PE Support to the Subnational Transport Program Project (P132515) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 11-Dec-2015 General Procurement Notice published on: 30-Nov-2016 July 9, 2010 PROCUREMENT Peru : Support to the Subnational Transport Program Project PLAN General Information Country: Peru Bank’s Approval Date of the Original Procurement Plan: 2016-12-22 2020-02-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132515 GPN Date: 2016-11-30 Project Name: Support to the Subnational Transport Program Project Loan / Credit No: IBRD / 85620 Executing Agency(ies): Descentralized Provias WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-9711-CW-RFB / Rehabilitacion y Mejoramiento del Camino Vecinal de Talavera- Infrastructure for Integration Solicitud de Single Stage - One Mulacancha-Taramba-Nueva IBRD / 85620 Posterior Open - National 1,354,815.84 1,705,419.84 Firmado 2017-07-03 2017-07-08 2017-08-19 2017-09-18 2017-10-23 2018-03-22 and Social Inclusion ofertas Envelope Esperanza -Ap-510 , Long. 14.28 km Prov. Andahuaylas, APURIMAC PE-PROVIAS-9712-CW-RFB / Mejoramiento de Camino Vecinal Pacobamba-Huironay- Infrastructure for Integration Solicitud de Single Stage - One Ccerabamba-Abra Cusqueña, IBRD / 85620 Posterior Open - National 5,456,251.32 6,187,924.11 Firmado 2017-07-03 2017-07-08 2017-08-19 2017-09-18 2017-10-23 2018-05-21 and Social Inclusion ofertas Envelope Long. 28.83 km Prov. Andahuaylas,APURIMAC PE-PROVIAS-4678-CW-RFB Infrastructure for Integration Solicitud de Single Stage - One / Chuchin - Esccana - Rumi IBRD / 85620 Posterior Open - National 3,023,521.00 0.00 Cancelado 2017-07-03 2017-07-17 2017-08-16 2017-08-30 2017-09-13 2018-11-07 and Social Inclusion ofertas Envelope Rumi -Huinche - Moyorcco PE-PROVIAS-4679-CW-RFB / Paquete N° 1 obras de Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 1,348,397.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-19 2017-08-02 2017-08-16 2018-05-13 mantenimiento periodico en Maintenance ofertas Envelope 40 km PE-PROVIAS-11812-CW-RFB / Servicio de gestión y conservación vial por niveles Rural Road Infrastructure Solicitud de Open - Single Stage - One IBRD / 85620 Previa 15,042,761.00 0.00 Cancelado 2018-08-13 2018-09-10 2018-10-26 2018-11-02 2018-12-11 2022-01-09 de servicio de los caminos Maintenance ofertas International Envelope vecinales de la provincia de Chanchamayo - Junín. PE-PROVIAS-77540-CW-RFB / Rehabilitación y Mejoramiento del Camino Infrastructure for Integration Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 3,790,304.00 3,550,630.76 Firmado 2018-09-27 2018-09-28 2018-10-29 2018-11-05 2018-11-19 2019-07-17 Vecinal Chuchín - Esccana - and Social Inclusion ofertas Envelope Rumirumi - Huinche - Moyorcco PE-PROVIAS-106440-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One Periódico del Camino Vecinal IBRD / 85620 Posterior Open - National 1,659,562.10 0.00 En ejecución 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-11-12 Maintenance ofertas Envelope Puente Mirador - Boca Satipo, Ancash PE-PROVIAS-106438-CW- RFB / Mantenimiento periódico del Camino vecinal: Rural Road Infrastructure Solicitud de Single Stage - One Circuito de Produccion Km IBRD / 85620 Posterior Open - National 3,442,055.92 0.00 Cancelado 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-12-27 Maintenance ofertas Envelope 15.5 Carretera Mazamari - Puerto Ocopa - A Dos de Mayo, Junin Page 1 PE-PROVIAS-106436-CW- RFB / Mantenimiento Periódico del Camino Vecinal Rural Road Infrastructure Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 2,001,461.10 0.00 Cancelado 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-09-28 Dv. Saywite - Cachora, Maintenance ofertas Envelope ubicado en el Departamento de Apurímac. PE-PROVIAS-106437-CW- RFB / Mantenimiento Rural Road Infrastructure Solicitud de Single Stage - One periodico del camino Palo IBRD / 85620 Posterior Open - National 2,148,246.18 0.00 Cancelado 2019-04-01 2019-04-06 2019-05-06 2019-05-26 2019-06-30 2019-10-28 Maintenance ofertas Envelope Seco - Parobamba Viejo, Ancash PE-PROVIAS-156785-CW- RFB / Mejoramiento de la carretera vecinal Puente Chico- Sancaragra- Cuchicancha- Mal Paso- Rural Road Infrastructure Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 7,908,588.56 0.00 2020-02-03 2020-02-08 2020-03-21 2020-04-20 2020-05-25 2020-11-21 Choquicocha - Santa Rosa- Maintenance ofertas Envelope pendiente Tablahuasi- Milpo - Quiulacocha, Distrito de Conchamarca - Ambo- Huánuco GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-80037-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One LICENCIA PARA EQUIPO IBRD / 85620 Posterior Open - National 51,618.81 49,118.99 Firmado 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-11-25 Management ofertas Envelope DE SEGURIDAD PERIMETRAL PE-PROVIAS-80038-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One RENOVACIÓN DE IBRD / 