PROCUREMENT PLAN (Textual Part) Project information: BURUNDI LANDSCAPE RESTORATION AND RESILIENCE PROJECT P160613 Project Implementation agency: MINISTRY OF AGRICULTURE AND LIVESTOCK Date of the Procurement Plan: February 15, 2019 Period covered by this Procurement Plan: February 2019 - October 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Burundi : Burundi Landscape Restoration and Resilience Project PLAN General Information Country: Burundi Bank’s Approval Date of the Original Procurement Plan: 2019-02-20 2020-06-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160613 GPN Date: Project Name: Burundi Landscape Restoration and Resilience Project Loan / Credit No: IDA / D2760 Executing Agency(ies): Burundi Landscape Restoration and Resilience Project WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-BLRRP-162193-CW-RFB / Travaux de construction et Improved Management of de réhabilitation des centres Single Stage - One En attente IDA / D2760 Protected Areas and A posteriori Appel d'offres Open - National 210,000.00 0.00 2020-03-10 2020-03-15 2020-04-26 2020-05-26 2020-06-30 2020-12-27 visiteurs et des postes de Envelope d'exécution Reserves surveillances pour le compte de l'OBPE BI-BLRRP-173980-CW-RFQ / Travaux de rénovation, Institutional Development d'équipement des bureaux and Capacity Building for Single Stage - One En attente des SFC d'Isare et IDA / D2760 A posteriori Demande de prix Limited 20,383.00 0.00 2020-05-27 2020-07-22 2021-01-18 Landscape Restoration and Envelope d'exécution Buhinyuza et d'éclairage et Resilience équipement du bureau communal de Buhinyuza GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINAGRIE-99975-GO- RFB / Achat groupes Sustainable Landscape Single Stage - One IDA / D2760 A posteriori Appel d'offres Open - National 154,500.00 94,784.80 Achevé 2019-02-10 2019-06-19 2019-02-15 2019-03-29 2019-06-26 2019-04-28 2019-11-22 2019-06-02 2019-11-06 2019-11-29 2020-02-17 d'equipements informatique Management Practices Envelope et bureautique Institutional Development Passation de BI-MINAGRIE-99974-GO-UN and Capacity Building for marchés auprès IDA / D2760 A posteriori Direct 475,000.00 317,993.98 Signé 2019-02-10 2019-03-13 2019-02-15 2019-03-22 2019-03-28 2019-09-18 / Achat de véhicules (10) Landscape Restoration and des agences de Resilience l'ONU BI-BLRRP-144859-GO-RFQ / Project Management, Single Stage - One Fourniture du mobilier de IDA / D2760 Coordination, and A posteriori Demande de prix Limited 30,000.00 24,660.08 Achevé 2019-11-13 2019-10-24 2020-01-08 2019-12-03 2020-07-06 2019-12-31 Envelope bureau Monitoring BI-BLRRP-147918-GO-RFQ / Project Management, Acquisition des équipements Single Stage - One En attente IDA / D2760 Coordination, and A posteriori Demande de prix Limited 2,250.00 0.00 2019-12-04 2020-01-29 2020-07-27 de collecte des données Envelope d'exécution Monitoring (Smartphones) BI-BLRRP- 99975-GO-UN/ Institutional Development ACHAT VÉHICULE / Achat Passation de and Capacity Building for En cours d'un véhicule pick up Double IDA / D2760 A posteriori marché de gré à Direct 50,000.00 0.00 2019-10-29 2020-01-02 2019-11-03 2020-03-28 2019-12-08 2020-06-05 Landscape Restoration and d'exécution cabine pour le compte du gré Resilience SP/ CFN Page 1 BI-BLRRP-152621-GO-RFB / Sustainable Landscape Open - Single Stage - One En cours Achat et distribution des IDA / D2760 A posteriori Appel d'offres 800,000.00 0.00 2020-01-13 2020-01-27 2020-01-18 