Ayeyarwady Integrated River Basin Management (AIRBM) Project Procurement Plan I. GENERAL 1. Project information a. Country/Borrower: Myanmar b. Project Implementing Agency: Ministry of Transport (Directorate for Water Resources and Improvement of River Systems) 2. Bank’s approval Date of the procurement Plan a. Original Plan: October 24, 2014 b. Revised Plan September 7, 2015 c. Revised Plan: November 11, 2015 d. Revised Plan: February 26, 2016 e. Revised Plan: August 4, 2016 f. Revised Plan: November 28, 2016 g. Revised Plan: March 21, 2017 3. Date of General Procurement Notice: a. Date : 18 February 2015 II. Type of Procurement. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Market Approaches Thresholds Prior Procurement International National-OpenNational RFQ Comments Review (Shopping) Threshold Works USD 3m and Less than Less than Recommended to US$ 2 mil. (Including above US$3m US$1m advertise for 7 days turnkey supply for RFQ above USD and installation 50,000. of plant and equipment) Goods, USD 1m and Less than Less than Recommended to US$ 1 mil. information above US$1m US$0.5m advertise for 7 days technology and for RFQ above USD non-consulting 50,000. services Consultants USD 0.1m Less than Not CQS method may US$ 0.3 mil. (Firms) and above US$0.1m applicable be used up to USD 500,000. Use of full RFP mandatory for CQS above USD 300,000. Limits on market approaches do not apply to individual consultants. Consultant US$ 0.2 mil. (Individuals) 1 2 PROCUREMENT Myanmar : Ayeyarwady Integrated River Basin Management Project PLAN General Information Country: Myanmar Bank’s Approval Date of the Original Procurement Plan: 2016-08-24 2020-12-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146482 GPN Date: Project Name: Ayeyarwady Integrated River Basin Management Project Loan / Credit No: IDA / 55590 Directorate Of Water Resources and Improvement of River Systems Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2. Hydro- CW2-1 / Meeting Room meteorological Observation Request for Single Stage - One 2017-10- 2018- IDA / 55590 Post Open - National 47,524.58 Completed 2017-03-05 2017-06-21 2017-04-30 2017-08-22 Upgrade, DMH Yangon Office and Information Systems Quotations Envelope 27 05-22 Modernization Component 1: Water CW1-1-2 / Demolition of Resource Management Request for Single Stage - One 2016-08- 2016- IDA / 55590 Post Open - National 2,603.61 Completed 2016-01-05 2016-03-01 2015-12-24 DWIR Building Institutions, Decision Support Quotations Envelope 28 01-12 Systems & Capacity Building Component 1: Water CW1-1-3 / Renovation of Resource Management Request for Single Stage - One 2016-09- 2016- IDA / 55590 Post Open - National 85,639.39 Completed 2016-02-05 2016-04-01 2016-02-19 DWIR Building Institutions, Decision Support Quotations Envelope 28 05-01 Systems & Capacity Building Component 1: Water CW1-3 / PMU Building Car Resource Management 2017-11- 2016- IDA / 55590 Post Direct Selection Direct 2,667.14 Completed 2017-09-30 2016-08-04 2017-09-30 2016-08-18 2017-10-21 2016-08-22 Parking Institutions, Decision Support 30 08-30 Systems & Capacity Building CW3-1-5A / DWIR Micro- Component 3. Navigation 2016-04- Project in Bagan, Nyaung U IDA / 55590 Enhancement on the Post Force Account Direct 114,265.00 Signed 2016-04-01 2016-03-16 2016-04-01 2016-04-01 2017-02-28 01 Groynes Ayeyarwady River CW3-1-5B / DWIR Micro- Component 3. Navigation 2016-04- Project in Bagan, Nyaung U IDA / 55590 Enhancement on the Post Force Account Direct 246,000.00 Signed 2016-04-01 2016-03-04 2016-04-01 2016-04-01 2017-02-28 01 Dredging Ayeyarwady River CW3-1-5C / DWIR Micro- Component 3. Navigation 2016-04- Project in Bagan, Nyaung U IDA / 55590 Enhancement on the Post Force Account Direct 264,000.00 Signed 2016-04-07 2016-03-04 2016-04-07 2016-04-07 2017-02-28 07 Dredging Ayeyarwady River Component 3. Navigation CW3-1-5D / DWIR Micro- 2016-04- IDA / 55590 Enhancement on the Post Force Account Direct 246,000.00 Signed 2016-04-07 2016-03-02 2016-04-07 2016-04-07 2017-02-28 Project, Pakkoku Dredging 07 Ayeyarwady River Component 3. Navigation CW3-1-5E / DWIR Micro- 2016-05- IDA / 55590 Enhancement on the Post Force Account Direct 236,836.00 Signed 2016-05-30 2016-03-16 2016-05-30 2016-05-30 2017-02-28 Project, Pakkoku Dredging 30 Ayeyarwady River Component 3. Navigation Pending CW3-1-5F / DWIR Micro- 2017-02- IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementat 2017-02-02 2017-02-02 2017-02-02 Project, Mandalay Dredging 02 Ayeyarwady River ion Component 3. Navigation Pending CW3-1-5G / DWIR Micro- 2017-06- IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementat 2017-06-02 2017-06-02 2017-06-02 Project, Mandalay Dredging 02 Ayeyarwady River ion Component 1: Water CW1-1-1REVISED / PMU Resource Management Request for Single Stage - One 1,188,755.4 2017-09- 2018- IDA / 55590 Post Open - National Completed 2017-09-30 2017-09-30 2017-11-22 Building Institutions, Decision Support Quotations Envelope 8 30 12-20 Systems & Capacity Building Component 1: Water Resource Management Single Stage - One 2018-07- CW1-1-1 / PMU Building IDA / 55590 Prior Request for Bids Open - International 0.00 Canceled 2017-12-31 2017-12-31 2017-12-31 2017-12-31 2018-01-21 Institutions, Decision Support Envelope 20 Systems & Capacity Building Component 3. Navigation CW3-2 / Renovation of DWIR Request for Single Stage - One 2018-08- 2018- IDA / 55590 Enhancement on the Post Open - National 26,346.44 Completed 2018-01-03 2018-02-28 2018-06-11 Mandalay Office Quotations Envelope 27 08-20 Ayeyarwady River Component 3. Navigation CW3-1 / River Bank Request for Single Stage - One 2018-10- 2019- IDA / 55590 Enhancement on the Post Open - National 825,216.13 Completed 2018-02-15 2018-04-12 2018-02-14 Protection for Sub Project 1 Quotations Envelope 09 06-28 Ayeyarwady River Component 3. Navigation Under CW3-1-5H / Micro Project in 2018-02- IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementat 2018-02-28 2018-02-13 2018-02-28 2018-02-28 Nyaung Oo 28 Ayeyarwady River ion Component 3. Navigation Under CW3-1-5I / Micro Project in 2018-02- IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementat 2018-02-28 2018-02-14 2018-02-28 2018-02-28 Pakkoku 28 Ayeyarwady River ion Component 3. Navigation CW3-3 / Hydraulic Structure Single Stage - One 2,185,602.7 2019-01- IDA / 55590 Enhancement on the Prior Request for Bids Open - National Signed 2018-04-12 2018-06-11 2018-04-17 2018-06-14 2018-05-17 2018-07-31 2018-06-16 2018-11-22 2018-07-21 2019-02-01 for Sub Project 1 Envelope 7 17 Ayeyarwady River Component 1: Water CW1-2 / Municipal Water Resource Management 2019-05- 2019- Supply Connection and Tank IDA / 55590 Post Direct Selection Direct 2,672.59 Completed 2018-09-30 2018-12-12 2018-10-05 2018-12-26 2018-11-09 2019-01-08 Institutions, Decision Support 08 01-28 for PMU Building Systems & Capacity Building CW2-2 / Refurbishment/renovation of Component 2. Hydro- the 5 regional support centers meteorological Observation Request for Single Stage - One 2019-08- (in Kalewa, Mandalay, IDA / 55590 Post Open - National 0.00 Canceled 2018-12-20 2019-02-14 and Information Systems Quotations Envelope 13 Mawlamyaing, Pathein, Modernization Myintkyina) and the MHEWC (in NPT) Page 1 CW3-1-5 J / Microproject for Component 3. Navigation Pending 2018-01- Aung Pan Chaung to Sin Min IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementat 2018-01-30 2018-01-30 2018-01-30 30 Waterway (Balaba) Ayeyarwady River ion Component 1: Water CW1-5 / Construction of Resource Management Single Stage - One 10,337,890. 