世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 采购计划 Procurement Plan 1. Project information Country: China Borrower: The People's Republic of China Project Name: Ningxia Desertification Contro and Ecological Protection Project Project No.: P121289 Loan No.: 8159-CN Project Implementing Agency (PIA): Refer to the plan 2. Bank's approval date of the procurement plan: [original:Feb. 16, 2012; Revision 1: Feb. 4, 2013] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: 2013-2017 5. Reference to (if any) Project Operational/Procurement Mannual: Yes 6. Short list comprising entirely of national consultant: Short list of consultants for services, estimated to cost less than US$500,000 equivalent per contract, may comprise entirely of national consultants in accoedance with the provisions of paragraph 2.7 of the Consultant Guidelines. 采购方å¼?和世界银行å‰?审é™?é¢? Procurement Threshold, Procurement Method and Prior Review Threshold 采购类别 采购é™?é¢? (US$ 000) 采购方å¼? å‰?审é™?é¢? (US$ 000) ≥20,000 国际竞争性招标 (ICB) 所有å?ˆå?Œ 1.土建包括ä¿?护和造林工程 ≥5,000çš„å?ˆå?Œ <20,000 国内竞争性招标 (NCB) æ¯?个县的第一个NCBå?ˆå?Œä¸?论金é¢?大å°? <200 询价采购 (Shopping) N/A 附件8_表1 ≥1,000 国际竞争性招标 (ICB) 所有å?ˆå?Œ ≥300çš„å?ˆå?Œ 2. 货物 <1,000 国内竞争性招标 (NCB) æ¯?个县的第一个NCBå?ˆå?Œä¸?论金é¢?大å°? <100 询价采购 (Shopping) N/A è´¨é‡?和费用为基础的选择 æ— é™?é¢? 所有å?ˆå?Œ (QCBS)/è´¨é‡?为基础的选择(QBS) <300 基于咨询者资历选择 (CQS) ≥100 3. 咨询æœ?务 个人咨询专家 (Individual ≥50 consultants) å?•ä¸€æ?¥æº? (single Source 所有å?ˆå?Œ Seletion) 附件8_表1 世界银行贷款å®?å¤?è?’漠化治ç?†å’Œç”Ÿæ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 采购计划 Procurement Plan å?•ä½?:å®?å¤?林业局项目办 世行审 å?ˆå?Œä¼°ç®—金é¢? Cost Estimate 采购方 查 预计完工/ 实施时间 预计å?‘æ ‡ 预计开标日 预计å?ˆå?Œ å¼? (å‰?审/ 供货日期 (月)Exp å?ˆå?Œæ??è¿° 日期 期 签署日期 Procur å?Žå®¡) Expected ectedCons å?ˆå?Œç¼–å?· Description of Expected Expected Expected 说明 Remarks ement Bank Starting truction Works 人民å¸?å…ƒ 美元 Date of Date of Bid Contract Metho Review Date of Duration( Issuing Opening Signing d (Prior/ Contract months) Post) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程采购 项目2012å¹´11 监测点建立ã€?县示范 月份å?¯åŠ¨ï¼Œä»¥ NX-TJ-01 示范 点建立å?Šæ¤?被æ?¢å¤?试 3,434,700 545,190 NBF —— 2013.3 2013.4 2013.5 2017.3 5å¹´ 至于2012å¹´çš„ 验点建立 采购计划内容 没有实施,更 工程总计 3,434,700 545,190 新调整于2013 年实施 Ⅱ货物采购 笔记本电脑ã€?æ•°ç ?相 项目2012å¹´11 机ã€?传真机ã€?激光打 NX-HW-01 办公设备 40,600 6,444.4 NBF —— 2013.5 2013.6 2013.7 2013.9 2个月 月份å?¯åŠ¨ï¼Œä»¥ å?°æœºã€?档案橱柜ã€?电 至于2012å¹´çš„ 脑桌椅 采购计划内容 没有实施,更 项目影å“? NX-HW-02 å?«æ˜Ÿå½±å“?è´­ä¹° 856,600 135,968.3 NBF —— 2013.3 2013.4 2013.5 2017.3 5å¹´ 新调整于2013 监测评价 年实施 货物总计 897,200 142,412.7 注:NBF:国内é…?套资金 附件8_表2_3 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants Ⅲ咨询æœ?务 å?•ä½?:å®?å¤?