2020-01-30 2020-02-29 2020-03-19 2020-03-30 2020-05-04 2020-10-31 Management Practices International Envelope d'exécution vaches BI-BLRRP-150671-GO-RFQ / Project Management, Single Stage - One En cours Acquisition des IDA / D2760 Coordination, and A posteriori Demande de prix Limited 12,000.00 0.00 2019-12-22 2020-02-27 2020-02-16 2020-08-14 Envelope d'exécution consommables de bureau Monitoring BI-BLRRP-147411-GO-RFB / Acquisition groupée des Institutional Development motos et des vélos pour les and Capacity Building for Single Stage - One En cours services fonciers communaux, IDA / D2760 A posteriori Appel d'offres Open - National 111,850.00 0.00 2019-11-27 2020-02-13 2019-12-02 2020-02-13 2020-01-13 2020-02-12 2020-03-18 2020-09-14 Landscape Restoration and Envelope d'exécution l'OBPE et les chefs de Resilience collines de la zone d'action du projet Passation de BI-BLRRP-158870-GO-DIR / Improved Management of marchés auprès En cours Achat de deux (02) véhicules IDA / D2760 Protected Areas and A posteriori Direct 102,000.00 0.00 2020-02-24 2020-03-27 2020-02-27 2020-04-05 2020-04-02 2020-09-29 des agences de d'exécution pick up Double cabine Reserves l'ONU BI-BLRRP-159824-GO-RFQ / Project Management, Fourniture et installation Single Stage - One En cours IDA / D2760 Coordination, and A posteriori Demande de prix Limited 4,500.00 0.00 2020-02-22 2020-03-03 2020-04-18 2020-10-15 des équipements Envelope d'exécution Monitoring téléphoniques BI-BLRRP-160641-GO-RFQ / Acquisition des boucles Sustainable Landscape Single Stage - One En cours IDA / D2760 A posteriori Demande de prix Limited 1,500.00 0.00 2020-02-29 2020-02-25 2020-04-25 2020-10-22 d'oreilles pour vaches et des Management Practices Envelope d'exécution applicateurs (pointeaux) BI-BLRRP-162192-GO-RFB / Acquisition du matériel de Improved Management of surveillance des Parcs Single Stage - One En cours IDA / D2760 Protected Areas and A posteriori Appel d'offres Open - National 100,000.00 0.00 2020-03-05 2020-03-14 2020-03-10 2020-03-14 2020-04-21 2020-05-21 2020-06-25 2020-12-22 Nationaux et des Réserves Envelope d'exécution Reserves Naturelles Forestières pour le compte de l'OBPE BI-BLRRP-162288-GO-RFB / Acquisition d'une Institutional Development Vidéoconférence et des and Capacity Building for Single Stage - One En cours IDA / D2760 A posteriori Appel d'offres Open - National 60,000.00 0.00 2020-03-06 2020-03-14 2020-03-11 2020-03-14 2020-04-22 2020-05-22 2020-06-26 2020-12-23 équipements de Landscape Restoration and Envelope d'exécution communication du Resilience MINEAGRIE BI-BLRRP-154434-GO-RFQ / Project Management, Acquisition d'appareils photo Single Stage - One IDA / D2760 Coordination, and A posteriori Demande de prix Limited 4,500.00 0.00 Annulé 2020-01-23 2020-02-21 2020-03-19 2020-09-15 numériques professionnels et Envelope Monitoring de Vidéoprojecteurs BI-BLRRP-144875-GO-RFB / Achat groupé d'équipements informatiques pour les Institutional Development bureaux des gouverneurs, and Capacity Building for Single Stage - One IDA / D2760 A posteriori Appel d'offres Open - National 30,000.00 0.00 Annulé 2019-11-08 2019-11-13 2019-12-25 2020-01-24 2020-02-28 2020-08-26 des administrateurs Landscape Restoration and Envelope communaux , des SFC, des Resilience parcs nationaux, de l'OBPE et des BPEAE BI-BLRRP-166822-GO-RFQ / Project Management, Single Stage - One En attente Acquisition des appareils IDA / D2760 Coordination, and A posteriori Demande de