2020-04- IDA / 55590 Prior Request for Bids Open - International Signed 2019-06-14 2019-10-16 2019-06-19 2019-11-06 2019-07-31 2020-01-10 2019-08-30 2020-04-08 2019-10-04 2020-06-04 NWRC HQ and HIC Building Institutions, Decision Support Envelope 45 01 Systems & Capacity Building Component 1: Water CW1-4 / Electricity Resource Management Request for Single Stage - One 2020-05- 2020- application and installation of IDA / 55590 Post Open - National 108,045.50 Completed 2019-10-06 2019-12-01 2019-10-11 Institutions, Decision Support Quotations Envelope 29 01-08 Transformer for PMU Building Systems & Capacity Building Component 2. Hydro- CW2-3 / DMH New Building Under meteorological Observation Single Stage - One 2020-10- Construction in NPT and IDA / 55590 Post Request for Bids Open - National 0.00 Implementat 2020-01-10 2020-06-03 2020-01-15 2020-02-26 2020-03-27 2020-05-01 and Information Systems Envelope 28 Renovation in YGN ion Modernization CW2-2 REVISED / Data Component 2. Hydro- Center Room and Rack Room Under meteorological Observation Request for Single Stage - One 2021-03- Renovation, and Distribution IDA / 55590 Post Open - National 0.00 Implementat 2020-07-15 2020-09-09 and Information Systems Quotations Envelope 08 Transformer Installation in ion Modernization Naypyitaw DMH Office GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Water G1-4-2 / DWIR Office Resource Management Request for Single Stage - One IDA / 55590 Post Limited 40,168.21 Completed 2016-02-06 2016-02-02 2016-04-02 2016-06-10 2016-09-29 2016-08-01 Equipment ( Yangon Office) Institutions, Decision Support Quotations Envelope Systems & Capacity Building Component 1: Water G1-8 / Office Resource Management Request for Single Stage - One Upgrade/Maintenance : WiFi IDA / 55590 Post Limited 6,057.12 Completed 2016-07-06 2016-08-31 2016-05-27 2017-02-27 2016-06-14 Institutions, Decision Support Quotations Envelope Installation at DWIR Systems & Capacity Building Component 2. Hydro- G2-2 / ADCP Flow meters meteorological Observation Request for Single Stage - One IDA / 55590 Post Limited 175,000.00 Completed 2016-12-06 2016-12-26 2017-01-31 2017-04-11 2017-07-30 2017-07-10 and associated equipment and Information Systems Quotations Envelope Modernization Component 1: Water Resource Management Request for Single Stage - One G1-9 / Vehicles IDA / 55590 Prior Open - National 168,803.98 Completed 2016-11-07 2017-01-18 2017-03-08 2017-07-17 2017-05-03 Institutions, Decision Support Quotations Envelope Systems & Capacity Building G3-1 / Speed Component 3. Navigation Request for Single Stage - One Boats/Hydrographic Survey IDA / 55590 Enhancement on the Prior Open - International 225,500.00 Completed 2016-12-06 2017-01-31 2017-05-11 2017-07-30 2018-08-28 Quotations Envelope Boats Ayeyarwady River G3-2 / Topo-Hydrographic survey equipment, satellite Component 3. Navigation Request for Single Stage - One images and maps, including IDA / 55590 Enhancement on the Prior Open - National 789,237.00 Completed 2016-10-06 2016-12-19 2017-05-12 2017-06-17 2017-10-26 Quotations Envelope installation of equipment and Ayeyarwady River training in surveying Component 3. Navigation G3-3 / Supply and Delivery Single Stage - One IDA / 55590 Enhancement on the Prior Request for Bids Open - International 1,716,855.12 Completed 2017-01-01 2017-03-29 2017-01-06 2017-04-06 2017-02-17 2017-06-19 2017-03-19 2017-10-17 2017-04-23 2017-12-21 2017-10-20 2019-08-08 of Aids to Navigation Envelope Ayeyarwady River Component 3. Navigation G3-4 / Multifunctional and Single Stage - One IDA / 55590 Enhancement on the Prior Request for Bids Open - International 2,100,000.00 Completed 2017-02-01 2017-05-12 2017-02-06 2017-05-24 2017-03-20 2017-08-31 2017-04-19 2018-02-06 2017-05-24 2018-04-06 2017-11-20 2020-01-02 Buoy Handling vessel Envelope Ayeyarwady River Component 3. Navigation G3-5 / Amphibious multi- Single Stage - One IDA / 55590 Enhancement on the Prior Request for Bids Open - International 1,551,999.00 Completed 2017-02-01 2017-07-07 2017-02-06 2017-07-25 2017-03-20 2017-09-06 2017-04-19 2018-03-29 2017-05-24 2018-05-17 2017-11-20 2019-04-08 purpose dredger Envelope Ayeyarwady River Component 3. Navigation G3-6 / WiFi Connection to Request for Single Stage - One IDA / 55590 Enhancement on the Post Open - National 4,081.86 Completed 2017-04-05 2017-05-31 2018-10-09 2017-11-27 2018-12-15 DWIR Mandalay Office Quotations Envelope Ayeyarwady River Component 3. Navigation G3-7 / Office Furniture for Request for Single Stage - One IDA / 55590 Enhancement on the Post Open - National 4,681.14 Completed 2017-04-05 2017-05-31 2018-06-22 2017-11-27 2018-07-09 DWIR Mandalay Office Quotations Envelope Ayeyarwady River Component 1: Water G1-10 / PMU Data Network Resource Management Request for Single Stage - One Infrastructure - Hardware and IDA / 55590 Post Open - National 75,587.62 Completed 2017-02-15 2017-04-12 2017-06-06 2017-10-09 2017-07-27 Institutions, Decision Support Quotations Envelope Software Systems & Capacity Building Component 1: Water G1-4-3 / DWIR Office Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 27,389.42 Completed 2016-02-28 2016-06-03 2016-06-03 2016-07-31 2016-08-08 Furniture for Yangon Office Institutions, Decision Support Quotations Envelope Systems & Capacity Building Component 1: Water Resource Management Request for Single Stage - One G1-6 / Accounting Software IDA / 55590 Post Open - National 16,871.81 Signed 2016-02-26 2016-06-06 2017-06-05 2016-07-06 Institutions, Decision Support Quotations Envelope Systems & Capacity Building G1-7 / Fiber Cable Component 1: Water Installation and Transmission Resource Management IDA / 55590 Post Direct Selection Direct 2,049.12 Completed 2016-06-01 2016-06-20 2016-06-01 2016-06-16 2016-06-22 2016-06-16 2016-06-28 for Data Network for PMU and Institutions, Decision Support DWIR Office Systems & Capacity Building Component 2. Hydro- G2-1-1 / DMH Office meteorological Observation Request for Single Stage - One Equipment for Nay Pyi Taw IDA / 55590 Post Open - National 20,143.35 Completed 2016-01-30 2016-03-31 2016-03-10 2016-03-31 2016-04-27 and Information Systems Quotations Envelope and Yangon Office Modernization Page 2 Component 2. Hydro- G2-1-4 / DMH Office meteorological Observation Request for Single Stage - One Furniture for Nay Pyi Taw and IDA / 55590 Post Open - National 14,876.87 Completed 2016-02-28 2016-06-03 2016-06-03 2016-07-29 2016-07-29 and Information Systems Quotations Envelope Yangon Office Modernization Component 2. Hydro- meteorological Observation Request for Single Stage - One G2-1-3 / Generators IDA / 55590 Post Open - National 26,757.13 Completed 2016-06-07 2017-02-07 2017-02-16 2017-03-31 2017-04-03 and Information Systems Quotations Envelope Modernization Component 1: Water G1-11 / Server Desktop and Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 16,086.97 Completed 2017-09-05 2017-10-31 2018-05-10 2018-04-29 2018-08-02 Accessories for PMU Office Institutions, Decision Support Quotations Envelope Systems & Capacity Building G2-1 / Fiber Cable Component 2. Hydro- Installation and Transmission meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 18,339.34 Completed 2017-03-05 2017-04-30 2017-07-06 2017-10-27 2017-09-11 for Data Network for DMH and Information Systems Quotations Envelope Office in NayPyiTaw Modernization Component 1: Water G1-12 / Office Furniture for Resource Management Request for Single Stage - One interim NWRC HQ/HIC IDA / 55590 Post Open - National 9,335.80 Signed 2018-02-06 2018-04-03 2018-10-10 2018-09-30 Institutions, Decision Support Quotations Envelope Building Systems & Capacity Building Component 1: Water G1-13 / Office Equipment for Resource Management Request for Single Stage - One interim NWRC HQ/HIC IDA / 55590 Post Open - National 7,738.91 Completed 2018-02-06 2018-04-03 2018-08-14 2018-09-30 2018-11-30 Institutions, Decision Support Quotations Envelope Building Systems & Capacity Building G1-14 / Data Network Component 1: Water Cabling, Sever, Desktop and Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 144,742.75 Completed 2018-02-06 2018-04-03 2019-07-18 2018-09-30 2019-11-08 Accessories for interim NWRC Institutions, Decision Support Quotations Envelope HQ/HIC Building Systems & Capacity Building Component 1: Water G1-15 / Internet Connection Resource Management for interim NWRC HQ/HIC IDA / 55590 Post Direct Selection Direct 0.00 Canceled 2018-02-01 2018-02-06 2018-03-13 2018-09-09 Institutions, Decision Support