林业局项目办 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° Brief Description of 估算金é¢?(美元) 选择方å¼? 世行审查 实施安排 Selection Schedule Contract Sevices Cost Estimate Selection (PRIOR/POS 采购过程 Selection Process å?ˆå?Œå®žæ–½ Name Method T) 邀请建议书Expect 收到建议书Expe å?ˆå?ŒæŽˆäºˆExpect Contract ed Inviting for cted Receipt ed Contract Implementation Proposals of Proposals Award Date Duration NX-ZX-01 å°?育å?Žæ¤?被æ?¢å¤?情况研究 68,873 —— NX-ZX-02 固定沙丘的æ¤?被物ç§?组æˆ?研究 68,873 NBF —— 2013.3 2013.4 2013.4 5å¹´ NX-ZX-03 防护林带间æ¤?被ç§?类研究 68,873 —— 项目实施期间年度工作检查和现场 NX-ZX-04 110,476 NBF —— 2013.5 2013.6 2013.6 5å¹´ 工作验收 1ã€?病虫害管ç?†è®¡åˆ’ï¼›2ã€?生物多样 NX-ZX-05 76,476 —— 性;3ã€?社会安全ä¿?障检测 NBF 2013.3 2013.4 2013.4 5å¹´ NX-ZX-06 环境影å“?评价 122,159 —— NX-ZX-07 培训 16,273 NBF —— 咨询å?ˆè®¡ 532,003 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:平罗县林业局 å?ˆå?Œä¼°ç®—金é¢? Cost 预计完工/ 实施时间( Estimate 世行审查 预计开标 月)Expec 采购方 预计å?‘æ ‡ 预计å?ˆå?Œ 供货日期 (å‰?审/å?Ž 日期 ted å¼? 日期 签署日期 Expected å?ˆå?Œæ??è¿° Description of 审) Bank Expected Construct 说明 Remarks å?ˆå?Œç¼–å?· Procur Expected Expected Starting Works Review Date of ion 人民å¸?å…ƒ 美元 ement Date of Contract Date of (Prior/Po Bid Duration Method Issuing Signing Contract st) Opening (months) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程采购 固定移动沙丘5666亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â… å?·å­?项目区Ⅰ林ç?­ç»?二路西 侧21个å°?ç?­5666亩。建设内容 â… å?·å­?项目区 包括扎设è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水 PL-TJ-01 è?‰æ–¹æ ¼å’Œé€ æž— 7,847,127 1,245,576 ã€?雨季点播ã€?è¡¥æ¤?ã€?病虫鼠害 2013-2014 防治å?Š2年的抚育管护,按照作 业设计施工,æˆ?活率和ä¿?存率 达到项目验收标准。(其中包å?« :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ 固定移动沙丘6349亩(建设è?‰ 作业设计年度计 方格和ç?Œæœ¨æž—)。建设地点: 划进行。2012å¹´ â… å?·å­?项目区Ⅰ林ç?­ç»?二路西 没有实施的7000 侧16个å°?ç?­6349亩,建设内容 亩è?‰æ–¹æ ¼å’Œé€ æž— â… å?·å­?项目区 包括扎设è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水 拆分到更新计划 PL-TJ-02 è?‰æ–¹æ ¼å’Œé€ æž— 8,793,048 1,395,722 ã€?雨季点播ã€?è¡¥æ¤?ã€?病虫鼠害 第1ã€?2å?·å?ˆå?Œã€‚ 2013-2014 防治å?Š2年的抚育管护,按照作 原采购计划2å?· 37个月(包 业设计施工,æˆ?活率和ä¿?存率 å?ˆå?Œæ‹†åˆ†åˆ°æ›´æ–° NCB å‰?审 2013.3 2013.4 2013.4 2014.7 å?«ä¸¤å¹´çš„抚 计划2ã€?3å?·å?ˆå?Œ 达到项目验收标准。(其中包å?« :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 育管ç?†ï¼‰ 中。 第5页 拆分到更新计划 第1ã€?2å?·å?ˆå?Œã€‚ 原采购计划2å?· 37个月(包 å?ˆå?Œæ‹†åˆ†åˆ°æ›´æ–° NCB å‰?审 2013.3 2013.4 2013.4 2014.7 å?«ä¸¤å¹´çš„抚 计划2ã€?3å?·å?ˆå?Œ 育管ç?†ï¼‰ 中。 固定移动沙丘6434亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â… å?·å­?项目区Ⅱ林ç?­1- 17å?·å°?ç?­6434亩,建设内容包 â… å?·å­?项目区 括扎设è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水ã€? PL-TJ-03 è?‰æ–¹æ ¼å’Œé€ æž— 8,910,768 1,414,408 雨季点播ã€?è¡¥æ¤?ã€?病虫鼠害防 2013-2014 æ²»å?Š2年的抚育管护,按照作业 设计施工,æˆ?活率和ä¿?存率达 到项目验收标准。(其中包å?