THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA June 2017 Report No: ACS22456 Standard Disclaimer: This volume is a product of the staff of the International Bank for Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Copyright Statement: The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978-750-8400, fax 978-750-4470, http://www.copyright.com/. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA, fax 202-522-2422, e-mail pubrights@worldbank.org. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Table of Contents Acknowledgements................................................................................................................................... i Abbreviations and Acronyms.................................................................................................................... ii EXECUTIVE SUMMARY............................................................................................................................ iii I. Introduction....................................................................................................................................... 1 1.1 Country Context.............................................................................................................................. 2 1.2 Sector Context................................................................................................................................ 3 1.3 Key Challenges................................................................................................................................ 9 1.4 Objective and Methodology......................................................................................................... 12 II. The State of Basic Service Delivery in Palestinian Local Governments............................................. 14 2.1 The Institutional Framework Governing Local Service Delivery..................................................... 18 2.2 Water and Waste Water................................................................................................................ 24 2.3 Solid Waste Management............................................................................................................. 32 2.4 Local Roads ..................................................................................................................................... 34 2.5 Socio-Demographics of Service Provision..................................................................................... 39 2.6 Citizen Willingness to Pay.............................................................................................................. 41 III. Drivers of Service Delivery Performance.......................................................................................... 47 3.1 The LGPA Performance Index........................................................................................................ 48 3.2 Geography and Administrative Set-up.......................................................................................... 50 3.3 Population Size, Density, and Wealth............................................................................................ 52 3.4 Area C and Separation Barrier...................................................................................................... 54 3.5 Joint Service Councils.................................................................................................................... 59 3.6 Fiscal Capacity............................................................................................................................... 61 3.7 Governance and Accountability.................................................................................................... 63 IV. Conclusion and Recommendations................................................................................................. 71 4.1 Prioritize the Improvement of the Quality and Reliability of Services.......................................... 72 4.2 Reform the Local Government Financing System as a Pre-condition for Success......................... 73 4.3 Strengthen LGU Accountability and Responsiveness to Increase Citizens’ Willingness to Pay .... 75 4.4 Consolidate and Professionalize Service Delivery......................................................................... 80 4.5 Increase Density and Connectivity, and Support the Marginalized that the PA Cannot Reach..... 81 4.6 Benchmarking for Improving Local Government Performance..................................................... 82 References.............................................................................................................................................. 83 Annex..................................................................................................................................................... 85 Annex 1: Methodology of Household Survey......................................................................................... 85 Annex 2: Methodology Qualitative Analysis........................................................................................... 86 Annex 3: Methodology LGPA Performance Index................................................................................... 87 Annex 4: Regression Results................................................................................................................... 88 Annex 5: Overview Key Informant Interviews and Focus Group Discussions....................................... 120 Annex 6: Key Informant Interviews and Focus Groups Discussions Referenced.................................. 121 Annex 7: LGU Performance Ranking..................................................................................................... 125 Annex 8: LGU Revenue Assignment, Management Responsibility, and Final Destination of Funds .... 139 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. List of Figures: Figure ES-1: Service Access across Sectors.............................................................................................. vi Figure ES-2: Satisfaction with Service Quality and Reliability..................................................................vii Figure ES-3: Population Size (left) & Density (right) as Performance Drivers...........................................ix Figure ES-4: Operating Revenues (left) & Operating Expenditures (right) as Performance Drivers............ x Figure ES-5: Citizen Service Center Use (left) & LGU Responsiveness (right) as Performance Drivers......xi Figure I-1: Fiscal Decentralization in the Palestinian territories and World Regions................................. 4 Figure I-2: Revenues by Type in Municipalities (left) and VCs (right)......................................................... 5 Figure I-3: Expenditure Allocation by Budget Type in Municipalities (left) and VCs (right)...................... 5 Figure I-4: Total Per Capita Expenditures with (left) and Without Outliers (right)..................................... 6 Figure I-5: Average Per Capita Expenditures in Operating Budget (left) and Enterprise Fund (right)....... 6 Figure I-6: Operating Budget Expenditure Categories Municipalities (left) and VCs (right)...................... 7 Figure I-7: The Dynamics of Net-Lending in the West Bank.................................................................... 11 Figure I-8: LGPA Survey - Municipality and Village Council Size-Groups and Population......................... 13 Figure II-1: Service Access across Sectors............................................................................................... 16 Figure II-2: Satisfaction with Service Quality and Reliability................................................................... 17 Figure II-3: Geography of Service Provision: Access to Improved Drinking Water.................................. 25 Figure II-4: Geography of Service Provision: Access to Piped Water....................................................... 25 Figure II-5: Satisfaction with Quality and Reliability: Piped Water.......................................................... 26 Figure II-6: Trends in Service Delivery: Change in Quality of Piped Water in Last 3 Years........................ 27 Figure II-7: Geography of Service Provision: Access to Improved Sanitation Facilities............................ 28 Figure II-8: Geography of Service Provision: Access to Piped Sewage..................................................... 28 Figure II-9: Satisfaction with Quality and Reliability: Piped Sewage........................................................ 29 Figure II-10: Trends in Service Delivery: Change in Quality of Piped Sewage in last 3 Years.................... 30 Figure II-11: Access to Improved Drinking Water Sources (% of Population with Access)...................... 30 Figure II-12: Access to Improved Sanitation Facilities (% of Population with Access)............................ 31 Figure II-13: Geography of Service Provision: Solid Waste Collection..................................................... 32 Figure II-14: Satisfaction with Quality and Reliability: Solid Waste Collection......................................... 33 Figure II-15 : Trends in Service Delivery: Change in Quality of Solid Waste Collection in last 3 Years...... 33 Figure II-16: Geography of Service Provision: Paved Roads.................................................................... 34 Figure II-17: Impact on the Poor: Likelihood of Service Access.............................................................. 39 Figure II-18: Gender Gap: Likelihood of Service Access.......................................................................... 40 Figure II-19: Impact on the Poor: Likelihood of Satisfaction with Quality and Reliability....................... 40 Figure II-20: Gender Gap: Likelihood of Satisfaction with Quality and Reliability.................................. 41 Figure II-21: Payment across Sectors...................................................................................................... 42 Figure II-22: Likelihood of Payment: Piped Water and Solid Waste Collection Services.......................... 43 Figure II-23: Maximum and Actual Willingness to Pay: Piped Water....................................................... 43 Figure II-24: Maximum and Actual Willingness to Pay: Solid Waste Collection....................................... 44 Figure II-25: Timely Payment without Major Problems........................................................................... 45 Figure II-26: Likelihood of Timely Payment: Piped Water and Solid Waste Collection Services............. 45 Figure III-1: LGU Performance Index: High and Low Performers............................................................ 48 Figure III-2: Differences in LGU Performance across Regions and LGU Types.......................................... 50 Figure III-3: Remoteness: Distance to Governorate Center and LGU Performance................................. 51 Figure III-4: Remoteness: Built-Up Area and LGU Performance.............................................................. 51 Figure III-5: LGU Population and Performance....................................................................................... 52 Figure III-6: Population Density and Performance.................................................................................. 53 Figure III-7: Household Wealth and LGU Performance........................................................................... 53 Figure III-8: Area C and Separation Barrier............................................................................................. 54 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Figure III-9: Area C and Separation Barrier: Likelihood of Service Access................................................ 56 Figure III-10: Area C and Separation Barrier: Likelihood of Service Satisfaction...................................... 56 Figure III-11: Share of Households in Area C and LGU Performance...................................................... 57 Figure III-12: Share of Built-up LGU area in Area C and LGU Performance............................................. 57 Figure III-13: Joint Service Council: Planning & Development................................................................. 59 Figure III-14: Joint Service Councils: Water and Waste Water Management.......................................... 60 Figure III-15: Joint Service Councils: Solid Waste.................................................................................... 61 Figure III-16: LGU Finance I: Per Capita Operating Budget Revenues...................................................... 62 Figure III-17: LGU Finance II: Per Capita Operating Budget Expenditures............................................... 63 Figure III-18: LGU Finance III: Fiscal Sustainability.................................................................................. 63 Figure III-19: LGU Responsiveness.......................................................................................................... 64 Figure III-20: Usage of Citizen Service Centers and Performance........................................................... 65 Figure III-21: LGU Responsiveness and Performance............................................................................. 65 Figure III-22: Trust in the Role of Elections in Improving Service Delivery............................................... 66 Figure III-23: Participation in Future Elections........................................................................................ 66 Figure III-24: LGU Responsiveness and Trust in Role of Elections for Service Delivery............................ 67 Figure III-25: LGU Responsiveness and Future Voting Behavior............................................................. 67 Figure III-26: Knowledge about Existence of One-Stop-Shops................................................................ 68 Figure III-27: Usage and Satisfaction with Feedback Instruments across Sectors................................... 69 Figure III-28: Channels for Citizens’ Feedback and Complaints.............................................................. 70 Figure IV-1: Pre-paid Meters and Citizens’ Willingness to Pay................................................................ 77 Figure IV-2: Non-payment: How Should Service Providers Respond?.................................................... 79 Figure A2-1: Municipalities and VCs Selected for Qualitative Analysis.................................................... 86 Figure A3-1: Methodology LGPA Performance Index............................................................................. 87 List of Tables: Table I-1: LGUs in the West Bank and Gaza............................................................................................... 3 Table I-2: Shares of Government Budget by Administrative Tier in 2011 and 2012.................................. 5 Table I-3: Access to Core Services............................................................................................................. 9 Table II-1: Overview of the Current Institutional Arrangements by Service Sector............................... 22 Table A4-1: Likelihood of Service Access - West Bank............................................................................. 88 Table A4-2: Likelihood of Service Access - Gaza...................................................................................... 89 Table A4-3: Likelihood of Satisfaction with Quality and Reliability - West Bank..................................... 90 Table A4-4: Likelihood of Satisfaction with Quality and Reliability - Gaza............................................... 91 Table A4-5: Likelihood of Payment: Piped Water and Solid Waste Collection Services.......................... 92 Table A4-6: Likelihood of Timely Payment: Piped Water and Solid Waste Collection............................ 93 Table A4-7: Likelihood of Service Access: Distance to Separation Barrier (1,000m)............................... 94 Table A4-8: Likelihood of Service Access: Distance to Separation Barrier (500m).................................. 95 Table A4-9: Likelihood of Service Access: Distance to Separation Barrier (250m).................................. 96 Table A4-10: Likelihood of Service Access: Area C.................................................................................. 97 Table A4-11: Likelihood of Service Satisfaction: Distance to Separation Barrier (1,000m)..................... 98 Table A4-12: Likelihood of Service Satisfaction: Distance to Separation Barrier (500m)........................ 99 Table A4-13: Likelihood of Service Satisfaction: Distance to Separation Barrier (250m)...................... 100 Table A4-14: Likelihood of Service Satisfaction: Area C........................................................................ 101 Table A4-15: Likelihood of Payment - Pre-Paid Meters & Citizen Willingness to Pay............................ 102 Table A4-16: Likelihood of Timely Payment - Pre-Paid Meters & Citizen Willingness to Pay................. 103 Table A4-17: Differences in LGU Performance across Regions and LGU Types..................................... 104 Table A4-18: Remoteness - Distance to Governorate Center and LGU Performance............................ 105 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Table A4-19: Remoteness - Built-Up Area and LGU Performance......................................................... 106 Table A4-20: Population Density and Performance.............................................................................. 107 Table A4-21: Household Wealth and LGU Performance....................................................................... 108 Table A4-22: Share of Households in Area C and LGU Performance.................................................... 109 Table A4-23: Share of Built-up LGU Area in Area C and LGU Performance........................................... 111 Table A4-24: Joint Service Councils I: Membership in JSC for Planning & Development....................... 111 Table A4-25: JSC II: Membership in JSC for Water & Waste Water....................................................... 112 Table A4-26: JSC III: Membership in JSC for Water and Waste Water................................................... 113 Table A4-27: Joint Service Councils III: Membership in JSC for Solid Waste.......................................... 114 Table A4-28: Joint Service Councils III: Membership in JSC for Solid Waste.......................................... 115 Table A4-29: LGU Finance I: Per Capita Operating Budget Revenues................................................... 116 Table A4-30: LGU Finance II: Per Capita Operating Budget Expenditures............................................ 117 Table A4-31: LGU Finance III: Fiscal Sustainability................................................................................ 118 Table A4-32: Usage of Citizen Service Centers and Performance......................................................... 119 Table A5-1: Overview Key Informant Interviews and Focus Group Discussions................................... 120 Table A6-1: Key Informant Interviews Referenced................................................................................ 123 Table A6-2: Focus Group Discussions Referenced................................................................................ 124 Table A7-1: LGU Performance Ranking................................................................................................. 138 Table A8-1: LGU Revenue Assignment (in the LGA), Management Responsibility and Final Destination of the Funds......................................................................................................................................... 140 Table A8-2: Expenditure Assignments According to Local Government Law....................................... 142 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Acknowledgements This report was prepared to inform the ongoing policy dialogue and investment program of the World Bank with the Palestinian Authority on municipal and local development. The team was led by Björn Philipp (Program Leader, MNC04) and Tobias Lechtenfeld (Social Development Specialist, GSURR), with strategic guidance from Marina Wes (Country Director for West Bank and Gaza) and under the direction of Ayat Soliman (Practice Manager, GSURR). The study team was comprised of Adrian Blatt- ner (Consultant, GSURR), Rafeef Abdelrazek (Operations Officer, MNC04), Yahia Abuhashem (Consult- ant, GSURR), Anna Paluszek (Consultant, GSURR), and Maha Bali (Senior Program Assistant, MNCGZ). The data analysis and report writing were organized by Adrian Blattner. The household survey was conducted by Alpha International, with support from the United States Agency for International De- velopment (USAID) and the Representative Office of Denmark to the Palestinian Authority (DRO). The team would like to acknowledge Benjamin P. Stewart (Geographer, GGSCE) and Dana Almubaied (Con- sultant, MNCGZ) for their valuable contributions. Bader Alaraj (Assistant Professor, Birzeit University) conducted interviews for the qualitative analysis. USAID also supported separate data collection ef- forts via an exit poll, gathering information on citizen experiences in accessing services in municipal offices and citizen service centers. The report has benefited tremendously from discussions with and comments from colleagues at dif- ferent stages of preparation, in particular Ellen Hamilton (Lead Urban Specialist, GSURR), Noriko Oe (Urban Specialist, GSURR), Philip Bottern (Senior Social Development Specialist, GSURR), Sarah Keener (Senior Social Development Specialist, GSURR), and Manuel Figueredo (Consultant, GSURR). The peer reviewers were Stephen Karam (Consultant, GSURR), Paula Restrepo Cadavid (Senior Economist, GSURR), and Christopher Pablo (Senior Urban Specialist, GSURR). We are also grateful to Alexander Klaits (Democracy & Governance Director, USAID), Reem Jafari (Democracy & Governance Specialist, USAID), and Asta Olesen (Senior Advisor, DRO) for their comments and inputs. The team is indebted to officials from the Palestinian Authority, particularly the Ministry of Local Gov- ernment (MoLG), the Municipal Development and Lending Fund, and other government agencies and non-governmental organizations for providing key inputs, data and help with the analysis. The team is indebted to Jamal Numan (Head of GeoMOLG Portal for Palestine Spatial Information) and the team at GeoMOLG department of the MoLG for their support with the GIS map layers of the local govern- ment units across the West Bank and Gaza utilized for the survey sampling. The team is also grateful for comments and discussions with colleagues from the Development Partners. The data analysis ben- efitted tremendously from the inputs and discussions with the team from USAID and the Research Consortium comprising of Renee Handley, Brian Kirchhoff, Carlos Fierros, and Jeffrey Telgarsky (NORC at the University of Chicago); and Fotini Christia (MIT), Ruben Enikolopov (Universitat Pompeu Fabra), and Erin York (Columbia University). An early version of the report was presented and discussed with representatives from the Palestinian Authority and Development Partners at a workshop organized by the World Bank, USAID, and DRO, held in Ramallah on March 9, 2017. i I THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Abbreviations and Acronyms CAPEX Capital Expenditure CoM Cabinet of Ministers CSC Citizen Service Center DISCO Distribution Company EQA Environment Quality Authority FCS Fragile and Conflict-affected situations FGD Focus Group Discussion GDP Gross Domestic Product GoI Government of Israel ICA Israeli Civil Administration IEC Israel Electric Corporation JSC Joint Service Council KII Key Informant Interview km Kilometer km2 Square Kilometer LGPA Local Government Performance Assessment LGSIP Local Governance and Services Improvement Program LGU Local Government Unit MDLF Municipal Development Lending Fund MDP Municipal Development Program MoEHE Ministry of Education and Higher Education MoFP Ministry of Finance and Planning MoH Ministry of Health MoLG Ministry of Local Government MoNE Ministry of National Economy MoPWH Ministry of Public Works and Housing NGO Non-Governmental Organization NIS New Israeli Shekel NPA National Policy Agenda NSP National Spatial Plan O&M Operations and Maintenance OPEX Operating Expenditure PA Palestinian Authority PCBS Palestinian Central Bureau of Statistics PENRA Palestinian Energy and Natural Resources Authority PERC Palestinian Electricity Regulatory Council PWA Palestinian Water Authority RDP Regional Development Plan UNICEF United Nations Children's Fund UNRWA United Nations Relief and Works Agency for Palestine VC Village Council VIP Ventilated Improved Pit Latrine WASH Water, Sanitation, and Hygiene WDI World Development Indicators WHO World Health Organization WSRC Water Sector Regulatory Council II ii EXECUTIVE SUMMARY THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. EXECUTIVE SUMMARY Why does the performance of Palestinian Local Governments matter? 1. Palestinian local governments represent a key pillar of the future Palestinian state. Predat- ing the Palestinian Authority, many have long and proud histories, including some of the oldest inhab- ited cities in the world. With increasing political and geographical fragmentation over the last two decades, Local Government Units (LGUs) have become of paramount importance regarding the pro- vision of services to the local population, particularly in areas where the relatively young central gov- ernment is politically, geographically, and fiscally constrained. Some existing LGUs were created as early as the second half of the 19th century, and over the decades, they have performed under the complexities of disparate political and legal regimes. As the lowest level of governance, Palestinian local authorities fulfill a critical role, not only as a key public service provider but also as the govern- ment tier closest to citizens, with elected councils critical for representation and accountability to citizens. The most recent local elections were on May 13, 2017, and in October 2012, only in the West Bank; following the most recent local elections in both the West Bank and Gaza in 2006. Strengthening LGUs and enabling them to perform as fully functional local governments accountable to citizens are key priorities for the Palestinian Authority. 2. A high level of fragmentation with large variations in fiscal and institutional capacity affects local service delivery performance. In 1997, there were 350 local authorities; today there are 417. This may not be financially viable and could adversely affect allocative efficiency in a highly financially constrained environment. In short, Palestinians could be paying for a large but inefficient local gov- ernment sector that is draining scarce public resources and external aid at the cost of eroding infra- structure, declining services, and suboptimal development. However, there is currently no evidence to substantiate this claim, and it is important to get a better understanding of the drivers of service delivery performance and the most effective ways to support LGUs to better perform for the benefit of the Palestinian people. 3. A lack of comprehensive data that is representative at the LGU level has made it impossible to assess and compare service delivery outcomes across Palestinian LGUs. Data on service coverage and basic governance indicators in Palestinian LGUs exists, but it does not cover all local services and is collected from the supply side, i.e., local authorities and service providers. Although the Palestinian Central Bureau of Statistics (PCBS) conducts regular household surveys, which would allow for as- sessing service outcomes from the demand-side, i.e., citizens and service users, the data is not repre- sentative at the level of individual LGUs. Those constraints have limited the possibilities for a compre- hensive performance assessment in the past. However, it is important to understand what drives the service delivery performance of Palestinian LGUs in order to make meaningful policy recommenda- tions, address the issues that are fully under Palestinian control, and highlight the adverse impacts that externally imposed constraints have on the living standards of the Palestinian people. However, to date, no robust evidence base exists to answer those questions. How do Palestinian Local Governments perform and how can it be measured? 4. The analysis presented in this report has the objective to fill this critical knowledge gap and help targeting interventions to improve service delivery in the West Bank and Gaza. The Palestinian Local Government Performance Assessment (LGPA) establishes the quantitative basis for analysis and a performance baseline for future benchmarking. Existing local service delivery data has been very limited, despite substantial external support to the sector over the last decades. Generally, the scope IV iii THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. of existing data only covers select supply-side information collected from LGUs or household data, which is not representative at the LGU level. Hence, under the LGPA, a comprehensive household survey, covering more than 380 Palestinian municipalities and village councils, was conducted, provid- ing the quantitative basis for the following analysis. In addition, data available from earlier analyses conducted by the World Bank was used to better understand the supply side of service delivery, in- cluding local government financing, performance of Joint Service Councils (JSCs), and institutional data collected under the Municipal Development Program (MDP). Complementary qualitative analysis and case studies were implemented to allow for a more comprehensive understanding of performance drivers and determining factors related to institutional capacity, governance, and political economy. 5. Service outcomes vary substantially both across LGUs and sectors. The LGPA assesses service delivery outcomes for the key pubic services under the responsibility of local authorities, i.e., water supply, sanitation, solid waste management, and local roads. The assessment reviews outcome varia- tions across sectors, individual LGUs, and geographic areas. Data on electricity supply, education and health was also collected by the LGPA household survey, but are not subject to this analysis. Although data for those service sectors will be important for follow-up analysis, the LGPA limits itself to the four basic services mentioned above. LGUs have no or only limited role in delivering education and health services, which are administered and operated by the national authority, international agencies or non-governmental organizations, or in electricity distribution, which falls under the responsibility of electricity distribution companies. 6. Outcome variations alone, while important to understand, do not allow for better targeting of interventions and policy recommendations. A more comprehensive measure is needed to assess LGU service delivery performance based on citizen access and satisfaction with service outcomes that would allow for comparisons of LGU performance across the West Bank and across Gaza. A perfor- mance index was therefore developed for policy makers and Development Partners as a tool to iden- tify and target interventions in municipalities and village councils. 7. The LGPA Performance index uses ten indicators to measure overall LGU performance. The ten indicators represent the three dimensions of access, quality and reliability for piped water, piped sewage, and waste collection, and a joint measure for local roads. The LGPA Performance index ranks LGUs according to their performance scores and allows for an analysis of key drivers for service deliv- ery performance, including geography size, wealth, fiscal strength, institutional capacity, governance, and modes of service delivery. How satisfied are households with service delivery outcomes? 8. Palestinians have achieved high rates of access, although services are not always available and quality differs. Palestinian LGUs have achieved remarkable levels of access to basic services, par- ticularly given the challenging circumstances of occupation and an overall context of fragility, conflict and violence. Piped water supply connections have reached almost universal coverage at 94 percent in the West Bank and 88 percent in the Gaza Strip. Over 80 percent of households in Gaza and up to 95 percent in the West Bank have access to regular solid waste collection. Around 77 percent of house- holds in the Gaza Strip are connected to a piped sewage network. At 30 percent, access to piped sew- age is much lower in the West Bank, although this is largely a reflection of the more rural character of West Bank villages compared with the highly urbanized Gaza Strip: in the West Bank, access to piped sewage is at 8 percent in Village Councils, compared to 37 percent in municipalities. For those house- holds connected to a piped sewage network, around 80 percent report that the quality and reliability of services is acceptable, suggesting that waste water priorities should focus on increasing treatment capacity and access to those households not yet connected. Comparing outcomes in the waste water sector to other countries, coverage with improved sanitation facilities is clearly higher in the Palestin- ian territories (96 percent) than in Lebanon (80.7 percent) and the average of fragile and conflict- iv V THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. affected situations (FCS; 43.5 percent), slightly higher than the average for the region (89.6 percent), and just below neighboring Jordanian (98.6 percent).1 Figure ES-1: Service Access across Sectors 94% 30% West Bank 95% 74% 88% Gaza 77% 83% 42% Piped Water Piped Sewage Solid Waste Collection Paved Local Roads Source: LGPA 2017 9. Only 1 percent of Gaza’s population has access to an improved source of drinking water. Despite high access rates, decades of underinvestment, protracted rehabilitation and repeated epi- sodes of violent conflict and war have affected the quality of services, particularly in Gaza. The rapidly deteriorating quality of groundwater caused by seawater intrusion and discharge of untreated sewage has made most of the piped water undrinkable. Only one percent of households in the Gaza Strip report to have access to improved drinking water and more than 97 percent have to rely on drinking water delivered by tanker trucks. Also overall satisfaction rates for piped water supply are lowest in Gaza across the Palestinian territories. Only 36 percent of households in the Gaza Strip are satisfied with the quality and reliability of piped water, compared with 54 percent in the West Bank. This finding is confirmed by qualitative interviews, which show that despite high connection rates, water shortages and quality remain critical challenges. Comparing service outcomes in the water sector to those of neighboring countries and countries of similar structural characteristics, access to improved drinking water sources in the Palestinian territories (57 percent) is lower than in both Jordan (96.9 percent) and Lebanon (99 percent), as well as the region (92.6 percent; excluding high income countries), and other fragile and conflict-affected situations (67.8 percent).2 10. Across sectors, access rates are lowest for local roads. Fewer than 2 in 3 Palestinian house- holds have access to paved roads. Only 42 percent of households in Gaza report having immediate access to a paved road from their home, compared with around 74 percent in the West Bank. This finding is consistent with the high share of roads investment projects prioritized in local development plans across Palestinian LGUs, suggesting that investment needs for local roads will remain high in the foreseeable future. It also reflects the shortage of funding LGUs have available for the rehabilitation, extension, and maintenance of roads. Compared to revenue-generating services, such as solid waste collection and water supply for which service providers generally charge user fees, LGUs have no direct income source to cover road rehabilitation and maintenance cost. Instead, LGUs have to rely entirely on own or shared taxes, grants from the central government, or from external donors which, however, tend to prioritize other sectors or investments in their support programs. 1 World Development Indicators. ibid. The quality of solid waste collection has room to improve. Only 59 percent of households in 11. 2 the West Bank, and surprisingly 70 percent of households in Gaza express satisfaction with the quality and reliability of solid waste collection services. Despite the increasing coverage of collection services VI v and substantial investments in sanitary landfills in both the West Bank and Gaza, LGPA findings suggest room for improving service outcomes. Investing in disposal infrastructure and collection equipment alone will not suffice. Experience from an output-based investment program in the southern West THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF tend to prioritize other sectors or investments in their support programs. SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. tend to prioritize other sectors or investments in their support programs. 11. The quality of solid waste collection has room to improve. Only 59 percent of households in the West Bank, and surprisingly 70 percent of households in Gaza express satisfaction with the quality 11. The quality of solid waste collection has room to improve. Only 59 percent of households in and reliability of solid waste collection services. Despite the increasing coverage of collection services the West Bank, and surprisingly 70 percent of households in Gaza express satisfaction with the quality and substantial investments in sanitary landfills in both the West Bank and Gaza, LGPA findings suggest and reliability of solid waste collection services. Despite the increasing coverage of collection services room for improving service outcomes. Investing in disposal infrastructure and collection equipment and substantial investments in sanitary landfills in both the West Bank and Gaza, LGPA findings suggest alone will not suffice. Experience from an output-based investment program in the southern West room for improving service outcomes. Investing in disposal infrastructure and collection equipment Bank targeting LGUs in the Hebron and Bethlehem Governorates provides good lessons how user sat- alone will not suffice. Experience from an output-based investment program in the southern West isfaction can be increased through improving the timeliness of collection services, cleanliness at col- Bank targeting LGUs in the Hebron and Bethlehem Governorates provides good lessons how user sat- lection points, and effectiveness of feedback and complaint mechanisms. Strengthening the manage- isfaction can be increased through improving the timeliness of collection services, cleanliness at col- ment capacity and improving responsiveness of service operators should be a priority for support. lection points, and effectiveness of feedback and complaint mechanisms. Strengthening the manage- ment capacity and improving responsiveness of service operators should be a priority for support. Figure ES-2: Satisfaction with Service Quality and Reliability Figure ES-2: Satisfaction with Service Quality and Reliability 54% 84% West Bank 54% 59% 84% West Bank 45% 59% 36% 45% Gaza 79% 36% 70% Gaza 79% 23% 70% 23% Piped Water Piped Sewage Solid Waste Collection Paved Local Roads Source: LGPA 2017 Piped Water Piped Sewage Solid Waste Collection Paved Local Roads 12. Overall, municipalities achieve consistently higher service outcome levels than village coun- Source: LGPA 2017 cils. In general, service outcome levels are declining in line with LGU size groups. This holds for both 12. Overall, municipalities achieve consistently higher service outcome levels than village coun- access and satisfaction ratings across sectors, except water supply. But size alone does not explain the cils. In general, service outcome levels are declining in line with LGU size groups. This holds for both difference in outcomes. Interestingly, households rate access and satisfaction with water supply ser- access and satisfaction ratings across sectors, except water supply. But size alone does not explain the vices highest in small municipalities, while large and medium size municipalities have outcomes more difference in outcomes. Interestingly, households rate access and satisfaction with water supply ser- comparable to those of village councils. This may be driven by the more rapid demographic growth in vices highest in small municipalities, while large and medium size municipalities have outcomes more municipalities outstripping the availability of bulk water and adversely affecting water quality and comparable to those of village councils. This may be driven by the more rapid demographic growth in availability. However, with this exception, LGPA findings confirm that service outcomes are generally municipalities outstripping the availability of bulk water and adversely affecting water quality and lower in village councils. Villages tend to struggle to provide and maintain the same level of services availability. However, with this exception, LGPA findings confirm that service outcomes are generally compared to municipalities. The current status quo is not sustainable and more needs to be done to lower in village councils. Villages tend to struggle to provide and maintain the same level of services consolidate service delivery in village councils to bring them at par with municipalities. compared to municipalities. The current status quo is not sustainable and more needs to be done to consolidate service delivery in village councils to bring them at par with municipalities. 13. Service outcomes vary across regions. For the most part, LGUs in the central and north West Bank achieve higher outcomes than the south West Bank and Gaza. This finding is consistent, except 13. Service outcomes vary across regions. For the most part, LGUs in the central and north West for piped sewage, for which access is higher in Gaza as a result of the high level of urbanization; and Bank achieve higher outcomes than the south West Bank and Gaza. This finding is consistent, except satisfaction is the highest in the south for those households who are connected to the sewage system. for piped sewage, for which access is higher in Gaza as a result of the high level of urbanization; and There is greater access to solid waste collection services in the north West Bank, with almost universal satisfaction is the highest in the south for those households who are connected to the sewage system. coverage, but satisfaction rates with the service is the lowest; this is somewhat counterintuitive given There is greater access to solid waste collection services in the north West Bank, with almost universal the long-standing support to improving solid waste management in the northern West Bank. There is coverage, but satisfaction rates with the service is the lowest; this is somewhat counterintuitive given the long-standing support to improving solid waste management in the northern West Bank. There is vi vi VII THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. no straightforward explanation for the regional variations, beyond the more pronounced divide be- tween the West Bank and the Gaza Strip. However, some have argued that a larger number of move- ment restrictions and proximity of LGUs to the separation barrier and Area C might be among the determinants for regional variations in service outcomes. 