Building Systems & Capacity Building Component 3. Navigation G3-9 / Hydraulic Structures Single Stage - One IDA / 55590 Enhancement on the Prior Request for Bids Open - National 0.00 Canceled 2018-08-31 2018-09-05 2018-10-17 2018-11-16 2018-12-21 2019-06-19 for Sub Project 1 Envelope Ayeyarwady River Component 1: Water G1-16 / Furniture for PMU Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 91,351.46 Completed 2018-09-06 2018-11-01 2019-02-19 2019-04-30 2019-04-10 Building Institutions, Decision Support Quotations Envelope Systems & Capacity Building Component 1: Water G1-17 / Equipment for PMU Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 21,155.96 Completed 2018-09-06 2018-11-01 2019-09-06 2019-04-30 2020-04-06 Building Institutions, Decision Support Quotations Envelope Systems & Capacity Building Component 2. Hydro- G2-3 / Upper-air Radio meteorological Observation Single Stage - One IDA / 55590 Prior Request for Bids Open - International 0.00 Canceled 2018-08-01 2018-08-06 2018-09-17 2018-10-17 2018-11-21 2019-05-20 Sounding Equipment and Information Systems Envelope Modernization Component 2. Hydro- G2-4 / Automatic Weather meteorological Observation Single Stage - One stations and associated IDA / 55590 Prior Request for Bids Open - International 1,984,616.17 Signed 2018-08-01 2018-11-16 2018-08-06 2018-12-17 2018-09-17 2019-02-25 2018-10-17 2019-07-26 2018-11-21 2019-12-24 2019-05-20 and Information Systems Envelope equipment Modernization Component 2. Hydro- G2-5 / Calibration lab Under meteorological Observation Request for Single Stage - One equipment and Electronic test IDA / 55590 Post Open - National 258,772.16 Implementati 2018-08-06 2018-10-01 2019-03-30 and Information Systems Quotations Envelope equipment on Modernization Component 2. Hydro- G2-6 / River monitoring meteorological Observation Single Stage - One IDA / 55590 Prior Request for Bids Open - International 0.00 Canceled 2018-08-01 2018-08-06 2018-09-17 2018-10-17 2018-11-21 2019-05-20 equipment and Information Systems Envelope Modernization Component 2. Hydro- G2-8 / Supply and meteorological Observation Request for Single Stage - One installation of river level IDA / 55590 Post Open - National 107,397.39 Completed 2018-08-06 2018-10-01 2018-12-07 2019-03-30 2019-11-15 and Information Systems Quotations Envelope monitoring stage boards Modernization G3-11 / Supply and Delivery Component 3. Navigation Single Stage - One of 2 Fast Transit Buoy IDA / 55590 Enhancement on the Prior Request for Bids Open - International 0.00 Canceled 2018-10-01 2019-05-16 2018-10-06 2018-11-17 2018-12-17 2019-01-21 2019-07-20 Envelope Handling Vessel Ayeyarwady River G3-12 / Two Cutter Suction Component 3. Navigation Single Stage - One Dredgers and Ancillary IDA / 55590 Enhancement on the Prior Request for Bids Open - International 10,589,855.10 Signed 2018-10-01 2019-01-03 2018-10-06 2019-01-21 2018-11-17 2019-03-11 2018-12-17 2019-11-28 2019-01-21 2020-02-20 2019-07-20 Envelope Equipment Ayeyarwady River Component 3. Navigation G3-14 / Three Aluminium Request for Single Stage - One IDA / 55590 Enhancement on the Post Open - International 753,420.00 Signed 2018-09-05 2018-10-31 2019-04-19 2019-04-29 Hydrographic Survey Boats Quotations Envelope Ayeyarwady River G3-10A / Supply and Component 3. Navigation Request for Single Stage - One Delivery of Acoustic Doppler IDA / 55590 Enhancement on the Post Open - National 175,000.00 Completed 2018-09-08 2018-11-03 2019-02-15 2019-05-02 2019-05-14 Quotations Envelope Current Profiler Ayeyarwady River G3-10REVISED / Supply and Delivery of Topo- Component 3. Navigation Hydrographic Survey Request for Single Stage - One IDA / 55590 Enhancement on the Post Open - International 614,890.00 Completed 2018-09-08 2018-11-03 2019-02-15 2019-05-02 2020-01-30 Equipment for the Stretch Quotations Envelope Ayeyarwady River Between Nyaung Oo and Yangon Component 2. Hydro- G2-3REVISED / Upper Air meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - International 0.00 Canceled 2018-09-08 2018-11-03 2019-05-02 Radio Sounding Equipment and Information Systems Quotations Envelope Modernization Page 3 Component 2. Hydro- G2-7 / River Survey Boats- 3 meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 476,726.00 Signed 2018-09-19 2018-11-14 2019-07-30 2019-05-13 Units and Information Systems Quotations Envelope Modernization Component 2. Hydro- G2-3REVISED-FINAL / Upper meteorological Observation Single Stage - One IDA / 55590 Post Request for Bids Open - International 1,032,786.00 Signed 2018-09-30 2018-10-16 2018-10-05 2018-11-16 2018-11-26 2018-12-16 2019-03-12 2019-01-20 2019-07-10 2019-07-19 Air Radio Sounding Equipment and Information Systems Envelope Modernization Component 2. Hydro- G2-6REVISED / River meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - International 541,480.00 Signed 2018-10-10 2018-12-05 2019-12-18 2019-06-03 Monitoring Equipment and Information Systems Quotations Envelope Modernization Component 2. Hydro- G2-10 / Automatic water meteorological Observation Single Stage - One IDA / 55590 Prior Request for Bids Open - International 0.00 Canceled 2018-11-30 2018-12-05 2019-01-16 2019-02-15 2019-03-22 2019-09-18 level recording Equipment and Information Systems Envelope Modernization G2-11 / Forecaster Component 2. Hydro- Under Workstations, Printers and meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 0.00 Implementati 2018-12-06 2019-01-31 2019-07-30 Automated Desktop and Information Systems Quotations Envelope on Deployment System Modernization G2-12 / Special furniture for Component 2. Hydro- the Forecast Operations meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 11,831.72 Signed 2018-12-05 2019-01-30 2019-11-18 2019-07-29 Centre and 5 regional support and Information Systems Quotations Envelope centers Modernization G2-15 / NPT Datacentre and Component 2. Hydro- Forecast Operations Centre meteorological Observation Single Stage - One IDA / 55590 Prior Request for Bids Open - International 0.00 Canceled 2018-12-01 2018-12-06 2019-01-17 2019-02-16 2019-03-23 2019-09-19 renovation,equipment and and Information Systems Envelope related-services Modernization Component 2. Hydro- G2-19 / Data Hub Server meteorological Observation IDA / 55590 Post Direct Selection Direct 5,866.46 Signed 2018-11-30 2018-09-01 2018-12-05 2019-08-14 2019-01-09 2019-09-03 2019-07-08 with Harddrives and UPS and Information Systems Modernization Component 2. Hydro- G2-20 / NPT-MDY-YGN meteorological Observation Request for Single Stage - One Internet capacity Upgrade with IDA / 55590 Post Open - National 94,959.08 Signed 2018-12-06 2019-01-31 2020-09-04 2019-07-30 and Information Systems Quotations Envelope Redundancy Modernization Component 2. Hydro- G2-9 / Vehicles, 4WD Pick- meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 0.00 Canceled 2018-12-05 2019-01-30 2019-07-29 up, 3.nos and Information Systems Quotations Envelope Modernization Component 1: Water G1-18 / Internet Bandwidth Resource Management IDA / 55590 Post Direct Selection Direct 1,458.82 Completed 2018-12-17 2019-01-14 2018-12-22 2019-01-29 2019-01-26 2019-04-23 2019-07-25 2019-06-01 Upgrading in PMU Building Institutions, Decision Support Systems & Capacity Building G2-13 / NPT Data centre and Component 2. Hydro- Forecast Operations Centre meteorological Observation Single Stage - One IDA / 55590 Prior Request for Bids Open - International 3,552,888.00 Signed 2018-12-20 2019-04-20 2018-12-25 2019-05-02 2019-02-05 2019-08-30 2019-03-07 2020-05-22 2019-04-11 2020-09-02 2019-10-08 set up and backend ICT and Information Systems Envelope infrastructure Modernization Component 2. Hydro- G2-10REVISED / Automatic meteorological Observation Single Stage - One Water Level Recording IDA / 55590 Post Request for Bids Open - International 519,777.00 Signed 2019-01-18 2019-04-25 2019-01-23 2019-03-06 2019-07-04 2019-04-05 2020-02-24 2019-05-10 2020-06-30 2019-11-06 and Information Systems Envelope Equipment (AWLR) Modernization G3-11REVISED / Supply