-127623- CS-INDV / CONSULTORÍA PARA LA COORDINACIÓN, SUPERVISIÓN Y Improving the CONSOLIDACIÓN DE Institutional Framework IBRD / 86820 Posterior Individual Limited 34,200.00 39,018.62 Firmado 2019-08-16 2019-08-21 2019-09-11 2019-10-16 2020-04-13 PRODUCTOS DE LA of the National STI ACTIVIDAD 1.1.1 PARA System LA IMPLEMENTACIÓN DE MEJORAS AL MARCO INSTITUCIONAL Y ORGANIZACIONAL DEL SINACYT. PE-FONDECYT-128038- CS-INDV / CONSULTORIA INDIVIDUAL PARA LA GESTIÓN DEL PLAN MULTIANUAL DE Research and Innovation ACTIVIDADES DE LA IBRD / 86820 Posterior Individual Limited 34,200.00 39,018.62 Firmado 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 Capacity DIRECCIÓN DE POLITICAS Y PROGRAMAS DEL CONCYTEC EN EL MARCO DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL PE-FONDECYT-128041- SINACYT. CS-INDV / CONTRATAR CONSULTOR DE SOPORTE Improving the ADMINISTRATIVO PARA Institutional Framework IBRD / 86820 Posterior Individual Limited 21,800.00 24,874.15 Firmado 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 LA GESTION DEL SUB of the National STI COMPONENTE 1.1 DEL System PROYECTO DE MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DEL SINACYT. PE-FONDECYT-128059- CS-INDV / PROFESIONAL PARA GESTIONAR EL PROCESO DE EVALUACIÓN Y SELECCIÓN RESPECTO Research and Innovation Ejecución A LOS IBRD / 86820 Posterior Individual Limited 22,000.00 0.00 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 Capacity pendiente SUBCOMPONENTES: INCREMENTO DE LA DISPONIBILIDAD DE CAPITAL HUMANO PARA CIENCIA, TECNOLOGÍA E INNOVACIÓN Y ASIGNACIÓN INTEGRAL DE RECURSOS PARA LOS SUBPROYECTOS DE I+D+i Page 12 PE-FONDECYT-128032- CS-INDV / APOYO EN GESTIÓN ADMINISTRATIVA PARA EL PROYECTO MEJORAMIENTO Y Project Management and Ejecución IBRD / 86820 Posterior Individual Limited 24,900.00 0.00 2019-08-19 2019-08-24 2019-09-14 2019-10-19 2020-04-16 AMPLIACIÓN DE LOS Monitoring & Evaluation pendiente SERVICIOS DEL SISTEMA NACIONAL DE CIENCIA, TECNOLOGÍA E INNOVACIÓN TECNOLÓGICA. PE-FONDECYT-136589- CS-INDV / ESPECIALISTA EN DESARROLLO DE SOFTWARE PARA Research and Innovation Ejecución ACTUALIZACIÓN Y IBRD / 86820 Posterior Individual Limited 8,786.00 0.00 2019-09-30 2019-10-05 2019-10-26 2019-11-30 2020-05-28 Capacity pendiente MANTENIMIENTO DE LA PLATAFORMA ACTUAL DEL FONDECYT – UNIDAD DE SEGUIMIENTO Y MONITOREO PE-FONDECYT-136592- CS-INDV / ESPECIALISTA EN DESARROLLO DE SOFTWARE PARA Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 8,786.00 0.00 2019-09-30 2019-10-05 2019-10-26 2019-11-30 2020-05-28 ACTUALIZACIÓN Y Capacity pendiente MANTENIMIENTO DE LA PLATAFORMA ACTUAL DEL FONDECYT – UNIDAD DE EVALUACIÓN Y SELECCIÓN PE-FONDECYT-137140- CS-INDV / PROFESIONAL PARA GESTIONAR EL PROCESO DE Research and Innovation Ejecución IBRD / 86820 Posterior Individual Limited 18,604.65 0.00 2019-10-01 2019-10-06 2019-10-27 2019-12-01 2020-05-29 EVALUACIÓN Y Capacity pendiente SELECCIÓN DEL SUBCOMPONENTE 3.1 Y 3.4 DEL SINACYT PARA PROPUESTAS DE LIMA Y CENTRO DEL PERÚ PE-FONDECYT-137142- CS-INDV / FACILITADOR DE LAS ACTIVIDADES Improving the RELACIONADAS CON LA Institutional Framework Ejecución ACTUALIZACIÓN DE LA IBRD / 86820 Posterior Individual Limited 11,361.51 0.00 2019-10-01 2019-10-06 2019-10-27 2019-12-01 2020-05-29 of the National STI pendiente POLÍTICA NACIONAL System DE CIENCIA,TECNOLOGÍA E INNOVACIÓN TECNOLÓGICA AL 2030. PE-FONDECYT-139898- CS-INDV / SERVICIO DE COORDINACIÓN Y ACOMPAÑAMIENTO EN MATERIA MIGRATORIA Improving the Y TRIBUTARIA PARA Institutional Framework IBRD / 86820 Posterior Individual Limited 11,627.91 13,473.05 Firmado 2019-10-11 2019-10-16 2019-11-06 2019-12-11 2020-06-08 EXTRANJEROS CUYOS of