14. While the likelihood for access to piped water is lower for poorer households, gender is not a determining factor driving service outcomes. Households at the bottom 40 percent of the wealth distribution are more likely to be affected by low access rates compared with higher income groups, particularly in the West Bank and for piped water supply. Non-poor households in the West Bank are almost two times more likely to have access to piped water than those in the bottom 40 percent of the wealth distribution. Findings also suggest that poorer households in the West Bank are less satis- fied with waste collection services than the non-poor are. The likelihood of being connected to the piped water network is slightly higher for households in the upper three wealth quintiles in Gaza, but this gap is not statistically significant. LGPA findings also suggest that there is no significant gender gap in basic service delivery. Service outcomes for female-headed households are statistically not sig- nificantly different from male-headed households, except for access to piped water and satisfaction with piped sewage in Gaza. Overall, Palestinian LGUs have achieved remarkably equitable service pro- vision, despite significant needs to improve service quality and reliability. What is driving the performance of Palestinian local governments? Size, Density and Location 15. While population size and location matter, municipalities perform better than village coun- cils even when ruling out differences in LGU size and geography. Size and location affect overall per- formance of Palestinian LGUs, but, importantly, the performance differences identified in the LGPA go beyond a pure size or regional effect. This is an important finding, underlining that other crucial factors drive the performance gap between municipalities and village councils. While households in villages clearly rate service outcomes lower than in municipalities, a focus on merging LGUs into larger entities will not necessarily improve service delivery performance by itself. Additional policy instru- ments, capacity development, and incentives, that go beyond size and ‘amalgamation’ are required to achieve better performance in Palestinian LGUs. 16. Higher population density is strongly associated with better performance outcomes. Popu- lation density varies substantially across Palestinian LGUs, ranging from less than four people per square kilometer (km2) in one of the small villages in the West Bank, the Village Council of Marj al Ghazal in the Jericho Governorate, to more than 11,000 people per km2 in Gaza City. In more than 75 percent of LGUs in the West Bank and Gaza, the average population per km2 is less than 1,000, and in 34 municipalities and village councils, it is below 100. These wide gaps are severely affecting service delivery outcomes, because LGU population density and service delivery performance are strongly correlated. The most populated 20 percent of LGUs on average perform 6.2 points higher than the least populated 20 percent of LGUs. On average, a 1 percent increase in population density corre- sponds to a 3.3-point higher performance score. This finding is consistent with global experience, since the cost of infrastructure and service provision declines on a per capita basis with increasing densities. Palestinian LGUs should aim to achieve higher levels of population density and avoid costly sprawl that is hampering service delivery performance. VIII vii THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Figure ES-3: Population Size (left) & Density (right) as Performance Drivers Source: LGPA 2017 17. Remote and marginalized LGUs perform significantly worse. Most Palestinian LGUs are lo- cated within a 5–10 km radius of their governorate capital, but distance quickly translates into lower performance. Using the geographical spread of LGUs relative to their governorate as a proxy for re- moteness reveals a strong correlation with service delivery outcomes: the most remote 20 percent LGUs on average perform 11 points lower than the least remote 20 percent LGUs. On average, a 1 percent increase in distance corresponds to the statistically significant decrease in performance out- comes of 5.2 points. Economic activity and fiscal capacity tend to be concentrated in the urban cen- ters, explaining part of the performance variations associated with distance. However, Palestinian LGUs suffer from additional layers of marginalization associated with the movement restrictions im- posed by the Government of Israel, magnifying the adverse impact of remoteness and distance to the urban centers observed elsewhere in the world. 18. In general, households in Area C or close to the separation barrier are less likely to have access to basic local services. Satisfaction with quality and reliability of services is also notably lower in Area C and near the barrier. In comparing the likelihood of service access for households that live within a 1 km radius of the separation barrier, no statistically significant coefficients are observed. However, if the distance considered is narrowed, significant differences emerge in the water sector: households living 500 or even 250 meters from the separation barrier are on average just half as likely to have access to piped water than those living farther away. This effect is statistically significant for both the entire West Bank sample and the subsample of LGUs that are intersected by the barrier. While the coefficients for the Area C indicator suggest that, on average, households living in Area C are less likely to have access to all of the four basic services, only the indicator for solid waste collection yields a statistically significant result: the odds to be covered by a waste collection service of house- holds that live in Area C are only one-third as large as those of households that live in Areas A and B. 19. Overall, Area C is associated with lower LGU performance scores. This finding holds even when controlling for important performance drivers, such as remoteness and size of LGU. On average, LGUs serving areas where at least 60 percent of the built-up area is in Area C have a statistically sig- nificant performance score, which is 5.8 points lower than the other West Bank LGUs. LGUs with a developed Area C area share of more than 70 and 80 percent perform 8.0 and 8.5 points lower on average. Palestinian LGUs have little means to improving service delivery outcomes of communities living in Area C, given their limited mandate beyond Areas A and B. Development Partners have stepped up their support to communities in Area C. Since 2012, around 113 masterplans have been prepared to support capital investment and service delivery improvements in 77 LGUs with Palestinian communities living in Area C. However, to date, only five of the plans have been approved by the Israeli Civil Administration (ICA). The other masterplans submitted to the ICA for approval are still awaiting a decision, 81 of them have been pending for more than 18 months. Fiscal Capacity and Responsiveness viii IX 20. Fiscal capacity is a main driver of LGU performance. Overall, per capita revenues are strongly THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF awaiting a decision, 81 of them have been pending for more than 18 months. SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. awaiting a decision, 81 of them have been pending for more than 18 months. Fiscal Capacity and Responsiveness Fiscal 20. Capacity and Responsiveness Fiscal capacity is a main driver of LGU performance. Overall, per capita revenues are strongly associated with higher LGU performance and a robust relationship between per capita expenditures 20. Fiscal capacity is a main driver of LGU performance. Overall, per capita revenues are strongly and LGU performance exists, disproportionally constraining smaller municipalities and village councils associated with higher LGU performance and a robust relationship between per capita expenditures due to their limited revenue base and institutional capacity. A 1 percent increase in per capita oper- and LGU performance exists, disproportionally constraining smaller municipalities and village councils ating revenues on average corresponds to a 4.7-points higher performance score; and a 1 percent due to their limited revenue base and institutional capacity. A 1 percent increase in per capita oper- increase in per capita operating expenditures to a performance score increase of 5.2 points. This effect ating revenues on average corresponds to a 4.7-points higher performance score; and a 1 percent is even more pronounced among municipalities, where a 1 percent increase in per capita revenues is increase in per capita operating expenditures to a performance score increase of 5.2 points. This effect associated with an average 6.5 higher performance score, and an 8.9 higher score for per capita ex- is even more pronounced among municipalities, where a 1 percent increase in per capita revenues is penditures. Fiscal capacity can be identified as one, if not the strongest driver of LGU performance, associated with an average 6.5 higher performance score, and an 8.9 higher score for per capita ex- even when ruling out differences due to size and location. Eroding local budgets limit the funding penditures. Fiscal capacity can be identified as one, if not the strongest driver of LGU performance, available to invest in extending, upgrading or even maintaining services at satisfactory levels. This even when ruling out differences due to size and location. Eroding local budgets limit the funding finding urges giving highest priority to advancing local government financing reform and addressing available to invest in extending, upgrading or even maintaining services at satisfactory levels. This the large imbalances of fiscal capacity across LGUs, in particular between village councils and munici- finding urges giving highest priority to advancing local government financing reform and addressing palities, but also across municipalities. The current inter-governmental fiscal architecture in Palestine the large imbalances of fiscal capacity across LGUs, in particular between village councils and munici- is characterized by local revenue assignments that are insufficient to cover the operational expendi- palities, but also across municipalities. The current inter-governmental fiscal architecture in Palestine ture needs of LGUs; and lack of a fiscal transfer from the central government that would include equal- is characterized by local revenue assignments that are insufficient to cover the operational expendi- ization elements to correct imbalances across local authorities characterized by varying fiscal capacity. ture needs of LGUs; and lack of a fiscal transfer from the central government that would include equal- Without addressing those horizontal and vertical fiscal imbalances, only limited progress can be envi- ization elements to correct imbalances across local authorities characterized by varying fiscal capacity. sioned for improving Palestinian local government performance. Without addressing those horizontal and vertical fiscal imbalances, only limited progress can be envi- sioned for improving Palestinian local government performance. Figure ES-4: Operating Revenues (left) & Operating Expenditures (right) as Performance Drivers Figure ES-4: Operating Revenues (left) & Operating Expenditures (right) as Performance Drivers Source: LGPA 2017 21. Source: LGPA 2017 Citizens’ willingness to pay and actual payments vary significantly, suggesting that LGUs need to improve both efforts to collect revenues and service outcomes. Given the limited resources 21. Citizens’ willingness to pay and actual payments vary significantly, suggesting that LGUs made available from transfers and shared taxes, LGUs have to rely mostly on own-source revenues. need to improve both efforts to collect revenues and service outcomes. Given the limited resources However, LGPA findings suggest large variations in the willingness to pay for local services and actual made available from transfers and shared taxes, LGUs have to rely mostly on own-source revenues. collection across local authorities. For example, average monthly piped water payments are higher in However, LGPA findings suggest large variations in the willingness to pay for local services and actual municipalities than in village councils, and the highest in medium-sized municipalities in the West Bank collection across local authorities. For example, average monthly piped water payments are higher in (136 New Israeli Shekel (NIS)). In the West Bank, citizens in municipalities also pay more for waste municipalities than in village councils, and the highest in medium-sized municipalities in the West Bank collection services (NIS 24) than citizens in village councils (NIS 21). Across the Palestinian territories, (136 New Israeli Shekel (NIS)). In the West Bank, citizens in municipalities also pay more for waste more than half of the households (52 percent) report a maximum willingness to pay for piped water collection services (NIS 24) than citizens in village councils (NIS 21). Across the Palestinian territories, that is lower than their actual payment. These results correspond to a considerable number of house- more than half of the households (52 percent) report a maximum willingness to pay for piped water holds reporting dissatisfaction with piped water costs: 39 percent of households in Gaza and 1 in 4 that is lower than their actual payment. These results correspond to a considerable number of house- holds reporting dissatisfaction with piped water costs: 39 percent of households in Gaza and 1 in 4 ix X ix THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. households in the West Bank are dissatisfied or very dissatisfied with the cost of piped water. In line with global experience, enhancing local revenue collection needs to go hand-in-hand with improving service delivery outcomes since user satisfaction tends to be driving willingness to pay for services. 22. Citizens are more likely to pay their bills on time if they are satisfied with service reliability and LGU responsiveness. On average, Palestinian households that agree their LGU is very responsive to citizens’ concerns or complaints have about 1.75 times higher odds to pay on time for piped water supply and solid waste collection. Assuming that a reform of the Palestinian local government financ- ing system would yet have to evolve over time and is likely to be implemented only in the medium- term, as a priority LGUs will need to increase own-source revenue collection to enhance their fiscal capacity as the main driver of service delivery performance. Compared to all other measures, results from the LGPA suggest one shortcut for LGUs to collect more revenues from user fees: increase re- sponsiveness to citizens’ needs. 23. Higher LGU responsiveness corresponds to better performance. Responsiveness helps in- creasing citizens’ willingness to pay. However, in addition, households that have used a citizen service center, or generally agree with the statement that their LGU is very responsive to citizen concerns and complaints, also rate service outcomes higher. Regardless of the size or location of a LGU, the LGPA finds a positive relationship between responsiveness and service delivery outcomes: on average the 20 percent of LGUs with the highest share of households reporting their LGU is very responsive to citizen concerns and complaints perform 16.4 points higher. 24. Less than one-third of Palestinians agree that their LGU is very responsive. There is plenty of room to make local authorities more responsive, increase citizen satisfaction, and enhance local rev- enue collection. Government responsiveness has also been found to be a key factor in the participa- tory behavior of citizens and believed to be a key driver to encouraging responsible citizenry, regaining trust in government, and enhancing political participation. In the Palestinian territories, the overall satisfaction rate with the responsiveness of LGUs is low: less than one-third of households agree that their municipality or village council is very responsive to citizen concerns and complaints. The rate in the West Bank (30 percent) is only slightly lower than in Gaza (37 percent), but it varies substantially across governorates: in Tubas, only 1 in 10 households agree that their LGU is very responsive, while in Tulkarm and Qalqilya, almost half of the households agreed with the statement. Comparing satis- faction rates across types of LGUs in the West Bank, the share of households agreeing is higher in municipalities (31 percent) than in village councils (24 percent). Figure ES-5: Citizen Service Center Use (left) & LGU Responsiveness (right) as Performance Drivers Source: LGPA 2017 x XI THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 25. While citizen service centers correspond to higher LGU responsiveness, only few citizens seem to know that they exist. The relationship between LGU responsiveness and service outcomes is also pronounced when assessing the role of citizen service centers. The quintile of LGUs with the high- est share of citizens who used a citizen service center, including one-stop-shops, on average have a 5.39 higher performance score. 26. LGUs need to reach out more actively to their citizens and promote the existence and use of a citizen service center. In West Bank municipalities where citizen service centers exist, only 16 percent of surveyed households report knowing about it, 37 percent report not knowing whether or not it exists, and 46 percent report not believing in its existence. Knowledge about feedback instru- ments is slightly higher in large municipalities, where at least 1 in 5 households report knowing that a center exists. In medium and small municipalities, only about 15 percent of households know about citizen service centers. Given the efforts and resources provided to establish one-stop-shops and other service centers in Palestinian LGUs, Development Partners, the Palestinian Authority, and local au- thorities need to give much more attention to promote their existence and use by the public. Institutional Arrangements 27. Institutional arrangements for service delivery vary across the basic service sectors, but tend to be fragmented. Functions are distributed across central and local authorities with a variety of stake- holders involved in the policy making, priority setting, financing, operation and monitoring of services. LGUs have full authority over local roads and are responsible for the planning, development, and maintenance of the network, with the Ministry of Public Works and Housing responsible for regional roads outside the municipal masterplans. LGUs also have full authority over solid waste management services, although disposal functions, and to a lesser extend primary collection and transfer functions, are generally delegated to a JSC. The Ministry of Local Government is the policy making authority and also monitors LGU performance in the solid waste sector. However, the water and sanitation sector is characterized by a high level of fragmentation, with policy making and sector investment planning functions at the Palestinian Water Authority, regulation and performance monitoring at the Water Sector Regulatory Council, and service operation at the local level. In total, there are more than 100 municipal water departments, and more than 160 village councils operating water services. 13 JSCs deliver water and sanitation services, but there are only 3 operating water utilities, 2 in the West Bank and 1 in Gaza. The high level of fragmentation causes high inefficiencies and a constraint to generating economies of scale. 28. Joint service provision can help in reaching economies of scale, increasing financial sustain- ability, and improving service delivery performance. The establishment and development of JSCs has been crucial to improving service delivery in Palestine since the adoption of the Local Government Act in 1997 and is an important element of the Palestinian Authority’s consolidation effort to leverage economies of scale and sustain many existing village councils in recent years. Broadly, there are three types of JSCs: those providing a single service, those providing multiple services, and those that were established for planning and development. The Joint Services Provision Assessment carried out by the World Bank in 2015 identified that out of the 82 existing JSCs in the West Bank and the 10 in Gaza, only 55 are active. Most (32) active JSCs are categorized as planning and development, 16 as solid waste management, and 7 as water supply and sanitation services. Some JSCs provide multiple ser- vices to their member LGUs. 29. JSC capacity and governance arrangements are critical to delivering better results. The cur- rent institutional framework and governance structure for service provision by the JSCs have several limitations. The management and decision-making structure, accountability framework, financing ar- rangement, public participation, and social accountability systems are generally inadequate or un- clear. As part of the 2015 assessment, a more detailed review of the active councils was conducted XII xi THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. based on a good governance framework assessing performance across six thematic areas: rule of law, effective and efficient service delivery, transparency, accountability, responsiveness, and participa- tion. Findings of the assessment confirmed large performance variations, with only 16 councils scoring at an acceptable level. The water sector had the best score; the scores for solid waste management and planning and development JSCs were lower on average. 30. Membership in a JSC does not in itself improve service delivery outcomes in LGUs, but it does appear to have a positive impact, particularly for village councils. LGPA findings suggest that a member of a planning and development JSC achieves an average 4.0-point higher performance score than a nonmember, regardless of population size and location. The performance gain is higher for village councils, performing an average of 5.2 points higher compared with municipalities, which see average performance gains of 4.1 points. This finding confirms that pooling resources, including for better institutional capacity in basic planning and development functions, has a positive impact on LGU performance. It is critical to reach a minimum scale in order to achieve adequate institutional capacity for operating services at satisfactory levels, which is particularly important for village coun- cils. However, because many planning and development JSCs have also been established at the re- quest of Development Partners to channel and manage donor funds, performance gains might also be related to the additional financing that is available to them. Scale alone is not enough. 31. With increasing degrees of specialization, the technical and institutional capacity of JSCs drives service delivery outcomes. In the water sector, membership in a JSC does not guarantee satis- factory service delivery outcomes. However, remarkable performance gains can be observed, for ex- ample, in Jenin, which was rated one of the best performing JSCs in the 2015 assessment. In general, membership in a water supply and sanitation JSC does not yield better outcomes in the sector, but when limiting the sample to the Jenin Governorate, where some LGUs belong to a JSC and others do not, membership in a JSC corresponds to a very strong and statistically highly significant performance gain in water service outcomes, scoring more than 30 points higher than the average. It will be imper- ative to continue and accelerate consolidating the water sector, since operating individual municipal and village water departments is neither sustainable nor viable in the long run. However, significant investments in reducing technical and commercial losses, in parallel to targeted utility reform and institutional strengthening programs, are required to improve service performance. 32. For solid waste services, the effect of JSC membership on performance outcomes varies across regions in the West Bank. On average, membership in a solid waste management JSC seems to suggest slightly lower service delivery outcomes. However, this might be a reflection of the fact that only a small number of LGUs can be used as control group. A more disaggregated analysis is re- quired to understand the differences. For example, focusing on performance-level variations between LGUs in Salfit and Qalqilya governorates that belong to a solid waste JSC, and those LGUs that do not, JSC membership corresponds to a notable, however statistically not significant, performance gain in solid waste collection performance scores. Governance and Accountability 33. More than 3 out of 4 Palestinian households think that voting in municipal elections can have a positive impact on local service delivery. This reflects a very strong belief in the importance of basic accountability mechanisms to improve LGU performance, but also suggests significant room for improvement. Households’ trust in the role of elections for service delivery differs across the Pal- estinian territories. In Gaza, almost a fifth of the households do not believe in such a relationship, and almost a third of the households in the West Bank do not think that voting and service outcomes are interrelated. Overall, trust in the role of voting is slightly higher in municipalities (69 percent) than in village councils (66 percent). xii XIII THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 34. Building more responsive LGUs strengthen citizens’ trust in the impact of voting and their willingness to vote in future election. Citizens who are satisfied with LGU responsiveness on average report more often that voting has an impact on service delivery. Among the households who strongly agree their LGU is very responsive, 86 percent believe that voting has an impact on public services. In contrast, among those households who strongly disagree, only 59 percent think that elections and service delivery outcomes are connected. As a result, among citizens who believe that voting in mu- nicipal elections influences service delivery outcomes, 80 percent planned to vote in the next elec- tions, compared to just 28 percent among those who think voting and public services are not related. Overall, at the time of the LGPA survey, more than 4 out of 10 Palestinian citizens in the West Bank did not plan to vote in the next municipal elections, as was reflected in the voter turnout of the latest West Bank elections in May 2017. 35. Basic accountability mechanisms need to improve to enhance citizen satisfaction with their LGUs. Not many Palestinian households use a feedback or complaint mechanism and satisfaction is only moderate. Overall, despite their existence in some LGUs, few households use available mecha- nisms to provide feedback or file a complaint. Only 16 percent of households in the West Bank and 8 percent in Gaza report having used either a citizen service center, municipal website, LGU or service- provider feedback system, or a booklet to address a service issue. Only 6 percent of West Bank house- holds have used a feedback system or LGU website compared with 3 percent and 5 percent in Gaza respectively. None of the surveyed households in Gaza claim to have used a service center; in the West Bank, the figure is around 4 percent. Only 40 percent of those who have used a feedback mechanism reported being satisfied with it. The vast majority of citizens would rather file a complaint directly to their LGU rather than working through a citizen service center or a feedback or complaint system. Conclusion and the Way Forward 36. Palestinian local governments have almost achieved universal coverage in terms of access to basic services. This is a remarkable achievement, particularly given the context of fragility and con- flict in the Palestinian territories. Although satisfaction rates vary across LGUs and sectors, and the bottom 40 percent experience an overall somewhat lower quality of services, household income is not a main determinant of service delivery outcomes, and there is no gender gap. These are very positive achievements under extremely difficult circumstances in a highly challenging environment. 37. Increasing access to improved drinking water should be given the highest priority, particu- larly in Gaza. With almost the entire population in Gaza dependent on potable water delivered by tanker trucks, solving the Gaza water crisis will remain the greatest challenge for local service delivery for years to come. Improvements in LGU performance will not solve the crisis, which goes well beyond local government issues and requires critical actions from the Palestinian Authority, the Government of Israel, and the international community, such as support to increasing bulk water supply to the Gaza Strip, including through purchase from Israel and private water purifiers to address the short term needs of a growing Gaza population, reducing technical and financial losses in a moribund water distribution network, treating and promoting the reuse of waste water, and increasing local desalina- tion capacity. 38. LGUs must strive to converge quality and reliability standards for basic services. While the local government mandate is broader than basic service provision, citizen satisfaction levels will not increase unless local governments deliver on their main tasks of supplying reliable drinking water and sanitation services, collect the garbage from households, and ensure a well maintained local road net- work. Key elements of good governance and professional management will be critical to making LGUs more responsive to the needs of citizens, and will also help make LGUs more reliable partners for private enterprises and promoting local development. Lack of reliable basic services rates among the highest of the concern for investors. In addition, targeted policies to support citizens in marginalized XIV xiii THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. communities need to be developed. Local government sector support alone will not suffice to address the disparate living standards across Palestine. A significant group of LGUs have received substantial external support, but service delivery outcomes remain at low levels of, including marginalized LGUs with high rates of poverty and/ or those that are deeply affected by the prevailing restrictions to movement and access. 39. Addressing vertical and horizontal fiscal imbalances is critical to improving local service de- livery performance. While size and location matter, their impact on LGU performance is limited com- pared with local fiscal capacity. Palestinian LGUs are largely dependent on service fees and charges to cover their operational expenditures, not to mention critical capital investments. Although Palestinian municipalities and village councils are responsible for providing critical public services, they have not been assigned sufficient revenue sources. On average, charges and service fees account for 50–70 percent of total revenues, mostly from public utility services, such as electricity and water. As a critical first step, Ministry of Local Government needs to review and revise LGU revenue and expenditure assignments. The current revenue assignments are not sufficient to deliver even on the core LGU func- tions. The property tax could provide a large potential revenue source for municipalities, but collection needs to be extended to all LGUs and should be decentralized from the Ministry of Finance and Plan- ning at least to the largest municipalities. Finally, establishing a fiscal transfer mechanism that effec- tively addresses imbalances is long overdue and requires highest attention from both Ministry of Local Government and the Ministry of Finance and Planning. 40. Changing the financial incentive structure for service provision must be at the core of the reform agenda. Due to chronic underfunding, LGUs have developed a practice of diverting revenues from service fees to meet their expenditure needs. Cross-subsidies and payment arrears are wide- spread and common practice across municipalities and village councils. Current incentives are strong: data for the years 2011–13 shows that total revenues per capita for village councils in charge of elec- tricity distribution can be up to four times higher than those without that responsibility. Village coun- cils with electricity distribution functions were able to spend over twice as much in per capita operat- ing and development expenditures than those without the responsibility for each year during the pe- riod of 2011–13. For municipalities, there is a difference of almost 100 percent between the two groups of municipalities in terms of total revenue per capita. Despite the recent separation of elec- tricity distribution from local governments, LGUs continue to receive dividends from electricity reve- nues that they request from distribution companies in their role as shareholders. Incentives and cur- rent practices are similar in the water sector. 41. Breaking this vicious circle will require decisive action at local and national levels. Key prior- ities include: (1) increase local revenue collection; (2) improve transparency of payment flows, includ- ing interagency arrears; (3) sanction entities that divert funds for nonessential or unproductive use; and (4) provide financial support to LGUs without the fiscal capacity to ensure basic service provision. Absent a regular fiscal transfer from the central government, improving local fiscal capacity will re- quire enhancing revenue collection and expenditure efficiency. However, our knowledge about the cost of service provision remains limited. Although a new budget format distinguishing between func- tional categories has been introduced, the majority of LGUs do not report actual revenues and ex- penses, which makes efficiency assessments difficult. More emphasis needs to be given to correct reporting during the budget review and approval process, including as a condition for allocating capital investment grants. 42. Responsive and accountable local governments are critical to better performance. Regard- less of the size and location of a LGU or the institutional arrangement for service provision, the LGPA shows a consistently better performance by responsive and accountable local governments. There is a large and growing number of LGUs that have achieved higher levels of service delivery performance xiv XV THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. through strengthening citizen engagement, improving transparency and accountability, and enhanc- ing local revenues. More attention must be paid to supporting effective governance arrangements that engage citizens at all stages of development planning, investment prioritization, and feedback on service delivery performance. This should be a priority for the PA but also for Development Partners. Given the dual positive impact on LGU performance from higher citizen satisfaction and willingness to pay, supporting more responsive and accountable LGUs promises the highest return on investment in parallel to a local government financing reform overhauling the inter-governmental fiscal architec- ture. 43. A clear policy needs to be developed for more professional and corporatized service deliv- ery. JSCs play a critical role in consolidating service delivery because they can gradually assume service operation functions from small and mostly weak LGUs, provide the necessary scale, and develop into the nucleus of future regional public utilities. However, JSCs do not guarantee improved performance in service delivery if they are not matched with more professional management and strong accounta- bility mechanisms in terms of service users and the local authorities they represent. Overall, Palestin- ian policy makers should aim to integrate villages and municipalities into more densely populated urban areas to achieve better performance outcomes. Public utilities are an effective means of re- gional integration. There is an urgent need to establish a clear action plan to separate and profession- alize service operation, with clearly assigned revenue streams and measurable performance stand- ards. Given the high fragmentation in the water sector, this initiative should be launched jointly be- tween the Ministry of Local Government and Palestinian Water Authority. A first critical step to disen- tangle financial flows and understand expenditure efficiency would be to establish separate cost ac- counts for utility services, particularly for water, waste water and solid waste management. 44. Finally, performance benchmarking should be made an integral instrument for evidence- based policy making. The LGPA has developed an instrument to track performance trends and im- provements, assess efficacy of policy measures, and evaluate donor support on a regular basis, which can be replicated. Palestine has unique and successful experience in managing a performance-based grant mechanism and providing targeted capacity-building support to municipalities, implemented by the Municipal Development and Lending Fund (MDLF). In parallel, Ministry of Local Government has started developing an online citizen portal for all LGUs through their GeoMOLG Department. This ex- perience, in addition to the new data from LGPA, can assist in the scaling-up the systematic linking of capital grant allocations to clear performance targets in LGUs and measuring expenditure efficiency to better understand the use of scarce public resources at the local level. LGUs can also use the LGPA to produce and publish citizen score cards, while Development Partners may consider using the base- line established by the LGPA to monitor progress and measure impact of their support to Palestinian LGUs. These are tremendous assets that Palestinian local governments can rely and build on as they strive to continue improving performance to benefit their citizens. XVI xv I. Introduction THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. I. Introduction 1.1 Country Context 1. Palestinian local governments are a key pillar of the future Palestinian state. They predate the Palestinian Authority (PA) and many have a long and proud history, including some of the oldest inhabited cities in the world. With increasing political and geographical fragmentation over the last two decades, Local Government Units (LGUs) have gained paramount importance providing services to the local population, particularly in areas where the relatively young central government was polit- ically, geographically, and fiscally constrained. Some of the existing LGUs were created as early as the second half of the 19th century and over decades, LGUs have performed under the complexities of different political and legal regimes. As the lowest level of governance, Palestinian local authorities fulfill a critical role not only as a key public service provider, but also as the government tier closest to citizens, with elected councils critical for representation and accountability to citizens. The most recent local elections took place on May 13, 2017 and in October 2012 in the West Bank only, while the last local elections in both the West Bank and Gaza were in 2006. 2. However, Palestinian LGUs operate in a challenging and deteriorating environment. Lacking a permanent peace agreement, prospects for social and economic development are heavily affected by fragmentation and restrictions on access to land and resources. The PA was initially established for a five-year interim period after the Oslo Accords in 1993 with responsibility for the administration of the territory under its jurisdiction. However, the Oslo accords were never fully implemented and came to full halt with the beginning of the second Intifada in 2000. The consequence today is a multi-layered system of physical, institutional and administrative restrictions, which have fragmented the Palestinian territories into small enclaves. The fragmentation goes beyond a divide between the West Bank and Gaza, with the West Bank further divided into Areas A, B and C. Effectively, the PA only has full civil and security control over 18 percent of the West Bank (Area A), and manages civil affairs in around 21 percent of the West Bank (Area B), with security under Israeli control. The remaining 61 percent of the West Bank are under full Israeli military administration (Area C).3 3. A well-functioning local government sector is critical to ensure basic service delivery and create a conducive environment for private-sector driven growth. The Palestinian economy is failing to generate the jobs and incomes needed to improve living standards. Restrictions on trade and the access to resources, along with a decade long blockade of Gaza, have led to a continuing decline in the productive base of the economy. Unemployment is high at 30 percent on average, with youth unem- ployment in Gaza even higher, reaching around 60 percent. The PA is under severe fiscal stress, expe- riencing a major downturn in budget support from donors which dropped from 32 percent of GDP in 2008 to 5 percent in 2016. Despite a decline, the deficit in 2016 amounted to USD1.09 billion, equiva- lent to 8 percent of GDP. 3 Area C is defined by the 1995 Israeli-Palestinian Interim Agreement on the West Bank and the Gaza Strip as “areas of the West Bank outside Areas A and B, which, except for the issues that will be negotiated in the permanent status negotiations, will be gradually transferred to Palestinian jurisdiction in accordance with this Agreement”. Source: World Bank. 2013. West Bank and Gaza: Area C and the Future of Palestinian Economy. 2 1 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 1.2 Sector Context 4. Strengthening LGUs and enabling them to perform as fully functional local governments ac- countable to citizens are key priorities for the PA. The Palestinian National Policy Agenda (NPA) 2017- 2022 “Putting Citizens First” assigns a critical role to LGUs to achieve its ambitious objectives. Respon- sive Local Government has been identified a national priority, along with improving services to citizens, strengthening transparency and accountability, and building resilient communities. Both central and local level authorities will need to work in tandem to deliver on this agenda. 5. The Ministry of Local Government was established by the PA in 1994. Increasing the territo- rial administration under the PA’s autonomous control was among the Ministry of Local Government’s (MoLG) initial objectives, which resulted in creation of several new LGUs. By 1997, the number of LGUs increased from 139 to more than 350. Today, 417 LGUs exist in total, out of which 142 are classified as municipalities and 275 as Village Councils (VCs). However, except for slight differences in revenue as- signments, i.e., VCs are not assigned property tax revenues but collect education tax instead, there is no distinction in the functional assignments between those two groups of local authorities. In practice, population size is the distinguishing factor, although without clear principles. Most municipalities have a population above 5,000 inhabitants while generally VCs are smaller than that, although there are several exceptions and population alone does not define the administrative classification. Table I-1: LGUs in the West Bank and Gaza West Bank Gaza Palestinian territories Municipalities 117 25 142 Villages 275 - 275 Total 392 25 417 6. Overall, Palestine is highly urbanized at 74 percent, with almost 1.9 million living in the 12 largest cities. Around half a million Palestinians live in medium-sized municipalities between 25,000 to 50,000 inhabitants, while the second largest group lives in small municipalities of the size between 4,000 to 25,000 inhabitants. VCs are home to only around 600,000 people, although they comprise the biggest share of LGUs. 7. However, decentralization has made only modest progress. Palestinian local government rev- enues amount to 11.5 percent of total revenues, equivalent to around 4 percent of GDP; while local government expenditures account for only 6 percent of expenditures, slightly more than 3 percent of GDP. Although in line with other countries in the region, compared to other world regions, the local government sector in the Palestinian territories is rather small, with fiscal decentralization still being in the early stages. 2 3 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Figure I-1: Fiscal Decentralization in the Palestinian territories and World Regions 35.00 32.4 30.00 30.9 28.9 25.00 20.00 19.7 19.3 18.7 18.8 15.00 18.3 10.00 11.5 11.3 9.0 5.00 6.2 0.00 Palestine Turkey Eastern Asia Eastern Europe and Europe Latin America and Central Asia Caribbean Subnational revenue, % of total Subnational expenditure, % of total Sources: PA and IMF Government Finance Statistics 2012 8. LGUs are assigned 27 functional responsibilities, but only deliver a fraction of those. With increasing political and geographical fragmentation, LGUs have gained paramount importance provid- ing services to the local population, particularly in areas where the relatively young central government was politically, geographically, and fiscally constrained. In the Local Government Act (LGA) of 1997, some 27 functions and responsibilities for LGUs were outlined, which include most but not all of the public services that are commonly delivered at the local level in countries at a similar stage of devel- opment. Despite large disparities in population size and administrative and financial capacity, the LGA assigns the same set of functions and responsibilities to municipalities and VCs alike, and does not distinguish between delegated and own responsibilities.4 In the case of delegated responsibilities, the PA would be ultimately responsible for the regulation and financing, while implementation would be under the responsibility of LGUs.5 In contrast, in the case of own responsibilities, LGUs would be gen- erally responsible for all stages of service provision.6 The absence of conditional grants or transfers from the PA to LGUs, apart from intercepted partial revenue sharing and emergency grants in the current system of intergovernmental finance, indicates that the LGA of 1997 had little intention to foster the delegation of responsibilities. 9. LGUs’ budgets are insufficient to provide the funding necessary to fulfill the functions as- signed to municipalities and VCs. Despite the comprehensive roles and functions of LGUs, local gov- ernment revenue and expenditures constitute only a minor share of the overall public budget, indicat- ing that fiscal decentralization is still at an early stage in the Palestinian territories.7 The only sources of shared revenues and transfers for LGUs include the Property Tax (not levied in VCs), Professional Licensing Fees, and the Transportation Fee, which is centrally collected and then split between LGUs and the central government.8 As a consequence, vertical and horizontal fiscal imbalances remain large and local government budgets are rather small compared to other countries and world regions: in 4 Article No. 1 of the LGA; see Annex 8 for a list of functions assigned to VCs. 5 Examples in other countries include education, health, and social welfare services. 6 Examples include street lighting, local roads, and parks. 