and Component 3. Navigation Single Stage - One Delivery of Fast Transit Buoy IDA / 55590 Enhancement on the Prior Request for Bids Open - International 2,408,313.00 Signed 2019-05-28 2019-06-20 2019-06-02 2019-06-25 2019-07-14 2019-08-01 2019-08-13 2019-10-21 2019-09-17 2019-12-24 2020-03-15 Envelope Handling Vessels Ayeyarwady River G3-15 / Supply and Delivery Component 3. Navigation Under Single Stage - One of Aids to Navigation between IDA / 55590 Enhancement on the Prior Request for Bids Open - International 0.00 Implementati 2019-11-17 2019-11-22 2020-01-03 2020-02-02 2020-03-08 2020-09-04 Envelope Nyaung Oo and Yangon Ayeyarwady River on G2-14 / Cloud computing Component 2. Hydro- and other equipment to meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 0.00 Canceled 2018-12-06 2019-01-31 2019-07-30 provide resilience to DMH and Information Systems Quotations Envelope systems, Yangon Modernization Component 1: Water G1-19 / DSS Software for Resource Management River Basin Modeling and IDA / 55590 Post Direct Selection Direct 215,000.00 Signed 2019-12-06 2019-11-26 2019-12-11 2019-12-23 2020-01-15 2020-03-12 2020-07-13 Institutions, Decision Support Dash Board Systems & Capacity Building G2-12REVISED / Special Component 2. Hydro- Furniture for the Forecast meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 32,004.00 Signed 2019-12-25 2020-02-19 2020-05-28 2020-08-17 Operations Center set up and and Information Systems Quotations Envelope backend ICT infrastructure Modernization Component 1: Water G1.17A / Equipment for PMU Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 21,707.46 Signed 2020-02-02 2020-03-29 2019-09-05 2020-09-25 Building Institutions, Decision Support Quotations Envelope Systems & Capacity Building NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Water S1-1 / PMU Website Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 714.55 Signed 2016-11-23 2016-12-07 2016-11-30 2017-06-05 Developer Institutions, Decision Support Quotations Envelope Systems & Capacity Building Component 3. Navigation Under S3-1 / Hydrographic Survey IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementati 2017-01-31 2018-09-28 2017-01-31 2018-09-28 2017-01-31 2017-01-31 Stretch 1 Ayeyarwady River on Page 4 Component 2. Hydro- S2-1 / Flow Surveys and meteorological Observation IDA / 55590 Post Force Account Direct 59,700.00 Signed 2016-09-30 2016-06-06 2016-09-30 2016-09-30 2016-09-06 2016-09-30 Rating Review and Information Systems Modernization Component 2. Hydro- S2-2REVISED / Topographic meteorological Observation Request for Single Stage - One Survey Firm to Support Flow IDA / 55590 Post Open - National 49,400.64 Signed 2017-05-30 2017-07-25 2017-11-16 2018-01-21 and Information Systems Quotations Envelope Survey Modernization Component 2. Hydro- S2-2 / Topographic Survey meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 0.00 Canceled 2017-03-05 2017-04-30 2017-10-27 Firm to Support Flow Survey and Information Systems Quotations Envelope Modernization Component 3. Navigation S3-2 / Installation of Aids to IDA / 55590 Enhancement on the Post Force Account Direct 132,510.08 Completed 2017-12-31 2018-07-30 2017-12-31 2018-08-03 2017-12-31 2018-08-08 2017-12-31 2018-10-24 Navigation Ayeyarwady River S2-3 / River Surveys and Very Component 2. Hydro- High Resolution Satellite Data meteorological Observation Request for Single Stage - One IDA / 55590 Post Open - National 131,334.71 Signed 2018-08-06 2018-10-01 2018-11-23 2019-03-30 for Central and Upper and Information Systems Quotations Envelope Myanmar (4 areas) Modernization S3-3 / Conducting the Component 3. Navigation Request for Single Stage - One Hydrographic Survey between IDA / 55590 Enhancement on the Post Open - National 1,053,000.00 Signed 2018-08-06 2018-10-01 2019-07-30 2019-03-30 Quotations Envelope Nyaung U and Yangon Ayeyarwady River S3-5 / Installation of Component 3. Navigation Benchmarks from Nyaung U to IDA / 55590 Enhancement on the Prior Force Account Direct 0.00 Canceled 2018-08-06 2018-08-16 2018-08-06 2018-08-06 2018-08-06 Yangon Ayeyarwady River S3-5REVISED / Installation of Component 3. Navigation Benchmarks from Nyaung Oo IDA / 55590 Enhancement on the Post Force Account Direct 40,029.87 Signed 2018-09-14 2018-07-24 2018-09-14 2018-09-14 2018-08-31 2018-09-14 to Yangon Ayeyarwady River Component 2. Hydro- meteorological Observation S2-4 / WMO agreement IDA / 55590 Prior Direct Selection Direct 3,438,338.00 Signed 2018-12-15 2019-06-10 2018-12-20 2019-09-18 2019-01-24 2019-08-21 2019-07-23 and Information Systems Modernization Component 1: Water S1-2 / Development of Resource Management Request for Single Stage - One IDA / 55590 Post Open - National 2,394.87 Completed 2019-08-20 2019-10-15 2019-11-22 2019-12-14 2020-03-18 Myanmar Official Water Portal Institutions, Decision Support Quotations Envelope Systems & Capacity Building S3-6 / Installation of Aids to Component 3. Navigation Pending Navigation (Nyaung Oo to IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementati 2020-03-30 2020-04-04 2020-05-09 2020-11-05 Yangon) Ayeyarwady River on S3-4 / Additional surveys Component 3. Navigation Request for Single Stage - One under the Engineering Study IDA / 55590 Enhancement on the Post Open - National 0.00 Canceled 2018-09-06 2018-11-01 2019-04-30 Quotations Envelope for Stretch 1 Ayeyarwady River S3-2A / Installation and Component 3. Navigation Pending reposition of Aids to IDA / 55590 Enhancement on the Post Force Account Direct 0.00 Implementati 2020-12-25 2020-12-30 2021-01-14 2021-01-14 Navigation in Stretch 1 Ayeyarwady River on (Mingun-Bagan) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Water C1.4-21 / Design and Consultant Resource Management Construction Supervision of IDA / 55590 Prior Qualification Open - International 78,170.00 Completed 2016-07-25 2016-09-16 2018-12-01 Institutions, Decision Support DWIR Building Selection Systems & Capacity Building Component 1: Water C1-17 / Ayeyarwady Master Resource Management Quality And Cost- Plan and Decision Support IDA / 55590 Prior Open - International 7,833,571.61 Signed 2016-10-24 2016-10-31 2016-11-14 2016-11-01 2016-12-28 2017-04-21 2017-01-25 2017-08-09 2017-02-24 2017-10-19 2017-03-31 2018-03-01 2017-05-05 2018-03-15 2018-05-05 Institutions, Decision Support Based Selection System Systems & Capacity Building Component 2. Hydro- C2-2 / DMH System meteorological Observation Quality And Cost- IDA / 55590 Prior Open - International 4,888,863.43 Signed 2016-11-16 2016-12-07 2017-01-20 2017-02-17 2016-09-23 2017-03-19 2016-11-30 2017-04-23 2017-04-19 2017-05-28 2017-05-15 2018-05-28 Integrator and Information Systems Based Selection Modernization C3-3 / ESIA/SEA/EMP Component 3. Navigation Consultant Supervision for Subproject 1 IDA / 55590 Enhancement on the Prior Qualification Open - International 416,368.00 Signed 2016-04-27 2016-05-18 2016-08-24 2016-11-30 2017-01-12 2017-01-04 2017-03-16 2017-07-03 and Stretch 1 Ayeyarwady River Selection Component 1: Water C1-12 / SOB Package 2: Consultant Resource Management Groundwater and data IDA / 55590 Prior Qualification Open - International 227,553.00 Completed 2016-05-10 2016-06-21 2016-07-26 2016-11-25 2017-04-06 2016-12-30 2017-05-03 2017-06-28 2017-12-29 Institutions, Decision Support management Selection Systems & Capacity Building Component 1: Water Consultant C1-13 / SOB Package 3: Resource Management IDA / 55590 Prior Qualification Open - International 237,567.45 Completed 2016-05-10 2016-06-21 2016-07-26 2016-11-25 2017-05-01 2016-12-30 2017-05-03 2017-06-28 2017-10-29 Sediments & geomorphology Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Consultant C1-14 / SOB Package 4: Resource Management IDA / 55590 Prior Qualification Open - International 269,945.38 Completed 2016-05-10 2016-06-21 2016-10-14 2016-12-30 2017-05-16 2017-02-03 2017-05-19 2017-08-02 2018-01-09 Biodiversity & Fisheries Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water C1-15 / SOB Package 5: Consultant Resource