85620 Posterior Open - National 109,957.24 0.00 En ejecución 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-12-03 Management ofertas Envelope LICENCIAS DE SOFTWARE CAD PE-PROVIAS-80039-GO-RFB / ADQUISICIÓN DE Decentralized Road Solicitud de Single Stage - One IBRD / 85620 Posterior Open - National 138,668.30 133,317.44 Firmado 2018-10-01 2018-10-02 2018-11-01 2018-11-06 2018-11-18 2018-12-03 LICENCIAS DE SOFTWARE Management ofertas Envelope DE GEOREFERENCIACION PE-PROVIAS-105434-GO- RFB / Adquisición de Decentralized Road Solicitud de Single Stage - One Ejecución IBRD / 85620 Posterior Open - National 801,116.74 0.00 2019-04-15 2019-04-20 2019-05-18 2019-06-02 2019-07-07 2019-09-05 Camionetas Doble Cabina Management ofertas Envelope pendiente 4x4 PE-PROVIAS-118756-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 26,865.67 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente DE BACKUP PARA SERVIDORES PE-PROVIAS-118892-GO- RFQ / ADQUISICIÓN DE Solicitud de Single Stage - One Ejecución LICENCIA DE SOFTWARE IBRD / 85620 Project Management Posterior Open - National 49,253.73 0.00 2019-06-17 2019-08-12 2020-02-08 cotizaciones Envelope pendiente ANTISPAM EN EL MARCO DE PATS PE-PROVIAS-150332-GO- RFQ / Aquisición de la Decentralized Road Solicitud de Single Stage - One Ejecución renovación de licencias CAD IBRD / 85620 Posterior Open - National 109,552.24 0.00 2020-02-14 2020-02-19 2020-04-01 2020-05-01 2020-06-05 2020-12-02 Management ofertas Envelope pendiente para la sede central y unidad zonal NON CONSULTING SERVICES Page 2 Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-9697-CS-QCBS / Estudio definitivo del camino vecinal Emp. Ruta Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 87,962.42 141,685.18 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 16 - Inkacancha and Social Inclusion en calidad y costo Long. 10.70 km Prov. Paucartambo, CUSCO PE-PROVIAS-9700-CS-QCBS / Estudio definitivo del camino vecinal Puente Checca - Puente Asunción - Infrastructure for Integration Selección basada Chitibamba - Emp. CU-126 IBRD / 85620 Posterior Open - National 240,869.05 225,734.90 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 and Social Inclusion en calidad y costo (Comunidad Huinchiri - Quehue), Long. 29.30 km Prov. Canas, CUSCO PE-PROVIAS-9702-CS-QCBS / Estudio definitivo del camino vecinal Emp. CU-129 Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 184,145.63 219,353.28 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 (Chapina) - Quille, and Social Inclusion en calidad y costo Long. 22.40 km Prov. Paruro, CUSCO PE-PROVIAS-9704-CS-QCBS / Estudio definitivo del camino vecinal Puente Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 246,376.98 0.00 Cancelado 2017-04-21 2017-05-05 2017-05-24 2017-06-21 2017-06-26 2017-07-17 2017-07-31 2018-09-24 Quesccañuma - and Social Inclusion en calidad y costo Huaynahuarco - Ccarapampa - Huisala PE-PROVIAS-4909-CS-QCBS / Estudio definitivo del camino vecinal Puente Angasmayo Millpo Dv Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 200,341.00 226,347.48 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 Huariperja - Huariperja, and Social Inclusion en calidad y costo Long. 24.40 km Prov. Huamanga, AYACUCHO PE-PROVIAS-4914-CS-QCBS / Estudio definitivo del camino vecinal Vinchos- Infrastructure for Integration Selección basada Paccha-Andabamba, IBRD / 85620 Posterior Open - National 186,612.00 170,361.24 Firmado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 and Social Inclusion en calidad y costo Long. 22.70 km Prov. Huamanga, AYACUCHO PE-PROVIAS-11172-CS- QCBS / Supervision de la Infrastructure for Integration Selección basada obra Pacobamba - Huironay - IBRD / 85620 Posterior Open - National 545,625.00 498,120.01 Firmado 2017-04-03 2017-04-24 2017-06-07 2017-07-05 2017-08-04 2017-09-08 2017-10-13 2018-06-10 and Social Inclusion en calidad y costo Ccerabamba - Abra Cusqueña PE-PROVIAS-11174-CS- QCBS / Supervision de la Infrastructure for Integration Selección basada obra Talavera - Mulacancha IBRD / 85620 Posterior Open - National 135,482.00 245,634.66 Firmado 2017-04-03 2017-04-24 2017-06-07 2017-07-05 2017-08-04 2017-09-08 2017-10-13 2018-04-11 and Social Inclusion en calidad y costo - Taramba - Nueva Esperanza - AP-510 PE-PROVIAS-4917-CS-QCBS / Elaboracion de Plan Vial Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 322,959.48 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2017-12-10 Provincial Participativo de 10 Management en calidad y costo GLP Page 3 PE-PROVIAS-4690-CS-QCBS Selección basada IBRD / 85620 Project Management Posterior Open - National 694,245.00 0.00 Cancelado 2017-09-04 2017-09-18 2017-10-07 2017-10-28 2017-11-02 2017-11-23 2017-12-07 2021-11-16 / Auditoria financiera en calidad y costo PE-PROVIAS-4915-CS-QCBS / Implementación del plan de Decentralized Road Selección basada acción de VDL en 4 IBRD / 85620 Posterior Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management en calidad y costo provincias . Region de Cusco y Puno PE-PROVIAS-4691-CS-FBS / Selección basada Paquete N° 2 de 10 Estudios Infrastructure for Integration IBRD / 85620 Posterior en calificaciones Open - National 1,644,157.00 0.00 Cancelado 2017-06-05 2017-06-19 2017-07-08 2017-07-22 2017-08-05 2018-09-29 definitivos de camino and Social Inclusion de consultores vecinales en 200 km PE-PROVIAS-4916-CS-QCBS / Implementación del plan de Decentralized Road Selección basada acción de VDL en 4 IBRD / 85620 Posterior Open - National 293,600.