prix Open - National 4,500.00 0.00 2020-04-05 2020-05-31 2020-11-27 Envelope d'exécution photos et Vidéoprojecteur Monitoring BI-BLRRP-162291-GO-DIR / Acquisition de pré-imprimés Passation de Sustainable Landscape En attente pour le compte des services IDA / D2760 A posteriori marché de gré à Direct 5,807.00 0.00 2020-03-31 2020-04-05 2020-05-10 2020-11-06 Management Practices d'exécution Fonciers Communaux gré (SFC)d'Isare et Buhinyuza Page 2 BI-BLRRP-167656-GO-RFQ / Project Management, Single Stage - One En cours Acquisition d'un Serveur IDA / D2760 Coordination, and A posteriori Demande de prix Open - National 20,000.00 0.00 2020-04-15 2020-06-10 2020-12-07 Envelope d'exécution avec accessoires pour l'UCP Monitoring BI-BLRRP-167904-GO-DIR / Project Management, Single Stage - One En attente Acquisition des Routeurs IDA / D2760 Coordination, and A posteriori Demande de prix Limited 2,000.00 0.00 2020-05-23 2020-07-18 2021-01-14 Envelope d'exécution pour connections internet Monitoring BI-BLRRP- 147697-GO-RFQ / Achat du matériel Sustainable Landscape Single Stage - One IDA / D2760 A posteriori Demande de prix Limited 13,703.00 0.00 Annulé 2019-12-04 2020-02-07 2020-01-29 2020-07-27 topographique pour les SEC Management Practices Envelope d'Isare et Buhinyuza BI-BLRRP-175511-GO-DIR / Acquisition des semences Passation de Sustainable Landscape En cours pour la mise en place et le IDA / D2760 A posteriori marché de gré à Direct 4,184.73 0.00 2020-06-09 2020-06-15 2020-06-14 2020-07-19 2021-01-15 Management Practices d'exécution développement des pépinières gré communautaires BI-BLRRP-175515-GO-RFQ / Acquisition des intrants et du matériel pour la mise en Sustainable Landscape Single Stage - One En attente IDA / D2760 A posteriori Demande de prix Open - National 63,836.50 0.00 2020-06-14 2020-08-09 2021-02-05 place et le développement Management Practices Envelope d'exécution des pépinières communautaires NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINAGRIE-109665-NC- DIR / Conclusion d'un Improved Management of Passation de contrat avec BIOVERSITY IDA / D2760 Protected Areas and A posteriori marché de gré à Direct 1,000,000.00 0.00 Annulé 2019-04-09 2019-11-05 2019-04-14 2019-11-19 2019-05-19 2019-11-15 pour le développement des Reserves gré semences améliorées BI-MINAGRIE-112698-NC- DIR / Acquisition et mise à Passation de Sustainable Landscape jour des logiciels de gestion IDA / D2760 A posteriori marché de gré à Direct 35,000.00 35,255.99 Signé 2019-04-30 2019-06-20 2019-05-05 2019-11-14 2019-06-09 2019-12-10 2019-12-06 Management Practices comptable et formations sur gré ces logiciels (Multi-site)/UCP BI-BLRRP-135159-NC-DIR / Convention avec la Direction Improved Management of Passation de de l'Aménagement du IDA / D2760 Protected Areas and A posteriori marché de gré à Direct 150,000.00 150,000.00 Signé 2019-10-24 2019-11-23 2019-10-29 2019-12-10 2019-12-03 2019-12-02 2020-05-31 Territoire (DGAT) pour la Reserves gré mise en oeuvre de la Composante B du Projet BI-BLRRP-135155-NC-DIR / Convention avec l'Office Institutional Development Passation de Burundais pour la Protection and Capacity Building for En cours IDA / D2760 A priori marché de gré à Direct 1,927,500.00 0.00 2019-10-15 2019-12-15 2019-10-29 2020-01-15 2019-12-17 2020-06-14 de l'Environnement pour la Landscape Restoration and d'examen gré mise en oeuvre de la Resilience composante C du Projet CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 