the National STI PROYECTOS System RESULTADOS GANADORES DEL CONCURSO DE INCORPORACIÓN DE INVESTIGADORES. PE-FONDECYT-141105- Project Management and Ejecución CS-INDV / Especialista IBRD / 86820 Posterior Individual Open 40,000.00 0.00 2019-10-17 2019-12-05 2019-12-26 2020-01-30 2020-07-28 Monitoring & Evaluation pendiente En Gestión Administrativa PE-FONDECYT-141128- CS-INDV / Especialista en Presupuesto y Finanzas del Proyecto de Project Management and Ejecución IBRD / 86820 Posterior Individual Open 39,285.71 0.00 2019-10-17 2019-12-05 2019-12-26 2020-01-30 2020-07-28 Mejoramiento y Monitoring & Evaluation pendiente Ampliación del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica. PE-FONDECYT-141132- CS-INDV / Coordinador General del Proyecto de Project Management and Ejecución IBRD / 86820 Posterior Individual Limited 53,571.43 0.00 2019-10-17 2019-10-22 2019-11-12 2019-12-17 2020-06-14 Desarrollo de la Monitoring & Evaluation pendiente Plataforma de Gestión del Conocimiento - DEGC PE-FONDECYT-141203- CS-INDV / MONITOR Research and Innovation Ejecución TÉCNICO DE LA IBRD / 86820 Posterior Individual Open 24,706.00 0.00 2019-10-17 2019-12-05 2019-12-26 2020-01-30 2020-07-28 Capacity pendiente UNIDAD DE SEGUIMIENTO Y MONITOREO PE-FONDECYT-141204- CS-INDV / MONITOR FINANCIERO DE LA Research and Innovation Ejecución IBRD / 86820 Posterior Individual Open 24,706.00 0.00 2019-10-17 2019-12-05 2019-12-26 2020-01-30 2020-07-28 UNIDAD DE Capacity pendiente SEGUIMIENTO Y MONITOREO PE-FONDECYT-145317- CS-INDV / Monitor Research and Innovation Ejecución IBRD / 86820 Posterior Individual Open 24,706.00 0.00 2019-11-12 2019-12-31 2020-01-21 2020-02-25 2020-08-23 Técnico 8 de la Unidad Capacity pendiente de Seguimiento y Monitoreo PE-FONDECYT-145323- CS-INDV / Monitor Research and Innovation Ejecución IBRD / 86820 Posterior Individual Open 24,706.00 0.00 2019-11-12 2019-12-31 2020-01-21 2020-02-25 2020-08-23 Financiero 8 de la Unidad Capacity pendiente de Seguimiento y Monitoreo PE-FONDECYT-54546-CS- Project Management and INDV / Especialista en IBRD / 86820 Posterior Individual Open 180,000.00 0.00 Cancelado 2019-04-08 2019-07-20 2019-07-20 2019-07-28 2020-07-26 Monitoring & Evaluation Adquisiciones PE-FONDECYT-146435- CS-INDV / 3 Research and Innovation Ejecución MONITORES TÉCNICOS IBRD / 86820 Posterior Individual Limited 75,000.00 0.00 2019-11-20 2019-12-04 2019-12-25 2020-01-29 2020-07-27 Capacity pendiente DE LA UNIDAD DE SEGUIMIENTO Y MONITOREO PE-FONDECYT-146436- CS-INDV / MONITOR Research and Innovation Ejecución FINANCIERO DE LA IBRD / 86820 Posterior Individual Limited 25,000.00 0.00 2019-11-20 2019-11-25 2019-12-16 2020-01-20 2020-07-18 Capacity pendiente UNIDAD SEGUIMIENTO Y MONITOREO PE-FONDECYT-146826- CS-INDV / Evaluación de Medio Termino de Proyecto Mejoramiento y Project Management and Ejecución Ampliación de los IBRD / 86820 Posterior Individual Limited 17,400.00 0.00 2019-11-22 2019-11-27 2019-12-18 2020-01-22 2020-07-20 Monitoring & Evaluation pendiente Servicios del Sistema Nacional de Ciencia,Tecnología e Innovación Tecnológico (SINACYT) PE-FONDECYT-121561- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y la IBRD / 86820 Posterior Individual Open 20,600.00 0.00 Cancelado 2019-06-28 2019-08-16 2019-09-06 2019-10-11 2020-04-08 Monitoring & Evaluation formulación de documentos de las iniciativas de vinculación academia- industria 6 Page 13 PE-FONDECYT-121562- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y la IBRD / 86820 Posterior Individual Open 20,600.00 0.00 Cancelado 2019-06-28 2019-08-16 2019-09-06 2019-10-11 2020-04-08 Monitoring & Evaluation formulación de