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-07-13 Management en calidad y costo provincias . Region de Cajamarca y Amazonas PE-PROVIAS-4918-CS-QCBS / Paquete N° 2 de Estudio Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 2,466,236.00 0.00 Cancelado 2017-04-03 2017-04-17 2017-05-06 2017-06-03 2017-06-08 2017-06-29 2017-07-13 2018-09-06 definitivo en 5 corredores and Social Inclusion en calidad y costo logisticos PE-PROVIAS-4689-CS-QCBS / Sistema de Informacion , Decentralized Road Selección basada Open - monitoreo y evaluación IBRD / 85620 Posterior 293,599.53 0.00 Cancelado 2017-05-24 2017-06-07 2017-06-26 2017-07-24 2017-07-29 2017-08-19 2017-09-02 2017-12-31 Management en calidad y costo International diseñado e implementado, mantenido y de acceso libre PE-PROVIAS-63578-CS- QCBS / PAQ.ANCASH: Perfil y est def rehab y mejoramiento CV Tr1:Emp.PE-1N-Dv.Fundo Pto Viejo-Pto. Santa, Tr2:Emp.PE- Infrastructure for Integration Selección basada Open - 1N-Emp.PE-1N Q,Emp.PE- IBRD / 85620 Posterior 444,794.14 407,580.09 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 and Social Inclusion en calidad y costo International 1NQ-Emp.AN-924,Emp.AN- 921 (Nepeña)-Dv.AN- 925,Dv.San José(Nepeña)-San José-Emp.AN- 104(Morteros),Tr3: Emp. An101(Alto Pusha PE-PROVIAS-63580-CS- QCBS / PAQ.APURIMAC:Perfil y est def rehab y mejoramiento CV Tr1:AP-855-Emp.PE-109 (Ccoriray)- Infrastructure for Integration Selección basada Open - Vito,Tr2:Emp.PE3SF-Pta. IBRD / 85620 Posterior 432,486.73 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 and Social Inclusion en calidad y costo International Carretera(Casanacocha),Tr3:D v Puca Puca-Molinopata- Trujipata-Emp.AP 103,Tr4:Emp. PE03A(Puente Huayquipa)-Huayquipa,Tr5: Emp.AP-768(Dv.Chalhuan PE-PROVIAS-63587-CS- QCBS / PAQ.LA LIBERTAD:Perfil y est def rehab y mejoramiento CV Tr1:Emp.LI-111- Lucma-La Represita-Penintay- Infrastructure for Integration Selección basada Open - Huachacual-Samamuy,Emp.LI- IBRD / 85620 Posterior 433,134.49 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 and Social Inclusion en calidad y costo International 713-Recuaycito,Tr2: Quiruvilca-Emp.LI-931,Emp.LI- 931-Huacampalda- Dv.Bado,Tr3:Emp.LI- 528(Pacanga)- Martín Sanches-Emp.LI-512 Page 4 PE-PROVIAS-63588-CS- QCBS / PAQ.LAMBAYEQUE: Perfil y est. def. rehab. y mejoramiento CV Tr1:Emp.PE-1N- Manco Capac 1-Emp.PE-1N,Emp.PE- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 344,391.58 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1N-Manco Capac 2-Emp.PE- and Social Inclusion en calidad y costo International 1N,Tr2:Emp.PE-06-El Higo- Emp.LA-109,Tr3:Emp.LA-112- Emp.LA-111,Emp.LA-112- Pta.Carretera,Tr4:Emp.PE- 1NJ(El Puente)-Inverna PE-PROVIAS-63581-CS- QCBS / PAQ. AYACUCHO:Perfil y estudio definitivo rehabilitación y mejoramiento de los CV Tr Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 428,816.10 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1: Emp. AY - 103 - and Social Inclusion en calidad y costo International Allpaspina - Putacca - Raymina - Pitec, Tr 2: Huambo - Alcamenca - Emp. PE - 32A PE-PROVIAS-63591-CS- QCBS / PAQ.PUNO: Perfil y est. def.rehab. y mejoramiento CV Tr1:Emp. PE-3SG(Llalli)-Emp.PU- 125,Tr2:Emp.PU-123-Dv.PU- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 621,157.18 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 1005-Dv.PU-1006-Dv. Huayta and Social Inclusion en calidad y costo International Pata, Emp.PU-1004-Huayta Pata-Coa Chico,Tr3:Emp.PE- 3S-Marcuyo-Emp.PU-1198(Río Zapatilla),Emp:PU-1198(Río Zapatilla PE-PROVIAS-63592-CS- QCBS / PAQ.TUMBES: Perfil y estudio definitivo rehabilitación y mejoramiento de los CV Tr 1: Emp. TU- Infrastructure for Integration Selección basada Open - 101 (La Coja) - Emp. TU- IBRD / 85620 Posterior 392,325.71 744,355.60 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 and Social Inclusion en calidad y costo International 516, Dv La Coja - Emp. TU-524 (Dv el Tutumo), Tr 2: Dv. Salado Grando - Plateritos - Emp.TU-516, Dv. Plateritos -Emp.TU-105 PE-PROVIAS-63590-CS- QCBS / PAQ.LORETO: Perfil y estudio definitivo rehabilitación y mejoramiento C.V. Emp. LO-103 (Nuevo Infrastructure for Integration Selección basada San Juan) - Dv. San Juan IBRD / 85620 Posterior Open - National 176,751.69 257,454.74 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 and Social Inclusion en calidad y costo de Puritana - Villa Puerto Cruz, Emp. Via No Clasificada - Nuevo Mundo - San Juan - San Juan de Puritana PE-PROVIAS-63589-CS- QCBS / PAQ.LIMA: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr I: Emp. PE-1S-Emp. Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 235,481.79 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 LM-835 (DV. La Huaca) - and Social Inclusion en calidad y costo San Antonio, Tr II: Emp. PE- 1S - San Antonio, Tr 2: Emp. PE-1S - Huayhuanco - Emp. LM-878 (Roldan) Page 5 PE-PROVIAS-63593-CS- QCBS / PAQ.UCAYALI: Perfil y estudio definitivo rehabilitación y mejoramiento Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 233,754.44 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-03-22 del camino vecinal Emp UC and Social Inclusion en calidad y costo 105 (Bolognesi) - Pta Carretera (A chambiral)-CC NN Sta Clara PE-PROVIAS-66683-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Huaraz, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 244,397.43 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Antonio Raymondi, Huari, Management en calidad y costo Huarmey, Huaylas, Ocros, Pomabamba, Santa, Sihuas y Yungay PE-PROVIAS-66684-CS- QCBS / Elaboración de Planes Viales Provinciales Decentralized Road Selección basada Participativos de: Huamanga, IBRD / 85620 Posterior Open - National 195,235.76 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo Cangallo, Huanta, La Mar, Lucanas, Paucar del Sara Sara y Víctor Fajardo PE-PROVIAS-66685-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Abancay, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 290,334.35 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Andahuaylas, Cotabambas, Management en calidad y costo Grau, Caraveli, Castilla, Nazca, Pisco, Barranca, Huaral y Yauyos PE-PROVIAS-66703-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Cajamarca, Decentralized Road Selección basada Open - Cajabamba, Chota, IBRD / 85620 Posterior 313,447.03 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo International Contumazá, Cutervo, Hualgayoc, San Ignacio, San Marcos, San Pablo, Bellavista, Huallaga y Picota PE-PROVIAS-66709-CS- QCBS / Elaboración de Planes Viales Provinciales Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 108,683.10 0.00 En ejecución 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Participativos Management en calidad y costo de:Chanchamayo, Jauja, Oxapampa, Atalaya PE-PROVIAS-66712-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Chiclayo, Ferreñafe, Lambayeque, Decentralized Road Selección basada Open - Ascope, Bolivar, Chepén, IBRD / 85620 Posterior 361,532.15 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo International Julcán, Otuzco, Pacasmayo, Pataz, Sánchez Carrión, Santiago de Chuco, Gran Chimu, Virú y Contralmirante Villar PE-PROVIAS-66714-CS- QCBS / Elaboración de Planes Viales Provinciales Participativos de: Carabaya, Decentralized Road Selección basada IBRD / 85620 Posterior Open - National 221,424.37 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Chucuito, El Collao, Lampa, Management en calidad y costo Moho, San Antonio de Putina, Tambopata, Manu y Tacna PE-PROVIAS-66717-CS- QCBS / Elaboración de Decentralized Road Selección basada Planes Viales Provinciales IBRD / 85620 Posterior Open - National 47,132.58 0.00 Cancelado 2018-06-14 2018-06-28 2018-07-17 2018-08-14 2018-08-19 2018-09-09 2018-09-23 2019-01-21 Management en calidad y costo Participativos de: Maynas y Ucayali. Page 6 PE-PROVIAS-73704-CS- QCBS / PQT APURIMAC:Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3S(Pte San Martin)- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 424,462.65 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Huancamarca-Chaccobamba- and Social Inclusion en calidad y costo International Casabamba-Cayara-Morochuco- Orccorbamba-Emp AP-549 (Lte Dist),Tr2 Emp AP-108- Pachaconas, Tr3 Emp AP-108- Huancaray, Tr4 Emp PE-PROVIAS-73705-CS- QCBS / PQT LA LIBERTAD I:Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-1N(Manuel Infrastructure for Integration Selección basada Open - Guarniz)-Faclo Chico -Nueva IBRD / 85620 Posterior 459,693.98 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 and Social Inclusion en calidad y costo International Esperanza-Faclo Grande -El Ingenio-La Compuerta- Algodonal-Hda Flaco Grande Vieja-Cruz de Guayabo-La Barranca, Tr 2 Emp PE PE-PROVIAS-73706-CS- QCBS / PQT LA LIBERTAD II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-1N-Calunga, Emp PE-1N-Chanquin Bajo- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 464,018.96 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 Emp LI-119, Emp S/C-Puente and Social Inclusion en calidad y costo International La Alameda, Tr2 Dv. Susanga(Huacapongo)- Condornada-Caray, Tr3 Emp PE-10A-Ayangay- Chugurpampa- C