BI-MINAGRIE-99911-CS- QCBS / Recrutement d'un consultant pour faire les Improved Management of Sélection fondée etudes de faisabilite pour la Open - IDA / D2760 Protected Areas and A priori sur la qualité et 350,000.00 0.00 Annulé 2019-02-09 2019-03-02 2019-04-15 2019-05-13 2019-06-12 2019-07-17 2019-08-21 2020-08-20 mise en place des terrasses International Reserves le coût progressives et radicales ainsi que le supervision par methode HIMO BI-MINAGRIE-108118-CS- QCBS / Recrutement d'un consultant pour faire des Improved Management of Sélection fondée études des faisabilité pour la Open - En cours IDA / D2760 Protected Areas and A posteriori sur la qualité et 350,000.00 0.00 2019-03-27 2019-10-01 2019-04-17 2019-06-24 2019-05-31 2020-01-16 2019-06-28 2020-03-10 2019-07-28 2020-03-10 2019-09-01 2019-10-06 2020-10-05 mise en place des terrasses International d'exécution Reserves le coût progressives et radicales ainsi que la supervision par méthode HIMO BI-MINAGRIE-128750-CS- CQS / Recrutement d’un Sélection fondée bureau de consultants pour Sustainable Landscape sur les Open - En cours la réalisation de l’étude de IDA / D2760 A posteriori 30,000.00 0.00 2019-09-19 2019-11-21 2019-10-10 2019-11-26 2019-11-23 2020-03-24 2019-12-23 2020-01-27 2020-07-25 Management Practices qualifications des International d'exécution référence du Projet de consultants Restauration et Résilience du Paysage du Burundi BI-BLRRP-142816-CS-QBS / Recrutement d'un bureau de Sélection fondée Project Management, services de consultants pour sur les IDA / D2760 Coordination, and A posteriori Open - National 20,000.00 0.00 Annulé 2019-11-07 2019-11-28 2020-01-11 2020-02-10 2020-03-16 2020-09-12 la mise en place d'un qualifications des Monitoring système informatisé de Suivi- consultants Evaluation BI-BLRRP-147225-CS-CQS / Recrutement d'un bureau de Sélection fondée Project Management, services de consultants pour sur les En cours IDA / D2760 Coordination, and A posteriori Open - National 20,000.00 0.00 2019-11-26 2019-12-17 2019-12-17 2020-02-04 2020-01-30 2020-02-29 2020-04-04 2020-10-01 la mise en place d'un qualifications des d'exécution Monitoring système informatisé de Suivi- consultants Evaluation BI-MINAGRIE-99907-CS- Improved Management of Sélection fondée QCBS / Recrutement d'un Open - IDA / D2760 Protected Areas and A priori sur la qualité et 1,884,300.00 0.00 Annulé 2019-02-09 2019-05-09 2019-03-02 2019-06-29 2019-04-15 2019-05-13 2019-06-12 2019-07-17 2019-08-21 2020-08-20 consultant pour la International Reserves le coût certification foncière BI-BLRRP- 99907-CS-QBS / Sustainable Landscape Sélection fondée Open - En cours Recrutement d'un consultant IDA / D2760 A priori 1,884,300.00 0.00 2019-02-09 2020-01-15 2019-03-02 2019-04-15 2020-02-11 2019-05-13 2020-04-21 2019-06-12 2019-07-12 2019-08-16 2020-08-15 Management Practices sur la qualité International d'exécution pour la certification foncière BI-BLRRP-154534-CS-QCBS Project Management, / Audit externe des comptes Sélection au Open - En cours IDA / D2760 Coordination, and A posteriori 25,000.00 0.00 2020-01-21 2020-02-14 2020-02-11 2020-02-29 2020-03-26 2020-04-23 2020-05-23 2020-06-27 2020-08-01 2021-01-28 du PRRPB pour la période moindre coût International d'exécution Monitoring de juillet 2019 à juin 2020 BI-BLRRP-158815-NC-RFQ / Sélection fondée Recrutement d'un prestataire Project Management, sur les pour la conception, création IDA / D2760 Coordination, and