documentos de las iniciativas de vinculación academia- industria 7 PE-FONDECYT-121563- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y la IBRD / 86820 Posterior Individual Open 20,600.00 0.00 Cancelado 2019-06-28 2019-08-16 2019-09-06 2019-10-11 2020-04-08 Monitoring & Evaluation formulación de documentos de las iniciativas de vinculación academia- industria 8 PE-FONDECYT-101196- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y formulación IBRD / 86820 Posterior Individual Open 35,295.00 0.00 Cancelado 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Monitoring & Evaluation de documentos de las iniciativas de vinculación academia-industria 5 PE-FONDECYT-101193- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y formulación IBRD / 86820 Posterior Individual Open 35,295.00 0.00 Cancelado 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Monitoring & Evaluation de documentos de las iniciativas de vinculación academia-industria 2 PE-FONDECYT-101194- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y formulación IBRD / 86820 Posterior Individual Open 35,295.00 0.00 Cancelado 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Monitoring & Evaluation de documentos de las iniciativas de vinculación academia-industria 3 PE-FONDECYT-101192- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y formulación IBRD / 86820 Posterior Individual Open 35,295.00 0.00 Cancelado 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Monitoring & Evaluation de documentos de las iniciativas de vinculación academia-industria 1 PE-FONDECYT-101195- CS-INDV / Consultoría para el seguimiento de las Project Management and actividades y formulación IBRD / 86820 Posterior Individual Open 35,295.00 0.00 Cancelado 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2019-11-27 Monitoring & Evaluation de documentos de las iniciativas de vinculación academia-industria 4 PE-FONDECYT-54531-CS- INDV / Especialista en Project Management and IBRD / 86820 Posterior Individual Open 180,000.00 0.00 Cancelado 2019-03-26 2019-07-08 2019-07-08 2019-07-19 2020-07-17 Gestión Administrativa Monitoring & Evaluation (Contabilidad) PE-FONDECYT-141138- CS-INDV / Especialista Legal del Proyecto de Project Management and Ejecución Mejoramiento y IBRD / 86820 Posterior Individual Open 32,142.86 0.00 2020-01-06 2020-02-24 2020-03-16 2020-04-20 2020-10-17 Monitoring & Evaluation pendiente Ampliación del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica PE-FONDECYT-108593- CS-INDV / SERVICIO DE SOPORTE ADMINISTRATIVO PARA Improving the LA GESTIÓN DEL SUB Institutional Framework Ejecución COMPONENTE 1.1 DE IBRD / 86820 Posterior Individual Limited 24,710.00 0.00 2019-12-30 2020-01-04 2020-01-25 2020-02-29 2020-08-27 of the National STI pendiente LAS ACTIVIDADES 1.1.1 System DEL PROYECTO DE MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DEL SINACYT PE-FONDECYT-141112- CS-INDV / Coordinador Adjunto del Proyecto de Project Management and Ejecución Mejoramiento y IBRD / 86820 Posterior Individual Open 45,882.35 0.00 2020-01-13 2020-03-02 2020-03-23 2020-04-27 2020-10-24 Monitoring & Evaluation pendiente Ampliación del Sistema Nacional de Ciencia, Tecnología e Innovación Tecnológica. PE-FONDECYT-152096- CS-INDV / CONSULTOR PARA LA ELABORACIÓN DE PLAN DE IMPLEMENTACIÓN Y DE DOCUMENTOS TÉCNICOS Y DE Project Management and Ejecución IBRD / 86820 Posterior Individual Limited 21,500.00 0.00 2020-01-06 2020-01-11 2020-02-01 2020-03-07 2020-09-03 DIFUSIÓN PARA LA Monitoring & Evaluation pendiente OPERACIÓN DE LA NUEVA PLATAFORMA DE GESTIÓN DEL CONOCIMIENTO DEL SISTEMA NACIONAL DE CIENCIA, TECNOLOGÍA E INNOVACIÓN (SINACYT) Page 14