PE-PROVIAS-73707-CS- QCBS / PQT LA LIBERTAD III: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Santa Rosa-El Alto Infrastructure for Integration Selección basada Open - San Idelfonso-Nvo. Horizonte- IBRD / 85620 Posterior 385,356.14 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 and Social Inclusion en calidad y costo International Lomas de Prieto, Tr2 Emp PE-1NH-Nvo Paraiso-Pta Carretera, Tr3 Quiruvilca- Emp LI-931,Emp LI-931- Huacampalda-Dv. Bado PE-PROVIAS-73708-CS- QCBS / PQT MADRE DE DIOS: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 432,662.82 0.00 Cancelado 2018-08-13 2018-08-27 2018-09-15 2018-10-13 2018-10-18 2018-11-08 2018-11-22 2019-11-22 PE-30C (Dv. Piñal) - Piñal - and Social Inclusion en calidad y costo International Nuevo San Juan, Tr2 Emp MD-101 (Boca Colorado) - Emp MD-518 (Nuevo San Juan Grande) PE-PROVIAS-73709-CS- QCBS / PQT PASCO: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr I: Emp PE-5N (Dv. Infrastructure for Integration Selección basada IBRD / 85620 Posterior Open - National 254,655.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Villa Rica) - Cedro Pampa - and Social Inclusion en calidad y costo Purus - Pte. Paucartambo - Emp PE-5N, Emp PA-691 - El Oconal - Puente Oconal - Emp. PA-691 Page 7 PE-PROVIAS-73710-CS- QCBS / PQT PUNO I: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3S-Culuyo- Chancachi-Aripa Ccoca Ruma- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 457,315.24 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 Thunuhuaya-Emp PU-1130, and Social Inclusion en calidad y costo International Tr2 Emp PE-3S(Pueblo Libre)-Emp PU-130, Emp PE- 3S(Crucero)-Ticaraya-Emp PU- 130, Emp PE-3S(Crucero)- Tuquin PE-PROVIAS-73711-CS- QCBS / PQT SAN MARTIN II: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp SM-113 (Yantalo) - Pto Los Angeles Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 395,736.10 0.00 Cancelado 2018-08-13 2018-09-03 2018-10-17 2018-11-14 2018-12-14 2019-01-18 2019-02-22 2020-02-22 (Rio Mayo), Tr2 Emp PE-5N and Social Inclusion en calidad y costo International - Purus - Rioja, Emp PE-5N - Sector Winba, Tr3 Emp SM-116 - Dv. CCNN El Naranjal - Dv. Lamas - Chirap PE-PROVIAS-74170-CS- QCBS / PQT ANCASH: Perfil y estudio definitivo rehabilitación y mejoramiento CV Tr1 Emp PE-3N(Caraz)- Tarna-Dv. Miramar-Dv. Lluco- Infrastructure for Integration Selección basada Open - IBRD / 85620 Posterior 381,896.15 0.00 Cancelado 2018-08-16 2018-08-30 2018-09-18 2018-10-16 2018-10-21 2018-11-11 2018-11-25 2019-11-25 Dv. Culluna-Parón-Pta and Social Inclusion en calidad y costo International Carretera(Pto Control ANP P.N. Huascarán), Emp AN- 836-Culluna-Emp AN-834 (Pte.Llacsho)-Llacsho,Tr2 Emp PE PE-PROVIAS-11816-CS- QCBS / Supervisión Rural Road Infrastructure Selección basada Open - Mantenimiento por niveles de IBRD / 85620 Previa 1,504,276.00 0.00 Cancelado 2018-09-03 2018-09-24 2018-11-07 2018-12-05 2019-01-04 2019-02-08 2019-03-15 2020-03-14 Maintenance en calidad y costo International servicio de la provincia de Chanchamayo - Junín. PE-PROVIAS-77544-CS- QCBS / Supervisión de Rehabilitación y Infrastructure for Integration Selección basada Mejoramiento del Camino IBRD / 85620 Posterior Open - National 283,971.00 276,039.66 En ejecución 2018-09-14 2018-09-28 2018-10-02 2018-10-30 2018-11-02 2018-11-06 2018-11-18 2019-08-15 and Social Inclusion en calidad y costo Vecinal Chuchín - Esccana - Rumirumi - Huinche - Moyorcco PE-PROVIAS-100356-CS- QCBS / REHABILITACION Y MEJORAMIENTO DEL CAMINO VECINAL Infrastructure for Integration Selección basada Open - Ejecución SHOCOSH - MANTACOCHA IBRD / 85620 Posterior 372,390.88 0.00 2019-03-15 2019-04-05 2019-05-19 2019-06-16 2019-07-16 2019-08-20 2019-09-24 2020-09-23 and Social Inclusion en calidad y costo International pendiente - QUEPATUPE - ACOBAMBILLA, DISTRITO DE HUACAR - AMBO - HUANUCO PE-PROVIAS-100357-CS- QCBS / MEJORAMIENTO DE LA CARRETERA VECINAL PUENTE CHICO - SANCARAGRA - CUCHICANCHA - MAL Infrastructure for Integration Selección basada Open - Ejecución IBRD / 85620 Posterior 388,058.82 0.00 2019-05-15 2019-06-05 2019-07-19 2019-08-16 2019-09-15 2019-10-20 2019-11-24 2020-11-23 PASO - CHOQUICOCHA - and Social Inclusion en calidad y costo International pendiente SANTA ROSA - TABLAHUASI - MILPO - QUIULACOCHA, DISTRITO DE CONCHAMARCA - AMBO - HUANUCO Page 8 PE-PROVIAS-106710-CS- QCBS / Supervision de la obra: Mejoramiento periódico del camino vecinal Circuito Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 296,581.77 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-11 de Produccion Km 15.5 - Maintenance en calidad y costo pendiente carretera Mazamani - Puerto Ocopa - A dos de Mayo, Junin PE-PROVIAS-106715-CS- QCBS / Supervisor de la obra: Mantenimiento Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 147,391.40 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-13 