7 World Bank. 2016. Public Expenditure Review - Palestinian Territories 8 The Transportation Fee is collected by Ministry of Transportation and 50 percent of the total revenue collected is to be allocated to the LGUs on per capita basis–however, in reality, the majority of the 50 percent share is intercepted by the MoFP to recover the arrears LGUs owe to their electricity suppliers. 4 3 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 2012, revenues and expenditures of municipalities accounted for 10 percent of total government rev- enues and 5.5 percent of total expenditures, while the revenues and expenditures of the 275 VCs con- stituted for less than 2 percent of the overall government budget. Table I-2: Shares of Government Budget by Administrative Tier in 2011 and 2012 Municipalities VCs Central Government Revenues 10% 1.5% 88% Expenditures 5.5% 1% 93% 10. Local budgets are dominated by revenues from user fees and severely constrained capital investment funds. Local fees and service charges represent more than 50 percent of total revenues, but are diverted away from the service sectors and mostly cross-subsidize general operational expend- itures. As a result, service network rehabilitation and maintenance is largely neglected, leading to de- clining service standards and asset depletion. Overall, capital investment funds are very limited, and overall LGUs largely depend on external sources for their development expenditure. Figure I-2: Revenues by Type in Municipalities (left) and VCs (right) 100% 100% 90% 90% 80% Operating Budget 80% Operating Budget 70% Revenue 70% Revenue 60% 60% 50% Enterprise Fund 50% Enterprise Fund 40% Revenue 40% Revenue 30% 30% Development 20% Development 20% Budget Revenue Budget Revenue 10% 10% 0% 0% Actual Actual Actual Actual Actual Actual 2010 2011 2012 2011 2012 2013 Sources: PA and IMF Government Finance Statistics 2012 Figure I-3: Expenditure Allocation by Budget Type in Municipalities (left) and VCs (right) 500,000,000 80,000,000 400,000,000 60,000,000 300,000,000 40,000,000 200,000,000 20,000,000 100,000,000 0 0 2010 2011 2012 2011 2012 2013 Muni. Operating Budget Expenditure VC Operating Budget Expenditure Muni. Enterprise Fund Expenditure VC Enterprise Fund Expenditure Muni. Development Budget Expenditure VC Development Budget Expenditure Sources: PA and IMF Government Finance Statistics 2012 4 5 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 11. A distorted system of inter-governmental relations causes large horizontal and vertical fiscal imbalances. No regular fiscal transfer exists to supplement for the shortage in own-source revenues and many LGUs have engaged in large-scale diversion of service fee revenues owed to Israeli suppliers in the electricity and water sectors, causing the so-called “net lending” (see Box I-1). This diversion of revenues further distorts existing inequalities in the local fiscal capacity, leading to a high concentra- tion of per capita revenues and expenditures in a few LGUs. For example, municipalities’ per capita own-source revenue was more than twice that of VCs’ in 2010 and 2011; and VCs with access to elec- tricity distribution revenues were able to spend almost twice as much in per capita operating and de- velopment expenditure per year compared to those without during the period 2011-2013. Figure I-4: Total Per Capita Expenditures with (left) and Without Outliers (right) Sources: PA and IMF Government Finance Statistics 2012 Figure I-5: Average Per Capita Expenditures in Operating Budget (left) and Enterprise Fund (right) Operating Budget Enterprise Fund Per Capita 197 Per Capita 381 Revenues 95 Municipalities Revenues 328 VCs Per Capita 195 Per Capita 295 Expenditures 95 Expenditures 271 12. The high level of fragmentation has potential implications on local service delivery perfor- mance, given the huge variations in fiscal and institutional capacity. In addition, a large number of local authorities, that cannot be financially viable by themselves, is costly and may adversely affect allocative efficiency in a highly financially constrained environment. In short, Palestinians might be paying for a large but inefficient local government sector that is draining scarce public resources and external aid at the cost of eroding infrastructure, declining services, and sub-optimal development. However, no evidence exists to date to substantiate this claim and it is important to get a better un- derstanding of the drivers of service delivery performance and most effective ways to support Pales- tinian LGUs to perform better for the benefit of the Palestinian people. 6 5 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Figure I-6: Operating Budget Expenditure Categories in Municipalities (left) and VCs (right) 100% 100% 80% 80% 60% 60% 40% 40% 20% 20% 0% 0% Actual 2010 Actual 2011 Actual 2012 Actual 2011 Actual 2012 Actual 2013 Expenses not related to a certain department General expenses- Public Administration Community Planning and Development Social activities Health Services Cultural activities Knowledge/ educational and cultural services Security &firefighting Public work Loan repayment Health Services General expenses- Public Administration General Services 13. Several attempts have been made in the past to consolidate Palestine’s fragmented local government system. A policy of amalgamation, adopted in 2010, has aimed at merging municipalities and VCs to larger entities. However, this policy has yielded only mixed results to date and overall, the total number of municipalities increased during the last two decades from 350 in 1997 to 417 in 2017. In parallel, the PA has increasingly focused on consolidating service delivery arrangements through inter-municipal cooperation and the establishment of Joint Service Councils (JSCs). The objective is to harness economies of scale and improve basic services across Palestine, without getting tangled up in the challenging process of tackling local political dynamics, difficult questions of local identity, and the overall desire of establishing and maintaining Palestinian representation across the territories. Such an approach has the potential to improve the financial sustainability of service delivery while main- taining a broad base of political representation and participation in local planning and investment pri- oritization. In addition, this approach is in line with sectoral policies, namely in the critical basic services of electricity supply, water supply and sanitation, that are undergoing or aiming at a commercialization and regionalization of service operation. However, to date, no data has been available to track and support performance improvements across the local government sector. 6 7 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Box I-1: Population Discrepancies Internal migration to leading urban centers in the West Bank have added significantly to the load on service delivery in some LGUs. As certain areas have gained economic promi- nence, internal migration to these locations has drastically increased, particularly in the Ramallah-Al Bireh urban area, which hosts the seat of government for the PA. Migratory population bulges have added pressure to financially constrained LGUs and overburdened services, affecting service delivery quality and availability. Infrastructure in many of the ar- eas is not sufficient to accommodate the added load, especially since LGUs have not ade- quately planned for the long-term effects of the population influx. This has led to: (i) height- ened traffic congestion; (ii) increased Operations & Maintenance (O&M) costs; (iii) installa- tion of unplanned off-site infrastructure; and (iv) opportunity costs for investing in other needed municipal services. Potentially sizeable discrepancies in official population figures cause resource constraints for some large municipalities in the Palestinian territories. LGUs have reported that inac- curate national population figures further exacerbate the situation. The shared revenues to support LGU budgets are based on the Palestinian Central Bureau of Statistics (PCBS) popu- lation data. It is a key factor determining the transfer amounts to LGUs from the Transpor- tation Fee, which is shared between the MoFP and LGUs. Fifty percent of the total revenue collected from transportation fees is to be allocated to the LGUs on a per capita basis. Ad- ditionally, municipal grants from the Second Municipal Development Program (MDP-II), one of the only reliable sources of financial support municipalities receive, is partially (30 per- cent) based on PCBS population figures. The PCBS population records for the LGUs are based on the registered residency of citizens’ national identification cards. Often residency, how- ever, is not updated when people relocate, as it is a difficult process with very few induce- ments for updating. Unlike PCBS, LGUs calculate their population based on service user fee and tax collection figures. Al Bireh’s population for 2016, for example, is 48,887 according to PCBS estimates, however the municipality estimates their residents at around 81,000 based on water and electricity user rates and tax collection. Various procedures should be considered to update residency and support LGUs dealing with population discrepancies. While this is not a widespread issue for all LGUs, the PA should consider measures, which can be taken to support those affected. Procedures for establishing residency should be reassessed and eased to encourage proper registration. Currently, unless a citizen has a tenancy contract in his/her name it is very difficult to request a change of residency. The use of a simple registration form to be filed at the local LGU could be introduced as an alternative way for citizens to establish residency. This is common prac- tice in many countries. Additionally, updated residency is not a mitigating factor for access to general services, however it could be linked to the national ID database. After a significant period of usage and access for services in an area differing from official residency, a call to update residency could be triggered. LGUs and service providers could collaborate on this. Furthermore, as the fiscal transfer amount is determined by the MoLG, they can consider alternative procedures where LGU population is determined by registered service users and taxpayers, rather than PCBS population data. This course of action would also encourage LGUs to crack down on illegal service connections to ensure all users are in the officially counted numbers. 8 7 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 1.3 Key Challenges 14. LGUs are responsible for the provision of critical local services but do not fulfill the full spec- trum of assigned tasks and responsibilities. The role of LGUs in public service delivery falls far short of what is prescribed in the 1997 LGA. Available data from household surveys and budget documents indicate that most municipalities only provide up to four core services, which are shown in Table I-3: Access to Core Services. For other important functions such as public transportation provision, capital investments in public infrastructure, firefighting, primary health, local school maintenance, and social welfare programs, the mandate and funding remains unclear. Often, these functions, primarily public infrastructure, are not implemented unless international donor programs exist to specifically finance them. Table I-3: Access to Core Services West Bank Gaza Palestinian territories Piped Water Supply 94% 88% 91% Solid Waste Collection 95% 83% 91% Waste Water Management 30% 77% 48% Paved Local Roads 87% 46% 62% 15. Identifying means to address the challenge of excessive local fragmentation will need to be a key step in improving service delivery. Facing severe fiscal constraints, small and remote VCs in the West Bank belong to the lowest performing LGUs in the Palestinian territories, often falling short of guaranteeing services of satisfactory quality or not providing access to the core services at all. Although a clear policy directive exists for the establishment of joint administrative structures among both VCs and municipalities in the form of Joint Service Councils (JSCs) to address capacity limitations, sufficient incentives remain to be built into the system to facilitate the formulation, financing, and implementa- tion of such initiatives. Moreover, selected VCs with the size and capacity to evolve into viable local authorities need further institutional support. Such support would need to be provided through a com- bination of incentives and capacity building that will enable VCs to function as accountable and finan- cially sustainable local governments. However, quantitative results presented in this report suggest that a careful assessment of performance outcomes for LGUs part of a JSC is detrimental before aiming for a wider application of the JSC model. 16. Local government sector reform will be a crucial key condition to improve basic local service delivery, particularly in the water sector. Securing sustainable water supply in the Palestinian territo- ries will require collective action across sectors and stakeholders, but cannot advance without well- functioning and more efficient local governments. Existing resource constraints and geopolitical chal- lenges are among the main challenges to securing sustainable water in the Palestinian territories. De- clining aquifer yield paired with rapid population growth has resulted in a decrease of internal re- sources for domestic supply in the West Bank from 190 liters per capita per day to only 100 liters in 2013.9 More than 95 percent of the water from the Gaza main aquifer is non-drinkable because of pollution and sea water intrusion. In order to meet internal demand, the PA increasingly relies on wa- ter purchases from Israel. However, while increasing bulk water supply to the West Bank and Gaza will be critical to meet the growing demand and address the Gaza water crisis, improving the efficiency 9 World Bank. 2017. West Bank and Gaza WASH Poverty Diagnostic. 8 9 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. and reducing losses in the Palestinian water distribution system is equally important. With more than 230 water service providers, mostly embedded in VC and municipal water departments, addressing the widespread performance issues in the water sector will not advance without a parallel reform ef- fort in the local government sector that addresses the underlying issues of fragmentation and lack of financial sustainability. 17. Breaking the vicious circle of poor service quality and reliability, consumers’ limited willing- ness to pay, and unstable LGU finances, will require a multi-level approach. The prevailing net-lend- ing issue poses a significant fiscal drain for the PA and creates perverse incentives for LGUs that con- tradict reform initiatives to improve service delivery. Particularly in the water sector, service providers are entrapped in a vicious circle of service provision. Across the West Bank and Gaza, unsatisfactory service outcomes are closely related with consumer disengagement and failure to pay. This is posing a serious risk to the financial position of water service providers and LGUs, further undermining the capacity to finance regular maintenance let alone investment in capital replacement and network re- habilitation, eventually affecting overall performance. Breaking this spiral of degrading service provi- sion will require targeting: (i) demand side factors, e.g. by affronting citizens’ deficient payment be- havior through innovative best practices, such as pre-paid service delivery, pro-poor subsidies or pay- ment plans; as well as (ii) supply side factors, e.g. by limiting unsustainable budgetary practices, such as cross-subsidization of LGU activities with enterprise budget funds. 18. Extending access and raising awareness for accountability and feedback tools is detrimental to enabling LGUs to respond to citizens’ needs. The establishment and use of public feedback and accountability tools, such as citizen service centers (CSC), one-stop-shops (OSS) and LGU websites, en- hances transparency and responsiveness to citizens, and enables citizens to participate and monitor local government performance. However, the majority of LGUs provides none or only one such feed- back channel. Moreover, evidence from both quantitative and qualitative research suggests that only a minor fraction of citizens in LGUs with such mechanisms know of their existence, let alone used them to redress grievances about service delivery. Nudging citizens to provide feedback through interaction with local representatives or service providers allows LGUs to effectively target existing service deliv- ery bottlenecks, while increasing citizen satisfaction with both service outcomes and LGU responsive- ness, which are empirically shown to be closely related to citizen payment behavior and willingness to pay. 10 9 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Box I-2: The Net-Lending Issue The Palestinian territories are highly dependent on energy imports from neighboring coun- tries due to the lack of domestic energy sources. The Israel Electric Corporation (IEC) is the largest energy supplier providing 88 percent of electricity consumed in the Palestinian ter- ritories. Electricity distribution in the Palestinian territories is carried out by Palestinian mu- nicipalities, village councils, and distribution companies (DISCOs). Net lending arises when Palestinian entities functioning as distributors of electricity and wa- ter services collect service fees from residents and rather than using those revenues to pay water and electricity suppliers, make only partial or no payment at all, thus accumulating arrears. LGUs see collected fees as a necessary source of revenue and clearly use them to cross-subsidize other activities, including their operating and development budgets. Outstanding payments owed to the IEC, including late payment fees, are either; 1) deducted by the Israeli Ministry of Finance from revenues that the Government of Israel (GoI) collects on behalf of the PA (clearance revenues) and are recorded in the PA’s budget as “net lend- ing”; or 2) accumulated as debt owed to the IEC. As a result, the PA finds itself providing unplanned subsidies of over US$200 million per year (2 percent of GDP) to the LGUs. The MoFP attempts to recover those losses by withholding revenues otherwise due to LGUs (municipal property tax, professional permit fees, transportation tax etc.), but these inter- cepts by no means offset utility non-payments and lead to a complicated, opaque and dis- torted intergovernmental fiscal relations system. One reason for the persistence of the net lending problem is that it has all the features of a “perverse” equilibrium. First, Israeli authorities eventually get their funds plus a fine, which means higher revenues. Many LGUs prefer to keep the “cash in hand” from electricity fees, as opposed to the promised transferred funds from local taxes, which are likely to be smaller in size, as some Bank computations also seem to confirm. The PA gets sandwiched in the middle but gets to retain the property tax, professional permit fee, and transportation tax, thus at least temporarily minimizing the blow. Figure Error! No text of specified style in document.-1: The Dynamics of Net-Lending in the West Bank 11 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 1.4 Objective and Methodology 19. This report establishes the quantitative basis for analyzing performance of Palestinian local governments and a baseline for future benchmarking to target investment and policy interventions. Different hypotheses are determining government interventions and policy decisions to strengthen Palestinian local governments, driven by the ultimate objective of enabling LGUs to provide better services. However, without reliable data it is difficult to assess the interrelation between inputs, out- puts, and outcomes of service delivery. This report focuses on an assessment of the ‘demand side’ of service delivery outcomes, such as access, quality and reliability, responsiveness, and willingness to pay for services mandated to municipalities and VCs. The analysis is based on a comprehensive house- hold survey and an index developed to assess overall LGU performance. The analysis is further ex- tended with insights from qualitative interviews and focus groups, and matched with factors influenc- ing the ‘supply side’ of service delivery, such as LGU institutional and fiscal capacity. The results allow for a robust understanding of the factors that influence LGU performance, and provide for strong evi- dence-based policy recommendations for future interventions in municipalities and VCs. 20. As existing municipal data is very limited in its scope and only covers minimal inputs into service delivery, a household survey covering more than 380 Palestinian LGUs was conducted. The household survey data focuses on access to public services, quality and reliability of service delivery, and citizens’ participation and willingness to pay, which allows for an in-depth analysis of the drivers of LGU performance in service delivery. The study includes a poll on service delivery outcomes for all LGUs in the Palestinian territories10, establishing a baseline dataset for both future analysis, e.g. on whether the bottom 40 percent are disproportionally affected by existing limitations, and develop- ment programs in the local government sector. The survey modules include a service delivery assess- ment of the following sectors: (i) water supply; (ii) waste water; (iii) electricity; (iv) solid waste collec- tion; (v) education; (vi) public transport; (vii) health care; and (viii) local roads. In addition, the modules also collected data on: (ix) household demographics and socio-economics; (x) citizen participation; and (xi) willingness to pay. Detailed information on the survey setup can be found in Annex 1. 21. Parallel qualitative analysis allows for a more comprehensive understanding of performance drivers related to institutional capacity, governance, and political economy. The qualitative analysis conducted for the LGPA draws on both Key Informant Interviews (KIIs) and Focus Group Discussions (FGDs). KIIs were conducted with a sample of municipal administrations, civil society organizations, and other relevant stakeholders. KIIs provide insights into: (i) which sectors are best covered; (ii) pro- vide a more complete narrative of the LGU performance drivers; and (iii) present insights into the fi- nancial challenges faced by LGUs. In addition, FDGs were conducted to gain insight into citizen percep- tions on the current state and existing challenges regarding service access, quality, affordability, and trends in the quality of services, which allows for the formulation of priorities for the expansion and improvement of service delivery. The discussions also examined the qualitative dimension of partici- pation, transparency and accountability, investigating how citizens would like to engage with their LGU. Moreover, the discussions explored current feedback mechanisms with local policy makers and how quality and access problems with service delivery are currently being addressed. Focus groups were held in Nablus, Hebron, Gaza City, Jabalya, Khan Yunis, Rafah, Ramallah, and Bethlehem, and an additional 10 FGDs were conducted in smaller municipalities and selected villages in the West Bank and Gaza. The methodological framework applied in the qualitative analysis is described in detail in Annex 2. 10 In total, 20 LGUs could not be accessed due to security restrictions. See Annex 1 for a detailed description. 12 11 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Figure I-8: LGPA Survey - Municipality and Village Council Size-Groups and Population 180 2,100,000 163 1,865,146 1,800,000 150 LGUs 1,500,000 120 Population 99 1,200,000 1,095,418 90 900,000 60 45 600,000 377,817 35 524,676 30 14 15 12 300,000 27,721 189,987 47,760 0 0 Small Medium Large Very Small Small Medium Large Village Council Village Council Village Council Municipality Municipality Municipality Municipality < 1,000 1,000 - 4,000 > 4,000 < 4,000 4,000 - 25,000 25,001 - 50,000 > 50,000 22. The analysis focuses on the drivers for local service delivery performance. Existing hypothe- ses can be expressed in statistical models with several determinants, including: the size of local au- thorities (economies of scale); the level of income (GDP per capita); fiscal strength (revenues per cap- ita, total revenues, expenditure per capita, total expenditure); institutional capacity (planning, finan- cial management, etc.); governance arrangements (transparency, accountability, participation); modes of service delivery (individual LGU, JSC, utility); but also consider the enabling environment and institutional framework, e.g., revenue and expenditure assignments, sector policy and strategies, and service standards. While all mandated services will be analyzed, the emphasis will be on the core ser- vices, (i) piped water supply, (ii) waste water management, (iii) solid waste collection and (iv) local roads. 12 13 II. The State of Basic Service Delivery in Palestinian Local Governments THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. II. The State of Basic Service Delivery in Palestinian Local Governments 23. Service access and satisfaction rates vary substantially both across LGUs and sectors. Access and satisfaction with the four basic services, (i) piped water supply, (ii) waste water management, (iii) solid waste collection, and (iv) local roads, is generally higher in the West Bank than in Gaza, and the highest in large municipalities in the central West Bank. Overall, the vast majority of households in the Palestinian territories is connected to the piped water network (91 percent), even though actual water availability is limited and quality insufficient in many LGUs. 91 percent of Palestinian households have access to a waste collection service, while only 2 out of 3 Palestinian households reports immediate access to paved roads (62 percent), and less than half a connection to a piped sewage network (48 percent). 24. Comparing service delivery outcomes between the West Bank and Gaza, notable gaps in ac- cess rates emerge. In the West Bank, 95 percent of households have access to solid waste collection services and 74 percent to local roads, compared to just 83 percent and 42 percent in Gaza, respec- tively. Also in the water sector, access rates are higher in the West Bank than in Gaza. 94 percent of the households in the West Bank have access to a piped water network, compared to 88 percent in Gaza. Comparing access to improved drinking water sources, coverage is almost universal in the West Bank, while only 1 percent of the households in Gaza is covered, and 97 percent rely on water delivered by tanker trucks. In contrast, overall coverage with sanitation services is higher in Gaza than in the West Bank. Access to piped sewage is more than twice as high in Gaza, where 3 out of 4 households are connected to a sewage network (77 percent), compared to less than 1 out of 3 in the West Bank (30 percent), which is mainly driven by a high degree of urbanization in Gaza. Access to improved san- itation facilities is universal in Gaza (99 percent), and similarly high in the West Bank (94 percent). Figure II-1: Service Access across Sectors 94% 30% West Bank 95% 74% 88% Gaza 77% 83% 42% Piped Water Piped Sewage Solid Waste Collection Paved Local Roads 25. Somewhat unexpectedly, access rates to core services are relatively high, while availability, 16 13 Piped Water THETHE PERFORMANCE Piped Sewage PERFORMANCE Solid Waste Collection OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. Paved Local Roads AN ASSESSMENT AN ASSESSMENT OF OF DELIVERY SERVICE THE OUTCOMES PERFORMANCE OFAND PERFORMANCE PALESTINIAN LOCALDRIVERS IN THE WEST GOVERNMENTS. BANK AND GAZA. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. quality and reliability of services fluctuate significantly. 25. On the positive side, the required infrastruc- Somewhat unexpectedly, access rates to core services are relatively high, while availability, ture investments for piped water and solid waste collection services are largely available in both the quality and reliability of services fluctuate significantly. On the positive side, the required infrastruc- West Bank and Gaza, especially in large municipalities in the West Bank. However, in practice, services ture investments for piped water and solid waste collection services are largely available in both the 13 are not available throughout, and citizens in many LGUs are affected by interruptions and lack of ser- West Bank and Gaza, especially in large municipalities in the West Bank. However, in practice, services vice delivery, as expressed by satisfaction levels with quality and reliability. are not available throughout, and citizens in many LGUs are affected by interruptions and lack of ser- vice delivery, as expressed by satisfaction levels with quality and reliability. 26. Overall, satisfaction rates are the highest for waste water services, and the lowest for local roads 26. . In the West Bank, 54 percent of households are satisfied with quality and reliability of piped Overall, satisfaction rates are the highest for waste water services, and the lowest for local water services, compared to just 1 out of 3 in Gaza. Taking only satisfaction with reliability into account, roads. In the West Bank, 54 percent of households are satisfied with quality and reliability of piped the gap between the West Bank and Gaza is slightly narrower: 60 percent of the households in the water services, compared to just 1 out of 3 in Gaza. Taking only satisfaction with reliability into account, West Bank are satisfied with piped water reliability, compared to 45 percent in Gaza. In the waste the gap between the West Bank and Gaza is slightly narrower: 60 percent of the households in the water sector in contrast, in both the West Bank and Gaza, roughly 4 out of 5 households are satisfied West Bank are satisfied with piped water reliability, compared to 45 percent in Gaza. In the waste with service quality and reliability. Somewhat surprisingly, Gaza outperforms the West Bank in terms water sector in contrast, in both the West Bank and Gaza, roughly 4 out of 5 households are satisfied of satisfaction with solid waste collection services. While in the West Bank only 59 percent of house- with service quality and reliability. Somewhat surprisingly, Gaza outperforms the West Bank in terms holds state to be satisfied with service quality and reliability, more than two-thirds (70 percent) of of satisfaction with solid waste collection services. While in the West Bank only 59 percent of house- households in Gaza are satisfied with service delivery outcomes in the solid waste sector. The lowest holds state to be satisfied with service quality and reliability, more than two-thirds (70 percent) of satisfaction rates are reported for local roads. In the West Bank, only every other household, and in households in Gaza are satisfied with service delivery outcomes in the solid waste sector. The lowest Gaza only 1 out of 4 households is satisfied with both the physical condition and the water drainage satisfaction rates are reported for local roads. In the West Bank, only every other household, and in during rain of the road outside their house. Gaza only 1 out of 4 households is satisfied with both the physical condition and the water drainage during rain of the road outside their house. Figure II-2: Satisfaction with Service Quality and Reliability Figure II-2: Satisfaction with Service Quality and Reliability 54% 54% 84% West Bank 59% 84% West Bank 45% 59% 36% 45% 36% 79% Gaza Gaza 70% 79% 23% 70% 23% Piped Water Piped Sewage Solid Waste Collection Paved Local Roads Piped Water Piped Sewage Solid Waste Collection Paved Local Roads 27. Following a description of the sector-specific institutional arrangements, this section gives an overview of the geographic and socio-economic variations in service outcomes across sectors 27. Following a description of the sector-specific institutional arrangements, this section gives . Notable gaps in service delivery outcomes across LGUs exist for all sectors, especially an overview of the geographic and socio-economic variations in service outcomes across sectors. for access to waste water services and paved roads. Socio-demographics at the household level play a considerable Notable gaps in service delivery outcomes across LGUs exist for all sectors, especially for access to role when predicting service outcomes, particularly in the water sector, but cannot fully explain exist- waste water services and paved roads. Socio-demographics at the household level play a considerable ing differences in service delivery outcomes. In this section, first the institutional arrangements across role when predicting service outcomes, particularly in the water sector, but cannot fully explain exist- service sectors are discussed (Chapter 2.1), then the geographical variation in service outcomes for ing differences in service delivery outcomes. In this section, first the institutional arrangements across water and waste water (Chapter 2.2), solid waste management (Chapter 2.3), and local roads (Chapter service sectors are discussed (Chapter 2.1), then the geographical variation in service outcomes for 2.4) is evaluated, differences in service outcomes across household socio-demographics are analyzed water and waste water (Chapter 2.2), solid waste management (Chapter 2.3), and local roads (Chapter (Chapter 2.5), and finally citizen willingness to pay is assessed (Chapter 2.6). 2.4) is evaluated, differences in service outcomes across household socio-demographics are analyzed (Chapter 2.5), and finally citizen willingness to pay is assessed (Chapter 2.6). 14 17 14 THETHE PERFORMANCE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 2.1 The Institutional Framework Governing Local Service Delivery 28. Institutional arrangements differ across sectors, with functions distributed across central and local authorities. A variety of central and local stakeholders are involved in the policy making, priority setting, financing, operation and monitoring of basic service delivery. A number of laws and bylaws governs service delivery across sectors. Institutional arrangements are fragmented and in many cases, LGUs have very limited authority over the services they are mandated to provide based on the LGA. For example, education and health are critical public services delivered at the local level, but with no involvement of the local authorities. Similarly, LGUs used to play a role in the distribution of elec- tricity and collection of service fees, but have ceded this function to the DISCOs. Hence, the analysis in this report focuses on the four basic services under the direct control of LGUs: water supply, sewage, solid waste management, and local roads. Table II-1 provides an overview of the current institutional arrangements by service sector. 29. De-facto assignments do not always reflect the legal institutional framework. At times, the distinction in jurisdictional coverage from central to local authorities results in service provision gaps for citizens living outside LGU and JSC jurisdictions. The PA has come to recognize the problems stem- ming from confusing and overlapping mandates, and some sectors have attempted to address this through updated laws and bylaws. However, in most sectors the delegation of functions in the laws, policies, and strategies does not address or account for the lack of fiscal and technical capacity at the designated agencies. Therefore, and as a result of the mismatch between institutional framework and capacities, a number of agencies are de facto unable to deliver on the designated functions. 30. In the water and waste water sector, responsibilities are distributed across several actors. At the central level, the principal state actors include (i) the Palestinian Water Authority (PWA), in effect the Palestinian water ministry; (ii) the Water Sector Regulatory Council (WSRC), set up under the 2014 Water Law with the mandate of sector regulator; (iii) the MoLG, supporting, monitoring, and regulating LGUs, including their water and sanitation services; and (iv) the Ministry of Finance and Planning (MoFP), allocating sector finance and managing financial flows. At the sub-national level, the state actors are LGUs: municipal water departments provide water and/or sanitation services (76 in the West Bank and 25 in Gaza). In addition, a number of municipalities and VCs have joined together to form JSCs (13 single-service water supply and sanitation JSCs to date), which provide water and/or waste water services. Some 162 VCs also deliver water and waste water services. In addition, there is a large number of donors that operate in the sector, and numerous national and international non- governmental organizations (NGOs) that very actively support development and service delivery in the water sector. 18 15 sumer feedback mecha- tion); counts and other tutes; UNWRA; nisms. LGUs (within jurisdic- national health sur- PCBS tion) veys); Palestinian THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF Public Health Insti- SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. tute Table II-1: Overview of the Current Institutional Arrangements by Service Sector Function Description Water & Solid Waste Roads Electricity Health Education Sewage MoLG; Environment Quality Authority (EQA); Ministry of Health (MOH); National Committee Ministry of Public Palestinian Wa- Palestinian En- on Solid Waste Man- Works and Hous- MoEHE; Higher Who sets the main policy ter Authority 19 ergy and Natural MoH; Policy making agement (in addition ing (MoPWH); Supreme Medical Council of Educa- guidelines? (PWA) Resources Au- to the above includes: MoLG (within tion thority (PENRA) Council MoFP; PWA; Ministry LGU jurisdiction) of National Economy (MoNE); Ministry of Education and Higher Education 2014 Water Local Government Act Law; 2017−2022 (LGA) of 1997; (SDP); Local Environmental Law Government Act No. (7) of 1999; (LGA) of 1997; Public Health Law of Commission for Local Govern- Developing JSC Bylaw 2016; 2004; General Electric- ment Act (LGA) of Tariff Regula- JSC Bylaws 2016; ity Law 2009; Re- Teaching Profes- 1997; What are the key legal pa- tions Bylaw Palestinian Ministerial newable Energy sion; Legislation Draft Road Law Council of Minsters rameters in the sector? 2013; Unified Cabinet Decisions No and Energy Effi- Accreditation 2000; Regulation for 53 (2008), 49 (2010), ciency (RE&EE) and Quality As- Road Traffic Law Water and 50 (2015), 108 (2016), Law 2015 surance Commis- (No. 5) Wastewater Tar- 150 (2017); sion for Higher iff and Connec- JSC Bylaw 2016; Education THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF tion Services National Solid Waste Fees 2017 Management Bi-Law SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. (draft) (draft); 19 16 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 20 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF Function Description Water & SERVICE DELIVERY OUTCOMES AND PERFORMANCE IN THE WEST BANK AND GAZA. Solid Waste DRIVERS Roads Electricity Health Education Sewage 2009 Action Plan 2009 Action MoLG; Plan for Environment for Reform; Reform;Authority Quality Water Sector National (EQA); Strategy Ministry offor Policy and Strat- Solid Waste Health (MOH); Manage- egy 2012−2032; ment in Palestine National Committee Ministry of Public 2011-2013 Na- Education Devel- Policies & What are the plans and Palestinian Wa- Palestinian En- Water Sector (2010-2014); on Solid Waste Man- Works and Hous- tional Health Strat- opment Strategic MoEHE; Higher Plans strategies Who sets the for main the sector? policy ter Authority ergy and Natural MoH; Policy making Reform Plan Updated National agement (in addition ing (MoPWH); egy; Plan (2014-2019) Council of Educa- guidelines? (PWA) Resources Au- Supreme Medical 2016−2018; Strategy for includes: to the aboveSolid MoLG (within tion thority (PENRA) Council Water Sector Waste PWA; Ministry MoFP; Management LGU jurisdiction) Strategic Devel- in of Palestine (2017 – National Economy opment Plan; 2022) (draft); (MoNE); Ministry of Education and Higher WSRC (du jour), Education Gap (de facto); Who regulates the sector PWA (standard 2014 Water MoLG; Local Government Cabinet of Act Palestinian Elec- incl. the licensing regime, setting); Law; 2017−2022 Ministers; (LGA) EQA; MoH; of 1997; tricity Regulatory Regulation MoPWH MoH MoEHE; UNWRA permits, standard setting, (SDP); LGU wa- MoLG,Local MoNE (Industrial Environmental Law Council (PERC); sanction mechanisms, etc. ter departments Government Act waste) No. (7) of 1999; PENRA (within (LGA) ofLGU ju- 1997; Public Health Law of Commission for risdiction) Local Govern- Developing JSC Bylaw 2016; 2004; General Electric- ment Act (LGA) of Tariff Regula- JSC Bylaws 2016; ity Law 2009; Re- Teaching Profes- MoLG; EQA; MoH; 1997; What are the key legal pa- tions Bylaw Palestinian Ministerial newable Energy sion; Legislation JSCs (within JSCs juris- Draft Road Law Council of Minsters rameters Who monitors sector? in thecompliance 2013; Unified Cabinet Decisions No and Energy Effi- Accreditation diction); LGUs (within 2000; with the sector regulation Regulation for 53 (2008), 49 (2010), ciency (RE&EE) and Quality As- WSRC (du jour); LGU jurisdiction) Road Traffic Law incl verification of licenses, Water and 50 (2015), 108 (2016), MoPWH; MoLG; Law 2015 surance Commis- Supervision *Supervision *Note there is a dis- (No. 5) PERC; PENRA MoH MoEHE; UNWRA data analysis, regular in- Wastewater Tar- 150 (2017); LGUs sion for Higher gap iff and facto); (deConnec- crepancy 2016; the JSC Bylawbetween spection, and other control Education tion Services role as stated National Solid in legis- Waste measures. lation versus in prac- Fees 2017 Management Bi-Law tice. (draft) (draft); THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF JSCs and LGUs (within own jurisdiction) in SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Who enforces sanctions in Enforcement cooperation with law PERC; PENRA MoH MoEHE; UNWRA case non-compliance? enforcement e.g. 16po- lice; 17 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF Function Description Water & SERVICE DELIVERY OUTCOMES AND PERFORMANCE IN THE WEST BANK AND GAZA. Solid Waste DRIVERS Roads Electricity Health Education Sewage MoH MoLG; (within LGU Environment boundaries for Quality Authority public health issues); (EQA); Ministry of Health (MOH); PWA in consul- National Committee Ministry of Public Palestinian tation with Wa- National Committee Palestinian En- on Solid Waste Man- Works and Hous- MoEHE; Higher Who sets the main policy ter Authority stakeholders on Solid Waste Man- ergy and Natural MoH; Policy making agement (in addition ing (MoPWH); MoPWH; LGUs; Supreme Medical Council of Educa- guidelines? Who plans implementation? (PWA) (Sector strategy) agement (National Resources Au- PENRA Planning Planning to the above includes: MoLG Higher(within Planning MoH tion MoEHE; UNWRA Who approves plans? LGUs (through Plans), MoLG, LGUs, & thority (PENRA) Department Council MoFP; PWA; Ministry LGU jurisdiction) Council; PECDAR SDIPs); JSCs (Local and Dis- of National Economy Utilities (Local trict Plans) (MoNE); Ministry of Strategies) Education and Higher MoFP; PWA (Na- Education tional Budget- 2014 Water Local Government Act ing); Law; 2017−2022 (LGA) of 1997; Service Provid- (SDP); Local Environmental Law ers (local budg- Government Act No. (7) of 1999; MoFP; ets); Commission for Who finances service provi- (LGA) of 1997; Public Health Law of LGU resources MoFP; UNWRA; lo- MoFP; UNWRA; LGU and JSC LGU/ Local Govern- User fees; Exter- Developing sion? Who is responsible for JSC Bylaw 2016; 2004;JSC User fees (transportation General Electric- cal NGOs; private private sector user fees & net (OPEX); ment Act (LGA) of nal Sources; Financing budgeting incl. capital in- Tariff Regula- JSC Bylaws 2016; tax; projects ity Law 2009; Re- sector service pro- Teaching service Profes- provid- lending subsi- External financing 1997; Clearance reve- What are the vestments, key legal wages, pa- opera- tions Bylaw Palestinian Ministerial budget); newable Energy viders; external sion; ers; external Legislation dies (OPEX); (CAPEX) Draft Road Law nues Council of Minsters rameters in the sector? tion & maintenance. 