A posteriori Open - National 7,500.00 0.00 Annulé 2020-02-24 2020-03-16 2020-04-29 2020-05-29 2020-07-03 2020-12-30 qualifications des et hébergement d'un site Monitoring consultants web du projet BI-MINAGRIE-99905-CS- Improved Management of Sélection fondée QCBS / Recrutement d'un Open - IDA / D2760 Protected Areas and A priori sur la qualité et 1,000,000.00 0.00 Annulé 2019-02-09 2019-05-10 2019-03-02 2019-12-26 2019-04-15 2020-03-11 2019-05-13 2020-04-24 2019-06-12 2019-07-17 2019-08-21 2020-08-20 consultant pour la International Reserves le coût mobilisation communautaire Page 4 BI-MINEAGRIE-180453-CS- QCBS / Recrutement d'une ONG chargée d'appuyer Sélection fondée l'Unité Nationale de Sustainable Landscape Open - En attente IDA / D2760 A priori sur la qualité et 957,000.00 0.00 2019-02-09 2019-03-02 2019-04-15 2019-05-13 2019-06-12 2019-07-17 2019-08-21 2020-08-20 Coordination du PRRPB Management Practices International d'exécution le coût dans la mobilisation des communautés de la zone du projet INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINAGRIE-99903-CS- INDV / Recrutement d'un Contingency Emergency consultant pour l'élaboration IDA / D2760 A posteriori Individuel Open 15,000.00 0.00 Annulé 2019-02-09 2019-03-30 2019-04-20 2019-05-25 2019-11-21 Response (CERC) de la situation genre du projet BI-MINAGRIE-101091-CS- CDS / Conclusion d'un contrat avec l'Université de Improved Management of Sélection de Florence pour le IDA / D2760 Protected Areas and A posteriori consultants par Direct 400.00 0.00 Annulé 2019-02-15 2019-02-27 2019-03-16 2022-02-28 renforcement des capacités et Reserves entente directe la supervision des travaux de construction des terrasses radicales BI-MINAGRIE-101101-CS- CDS / Conclusion d'un Improved Management of Sélection de contrat avec BIOVERSITY IDA / D2760 Protected Areas and A priori consultants par Direct 1,000,000.00 0.00 Annulé 2019-02-15 2019-02-25 2019-05-01 2019-10-28 pour le developpement des Reserves entente directe semences améliorées BI-MINAGRIE-103392-CS- INDV / Recrutement d'un Sustainable Landscape IDA / D2760 A posteriori Individuel Open 7,500.00 0.00 Annulé 2019-02-27 2019-04-17 2019-05-08 2019-06-12 2019-12-09 consultant pour la mise à Management Practices jour du document du PAD BI-MINAGRIE-108107-CS- CDS / Recrutement de l'Université de Florence pour Improved Management of Sélection de En cours le renforcement des capacités IDA / D2760 Protected Areas and A posteriori consultants par Direct 400,000.00 0.00 2019-03-27 2019-06-10 2019-04-06 2019-09-10 2019-06-10 2019-12-07 d'examen et la supervision des Reserves entente directe travaux de construction des terrasses radicales. BI-MINAGRIE-108111-CS- INDV / Recrutement d'un Contingency Emergency En cours consultant pour l'élaboration IDA / D2760 A posteriori Individuel Open 15,000.00 0.00 2019-03-27 2019-05-31 2019-05-15 2019-08-07 2019-06-05 2019-07-10 2020-01-06 Response (CERC) d'exécution de la situation genre du projet BI-MINAGRIE-108193-CS- INDV / Recrutement d'un consultant pour une étude Sustainable Landscape En cours IDA / D2760 A posteriori Individuel Open 15,000.00 0.00 2019-03-28 2019-06-13 2019-05-16 2019-11-14 2019-06-06 2019-11-14 2019-07-11 2020-01-07 d'impact environnemental et Management Practices d'exécution social du projet et sa vulgarisation BI-MINAGRIE-112706-CS- INDV / Recrutement d'un Sustainable Landscape En cours IDA / D2760 A posteriori Individuel Open 18,000.00 0.00 2019-04-30 