Management Sectoral development and IDA / 55590 Prior Qualification Open - International 245,680.00 Completed 2016-05-10 2016-06-21 2016-07-26 2016-11-25 2017-03-15 2016-12-30 2017-05-03 2017-06-28 2017-11-30 Institutions, Decision Support macroeconomics Selection Systems & Capacity Building Component 1: Water C1-16 / SOB Package 6: 3D Consultant Resource Management Mapping and local IDA / 55590 Prior Qualification Open - International 344,425.00 Completed 2016-05-10 2016-06-21 2016-07-26 2017-02-01 2016-11-25 2017-03-07 2016-12-30 2017-05-03 2017-06-28 2017-12-06 Institutions, Decision Support consultations Selection Systems & Capacity Building Page 5 Component 1: Water C1-19REVISED / HIC/NWRC Resource Management Quality And Cost- Building Design and IDA / 55590 Prior Open - International 1,533,487.90 Signed 2017-05-25 2017-06-13 2017-06-15 2017-06-21 2017-07-29 2017-10-30 2017-08-26 2017-12-21 2017-09-25 2018-02-14 2017-10-30 2018-05-22 2017-12-04 2018-06-13 2018-12-04 Institutions, Decision Support Based Selection Construction Supervision Systems & Capacity Building C3-13 / Feasibility Study, Component 3. Navigation Engineering design, Capacity Quality And Cost- IDA / 55590 Enhancement on the Prior Open - International 2,874,019.84 Signed 2017-08-31 2017-09-08 2017-09-21 2017-10-27 2017-11-04 2018-04-10 2017-12-02 2018-06-07 2018-01-01 2018-12-12 2018-02-05 2019-03-11 2018-03-12 2019-03-18 2019-03-12 Building and Construction Based Selection Ayeyarwady River Supervision for Stretch1 C3-14 / ESIA,ESMP and Component 3. Navigation Quality And Cost- ARAPs Implementation IDA / 55590 Enhancement on the Prior Open - International 817,075.00 Signed 2017-08-31 2017-09-08 2017-09-21 2017-10-27 2017-11-04 2018-03-30 2017-12-02 2018-05-16 2018-01-01 2018-11-22 2018-02-05 2019-03-07 2018-03-12 2019-03-18 2019-03-12 Based Selection Support for Stretch 1 Ayeyarwady River C1-19 / Architectural and Component 1: Water Engineering Design and Resource Management Quality And Cost- IDA / 55590 Prior Open - International 0.00 Canceled 2017-03-31 2017-04-21 2017-06-04 2017-07-02 2017-08-01 2017-09-05 2017-10-10 2018-10-10 Construction Supervision of Institutions, Decision Support Based Selection the NWRC HQ/HIC Systems & Capacity Building C2-8 / Design and Component 2. Hydro- Construction Supervision of Consultant meteorological Observation New Building in NPT and IDA / 55590 Post Qualification Open - National 222,899.00 Signed 2018-04-01 2018-09-05 2018-04-22 2018-06-05 2019-01-15 2018-07-05 2019-06-25 2018-08-09 2019-06-27 2019-02-05 and Information Systems Renovation of Buildings in Selection Modernization NPT and Yangon C2-9 / Impact Based Component 2. Hydro- Forecasting Pilots and Flood meteorological Observation Quality And Cost- Hazard Mapping in the IDA / 55590 Prior Open - International 1,748,748.25 Signed 2018-08-01 2018-08-05 2018-08-22 2018-09-09 2018-10-05 2019-05-27 2018-11-02 2019-07-24 2018-12-02 2020-01-24 2019-01-06 2020-07-22 2019-02-10 2020-09-01 2020-02-10 and Information Systems Based Selection Chindwin and Central Modernization Ayeyarwady Basin, Myanmar Component 2. Hydro- C2-11 / ACAS Coordination Consultant meteorological Observation and Development of Agro IDA / 55590 Prior Qualification Open - International 183,060.00 Signed 2018-08-20 2018-09-05 2018-09-10 2018-09-21 2018-10-24 2019-03-19 2018-11-23 2019-08-11 2018-12-28 2019-09-25 2019-06-26 and Information Systems Meteorological Products Selection Modernization C3-17 / Formulation of the Component 3. Navigation Navigation Strategy and Quality And Cost- IDA / 55590 Enhancement on the Prior Open - International 0.00 Canceled 2018-08-01 2018-08-22 2018-10-05 2018-11-02 2018-12-02 2019-01-06 2019-02-10 2020-02-10 Action Plan, including Fleet Based Selection Ayeyarwady River Optimization C3-17REVISED / Formulation of the Resource Management Component 3. Navigation Consultant and Operation Plan for IDA / 55590 Enhancement on the Post Qualification Open - International 544,306.93 Signed 2019-04-01 2019-04-10 2019-04-22 2019-06-05 2019-08-20 2019-07-05 2019-12-13 2019-08-09 2020-01-15 2020-02-05 Ayeyarwady Navigation - Ayeyarwady River Selection RMOP C2-24 / Update of the Component 2. Hydro- Myanmar Climate Change Consultant meteorological Observation Alliance documentation with IDA / 55590 Post Qualification Open - National 0.00 Canceled 2018-12-01 2018-12-22 2019-02-04 2019-03-06 2019-04-10 2019-10-07 and Information Systems new outputs from DMH on Selection Modernization climate trends and projections C1-33 / ESIA and ESMP Component 1: Water Consultancy Service for Consultant Resource Management Feasibility Study on IDA / 55590 Post Qualification Open - International 0.00 Canceled 2019-03-29 2019-04-19 2019-06-02 2019-07-02 2019-08-06 2020-02-02 Institutions, Decision Support Navigation Enhancement Work Selection Systems & Capacity Building For Stretch 2 Component 1: Water C1-32 / Feasibility Study on Resource Management Quality And Cost- Navigation Enhancement Work IDA / 55590 Post Open - International 0.00 Canceled 2019-03-29 2019-04-19 2019-06-02 2019-06-30 2019-07-30 2019-09-03 2019-10-08 2020-10-07 Institutions, Decision Support Based Selection for Stretch 2 Systems & Capacity Building Component 1: Water C1-35 / Yangon Region Resource Management Quality And Cost- IDA / 55590 Post Open - International 0.00 Canceled 2019-04-01 2019-04-22 2019-06-05 2019-07-03 2019-08-02 2019-09-06 2019-10-11 2020-10-10 IWRM Project Feasibility Study Institutions, Decision Support Based Selection Systems & Capacity Building INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Water C1.4-12 / HIC Individual Resource Management INTERNATIONAL IDA / 55590 Prior Consultant Open 7,598.00 Completed 2015-08-10 2015-10-01 2015-10-30 Institutions, Decision Support CONSULTANT Selection Systems & Capacity Building Component 1: Water Individual C1.4.1 / Component-1 Resource Management IDA / 55590 Prior Consultant Open 169,200.00 Signed 2015-08-10 2015-08-07 Director Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1.4-4 / NATIONAL Resource Management IDA / 55590 Prior Consultant Open 32,136.00 Signed 2016-02-18 2016-02-08 PROCUREMENT OFFICER Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C2.1-10 / COMPONENT 2 Resource Management IDA / 55590 Prior Consultant Open 317,155.15 Signed 2016-02-19 2016-02-19 INTERNATIONAL ADVISOR Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1.4-4- b / NATIONAL Resource Management IDA / 55590 Prior Consultant Open 34,380.00 Signed 2016-07-18 2016-07-04 PROCUREMENT OFFICER2 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1.4-15 / National Financial Resource Management IDA / 55590 Prior Consultant Open 15,120.00 Signed 2016-07-18 2016-08-01 Officer Institutions, Decision Support Selection Systems & Capacity Building C3-6 / Engineering design, Component 3. Navigation capacity building and IDA / 55590 Enhancement on the Prior Direct Selection Direct 1,005,109.04 Signed 2016-11-16 2016-11-26 2017-01-30 2017-01-12 2017-07-29 construction supervision for Ayeyarwady River sub project1 Page 6 Component 1: Water C1-4-2 / International Individual Resource Management Project Coordination Advisor IDA / 55590 Prior Consultant Open 91,900.00 Signed 2016-11-17 2017-01-05 2017-01-26 2016-12-01 2017-03-02 2016-12-20 2017-08-29 Institutions, Decision Support to Project Director Selection Systems & Capacity Building Component 1: Water Individual C1-4-6 / National Project Resource Management IDA / 55590 Post Consultant Open 12,600.00 Signed 2016-01-22 2016-04-28 2016-02-08 2016-02-29 2016-05-13 2016-05-17 2016-05-17 2016-11-13 Accountant Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-1-14 / HIC/GIS & Data Resource Management IDA / 55590 Post Consultant Open 30,000.00 Completed 2016-10-07 2016-10-07 2016-11-28 2016-12-19 2017-05-08 2017-01-23 2017-07-03 2017-07-22 2019-11-08 Base Specialist Institutions, Decision Support Selection Systems & Capacity Building C1-2-1A / Institutional Component 1: Water Individual Review and Development Resource Management IDA / 55590 Post