2013; Unified Cabinet Decisions No External and Energy Effi- sources Accreditation sources CAPEX ≥ 76% ex- 2000; Financ- Regulation for 53 (2008), 49 (2010), ing (CAPEX) ciency (RE&EE) and Quality As- ternal financing Road Traffic Law Water and 50 (2015), 108 (2016), Law 2015 surance Commis- *OPEX & CAPEX (No. 5) Wastewater Tar- 150 (2017); sion for Higher funding gap in iff and Connec- JSC Bylaw 2016; Education waste water tion Services (no National Solid Waste user fees) Fees 2017 Management Bi-Law THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF (draft) (draft); Palestinian Elec- Who administers the ser- LGU water de- LGUs; JSCs; MoLG; MoH; UNRWA; lo- tricity Transmis- SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. vice? This includes bidding, partments; JSCs; MDLF (on behalf of MoPWH; LGU; cal NGOs; private Administration sion Company MoEHE; UNWRA contracting, & daily respon- Service provid- external financing - PECDAR sector service pro- Ltd (once they sibilities ers Gaza) viders; 16 become opera- 21 18 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 22 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF Function Description Water & SERVICE DELIVERY OUTCOMES AND PERFORMANCE IN THE WEST BANK AND GAZA. Solid Waste DRIVERS Roads Electricity Health Education Sewage MoLG; Environment tional); Distribu- Quality Authority tion Companies (EQA); Ministry of (DISCOs) Health (MOH); Public (LGU/ JSC National Committee Ministry of Public Palestinian water depart-Wa- Palestinian En- on Solid Waste Man- Works MoPWH; and Hous- LGU; MoEHE; Higher Who sets the main policy ter Authority ments, utilities) ergy and Natural MoH; Policy making agement (in addition ing (MoPWH); Hired Private Supreme Medical Council of Educa- guidelines? Who delivers (“produces”) (PWA) Bulk Supply: Resources Au- Public (DISCOs, to the above Public; includes: private opera- MoLG (within Contractors (con- MoH; UNRWA; tion Operation the service? Public or pri- West Bank Wa- thority (PENRA) LGUs); Private Council MoEHE; UNRWA; MoFP; tors PWA; Ministry LGU jurisdiction) struction & NGOs; vate operators, or a mix. ter Department (JDECO; GPP) Private Sector of National Economy maintenance Private Sector purchased from (MoNE); Ministry of work) Mekorot; Education and Higher LGU wells Education MoFP; UNWRA; 2014 Water Local Government Act NGOs; Private Sec- Law; 2017−2022 (LGA) of 1997; tor; Palestinian (SDP); Local Environmental MoLG (mainly Griev-Law Central Bureau of MOEHE; Na- Who monitors service deliv- Government Act No. (7) of 1999; ance Redress); Statistics (PCBS tional Institute Commission for ery incl. regular reporting, (LGA) of 1997; Public MoH and Health EQALaw of (Out- Local Govern- with MoH regularly for Educational Developing evaluation of outputs, data JSC Bylaw 2016; 2004; side LGU jurisdiction); MoPWH; MoLG; General Electric- PERC; individual Monitoring WSRC ment Act (LGA) of conducts the Na- Training; collection, statistics, & con- Tariff Regula- JSC (within JSCsBylaws 2016; jurisdic- LGUs ity Law 2009; Re- DISCOs Teaching Higher Profes- 1997; tional Health Ac- Education Insti- What sumerare the key feedback legal pa- mecha- tions Bylaw Palestinian tion); Ministerial newable Energy sion; Legislation Draft Road Law Council of Minsters counts and other tutes; UNWRA; rameters nisms. in the sector? 2013; Unified Cabinet Decisions LGUs (within No jurisdic- and Energy Effi- Accreditation 2000; national health sur- PCBS Regulation for 53 (2008), 49 (2010), tion) ciency (RE&EE) and Quality As- Road Traffic Law veys); Palestinian Water and 50 (2015), 108 (2016), Law 2015 surance Commis- (No. 5) Public Health Insti- Wastewater Tar- 150 (2017); sion for Higher tute iff and Connec- JSC Bylaw 2016; Education tion Table II-1: Overview Services of the National Current Solid Waste Institutional Arrangements by Service Sector Fees 2017 Management Bi-Law (draft) (draft); THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. 16 19 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 31. In the West Bank, two-fifths of bulk water is supplied from internal resources, largely man- aged by the West Bank Water Department, and three-fifths is purchased from Israel.11 Bulk water pro- vision in the West Bank is the responsibility of the West Bank Water Department, which manages wells and purchases water from the Israeli bulk supplier, Mekorot, and distributes and sells bulk water to service providers. In Gaza, the Coastal Water Management Utility operates as a water provider to the municipalities and as a project implementer. Water and sanitation retail service providers fall into sev- eral categories. There are only two formally established autonomous “utilities”: (i) the Jerusalem Water Undertaking provides water services to East Jerusalem and surrounding communities, and to much of the Ramallah and Al Bireh Governorates; and (ii) the Water Supply and Sanitation Authority provides water services to the Bethlehem area. The other main providers are departments of municipalities, VCs, and JSCs. Services to some refugee camps are provided by the United Nations Relief and Works Agency for Palestine (UNRWA). In both the West Bank and to a greater extent in Gaza, there is an active private sector of water purifying plants and private water tankers. Involvement of civil society and the served population is through citizen groups and individual consumers who engage on water issues, although in a limited way. 32. Institutional assignments for solid waste management involve both central and local stake- holders. The main actors in the solid waste sector at the central level include: (i) the MoLG, which is responsible for the National Solid Waste Management Strategy and regulates and monitors LGU perfor- mance in the sector; (ii) the Environmental Quality Authority (EQA), overseeing environmental protec- tion and ensuring enforcement of environmental laws, primarily through licensing, regulations, and monitoring solid waste management facilities including land fill sites; and (iii) the Ministry of Health (MoH), which coordinates with the EQA and MoLG to regulate the disposal of certain waste and the closure and/or rehabilitation of dumpsites. Also involved at the central level in legislation, policy, and strategy development is the National Committee for Solid Waste Management, which reports to the Cabinet of Ministers (CoM). This body includes in addition to the MoLG, EQA, and MoH, the MoFP, and recently added the PWA, Ministry of National Economy (MoNE), and the Ministry Education and Higher Education (MoEHE). The Committee has recently prepared an updated draft of the Solid Waste Man- agement Strategy for 2017 – 2022, and a draft Solid Waste Management Bylaw proposed for approval to the CoM and public disclosure in summer 2017. Waste management at the local level, including col- lection, transport, and final disposal, is administered by both LGUs and JSCs within their respective ju- risdictions. Examples include the Jenin JSC for the Jenin and Tubas Governorates and the Hebron-Beth- lehem Higher JSC for Solid Waste Management. However, there is a gap between what is proscribed in the policies regarding assigned roles and tasks, and what de facto takes place. The new draft bylaw will address the conflicting roles and provide clarity to the institutional and implementation arrangements for the stakeholders in the sector. 33. Similarly, LGUs share mandates in the road sector with central authorities. At the central level the Ministry of Public Works and Housing (MoPWH) is responsible for the development, maintenance, and rehabilitation of the main and regional roads outside the jurisdiction of municipalities and VCs. At the local level, municipalities and VCs are responsible for the roads within their immediate jurisdiction (masterplans), which includes planning, development, and maintenance of the network. In the West Bank, the authority of these agencies is limited to the PA controlled areas (Areas A and B), while the GoI has full administrative control of Area C including management of the road network, which represents a bulk of the existing roads. Currently, there is a limited role for the private sector in managing and investing in the public road network in the Palestinian territories. 11 World Bank. 2017. West Bank and Gaza WASH Poverty Diagnostic. 20 23 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 34. The road network, which is the most important and dominant mode of transport in West Bank and Gaza, faces numerous challenges. The study found that better roads remain one of the most de- sired services in West Bank (47 percent) and Gaza (74 percent). Further indication roads remain a high priority for Palestinians living in the West Bank and Gaza, under the MDP, which pools funding from the Bank, international donors, and the PA,12 51 percent of Cycle 1 and 71 percent of Cycle 2 funding for municipalities went to roads13. The sector however faces institutional, fiscal, and external challenges. The current institutional arrangements, with the responsibilities for road planning, construction, maintenance, and funding split between multiple ministries and agencies depending on the type of work, funding source, and road category, are confusing and overlapping.14 The sector lacks a compre- hensive Road Masterplan, which could streamline the organizational management of the multiple pro- jects by assorted stakeholders and facilitate the coordination of maintenance activities. Similar to the other core services, the sector also lacks the sufficient funds for executing necessary projects and maintenance. Roads represent the biggest public capital asset, and there is a complete reliance on the public sector for the development of the network, since commercial infrastructure financing is not uti- lized. Lastly, the role of the geo-political situation cannot be ignored. The GoI severely restricts the Pal- estinians ability to upgrade roads or construct new routes in Area C without previous consent, most often not given. This has left areas cut off with limited access to services (e.g. solid waste collection, health and education services) and constrained access to other areas of the West Bank. The situation has also created a reliance on the donor community to upgrade roads in Area C as it is easier for them to obtain Israeli permission for the infrastructure work needed. 2.2 Water and Waste Water 35. Lacking access to improved drinking water sources for households in Gaza remains a key chal- lenge. Figure II-3 demonstrates that across regions in the Palestinian territories, significant differences in access to drinking water sources considered improved by the WHO / UNICEF Joint Monitoring Pro- gramme exist. 15 Following a sharp deterioration of access to water services in all five governorates, mainly due to over-exploitation of the Coastal Aquifer, Gaza’s only internal renewable water source, only 1 percent of the households in Gaza has access to an improved drinking water source. The World Bank’s 2017 WASH Poverty Diagnostic finds that the majority of the 260 municipal wells in the Gaza strip do not meet the salt and nitrate maximum thresholds set by the World Health Organization (WHO), forcing 97 percent of the population in Gaza to acquire drinking water from private tanker trucks. In the West Bank in contrast, access to improved drinking water sources reaches 94 percent, with VCs having slightly higher access rates (95 percent) than municipalities (93 percent). However, when defining access as continuous access without interruption for a full day during the previous two weeks, access to im- proved drinking water drops to 81 percent, mainly driven by large decreases in Jenin, Nablus, and Heb- ron. 12 A program which pools funding from the Bank, international donors, and the PA that incentivizes the development of mu- nicipal management capacity through performance-based grants to municipalities. 13 MDLF. 2016 Annual Report. 14 World Bank. 2007. West Bank and Gaza Transport Sector Strategy Note. 15 The following drinking water sources are considered improved: Piped water into dwelling, yard, or plot; public tap or stand- pipe; tubewell or borehole; protected dug well; protected spring; rainwater collection; bottled water. 24 21 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-3: Geography of Service Provision: Access to Improved Drinking Water West Bank North 96% Central 98% South 87% Municipalities 93% VCs 95% Gaza 1% 97% of households in Gaza rely on drinking water delivered by water tanker-trucks 36. Access to piped water is the highest in municipalities in the central West Bank. Figure II-4 pro- vides an overview on spatial differences in access to piped water, measured at the LGU level. Access rates are the highest in LGUs in the central West Bank, with an average coverage of 99 percent, and the lowest in the south West Bank and Gaza, where on average 1 out of 10 households lacks a connection to a piped water network. However, in neither between the West Bank and Gaza, nor between regions within the West Bank, does the outcome gap exceed 10 percentage points. Across LGUs in the West Bank, access rates are slightly higher in municipalities (94 percent) than VCs (92 percent) but no clear structural relationship between LGU size group and access to piped water emerges. Figure II-4: Geography of Service Provision: Access to Piped Water North Municipalities - West Bank 94% Large 93% Medium 91% Central Small 97% Gaza 99% Village Councils - West Bank 88% Large 92% Medium 94% South Small 89% 90% 22 25 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 37. The Gaza water crisis is further aggravated by the lack of regular energy supply. Gaza suffers from frequent power cuts and rationed supply which only provides around 8 hours of electricity per day to citizens. However, the lack of coordination between electricity and water distribution schedule fur- ther affects household water supply in addition to electricity restrictions affecting the operation of wells that feed the piped network. Most of FGD participants in Gaza complained because they “do not receive water and electricity at the same time”16 or because of what some citizens called “the lack of coordina- tion between ‘water supply schedule’ and the ‘provision of electricity schedule.’” A FDG participant from Gaza explained why this matters to a large number of Gaza residents: “People need electricity to operate their water pumps and store water in tanks located on their roofs. However, they cannot do this when they have water without having electricity. Sometimes, people stay up at night waiting for electricity to be able to fill their tanks…” These findings are confirmed by the mayor of Gaza City who explained there is a “difficulty of operating some water wells due to power outages.” 38. Satisfaction with the quality and reliability of piped water is higher in the north and central than in the south West Bank and Gaza, and differs notably with LGU size. Figure II-5 provides an over- view on spatial differences in satisfaction with the quality and reliability of piped water, conditional on being connected to the piped water network. In the north and central West Bank, on average 2 out of 3 citizens are satisfied or very satisfied with piped water quality and reliability, compared to only half of the households in the south West Bank. Satisfaction rates are the lowest in Gaza, where only 36 percent of households state they are satisfied with the quality and reliability of their piped water connection. Both across municipalities and VCs in the West Bank, satisfaction is the highest in small LGUs. Figure II-5: Satisfaction with Quality and Reliability: Piped Water North Municipalities - West Bank 58% Large 52% Medium 41% Central Small 58% 60% Gaza Village Councils - West Bank 36% Large 47% Medium 61% South Small 62% 44% 39. Qualitative analysis underlines survey findings that despite high connection rates to the water network, water shortages and quality remain critical challenges. Most affected is the southern West 16 Quotes throughout the report are from Key Informant Interviews (KIIs) and Focus Group Discussions (FGDs), and are trans- lated from Arabic. See Annex 2 for a detailed description of the methodology and an overview of the quotes used in this re- port. Araj, Bader. 2017. Qualitative Research Report Focus Group Discussions and Key Informant Interviews. 26 23 Large 47% Medium 61% South THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF Small 62% SERVICE SERVICEDELIVERY DELIVERYOUTCOMES OUTCOMESAND PERFORMANCEDRIVERS ANDPERFORMANCE 44% DRIVERS INTHE IN THEWEST BANKAND WESTBANK ANDGAZA. GAZA. Bank (e.g. Hebron, Bethlehem and Beit Sahour) where some residents report receiving piped water, on THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF average, once every three weeks. In comparison, the poor quality of water is the most challenging issue 39. SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Qualitative analysis underlines survey findings that despite high connection rates to the water in Gaza, because of the lack of fresh water available from the overdrawn coastal aquifer and limited network, water shortages and quality remain critical challenges. Most affected is the southern West waste water treatment capacity causing further pollution from infiltration of untreated sewage. In ad- Bank (e.g. Hebron, Bethlehem and Beit Sahour) where some residents report receiving piped water, on dition, most LGUs in the West Bank and Gaza suffer significant water-losses from old leaking water net- average, once every three weeks. In comparison, the poor quality of water is the most challenging issue 16 works that require expensive maintenance and renewal. Quotes throughout the report are from Key Informant Interviews (KIIs) and Focus Group Discussions (FGDs), and are trans- in Gaza, because of the lack of fresh water available from the overdrawn coastal aquifer and limited lated from Arabic. See Annex 2 for a detailed description of the methodology and an overview of the quotes used in this re- waste water treatment capacity causing further pollution from infiltration of untreated sewage. In ad- port. Araj, Bader. 2017. Qualitative Research Report Focus Group Discussions and Key Informant Interviews. 40. A third of the households in the south West Bank and in Gaza report a deterioration in the dition, most LGUs in the West Bank and Gaza suffer significant water-losses from old leaking water net- quality of piped water during the last 3 years. works that require expensive maintenance and renewal. Figure II-6 demonstrates that while the majority of house- holds across LGUs in the Palestinian territories did not experience a change in the quality of piped sew- 23 age services, quality in the south West Bank and in Gaza deteriorated for a third of the population. In 40. A third of the households in the south West Bank and in Gaza report a deterioration in the contrast, 44 percent of the households in the south West Bank and 43 percent in the central West Bank quality of piped water during the last 3 years. Figure II-6 demonstrates that while the majority of house- report an improvement during the last 3 years. In contrast to the sewage and solid waste sector, service holds across LGUs in the Palestinian territories did not experience a change in the quality of piped sew- quality improved in smaller VCs and municipalities in the West Bank, relative to larger LGUs. In small age services, quality in the south West Bank and in Gaza deteriorated for a third of the population. In municipalities and VCs, only 1 out of 5 and 1 out of 8 households report a deterioration, respectively, contrast, 44 percent of the households in the south West Bank and 43 percent in the central West Bank compared to 1 out of 3 in large municipalities, and 1 out of 4 in large VCs. report an improvement during the last 3 years. In contrast to the sewage and solid waste sector, service quality improved in smaller VCs and municipalities in the West Bank, relative to larger LGUs. In small Figure II-6: Trends in Service Delivery: Change in Quality of Piped Water in Last 3 Years municipalities and VCs, only 1 out of 5 and 1 out of 8 households report a deterioration, respectively, compared to 1 out of 3 in large municipalities, and 1 out of 4 in large VCs. Regions Municipalities - West Bank Figure II-6: Trends in Service Delivery: Change in Quality of Piped Water in Last 3 Years North Large 32 43 25 20 56 27 West Bank Regions 35 West Bank Municipalities - Medium 40 26 Central North 18 52 43 West Bank 20 56 27 Large Small 1932 52 43 25 29 West Bank South Medium VCs - 35 West Bank 40 26 Central 32 38 44 West Bank 18 52 43 West Bank Small 19 52 29 Large 25 50 25 Gaza South 36 52 24 32 38 44 VCs - MediumWest Bank 15 55 29 West Bank Deteriorated No Change Improved Large Small 1225 59 50 25 28 Gaza 36 52 24 Medium 15 55 29 41. The vast majority of households in the Palestinian territories have access to an unshared im- Deteriorated No Change Improved Small 12 59 28 proved sanitation facility. Figure II-7 illustrates that access to improved unshared sanitation facilities as defined by the WHO / UNICEF Joint Monitoring Program exceeds 90 percent in all regions of the Pales- 17 tinian territories. 41. With 99 percent and 97 percent coverage, access to improved sanitation facilities is The vast majority of households in the Palestinian territories have access to an unshared im- universal in Gaza and in the south West Bank, respectively. In the north and central west Bank, 92 per- proved sanitation facility. Figure II-7 illustrates that access to improved unshared sanitation facilities as cent of households are covered by an improved sanitation facility. In the West Bank, access rates are defined by the WHO / UNICEF Joint Monitoring Program exceeds 90 percent in all regions of the Pales- higher in municipalities (95 percent) than in VCs (88 percent). tinian territories.17 With 99 percent and 97 percent coverage, access to improved sanitation facilities is universal in Gaza and in the south West Bank, respectively. In the north and central west Bank, 92 per- cent of households are covered by an improved sanitation facility. In the West Bank, access rates are higher in municipalities (95 percent) than in VCs (88 percent). 17 The following types of sanitation facilities are considered improved: flush or pour-flush to piped sewage system, septic tank, or pit latrine; ventilated improved pit latrine (VIP); pit latrine with slab; composting toilet. All sanitation facilities that are shared with individuals not belonging to the own household are considered unimproved. 17 The following types of sanitation facilities are considered improved: flush or pour-flush to piped sewage system, septic tank, or pit latrine; ventilated improved pit latrine (VIP); pit latrine with slab; composting toilet. All sanitation facilities that 24 are shared with individuals not belonging to the own household are considered unimproved. 27 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-7: Geography of Service Provision: Access to Improved Sanitation Facilities West Bank North 92% Central 92% South 97% Municipalities 95% VCs 88% Gaza 99% 96% of Palestinian households have access to an improved sanitation facility 42. While coverage with improved sanitation facilities is almost universal, piped sewage coverage is low, differing significantly by LGU type and size, and is notably higher in Gaza. Fig- ure II-8demonstrates the sharp contrast to the distribution of piped sewage coverage. 77 percent of the households in Gaza and only 30 percent of the households in the West Bank are connected to a piped sewage network. Driven by high access in its large cities, Gaza clearly outperforms the West Bank: in the five largest cities in Gaza, access rates reach 93 percent, compared to just 76 percent in the five largest cities in the West Bank. Across the three regions of the West Bank, on average slightly less than a third of citizens have access to piped sewage, with access rates differing notably by LGU type and size. The best performing LGUs are large municipalities with access rates over 70 percent, while in VCs, less than 1 out of 10 citizens is connected to piped sewage system. Figure II-8: Geography of Service Provision: Access to Piped Sewage North Municipalities - West Bank 30% Large 77% Medium 36% Central Small 21% 30% Gaza Village Councils - West Bank 77% Large 8% South Medium 8% Small 1% 29% 28 25 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. In the smallest LGU size group, VCs with less than 1,000 inhabitants, piped sewage is virtually not avail- able. The municipalities in the West Bank where piped sewage is predominantly only available include Nablus, Qalqiliya, Salfit, Ramallah, Bethlehem, and Hebron, as can be seen in Figure II-8 43. Among households that have access to a piped sewage system, satisfaction is the highest in the north and south West Bank. Figure II-9 shows the geographical variation of satisfaction with the quality and reliability of piped sewage services for households that are connected to the sewage net- work. Satisfaction is higher among citizens in the West Bank (86 percent) than in Gaza (79 percent) and the highest in the south West Bank (89 percent). A main determinant of satisfaction with the quality and reliability of piped sewage is the reliability of sewage pipes: while of the households that do not experi- ence an overflowing or clogged pipe on a regular basis, state 91 percent to be satisfied with piped sew- age quality; only 17 percent of the households that experience an overflow or clog of sewage pipes at least once per month report to be satisfied with quality and reliability of sewage services. Figure II-9: Satisfaction with Quality and Reliability: Piped Sewage North Municipalities - West Bank 86% Large 87% Medium 84% Central Small 86% 82% Gaza Village Councils - West Bank 79% Large 74% South Medium 88% 89% 44. The broad majority of the households in the West Bank and Gaza reports an improvement or no change in the quality of piped sewage services in the last 3 years. Figure II-10 demonstrates that the vast majority of households across LGUs in the Palestinian territories did not experience a change in the quality of piped sewage services. In the south West Bank, more than 4 out of 10 households report an improvement, while only 1 out of 4 households in both the north West Bank and in Gaza experienced an improvement. Compared to the outcomes for piped water and solid waste collection, only small shares of households report a deterioration for piped sewage services. Across LGUs, households report higher rates of improvement in municipalities (30 percent) than in VCs (29 percent), and in larger LGUs. 26 29 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-10: Trends in Service Delivery: Change in Quality of Piped Sewage in Last 3 Years Regions Municipalities - West Bank North Large 5 59 25 4 76 27 West Bank Medium 8 62 26 Central 7 66 43 West Bank Small 4 77 29 South VCs - West Bank 5 53 44 West Bank Large 2 80 25 Gaza 13 72 24 Medium 5 73 29 Deteriorated No Change Improved Small 0 100 28 45. Comparing trends in water and sanitation across countries, the Palestinian territories have seen a substantial decline in access to improved drinking water sources in the ten years leading up to 2015. Through the World Bank’s World Development Indicators (WDI), information on access to im- proved drinking water and sanitation is presented below in Figure II-11 and Figure II-12, respectively. The service access rates for the Palestinian territories were compared to the neighboring countries of Jordan and Lebanon as well as to regional averages including for fragile and conflict-affected situations (FCS). Countries of similar structural characteristics including size, geographical location, landlocked na- ture, having low labor force participation rates, and a high dependency on aid and remittances were also considered. Figure II-11: Access to Improved Drinking Water Sources (% of Population with Access) a. Selected peers by country b. By region excluding high income 100 100 95 95 90 90 85 85 80 80 75 75 70 70 65 65 60 60 55 55 50 50 45 45 40 40 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 East Asia & Pacific Jordan Lebanon Europe & Central Asia Bosnia and Herzegovina Haiti Latin America & Caribbean Mali Moldova Middle East & North Africa Palestine Sub-Saharan Africa Fragile and conflict affected situations Source: World Development Indicators as of March 15, 2017. Note: Countries were selected by neighboring location and by which have similar structural characteristics such as size, geographical location, landlocked, and having low labor force participation rates in addition to a high depend- ency on aid and remittances. Regions exclude high-income countries. 30 27 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. According to the WDI’s latest figures, the percent of the population with access to improved drinking water has declined from 78.2 percent in 2005 to only 58.4 percent with access in 2015. This is signifi- cantly much lower than for Lebanon (99 percent) and Jordan (96.9 percent), and the region (92.6 per- cent excluding high income countries). The rate is also lower than the 67.8 percent average for FCS. This is predominantly attributable to the deteriorating quality of urban water supply in Gaza.18 While the LGPA survey found higher access rates to piped water, access to drinking water remains significantly low for the Palestinian territories. 46. In contrast, access to improved sanitation facilities in the Palestinian territories has slowly been on the rise. The WDI numbers indicate that the population’s access to improved sanitation has increased from already high numbers to 92.3 percent by 2015, 10 percentage points higher than Leba- non (80.7 percent) and closer to Jordanian access rates (98.6 percent). This is very similar to the LGPA’s finding that 96% of Palestinian households have access to an improved sanitation facility. Access rates in the Palestinian territories are significantly higher than the FCS average (43.5 percent) and slightly higher than the average for the region (89.6 percent). Figure II-12: Access to Improved Sanitation Facilities (% of Population with Access) a. Selected peers by country b. By region excluding high income 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Jordan Lebanon East Asia & Pacific Europe & Central Asia Bosnia and Herzegovina Haiti Latin America & Caribbean Mali Moldova Middle East & North Africa Palestine Sub-Saharan Africa Fragile and conflict affected situations Source: World Development Indicators as of March 15, 2017. Note: Countries were selected by neighboring location and by which have similar structural characteristics such as size, geographical location, landlocked, and having low labor force participation rates in addition to a high depend- ency on aid and remittances. Regions exclude high-income countries. 18 World Bank. 2017. West Bank and Gaza WASH Poverty Diagnostic. 28 31 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 2.3 Solid Waste Management 47. Availability of solid waste collection services is higher in larger LGUs and the highest in the north West Bank. Figure II-13 shows the geographical distribution of the availability of solid waste col- lection services at the LGU level. While in the West Bank, over 90 percent of households are covered by a waste collection service, almost 1 out of 5 households in Gaza is not covered (17 percent). In the West Bank, nearly 100 percent of households in municipalities, and 90 percent of households in medium and large VCs have access to waste collection services. In small VCs however, one out of four households still lacks access to any form of waste collection service. There is a noticeable correlation between low access to solid waste collection and low access to paved local roads, particularly in the southern West Bank and areas in Gaza. It would be difficult for solid waste collection trucks to access areas without paved roads, which highlights again the interdependence of the core services and the coordination needed for their provision. Figure II-13: Geography of Service Provision: Solid Waste Collection North Municipalities - West Bank 98% Large 98% Medium 98% Central Small 97% Gaza 95% Village Councils - West Bank 83% Large 87% Medium 92% South Small 74% 93% 48. Satisfaction with the quality and reliability of solid waste collection services is low in the north West Bank and in small LGUs. In Gaza, and in the Central and south West Bank, 2 out of 3 households are satisfied with waste collection services, compared to only every second household in the north West Bank. These results are mainly driven by differing frequencies of solid waste collection across regions and LGU size groups: in West Bank VCs solid waste is collected less than 2 times per week, compared to 4 times in municipalities in the West Bank and 5 times for municipalities in Gaza. 32 29 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-14: Satisfaction with Quality and Reliability: Solid Waste Collection North Municipalities - West Bank 54% Large 70% Medium 69% Central Small 59% 69% Gaza Village Councils Large 49% 70% Medium 50% South Small 57% 65% 49. On average, more than a third of the households in the West Bank, and a fourth of the house- holds in Gaza experienced an improvement in the quality of solid waste collection services in the last 3 years. Figure II-15 demonstrates that the majority of households across LGUs in the Palestinian terri- tories did not experience a change in the quality of solid waste collection services. While in the north West Bank and in Gaza, only 1 out of 4 households reports an improvement, a clearly larger share of households experienced an improvement in the central West Bank (43 percent) and in the south West Bank (44 percent). Figure II-15 : Trends in Service Delivery: Change in Quality of Solid Waste Collection in last 3 Years Regions Municipalities - West Bank North Large 18 40 43 19 54 27 West Bank Medium 14 40 47 Central 13 44 43 West Bank Small 17 50 34 South VCs - West Bank 17 40 44 West Bank Large 20 54 26 Gaza 18 58 24 Medium 19 51 31 Deteriorated No Change Improved Small 14 59 27 The share of households that experiences a deterioration in service quality ranges from 13 percent in the central West Bank to 18 and 19 percent in Gaza and the north West Bank, respectively. Across LGUs, 30 33 West Bank Large 20 54 26 Gaza 18 58 24 Medium THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF 19 51 31 SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. Deteriorated No Change Improved Small 14 59 27 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. The share of households that experiences a deterioration in service quality ranges from 13 percent in the central West Bank to 18 and 19 percent in Gaza and the north West Bank, respectively. Across LGUs, households report higher rates of improvement in municipalities (39 percent) than in VCs (29 percent), and in larger LGUs. 2.4 Local Roads 30 50. Access to paved local roads is twice as high in the West Bank than in Gaza. In the West Bank, 9 out of 10 households are located by a paved road, while less than half of the households in Gaza have direct access to paved roads. As a consequence, almost three quarters of the citizens in Gaza desire better roads. Access to paved roads is 26 percent higher in municipalities than VCs, with the highest percentage of access found in the central West Bank. Results also indicated concerns with the opera- tions and maintenance of existing roads. Figure II-16: Geography of Service Provision: Paved Roads North Municipalities - West Bank 87% Large 91% Medium 88% Central Small 88% 92% Gaza Village Councils - West Bank 46% Large 79% South Medium 85% Small 76% 83% Over half of the households (60 percent) report that they are not satisfied with the conditions of roads outsides their houses. The number is significantly higher in Gaza, where only a quarter of households report satisfaction. In the West Bank 49 percent report to be satisfied with roads, with more households in municipalities (40 percent) reporting satisfaction than in VCs (34 percent). Half of the households in Gaza report that the road outside their house cannot be used during heavy rain for walking and driving, and one out of three households surveyed in Gaza mention drainage during rain as one of the main problems with roads in their communities. In the West Bank in contrast, only 1 out of 4 households do not have access to a road which can be used even during heavy rain, and only 1 out of 5 households mention drainage during rain as a main problem with local roads. The poor situation for roads in Gaza was exacerbated by the significant damage to infrastructure during the 2014 Gaza War. 51. Despite the provision of roads being a shared service between central government and LGUs, there remain a number of road issues in addition to infrastructure which LGUs are responsible for. Households in both the West Bank and Gaza report no/irregular street cleaning as the most important 34 31 and one out of three households surveyed in Gaza mention drainage during rain as one of the main problems with roads in their communities. In the West Bank in contrast, only 1 out of 4 households do not have access to a road which can be used even during heavy rain, and only 1 out of 5 households THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF mention drainage during rain as a main problem with local roads. The poor situation for roads in Gaza SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. was exacerbated by the significant damage to infrastructure during the 2014 Gaza War. 51. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF Despite the provision of roads being a shared service between central government and LGUs, SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. there remain a number of road issues in addition to infrastructure which LGUs are responsible for. Households in both the West Bank and Gaza report no/irregular street cleaning as the most important problem with roads in their community. However, at the LGU level, VCs (22 percent) report that pot- holes/ bad road surface as the most important issue over no/irregular street cleaning (20 percent). Both categories fall under the mandates of the LGUs to address. Access to streetlights is high (71 percent) but again similar to paved road access, there is a large gap between the West Bank and Gaza. Only 51 per- 31 cent of households in Gaza report that the road outside their house has functioning streetlights, com- pared to 84 percent in the West Bank. A higher percentage of households in VCs (79 percent) report the road had functioning streetlights to than in municipalities (71 percent), with the north West Bank re- porting the highest presence of streetlights (87 percent). 35 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 1920212223 Box II-1: Spaces of Exception Rapid urban growth is putting substantial pressures on service delivery systems. The Pal- estinian territories are facing rapid urbanization and spatially concentrated development with limited space to expand. Already today, 74 percent of the West Bank and Gaza is con- sidered urban. Frequently, spatial expansion outpaces administrative growth and capacities, coupled with incomplete and outdated local government laws, regulations, and systems. Building often precedes planning and service delivery, resulting in inefficient land use and infrastructure development. LGUs are mandated to provide services within their masterplan boundaries, however there remain built-up areas requiring core services outside the boundaries. LGU adminis- trative boundaries (city limits) govern the expanse LGUs are responsible to provide services to, and these correspond with the approved masterplan borders.19 However, in most cases the LGU masterplan boundaries do not cover the full land area of the LGU, nor do they align and link with neighboring LGU masterplans as is typically standard for municipal demarca- tion. These boundaries also differ from the electoral boundaries which encompass further districts than the masterplans. This has resulted in sizeable in-between areas or spaces of exception across the West Bank, totaling 1,225.65 km2 (22.44 percent).20 The lands of these in-between areas, originally designated as “green” or for agricultural use, are associated with certain municipal or village lands, but do not fall within the LGU masterplans. There- fore, they do not come under the jurisdiction of the LGUs who in turn are not responsible to provide services to the areas. Much of the land outside the masterplans was designated as green or agricultural use, however they are increasingly being used for multi-purpose use. According to the Town, Village and Building Planning Law, No. 79, 1966, since these areas were originally considered green land or for agricultural use, only agricultural buildings and roads were allowed. Ser- vices for the areas come under the administrative authority of the assorted PA line ministry departments or directorate offices – MoLG, MoPWH, PWA’s West Banks Water Depart- ment, and the EQA.21 In practice however, these locations are now going through more ex- panded development with building permits provided by the MoLG Directorate Offices.22 The core services should be connected to the closest LGU by the corresponding line ministry.23 The sites vary in levels of built environment. Some may be indistinguishable from city cen- ters which have built out to them, but as more often is the case, most of the land tends to be located on LGU peripheries. Additionally, regional planning is weak in Palestine; if the corresponding line ministries have regional plans including these spaces, which many do not, they are not developed or detailed for residential and mixed land-use. 19 This is a policy remaining and adopted from the British Mandate for Palestine’s Regional Master Planning Schemes of 1942 Jerusalem District RJ/5 and Samaria District 1945 S15. 20 Source: GeoMOLG 21 This excludes portions within Area C for which Israel has full control of security matters and all land-related civil administra- tion, including land allocation, planning and construction, and infrastructure. 22 There are also situations in which people build without permits in these areas and then pay a building fine post-construc- tion. 23 Palestinian Authority. 1994. Town, Village and Building Planning Law, No. 79, 1966. 36 33 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. Due to the lack of affordable centrally located urban land particularly in Area A, citizens of urban centers are opting to build in the peripheries of major urban centers. Much of the unbuilt and unplanned areas where expansion is taking place falls within the in-between spaces; however, line ministries and LGUs do not have the financial capacities nor invest- ment interest to provide off-site infrastructure to the areas. Citizens or private developers building in the unplanned peripheries cover the burden of installing the needed offsite in- frastructure and coordinate with line ministries and LGUs to connect to the main service lines. Despite the regulation requiring connection to the closest LGU, the process is in actu- ality done at the discretion of the individual citizens or private developers, and has resulted in service provision by different LGUs to one neighborhood and in extreme cases to the same home. This happens for various reasons, including: (i) interest in connecting to the more prominent LGU, which is perceived as providing more reliable services; (ii) weak ser- vice availability at the closest LGU requiring the service provision to be connected to another LGU or shared by multiple LGUs24; and (iii) interest by an LGU to increase its user fee reve- nue. Examples can be seen in: (i) the new neighborhoods between the Nablus Municipality and the VC of ‘Iraq Burin; (ii) the land area between Beit Kahil VC, Hebron Municipality, and Taffuh Municipality; and (iii) Al Rehan neighborhood between Ramallah Municipality and Surda-Abu Qash Municipality. Despite some LGUs interested in increasing their user base, many are forced to respond to expanding peripheries and unplanned built-up areas with costly ad hoc service and in- frastructure provision as well as post-construction, de facto planning within outdated masterplans. Some see the provision of services to spaces beyond their masterplan bound- aries and mandate, as additional burdens to over utilized, under capacitated services. Also, LGUs, which provide the services, may not benefit from the property tax of these residents if they are on another LGU’s land. This further adds to municipal resource constraints, espe- cially for smaller LGUs with very limited financial sources. Masterplan boundaries are hindered from sorely needed extensions due to Area C re- strictions. A significant lag in the extension of the masterplan boundaries is compounding the situation. Most require coordination and approval from the Israeli Civil Administration, and LGUs wait years for approval to expand, and if given, it is often lacking the needed ex- tent. This is because the majority of proposed municipal and VC expansions partially include Area C. It is very difficult for urban centers to proceed with natural expansion, since most are partially or entirely surrounded by it with a significant portion of unbuilt lands located there. The PA can take steps to improve coordination and sectoral policies at the central level to address the spaces beyond masterplan boundaries. The situation will become increasingly problematic for the future, as the population continues to grow with limited available space and the geopolitical spatial divides of the West Bank remain unresolved. However, there are steps the PA can take to improve the situation. At the central level, the NPA that provides two- to five-year sector strategies and policies should have coordination and alignment with the National Spatial Plan (NSP). At this stage the NSP only provides an environmental pro- tection layer, and does not link with the existing built-up areas or infrastructure networks 24 24 As reported by the PWA. 34 37 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. at the local or regional scales. Additionally, while the NPA is regularly updated25, the NSP does not have a defined timeframe for development. This is a setback for short- to long- term development planning. Without an NSP in place, it becomes challenging to spatially analyze national sector policies holistically and their implications on the ground. Equally important is the need for clearly defined policy on the reclassification of agricultural lands to residential and mixed-use, which should take place at the central level in line with long- term strategic plans. Regional and local level policies and procedures could be put in place to address the situation. Line ministry coordination and regional planning also play an important role in addressing the development of these transitional areas. There is no institutional structure to manage and implement regional development plans (RDPs), which could govern the lands outside of LGU masterplans. Additionally, there are conflicting and unclear man- dates for the line ministries, their regional offices, and the governorates. This vacuum has allowed for the irregular, ad hoc service delivery for these places. A clear cross-sectoral joint policy to govern regional development of these spaces needs to be agreed on by the PA. At the local level, a service delivery provision plan agreed upon or certified by the line ministries, and surrounding LGUs and JSCs, should be a prerequisite for the issuance of building permits in these locations. Until such a system and policy can be put in place, the MoLG Directorate offices should involve concerned LGUs and JSCs in the current permit- ting process. A joint committee of the involved LG stakeholders should predetermine the optimal course of service provision before approving building permits within these transi- tional areas. 