periódico del Camino vecinal Maintenance en calidad y costo pendiente Dv Saywite - Cachora, Apurimac PE-PROVIAS-106717-CS- QCBS / Supervision de la Rural Road Infrastructure Selección basada Ejecución obra: Mantenimiento IBRD / 85620 Posterior Open - National 184,726.51 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-15 Maintenance en calidad y costo pendiente periódico del camino vecinal Palo Seco - Parobamba viejo PE-PROVIAS-106718-CS- QCBS / Supervision de la Obra: Mantenimiento Rural Road Infrastructure Selección basada Ejecución IBRD / 85620 Posterior Open - National 206,710.73 0.00 2019-04-01 2019-04-15 2019-05-15 2019-06-12 2019-06-17 2019-07-04 2019-08-08 2019-12-09 periódico del camino vecinal Maintenance en calidad y costo pendiente Puente Mirador - Boca Satipo, Junin PE-PROVIAS-160502-CS- QCBS / Supervisión de obra: Mejoramiento de la carretera vecinal Puente Chico- Sancaragra- Cuchicancha- Rural Road Infrastructure Selección basada Open - Ejecución Mal Paso - Choquicocha - IBRD / 85620 Posterior 744,778.43 0.00 2020-02-19 2020-03-11 2020-04-24 2020-05-22 2020-06-21 2020-07-26 2020-08-30 2021-08-30 Maintenance en calidad y costo International pendiente Santa Rosa -Tablahuasi- Milpo - Quiulacocha, distrito de Conchamarca- Provincia de Ambo - departamento de huánuco INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-PROVIAS-4694-CS-INDV / Paquete N° 3 de 25 expedientes de Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 694,245.00 0.00 Cancelado 2017-06-05 2017-07-03 2017-07-17 2017-07-31 2017-11-28 mantenimiento periodico de Maintenance caminos vecinales por 500 km PE-PROVIAS-4693-CS-INDV / Elaboracion de Plan Vial Decentralized Road IBRD / 85620 Posterior Individual Open 17,616.00 0.00 Cancelado 2017-01-16 2017-02-13 2017-02-27 2017-03-13 2017-10-09 Departamental Participativo Management paquete 2 PE-PROVIAS-12057-CS- INDV / Consultoría para los Decentralized Road procedimiento de certificación IBRD / 85620 Posterior Individual Open 8,807.99 0.00 Cancelado 2017-05-02 2017-05-07 2017-05-07 2017-05-19 2017-08-17 Management ocupacional para el mantenimiento de caminos PE-PROVIAS-12307-CS- INDV / Consultoría para el Decentralized Road IBRD / 85620 Posterior Individual Open 16,441.57 0.00 Cancelado 2017-05-02 2017-05-16 2017-05-16 2017-05-28 2017-12-24 seguimiento y evaluación del Management Plan de Acción de la VDL PE-PROVIAS-28360-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,161.48 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de ICA Page 9 PE-PROVIAS-28370-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,677.15 26,137.90 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de General Sánchez Cerro PE-PROVIAS-28372-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de Daniel Alcides Carrión PE-PROVIAS-28374-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,822.70 24,936.16 Firmado 2017-09-29 2017-10-06 2017-10-06 2017-10-27 2018-02-24 Vial Provincial Participativo Management de Candarave PE-PROVIAS-39281-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 25,901.94 25,265.44 Firmado 2017-12-04 2017-12-11 2017-12-11 2017-12-26 2018-12-21 Management la gestión vial de gobiernos regionales PE-PROVIAS-39284-CS- INDV / Consultor individual Decentralized Road senior en fortalecimiento de IBRD / 85620 Posterior Individual Open 22,201.67 0.00 Cancelado 2017-12-04 2017-12-11 2017-12-11 2017-12-26 2018-12-21 Management la gestión vial de gobiernos locales PE-PROVIAS-39747-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,958.65 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Chupaca PE-PROVIAS-39752-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 20,448.05 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo - Management Cajatambo PE-PROVIAS-39753-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo - Management Tahuamanu PE-PROVIAS-39754-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,968.24 0.00 Cancelado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo - Management Ilo PE-PROVIAS-39756-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Huancané PE-PROVIAS-39757-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,060.44 27,339.64 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Melgar PE-PROVIAS-39759-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Sandia PE-PROVIAS-39771-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,593.59 24,936.16 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Rioja PE-PROVIAS-39772-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,360.16 23,734.41 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management San Martín Page 10 PE-PROVIAS-39773-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,435.09 22,833.11 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-03-22 Vial Provincial Participativo - Management Tocache PE-PROVIAS-39774-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,126.73 