Consultant Open 41,700.00 Completed 2016-05-10 2016-06-16 2016-08-08 2016-08-29 2016-08-03 2016-10-11 2016-10-11 2017-04-09 2017-05-17 Planning - Team Leader and Institutions, Decision Support Selection Institutional Specialist Systems & Capacity Building C1-2-1B / Institutional Component 1: Water Individual Review and Development Resource Management IDA / 55590 Post Consultant Open 40,350.00 Completed 2016-06-01 2016-06-13 2016-08-08 2016-08-26 2016-09-16 2016-09-20 2016-09-20 2017-03-19 2017-05-13 Planning - Management Institutions, Decision Support Selection Specialist Systems & Capacity Building C1-2-1C / Institutional Component 1: Water Individual Review and Development Resource Management IDA / 55590 Post Consultant Open 42,750.00 Completed 2016-05-10 2016-06-16 2016-08-08 2016-08-29 2016-08-03 2016-09-20 2016-09-20 2017-03-19 2017-05-18 Planning - Governance Institutions, Decision Support Selection Specialist Systems & Capacity Building Component 1: Water Individual Resource Management C1-11A / HIC GIS Specialist IDA / 55590 Post Consultant Open 19,530.00 Signed 2016-05-10 2016-04-29 2016-07-18 2016-08-08 2016-07-13 2016-09-01 2016-09-01 2017-02-28 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-11B / HIC Water Resource Resource Management IDA / 55590 Post Consultant Open 13,860.00 Completed 2016-05-10 2016-04-29 2016-07-19 2016-08-09 2016-07-13 2016-08-29 2016-08-29 2017-02-25 2017-08-26 Engineer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-11C / HIC Resource Resource Management Under IDA / 55590 Post Consultant Open 20,160.00 2016-10-01 2016-04-29 2016-11-24 2016-12-15 2016-11-23 2017-01-19 2016-08-17 2017-07-18 Economist Institutions, Decision Support Implementation Selection Systems & Capacity Building Component 1: Water Individual C1-11D / HIC Environmental Resource Management IDA / 55590 Post Consultant Open 20,160.00 Signed 2016-05-31 2016-04-29 2016-07-14 2016-07-25 2016-07-13 2016-08-17 2016-08-17 2017-02-13 Scientist Institutions, Decision Support Selection Systems & Capacity Building Component 2. Hydro- Individual C2-1 / Component 2 Project meteorological Observation IDA / 55590 Post Consultant Open 25,200.00 Completed 2016-07-28 2016-08-09 2016-09-15 2016-10-06 2016-11-17 2016-11-10 2016-12-06 2017-05-09 2017-12-05 Officer and Information Systems Selection Modernization Component 2. Hydro- C2-3 / DMH International Individual meteorological Observation Institutional and Regulatory IDA / 55590 Post Consultant Open 52,530.00 Signed 2017-02-10 2017-02-13 2017-03-31 2017-04-21 2017-05-31 2017-05-26 2017-05-22 2017-11-22 and Information Systems Review Consultant Selection Modernization Component 2. Hydro- C2-4 / DMH National Individual meteorological Observation Institutional and Regulatory IDA / 55590 Post Consultant Open 15,070.00 Completed 2017-02-10 2017-03-03 2017-03-31 2017-04-21 2017-08-08 2017-05-26 2017-08-08 2017-11-22 2018-08-08 and Information Systems Review Consultant Selection Modernization Component 1: Water Individual C1-11-C-REVISED / HIC Resource Management IDA / 55590 Post Consultant Open 18,900.00 Completed 2016-10-07 2016-10-07 2016-11-25 2016-12-12 2016-12-01 2016-12-12 2016-12-12 2017-06-10 2017-12-11 Resource Economist-Revised Institutions, Decision Support Selection Systems & Capacity Building C3-10 / Component 3 Component 3. Navigation Individual International Engineering IDA / 55590 Enhancement on the Post Consultant Open 96,850.00 Completed 2016-10-31 2016-10-31 2016-12-19 2017-01-09 2017-01-12 2017-01-17 2017-01-17 2017-07-16 2017-12-14 Specialist Ayeyarwady River Selection Component 3. Navigation Individual C3-11 / Project Officer 2 for IDA / 55590 Enhancement on the Post Consultant Open 14,400.00 Signed 2017-02-17 2017-04-27 2017-04-07 2017-04-28 2017-07-14 2017-06-02 2017-07-12 2017-11-29 Component 3 Ayeyarwady River Selection Component 1: Water Individual C1-4-8A / National Resource Management IDA / 55590 Post Consultant Open 18,540.00 Completed 2016-01-29 2016-02-17 2016-02-17 2016-02-01 2016-02-24 2016-02-24 2018-02-23 2019-04-10 Environmental Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-8B / National Social Resource Management IDA / 55590 Post Consultant Open 11,340.00 Completed 2016-11-18 2016-12-12 2016-12-19 2016-12-13 2016-12-19 2016-12-19 2017-12-18 2017-02-17 Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water C 1-4-11B / Stakeholder Individual Resource Management Communication Officer 2 for IDA / 55590 Post Consultant Open 15,600.00 Signed 2017-01-17 2017-01-17 2017-03-07 2017-03-28 2017-05-02 2017-04-03 2017-10-29 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 3. Navigation Individual C3-12 / International IDA / 55590 Enhancement on the Post Consultant Open 121,590.00 Signed 2017-05-30 2017-04-26 2017-07-18 2017-08-08 2017-07-14 2017-09-12 2017-07-25 2018-03-11 Hydraulic Modelling Specialist Ayeyarwady River Selection Component 1: Water Individual C1-18REVISED / Evaluator for Resource Management IDA / 55590 Post Consultant Direct 9,000.00 Completed 2017-05-30 2017-06-06 2017-06-09 2017-06-30 2017-06-06 2017-08-04 2017-06-06 2018-01-31 2017-06-06 Myanmar-Netherlands MOU Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-3 / International Resource Management IDA / 55590 Post Consultant Open 317,300.00 Completed 2015-08-31 2015-05-01 2015-11-30 2015-11-30 2015-12-24 2015-12-24 2017-12-23 2018-07-31 Procurement Advisor Institutions, Decision Support Selection Systems & Capacity Building Page 7 Component 1: Water Individual C1-4-5 / International Resource Management IDA / 55590 Post Consultant Open 231,915.00 Completed 2015-08-31 2015-05-01 2015-11-30 2015-11-30 2015-12-24 2015-12-24 2017-12-23 2019-05-09 Financial Management Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-7 / International Resource Management IDA / 55590 Post Consultant Open 334,500.00 Terminated 2015-08-31 2015-05-03 2015-12-01 2016-01-31 2016-02-15 2016-02-15 2018-02-14 Safeguards Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-9 / Component 1 Resource Management IDA / 55590 Post Consultant Open 231,915.00 Signed 2015-10-31 2015-05-05 2015-12-31 2015-12-31 2016-01-07 2016-01-07 2018-01-06 International Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water C1-4-11A / Stakeholder Individual Resource Management Communication Officer 1 for IDA / 55590 Post Consultant Open 18,900.00 Completed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-06-21 2016-06-21 2017-06-20 2017-06-20 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 1: Water Individual C1-4-18 / Project Director Resource Management IDA / 55590 Post Consultant Open 21,420.00 Completed 2016-03-01 2016-02-17 2016-03-01 2016-03-01 2016-03-17 2016-03-17 2017-03-16 2016-05-30 Executive Assistatn Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-20 / National IT Resource Management IDA / 55590 Post Consultant Open 11,340.00 Signed 2016-07-31 2016-07-13 2016-07-31 2016-07-31 2016-09-06 2016-09-06 2017-09-05 Network Specialist Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-9A / Project Officer 1 for Resource Management IDA / 55590 Post Consultant Open 18,900.00 Signed 2016-02-01 2016-04-28 2016-02-01 2016-02-01 2016-05-02 2016-05-02 2017-05-01 Component 1 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-9B / Project Officer 2 for Resource Management IDA / 55590 Post Consultant Open 10,080.00 Signed 2016-02-29 2016-04-28 2016-02-29 2016-02-29 2016-05-12 2016-05-12 2018-05-11 Component 1 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10A / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Completed 2016-02-29 2016-04-06 2016-02-29 2016-03-31 2016-04-01 2016-04-06 2018-04-01 2019-04-05 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10C / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Completed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-04-01 2016-04-08 2018-04-01 2019-04-07 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10D / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Signed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-04-01 2016-04-21 