25 25 Formerly known as the National Development Plan, the National Policy Agenda was presented in 2016 as the follow-up to the NDPs of previous years. 38 35 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 2.5 Socio-Demographics of Service Provision 52. Access to core services is lower for the bottom 40 percent of the wealth distribution, particu- larly in the West Bank. For the poverty analysis, a wealth index based on 10 durable assets was con- structed to identify the bottom 40 percent of the wealth distribution. To account for the divergent dis- tribution of assets, and to allow for a clear identification of the bottom 40 percent, two separate indexes were constructed for both the West Bank and Gaza. Figure II-17 shows the results of logistic regression models that measure the odds of service access for poor households and for female-headed households, compared to the odds of service access for non-poor and for male-headed households, respectively, when controlling for service delivery outcomes at the LGU level and VC and regional effects in the West Bank.26 53. In both the West Bank and Gaza, statistically significant differences in the odds of access to piped water and local roads between poor and non-poor households exist. In the West Bank, when predicting access, non-poor households are more than twice as likely (115 percent) to have access to piped water than households that belong to the bottom 40 percent of the wealth distribution. In Gaza, the likelihood of being connected to the piped water network is more than 1.6 times higher for house- holds in the upper three wealth quintiles. While in the West Bank, non-poor households are 24 percent more likely to be located at a paved road, the difference between poor and non-poor households amounts to more than a third in Gaza. Figure II-17: Impact on the Poor: Likelihood of Service Access West Bank Gaza Higher for bottom 40% households 0.97 1.01 0.84 Equal 0.81 0.78 0.74 0.69** Lower for 0.53*** bottom 40% households Piped Water Piped Sewage Waste Collection Local Roads 54. Access to core services for female-headed households is statistically not significantly different from male-headed households, except for piped water in Gaza. Figure II-18 shows the results of the same regression models as above, measuring the likelihood of service access for male-headed house- holds compared to female-headed households, while controlling for service delivery outcomes at the LGU level.27 In the West Bank, small differences in the likelihood of access to the core services exist, 26 Estimates are the odd ratios from weighted logit regressions of an indicator for service access on an indicator for households that belong to the bottom 40 percent of the wealth distribution, and an indicator for female-headed households, controlling for LGU performance (measured with a performance score for the respective service as outlined in section IV), indicators for the north and south West Bank, VCs and female-headed households. Standard errors are clustered at the Governorate level. Detailed outputs for all regressions can be found in Annex 4. 27 Estimates are from the same regression as above. 36 39 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. which are however statistically not significant. Male-headed households on average have 1.58 higher odds to have access to paved roads. Differences in service access between genders is more pronounced in Gaza but hardly statistically significant: female-headed households are on average almost 1.5 times more likely to have access to piped water, which is the only statistically significant gender gap across sectors. Figure II-18: Gender Gap: Likelihood of Service Access West Bank 1.9* Gaza Higher for 1.41 female-headed households 1.08 1.09 1.29 1.00 0.98 Equal 0.79 Lower for female-headed households Piped Water Piped Sewage Waste Collection Local Roads 55. Besides waste collection services in the West Bank, satisfaction with service quality and relia- bility is statistically not different for households of the bottom 40 percent. Figure II-19 shows the re- sults of regression models that measure the likelihood of satisfaction with service quality and reliability for non-poor households compared to poor households, when controlling for service delivery outcomes at the LGU level.28 Figure II-19: Impact on the Poor: Likelihood of Satisfaction with Quality and Reliability West Bank Gaza Higher for 1.38 1.3* bottom 40% households 1.13 1.15 1.02 1.04 Equal 0.99 0.63 Lower for bottom 40% households Piped Water Piped Sewage Waste Collection Local Roads 28 Estimates are from logit regressions of an indicator for satisfaction with quality and reliability of the respective service on an indicator for female-headed households, bottom 40% households, LGU performance, and indicators for the north and south West Bank, and VCs. Standard errors are clustered at the Governorate level. 40 37 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Only for satisfaction with waste collection services in the West Bank and Gaza, statistically significant differences in the likelihood of satisfaction exist: poor households are 13 percent more likely to be sat- isfied with quality and reliability. Comparing satisfaction with piped sewage systems, poor households have a smaller likelihood of being satisfied with quality and reliability in both the West Bank (17 percent) and Gaza (40 percent). 56. Satisfaction with core services is statistically not significantly different for female-headed households. Figure II-20 shows the results of regression models that measure the likelihood of satisfac- tion with service quality and reliability for male-headed households compared to female-headed house- holds, when controlling for service delivery outcomes at the LGU level. 29 In the West Bank, female- headed households are on average more likely to be satisfied with quality and reliability in all four core sectors, statistically however not significant. In Gaza, differences in the satisfaction likelihood for piped water (8 percent), roads (5 percent), and sewage (31 percent) are low to moderate, while a strong gen- der gap in satisfaction with waste collection services exist: male-headed households are almost 2 times as likely to be satisfied with service quality and reliability compared to female-headed households. Figure II-20: The Gender Gap: Likelihood of Satisfaction with Quality and Reliability West Bank Gaza Higher for 1.42* 1.35 1.26 female-headed households 1.02 0.96 1.01 1.14 Equal 0.49 Lower for female-headed households Piped Water Piped Sewage Waste Collection Local Roads 2.6 Citizen Willingness to Pay 57. Investigating the drivers of LGU collection efficiency and citizens’ payment behavior is of ma- jor importance to improving both LGU budgets and public service delivery. As demonstrated in Chapter 3, insufficient budgets, often due to low collection efficiency, are strongly associated with low perfor- mance outcomes and pose a major constraint for LGUs in enhancing service delivery outcomes. Given that the largest share of LGU revenues, about half of municipalities’ revenues and two thirds of VC’s revenues, come from the enterprise budget, is made up primarily by bills paid for public utility services, such as water and electricity; investigating citizens’ payment behavior and finding means to improve collection efficiency provides a crucial step to achieve sustainable LGU financing and thus better service delivery outcomes. 58. While the vast majority of households in the West Bank pays for services, large shares of households in Gaza do not. Among the households in the West Bank with service access, only a minor 29 Estimates are from the same regression as above. 38 41 that the largest share of LGU revenues, about half of municipalities’ revenues and two thirds of VC’s revenues, come from the enterprise budget, is made up primarily by bills paid for public utility services, such as water and electricity; investigating citizens’ payment behavior and finding means to improve THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT collection efficiency provides a crucial step to achieve sustainable LGU financing and thus better service SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN THEWEST INTHE BANKAND WESTBANK ANDGAZA. GAZA. delivery outcomes. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF fraction of 6 percent (piped water) to 1 percent (electricity) reports to not pay for services. In Gaza in 58. SERVICE While the DELIVERY OUTCOMES vast majority AND PERFORMANCE of households DRIVERS in the West IN pays Bank THE WEST BANK AND for services, GAZA. large shares of contrast, the non-payment shares are much higher for all services except internet: 43 percent of house- households in Gaza do not. Among the households in the West Bank with service access, only a minor holds report no payment for piped water, despite being connected, and only every third household re- fraction of 6 percent (piped water) to 1 percent (electricity) reports to not pay for services. In Gaza in ports to pay for waste collection services. Also, 1 out of 4 households in Gaza does not pay for sewage contrast, the non-payment shares are much higher for all services except internet: 43 percent of house- 29 Estimates are from the same regression as above. services, and for sewage services included jointly with water bills, the share of nonpayment rises to 6 holds report no payment for piped water, despite being connected, and only every third household re- out of 7 households (86 percent). In sharp contrast to the water, waste water, solid waste, and electricity ports to pay for waste collection services. Also, 1 out of 4 households in Gaza does not pay for sewage services, willingness to pay for internet is at similar levels in Gaza as in the West Bank, with a 96 percent services, and for sewage services included jointly with water bills, the share of nonpayment rises to 6 38 share of households paying. out of 7 households (86 percent). In sharp contrast to the water, waste water, solid waste, and electricity services, willingness to pay for internet is at similar levels in Gaza as in the West Bank, with a 96 percent Figure II-21: Payment across Sectors share of households paying. Figure II-21: Payment across Sectors 94% 97% West Bank 98% 94% 98% 97% West Bank 99% 98% 98% 99% 57% 76% Gaza 38% 57% 76% 96% Gaza 38% 70% 96% 70% Piped Water Sewage Services Solid Waste Collection Piped Water Sewage Services Solid Waste Collection Electricity Internet Electricity Internet 59. Satisfaction with service quality and reliability, and household wealth are key drivers for the likelihood of citizens to pay for services. Figure II-22 shows the results from regressions measuring the average effect of several covariates on the likelihood that households’ pay for piped water and solid 59. Satisfaction with service quality and reliability, and household wealth are key drivers for the 30 waste collection, when controlling for geographical attributes. Households that belong to the bottom likelihood of citizens to pay for services. Figure II-22 shows the results from regressions measuring the 40 percent of the wealth distribution of the West Bank and Gaza are on average only half as likely to pay average effect of several covariates on the likelihood that households’ pay for piped water and solid for piped water and solid waste collection services, respectively. Stronger but statistically not as signifi- waste collection, when controlling for geographical attributes. 30 Households that belong to the bottom cant, satisfaction with service quality and reliability also corresponds to a higher likelihood for service 40 percent of the wealth distribution of the West Bank and Gaza are on average only half as likely to pay payment. In the water sector, satisfied households have 1.29 times larger odds to pay, compared to 1.41 for piped water and solid waste collection services, respectively. Stronger but statistically not as signifi- times in the solid waste sector. Interestingly, household satisfaction with LGU responsiveness to citizen cant, satisfaction with service quality and reliability also corresponds to a higher likelihood for service concerns and complaints corresponds to a higher likelihood of payment, the effect is however statisti- payment. In the water sector, satisfied households have 1.29 times larger odds to pay, compared to 1.41 cally not significant. LGU performance in the respective sector does not have a notable impact on the times in the solid waste sector. Interestingly, household satisfaction with LGU responsiveness to citizen willingness to pay for piped water and solid waste collection. concerns and complaints corresponds to a higher likelihood of payment, the effect is however statisti- cally not significant. LGU performance in the respective sector does not have a notable impact on the willingness to pay for piped water and solid waste collection. 30 Estimates are from logit regressions of an indicator for payment for 1) Piped Water and 2) Solid Waste Collection, indicators for households that belong to the bottom 40 percent, are satisfied with service quality and reliability, and agree that their LGU is very responsive, and the LGU performance score for piped water and solid waste collection, respectively, and for Gaza, and 30 Estimates are from logit regressions of an indicator for payment for 1) Piped Water and 2) Solid Waste Collection, indicators the north and south West Bank, and VCs. for households that belong to the bottom 40 percent, are satisfied with service quality and reliability, and agree that their LGU is very responsive, and the LGU performance score for piped water and solid waste collection, respectively, and for Gaza, and the north and south West Bank, and VCs. 42 39 39 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-22: Likelihood of Payment: Piped Water and Solid Waste Collection Services Higher 1.36* 1.4 Equal 1.24 1.01 1.0 0.99 Lower 0.46** 0.37** Bottom 40% Satisfaction with Agree that LGU is 1 point higher LGU Quality and very responsive performance Reliability Piped Water Solid Waste Collection 60. Across regions and LGU types, payments for water and solid waste differ notably, and are higher than households’ maximum willingness to pay. This may potentially reflect low levels of satis- faction with service quality, reliability, and costs. Comparing average monthly payments for piped water across regions, households in the central West Bank spend on average two times more (130 NIS) than in Gaza (60 NIS). Piped water payments are higher in municipalities than in VCs, and the highest in me- dium-sized municipalities (136 NIS). Figure II-23: Maximum and Actual Willingness to Pay: Piped Water Piped Water Municipalities - West Bank North 89 Large 102 West Bank 75 67 Medium 136 102 Central 130 West Bank 100 Small 104 83 Village Councils - West Bank South 114 West Bank 79 Actual Payment Large 97 79 61 (NIS per Month) Gaza Medium 93 35 81 Maximum Willingness to Pay (NIS per Month) 61. Across the Palestinian territories, more than half of the households (52 percent) report a maximum willingness to pay for piped water that is lower than their actual payment. The gap is the largest in Gaza and in large municipalities in the West Bank, where actual payments are almost over 50 percent higher 40 43 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. than the reported maximum willingness to pay. These results correspond to a considerable amount of households reporting dissatisfaction with piped water costs: 39 percent of households in Gaza and 1 out 4 households in the West Bank are dissatisfied or very dissatisfied with the cost of piped water. 62. Also in the solid waste sector, payments are higher in the West Bank than in Gaza and in mu- nicipalities than in VCs, and tend to exceed households’ maximum willingness to pay. Comparing max- imum and actual willingness to pay for solid waste collection services across Palestinian regions, equally striking differences are observed: in the West Bank, the average amount spent (37 NIS) is more than two times higher than in Gaza (14 NIS). Within the West Bank, both maximum and actual willingness to pay is the highest in the central West Bank (37 and 22 NIS, respectively), and the lowest in the north West Bank (17 and 15 NIS). Comparing municipalities and VCs, citizens in municipalities are both willing to and currently spend more (19 and 24 NIS) than citizens in VCs (16 and 21 NIS). Similarly to the water sector, households report higher actual payments than maximum willingness to pay, which is potentially associated with 1 out 5 households being dissatisfied with each quality, reliability, and cost of waste collection services. Figure II-24: Maximum and Actual Willingness to Pay: Solid Waste Collection Solid Waste Collection Municipalities - West Bank North 17 22 Large 21 West Bank 15 Medium 33 19 Central 37 Small 23 West Bank 22 17 South 27 Village Councils - West Bank West Bank 20 Actual Payment (NIS per Month) Large 24 16 14 Maximum 18 Gaza Medium 8 Willingness to Pay 17 (NIS per Month) 63. Reported payment timeliness is higher in Gaza than in the West Bank, and higher for internet than for any other service. Among the households in the Palestinian territories that have access to piped water, electricity, solid waste collection services and internet, for each service at least 2 out of 3 house- holds report paying on time without major problems. In both the West Bank and Gaza, payment timeli- ness is the lowest for piped water (68 percent and 80 percent, respectively) and the highest for internet (82 percent and 89 percent, respectively). In the solid waste and electricity sector, 1 out of 4 households in the West Bank reports to at least sometimes face difficulties in paying service fees on time, compared to just 1 out of 7 households in Gaza. 44 41 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure II-25: Timely Payment without Major Problems 94% 98% West Bank 98% 99% 57% 38% Gaza 96% 70% Piped Water Solid Waste Collection Electricity Internet 64. Household wealth and satisfaction with both service quality and reliability, and LGU respon- siveness are key drivers for citizen likelihood to pay on time for services. Figure II-26 shows the results from regressions measuring the average effect of several covariates on the probability that households report to pay for piped water and solid waste collection on time, when controlling for geographical at- tributes. 31 Households that belong to the bottom 40 percent of the wealth distribution of the West Bank and Gaza, on average have 0.57 times and 0.64 times smaller odds to pay on time for piped water and solid waste collection services, respectively. Figure II-26: Likelihood of Timely Payment: Piped Water and Solid Waste Collection Services 1.76** 1.73*** Higher Equal 1.14 1.19 1.0 1.02** Lower 0.64** 0.57** Bottom 40% Satisfaction with Agree that LGU is 1 point higher LGU Quality and very responsive performance Reliability Piped Water Solid Waste Collection 31 Estimates are from logit regressions of an indicator for timely payment for 1) Piped Water and 2) Solid Waste Collection, indicators for households that belong to the bottom 40 percent, are satisfied with service quality and reliability, and agree that their LGU is very responsive, the LGU performance score for piped water and solid waste collection, respectively, and for Gaza, and the north and south West Bank, and VCs. 42 45 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Moreover, payment timeliness is strongly associated with citizens’ perception of LGU responsiveness: households that are satisfied with the responsiveness of their municipality or VC to concerns and com- plaints, on average have 1.73 times and 1.76 times larger odds to report to pay on time for piped water and waste collection services. Both satisfaction with quality and reliability and the LGU performance score for solid waste collection correspond to statistically significantly higher likelihoods of timely pay- ments in the solid waste sector. 46 43 III. Drivers of Service Delivery Performance THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. III. Drivers of Service Delivery Performance 3.1 The LGPA Performance Index 65. The LGPA Performance Index uses ten indicators to measure overall LGU performance in four sectors. The key objective of the LGPA performance index is to conduct comparisons of local govern- ment performance across all LGUs in the West Bank and Gaza, in order to gain better insights into the main drivers of service delivery and how to close existing gaps in LGU performance. The aim of the Index is to provide a tool for both policy makers and Development Partners to identify and target interventions in VCs and municipalities. Three dimensions are used to construct a comprehensive measure: method- ologically, the LGU performance is modeled as a Cobb-Douglas-style function, taking into account citizen satisfaction with both service quality and reliability. The performance outcomes at the LGU level are weighted by the share of citizens with service access, thereby rewarding LGUs with higher access rates, while penalizing LGUs, in which only small shares of citizens are provided access to the core services.32 66. Performance outcomes differ significantly across Palestinian LGUs. Figure III-1 illustrates that the LGU Performance Scores range from 0 to 88. LGUs in Gaza perform significantly lower than LGUs in the West Bank. Within the West Bank, LGUs in the central West Bank outperform LGUs in the north and south. Comparing differences between municipalities and VCs, municipalities perform better, also when ruling out differences in LGU size. The following sections review in more detail what drives Palestinian Local Government Performance. Figure III-1: LGU Performance Index: High and Low Performers 100 80 84 85 88 79 82 60 40 50 20 0 4 10 10 13 0 Low Performers Mean High Performers 67. Large differences in LGU performance across regions and between municipalities and VCs ex- ist. The lowest performing VC is Msafir Yatta in the West Bank, where citizen lack access to all of the four key services; the highest performing municipality is Salfit, where the vast majority of citizens has access to all four key services and is satisfied with both service quality and reliability. Chapter 3 aims to 1/2 1/2 32 The LGU Performance index for LGU i can be written as LGU Performance Scorei = Accessi (Qualityi x Reliabilityi ), where Access refers to the share of citizens in LGU i that has service access, and quality and reliability to the share of households that is satisfied with service quality and reliability, respectively. The sub-index for local roads is based on the access rate only. 48 44 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. identify the drivers of the substantial variation in LGU performance, by conducting a regression-based assessment of key LGU characteristics starting with geography and administrative setup (West Bank/Gaza, urban/rural, remoteness) (Chapter 3.2). 68. Economies of scale, household wealth, and population density drive better service outcomes in larger LGUs and municipalities. Larger LGUs perform significantly better, particularly when compar- ing VCs in the central West Bank. The effect is not as pronounced in Gaza and for municipalities. More- over, LGUs with higher population density have on average better performance ratings. Finally, service delivery outcomes are driven by a strong wealth gradient at the household level (Chapter 3.3). 69. Mayors and citizen frequently refer to the impact of Area C and restrictions on movement when explaining service delivery outcomes deficits. The results show that households in Area C or close to the separation barrier are less likely to have access to basic services. Moreover, satisfaction with quality and reliability of core services is also notably lower in Area C and near the barrier. Finally, Area C is associated with lower LGU Performance Scores, even when controlling for important drivers of per- formance, such as remoteness and LGU size (Chapter 3.4). 70. Joint service provision can serve as a tool of improving service delivery outcomes, particularly for small and remote VCs. Excessive fragmentation of local service delivery is a key challenge for public services in the West Bank and Gaza: 163 VCs, corresponding to more than a third of the LGUs in the Palestinian territories, have a population of 4,000 or less, and 45 VCs below 1,000 even. As VCs have on average 40 percent less per capita operating revenues compared to municipalities, many lack the capac- ity that would enable them to serve as accountable and financially sustainable local governments. To affront LGU fragmentation, joint administrative structure in the form of JSCs, both among several small VCs and with municipalities, have increasingly become a viable solution for meeting existing develop- ment needs and improving service delivery. While the number of active and functioning JSCs is still lim- ited, overall JSC membership seems to benefit individual LGUs. For example, membership in a JSC for planning and development corresponds to strong performance gains, particularly for VCs. For more specified services, institutional capacity and professional management of individual JSCs become more important, however membership can significantly drive service delivery performance. For example, in the water sector, JSC membership does not guarantee satisfactory service delivery outcomes across JSCs, but remarkable performance gains can be observed, e.g., in Jenin (Chapter 3.5). 71. As budgets are insufficient to fulfill the functions assigned to LGUs, improving collection effi- ciency is of major importance to improve public service delivery. Fiscal sustainability is shown to be a key driver of LGU performance, critically affecting the ability of LGUs to provide services. Overall, per capita revenues are strongly associated with higher LGU performance and a robust relationship between per capita expenditures and LGU performance exists, disproportionally constraining smaller LGUs and VCs due to their limited revenue base and institutional capacity. Given that the largest share of LGU revenues, about half of municipalities’ revenues and two thirds of VCs’ revenues, come from the enter- prise budget primarily made up by bills paid for public utility services including water and electricity, assessing and improving collection efficiency is a crucial step towards more sustainable LGU financing (Chapter 3.6).33 72. Low satisfaction with LGU responsiveness and limited levels of political engagement are strongly associated with lower performance outcomes. This leaves room for improvement in LGU re- sponsiveness to citizens’ complaints and concerns. In the literature on citizen engagement, government responsiveness is often named the key determinant for citizens’ participatory behavior and believed to be a pre-condition for encouraging responsible citizenry, regaining trust in government, and enhancing 33 World Bank. 2016. Public Expenditure Review – Palestinian territories. 45 49 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. political participation. A third of the households in the Palestinian territories do not believe that its local government is very responsive to citizen concerns and complaints. As a consequence, equally high shares of citizens do not believe that local elections can positively impact service delivery outcomes and indicated that they do not plan to vote in the next municipal elections. Given that LGU responsiveness and citizen participation indicators are strongly associated with better LGU performance, addressing the disinterest of major shares of the Palestinian population in participating in their local political system is a key factor for improving service delivery (Chapter 3.7). 3.2 Geography and Administrative Set-up 73. A large performance gap between the West Bank and Gaza, and across regions in the West Bank exists. LGUs in the West Bank on average have a 19-point higher performance score than LGUs in Gaza, even when accounting for performance differences attributable to population size and LGU type.34 The size of the remaining performance gap is striking, particularly given that access rates for piped sew- age are significantly higher in Gaza than in the West Bank. Also when comparing performance outcomes across regions in the West Bank, while controlling for both LGU size and status (municipalities and VCs), ample performance differences become visible: LGUs in the north West Bank have a 4-point lower per- formance score than LGUs in the central West Bank, and the performance gap between LGUs in the central and south West Bank amounts to 13 points. Figure III-2: Differences in LGU Performance across Regions and LGU Types Gaza (vs. West Bank) -19*** Municipalities (vs. VCs) 5* Central (vs. north West Bank) 4* Central (vs. south West Bank) 13* 74. Municipalities perform better than VCs, also when ruling out differences in LGU size. Holding LGU size fixed, municipalities on average have a 5-point higher LGU performance score than VCs, when controlling for geographical differences in LGU performance between Gaza and the north, central, and south West Bank. It is important to point out that in the given analytical framework, this performance 34 Estimates are from OLS regressions of the LGU Performance Score on the, the log of LGU population (based on PCBS 2016 projections) and indicators for Gaza, the north and south West Bank, and VCs. 50 46 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. difference goes beyond a pure size effect, underlining that a more in-depth analysis is crucial to deter- mine the factors that drive the performance gap between municipalities and VCs. 75. Remote LGUs perform significantly lower. While 1 out of 5 Palestinian LGUs is within a 5 km radius of its governorate capital, and more than half are 10 km or closer, the distance between the most remote VCs and its governorate capitals amount to more than 30 km. Using the geographical spread of LGUs relative to their governorate as remoteness proxy reveals a strong correlation with service delivery outcomes: the 20 percent most remote LGUs on average perform 11 points lower than the least 20 percent. 35 The effect is statistically more significant and more pronounced in municipalities (18 points) than in VCs (10 points). Figure III-3: Remoteness - Distance to Governorate Center and LGU Performance Least remote quintile (vs. most remote quintile) Overall +11*** Municipalities +18*** VCs +10** 76. The correlation between built-up LGU area and performance is positive but moderate. Using built-up LGU area share as proxy allows for an analysis of the relationship between the degree of urban- ization and service delivery outcomes. Across the Palestinian territories, the share of LGU built-up area ranges from 0.2 percent in the least urbanized VC, Marj al Ghazal in Jericho, to more than 99 percent in Ad Doha in the West Bank.36 Figure III-4: Remoteness - Built-Up Area and LGU Performance Most built-up Quintile (vs. least built-up quintile) Overall +6* Municipalities +15*** VCs +3 The second proxy for remoteness indicates that a statistically significant negative relationship between LGU 35 Estimates are from OLS regressions of the LGU Performance Score on the distance between the LGU and Governorate center, the log of population and indicators for Gaza, the north and south West Bank, and VCs. 36 The built-up area classification follows the GeoMOLG definition and includes all buildings in LGUs. In some instances, small un-populated areas that are enclosed by built-up areas are included. 47 51 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. The second proxy for remoteness indicates that a statistically significant negative relationship between 37 remoteness and performance outcomes exists. LGU remoteness and performance outcomes exists. A 10 percentage point higher share of LGU area that is 37 A 10 percentage point higher share of LGU area covered by built-up constructions corresponds to a 5.7-points higher performance score. Similar to the that is covered by built-up constructions corresponds to a 5.7-points higher performance score. Simi- population density and distance to governorate capital proxies, the effect is stronger and statistically lar to the population density and distance to governorate capital proxies, the effect is stronger and statistically significant only among municipalities. significant only among municipalities. 3.3 Population Size, Density, and Wealth 76. Larger LGUs perform significantly better, particularly when comparing VCs in the central West Bank. Across LGUs in the West Bank and Gaza, a 10 percent increase in LGU population on average corresponds to a 20-point higher LGU performance score, when controlling for regional differences in LGU performance between Gaza and the north, central, and south West Bank, and between municipal- ities and VCs.38 The results suggest that the marginal effect of LGU size on performance outcomes in the four core sectors is higher in the West Bank than in Gaza, and stronger among municipalities than VCs. Figure III-5: LGU Population and Performance 10% Increase in population Overall +20* West Bank +20 Gaza +17 Municipalities +27* VCs +8 77. Population density is strongly associated with performance outcomes. Figure III-6 shows the results from regressions assessing the relationship between LGU performance and remoteness, proxied by population density, when holding population size and geographical attributes fixed. 39 Population density varies substantially across Palestinian LGUs, ranging from less than 4 in the small VC Marj al Ghazal in the Jericho Governorate, to more than 11,000 people per square km in Gaza City. In more than 75 percent of LGUs in the West Bank and Gaza, the average population per square km is less than 1,000, and in 34 municipalities and VCs, it is below 100. These wide gaps are severely affecting service delivery outcomes, as population density and LGU performance are strongly correlated: the most populated 20 percent of LGUs on average perform 6.2 points higher than the least populated 20 percent of LGUs. Assessing differences in the effect by municipalities and VCs, the performance difference is stronger across municipalities (20 points) then VCs (7 points), and statistically more significant for municipalities. This is due to the 40 times higher standard deviation in population, and more than 5 times higher stand- ard deviation in population density across municipalities. Overall on average, a 1 percent increase in population density corresponds to a 3.3-points higher performance score. 37 Estimates are from OLS regressions of the LGU Performance Score on the share of built-up LGU, the log of population and indicators for Gaza, the north and south West Bank, and VCs. 38 Estimates are from OLS regressions of the LGU Performance Score on the log of LGU population (Based on 2016 population projections by the PCBS), and indicators for Gaza, the north and south West Bank, and VCs. 39 Estimates are from OLS regressions of the LGU Performance Score on the log of people per square kilometer LGU area, controlling for the log of population and including indicators for Gaza, the north and south West Bank, and VCs. 52 48 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure III-6: Population Density and Performance Most densely populated quintile (vs. least densely populated quintile) Overall +6* West Bank +5 Gaza +21 Municipalities +20*** VCs +7* 78. A strong positive relationship between household wealth and LGU performance exists. Figure III-7 shows the results of regressions measuring the association between the share of households that belong to the bottom 40 percent of the wealth distribution and LGU performance, when controlling for LGU size and regional effects.40 The quintile of LGUs with the lowest share of the bottom 40 percent households, on average has a 12-points higher performance score, compared to the top quintile. On average, a LGU with a 1 percent higher share of bottom 40 percent households has a 2.4-points lower performance score. The wealth gradient exists in both the West Bank and Gaza but is statistically signif- icant in the West Bank only. The effect is largely driven by an urban-rural gap in wealth levels: the share of bottom 40 percent households is notably larger in VCs than in municipalities. Figure III-7: Household Wealth and LGU Performance Quintile with lowest share of poor households (vs. quintile with highest share) Overall +12*** Municipalities +6 VCs +14*** 40 Estimates are from OLS regressions of the LGU Performance Score on 1) the share of households belonging to the bottom 40 percent of the wealth distribution, controlling for the log of population and including indicators for Gaza, the north and south West Bank, and VCs. 49 53 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 3.4 Area C and Separation Barrier 79. Area C provides a number of barriers to the Figure III-8: Area C and Separation Barrier provision of services for the Palestinian citizens liv- ing in the West Bank. Sixty-one percent of the West Bank, Area C, is under complete Israeli military ad- Area A & B ministration and authority. Any construction or Area C maintenance work in these areas requires a permit and approval from the ICA, which is extremely diffi- Separation 41 cult, often impossible, to obtain. The Israeli control Barrier of Area C and the inability to carry out legal construc- tion there have direct impacts on service provision. Palestinians living in Area C, numbering approxi- mately 279,00042, have less access to services, and poorer quality for those available. They rely on out- dated, deteriorated infrastructure and, when granted, the limited number of additions and up- grades, which are wholly insufficient to address Pal- estinian’s needs. According to the latest West Bank and Gaza WASH Poverty Diagnostic43, households in the West Bank unconnected to water are largely in Area C, where movement and access restrictions pre- vent network connections. It is estimated, that over 100,000 Area C residents do not have water network access. 80. Service provision in Areas A and B of the West Bank is also highly constrained by Area C re- strictions. The remaining 39 percent of the West Bank is spatially divided into an archipelago of urban and peri-urban land pockets territorially disconnected from one another by Area C. Integrated service networks across LGUs are difficult to establish due to the inability to physically connect infrastructure across Area C. Local councils and line ministries are unable improve or maintain service networks, or install needed infrastructure in areas affected by Area C. This includes lands within LGUs categorized as Area C and Area C lands between and dividing LGUs. (See Box III-1) Typical urban development needs and best practices become untenable, for example: (i) the establishment of access and ring roads to connect LGUs, ease traffic, facilitate solid waste collection; (ii) installation of water and sewage pipes in line with the physical natural environment (e.g. along slopes); (iii) upgrade and/or repair of faulty or broken network lines affecting the entire network and quality of service provision; and (iv) the estab- lishment of and connections to service treatment plants. The separation barrier exacerbates the situa- tion by creating additional physical barriers (e.g. concrete wall, double fencing, ditches) between LGUs severing natural and historical connection routes. LGUs and line ministries are prevented from building on economies of scale to improve service delivery in areas heavily permeated by Area C. 81. The PA, line ministries, and LGUs also lose out financially due to Area C. Under the 1995 interim agreement, the ICA is expected to collect revenues and taxes in Area C and remit them to the PA, in- cluding property tax, income tax, and VAT from individuals and businesses operating in Area C.44 Alt- hough the ICA continues collecting these taxes from Palestinians in these areas, it does not remit them 41 UNOCHA. 2009. Restricting Space: The Planning Regime Applied by Israel in Area C of the West Bank. 42 UNOCHA. 2013. In the Spotlight: Area C Vulnerability Profile. The Vulnerability Profile Project (VPP). 43 World Bank. 2017. West Bank and Gaza WASH Poverty Diagnostic. 44 World Bank. 2016. Economic Monitoring Report to the Ad Hoc Liaison Committee. 54 50 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. to the PA. Property tax in particular represents one of few taxes and revenues shared with LGUs, and Area C deprives them of the potential increased source of revenue, which is sorely needed. The situation of Area C also discourages private sector investment in public infrastructure projects and service provi- sion PPPs, such as solar panel projects, large scale road projects, and service treatments plants. A 2015 PPP assessment found that the restrictions on access, control over natural resources, land management, and permitting particularly in Area C pose significant challenges to the development and implementa- tion of infrastructure PPPs.45 LGUs and line ministries as a result miss out from service provision alter- natives which would ease the financial burden on them. Box III-1: Rawabi City Development Constraints from Area C46 Rawabi is a new, planned city north-west of Ramallah, and the largest real estate investment ever made in the Palestinian territories. It was built almost entirely in Area A (95%), how- ever, the development of the city faced a number of constraints to establishing service con- nections related to Area C. The project’s investors along with the PA and the international community spent much political capital to obtain a temporary permit from the ICA for the main access road to the south of the city, which runs for 3.8km through Area C. The permit must be renewed every year, and the temporariness of the permit creates uncertainty over the future access to the city. Other utility services are also affected, including water and waste water treatment. The water connection was drastically delayed and increased devel- opment costs significantly. Part of the 9 km stretch connecting Rawabi to the existing piped system (in the village of Aboud) lies in Area C. Rawabi applied for a permit through the Joint Water Committee, but waited six years to receive approval, and the opening of the city was delayed for two years. Also, the most efficient solution for the waste water treatment for the city would be a regional waste water treatment plant servicing 18 villages around the area. This plant would allow the exploitation of economies of scale, which are key for this type of utility. However, the site where the plant should be located is in Area C, which would require permit from the ICA. 82. Households living in Area C or close to the separation barrier are less likely to have access to basic services. Figure III-10 show the results of regressions measuring the likelihood of service access and satisfaction of households that are impacted by the Israeli restrictions, proxied by proximity to the wall and a dummy for Area C.47 When comparing the likelihood of service access for households that live within a 1km radius of the separation barrier, the models do not yield statistically significant coeffi- cients. However, when narrowing the distance, significant differences in the water sector emerge: households that live within a 500m or even 250m distance are on average just half as likely to have access to piped water, compared to households that live do not live as close to the barrier. This effect is statistically significant for both the entire West Bank sample, and the sub-sample of LGUs that are inter- sected by the barrier. While the coefficients for the Area C indicator suggest that on average, households living in Area C are less likely to have access to all of the four key services, only the indicator for solid waste collection yields a statistically significant result: households that live in Area C are only a third as likely to be covered by waste collection service. 45 IFC/PPIAF. 2015. West Bank and Gaza - Assessing the Potential for Public-Private Partnerships. 46 Adapted and updated from the report: World Bank. 2013. Area C and The Future of the Palestinian Economy. 47 Estimates are from separate logit regressions of an indicator for households A) with service access and B) that are satisfied with service quality and reliability, on indicators for LGUs that are 1a) 1km, 1b) 500m, 1c) 250m or closer to the wall, and 2) in Area C, the LGU performance index for the respective sector, and indicators for bottom 40 percent households, and the north and south West Bank. The sample is limited to households from the West Bank and standard errors clustered by Governorate. 