2019-06-16 2019-06-18 2019-07-09 2019-08-13 2020-02-09 comptable pour le compte de Management Practices d'exécution l'UC-PRRPB Page 5 BI-MINAGRIE-112711-CS- INDV / Recrutement d'un (e) Sustainable Landscape En cours IDA / D2760 A posteriori Individuel Open 18,000.00 0.00 2019-04-30 2019-06-16 2019-06-18 2019-07-09 2019-08-13 2020-02-09 assistant du Coordonnateur Management Practices d'exécution du PRRPB BI-MINAGRIE-112713-CS- INDV / Recrutement d'un (e) Secrétaire Sustainable Landscape En attente IDA / D2760 A posteriori Individuel Open 9,600.00 0.00 2019-04-30 2019-06-18 2019-07-09 2019-08-13 2020-02-09 receptionniste/standardiste Management Practices d'exécution pour le compte de l'UC- PRRPB. BI-MINAGRIE-125656-CS- INDV / Recrutement d'une Unité de Suivi Évaluation Sustainable Landscape En attente IDA / D2760 A posteriori Individuel Open 18,000.00 0.00 2019-07-31 2019-09-18 2019-10-09 2019-11-13 2020-05-11 pour l'unité provinciale du Management Practices d'exécution Projet dans la Province de Bujumbura BI-MINAGRIE-123980-CS- INDV / Recrutement d'un agent de suivi évaluation Sustainable Landscape En attente IDA / D2760 A posteriori Individuel Open 18,000.00 0.00 2019-08-14 2019-10-02 2019-10-23 2019-11-27 2020-05-25 pour l'unité provinciale de Management Practices d'exécution coordination du projet à Muyinga BI-BLRRP-135167-CS-INDV / Recrutement d'un Sustainable Landscape En cours consultant pour l'élaboration IDA / D2760 A posteriori Individuel Open 10,000.00 0.00 2019-09-20 2019-10-10 2019-11-08 2019-11-29 2020-01-03 2020-07-01 Management Practices d'exécution de la stratégie communication BI-BLRRP-135179-CS-INDV / Recrutement d'un Contingency Emergency En cours consultant pour la formation IDA / D2760 A posteriori Individuel Open 150,000.00 0.00 2019-09-20 2019-08-20 2019-11-08 2019-11-29 2020-01-03 2020-07-01 Response (CERC) d'exécution en gestion axée sur les résultats BI-BLRRP-138414-CS-INDV / Recrutement d'un consultant pour l'adaptation Sustainable Landscape du Manuel des procédures IDA / D2760 A posteriori Individuel Open 3,000.00 0.00 Annulé 2019-10-15 2019-11-25 2019-12-03 2019-12-24 2020-01-28 2020-07-26 Management Practices du PACSC pour produire le Manuel des Procédures du PRRPB BI-BLRRP-137037-CS-LCS / Recrutement d'un consultant Project Management, Sélection de pour l'audit du PRRPB pour IDA / D2760 Coordination, and A posteriori consultants par Direct 10,000.00 8,869.32 Achevé 2019-10-24 2019-11-06 2019-11-03 2019-11-22 2020-01-07 2019-12-02 2020-07-05 2019-12-30 la période courant à partir Monitoring entente directe du 01/10/2018 au 30/06/2019 BI-BLRRP-143000-CS-INDV / Recrutement d'un consultant pour l'élaboration Institutional Development d'un Plan de mobilisation and Capacity Building for En cours IDA / D2760 A posteriori Individuel Open 15,000.00 0.00 2019-10-28 2019-11-08 2019-12-16 2020-01-06 2020-02-10 2020-08-08 des parties prenantes du Landscape Restoration and d'exécution Projet de Restauration et de Resilience Résilience du Paysage du Burundi (PRRPB) Page 6 BI-BLRRP-143005-CS-INDV / Recrutement d'un consultant individuel pour l'élaboration d'un plan spécifique en faveur en Improved Management of faveur des peuples En cours IDA / D2760 Protected Areas and A posteriori Individuel Open 15,000.00 0.00 2019-10-28 2019-11-08 2019-12-16 2020-01-15 2020-01-06 2020-03-28 2020-02-10 2020-08-08 autochtones (Batwa) dans les d'exécution Reserves communes de Buhinyuza et d’Isale dans le cadre