2018-04-01 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10E / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Completed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-04-01 2016-04-08 2018-04-01 2018-04-07 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10F CBBW / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Completed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-04-01 2016-04-07 2017-04-01 2016-06-30 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10F PEP / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Completed 2016-02-29 2016-02-17 2016-02-29 2016-02-29 2016-04-01 2017-03-17 2018-03-03 2018-03-16 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10G / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,300.00 Signed 2016-02-29 2016-04-07 2016-02-29 2016-02-29 2016-04-01 2016-04-07 2018-04-01 Researcher Institutions, Decision Support Selection Systems & Capacity Building Component 3. Navigation Individual C3-4-11 / Component 3 IDA / 55590 Enhancement on the Post Consultant Open 231,915.00 Signed 2015-08-31 2015-05-01 2015-10-31 2015-10-31 2015-12-22 2015-12-22 2017-12-21 International Advisor Ayeyarwady River Selection Component 3. Navigation Individual C3-4-1 / Project Officer 1 for IDA / 55590 Enhancement on the Post Consultant Open 16,380.00 Signed 2016-02-29 2016-04-28 2016-05-31 2016-05-31 2016-07-04 2016-07-04 2018-07-03 Component 3 Ayeyarwady River Selection Component 1: Water Individual C1-18 / Evaluator for Resource Management IDA / 55590 Prior Consultant Direct 0.00 Canceled 2017-03-03 2017-03-13 2017-03-13 2017-04-03 2017-09-30 Myanmar-Netherlands MOU Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-1-13 / NWRC Secretariat Resource Management IDA / 55590 Post Consultant Open 0.00 Canceled 2017-12-31 2017-12-31 2017-12-31 2018-03-01 2019-03-01 Support Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-20 / English/Myanmar Resource Management IDA / 55590 Post Consultant Open 8,400.00 Signed 2017-11-30 2017-12-31 2018-01-18 2018-02-08 2018-06-01 2018-03-15 2018-06-05 2018-09-11 Translator for PMU Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-21 / English/Myanmar Resource Management IDA / 55590 Post Consultant Open 9,600.00 Completed 2017-11-30 2017-12-31 2018-01-18 2018-02-08 2018-06-01 2018-03-15 2018-06-07 2018-09-11 2018-12-31 Translator for Component 1 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-22 / HIC IT Network Resource Management IDA / 55590 Post Consultant Open 9,600.00 Completed 2017-12-31 2018-06-25 2018-02-18 2018-03-11 2018-11-21 2018-04-15 2018-12-03 2018-10-12 2019-12-02 Specialist Institutions, Decision Support Selection Systems & Capacity Building Page 8 Component 1: Water Individual C1-23 / AG Secretariat Resource Management IDA / 55590 Post Consultant Open 8,400.00 Signed 2017-12-31 2017-12-31 2018-02-18 2018-03-11 2018-08-01 2018-04-15 2018-08-01 2018-10-12 Technical Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-24 / NWRC Secretariat Resource Management Under IDA / 55590 Post Consultant Open 0.00 2017-11-30 2017-12-31 2018-01-18 2018-02-08 2018-03-15 2018-09-11 Coordinating Officer Institutions, Decision Support Implementation Selection Systems & Capacity Building Component 1: Water Individual C1-25 / Stakeholder Forum Resource Management IDA / 55590 Post Consultant Open 18,000.00 Completed 2017-11-30 2018-06-25 2018-01-18 2018-02-08 2019-05-02 2018-03-15 2019-05-15 2018-09-11 2019-08-30 Coordinator for Component 1 Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-26 / Senior Safeguard Resource Management IDA / 55590 Post Consultant Direct 30,800.00 Completed 2017-11-21 2017-12-01 2017-12-01 2017-12-22 2018-01-26 2017-12-29 2018-07-25 2018-06-29 Specialist (National) Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-27 / National Civil Resource Management IDA / 55590 Post Consultant Open 26,400.00 Signed 2018-02-01 2018-03-06 2018-03-22 2020-02-17 2018-04-12 2020-03-04 2018-05-17 2020-03-05 2018-11-13 Engineer,Structural Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water C1-28 / C1 National Social Resource Management Specialist for Yangon Region IDA / 55590 Post Direct Selection Direct 3,000.00 Completed 2018-02-01 2018-01-31 2018-02-11 2018-03-04 2018-03-09 2018-03-24 2018-05-11 Institutions, Decision Support IWRM Project Preparation Systems & Capacity Building Component 2. Hydro- C2-5 / Component 2 meteorological Observation IDA / 55590 Post Direct Selection Direct 157,463.00 Signed 2018-01-01 2018-05-11 2018-01-11 2018-03-17 2018-05-11 2018-09-13 International Advisor 2 and Information Systems Modernization Component 2. Hydro- C2-7 / Component 2 meteorological Observation International Hydrological IDA / 55590 Post Direct Selection Direct 163,568.00 Signed 2018-02-28 2018-09-03 2018-03-10 2018-05-14 2018-05-01 2018-11-10 and Information Systems Specialist Modernization Component 3. Navigation Individual C3-15 / Senior River IDA / 55590 Enhancement on the Post Consultant Open 243,600.00 Completed 2018-02-28 2018-06-04 2018-04-18 2018-05-09 2018-09-05 2018-06-13 2018-09-12 2018-12-10 2019-07-01 Engineer Ayeyarwady River Selection Component 3. Navigation Individual C3-16 / Project Officer 3 for Under IDA / 55590 Enhancement on the Post Consultant Open 14,400.00 2018-02-01 2018-11-19 2018-03-22 2018-05-14 2018-04-12 2018-05-15 2018-05-17 2018-11-13 Component 3 Implementation Ayeyarwady River Selection Component 2. Hydro- C2-1A / Project Officer 2 for meteorological Observation IDA / 55590 Post Direct Selection Direct 24,000.00 Signed 2018-01-15 2018-02-01 2018-01-25 2018-02-09 2018-02-08 2018-08-08 Component 2 and Information Systems Modernization Component 1: Water C1-4-8C / National Resource Management IDA / 55590 Post Direct Selection Direct 14,400.00 Completed 2017-11-30 2017-12-01 2017-12-10 2017-12-25 2017-12-19 2018-12-25 2018-06-29 Safeguard Officer Institutions, Decision Support Systems & Capacity Building Component 1: Water Individual C1-4-3A / International Resource Management IDA / 55590 Prior Consultant Open 197,600.00 Signed 2018-04-12 2018-05-13 2018-05-15 2018-09-24 2018-05-29 2018-10-15 2018-06-17 2018-11-27 2018-12-14 Procurement Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-29 / PFI Coordinator for Resource Management IDA / 55590 Post Consultant Open 30,000.00 Signed 2018-08-31 2019-09-25 2018-10-19 2019-09-25 2018-11-09 2019-09-25 2018-12-14 2019-10-03 2019-06-12 YGN-IWRM Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-8 D / National Resource Management IDA / 55590 Post Consultant Open 18,000.00 Signed 2018-07-31 2018-08-09 2018-09-18 2018-10-09 2018-11-13 2018-09-27 2019-05-12 Environmental Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-8 E / National Social Resource Management IDA / 55590 Post Consultant Open 18,000.00 Completed 2018-07-31 2018-08-09 2018-09-18 2018-10-09 2018-11-13 2018-10-01 2019-05-12 2019-07-31 Officer Institutions, Decision Support Selection Systems & Capacity Building Component 2. Hydro- Individual C2-10 / National Legal meteorological Observation IDA / 55590 Post Consultant Open 12,590.00 Signed 2018-08-01 2018-07-25 2018-09-19 2018-10-10 2018-11-28 2018-11-14 2018-11-28 2019-05-13 Consultant and Information Systems Selection Modernization Component 3. Navigation Individual C3-19 / National Specialist IDA / 55590 Enhancement on the Post Consultant Open 12,360.00 Signed 2018-07-16 2018-07-28 2018-09-03 2018-09-24 2019-01-18 2018-10-29 2019-01-24 2019-04-27 for Aids to Navigation Ayeyarwady River Selection Component 2. Hydro- C2-6 / Component 2 meteorological Observation IDA / 55590 Post Direct Selection Direct 0.00 Canceled 2018-01-01 2018-01-11 2018-03-17 2018-09-13 National Advisor and Information Systems Modernization C1-31REVISED / The New Yangon City (regional) fresh Component 1: Water water supply study- Resource Management Under IDA / 55590 Post Direct Selection Direct 0.00 2018-09-30 2018-12-07 2018-10-10 2018-12-07 2018-12-14 2019-06-12 Development of the vision and Institutions, Decision Support Implementation functional