51 55 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure III-9: Area C and Separation Barrier: Likelihood of Service Access Distance to separation barrier Area C 1,000m 500m 250m Higher 1.07 1.07 1.00 Equal 0.80 0.79 1.04 1.00 0.90 0.89 0.62** 0.81 Lower 0.69 0.66 0.53* 0.53*** 0.35*** Piped Water Piped Sewage Waste Collection Local Roads 83. Satisfaction with quality and reliability of core services is notably lower in households living in Area C or close to the barrier. Similar to the models for service access, the effect of proximity to the separation barrier is not significant for households living 1km or closer to the wall. Among households that live within a 500m radius, however, the likelihood of satisfaction with the quality and reliability of piped sewage and roads is 38 percent and 28 percent lower, respectively. Reducing the range to 250m, the models yield significant results for both solid waste collection and local roads: households that live 250m or closer to the wall, on average are 28 percent less likely to be satisfied with the quality and reliability of solid waste collection services, and 41 percent less likely to be satisfied with local roads. Assessing the impact of Area C, the models suggest that households in Area C are also less likely to be satisfied with service quality and reliability. However, only the coefficient for the roads sector is statis- tically significant: households in Area C are 45 percent less likely to be satisfied with local roads. Figure III-10: Area C and the Separation Barrier: Likelihood of Service Satisfaction Distance to separation barrier Area C 1,000m 500m 250m Higher 1.06 0.95 0.95 0.91 0.91 0.89 Equal 0.79 0.73* 0.91 0.83 Lower 0.71* 0.73 0.76 0.64*** 0.64* 0.57*** Piped Water Piped Sewage Waste Collection Local Roads 56 52 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 84. Service delivery outcomes are significantly lower in LGUs with higher shares of households living in Area C. Figure III-11 shows the results of regressions assessing the impact of Area C on LGU performance. 48 Comparing the 20 percent of LGUs with the highest share of households that live in Area C with the 20 percent with the lowest share, including LGUs that are not part of Area C, the regression results do not yield statistically significant performance differences. However, when limiting the sample to LGUs that at least partly belong to Area C, the regressions indicate that the quintile of LGUs with the highest share of Area C households on average perform 11.1-points lower. Figure III-11: Share of Households in Area C and LGU Performance Quintile with highest share of Area C households (vs. lowest) -1.4 All LGUs -11.1** Area C LGUs 85. LGU performance is lower in LGUs with higher shares of built-up area that belongs to Area C. Measuring the impact of Area C with the share of built-up LGU area that is part of Area C, notable dif- ferences in LGU performance are observed. The results suggest that higher shares of built-up LGU Area that is part of Area C correspond to lower performance outcomes. However, only when comparing LGUs with a share of Area C households higher than 70 percent with LGUs with a share below 70 percent, the regressions yield a statistically significant performance difference of 8.1 points. Figure III-12: Share of Built-up LGU area in Area C and LGU Performance -2.6 > 50% -5.8 > 60% -8.1* > 70% -8.6 > 80% -6.5 > 90% 86. Mayors see service delivery further complicated by the external governance structure, espe- cially for the water sector. Many mayors report receiving water directly from the national water com- pany of Israel, Mekorot. For example, the mayor of Salim reports that water from Mekorot “is delivered to us through a pipe that feeds three villages, Salim, Uzmout, and Deir al-Huteb. The Israelis control the amount of water we consume….we suffer especially in summer….there are households in Salim that do not receive water for 3-4 days a week.” In addition, maintenance is challenging in Gaza due to the 10- 48 Estimates are from regressions of the LGU performance index on 1) the LGU quintiles for the share of Area C households, and 2) on 1c) 250m or closer to the wall, and 2) dummies for LGUs with shares of built-up LGU area that is higher than a) 50 percent, b) 60 percent, c) 70 percent, d) 80 percent, and e) 90 percent, indicators for the north and south West Bank, and VCs, the log of LGU population, and the log of the distance between a LGU´s center and its governorate capital. 53 57 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. year-long Israeli blockade, which severely limits the availability of equipment and needed parts in the strip. As the Gaza City Director explained: “We have 75 water wells which lack […] spare parts.” The Mayor of Khan Yunis also mentioned that “there are 2,500 water meters that are broken down and need replacement […] however, the import restrictions for Gaza make it hard to obtain these parts and other equipment needed.” 58 54 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 3.5 Joint Service Councils Capacity 87. JSCs provide a promising means for addressing LGU fragmentation and improving service de- livery outcomes, particularly in small and remote VCs. The 1997 LGA established the option for LGUs to join forces in planning and service provision under the umbrella of a JSC, aimed at scaling up access, quality, and reliability of local public services. Since 1997, more than 80 JSCs have been created. Broadly, there are three types of JSCs, either providing a single service, multiple services, or those being estab- lished for planning and development. A Joint Services Provision Assessment carried out by the Bank in 2015 identified that out of the 82 existing JSCs in the West Bank and the 10 JSCs in Gaza, only around 55 are active. Most of the active JSCs, i.e., 32 in total, are categorized as Planning and Development JSCs. 16 JSCs were established for solid waste management, and seven JSCs provide water supply and sanita- tion services. A respondent from the city of Khan Yunis spoke enthusiastically about the importance of JSCs and their positive impact on service delivery: “I see the existence of JSCs as something important and useful…for example, […] some services are better if we deal with them jointly such as waste collection which needs huge infrastructures, trucks, machines, and transfer stations.” 88. Membership in a JSC can have significant impact on performance, particularly for VCs. Fig- ure III-13 shows the results from regressions measuring the average impact of membership in a JSC for planning and development on LGU Performance Scores, controlling for both LGU size and geographical attributes.49 Comparing outcomes between JSC-members and non-members across the West Bank and Gaza, the model yields strongly significant results, suggesting that JSC-members on average have a 3.96- points higher performance score. The performance gain is higher in Gaza, where LGUs on average per- form 13.2-points higher when being a JSC-member, than for the West Bank, where LGUs see average performance gains of 3.37 points. Moreover, the average increase in performance for member LGUs is higher across VCs (5.21) than municipalities (4.06), and significant for VCs only. Figure III-13: Joint Service Councils I: Membership in JSC for Planning & Development Overall +3.96** West Bank +3.37* Gaza +13.2* Municipalities +4.06 VCs +5.21** 89. However, during interviews with mayors, much criticism was directed at JSCs. For example, the Mayor of Tamoun characterized his council experience with three separate JSCs – water, solid waste, and planning and development – as losing control over revenue generation and service delivery, while still being accountable to citizens: “We are members of three JSCs; one for water, another one for solid waste, as well as a JSC for Planning and Development which is inactive…before we joined the Solid Waste JSC, we used to generate revenue for our town… but now the solid waste service causes a deficit. Our municipality is against these councils…” A director from Khan Yunis was similarly critical and said: “The 49 Estimates are from OLS regressions of the LGU Performance Score on an indicator for LGUs that are member of a JSC for planning and development, the log of LGU population (based on PCBS projections for the year 2016), and indicators for Gaza, the north and south West Bank, and VCs. Results from the second and third model use the same set-up but are limited to the sub-samples of 1) municipalities and 2) VCs. 55 59 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Solid Waste JSC is a burden because we still have to provide bins, trucks and workers…[also] joining the council was not a matter of choice…as a municipality we had to become a member…however, average people do not know about it.” 90. With increasing degrees of specialization, the technical and institutional capacity of JSCs drives service delivery outcomes. In the water sector, JSC-membership does not guarantee satisfactory service delivery outcomes. Figure III-14 shows the results from regressions measuring the average impact of membership in a JSC for Piped Water / Waste Water Management on LGU Performance Scores in the water and waste water sector, controlling for both LGU size and geographical attributes.50 Comparing outcomes between JSC-members and non-members across the West Bank and Gaza, the model does not yield statistically significant performance differences in the piped water sector. However, when lim- iting the sample to the Jenin Governorate, where some LGUs belong to a JSC and others do not, JSC membership corresponds to a very strong and statistically highly significant performance gain in piped water outcomes. In the waste water sector in contrast, JSC membership is associated with significantly lower performance scores, when comparing all Palestinian LGUs. In Jenin, JSC members perform slightly lower than non-members, the performance difference is however statistically not significant. Figure III-14: Joint Service Councils II: Membership in JSC for Water and Waste Water Management Piped Water Overall +4.38 Jenin +30.82*** Piped Sewage -6.26 Overall -2.26 Jenin 91. In the solid waste sector, the effect of JSC-membership on performance outcomes varies across regions in the West Bank. Figure III-15 shows the results from regressions measuring the average impact of membership in a JSC for Solid Waste Management on LGU Performance Scores in solid waste collection, controlling for both LGU size and geographical attributes.51 Similar to the negative results of 50 Estimates are from OLS regressions of the LGU Performance Score for 1) Piped Water and 2) Piped Sewage, on an indicator for LGUs that are member of a JSC for water and waste water management, the log of LGU Population (based on PCBS projec- tions for the year 2016), and indicators for Gaza, the north and south West Bank, and VCs. The overall results use the entire sample of LGUs, while the regression for Jenin uses a sample that is limited to LGUs in Jenin Governorate. 51 Estimates are from OLS regressions of the LGU Performance Score for solid waste collection, on an indicator for LGUs that are member of a JSC for solid waste collection, the log of LGU Population (based on PCBS projections for the year 2016), and 60 56 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. the waste water sector, service delivery outcomes of JSC-members are significantly worse than in non- member LGUs. Focusing on differences in performance levels between Salfit, where virtually all LGUs belong to the same JSC, and Qalqilya, where no such association exists, JSC membership corresponds to a strong but not statistically significant performance gain in solid waste collection performance scores. When comparing Bethlehem and Hebron in contrast, mean performance levels of JSC-members and non-members are almost identical. Figure III-15: Joint Service Councils III: Membership in JSC for Solid Waste Solid Waste Collection Salfit/Qalqilya -1.9 Overall Salfit/Qalqilya +4.44 3.6 Fiscal Capacity 92. Revenue sources for LGUs are limited and public budgets fall short of their potential due to ineffective collection of fees and taxes. The main sources of revenue for LGUs are locally collected rev- enues comprised of: (i) user fees, such as payments for electricity, water, solid waste collection, and where applicable, public markets and slaughterhouses; (ii) local fees, such as building permits and fees for signs; and (iii) taxes. The economically most significant revenue sources, such as the property tax, professional permit fees, and transportation fees are collected and administered centrally by the PA. These revenues are subject to high deductions to offset municipal arrears for electricity and water fees, partly owed to Israel, lack transparency in the calculation, and are transferred in an ad-hoc and opaque manner, which poses a key constraint to LGU budgetary planning. 93. Financial sustainability of local service provision is a critical issue that affects LGUs ability to provide services in an accountable and efficient manner, disproportionally constraining VCs given their limited size, revenue base, and institutional capacity. VCs and municipalities share most of the locally collected revenue assignments. Nevertheless, pronounced horizontal disparities among LGUs and particularly between municipalities and VCs exist, largely because the Property Tax is not levied in VCs. As a result, VCs have on average 40 percent less per capita operating revenues compared to municipal- indicators for Gaza, the north and south West Bank, and VCs. The first regression model uses the entire sample of LGUs, the sample of the second model is limited to Salfit and Qalqilya Governorates, and the third to Bethlehem and Hebron Governorates. 57 61 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. ities. In 2012 for example, per capita operating revenues were NIS63 for VCs and NIS165 for municipal- ities.52 While VCs receive a higher per-capita share of transfer funding due to reallocation of Transpor- tation Fees, these funds do not fully compensate for the larger total per capita revenues municipalities receive. Overall, VCs lack a stable and predictable financing source that would allow them to meet ex- isting development and capital investment requirements. While municipalities have access to funds pro- vided by the MDLF, no systematic funding mechanism exists to finance investments in VCs. This leaves a funding gap for the majority of 266 villages and marginalized communities. 94. Per capita revenues are strongly associated with higher LGU performance. Figure III-16 shows the results from regressions measuring the average effect of LGU per capita operating revenues on LGU Performance Scores, controlling for both LGU size and geographical attributes.53 The models yield highly statistically significant coefficients, emphasizing that LGU financing is a key driver for service delivery outcomes: a 1 percent increase in per capita operating revenues on average corresponds to a 4.5-points higher performance score. The effect is more pronounced among municipalities, where a 1 percent in- crease in per capita revenues is associated with an on average 6.5-point higher performance score. Figure III-16: LGU Finance I: Per Capita Operating Budget Revenues 1% Increase in LGU revenues +5*** Overall +7** Municipalities +3 VCs 95. A robust, and even stronger relationship between per capita expenditures and LGU perfor- mance exists. Figure III-17 presents regression results, estimating the average impact of LGU per capita operating expenditures on LGU Performance Scores, controlling for LGU size and geographical attrib- utes.54 The expenditure model yields similar results as the revenue model, suggesting that both reve- nues and expenditures drive service delivery outcomes: the average effect of a 1 percent increase in per capita expenditures is a performance score increase of 5.2 points. Again, the effect is notably larger, and only statistically significant in municipalities. 52 World Bank. 2016. Public Expenditure Review – Palestinian Territories. 53 Estimates are from OLS regressions of the LGU Performance Score on the log of per capital LGU operating budget revenues, the log of LGU Population (projections for the year 2016), and indicators for Gaza, the north and south West Bank, and VCs. 54 Estimates are from OLS regressions of the LGU Performance Score on the log of per capital LGU operating budget expendi- tures, the log of LGU Population (projections for the year 2016), and indicators for Gaza, the north and south West Bank, and VCs. 62 58 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure III-17: LGU Finance II: Per Capita Operating Budget Expenditures 1% Increase in LGU expenditures Overall +5*** Municipalities +9*** VCs +3 96. Financial sustainability is a key driver of LGU performance. Going beyond operating budget expenditures and revenues, Figure III-18 shows the results from regressions measuring the role of fiscal sustainability, proxied by indicators for satisfactory collection efficiency and own revenue sources from the MDP-II, and a basic surplus in both operational and enterprise budgets, for municipality perfor- mance, when holding both population size and geographical attributes fixed.55 Both models yield posi- tive, and statistically significant coefficients: municipalities with satisfactory collection efficiency and own revenue sources, on average have a 5.6 higher performance score, and municipalities with a surplus in operational and enterprise budgets perform on average 5.4 points higher. Figure III-18: LGU Finance III: Fiscal Sustainability Satisfactory Collection Efficiency +6* Surplus in Operating Budget and Enterprise +5* Fund 3.7 Governance and Accountability 97. Assessing the drivers of citizens’ participatory patterns and enhancing local government re- sponsiveness is crucial to increase accountability and improve service delivery outcomes. Growing empirical evidence suggests that citizen interactions with local governments spur their efforts in achiev- ing improved development results, such as sustainable public financial management, social inclusion and empowerment, and effective public service delivery.56 Citizen involvement can come in the forms of participation in local governance and involvement in decision-making, information-exchange regard- ing service provision, or through grievance redressal. 55 Estimates are from OLS regressions of the LGU Performance Score on indicators for 1) Satisfactory Collection Efficiency and 2) Surplus in Operating Budget and Enterprise Fund, as defined in the MDP-II, the log of LGU Population (2016 projections), and indicators for Gaza, the north and south West Bank, and VCs. 56 World Bank. 2014. Strategic Framework for Mainstreaming Citizen Engagement in World Bank Group Operations. 59 63 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 98. Less than a third of Palestinian citizens agree that their LGU is very responsive to citizen con- cerns and complaints. Government responsiveness has been found to be a key factor for citizens’ par- ticipatory behavior and believed to be a key driver for encouraging responsible citizenry, regaining trust in government, and enhancing political participation. In the Palestinian territories, overall satisfaction with the responsiveness of LGUs is low: the assessment found that less than a third of the households agree with the statement that their municipality or VC is very responsive to citizen concerns and com- plaints. While the number is slightly lower in the West Bank (30 percent) than in Gaza (37 percent), it varies substantially across governorates: in Tubas, only 1 out of 10 households agree that their LGU is very responsive, while in Tulkarm and Qalqilya almost half the households consider their LGU to be very responsive. Comparing satisfaction with responsiveness across LGU types in the West Bank, the share of households reporting to agree is higher in municipalities (31 percent) than in VCs (24 percent). Figure III-19: LGU Responsiveness “My municipality or Village Council is very responsive to citizen concerns and complaints” West Bank 30% 35% 35% Gaza 37% 27% 36% Municipalities 31% 35% 34% West Bank Village Councils 24% 39% 37% West Bank Agree or Strongly Agree Partially Agree Disagree or Strongly Disagree 99. Higher LGU responsiveness corresponds to better performance outcomes. Figure III-20 and Figure III-21 show the results from regressions measuring the average impact of two proxies for LGU responsiveness when controlling for both LGU size and geographical attributes. 57 The first model measures the effect of the share of households that have used a CSC; and the second model the share of households agreeing with the statement that their LGU is very responsive to citizen concerns and complaints. Both models yield statistically significant and positive coefficients for the responsiveness proxies, suggesting a positive relationship between LGU responsiveness and service delivery outcomes at the LGU level. The average performance of the quintile of LGUs with the highest share of households reporting that their LGU is very responsive to citizen concerns and complaints on average perform 16.4 points higher. Correspondingly, LGUs in the quintile with the highest share of citizens who used CSCs, including OSSes, on average have a 5.39 higher performance score. 57 Estimates are from OLS regressions of the LGU Performance Score on a) the log of the share of households that used a citizen service center, and b) the log of the share of households that agree that their LGU is very responsive, including indicators for Gaza, the north and south West Bank, and VCs, and the log of population. 64 60 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure III-20: Usage of Citizen Service Centers and Performance LGU quintile with highest share of households that used citizen service center (vs. lowest quintile) +5.39* Figure III-21: LGU Responsiveness and Performance LGU quintile with highest share of households agreeing that LGU is very responsive (vs. lowest quintile) +16.35*** 100. Almost 3 out of 4 Palestinian households thinks that voting in municipal elections can have a positive impact on local service delivery. Household trust in the role of elections in service delivery differs significantly across the Palestinian territories. Figure III-22 shows that while in Gaza, 82 percent of the households believe in such a relationship, almost a third of the households in the West Bank do not think that voting and service outcomes are interrelated. Trust in the role of voting is slightly higher in municipalities (69 percent) than in VCs (66 percent), and in the Central West Bank (75 percent) than in the North (63 percent) and South West Bank (71 percent). 61 65 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Figure III-22: Trust in the Role of Elections in Improving Service Delivery Can voting in municipal elections have a positive impact on service delivery? West Bank 69% 31% Gaza 82% 18% Municipalities 69% 31% West Bank Village Councils 66% 34% West Bank Yes No 101. Almost two thirds of Palestinian citizens report to plan to vote in the next municipal elections. The willingness of households to vote in the next municipal elections differs significantly between the West Bank and Gaza (Figure III-23). At the time of the survey, in Gaza, 75 percent of households reported to plan to vote in the next municipal elections, compared to only 56 percent of the households in the West Bank. The result for the West Bank is very close to the actual turnout numbers observed both in the latest municipal elections in May 2017 (53.4 percent) and 2012 (52.15 percent). Across municipali- ties and VCs in the West Bank, the share of households that planned to vote in the latest municipal elections is similar at 56 and 57 percent, respectively. Figure III-23: Participation in Future Elections Plan to vote Do not plan to vote West Bank 57% 43% Gaza 75% 25% Municipalities 57% 43% West Bank Village Councils 56% 44% West Bank 102. Citizen trust in the impact of voting on service delivery outcomes and willingness to vote in future elections are strongly associated with satisfaction of LGU responsiveness. Figure III-24 and Fig- ure III-25 indicate that citizens who are satisfied with LGU responsiveness on average report more often that voting has an impact on service delivery. Among the households who strongly agree that their LGU is very responsive, 86 percent believe that voting has an impact on public services; and among those who strongly disagree, only 59 percent think that the elections and services are connected. Moreover, among citizens who believe that voting in municipal elections influences service delivery outcomes, 80 percent plan to vote in the next election, compared to just 28 percent among those who think voting and public services are not related. Similarly, among households that strongly agree that their LGU is responsive to their concerns and complaints, 9 out of 10 plan to vote in the next municipal elections. 66 62 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Among the households who are dissatisfied with LGU responsiveness however, only slightly more than half report they plan to participate in the next municipal election. Figure III-24: LGU Responsiveness and Trust in Role of Elections for Service Delivery Can voting in municipal elections have a positive impact on service delivery? Yes No “LGU is very responsive” Strongly Agree 86% 14% Agree 82% 18% Partially Agree 79% 21% Disagree 64% 36% Strongly Disagree 59% 41% Figure III-25: LGU Responsiveness and Future Voting Behavior “LGU is very responsive” Plans to Vote Doesn't Plan to Vote Strongly Agree 91% 9% Agree 74% 26% Partially Agree 69% 31% Disagree 53% 47% Strongly Disagree 56% 44% 103. The majority of households in the West Bank and Gaza are well-informed and satisfied with their level of knowledge on local service provision, however the knowledge about modes of service delivery is low. For each of the four services – piped water, piped sewage, waste collection, and elec- tricity – only 1 out of 10 households reported the need to acquire information regarding access, mainte- nance, service quality or price during the last 12 months. The outlets used by citizens to seek information differ by service. For information regarding the electric grid connection, less than half of the respondents (48 percent) reported that they would contact the municipality/VC, while 55 percent would contact a public utility company. In turn, for piped water, piped sewage, and solid waste collection, the vast ma- jority of households receive information from the municipality or VC (90 percent, 97 percent, and 98 THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. percent, respectively). Interestingly, of the households that are covered by an active JSC for water and waste water, only 1 out of 3 reported that piped water is provided by a JSC. Accordingly, in LGUs where a JSC for solid waste collection is active, only 1 out 4 households reported solid waste collection services by a JSC. 104. Mayors in larger cities in the West Bank emphasize the importance of existing feedback mech- 63 67 anisms. As the Mayor of Ramallah explained: “We have a division for complaints at our Citizen Services Center. Each citizen can file a written complaint, and we address it within a known timeframe that de- THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. a JSC for solid waste collection is active, only 1 out 4 households reported solid waste collection services by a JSC. 104. Mayors in larger cities in the West Bank emphasize the importance of existing feedback mech- anisms. As the Mayor of Ramallah explained: “We have a division for complaints at our Citizen Services Center. Each citizen can file a written complaint, and we address it within a known timeframe that de- pends on the nature of the complaint…we are committed to examine each complaint and let the citizens know about the decision…” In the same context, the City Manager of Nablus uses a program to follow up how each department of the municipality deals with complaints received by phone. “The program tells me how many complaints each division receives and how many of them have been dealt with by the relevant division…once I notice there is a delay from one of the divisions I call the supervisors there and urge them to speed up the process…” Mayors also emphasized that citizens in large WB cities can file their complaints electronically through municipal websites and Facebook pages. 105. In comparison, due to the absence of CSCs in Gaza, municipalities depend on the traditional Qulem Al-Jomhour system, “Pen-of-the-Public”, to deal with citizen complaints. Qulem Al-Jomhour is a division in city halls or a window assigned to receive citizen written complaints and to refer them to relevant departments. For example, according to the City Director of Khan Yunis, “An individual can file a complaint through Qulem Al-Jomhour…then it goes to the relevant division to be dealt with…at the end we send a text message to citizens updating them about their complaints.” In the same context, Directors at Rafah municipality said that Qulem Al-Jomhour in that city is being “computerized” and “soon people will be able to write their complaints from home.” Figure III-26: Knowledge about Existence of One-Stop-Shops “Does your municipality/VC have a Citizen Service Center/One-Stop-Shop available?” Sample: Municipalities, where One-Stop-Shop is available Large 19% 44% 36% Municipalities Medium 15% 43% 42% Municipalities Small 14% 33% 52% Municipalities Yes Don't Know No 106. In LGUs that have a OSS, only 16 percent of households know about their existence, illustrating that citizens’ knowledge of available feedback instruments is very limited. Comparing LGUs in the West Bank in which a OSS exists, striking results about citizens’ information emerge. Only 16 percent of surveyed households report knowing that a CSC, including OSS, is available in their municipality, 37 percent report that they did not know whether a CSC exists, and 46 percent even report that they believe that no CSC is available. Knowledge about availability of a CSC is slightly higher in large municipalities, where at least 1 out 5 households reports that an CSC exists, than in medium and small municipalities, where only about 15 percent of households report availability of an CSC. 64 68 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 107. Usage of feedback/complaint instruments across the Palestinian territories is very low, while levels of satisfaction are moderate. Only 16 percent of households in the West Bank and 8 percent of households in Gaza report to have used a CSC including OSS, the municipality’s or VC´s website, a feed- back system of the LGU or service provider, or a service booklet to address a service issue. 6 percent of the households in the West Bank report to have used a feedback system or a LGU´s website, compared to 3 percent and 5 percent in Gaza, respectively. While only 4 percent of households in the West Bank have used a service center, including OSSs, and just 2 percent a service booklet, no household in Gaza reports to have used a service center, and less than 1 percent a service booklet to address a service issue. Comparing satisfaction with feedback instruments in the West Bank, 2 out of 3 households that used service booklets, a website, or CSC were satisfied with the respective instrument to resolve service problems, while only 40 percent report satisfaction with LGU and service provider feedback systems. In Gaza, two-thirds of the households were satisfied with resolving a service issue through a complaint on their LGU´s website, while less than half of households were satisfied with service booklets and feedback systems. 108. The majority of citizens who participated in qualitative FGDs expressed overall satisfaction with available mechanisms to resolve problems with public services. However, the degree of satisfac- tion among citizens is affected by how effectively local councils address submitted complaints. Citizens in larger West Bank LGUs expressed higher levels of satisfaction with complaint mechanisms and pro- cesses, especially when feedback timeframes are made public. Also, the qualitative analysis shows that the level of satisfaction is higher in LGUs where neighborhood committees are available as channels for citizens to file their complaints, especially in Gaza. Elected neighborhood committees tend to deal with complaints more effectively than appointed ones, according to respondents. Villages and small towns are inclined to adopt less institutionalized complaint mechanisms. They mostly use an “open-door” pol- icy and encourage direct contact with mayors and council members and staff. However, even good com- plaints mechanisms cannot address all issues when resources are limited. As expressed by one mayor, it depends on the “the nature of the complaint, and the availability of resources determine how we deal with it.” Figure III-27: Usage and Satisfaction with Feedback Instruments across Sectors Instrument used to address a service issue Satisfaction with instrument used West Bank Gaza 2% 67% Service Booklet Service Booklet < 1% 46% Feedback 6% 40% Feedback System System 3% 41% 6% 68% Website Website 5% 67% Service Center/ 4% Service Center/ 69% One-Stop-Shop 0% One-Stop-Shop 0% 109. The vast majority of citizens would rather seek their LGU directly to file a complaint instead of using a feedback or complaint system or CSC. In the situation of a problem with the electric grid connection, 48 percent of respondents would contact the municipality or VC of their LGU; however far 65 69 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. more households would do so for piped water, piped sewage, or waste collection services (79 percent, 79 percent, and 81 percent, respectively). For electricity-related problems, a third of the respondents would submit a complaint at a CSC or through a feedback/complaint system for problems, but only a minor number in case of problems with piped water, piped sewage, and waste collection services (6 percent, 7 percent, and 5 percent, respectively). On average about 10 percent of households report that they would not file a complaint at all in case of a service issue, potentially reflecting dissatisfaction with the responsiveness of LGUs and service providers. Figure III-28: Channels for Citizens’ Feedback and Complaints In case of any service problem, how would you submit a complaint? 0% 20% 40% 60% 80% Electricity Solid Waste Collection Piped Sewage Piped Water 70 66 IV. Conclusion and Recommendations THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. IV. Conclusion and Recommendations 4.1 Prioritize the Improvement of the Quality and Reliability of Services 110. Palestinian local governments have almost achieved universal coverage in terms of access to basic services. Access to basic services is remarkably high in the Palestinian territories, although satis- faction rates vary widely across LGUs and sectors and the bottom 40 percent enjoy overall lower quality of services. However, household income is not a main determinant of service delivery outcomes and no gender gap exists. All those are very positive achievements under extremely difficult circumstances in a highly challenging environment of fragility and conflict in the Palestinian territories. Improving the qual- ity and reliability of basic service provision must now move to the center of attention for policy makers and Development Partners. 111. Increasing access to improved drinking water should be given the highest priority, particularly in Gaza. With almost the entire population in Gaza dependent on potable water delivered by tanker trucks, solving the Gaza water crisis will remain the greatest challenge for local service delivery in the years to come. Improvements in LGU performance will not solve the crisis, which goes well beyond local government issues. Increasing access to drinking water in Gaza will require critical actions from the Pal- estinian Authority, the Government of Israel, and the international community to increase bulk water supply to the Gaza Strip; reduce technical and financial losses in a moribund water distribution network; treat and promote the reuse of waste water; and increase local desalination capacity, including from private water purifiers, to address the short-term needs of a growing population. 112. Improving water quality remains a key priority across the West Bank as well. A more strategic approach is needed in coordination with the Ministry of Local Government and the Palestinian Water Authority to consolidate highly fragmented water service providers. Although the institutional structure of that approach has been agreed on and adopted by the Palestinian Authority, implementation pro- gress is lagging behind and will not accelerate without parallel local government sector reform. A situa- tion in which more than 260 local water departments operate to supply drinking water in a water-scarce environment with large technical and commercial losses is simply not viable. It affects the financial sus- tainability of one of the key public service sectors, causes water shortages and is a drain to the Palestin- ian economy. The Palestinian Authority and Palestinian LGUs need to move decisively into establishing regional water and sanitation utilities. Current financial incentives by which LGUs retain water user fees to cross-subsidize their general expenditure need to be replaced with alternative funding sources, in- cluding conditional grants in exchange for improved financial discipline. 113. LGUs must strive to converge quality and reliability standards for basic services. While the local government mandate is broader than basic service provision, citizen satisfaction rates will not in- crease unless local governments deliver on their key tasks of supplying reliable drinking water and san- itation services, collect the garbage from households, and ensure a well maintained local road network. Prevailing variations in basic service delivery outcomes affect the overall living standards of Palestinians. However, low satisfaction rates with LGU responsiveness has had an adverse impact on the willingness to pay for public services among citizens, which is crucial to addressing the Palestinian Authority’s severe fiscal crisis. For example, the quality and satisfaction level of solid waste collection continues to vary significantly. LGUs fully control this basic service and can generally improve garbage collection services without incurring significant additional capital expenditures, e.g., for collection equipment, by optimiz- ing service operations. Establishing feedback mechanisms and addressing citizens’ complaints, e.g., on 72 67 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. routes and collection schedules, can be a simple but effective way to improve satisfaction rates. Overall, good governance and professional management will be critical to making LGUs more responsive to the needs of citizens, and they will also help make LGUs more reliable partners for private business and promoting local development. A dependable supply of basic public services is not only a key determinant for improving living standards but also a pre-condition for more private-sector driven growth that relies on a stable and predictable supply of services. While factors such as access to Area C and the separation barrier are out of the control of the Palestinian Authority, there are a number of important policies that the Palestinian Authority can implement to improve service delivery performance across Palestinian lo- cal governments. Both central and local authorities should not lose sight of actions that can be taken, even in the challenging framework of movement and access restrictions of the Palestinian territories. Some of the most important interventions are summarized below. 4.2 Reform the Local Government Financing System as a Pre-condition for Success 114. As a critical first step, the Ministry of Local Government must review and revise LGU revenue and expenditure assignments. The Local Government Act of 1997 does not distinguish between dele- gated responsibilities and own responsibilities. In the case of delegated responsibilities, the PA would ultimately be responsible for the regulation and financing of those functions but they would be imple- mented by LGUs. However, for own responsibilities, LGUs would generally be responsible for the ser- vices, including the raising of sufficient revenues. The absence of conditional grants from the Palestinian Authority to LGUs under the current system of intergovernmental finance indicates that the Local Gov- ernment Act was not intended to introduce delegated responsibilities. Furthermore, the act does not distinguish between mandatory functions, i.e., services that LGUs must provide and voluntary functions, i.e., those that may be provided if funds are available and the service deemed convenient by the local council. However, the current revenue assignments are not even sufficient to deliver on core functions. These are major shortcomings that need to be jointly reviewed by the Ministry of Finance and Planning and the Ministry of Local Government. 115. Palestinian LGUs are largely dependent on service fees and charges to cover their operational expenditures. While population size and geographic location matter, their impact on LGU performance is more limited than local fiscal capacity. Although Palestinian municipalities and village councils are responsible for providing critical public services, they have not been assigned sufficient revenue sources. The Local Government Act assigns 27 functional responsibilities to LGUs, but those functional assign- ments are not matched with appropriate revenue sources. Although the act assigns 16 revenue sources to municipalities, LGUs depend heavily on user fees to finance operating expenditures, not to mention critical capital investments. On average, charges and service fees account for 50–70 percent of total revenues, mostly from public utility services such as electricity and water, but also from charges for building permits, solid waste collection, sign boards, and cemetery fees, among others. 116. Addressing vertical and horizontal fiscal imbalances is critical to improving local service deliv- ery performance. LGUs are supposed to receive revenue from property taxes, professional license fees, education taxes, and transportation fees, but the revenue base varies dramatically across LGUs, leading to considerable horizontal imbalances. No regular and predictable intergovernmental fiscal transfer ex- ists to cover general local expenditures and fund basic capital investments. 117. While the property tax is potentially a significant revenue source for LGUs, it is only collected in municipalities and not villages, and the Ministry of Finance and Planning retains 10 percent for 68 73 116. Addressing vertical and horizontal fiscal imbalances is critical to improving local service deliv- ery performance. LGUs are supposed to receive revenue from property taxes, professional license fees, education taxes, and transportation fees, but the revenue base varies dramatically across LGUs, leading THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF to considerable horizontal imbalances. No regular and predictable intergovernmental fiscal transfer ex- SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. ists to cover general local expenditures and fund basic capital investments. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF While the property tax is potentially a significant revenue source for LGUs, it is only collected 117. SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. in municipalities and not villages, and the Ministry of Finance and Planning retains 10 percent for administering the tax. In practice, property tax has traditionally been collected only in around 30 mu- nicipalities, although this number has been expanding more recently and has now reached 70 munici- palities in total. However, much of the tax revenues get fully or partially intercepted by the Ministry of Finance and Planning to compensate for the arrears accumulated. Referred to as “net lending,” these 68 arrears are usually related to electricity or less often to water charges. 118. Changing the financial incentive structure for service provision will need to be at the core of the reform agenda. Due to chronic underfunding, LGUs have developed a practice of diverting revenues from service fees to meet their expenditures needs. Cross-subsidies and payment arrears are wide- spread and common practice across municipalities and village councils. Current incentives are strong: data for the years 2011–13 show that total revenues per capita for village councils in charge of electricity distribution can be up to four times higher than those without that responsibility. Village Councils with electricity distribution functions were able to spend over twice as much in per capita operating and development expenditures than those without the responsibility for each year during the period of 2011–13. For municipalities, there is a difference of almost 100 percent between the two groups of municipalities in terms of total revenue per capita for each year during the period of 2011-13. Despite the recent separation of electricity distribution from local governments, LGUs continue to receive divi- dends from electricity revenues that they request from distribution companies in their role as share- holders. Incentives and current practices of “net lending” are similar in the water sector. Those financial incentives need to be replaced with alternative revenue sources. 