22,532.67 Firmado 2017-12-11 2017-12-15 2017-12-15 2017-12-22 2018-04-06 Vial Provincial Participativo - Management Tarata PE-PROVIAS-62410-CS- INDV / Expediente tecnico para el mantenimiento periodico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 58,967.72 57,699.86 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos: 1) Maintenance San Luis - Cardon - Canchabamba y 2) Tarica - Parihuanca - Aco PE-PROVIAS-62413-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure vecinales de los tramos 1) IBRD / 85620 Posterior Individual Open 64,410.80 63,025.92 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Maintenance Palo Seco - Parobamba Viejo, 2) Puente Tambillo - Runtujirca y 3) Emp. R548 (Huayllan) - Huanchacbamba PE-PROVIAS-62414-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 32,562.05 31,861.94 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos 1) Maintenance Dv. Saywite - Cachora y 2) Cementerio - San isidro de Chicón PE-PROVIAS-62415-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 49,428.95 48,366.18 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 periodico del camino vecinal Maintenance Puente Mirador - Boca Satipo PE-PROVIAS-62416-CS- INDV / Expediente Técnico para el mantenimiento periodico de los caminos Rural Road Infrastructure vecinales de los tramos 1) IBRD / 85620 Posterior Individual Open 70,928.31 0.00 Cancelado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Maintenance Emp R510 (Cerro Rico) - Mina San Juan de Chorunga y 2) Huanca - Pte. Pichiricma - Sector Suchocc PE-PROVIAS-62417-CS- INDV / Expediente tecnico para el mantenimiento periodico del camino vecinal Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 70,841.00 69,317.87 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 Circuito de Produccion Km Maintenance 15.5 Carretera Mazamari - Puerto Ocopa - A Dos de Mayo PE-PROVIAS-62418-CS- INDV / Expediente técnico para el mantenimiento periódico de los caminos Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 48,166.65 47,131.02 Firmado 2018-05-11 2018-05-18 2018-05-18 2018-06-01 2018-07-31 vecinales de los tramos 1) Maintenance DV. Chapapampa - Jonsani y 2) DV. Pampa Blanca - Huanuara- Cairani PE-PROVIAS-62419-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 18,276.43 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Paijan - El Milagro Page 11 PE-PROVIAS-62420-CS- INDV / Expediente tecnico Rural Road Infrastructure para el mantenimiento IBRD / 85620 Posterior Individual Open 28,713.88 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 Maintenance periodico del camino vecinal Locuto - Callejones PE-PROVIAS-62421-CS- INDV / Expediente tecnico para el mantenimiento Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 8,361.57 0.00 Cancelado 2018-06-04 2018-06-11 2018-06-11 2018-06-25 2018-08-24 periodico del camino vecinal Maintenance Santa Rosa de Masisea - Laguna Santa María PE-PROVIAS-63005-CS- INDV / Elaboración de Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.00 20,292.15 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo Management de Asunción PE-PROVIAS-63490-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 23,177.80 22,679.46 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Casma PE-PROVIAS-63496-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,768.36 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Antabamba PE-PROVIAS-63497-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,438.22 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Aymaraes PE-PROVIAS-63502-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,381.04 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Camaná PE-PROVIAS-63503-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 25,312.60 24,872.64 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Condesuyos PE-PROVIAS-63507-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 31,107.04 30,672.08 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Arequipa PE-PROVIAS-63508-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 32,021.96 31,465.39 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Caylloma PE-PROVIAS-63510-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 22,872.83 22,475.28 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Parinacochas PE-PROVIAS-63512-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Sucre PE-PROVIAS-63513-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 24,092.71 23,755.83 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Santa Cruz PE-PROVIAS-63515-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,532.48 26,071.32 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management San Miguel Page 12 PE-PROVIAS-63517-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 28,972.25 28,468.68 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Celendin PE-PROVIAS-63519-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 