du Projet de Restauration et de Résilience du Paysage du Burundi BI-BLRRP-144837-CS-INDV / Recrutement d'un Institutional Development Consultant individuel pour and Capacity Building for IDA / D2760 A posteriori Individuel Open 15,000.00 7,074.36 Signé 2019-11-07 2019-11-26 2019-12-26 2020-01-13 2020-01-16 2020-02-03 2020-02-20 2020-03-03 2020-08-18 l'élaboration d'un Plan de Landscape Restoration and Gestion des Pestes et Resilience Pesticides BI-BLRRP-135163-NC-DIR / Convention avec le Institutional Development Secrétariat Permanent de la Sélection de and Capacity Building for Commission Nationale IDA / D2760 A posteriori consultants par Direct 180,000.00 0.00 Annulé 2019-11-07 2019-11-17 2020-01-21 2020-07-19 Landscape Restoration and Foncière pour la mise en en entente directe Resilience oeuvre de la composante A du Projet BI-BLRRP-150250-CS-CDS / Recrutement d'un consultant Project Management, Sélection de individuel pour la mise à En cours IDA / D2760 Coordination, and A posteriori consultants par Direct 5,000.00 0.00 2019-12-13 2019-12-23 2019-12-23 2020-01-07 2020-02-26 2020-08-24 jour du Cadre de Gestion d'exécution Monitoring entente directe Environnemental et social (CGES) pour le PRRPB BI-BLRRP-150256-CS-CDS / Recrutement d'un consultant Project Management, Sélection de individuel pour la mise à En cours IDA / D2760 Coordination, and A posteriori consultants par Direct 5,000.00 0.00 2019-12-13 2019-12-23 2019-12-23 2020-01-07 2020-02-26 2020-08-24 jour du Cadre de Politique d'exécution Monitoring entente directe de Réinstallation Involontaire pour le PRRPB BI-BLRRP-150260-CS-CDS / Recrutement d'un consultant individuel pour la mise à Project Management, Sélection de En cours jour d'un cadre de IDA / D2760 Coordination, and A posteriori consultants par Direct 5,000.00 0.00 2019-12-13 2019-12-23 2019-12-23 2020-01-07 2020-02-26 2020-08-24 d'exécution Planification en Faveur des Monitoring entente directe Peuples Autochtones pour le PRRPB BI-BLRRP-150301-CS-CDS / Recrutement d'un Consultant Project Management, Sélection de En cours individuel pour la mise à IDA / D2760 Coordination, and A posteriori consultants par Direct 5,000.00 0.00 2019-12-13 2019-12-23 2019-12-23 2020-01-07 2020-02-26 2020-08-24 d'exécution jour du Cadre fonctionnel Monitoring entente directe pour le PRRPB BI-MINAGRIE-99909-CS- Improved Management of Sélection de CDS / Contrat avec FAO IDA / D2760 Protected Areas and A priori consultants par Direct 1,190,000.00 0.00 Annulé 2019-02-09 2019-11-20 2019-02-19 2019-04-25 2019-10-22 pour la mise place des Reserves entente directe champs écoles paysans BI-BLRRP-135176-CS-INDV / Recrutement d'un Sustainable Landscape consultant pour l'élaboration IDA / D2760 A posteriori Individuel Open 10,000.00 0.00 Annulé 2019-09-20 2019-10-10 2019-11-08 2019-11-29 2020-01-03 2020-07-01 Management Practices d'un Manuel de Suivi- Évaluation BI-BLRRP- 99909-CS-CDS CONTRAT AVEC FAO / Improved Management of Sélection de Contrat avec la FAO pour En cours IDA / D2760 Protected Areas and A priori consultants par Direct 1,190,000.00 0.00 2019-02-09 2020-01-15 2019-02-19 2020-03-14 2019-04-25 2019-10-22 la mise en place des d'exécution Reserves entente directe Champs Ecole Paysans (CEP) Page 7 BI-BLRRP-147343-NC-DIR / Convention avec le Secrétariat Permanent de la Institutional Development Sélection de Commission Foncière and Capacity Building for En cours IDA / D2760 A posteriori consultants par Direct 180,000.00 