119. Breaking this vicious circle will require decisive action at the local and national level. Key pri- orities include: (i) increase local revenue collection; (ii) improve transparency of payment flows, includ- ing interagency arrears; (iii) sanction entities which divert funds for non-essential or unproductive use; and (iv) provide financial support to those LGUs without the fiscal capacity to ensure basic service pro- vision. Some progress has been made to address these underlying issues, but more needs to be done. The Municipal Development Program, supported by several Development Partners, provides a perfor- mance-based investment grant to municipalities allocated through a transparent and predictable mech- anism, subject to a municipality implementing key reforms such as increasing revenue collection for local services and improving transparency in budgeting and reporting, among other. With support from the Local Governance and Services Improvement Program, reforms to the revenue-sharing mechanism of the transportation fee are underway to make it more transparent, predictable, and regular. In parallel, the Ministry of Finance and Planning has improved transparency in reporting the annual amounts of property tax and transportation fee transferred to local authorities. However, much less progress has been made in establishing a regular fiscal transfer from the Palestinian Authority to local authorities beyond the donor-funded Municipal Development Program. Accordingly, progress also has been very limited in expanding and decentralizing property tax collection in municipalities; and introducing addi- tional own source revenues for LGUs. 120. Establish a fiscal transfer mechanism that effectively addresses imbalances. Building on the existing revenue sharing system for the transportation fees, more needs to be done to reduce vertical imbalances. For example, the full amount of the transportation fee revenues should be assigned to local governments based on a stable-over-time formula for the distribution of the funds, such as that piloted under the Local Governance and Services Improvement Program. In addition, large horizontal imbal- ances will require introducing equalization grants across both municipalities and village councils based on a substantial pool of annually stable and predictable funds, for example, as a percentage share of total central tax collections. Further, the PA needs to introduce a system of conditional grants beyond the donor-funded Municipal Development Program to fund delegated responsibilities and provide an incentive for LGUs to complement and implement the Palestinian Authority´s sectoral objectives at the THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF local level. Achieving this ambitious objective will require closer collaboration across Development Part- SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. ners and a willingness to move from funding based on individual projects to more local budget- and program-based financing. 74 121. The main functional responsibilities of LGUs must be profoundly refocused. The corporatiza- 69 tion of utility services, such as electricity and water supply, should be a priority over the medium term to improve the financial sustainability and performance of service delivery. Other local services assigned THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. THE PERFORMANCE OF PALESTINIAN LOCAL GOVERNMENTS. AN ASSESSMENT OF SERVICE DELIVERY OUTCOMES AND PERFORMANCE DRIVERS IN THE WEST BANK AND GAZA. program-based financing. 121. The main functional responsibilities of LGUs must be profoundly refocused. The corporatiza- tion of utility services, such as electricity and water supply, should be a priority over the medium term to improve the financial sustainability and performance of service delivery. Other local services assigned to LGUs will need to be revised and updated following several basic guidelines, such as: (i) introducing a differentiation in functional assignments between municipalities and VCs; (ii) clearly differentiating be- tween obligatory and voluntary services and between delegated and own services; and (iii) clarifying for each case of delegated and own services who is responsible for the various aspects of concurrent re- sponsibilities such as regulation, financing, and actual service delivery. 122. Provide additional revenue sources, and enhance the efficiency of collection. LGUs lack suffi- cient own-tax and nontax revenues to provide the public services they have been assigned. Increased financing of LGUs should come in large part from own-revenue sources in addition to conditional and unconditional transfers. Increasing transparency and improving service delivery will be key to increasing the willingness to pay among citizens. In addition, in order to improve LGU revenues, more attention should be given to the efficiency with which taxes are collected. The property tax is likely the most sig- nificant potential revenue source for LGUs, and there is much room to increase it by, for example, ap- plying it to all municipalities and village councils, but also revamping and simplifying the current valua- tion methodology. Global experience demonstrates that property tax decentralization can help increase revenues from that source. A first step could be to decentralize collection to large municipalities with the highest potential yield while keeping value assessments centralized. The professional tax should be modernized to increase its coverage, unify its administration, and revise its rates. LGUs are best placed to administer and collect the professional tax because they have information advantages over central authorities. Finally, the Palestinian Authority should explore betterment levies, i.e., one-time charges on the increased value of properties associated with urban improvements; assign the land and property transfer tax currently raised by the Palestinian Land Authority to LGUs; and consider introducing a local flat-rate “piggyback” personal income tax to be paid to the local government where the taxpayer keeps residence. 4.3 Strengthen LGU Accountability and Responsiveness to Increase Citizens’ Willingness to Pay 123. Absent a regular fiscal transfer from the central government, improving local fiscal capacity will require enhancing both revenue collection and expenditure efficiency. According to the LGPA find- ings, households in the bottom 40 percent are less likely to pay for services than higher-income house- holds. Given the deteriorating economic conditions of Palestinian households, overall willingness to pay is unlikely to increase substantially in the near future. More responsive LGUs are in a better position to collect more revenues from service users. 124. Three determinants affect the ability of local councils to collect fees from citizens for provided services. First, high levels of unemployment, especially in Gaza and in the poorest West Bank areas, pose real challenges to poor households in paying their fees. Second, local councils do not have effective instruments to encourage or nudge unwilling citizens to pay. Very few LGUs apply pro-poor payment modalities through payment plans or allow vulnerable citizens to pay reduced amounts. Box IV-1 pro- vides an overview of best practices that allowed some LGUs to enhance collection efficiency. The third determinant is the lack timeliness of fiscal transfers to local councils. The lack of support from local councils to increase the willingness of citizens to pay hinders efforts to increase citizen commitments to 70 75 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. pay for services (e.g., support enforcement or courts). Notably, not only individual users, but also gov- ernmental authorities and institutions, do not pay for the services they receive from LGUs. For example, the deputy mayor of Nablus reports that “accumulative debt which citizens owe the municipality is about NIS 310 million, while Palestinian Authority institutions located in Nablus owe NIS 60 million.” Similar arrears were reported in municipalities in Gaza. 125. Responsive and accountable local governments are critical to better performance and to in- creasing the willingness to pay among citizens. In parallel to revising the intergovernmental fiscal ar- chitecture, particular emphasis must be given to strengthening local governance and citizen engage- ment. Regardless of the size and location of a LGU or the institutional arrangement for service provision, the Local Government Performance Assessment reveals consistently better performance for responsive and accountable local governments. There is a large and growing number of LGUs that have achieved higher levels of service delivery performance through strengthening citizen engagement, improving transparency and accountability, and enhancing local revenues. Rather than diverting attention into nominal debates about the optimal size of LGUs, more attention should be given to supporting effective governance arrangements that engage citizens at all stages of development planning, investment prior- itization, and feedback on service delivery performance. 76 71 1 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Box IV-1: How do Some LGUs Increase Revenue Collection Efficiency? During the qualitative data collection process, mayors and council members were asked about tested innovations to increase service fee collection from residents. Their input is summarized below. i. Prepaid systems are the most effective way of increasing collection rates, but till pose challenges. Results from the household survey as well as the qualitative re- search suggest that prepaid systems can help tackle the problem of a low level of willingness to pay for services. Households using a prepaid meter for piped water are on average 2.85 times more likely to pay. Households using a prepaid meter for electricity are 20 times more likely to pay and 1.39 times more likely to pay on time. There is also a general agreement among mayors that the prepaid approach to ser- vice delivery is highly effective at ensuring payment. In the words of the Beit Kahil Mayor, “paying in advance … is like buying from a store—if you do not pay for it, you cannot get it.” However, imposing a prepaid system is difficult due to the cost of installing new equipment. The Beit Kahil council “decided to install prepaid water meters … it turned out that the equipment for 1,185 households we need for our town costs USD 160,000. MoLG was willing to provide USD 100,000 but we cannot cover the remainder [of USD 60,000] … although we need the upgrade urgently.” In addition, imposing prepayment for core services such as water can provoke social backlash for mayors and councils, as was the case for Bani Zeid al Garbiy, where a nongovernmental organization got involved to prevent the introduction of prepaid meters, arguing that “water is a basic human right and should not be cut off from people because they cannot afford it,” according to the mayor. Figure IV-1: Pre-paid Meters and Citizens’ Willingness to Pay ii. Linking payments for different services can increase efficiency. For example, when paying for electricity, citizens of Salim and Beit Kahil automatically have to also pay for waste collection services. According to a citizen from Beit Kahil, “with- out connecting other services to prepaid electricity supply … many people will not pay for waste collection or school fees.” The mayor of Beit Kahil explains: “because electricity is a prepaid service the collection rate is 100 percent. Connecting waste 72 77 2 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. collection fees allows the council to plan with revenue with certainty, which we depend on heavily to pay salaries and to improve some of our services.” Other municipalities such as Bethlehem are trying to do the same. iii. Discounts for paying total annual fees at one time mobilizes payments and pro- vides more stable revenues. Many LGUs in the West Bank and Gaza offer sub- stantial reductions in service fees if a citizen pays the full annual amount at one time, such as for waste collection or property taxes. The deputy mayor of Beth- lehem describes the method adopted by his municipality: “People receive 20 per- cent discount when they pay the full annual amount in January, 15 percent in February, 10 percent in March, and 5 percent in April.” Even though the method does not ensure that all citizens pay for services, it reduces payment delays and makes local government unit (LGU) revenue streams more predictable. Accord- ing to the mayor of Khan Yunis: “In the past we used to have a wrong policy, rewarding people who did not pay by offering discounts to encourage them to pay … however, now we adopted a reverse policy of encouraging those who are committed and pay their fees on time….” iv. Social pressure can be an effective method in smaller and mid-size LGUs. Asked how service providers should react in case households do not pay for piped wa- ter, solid waste collection services, or electricity, only 1 in 20 households in the West Bank and Gaza suggest disconnecting the household, while almost half of the households suggest as the most viable option visiting the household to un- derstand the problems it is facing. Such forms of social pressure are especially used in villages and smaller towns to encourage late-payers to settle their debts to local councils. The mayor of Salim describes how he personally helped the electricity utility collect fees from citizens in the village by going from house to house. “The company did want to tell the police and we used social pressure to solve this issue … we solved 50 percent of it … we went from house to house with them.” Some village councils organize visits to nonpaying households to try to “understand their financial situation and find some solutions accordingly.” Simi- larly, the city engineer of Hebron reports that “we prefer family influence more than resorting to the law or police. We go to an area or a neighborhood and talk to a social or tribal figure … who uses his personnel and family connections to solve the issue.” v. Offering payment plans to settle delayed payments. A large share of Palestinian households suggest that a service provider should offer a payment plan if a household is not paying for piped water (44 percent), solid waste collection (39 percent), or electricity (46 percent). In fact, most LGUs try to reach settlements or sign payment plans with households that have overdue payments. According to the Gaza City director, “we develop a payment plan for people who cannot afford paying [but] we do not apply a general-decrease of fees … [because other households would also stop paying]. However, we resort to court to deal with those who do not want to pay.” Similarly, the mayor of Gaza says that “ if a citizen has a cumulative debt, we ask [the household] to pay the next bill and pay a part of the debt, such as an additional 50 NIS, every time the future bills are paid.” 78 73 3 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. And the Mayor of Ramallah notes: “Our municipality sent official letters to households informing them of the debt they have to pay and encouraging them to come to reach a settlement with the municipality. A settlement does not in- clude any discount but is only based on a scheduled repayment approach.” Figure IV-2: Non-payment: How Should Service Providers Respond? vi. Certificates of clearance are leveraged by LGUs to encourage citizens to pay service fees. Among the most effective approaches to nudge citizens into paying for services are "certificates of clearance. These letters verify that no fees and taxes are overdue. Local councils use the certificates as a pre-condition for providing citizens with official letters and other services. vii. Other innovations, such as decentralized payment locations, can have a posi- tive impact on the efficiency of fee collection. Providing citizens with the option of making payments at a decentralized location, such as a CSC, OSS, or local shop, can increase fee-collection rates. The city manager of Nablus is consider- ing issuing "VIP" cards to reward citizens who pay on time. “This card would be renewed annually and allows its holder to receive ‘faster treatment’ when they approach the municipality or one of its offices … as a reward for their commit- ments.” viii. Resorting to court . In some LGUs, especially in large cities such as Gaza City (with a population of 700,000), local councils sometimes resort to court as a last option to force people to pay for the services they receive. However, it remains unclear how effective such an approach is, particularly given that delayed and non-payments are often driven by unemployment and poverty. In addition, less than 4 percent of households in the West Bank and Gaza believe that service providers should take cases of households not paying for the services they re- ceive to court. 74 79 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 4.4 Consolidate and Professionalize Service Delivery 126. A clear policy for more professional and corporatized service delivery must be developed. Joint Service Councils play a critical role in consolidating service delivery because they can gradually assume service operation functions from small and mostly weak LGUs, provide the needed scale, and develop into the nucleus of a future regional public utility. However, JSCs do not by themselves guarantee better service delivery performance if they are not matched with more professional management and strong accountability mechanisms in terms of service users as well as the local authorities they represent. Large variations in the performance of single- and multiple service JSCs suggest an urgent need to establish a clear action plan in coordination with the responsible line agencies, particularly the Palestinian Water Authority, to separate and professionalize service operations, with clearly assigned revenue streams and measurable performance standards to operate as independent utilities. Overall, Palestinian policy mak- ers should aim at integrating villages and municipalities into more densely populated urban areas to achieve better performance outcomes. Public utilities can be an effective means of regional integration. 127. Corporatizing public service utilities will require clearing LGU arrears and strengthening the governance structure for service provision. A first critical step to disentangle financial flows, understand expenditure efficiency, and eventually solve the net lending issue is to establish separate cost accounts for utility services, particularly water and wastewater and solid waste management. The establishment of distribution companies in the energy sector has been a decisive push in the right direction to ring- fence and commercialize electricity distribution functions, although revenues continue flowing back in the form of dividends. However, current budgeting and reporting practices do not allow for consistent and transparent tracking of financial flows; and overall payment discipline is low. In addition to separat- ing accounts and applying functional budget classification to improve LGU budgeting and reporting, ex- isting and well-performing single-service JSCs should be transformed into more independent entities with the goal of becoming utilities over the medium term. With a new bylaw on joint-service provision, the Ministry of Local Government has started adopting a more utility-driven approach to governing JSCs. However, implementation has been slow, and there is no consensus yet on the trajectory that JSCs should aspire to between the spectrum of “umbrella-LGU” to “commercial service operator.” The MoLG needs to define a clear policy directive with cross-PA buy-in. 128. JSCs should be held to higher standards, but they will require additional support. Most of the JSCs suffer from a weak financing structure and have little own revenues. Fee collection is weak and the tariffs charged rarely cover operating costs, let alone capital replacement and depreciation. Overall, bill- ing and accounting systems need an overhaul. Only half of the JSCs assessed by the World Bank were able present a budget that had been approved by the General Assembly. Annual JSC accounts rarely undergo an external audit, especially Planning and Development JSCs. Introducing more rigid auditing requirements is an important step toward improving transparency and accountability. Stronger client orientation and citizen feedback will require establishing complaint mechanisms, most of which are cur- rently weak or nonexistent. Most importantly, JSCs should be given more independence, and their bot- tom-up accountability links to the member LGUs and service users strengthened, rather than top-down to the MoLG, which currently reviews and approves JSC budgets, has significant leeway in the allocation of development funds, and is considering establishing a direct budget line to finance JSCs. In parallel, specific technical capacity and institutional strengthening to support better performing JSCs are needed to help those that are transforming into professional and dedicated service operators. A stronger role for the private sector needs to be considered, drawing on recent positive experiences, for example in the Higher JSC for Solid Waste Management in the southern West Bank. 80 75 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 4.5 Increase Density and Connectivity, and Support the Marginalized that the PA Cannot Reach 129. Policies to support increased density will have an impact on LGU performance and the cost of service delivery. Global evidence suggests a strong correlation between increased density and expendi- ture efficiency, which has been confirmed by the Local Government Performance Assessment findings. Per capita cost of service delivery increases with declining density, given that the number of households served is much lower in less densely populated areas. This has a direct impact on the capital and oper- ating cost of infrastructure networks and service provision, such as the water and sewage pipe meters, and operating hours for solid waste collection trucks that have to cover a large service area with few users. The policies of the Palestinian Authority can help in facilitating denser development in cities and municipalities, including but not limited to: adjusting current floor-to-area ratios for building permits, which currently curtail new developments to eight-story buildings; introducing vacant land fees to pro- vide an incentive for bringing idle land back to market; and other zoning regulations to allow for denser, mixed-used developments. 130. Reducing the cost of remoteness and improving connectivity can also improve LGU perfor- mance. Palestinian LGUs are constrained by the territorial fragmentation imposed as a result of Area C restrictions, severely limiting the extent to which investments in the regional roads network can improve connectivity and access for remote communities. Selected improvements in the transportation network and better traffic management, particularly in larger urban agglomerations, may contribute to the re- duction in the cost of remoteness and improve connectivity. However, the direct impact of the Palestin- ian Authority's policies and investment decisions is rather marginal due to the constraints in the Pales- tinian territories, and addressing issues of remoteness to improve LGU performance will require actions by the Israeli Civil Administration (ICA). Nevertheless, based on select positive examples, the Palestinian Authority, in coordination with Development Partners, should consider making specific proposals to the ICA for expanding critical access roads or developing other practical solutions to better serve remote communities. Since 2012, around 113 masterplans have been prepared to support capital investment and service delivery improvements in 77 LGUs with Palestinian communities living in Area C. However, to date, only five of the plans have been approved by the ICA. The other masterplans that were submit- ted for approval are still awaiting a decision, 81 of them have been pending for more than 18 months. 131. Complementary and targeted policies to support citizens in marginalized communities must be developed. Local government sector support alone will not suffice to address the large differences in living standards across Palestine, particularly under the current regime of movement restrictions. A significant group of LGUs have received substantial external support, but remain at low levels of service delivery outcomes, including marginalized LGUs with high rates of poverty and/ or that are heavily af- fected by the prevailing movement and access restrictions. Social protection policies, such as cash trans- fers or other targeted interventions to directly reach the poor are critical given the strong correlation between increasing household wealth and better LGU performance. Local government support cannot fully substitute core functions that are the responsibility of the central government. 76 81 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 4.6 Benchmarking for Improving Local Government Performance 132. Finally, the Ministry of Local Government should institutionalize performance benchmarking and make it an integral instrument for evidenced-based policy making. The Local Government Perfor- mance Assessment has developed an instrument that can be replicated in the future to track perfor- mance trends and improvements, assess efficacy of policy measures, and regularly evaluate donor sup- port. Following the successful example of benchmarking under the Municipal Development Program, the Ministry of Finance and Planning and the MoLG should consider linking capital grant allocations to clear performance targets in LGUs. Regular national benchmarking of local service delivery performance can serve as the basis for a conditional grant transfer program, linking grant allocation to the clear, sector-specific policy objectives of the Palestinian Authority, e.g., in the energy and water sector. Fur- thermore, the data of Local Government Performance Assessment can assist in measuring expenditure efficiency to better understand the use of scarce public resources at the local level. The Ministry of Local Government has already established an effective geospatial department that has developed an online local government information system. In addition, the Municipal Development and Lending Fund has unique experience in managing a performance-based grant mechanism and providing targeted capacity- building support to municipalities. These are tremendous assets that Palestinian local governments can rely on as they strive to continue improving performance for the benefit of their citizens. 133. The data collected for this analysis can have widespread use in ongoing or planned develop- ment programs. They provide the Palestinian Authority and Development Partners with a unique op- portunity to complement the supply-side data that the Municipal Development Lending Fund collects from municipalities for the Municipal Development Program’s performance ranking with demand-side information on service delivery outcomes. Particularly, data on LGU responsiveness and citizen satisfac- tion can strengthen the current assessment of local accountability, providing a more comprehensive way to assess LGU performance in this critical focus area. The recently launched USAID-financed “Com- munities Thrive” Program will use Local Government Performance Assessment for their baseline assess- ment and impact monitoring over the program's lifetime. Furthermore, the Ministry of Local Govern- ment should use the Local Government Performance Assessment to monitor service delivery improve- ments in the program villages supported by the Local Governance and Services Improvement Program. 134. Citizen scorecards. At the local level, the Local Government Performance Assessment allows for a broader application of citizen scorecards. Each LGU could be provided with a score that could be made publicly available to help citizen and community-based organizations understand the relative position of their LGU compared with other local authorities. Substantial global experience exists demonstrating the positive impact of strengthening citizen engagement at the local level, spurring innovation and knowledge exchange among LGUs, providing additional incentives for improvement, and tracking pro- gress over time. 82 77 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. References Araj, Bader. 2017. “Qualitative Research Report Focus Group Discussions and Key Informant Interviews.” West Bank and Gaza: Local Government Performance Assessment. World Bank Group. Washington D.C. British Mandate of Palestine. 1942. “Jerusalem District Outline Regional Planning Scheme RJ/5.” British Mandate Palestine. British Mandate of Palestine. 1945. “Samaria District Regional Outline Planning Scheme S15.” British Mandate Palestine. IFC/PPIAF (International Finance Corporation/Public-Private Infrastructure Advisory Facility). 2015. “West Bank and Gaza - Assessing the Potential for Public-Private Partnerships.” World Bank Group. Washington D.C. MDLF (Municipal Development Lending Fund). 2016. “Annual Report 2016.” Ramallah. Niksic, Orhan, and Nur Nasser Eddin. 2016. “Public Expenditure Review - Palestinian territories.” World Bank Group. Washington D.C. Niksic, Orhan, Nur Nasser Eddin, and Massimiliano Cali. 2013. “West Bank and Gaza - Area C and the Future of Palestinian Economy.” World Bank Group. Washington D.C. Palestinian National Authority. 1994. “Town, Village and Building Planning Law, No. 79, 1966.” Ramallah. Palestinian National Authority. 1997. “Local Authorities Law, 1997.” Ramallah. Palestinian National Authority. 2014. “Water Law, 2014.” Ramallah. Palestinian National Authority. 2016. “Palestinian National Policy Agenda 2017-2022 Putting Citizens First.” Ramallah. Palestinian Central Bureau of Statistics, Various years. Populations Projections (database). Ramallah, http://www.pcbs.gov.ps/site/lang__en/803/default.aspx UNOCHA (United Nations Office for the Coordination of Humanitarian Affairs). 2009. “Restricting Space: The Planning Regime Applied by Israel in Area C of the West Bank.” United Nations. New York. UNOCHA (United Nations Office for the Coordination of Humanitarian Affairs). 2013. “In the Spotlight: Area C Vulnerability Profile.” United Nations. New York. WHO/UNICEF (World Health Organization/ United Nations Children's Fund). Various years. Joint Moni- toring Programme (JMP) for Water Supply and Sanitation. Geneva, https://www.wssinfo.org/ World Bank. Various years. World Development Indicators (database). Washington D.C., http://data- bank.worldbank.org/data/reports.aspx?source=world-development-indicators World Bank. 2007. “West Bank and Gaza Transport Sector Strategy Note.” World Bank Group. Washing- ton D.C. 78 83 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. World Bank. 2014. “Strategic Framework for Mainstreaming Citizen Engagement in World Bank Group Operations.” Washington, DC. World Bank. 2015. “Joint Services Council Assessment in the West Bank and Gaza.” World Bank Group. Washington D.C. World Bank. 2016. “Economic Monitoring Report to the Ad Hoc Liaison Committee: main report.” World Bank Group. Washington D.C. World Bank. 2017. “Toward Water Security for Palestinians, West Bank and Gaza WASH Poverty Diag- nostic”. World Bank Group. Washington D.C. 84 79 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Annex Annex 1: Methodology of Household Survey Background and Objective As existing municipal data is very limited in its scope and only covers minimal inputs into service delivery, a household survey covering more than 380 Palestinian LGUS was conducted. The main goal of the LGPA survey is to establish the quantitative basis for analyzing performance of Palestinian local governments and a baseline for future benchmarking to target investment and policy interventions. The household survey data for the first time allows for an assessment on the ‘demand side’ of service delivery out- comes, such as access, quality and reliability, responsiveness, and willingness to pay for services man- dated to municipalities and VCs. Data Collection The quantitative data collection for the LGPA was conducted by Alpha International for Polling, Research and Informatics, a Palestinian enterprise that operates throughout the West Bank and Gaza. The data collection was conducted between August 15, 2016 and February 9, 2017, using Tablet Assisted Personal Interviewing (TAPI), and consisted of two parts: 1) Household Survey (long interview) The household survey data focuses on access to public services, quality and reliability of service delivery, and citizens’ participation and willingness to pay, which allows for an in-depth analysis of the drivers of LGU performance in service delivery. The survey modules include a service delivery assessment of the following sectors: (i) water supply; (ii) waste water; (iii) electricity; (iv) solid waste collection; (v) education; (vi) public transport; (vii) health care; and (viii) local roads. In addition, the modules also collected data on (ix) household demographics and socio-economics; (x) citizen participation; and (xi) willingness to pay. 2) Service Delivery Poll (short interview) The service delivery poll is used to collect a core set of service delivery outcome indicators during a rapid face-to-face polling assessment for all municipalities and VCs. The polling data complements the more comprehensive household survey. Sampling The survey sample is representative for the entire population. The household sample of N=11,970 households is designed to be representative at the Governorate and the LGU level. The sample is popu- lation weighted and based on a remote sensing sampling framework. The total available sample includes N=9,562 long interviews and an additional N=2,408 short interviews. 80 85 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT OF OF AN ASSESSMENT SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Annex 2: Methodology Qualitative Analysis Focus Groups and Stakeholder Interviews were conducted in 8 major cities and in 10 small & medium- size LGUs in both the West Bank and Gaza. The selection was conducted based on: • Size (PCBS population data) • LGU type (municipality/village council) • Mode of service delivery (individual vs. joint service council) • Income level (MDLF Data) • Performance in service delivery (LGPA household survey results) A particular focus of the qualitative analysis was to identify the drivers of LGU performance, particu- larly (i) the effectiveness of Joint Service Councils, (ii) the role of institutional capacity, and (iii) the im- pact of improvement in transparency and accountability. Figure A2-1: Municipalities and VCs Selection for Qualitative Analysis 86 81 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Annex 3: Methodology LGPA Performance Index The key objective of the LGPA performance index is to conduct comparisons of local government per- formance across all LGUs in the West Bank and Gaza, in order to gain better insights into the main drivers of service delivery and how to close existing gaps in LGU performance. The aim of the Index is to provide a tool for both policy makers and Development Partners to identify and target interventions in VCs and municipalities. Three dimensions are used for each of the four core sectors to construct a comprehen- sive measure: methodologically, for the services piped water, piped sewage, and solid waste collection service, LGU performance is modeled as a Cobb-Douglas-style function, taking into account citizen sat- isfaction with both service quality and reliability, Figure A3-1: Methodology LGPA Performance Index , where Access refers to the percent share of citizens in LGU i that has access to service s, Quality to the percent share of citizens in LGU i that is satisfied with quality of service s, and Reliability to the percent share of citizens in LGU i that is satisfied with reliability of service s. For roads, the LGU performance score is defined as the share of citizens in LGU i that are located at a paved road. The overall LGU performance index score is then obtained by calculating the average of the four indi- vidual service scores, normalized to a range of 0 to 100. By weighting the satisfaction outcomes with the share of citizens with access to the core services, the index rewards LGUs with higher access rates, while penalizing LGUs, in which only small shares of citizens are provided access to the core services. As a result, only those LGUs reach high scores that (i) achieve strong scores in multiple dimensions and (ii) provide services for a significant share of citizens. 82 87 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Annex 4: Regression Results Table A4 - 1: Likelihood of Service Access - West Bank (Figure II-17 & Figure II-18) Piped Piped Solid Waste Local Service Access Water Sewage Collection Roads Sample: West Bank (1) (2) (3) (4) Female Household Head 1.288 0.998 0.975 1.081 (0.499) (0.245) (0.190) (0.115) Village Council 0.795 0.642** 0.593* 1.222*** (0.172) (0.109) (0.147) (0.062) Regions (Reference: North) - Central West Bank 3.057 1.025 0.174** 1.185 (1.928) (0.280) (0.097) (0.120) - South West Bank 0.981 0.555* 0.183*** 1.000 (0.372) (0.148) (0.089) (0.078) Bottom 40% Household 0.529*** 0.741 0.686** 0.844 (0.084) (0.135) (0.094) (0.074) LGPA Performance Index 1.043*** 1.087*** 1.048*** 1.078*** For Sector (0.004) (0.003) (0.008) (0.005) Pseudo R-squared 0.192 0.674 0.223 0.119 Number of Observations 9,048 9,028 9,050 9,052 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gov- ernorate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 88 83 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 2: Likelihood of Service Access - Gaza (Figure II-17 & Figure II-18) Piped Piped Solid Waste Local Service Access Water Sewage Collection Roads Sample: Gaza (1) (2) (3) (4) Female Household head 1.865* 0.793 1.410 1.087 (0.551) (0.286) (0.342) (0.231) Bottom 40% Household 0.805 0.967 1.005 0.778 (0.166) (0.263) (0.143) (0.105) Performance Index 1.039** 1.091*** 1.058*** 1.041** For Sector (0.015) (0.008) (0.006) (0.002) Pseudo R-squared 0.048 0.340 0.136 0.031 Number of Observations 1,455 1,453 1,455 1,455 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gov- ernorate in parentheses. Sample is limited to Gaza. * p<0.05, ** p<0.01, *** p<0.001 84 89 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 3: Likelihood of Satisfaction with Quality and Reliability - West Bank (Figure II-19 & Figure II-20) Satisfaction with Quality Piped Piped Solid Waste Local and Reliability Water Sewage Collection Roads Sample: West Bank (1) (2) (3) (4) Female Household head 1.143 1.352 1.023 1.258 (0.090) (0.497) (0.127) (0.231) Village Council 1.021 1.289 1.023 0.638** (0.048) (0.268) (0.050) (0.096) Regions (Reference: North) - Central West Bank 1.132 1.251 1.160** 1.436 (0.116) (0.335) (0.064) (0.344) - South West Bank 1.157 1.731*** 1.081 1.558 (0.168) (0.241) (0.050) (0.450) Bottom 40% 0.987 1.127 1.283* 1.019 (0.115) (0.449) (0.136) (0.090) Performance Index 1.051*** 1.009* 1.049*** 1.032*** For Sector (0.001) (0.004) (0.001) (0.008) Pseudo R-squared 0.212 0.013 0.120 0.029 Number of Observations 8,331 1,233 8,394 7,401 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gov- ernorate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 90 85 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 4: Likelihood of Satisfaction with Quality and Reliability - Gaza (Figure II-19 & Figure II-20) Satisfaction with Quality Piped Piped Solid Waste Local and Reliability Water Sewage Collection Roads Sample: Gaza (1) (2) (3) (4) Female Household head 0.964 1.417* 0.488 1.008 (0.136) (0.230) (0.249) (0.416) Bottom 40% Household 1.042 0.626 1.145 1.379 (0.141) (0.184) (0.305) (0.431) Performance Index 1.042*** 0.997 1.027*** 1.032** For Sector (0.007) (0.014) (0.002) (0.012) Pseudo R-squared 0.069 0.010 0.035 0.018 Number of Observations 1,227 861 1,064 1,140 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gov- ernorate in parentheses. Sample is limited to Gaza. * p<0.05, ** p<0.01, *** p<0.001 86 91 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 5: Likelihood of Payment: Piped Water and Solid Waste Collection Services (Figure II-22) Piped Solid Waste Water Collection Likelihood of Payment (1) (2) Bottom 40% Household 0.460* 0.373*** (0.157) (0.076) Village Council 0.705 2.571 (0.269) (1.302) Regions (Reference: Central) - North West Bank 0.931 3.629 (0.998) (2.754) - South West Bank 0.370 1.391 (0.312) (1.032) - Gaza 0.0310*** 0.0424*** (0.026) (0.024) Satisfaction with Quality and Relia- 1.362* 1.396 bility (0.196) (0.266) 1.238 1.001 Agrees that LGU Is very Responsive (0.205) (0.178) Performance Index 0.994 0.985 For Sector (0.006) (0.010) Pseudo R-squared 0.266 0.421 Number of Observations 6,572 5,550 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Governorate in parentheses. * p<0.05, ** p<0.01, *** p<0.001 92 87 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 6: Likelihood of Timely Payment: Piped Water and Solid Waste Collection Services (Figure II-26) Piped Solid Waste Water Collection Likelihood of Timely Payment (1) (2) Bottom 40% 0.567*** 0.635** (0.045) (0.088) Village Council 0.789 1.037 (0.161) (0.223) Regions (Reference: Central) - North West Bank 0.932 1.683 (0.372) (0.779) - South West Bank 0.439*** 0.641 (0.088) (0.155) - Gaza 1.245 1.314 (0.324) (0.245) 1.140 1.186 Satisfaction with Quality and Reliability (0.231) (0.111) 1.728*** 1.758** Agrees that LGU Is very Responsive (0.226) (0.341) Performance Index 1.004 1.019** For Sector (0.005) (0.006) Pseudo R-squared 0.061 0.062 Number of Observations 6,841 6,850 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Governorate in parentheses. * p<0.05, ** p<0.01, *** p<0.001 88 93 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 7: Likelihood of Service Access: Distance to Separation Barrier (1,000m) (Figure III-9) Piped Piped Solid Waste Local Likelihood of Service Ac- Water Sewage Collection Roads cess: 1,000 m Distance to Separation Barrier (1) (2) (3) (4) Distance to Separation 0.806 1.038 1.065 0.998 Barrier (1,000m) (0.319) (0.227) (0.323) (0.137) Village Council 0.795 0.702* 0.620 1.230*** (0.160) (0.119) (0.172) (0.058) Regions (Reference: North) - Central West Bank 3.328* 1.155 0.206* 1.190* (1.942) (0.340) (0.128) (0.102) - South West Bank 1.020 0.615* 0.214** 0.986 (0.404) (0.144) (0.106) (0.076) Bottom 40% Household 0.536*** 0.817 0.751** 0.849 (0.072) (0.154) (0.076) (0.072) Performance Index 1.045*** 1.086*** 1.047*** 1.080*** For Sector (0.004) (0.003) (0.008) (0.005) Pseudo R-squared 0.201 0.665 0.205 0.129 Number of Observations 10,270 10,270 10,270 10,270 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gov- ernorate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 94 89 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 8: Likelihood of Service Access: Distance to Separation Barrier (500m) (Figure III-9) Piped Piped Solid Waste Local Likelihood of Service Ac- Water Sewage Collection Roads cess: 500 m Distance to Separation Barrier (1) (2) (3) (4) Distance to Separation 0.532* 0.900 1.071 0.891 Barrier (500m) (0.164) (0.174) (0.314) (0.080) Village Council 0.796 0.696* 0.617 1.228*** (0.174) (0.116) (0.166) (0.056) Regions (Reference: North) - Central West Bank 3.406* 1.195 0.207** 1.203* (1.921) (0.389) (0.126) (0.098) - South West Bank 1.018 0.612* 0.214** 0.982 (0.397) (0.140) (0.106) (0.071) Bottom 40% Household 0.537*** 0.815 0.751** 0.847 (0.075) (0.155) (0.076) (0.072) Performance Index 1.045*** 1.086*** 1.047*** 1.080*** For Sector (0.004) (0.002) (0.008) (0.005) Pseudo R-squared 0.202 0.665 0.205 0.130 Number of Observations 10,270 10,270 10,270 10,270 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 90 95 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 9: Likelihood of Service Access: Distance to Separation Barrier (250m) (Figure III-9) Piped Piped Solid Waste Local Likelihood of Service Ac- Water Sewage Collection Roads cess: 250m Distance to Separation Barrier (1) (2) (3) (4) Distance to Separation 0.529** 0.796 0.692 0.997 Barrier (250m) (0.103) (0.295) (0.195) (0.183) Village Council 0.788 0.697* 0.609 1.230*** (0.177) (0.116) (0.159) (0.055) Regions (Reference: North) - Central West Bank 3.315* 1.191 0.212** 1.190 (1.925) (0.372) (0.127) (0.107) - South West Bank 1.016 0.613* 0.213** 0.986 (0.395) (0.141) (0.106) (0.071) Bottom 40% Household 0.539*** 0.815 0.749** 0.849 (0.076) (0.155) (0.077) (0.071) Performance Index 1.045*** 1.086*** 1.046*** 1.080*** For Sector (0.004) (0.002) (0.008) (0.005) Pseudo R-squared 0.201 0.665 0.205 0.129 Number of Observations 10,276 10,276 10,276 10,276 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 96 91 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 10: Likelihood of Service Access: Area C (Figure III-9) Piped Piped Solid Waste Local Likelihood of Service Ac- Water Sewage Collection Roads cess: Area C (1) (2) (3) (4) Area C Household 0.692 0.792 0.348*** 0.611** (0.194) (0.621) (0.078) (0.100) Village Council 0.806 0.701* 0.610* 1.251*** (0.173) (0.120) (0.148) (0.062) Regions (Reference: North) - Central WB 3.306* 1.196 0.240* 1.223* (1.893) (0.356) (0.138) (0.097) - South West Bank 1.030 0.618* 0.227** 1.002 (0.398) (0.142) (0.111) (0.071) Bottom 40% Household 0.541*** 0.821 0.768* 0.853 (0.075) (0.166) (0.083) (0.074) Performance Index 1.045*** 1.086*** 1.044*** 1.080*** For Sector (0.004) (0.003) (0.008) (0.005) Pseudo R-squared 0.201 