29,887.16 29,469.25 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Jaén PE-PROVIAS-63521-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 20,738.03 20,448.05 Firmado 2018-05-21 2018-05-28 2018-05-28 2018-06-15 2018-09-13 Vial Provincial Participativo - Management Palpa PE-PROVIAS-75994-CS- INDV / Elaboración del Plan Decentralized Road IBRD / 85620 Posterior Individual Open 26,573.00 26,167.77 Firmado 2018-08-28 2018-09-04 2018-09-04 2018-09-22 2019-01-05 Vial Provincial Participativo - Management La Unión PE-PROVIAS-80036-CS- INDV / Actualización de la Metodología para la Decentralized Road IBRD / 85620 Posterior Individual Open 27,489.31 27,070.11 Firmado 2018-09-28 2018-10-05 2018-10-05 2018-10-23 2019-01-21 Elaboración de Planes Viales Management Departamentales Participativos - PVDP PE-PROVIAS-89108-CS- INDV / PAQUETE Nro.1 Expediente Técnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AN-104 - Tambillo - IBRD / 85620 Posterior Individual Open 59,179.77 60,149.93 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Maintenance Dv. Parcap - Huata, Tramo 2: Tramo 1: Emp. PE.-14C (Pomabamba) - Dv. Chuyas - Dv. Huayllan - Pte. Lucma (Límite Provincial). PE-PROVIAS-89109-CS- INDV / PAQUETE Nro. 2 Expediente Tecnico de Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. AP-113 - Hurihuiri - IBRD / 85620 Posterior Individual Open 75,182.42 76,414.92 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Maintenance Taribamba - Pichibamba - Sorconta - Dv. Sapsi - Paccaypata, Tramo 2: Emp. PE-30 A (Yaca) - Occobamba - Soccos - Lucmayoc - Circa. PE-PROVIAS-89114-CS- INDV / PAQUETE Nro. 3 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-108 (Huancapampa) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 111,343.90 113,169.21 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 - Dv. Chajama - Ayahuay - Maintenance Chilcahuay - Pachaconas, Tramo 2: Dv. Yauricocha (Tunapita) - Yanaca, Tramo 3: Emp. AY-105 - Dv. Yanasanja - Ccoña PE-PROVIAS-89115-CS- INDV / PAQUETE Nro. 4 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. AP-102 - Socos - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 93,242.01 94,770.57 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Mitobamba - Dv. Ocobamba - Maintenance Escorno - Emp. AP-102 (Tres Cruces), Tramo 2: Emp. AP- 102 (Comun Pampa) - Callapayoc - Dv. Mollepata - Quispimarca, T Page 13 PE-PROVIAS-89116-CS- INDV / PAQUETE Nro. 5 Expediente Técnico de Mantenimiento Periódico del Camino Vecinal Tramo 1: Emp. CA-109 - Pizon - Dv. Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 103,080.74 104,780.04 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 El Mirador - Chalan, Emp. Maintenance CA-992 - El Mirador, Tramo 2: Emp. CA-100 (San Gregorio) - Dv. Varapaccha - Agua Blanca - El Prado - Emp. CA-100. PE-PROVIAS-89117-CS- INDV / PAQUETE Nro. 6 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. CU-105 - Ipal - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 83,747.27 85,120.18 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Yanacacca - Arenalniyoc - Maintenance Santa Cruz - Dv. Combapata - Abra Bellavista, Tramo 2: Quebrada Honda - Selva Alegre - Sigasiato - Yuveni - Chuanq PE-PROVIAS-89118-CS- INDV / PAQUETE Nro. 7 Expediente tecnico para el mantenimiento periodico del camino vecinal Tramo 1: Emp. PE-12G (Haquira) - Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 115,386.53 117,278.11 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Orcopampa - Dv. Patabamba Maintenance - Chacamachay - Dv. Yuricancha - Emp. PE-3SY, Tramo 2: Emp. CU-118 (Ccapi) - Cajapacara - Cascas - Emp. CU-119 PE-PROVIAS-89119-CS- INDV / PAQUETE Nro. 8 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Rural Road Infrastructure Emp. CU-113 - Manzanares - IBRD / 85620 Posterior Individual Open 83,817.76 85,191.82 En ejecución 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Maintenance Sunchubamba - Jajahuana - Challabamba - Dv. Mojopata - Dv. Chusa - Ichipia, Tramo 2: Emp. CU-118 (Icura) - Dv. Chillahuane - Dv. Huach PE-PROVIAS-89120-CS- INDV / PAQUETE Nro. 9 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. PE-3N - Estaca Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 118,133.66 120,070.28 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 Machay - Chuquis - Ninash Maintenance - Huancapampa - Dv. Tingo Chico - Huancan, Emp. HU- 717 (Chuquis) - Ucrumarca, Tramo 2: Emp. PE-18A - Pachachupan - PE-PROVIAS-89121-CS- INDV / PAQUETE Nro.10 Expediente Tecnico para el Mantenimiento Periodico del Camino Vecinal Tramo 1: Emp. JU-106 (Hornomachay) Rural Road Infrastructure IBRD / 85620 Posterior Individual Open 87,353.49 88,785.52 Firmado 2018-12-04 2018-12-10 2018-12-14 2018-12-20 2019-02-18 - Huancash - Yanañahui, Maintenance Tramo 2: Huasahuasi - Dv. Tambra - Dv. Pongo - San Juan de La Libertad - Cayan, Emp. JU-548 (San Juan de La Li Page 14