0.00 2019-12-13 2020-01-16 2019-12-23 2020-01-29 2020-02-26 2020-08-24 Nationale (SP/CFN) pour la Landscape Restoration and d'exécution entente directe supervision des activités en Resilience rapport avec la certification foncière BI-BLRRP-154292-CS-INDV / Recrutement d'un consultant individuel pour Project Management, l'élaboration d'un Manuel IDA / D2760 Coordination, and A posteriori Individuel Open 15,000.00 10,248.77 Signé 2020-01-17 2020-02-03 2020-03-06 2020-04-06 2020-03-27 2020-04-29 2020-05-01 2020-04-29 2020-10-28 des Procédures de Gestion Monitoring Administrative, Financière et Comptable du PRRPB BI-BLRRP-154313-CS-INDV / Recrutement d'un Project Management, consultant individuel pour En cours IDA / D2760 Coordination, and A posteriori Individuel Open 15,000.00 0.00 2020-01-17 2020-02-03 2020-03-06 2020-03-27 2020-05-01 2020-10-28 l'élaboration d'un Manuel d'exécution Monitoring des Procédures de Passation des Marchés du PRRPB BI-BLRRP-158811-CS-INDV / Recrutement d'un Project Management, consultant individuel IDA / D2760 Coordination, and A posteriori Individuel Open 7,500.00 0.00 Annulé 2020-02-12 2020-02-18 2020-04-01 2020-04-22 2020-05-27 2020-11-23 temporaire chargé des Monitoring Sauvegardes Sociales pour une période de 3 mois BI-BLRRP-159902-CS-CDS / Contrat avec Bioversity International pour assistance Improved Management of Sélection de technique dans l'acquisition En cours IDA / D2760 Protected Areas and A priori consultants par Direct 500,000.00 0.00 2020-02-17 2020-02-20 2020-02-27 2020-03-14 2020-05-02 2020-10-29 des semences améliorées et d'exécution Reserves entente directe la formation en développement des pépinières communautaires BI-BLRRP-160473-CS-INDV / Recrutement d'un consultant individuel Project Management, national chargé d'appuyer En cours IDA / D2760 Coordination, and A posteriori Individuel Limited 10,000.00 0.00 2020-02-19 2020-02-20 2020-02-24 2020-02-24 2020-03-16 2020-03-27 2020-04-20 2020-10-17 l'UCP-PRRPB dans la mise d'exécution Monitoring en oeuvre des activités de sauvegarde environnementale et sociale BI-BLRRP-166821-CS-INDV / Recrutement d'un consultant individuel charger Improved Management of En cours d'élaborer un plan d'affaire IDA / D2760 Protected Areas and A posteriori Individuel Limited 8,000.00 0.00 2020-03-31 2020-04-22 2020-04-05 2020-04-26 2020-05-31 2020-11-27 d'exécution d'écotourisme pour la réserve Reserves naturelle forestière de Bururi BI-BLRRP-167913-CS-INDV / Recrutement d'un Consultant Individuel Project Management, En cours facilitateur pour l'élaboration IDA / D2760 Coordination, and A posteriori Individuel Open 15,000.00 0.00 2020-04-13 2020-04-22 2020-06-01 2020-06-22 2020-07-27 2021-01-23 d'exécution d'un plan de suivi-évaluation Monitoring (Production d'un manuel de suivi-Evaluation) du PRRPB BI-BLRRP-160478-CS-INDV / Recrutement d'un Project Management, Spécialiste en Sauvegardes IDA / D2760 Coordination, and A posteriori Individuel Open 30,000.00 0.00 Annulé 2020-02-28 2020-03-18 2020-04-17 2020-05-08 2020-06-12 2020-12-09 Environnementales et Monitoring Sociales Page 8 BI-BLRRP-173989-CS-INDV / Recrutement d'un spécialiste chargé d'appuyer Project Management, le projet dans la mise en En cours IDA / D2760 Coordination, and A posteriori Individuel Open 30,000.00 0.00 2020-05-22 2020-06-06 2020-07-10 2020-07-31 2020-09-04 2021-03-03 oeuvre des activités de d'exécution Monitoring Sauvegardes Environnementales et Sociales Page 9