0.665 0.221 0.132 Number of Observations 10,276 10,276 10,276 10,276 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 92 97 THE PERFORMANCE OF PALESTINIAN THE PERFORMANCE LOCAL OF PALESTINIAN GOVERNMENTS. LOCAL GOVERNMENTS.AN ASSESSMENT AN OF ASSESSMENT OF SERVICE DELIVERY SERVICE OUTCOMES DELIVERY AND OUTCOMES ANDPERFORMANCE DRIVERS PERFORMANCE DRIVERS ININ THE THE WEST WEST BANK BANK AND AND GAZA.GAZA. Table A4 - 11: Likelihood of Service Satisfaction: Distance to Separation Barrier (1,000m) (Figure III-10) Piped Piped Solid Waste Local Likelihood of Service Sat- Water Sewage Collection Roads isfaction: 1,000m to Sep- aration Barrier (1) (2) (3) (4) Distance to Separation 0.947 0.908 0.954 0.828 Barrier (1,000m) (0.087) (0.136) (0.037) (0.133) Village Council 1.030 1.338 1.001 0.648** (0.048) (0.217) (0.042) (0.094) Regions (Reference: North) - Central West Bank 1.058 1.042 1.214*** 1.405 (0.079) (0.186) (0.054) (0.329) - South West Bank 1.141 1.467** 1.073 1.463 (0.152) (0.197) (0.046) (0.417) Bottom 40% Household 0.978 0.991 1.254* 1.037 (0.081) (0.294) (0.127) (0.091) Performance Index 1.051*** 1.013** 1.048*** 1.031*** For Sector (0.001) (0.004) (0.001) (0.007) Pseudo R-squared 0.208 0.012 0.121 0.028 Number of Observations 9,467 1,467 9,525 8,298 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 98 93 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 12: Likelihood of Service Satisfaction: Distance to Separation Barrier (500m) (Figure III-10) Piped Piped Solid Waste Local Likelihood of Service Sat- Water Sewage Collection Roads isfaction: 500m to Sepa- ration Barrier (1) (2) (3) (4) Distance to Separation 1.060 0.638*** 0.907 0.708* Barrier (500m) (0.112) (0.075) (0.059) (0.108) Village Council 1.034 1.309 1.001 0.649** (0.049) (0.207) (0.043) (0.094) Regions (Reference: North) - Central West Bank 1.041 1.113 1.218*** 1.417 (0.073) (0.179) (0.062) (0.328) - South West Bank 1.142 1.451** 1.073 1.471 (0.156) (0.203) (0.045) (0.423) Bottom 40% Household 0.980 0.982 1.253* 1.036 (0.081) (0.287) (0.127) (0.091) Performance Index 1.051*** 1.013** 1.048*** 1.031*** For Sector (0.001) (0.004) (0.001) (0.008) Pseudo R-squared 0.208 0.015 0.121 0.028 Number of Observations 9,467 1,467 9,525 8,298 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 94 99 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 13: Likelihood of Service Satisfaction: Distance to Separation Barrier (250m) (Figure III-10) Piped Piped Solid Waste Local Likelihood of Service Satis- Water Sewage Collection Roads faction: 250m to Separa- tion Barrier (1) (2) (3) (4) Distance to Separation 0.788 0.726 0.729* 0.573*** Barrier (250m) (0.100) (0.142) (0.095) (0.059) Village Council 1.030 1.352* 1.001 0.651** (0.048) (0.199) (0.042) (0.096) Regions (Reference: North) - Central West Bank 1.057 1.052 1.218*** 1.389 (0.081) (0.188) (0.063) (0.319) - South West Bank 1.143 1.479** 1.075 1.483 (0.153) (0.193) (0.043) (0.428) Bottom 40% Household 0.978 0.990 1.252* 1.038 (0.080) (0.290) (0.127) (0.091) Performance Index 1.051*** 1.013** 1.048*** 1.031*** For Sector (0.001) (0.004) (0.001) (0.008) Pseudo R-squared 0.208 0.012 0.121 0.028 Number of Observations 9,467 1,467 9,525 8,298 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 100 95 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 14: Likelihood of Service Satisfaction: Area C (Figure III-10) Piped Piped Solid Waste Local Likelihood of Service Satis- Water Sewage Collection Roads faction: Area C (1) (2) (3) (4) Area C Household 0.904 0.765 0.889 0.631* (0.107) (0.432) (0.057) (0.123) Village Council 1.036 1.354* 1.004 0.654** (0.047) (0.203) (0.043) (0.096) Regions (Reference: North) - Central West Bank 1.053 1.071 1.209*** 1.385 (0.080) (0.170) (0.056) (0.312) - South West Bank 1.148 1.501** 1.081 1.501 (0.156) (0.194) (0.045) (0.438) Bottom 40% Household 0.981 1.000 1.256* 1.048 (0.079) (0.288) (0.126) (0.088) Performance Index 1.051*** 1.013*** 1.048*** 1.031*** For Sector (0.001) (0.004) (0.001) 1.031*** Pseudo R-squared 0.208 0.013 0.121 0.030 Number of Observations 9,467 1,467 9,525 8,298 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 96 101 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 15: Likelihood of Payment - Pre-Paid Meters and Citizen Willingness to Pay (Figure IV-1) Piped Electricity Water Likelihood of Payment (1) (2) Bottom 40% Household 0.414*** 0.320** (0.093) (0.116) Village Council 0.0336*** 0.739 (0.025) (0.208) Regions (Reference: Central) - North West Bank 0.502 0.556 (0.447) (0.552) - South West Bank 0.324 0.882 (0.241) (0.714) - Gaza 0.0336*** 0.164 (0.025) (0.340) 2.847** 19.71*** Pre-Paid Meter (0.960) (16.703) Satisfaction with Quality and Reliability 1.369* 1.623 (0.212) (0.518) Performance Index for 0.996 1.007 Sector (0.006) (0.022) Pseudo R-squared 0.243 0.328 Number of Observations 8,330 7,655 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. * p<0.05, ** p<0.01, *** p<0.001 102 97 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 16: Likelihood of Timely Payment - Pre-Paid Meters and Citizen Willingness to Pay (Figure IV-1) Piped Electricity Water Likelihood of Timely Payment (1) (2) Bottom 40% Household 0.561*** 0.575*** (0.040) (0.054) Village Council 1.791 0.861 (0.636) (0.225) Regions (Reference: Central) - North West Bank 1.105 1.579 (0.460) (0.758) - South West Bank 0.496*** 0.589* (0.086) (0.152) - Gaza 1.791 12.77*** (0.636) (9.332) 1.233 1.394* Pre-Paid Meter (0.142) (0.222) 1.190 1.242 Satisfaction with Quality and Reliability (0.277) (0.187) Performance Index 1.004 1.020* For Sector (0.005) (0.008) Pseudo R-squared 0.059 0.059 Number of Observations 7,510 8,698 Notes: Coefficients are exponentiated and represent Odd Ratios; Standard errors clustered by Gover- norate in parentheses. * p<0.05, ** p<0.01, *** p<0.001 98 103 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 17: Differences in LGU Performance across Regions and LGU Types (Figure III-2) Total Total Mu- WB Munici- Gaza Munic- Village Sample nicipalities palities ipalities Councils LGU Performance Index (1) (2) (3) (4) (5) Log LGU Population 1.958* 2.701 3.428* 1.664 0.783 (0.962) (1.374) (1.617) (2.337) (1.387) Village Council -5.043* (2.074) Regions (Reference: Central) - North West Bank -4.465** -3.000 -3.083 -5.517** (1.646) (2.616) (2.597) (2.082) - South West Bank -12.64*** -9.037** -9.588** -15.38*** (2.052) (2.960) (3.012) (2.730) - Gaza -18.69*** (3.856) Adj R-Squared 0.146 0.129 0.056 -0.024 0.110 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 104 99 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 18: Remoteness - Distance to Governorate Center and LGU Performance (Figure III-3) Total Total Munici- WB Munici- Gaza Munici- Village LGU Performance Index Sample palities palities palities Councils (1) (2) (3) (4) (5) Log LGU Population 1.210 0.0270 -0.617 1.712 0.350 (0.952) (1.632) (1.705) (3.669) (1.356) Village Council -4.919* (2.058) Distance to Gov. Center (Reference: 1st Quintile): - 2nd Quintile -4.898 -11.32* -15.76*** -2.458 -4.425 (2.492) (4.442) (4.491) (10.019) (3.174) - 3rd Quintile -4.958* -9.433* -13.07** 6.574 -3.460 (2.476) (4.430) (4.550) (11.234) (3.090) - 4th Quintile -6.285** -12.13** -15.05*** -5.005 (2.345) (4.137) (4.237) (2.968) - 5th Quintile -10.90*** -17.68*** -20.55*** -9.709** (2.482) (4.074) (4.184) (2.977) Regions (Reference: North) - Central West Bank 5.278** 3.162 2.884 7.041*** (1.639) (2.502) (2.519) (2.084) - - South West Bank -7.659*** -4.695 -4.336 9.289*** (1.907) (2.542) (2.451) (2.531) - Gaza -16.09*** -16.66*** (3.861) (4.419) Adj. R-Squared 0.183 0.239 0.239 -0.101 0.135 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 100 105 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 19: Remoteness - Built-Up Area and LGU Performance (Figure III-4) Total Total Munici- WB Munici- Gaza Munici- Village Sample palities palities palities Councils LGU Performance Index (1) (2) (3) (4) (5) Log LGU Population 1.648 1.814 1.053 3.879 0.916 (0.974) (1.594) (1.764) (3.003) (1.423) Village Council -4.801* (2.041) Built-up Area Share: (Reference: 1st Quintile) - 2nd Quintile 1.793 2.439 1.299 3.464 (2.378) (3.232) (3.143) (2.992) - 3rd Quintile -0.654 -0.960 -2.254 -18.36** -2.544 (2.219) (2.773) (2.722) (6.363) (3.360) - 4th Quintile -2.793 5.033 4.901 -26.17* -3.210 (2.180) (4.064) (4.170) (11.149) (2.962) - 5th Quintile 5.668* 8.079 14.90*** -32.82** 2.431 (2.750) (4.678) (4.213) (9.404) (3.232) Regions (Reference: North) - Central West Bank 4.628** 2.760 2.200 4.864* (1.617) (2.485) (2.474) (2.079) - South West Bank -8.401*** -6.864* -6.916* -9.826*** (2.000) (3.295) (3.203) (2.623) - Gaza -17.59*** -18.45*** (4.367) (5.372) Adj. R-Squared 0.167 0.143 0.149 0.049 0.124 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 106 101 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 20: Population Density and Performance (Figure III-6) Total Total Mu- WB Munici- Gaza Munici- Village Sample nicipalities palities palities Councils LGU Performance Index (1) (2) (3) (4) (5) Log LGU population 1.110 0.733 1.575 -1.790 0.0822 (1.016) (1.458) (1.759) (2.857) (1.450) Village Council -5.098* (2.084) Population Density: (Reference: 1st Quintile) - 2nd Quintile 2.589 -3.364 -3.002 4.515 (2.489) (4.355) (4.366) (2.859) - 3rd Quintile -0.690 -1.065 -1.000 -0.0379 (2.292) (3.578) (3.593) (2.821) - 4th Quintile 3.447 -1.416 -0.514 7.349* (2.346) (3.079) (3.037) (2.964) - 5th Quintile 6.174* 7.167* 5.925 19.05 1.843 (2.693) (3.346) (3.406) (9.840) (3.595) Regions (Reference: North) - Central West Bank 4.793** 2.165 2.527 6.846** (1.685) (2.737) (2.740) (2.097) - South West Bank -8.683*** -7.874* -7.849* -9.459*** (2.069) (3.033) (3.067) (2.671) - Gaza -15.95*** -17.21*** (3.946) (4.443) Adj. R-Squared 0.157 0.167 0.073 0.137 0.128 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 102 107 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 21: Household Wealth and LGU Performance (Figure III-7) Total Sam- Total Munici- WB Munici- Gaza Municipal- Village ple palities palities ities Councils LGU Performance Index (1) (2) (3) (4) (5) Log LGU Population 1.201 2.427 3.057 1.089 -0.658 (0.934) (1.302) (1.650) (2.106) (1.373) Village Council -4.434* (2.060) Share of bottom 40% HHs: (Reference: 1st Quintile) - 2nd Quintile -3.963 -6.499* -5.162 -14.28 -0.702 (2.191) (3.116) (3.280) (9.210) (3.080) - 3rd Quintile -3.988 -3.895 -3.231 -6.867 -3.364 (2.103) (3.138) (3.474) (7.890) (2.875) - 4th Quintile -7.911*** -7.911* -4.462 -22.41 -7.565* (2.312) (3.730) (3.764) (10.672) (3.003) - 5th Quintile -11.78*** -6.449 -6.631 -8.597 -12.75*** (2.493) (4.633) (4.311) (17.766) (3.032) Regions (Reference: Central) - North West Bank -3.387* -1.270 -2.041 -4.331* (1.668) (2.888) (2.842) (2.062) - South West Bank -9.058*** -7.146* -7.915* -11.04*** (2.150) (3.144) (3.254) (2.814) - Gaza -15.78*** -15.55*** (3.728) (4.371) Adj. R-Squared 0.195 0.144 0.050 0.040 0.182 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 108 103 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 22: Share of Households in Area C and LGU Performance (Figure III-11) WB LGUs Area C LGUs LGU Performance Index (1) (2) Log LGU Population 0.0778 -1.031 (1.093) (2.004) Village Council -5.153* -5.922 (2.109) (3.237) Log Distance to Gov. Center -5.388*** -6.821*** (1.306) (1.490) Share of Area C households: (Reference: 1st Quintile) - 2nd Quintile -1.121 (3.079) - 3rd Quintile 3.778 -0.778 (2.253) (2.487) - 4th Quintile 3.210 -2.038 (1.804) (2.899) - 5th Quintile -1.391 -11.07** (2.012) (4.154) Regions (Reference: North) - Central West Bank 5.309** 4.998* (1.641) (2.259) - South West Bank -7.363*** -6.345* (1.930) (2.751) Adj. R-Squared 0.170 0.276 Number of Observations 346 166 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 104 109 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 23: Share of Built-up LGU area in Area C and LGU Performance (Figure III-12) WB LGUs WB LGUs WB LGUs WB LGUs WB LGUs LGU Performance Index (1) (2) (3) (4) (5) Log LGU Population 0.0634 -0.353 -0.612 -0.501 -0.172 (1.157) (1.104) (1.087) (1.072) (1.128) Village Council 0.0634 -0.353 -0.612 -0.501 -0.172 (1.157) (1.104) (1.087) (1.072) (1.128) Log Distance to Gov Center -5.416*** -5.467*** -5.429*** -5.280*** -5.309*** (1.301) (1.282) (1.269) (1.269) (1.274) Share of Built-Up Area Belonging to Area C - more than 50% -2.639 (2.690) - more than 60% -5.757 (3.043) - more than 70% -8.047* (3.625) - more than 80% -8.549 (4.837) - more than 90% -6.523 (4.834) Regions (Reference: North) - Central West Bank 5.644*** 5.546*** 5.679*** 5.716*** 5.775*** (1.631) (1.618) (1.608) (1.617) (1.621) - South West Bank -7.301*** -7.008*** -6.828*** -6.951*** -7.079*** (1.957) (1.929) (1.913) (1.893) (1.861) Adj. R-Squared 0.165 0.173 0.179 0.176 0.169 Number of Observations 346 346 346 346 346 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. Sample is limited to the West Bank. * p<0.05, ** p<0.01, *** p<0.001 110 105 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 24: Joint Service Councils I: Membership in JSC for Planning & Development (Figure III-13) Total Sam- Total Munic- WB Munici- Gaza Mu- Village ple ipalities palities nicipalities Councils LGU Performance Index (1) (2) (3) (4) (5) Log LGU Population 2.095* 3.130* 3.760* 2.342 0.421 (0.958) (1.347) (1.622) (2.167) (1.360) Village Council -5.103* (2.059) JSC for Planning & Dev. 3.962** 4.109 2.341 13.20* 5.202** (1.470) (2.240) (2.402) (6.058) (1.974) Regions (Reference: Central) - North West Bank -4.731** -3.305 -3.266 -6.001** (1.662) (2.577) (2.576) (2.153) - South West Bank -13.06*** -8.466** -9.329** -16.99*** (2.090) (3.039) (3.068) (2.927) - Gaza -19.12*** -18.15*** (3.720) (4.397) Adj. R-Squared 0.161 0.143 0.055 0.120 0.133 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 106 111 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 25: Joint Service Councils II: Membership in JSC for Water and Waste Water Management (Figure III-14) Total Sam- Total Mu- WB Munici- Gaza Munici- Village LGU Performance Index ple nicipalities palities palities Councils (Piped Water) (1) (2) (3) (4) (5) Log LGU Population -2.964 -3.545 -2.942 -3.903 -2.375 (1.947) (2.245) (3.401) (2.647) (3.129) Village Council -6.708 (4.673) 4.389 1.638 -2.925 16.23* 5.535 JSC for Water and Waste Water (5.071) (6.703) (8.206) (6.194) (7.592) Regions (Reference: Central) - North West Bank -2.068 4.873 5.785 -5.165 (3.815) (6.452) (6.481) (4.666) - South West Bank -13.25** -11.53 -12.12 -13.78* (4.630) (7.147) (7.362) (6.128) - Gaza -16.95** -12.70* (5.220) (6.188) Adj. R-Squared 0.034 0.088 0.050 0.162 0.008 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 112 107 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 26: Joint Service Councils II: Membership in JSC for Water and Waste Water Management (Figure III-14) Total Total Munici- WB Munici- Gaza Munici- Village LGU Performance Index Sample palities palities palities Councils (Piped Sewage) (1) (2) (3) (4) (5) Log LGU Population 6.377*** 10.97*** 14.14*** 5.483 2.205* (1.464) (2.866) (3.375) (3.986) (1.102) Village Council 1.430 (3.252) -6.256 -10.63 -2.698 -39.47*** 0.0636 JSC for Water and Waste (4.050) (6.481) (7.031) (10.088) (4.913) Water Regions (Reference: Central) - North West Bank 2.812 -0.480 -2.546 3.407 (2.564) (5.373) (5.296) (2.755) - South West Bank -0.710 -5.158 -7.321 -1.477 (2.841) (7.065) (7.254) (2.307) - Gaza 24.19*** 17.92 (7.269) (9.352) Adj. R-Squared 0.192 0.226 0.134 0.235 0.009 Number of Observations 380 139 116 23 241 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 108 113 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 27: Joint Service Councils III: Membership in JSC for Solid Waste (Figure III-15) Jenin Jenin LGU Performance Index Piped Water Piped Sewage (1) (2) Log LGU Population -7.966 2.548 (5.389) (1.973) Village Council -14.92 2.334 (12.275) (2.000) JSC for Water and Waste 30.82*** -2.269 Water (Jenin) (7.415) (1.552) Adj. R-Squared 0.152 0.059 Number of Observations 59 59 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 114 109 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 28: Joint Service Councils III: Membership in JSC for Solid Waste (Figure III-15) LGU Performance Index Total Sample Salfit, Qalqiliya (Solid Waste Collection) (1) (2) Log LGU Population 2.735 -3.747 (1.492) (5.822) Village Council -10.81** -2.687 (3.392) (11.365) JSC for Solid Waste Coll. -1.903 4.436 (5.213) (7.722) Regions (Reference: Central) - North West Bank -12.55*** (3.248) - South West Bank -19.57*** (3.833) - Gaza -27.85*** (5.781) Adj. R-Squared 0.128 -0.067 Number of Observations 380 38 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 110 115 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 29: LGU Finance I: Per Capita Operating Budget Revenues (Figure III-16) WB Municipal- WB Village West Bank ities Councils LGU Performance Index (1) (2) (3) Log LGU Population 0.995 0.862 0.0189 (1.303) (1.934) (1.911) Village Council -2.514 (2.287) Log per Capita Operating 4.510* 6.485** 3.148 Budget Revenues (1.879) (2.157) (2.608) Regions (Reference: Cen- tral) - North West Bank -2.531 -0.912 -3.696 (1.723) (3.034) (2.170) - South West Bank -9.279*** -6.150 -12.14** (2.443) (3.463) (3.644) Adj R-Squared 0.146 0.141 0.082 Number of Observations 274 110 164 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 116 111 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 30: LGU Finance II: Per Capita Operating Budget Expenditures (Figure III-17) WB Municipal- WB Village West Bank ities Councils LGU Performance Index (1) (2) (3) Log LGU Population 1.552 0.404 0.790 (1.263) (1.785) (1.887) Village Council -0.195 (2.383) Log per Capita Operating 5.157*** 8.977*** 2.887 Budget Expenditures (1.513) (2.262) (1.964) Regions (Reference: Cen- tral) - North West Bank -5.267** -4.996 -5.226* (1.720) (2.674) (2.274) - South West Bank -9.954*** -7.103* -12.11*** (2.234) (2.951) (3.503) Adj R-Squared 0.157 0.195 0.078 Number of Observations 274 110 164 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 112 117 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 31: LGU Finance III: Fiscal Sustainability (Figure III-18) Total Sample Total Sample LGU Performance Index (1) (2) Log LGU Population 2.913* 2.562* (1.196) (1.283) Satisfactory Collection Efficiency (MDP-II) 5.494* (2.689) Surplus in Operating Budget & Enterprise 5.444* Fund (MDP-II) (2.377) Regions (Reference: Central) - North West Bank -1.961 -2.398 (2.695) (2.708) - South West Bank -9.138** -8.023* (3.097) (3.250) - Gaza -17.12*** -16.74*** (4.526) (4.391) Adj. R-Squared 0.172 0.174 Number of Observations 133 135 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 118 113 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A4 - 32: Usage of Citizen Service Centers, LGU Responsiveness, and Performance (Figure III-20 & Figure III-21) Usage of Citizen LGU Respon- LGU Performance Index Service Centers siveness (1) (2) Log LGU Population 1.641 2.138 (1.296) (1.164) Village Council -5.507* -4.813* Service Center (Reference: 1st to 3rd Quin- (2.261) (2.090) tile) Share of Households that Used Citizen - 4th Quintile 0.364 (2.450) - 5th Quintile 5.388* (2.594) Share of Households Agreeing that LGU is very Responsive (Reference: 1st Quintile) - 2nd Quintile 3.330 (2.891) - 3rd Quintile 7.115** (2.630) - 4th Quintile 12.41*** (2.647) - 5th Quintile 16.23*** (2.742) Regions (Reference: Central) - North West Bank -4.582* -5.804** (2.093) (1.906) - South West Bank -9.408*** -10.32*** (2.556) (2.700) - Gaza -16.36*** -20.56*** (4.708) (3.819) Adj. R-Squared 0.154 0.302 Number of Observations 223 223 Notes: Coefficients are estimates from OLS regressions. Robust standard errors in parentheses. * p<0.05, ** p<0.01, *** p<0.001 114 119 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Annex 5: Overview Key Informant Interviews and Focus Group Discussions Table A5-1: Overview Key Informant Interviews and Focus Group Discussions Focus Group Key Informant In- # LGU Name Date Discussion terviews 1 Kufer Kadoum December 28, 2016 1 2 2 Dier-al Assel Al-Fouqa December 29, 2016 1 2 3 Rafah December 29, 2016 1 2 4 Khan Yunis December 31, 2016 1 2 5 An Nuseirat January 3, 2017 1 2 6 Jabalya January 9, 2017 1 2 7 Gaza City January 12, 2017 1 2 8 Salim January 15, 201 1 2 9 Irtas January 22, 2017 1 2 10 Tamoun January 23, 2017 1 2 11 Beit Kahil January 27, 2017 1 2 12 Bani Zeid al Garbiy January 29, 2017 1 2 13 Hebron February 1, 2017 1 2 14 Bethlehem February 2, 2017 1 2 15 Beit Sahour February 3, 2017 1 2 16 Ramallah February 4, 2017 1 2 17 Nablus February 5, 2017 1 2 120 115 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Annex 6: Key Informant Interviews and Focus Groups Discussions Referenced Table A6 - 1: Key Informant Interviews Referenced Key Informants Interviews (KKIs) # Quote Date Location #Paragraph #Page 1 [water from Mekorot] “is delivered to us January 15, Salim 86 53 through a pipe that feeds three villages, 2017 Salim, Uzmout, and Deir al-Huteb. The Israelis control the amount of water we consume….we suffer especially in sum- mer….there are households in Salim that do not receive water for 3-4 days a week.” 2 [there is a] “difficulty of operating some January 12, Gaza City 37 23 water wells due to power outages.” 2017 3 “We have 75 water wells which lack […] January 12, Gaza City 86 54 spare parts.” 2017 4 “there are 2,500 water meters that are December Khan 86 54 broken down and need replacement […] 31, 2016 Younis however, the import restrictions for Gaza make it hard to obtain these parts and other equipment needed.” 5 “I see the existence of JSCs as something December Khan 87 55 important and useful…for example, […] 31, 2016 Younis some services are better if we deal with them jointly such as waste collection which needs huge infrastructures, trucks, machines, and transfer stations.” 6 “We are members of three JSCs; one for January 23, Tamoun 89 55 water, another one for solid waste, as 2017 well as a JSC for Planning and Develop- ment which is inactive…before we joined the Solid Waste JSC, we used to gener- ate revenue for our town… but now the solid waste service causes a deficit. Our municipality is against these councils…” 7 “The Solid Waste JSC is a burden because December Khan 89 56 we still have to provide bins, trucks and 31, 2016 Younis workers…[also] joining the council was not a matter of choice…as a municipality we had to become a member…however, average people do not know about it.” 8 “We have a division for complaints at February 4, Ramallah 104 64 our Citizen Services Center. Each citizen 2017 can file a written complaint, and we ad- dress it within a known timeframe that depends on the nature of the com- plaint…we are committed to examine 116 121 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. each complaint and let the citizens know about the decision…” 9 The program tells me how many com- February 5, Nablus 104 64 plaints each division receives and how 2017 many of them have been dealt with by the relevant division…once I notice there is a delay from one of the divisions I call the supervisors there and urge them to speed up the process…” 10 “the nature of the complaint, and the January 23, Tamoun 108 65 availability of resources determine how 2017 we deal with it.” 11 “accumulative debt which citizens owe February 5, Nablus 124 70 the municipality are about NIS 310 mil- 2017 lion, while PA institutions located in Na- blus owe NIS 60 million.” 12 “paying in advance…is like buying from a January 27, Beit Kahil Box IV-1/ i 72 store - if you do not pay for it cannot get 2017 it.” 13 [council] “decided to install pre-paid wa- January 27, Beit Kahil Box IV-1/ i 72 ter meters…it turned out that the equip- 2017 ment for 1,185 households we need for our town costs USD 160,000. MoLG was willing to provide USD 100,000 but we cannot cover the remainder [USD 60,000]…although we need the upgrade urgently.” 14 “water is a basic human rights and January 29, Bani Zeid al Box IV-1/i 72 should not be cut off from people be- 2017 Garbiy cause they cannot afford it” 15 “because electricity is a pre-paid service January 27, Beit Kahil Box IV-1/ii 72 the collection rate is 100 percent. Con- 2017 necting waste collection fees allows the council to plan with revenue with cer- tainty, which we depend on heavily to pay salaries and to improve some of our services.” 16 “People receive 20 percent discount February 2, Bethlehem Box IV-1/iii 73 when they pay the full annual amount in 2017 January, 15 percent in February, 10 per- cent in March, and 5 percent in April.” 17 “In the past we used to have a wrong pol- December Khan Box IV-1/iii 73 icy, rewarding people who did not pay by 31, 2016 Younis offering discounts to encourage them to pay…however, now we adopted a reverse policy of encouraging those who are committed and pay their fees on time…”. 122 117 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. 18 “The company did want to tell the police January 15, Salim Box IV-1/iv 73 and we used social pressure to solve this 2017 issue […] we solved 50 percent of it […] we went from house to house with them.” 19 “we prefer family influence more than February 1, Hebron Box IV-1/iv 73 resorting to the law or police. We go to 2017 an area or a neighborhood and talk to a social or tribal figure - […] who in uses his personnel and family connections to solve the issue.” 20 “we develop a payment plan for people January 12, Gaza City Box IV-1/v 73 who cannot afford paying […but] we do 2017 not apply a general-decrease of fees […] because other households would also stop paying]. However, we resort to court to deal with those who do not want to pay.” 21 “if a citizen has a cumulative debt we January 12, Gaza City Box IV-1/v 73 ask [the household] to pay the next bill 2017 and pay a part of the debt, such as an additional 50 NIS, every time the future bills are paid.” 22 “our municipality sent official letters to February 4, Ramallah Box IV-1/v 73 households informing them of the debt 2017 they have to pay and encouraging them to come to reach a settlement with the municipality. A settlement does not in- clude any discount but is only based on a scheduled re-payment approach.” 118 123 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCALLOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENT OF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERS PERFORMANCE DRIVERSIN THE IN WEST THE BANK WEST GAZA. AND AND BANK GAZA. Table A6 - 2: Focus Group Discussions Referenced Focus Group Discussions (FDGs) # Quote Date Location #Para- #Page graph 1 [we] “do not receive water and electric- January 12, Gaza City 37 7 (38) ity at the same time” 2017 2 “the lack of coordination between ‘wa- January 12, Gaza City 37 7 (38) ter supply schedule’ and the ‘provision 2017 of electricity schedule.’” 3 “People need electricity to operate their January 3, An Nusei- 37 7 (38) water pumps and store water in tanks 2017 rat (Gaza) located on their roofs. However, they cannot do this when they have water without having electricity. Sometimes, people stay up at night waiting for elec- tricity to be able to fill their tanks…” 4 “without connecting other services to January 27, Beit Kahil Box 6/ii 59 pre-paid electricity supply […] many 2017 people will not pay for waste collection or school fees”. 124 119 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. Annex 7: LGU Performance Ranking Table A7 - 1: LGU Performance Ranking Performance Performance LGU Name Governorate Municipality/VC Rank Score 1 89 Salfit Salfit Municipality 2 85 Anabta Tulkarm Municipality 3 85 Zeita Tulkarm Municipality 4 84 Iktaba Tulkarm VC 5 82 Shuyukh al Arrub Hebron VC 6 80 Ramallah Ramallah Municipality 7 80 Al Bireh Ramallah Municipality 8 79 Qalqiliya Qalqilya Municipality 9 77 Sarra Nablus VC 10 77 Dura al Qar Ramallah VC 11 77 Deir Sharaf Nablus VC 12 76 Tulkarm Tulkarm Municipality 13 75 Jilijliya Ramallah VC 14 74 Shabtin Ramallah VC 15 74 Habla Qalqilya Municipality 16 74 Anata Jerusalem Municipality 17 74 Ar Ram Jerusalem Municipality 18 73 Nablus Nablus Municipality 19 73 Beit Jala Bethlehem Municipality 20 73 Kafr Malik Ramallah VC 21 72 Beit Iba Nablus VC 22 72 At Tira Ramallah VC 23 72 Hebron Al Khalil Hebron Municipality 24 72 Al Walaja Bethlehem VC 25 72 Bir Nabala Jerusalem Municipality 120 125 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 26 71 Bani Zeid al Garbiya Ramallah Municipality 27 71 Kafr al Labad Tulkarm Municipality 28 71 Qaryut Nablus VC 29 71 Ad Doha Bethlehem Municipality 30 70 Bethlehem Bethlehem Municipality 31 70 Rammun Ramallah VC 32 70 Kifl Haris Salfit Municipality 33 70 Mas Ha Salfit VC 34 70 Baqa ash Sharqiya Tulkarm Municipality 35 69 Bala Tulkarm Municipality 36 69 Beit Surik Jerusalem Municipality 37 69 Al Janiya Ramallah VC 38 69 Falamya Qalqilya VC 39 69 Alfondoq Qalqilya VC 40 69 Nisf Jbayel Nablus VC 41 68 Saffarin Tulkarm VC 42 68 Hajja Qalqilya VC 43 68 Sir Jenin VC 44 68 Jericho Ariha Jericho Municipality 45 68 Zawata Nablus VC 46 67 Illar Tulkarm Municipality 47 67 Attil Tulkarm Municipality 48 67 Odala Nablus VC 49 67 An Naqura Nablus VC 50 67 Ein Qiniya Ramallah VC 51 67 At Tuwani Hebron VC 52 67 Budrus Ramallah VC 53 66 Beit Anan Jerusalem Municipality 54 66 Azmut Nablus VC 126 121 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 55 66 Almaghazi Deir al Balah Municipality 56 66 Farun Tulkarm VC 57 66 Abud Ramallah VC 58 66 Biet Sakaria Bethlehem VC 59 66 Deir Qaddis Ramallah VC 60 66 Beit Amin Qalqilya VC 61 65 Um Al-Naser North Gaza Municipality 62 65 Osarin Nablus VC 63 65 Ein Siniya Ramallah VC 64 65 Almusaddar Deir al Balah Municipality 65 65 An Nabi Elyas Qalqilya VC 66 65 Deir Ballut Salfit Municipality 67 64 Jibiya Ramallah VC 68 64 At Tayba Jenin VC 69 64 Tura Jenin VC 70 64 Deir al Hatab Nablus VC 71 64 Beit Ur al Fauqa Ramallah VC As Sawahira ash 72 64 Jerusalem Municipality Sharqiya 73 63 Deir Istiya Salfit Municipality 74 63 Marda Salfit VC 75 63 Sarta Salfit VC 76 63 Beit Liqya Ramallah Municipality 77 63 Beit Lid Tulkarm Municipality 78 63 Abu Dis Jerusalem Municipality 79 63 Al Kafreiat Tulkarm Municipality 80 63 Deir al Ghusun Tulkarm Municipality 81 62 Nilin Ramallah Municipality 82 62 Al Khas Bethlehem VC 122 127 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 83 62 Ein Arik Ramallah VC 84 62 Biddya Salfit Municipality 85 62 Kharbatha al Misbah Ramallah VC 86 62 Sabastiya Nablus Municipality 87 62 Beit Sahur Bethlehem Municipality 88 61 Qatanna Jerusalem Municipality 89 61 Kafr Qallil Nablus VC 90 61 Beit Hanoon North Gaza Municipality 91 61 Nuba Hebron Municipality 92 61 Al Midya Ramallah VC 93 61 Majdal Bani Fadil Nablus VC 94 61 Ras Karkar Ramallah VC 95 61 Dar Salah Bethlehem VC 96 60 Al Riyad/Nazlat Zeid Jenin VC 97 60 Rujeib Nablus VC 98 60 Battir Bethlehem Municipality 99 60 Al Qubeiba Jerusalem VC 100 60 Ramin Tulkarm VC 101 60 Beit Sira Ramallah VC 102 60 Kafr Ein Ramallah VC 103 60 Beit Fajjar Bethlehem Municipality 104 59 Rantis Ramallah VC 105 59 Beit Wazan Nablus VC 106 59 Haris Salfit VC 107 59 Kafr Laqif Qalqilya VC 108 59 Gaza Gaza Municipality 109 59 Kafr Rai Jenin Municipality 110 58 Yasuf Salfit VC 111 58 Kharbatha Bani Harith Ramallah VC 128 123 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 112 58 Az Zawiya Salfit Municipality 113 58 Az Zubeidat Jericho VC 114 58 Ajjul Ramallah VC 115 58 Beit Duqqu Jerusalem VC 116 58 Bir Zeit Ramallah Municipality 117 58 Al Lubban al Gharbi Ramallah VC 118 58 Al Ettihad Ramallah Municipality 119 58 Farkha Salfit VC 120 57 Halhul Hebron Municipality 121 57 Elezaria Jerusalem Municipality 122 57 Jalood Nablus VC 123 57 Kharas Hebron Municipality 124 57 Azzun Qalqilya Municipality 125 57 Deir Ghazala Jenin VC 126 57 Bilin Ramallah VC 127 57 Al Judeira Jerusalem VC 128 57 Huwwara Nablus Municipality 129 57 Beita Nablus Municipality 130 57 Aqraba Nablus Municipality 131 57 Seida Tulkarm VC 132 57 Beit Imrin Nablus VC 133 56 Kafr Aqab Jerusalem Municipality 134 56 Wadi Fukin Bethlehem VC 135 56 Beituniya Ramallah Municipality 136 56 Burham Ramallah VC 137 56 Kardala Tubas VC 138 56 Zatara Bethlehem Municipality 139 56 Jabalya North Gaza Municipality 140 56 Al Bureij Deir al Balah Municipality 124 129 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 141 56 Beit Hasan Nablus VC 142 56 Qarawat Bani Hassan Salfit Municipality 143 55 Jannatah Bed Flouh Bethlehem Municipality 144 55 Tubas Tubas Municipality 145 55 Azzun Atma Qalqilya VC 146 55 Shufa Tulkarm VC 147 55 Al Kfeer Jenin VC 148 55 Beitin Ramallah VC 149 55 Deir Ibzi Ramallah VC 150 55 Jammain Nablus Municipality 151 55 Talfit Nablus VC 152 55 An Nassariya Nablus VC 153 54 Al Azb Al Gharby Qalqilya VC 154 54 Qusra Nablus Municipality 155 54 Ras Atiya Qalqilya VC 156 54 Nahhalin Bethlehem VC 157 54 Tarqumiya Hebron Municipality 158 54 An Nazla ash Sharqiya Tulkarm VC 159 54 Jinsafut Qalqilya VC 160 54 Baqat al Hatab Qalqilya VC 161 54 Jurish Nablus VC 162 53 Urif Nablus VC 163 53 Kafr Thulth Qalqilya Municipality 164 53 Hizma Jerusalem Municipality 165 53 Qalandiya Jerusalem VC 166 53 Al Minya Bethlehem VC 167 53 Beit Tamir Bethlehem VC 168 53 Biddu Jerusalem Municipality 169 53 Al Jarushiya Tulkarm VC 130 125 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 170 53 Al Badhan Nablus VC 171 53 Turmusayya Ramallah Municipality 172 53 Al Jalama Jenin VC 173 52 Sinjil Ramallah Municipality 174 52 Silwad Ramallah Municipality 175 52 Deir as Sudan Ramallah VC 176 52 Ein el Beida Tubas VC 177 52 Shuqba Ramallah VC 178 52 Sair Hebron Municipality 179 52 Deir Dibwan Ramallah Municipality 180 52 Husan Bethlehem VC 181 52 Awarta Nablus VC 182 52 Madama Nablus VC 183 51 Taffuh Hebron Municipality 184 51 Yabad Jenin Municipality 185 51 Jit Qalqilya VC 186 51 Immatin Qalqilya VC Al Mazraa ash 187 51 Ramallah Municipality Sharqiya 188 51 Mithlon Jenin Municipality 189 51 Anza Jenin VC 190 51 Jayyus Qalqilya Municipality 191 50 Deir al Balah Deir al Balah Municipality 192 50 Al Zaytouneh Ramallah Municipality 193 50 At Tayba Ramallah Municipality 194 50 Madinat Ezahra Gaza Municipality 195 50 Al Asaesah Jenin VC 196 50 Sanniriya Qalqilya VC 197 50 Beit Ur at Tahta Ramallah VC 126 131 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 198 50 Qusin Nablus VC 199 50 Ash Shuyukh Hebron Municipality 200 50 Abwein Ramallah Municipality 201 49 Arrana Jenin VC 202 49 Tammun Tubas Municipality 203 49 Deir Jarir Ramallah VC 204 49 Ein Yabrud Ramallah VC 205 49 Dura Hebron Municipality 206 49 As Sawiya Nablus VC 207 49 Beit Ula Hebron Municipality 208 49 Qaffin Tulkarm Municipality 209 49 Al Khadr Bethlehem Municipality 210 49 Al Nowaaima Jericho VC 211 49 Tuqu Bethlehem Municipality 212 49 Qarawat Bani Zeid Ramallah VC 213 48 An Nuseirat Deir al Balah Municipality 214 48 Beit Lahiya North Gaza Municipality 215 48 Bani Naim Hebron Municipality 216 48 Al Jaba Bethlehem VC 217 48 Ejnasnia Nablus VC 218 48 Anin Jenin VC 219 48 Khuzaa Khan Yunis Municipality 220 48 Zeita Jammain Nablus VC 221 47 Burin Nablus VC 222 47 Rafah Rafah Municipality 223 47 Kisan Bethlehem VC 224 47 Umm Salamuna Bethlehem VC 225 47 Salim Nablus VC 226 47 Beit Kahil Hebron VC 132 127 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 227 47 Beit Ummar Hebron Municipality 228 46 Tell Nablus VC 229 46 Marah Maalla Bethlehem VC 230 46 Burqa Ramallah VC 231 46 Beit Dajan Nablus VC 232 46 Qabatiya Jenin Municipality 233 46 Ein Shibli Nablus VC 234 46 Hindaza and Braidah Bethlehem VC 235 46 Iskaka Salfit VC 236 45 Al Araqa Jenin VC 237 45 Az Zababida Jenin Municipality 238 45 Duma Nablus VC 239 45 Aqqaba Tubas Municipality 240 45 Al Yamun Jenin Municipality 241 45 Jenin Jenin Municipality 242 45 Atuf Tubas VC 243 45 Idhna Hebron Municipality 244 45 Al Jadida Jenin VC 245 45 Jaba Jerusalem VC Al Lubban ash 246 45 Nablus VC Sharqiya 247 45 Silat adh Dhahr Jenin Municipality 248 45 Mikhmas Jerusalem VC 249 44 Jurat ash Shama Bethlehem VC 250 44 Al Hashimiya Jenin VC 251 44 Al Majd Hebron VC 252 44 Al Mughayyir Jenin VC 253 44 Yasid Nablus VC 254 44 Kobar Ramallah VC 128 133 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 255 44 Saffa Ramallah VC 256 44 Thahr Al Abed Jenin VC 257 44 Rafat Salfit VC 258 44 Khirbet Abu Falah Ramallah VC 259 44 Yabrud Ramallah VC 260 43 Asira ash Shamaliya Nablus Municipality 261 43 Surda o Abu Qash Ramallah Municipality 262 42 Surif Hebron Municipality 263 42 Atara Ramallah Municipality 264 42 Rafat Jerusalem VC 265 42 Burqa Nablus VC 266 42 Bir al Basha Jenin VC 267 42 Hitta Hebron VC 268 41 Asira al Qibliya Nablus VC 269 41 Misliya Jenin VC 270 41 Deir Nidham Ramallah VC 271 41 Ajja Jenin Municipality 272 41 Yatma Nablus VC 273 41 Al Mughayyir Ramallah VC 274 41 Kafr ad Dik Salfit Municipality 275 41 Al Ubeidiya Bethlehem Municipality 276 41 Al Burj Biet Marsim Hebron VC 277 41 Khallet al Haddad Bethlehem VC 278 41 Al Ramah Jenin VC 279 40 Bani Suheila Khan Yunis Municipality 280 40 Fahma Jenin VC 281 40 Sanour Jenin VC 282 40 Bani Zeid ash Sharqiya Ramallah Municipality 283 40 Arraba Jenin Municipality 134 129 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 284 40 Kafr Qud Jenin VC 285 40 Al Masara Bethlehem VC 286 40 Kafr Qaddum Qalqilya VC 287 40 Kafr Nima Ramallah VC 288 40 As Samu Hebron Municipality 289 39 Zububa Jenin VC 290 39 Az Zawayda Deir al Balah Municipality 291 39 Bardala Tubas VC 292 39 Karma Hebron VC 293 39 Al Aouja Jericho Municipality 294 39 Yatta Hebron Municipality 295 38 Bizzariya Nablus VC 296 38 Kafr Dan Jenin Municipality 297 38 Deir Abu Mashal Ramallah VC 298 38 Rummana Jenin VC 299 38 Al Fandaqumiya Jenin VC 300 38 Khan Yunis Khan Yunis Municipality 301 38 Qibya Ramallah VC 302 38 Marah Rabah Bethlehem VC 303 37 Wadi al Fara Tubas VC 304 37 An Nabi Salih Ramallah VC 305 37 Birqin Jenin Municipality 306 37 Qira Salfit VC 307 37 Adh Dhahiriya Hebron Municipality 308 37 Beit Furik Nablus Municipality 309 36 Tayasir Tubas VC 310 36 Em Al Khair Hebron VC 311 36 Silat al Harithiya Jenin Municipality 312 36 Absan al Kabira Khan Yunis Municipality 130 135 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 313 36 Fahma al Jadida Jenin VC 314 35 Talluza Nablus VC 315 35 Qabalan Nablus Municipality 316 34 Ash Shawawra Bethlehem VC 317 34 Aqqaba Tubas VC 318 34 Raba Jenin VC 319 34 Tiinnik Jenin VC 320 34 Wadi Rahhal Bethlehem VC 321 34 Marj Naja Jericho VC 322 34 Deir al Asal al Fauqa Hebron VC 323 34 Marj al Ghazal Jericho VC 324 34 Fasayil Jericho VC 325 33 Imreish Abda Hebron VC 326 33 Khursa Hebron VC 327 33 Arabbuna Jenin VC 328 32 Sikka Tawwas Hebron VC 329 32 Al Aqrabaniya Nablus VC 330 32 Sireec Jenin VC 331 32 Einabus Nablus VC 332 32 Wadi an Nis Bethlehem VC 333 31 Al Qarara Khan Yunis Municipality 334 31 Jifna Ramallah VC 335 31 Deir Abu Daif Jenin VC 336 31 Bruqin Salfit Municipality 337 31 Ar Rihiya Hebron VC 338 31 Jaba Jenin Municipality 339 31 Jalqamus Jenin VC 340 31 Arab ar Rashayida Bethlehem VC 341 30 Hadab al Fawwar Hebron VC 136 131 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 342 29 Furush Beit Dajan Nablus VC 343 29 Imneizil Hebron VC 343 29 Kharbat Al-deir Hebron VC 343 29 Beit Qad ash Shamali Jenin VC 346 28 Artas Bethlehem VC 347 28 Al Karmil Hebron Municipality 348 27 Al Rayan Jenin VC 349 26 Ar Ramadin Hebron VC 350 26 Al Fukhkhari Khan Yunis Municipality 351 26 Absan as Saghira Khan Yunis Municipality 352 26 Al Attara Jenin VC 353 25 Al Naser Rafah Municipality 354 25 Jalbun Jenin VC 354 25 Al Najada Al Kaabna Hebron VC 354 25 Al Zwaydieen Hebron VC 357 25 Al Yasreiah Hebron Municipality 358 24 As Sura Hebron VC 359 24 Az Zawiya Jenin VC 360 24 Beit Qad al Janubi Jenin VC Abu al Asja Abu al 361 23 Hebron VC Ghozlan 362 23 Khallet al Maiyya Hebron VC 363 22 Faqqua Jenin VC 364 22 Kufeirit Jenin VC 365 22 Beit Amra Hebron VC Al Hathalin Khshm Al 366 21 Hebron VC Daraj 366 21 Aba ash Sharqiya Jenin VC 368 21 Al Jiftlik Jericho VC 369 20 Ash Shuhada Jenin VC 132 137 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. ANAN ASSESSMENTOF ASSESSMENT OF SERVICE SERVICE DELIVERY DELIVERY OUTCOMES OUTCOMES AND AND PERFORMANCE DRIVERSIN PERFORMANCE DRIVERS INTHE THEWEST WESTBANK AND BANK GAZA. AND GAZA. 370 19 Deir al Asal at Tahta Hebron VC 371 19 Mirka Jenin VC 372 19 Biet Al Roush Alfouqa Hebron VC 373 17 Beit ar Rush at Tahta Hebron VC 374 16 Wadi as Salqa Deir al Balah Municipality 375 14 Zibda Al Jadida Jenin VC 376 13 Umm at Tut Jenin VC 377 10 Deir Razih Tarrama Hebron VC 378 10 Shokat as Sufi Rafah Municipality 379 4 Almaleh Tubas VC 380 0 Msafir Yatta Hebron VC 138 133 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Annex 8: LGU Revenue Assignment, Management Responsibility, and Final Destination of Funds Table A8-1: LGU Revenue Assignment (in the LGA), Management Responsibility and Final Destina- tion of the Funds Who sets Who sets Who Who retains / the base the rate collects how much (%) Property Tax (O) MoFP for MoFP for MoFP for MoFP -10% (West Bank) West Bank, West Bank, West Bank, Municipali- Municipali- Municipali- ties for Gaza ties for Gaza ties for Gaza Municipalities – 90% (West Bank) Municipalities – 100 % (Gaza) But MoFP intercepts revenues for municipal arrears Profession Permit Fees (O) MoFP MoFP MoFP MoFP -10% Municipalities – 90% But MoFP intercepts revenues for municipal arrears Craft and Industrial Fees Municipali- Municipali- Municipali- Municipalities (O) ties ties ties Transportation Tax (O) Ministry of MoT MoT and en- The distribution formula changes Transport ters amounts from year to year according to the (MoT) in Single decision of the "Transportation Treasury Ac- Tax Distribution Committee" at count the MoLG. The percentage of funds allocated according to pop- ulation ranged between 55-75% of the total appropriated funds from 2008 to 2013. But MoFP intercepts revenues for municipal arrears Education tax (7% tax lev- MoFP MoFP Municipali- Earmarked to Schools mainte- ied on property tax base) ties nance (O) Solid Waste Collection Fee Municipali- Municipali- Municipali- Municipalities or Joint Service (O) ties or Joint ties or Joint ties or Joint Council Service Coun- Service Coun- Service Coun- cil cil cil Official document prepara- Municipali- Municipali- Municipali- Municipalities tion fee (O) ties ties ties Building License Fee (O) Municipali- Municipali- Municipali- Municipalities ties ties ties 144 139 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Signboard fees (O) Municipali- Municipali- Municipali- Municipalities ties ties ties Fines (municipal court, Municipali- Municipali- Municipali- Municipalities transportation) (O) ties ties ties Ceiling tax (O) VC VC VC VC Personal tax (O) VC VC VC VC Electricity Fee (E) PA PA Utilities or Utilities or Municipalities Municipali- ties Water Fee (E) PWA PWA Utilities or Utilities or Municipalities Municipali- ties Waste Water Fee (E) Municipali- Municipali- Municipali- Municipalities ties ties ties Slaughterhouses Fee (E) Municipali- Municipali- Municipali- Municipalities ties ties ties Vegetable Markets Fee (E) Municipali- Municipali- Municipali- Municipalities ties ties ties Public Parking Fee (E) Municipali- Municipali- Municipali- Municipalities ties ties ties Other fees (O) including Municipali- Municipali- Municipali- Municipalities building permit fee; water ties ties ties and electricity connection fees; waste water and sew- age connection fee; gar- bage collection fee; sign board fees; cemetery fees; and some farming fees for roads Source: Updated from WB (2014A). “O” stands for Operating Revenue and “E” for Enterprise Revenue 140 145 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. Table A8 - 2: Expenditure Assignments According to Local Government Law Assignment 1. Town planning 2. Street construction, rehabs, paving, and roads 3. Rain water drainage system* 4. Street names and numbering 5. Sidewalks 6. Street lighting 7. Public transport stands and terminals 8. Water supply 9. Electricity supply 10. Sewer system 11. Waste water treatment 12. Public lavatories 13. Solid waste collection and disposal 14. Solid waste treatment 15. Fruit and vegetable markets 16. Public parks 17. Social assistance programs** 18. Sports facilities 19. Libraries 20. Museums and culture 21. Regulation, control and monitoring*** 22. Cemeteries 23. Schools 24. Health centers 146 141 THE PERFORMANCE THE PERFORMANCE OF PALESTINIAN OF PALESTINIAN LOCAL LOCAL GOVERNMENTS. GOVERNMENTS. AN ASSESSMENT AN ASSESSMENT OF OF SERVICEDELIVERY SERVICE OUTCOMESAND DELIVERYOUTCOMES ANDPERFORMANCE PERFORMANCEDRIVERS DRIVERSIN INTHE WESTBANK THEWEST ANDGAZA. BANKAND GAZA. 25. Slaughterhouses 26. Fire fighting 27. Transit management (traffic lights, signs, meters, and others) 28. Other (the law explicitly allows for other functions) (Art. 15 of the LGA of 1997) * These functions are not explicit in the law; however, they are understood to be part of the expendi- ture responsibilities of the local councils. ** Such as shelter for the homeless, food donations, and other local social programs. *** Regulation, control and monitoring of: public health standards, slaughterhouses, food safety, res- taurants, hotels, and public facilities, weight and scales control, craft and industry hazards, clinic and health center standards, street vendors and stands, public transportation. 142 147 The data collection, analysis, and production of this report was supported by the Representative Of- fice of Denmark, U.S. Agency for International Development, and the World Bank. Co-financing was provided through the Palestinian Partnership for Infrastructure Development Multi-Donor Trust Fund (PID MDTF) and the Palestinian Recovery and Development Program Trust Fund (PRDP) managed by the World Bank. The PID MDTF is currently being supported with contributions from: Croatia; Den- mark; Finland; France; Netherlands; Norway; Portugal; and Sweden. The PRDP is financed by: Australia; France; Japan; Kuwait; and Norway. The views expressed in this publication do not necessarily reflect the views of the contributing donors.