requirements of the Systems & Capacity Building Pan Hlaing River System Component 2. Hydro- Individual C2-12 / Component 2 meteorological Observation IDA / 55590 Post Consultant Open 688.98 Signed 2018-11-30 2018-11-28 2019-01-18 2019-02-08 2019-02-19 2019-03-15 2019-03-06 2019-09-11 Finance Assistant and Information Systems Selection Modernization Component 2. Hydro- C2-13 / Component 2 Individual meteorological Observation Project Officer cum. Asst. to IDA / 55590 Post Consultant Open 12,000.00 Signed 2018-11-30 2018-11-28 2019-01-18 2019-02-08 2019-02-28 2019-03-15 2019-03-04 2019-09-11 and Information Systems Procurement Selection Modernization Page 9 Component 3. Navigation Individual C3-19A / National Specialist IDA / 55590 Enhancement on the Post Consultant Direct 12,360.00 Signed 2018-12-15 2018-11-13 2018-12-25 2019-01-15 2019-01-18 2019-02-19 2019-01-29 2019-08-18 for Aids to Navigation Ayeyarwady River Selection Component 3. Navigation Individual C3-19B / National Specialist IDA / 55590 Enhancement on the Post Consultant Direct 12,360.00 Signed 2018-12-15 2018-11-13 2018-12-25 2019-01-15 2019-01-18 2019-02-19 2019-01-29 2019-08-18 for Aids to Navigation Ayeyarwady River Selection C3-18 / National River Component 3. Navigation Individual Under Engineer and Coordinator for IDA / 55590 Enhancement on the Post Consultant Limited 0.00 2019-04-01 2019-12-02 2019-04-06 2019-04-27 2019-06-01 2019-11-28 Implementation Component 3 Ayeyarwady River Selection Component 1: Water C1-31 / The New Yangon Resource Management City (regional) fresh water IDA / 55590 Prior Direct Selection Direct 0.00 Canceled 2018-08-31 2018-09-10 2018-11-14 2019-05-13 Institutions, Decision Support supply study Systems & Capacity Building Component 1: Water C1-30 / International Water Resource Management IDA / 55590 Prior Direct Selection Direct 0.00 Canceled 2018-08-31 2019-02-06 2018-09-10 2018-11-14 2019-05-13 Law Consultant Institutions, Decision Support Systems & Capacity Building Component 1: Water C1-4-11C / Stakeholder Individual Resource Management Communication Officer for IDA / 55590 Post Consultant Open 12,000.00 Completed 2019-04-01 2018-06-29 2019-05-20 2019-06-10 2019-05-02 2019-07-15 2019-05-02 2020-01-11 2019-08-30 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 1: Water Individual C1-21A / English-Myanmar Resource Management Pending IDA / 55590 Post Consultant Open 0.00 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 Translator for Component 1 Institutions, Decision Support Implementation Selection Systems & Capacity Building Component 1: Water Individual C1-30REVISED / International Resource Management IDA / 55590 Post Consultant Open 36,140.00 Signed 2019-04-01 2019-02-01 2019-05-20 2019-06-10 2019-07-15 2019-01-07 2020-01-11 Water Law Consultant Institutions, Decision Support Selection Systems & Capacity Building C1-36 / International Component 1: Water Individual Strategic Advisor for the Resource Management Pending IDA / 55590 Post Consultant Open 0.00 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 preparation of the Yangon Institutions, Decision Support Implementation Selection Region IWRM Project Systems & Capacity Building Component 1: Water Individual C1-38 / Interim International Resource Management IDA / 55590 Post Consultant Open 22,360.00 Signed 2019-05-28 2019-04-23 2019-05-31 2019-05-20 2019-06-01 2019-05-24 2019-06-03 2019-05-31 2019-11-30 Finance Management Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1.4-8F / National Safeguard Resource Management IDA / 55590 Post Consultant Open 15,600.00 Signed 2019-07-31 2019-08-01 2019-09-02 2019-07-22 2019-09-09 2019-09-16 2019-09-11 2019-09-16 2020-09-05 Officer Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-5A / International Resource Management IDA / 55590 Prior Consultant Direct 101,000.00 Signed 2019-12-31 2020-01-06 2020-01-10 2020-01-31 2020-03-25 2020-03-06 2020-01-23 2020-09-02 Financial Management Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-4-7A / International Resource Management IDA / 55590 Post Consultant Open 100,630.00 Signed 2019-12-31 2020-01-03 2020-02-18 2020-03-26 2020-03-10 2020-05-17 2020-04-14 2020-05-20 2020-10-11 Safeguards Advisor Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-1-14A / HIC/GIS Data Resource Management Under IDA / 55590 Post Consultant Open 0.00 2020-01-30 2019-12-22 2020-03-19 2020-04-09 2020-05-14 2020-11-10 Base Specialist Institutions, Decision Support Implementation Selection Systems & Capacity Building Component 1: Water Individual C1-22A / HIC IT Network Resource Management Under IDA / 55590 Post Consultant Open 0.00 2020-01-30 2019-12-22 2020-03-19 2020-04-09 2020-05-14 2020-11-10 Specialist Institutions, Decision Support Implementation Selection Systems & Capacity Building Component 1: Water C1-4-11D / Stakeholder Individual Resource Management Communication Officer for IDA / 55590 Post Consultant Open 6,000.00 Signed 2020-01-30 2019-11-12 2020-03-19 2019-12-11 2020-04-09 2020-01-20 2020-05-14 2020-01-24 2020-11-10 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 1: Water Individual C1-25A / Stakeholder Forum Resource Management IDA / 55590 Post Consultant Open 21,600.00 Signed 2020-01-30 2019-11-12 2020-03-19 2019-12-11 2020-04-09 2020-03-03 2020-05-14 2020-03-03 2020-11-10 Coordinator for Component 1 Institutions, Decision Support Selection Systems & Capacity Building Component 2. Hydro- Individual C2-12A / Component 2 meteorological Observation Under IDA / 55590 Post Consultant Open 0.00 2020-01-30 2020-01-02 2020-03-19 2020-04-09 2020-05-14 2020-11-10 Finance Assistant and Information Systems Implementation Selection Modernization Component 1: Water Individual C1-10B-MMMA / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2018-02-01 2017-09-29 2018-03-22 2018-01-02 2018-04-12 2018-01-15 2018-05-17 2018-02-13 2018-11-13 Researchers Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10E-HSDL / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2018-02-01 2017-09-29 2018-03-22 2018-01-02 2018-04-12 2018-02-13 2018-05-17 2018-02-13 2018-11-13 Researchers Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10G-ZMH / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2018-02-01 2017-09-29 2018-03-22 2018-03-01 2018-04-12 2018-02-13 2018-05-17 2018-02-13 2018-11-13 Researchers Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10H-KKT / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2018-02-01 2017-09-29 2018-03-22 2018-03-01 2018-04-12 2018-02-13 2018-05-17 2018-02-13 2018-11-13 Researchers Institutions, Decision Support Selection Systems & Capacity Building Page 10 Component 1: Water Individual C1-10A-AKK / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2019-06-01 2019-02-28 2019-07-20 2019-05-03 2019-08-10 2019-06-05 2019-09-14 2019-06-05 2020-03-12 Researchers Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water Individual C1-10F-CMW / HIC Junior Resource Management IDA / 55590 Post Consultant Open 6,000.00 Signed 2019-06-01 2019-02-28 2019-07-20 2019-05-03 2019-08-10 2019-06-03 2019-09-14 2019-06-03 2020-03-12 Researchers Institutions, Decision Support Selection Systems & Capacity Building Component 1: Water C1-4-11B-AT / Stakeholder Individual Resource Management Communication Officer 2 for IDA / 55590 Post Consultant Open 15,600.00 Signed 2017-04-01 2017-01-16 2017-05-20 2017-02-27 2017-06-10 2017-03-23 2017-07-15 2017-04-03 2018-01-11 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 1: Water C1-4-11B-TSA / Stakeholder Individual Resource Management Communication Officer 2 for IDA / 55590 Post Consultant Open 13,200.00 Signed 2017-11-01 2017-09-29 2017-12-20 2017-10-25 2018-01-10 2017-10-25 2018-02-14 2017-11-01 2018-08-13 Institutions, Decision Support Component 1 Selection Systems & Capacity Building Component 3. Navigation Individual C3-15A / Senior River Under IDA / 55590 Enhancement on the Post Consultant Open 0.00 2020-02-21 2020-02-25 2020-04-10 2020-05-01 2020-06-05 2020-12-02 Engineer Implementation Ayeyarwady River Selection Page 11