«ï¼š å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 建设æµ?动沙丘防ç?«ä½œä¸šé?“61.02 公里ã€?瞭望塔1处ã€?护林点2处 按照2013- 基础 ã€?项目标示牌1å?—ã€?防ç?«æŠ¤æž—è­¦ 2015年作业设计 PL-TJ-04 设施2013- 示牌2å?—。按照作业设计施工, 4,582,731 727,418 年度计划原采购 2014 施工质é‡?达到项目验收标准。( 计划11å?·å?ˆå?Œæ›´ 其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 新为新计划4å?· 预è§?费) ã€?5å?·å?ˆå?Œï¼Œå¢ž 建设æµ?动沙丘防ç?«ä½œä¸šé?“60å…¬ 加作业é?“建设48 里ã€?瞭望塔1处ã€?护林点2处ã€? .64公里,瞭望 基础 项目标示牌1å?—ã€?防ç?«æŠ¤æž—警示 å¡”1座,护林点1 PL-TJ-05 设施2014- 牌2å?—。按照作业设计施工,施 4,513,446 716,420 处,护林警示牌 2015 工质é‡?达到项目验收标准。(å…¶ 3å?—,增加投资3 中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ 438740元。 è§?费) 固定移动沙丘5653亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â…¤å?·å­?项目区Ⅰ林ç?­10—21å°? ç?­5653亩。建设内容包括扎设 â…¤å?·å­?项目区 è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水ã€?雨季点 PL-TJ-06 è?‰æ–¹æ ¼å’Œé€ æž— 7,829,122 1,242,718 æ’­ã€?è¡¥æ¤?ã€?病虫鼠害防治å?Š2å¹´ 2014-2015 的抚育管护,按照作业设计施工 ,æˆ?活率和ä¿?存率达到项目验 å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ 收标准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 作业设计年度计 5%çš„ä¸?å?¯é¢„è§?费) 划进行。原采购 计划6ã€?7å?·å?ˆå?Œ 拆分到更新计划 6ã€?7ã€?9ã€?10å?· å?ˆå?Œä¸­ã€‚ 29个月(包 第6页 NCB å‰?审 2013.12 2014.1 2014.03 2015.7 å?«ä¸€å¹´çš„抚 育管ç?†ï¼‰ å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ 作业设计年度计 划进行。原采购 固定移动沙丘7454亩(建设è?‰ 计划6ã€?7å?·å?ˆå?Œ 方格和ç?Œæœ¨æž—)。建设地点: 拆分到更新计划 â…¤å?·å­?项目区Ⅰ林ç?­22—39å°? 6ã€?7ã€?9ã€?10å?· ç?­7454亩。建设内容包括扎设 å?ˆå?Œä¸­ã€‚ â…¤å?·å­?项目区 è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水ã€?雨季点 PL-TJ-07 è?‰æ–¹æ ¼å’Œé€ æž— 10,323,417 1,638,638 æ’­ã€?è¡¥æ¤?ã€?病虫鼠害防治å?Š3å¹´ 2014-2015 的抚育管护,按照作业设计施工 ,æˆ?活率和ä¿?存率达到项目验 收标准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 5%çš„ä¸?å?¯é¢„è§?费) 固定移动沙丘6456亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: 29个月(包 â…¡å?·å­?项目区Ⅰ林ç?­1—8å°?ç?­ NCB å‰?审 2013.12 2014.1 2014.03 2015.7 å?«ä¸€å¹´çš„抚 å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ â…¡æž—ç?­1—3å°?ç?­6456亩。建设 育管ç?†ï¼‰ 作业设计年度计 â…¡å?·å­?项目区 内容包括扎设è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€? 划进行。原采购 PL-TJ-08 è?‰æ–¹æ ¼å’Œé€ æž— 补水ã€?雨季点播ã€?è¡¥æ¤?ã€?病虫 8,941,237 1,419,244 计划3å?·å?ˆå?Œæ‹† 2014-2015 鼠害防治å?Š2年的抚育管护,按 分到更新计划8 照作业设计施工,æˆ?活率和ä¿? å?·å?ˆå?Œä¸­ã€‚ 存率达到项目验收标准。(其中 包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§? 费) 固定移动沙丘4388亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â…¤å?·å­?项目区Ⅰ林ç?­1—9å°?ç?­4 388亩。建设内容包括扎设è?‰æ–¹ â…¤å?·å­?项目区 æ ¼ã€?æ¤?è‹—ã€?补水ã€?雨季点播ã€? PL-TJ-09 è?‰æ–¹æ ¼å’Œé€ æž— 6,077,161 964,629 è¡¥æ¤?ã€?病虫鼠害防治å?Š2年的抚 2014-2015 育管护,按照作业设计施工,æˆ? 活率和ä¿?存率达到项目验收标 å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ 准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 作业设计年度计 ä¸?å?¯é¢„è§?费) 划进行。原采购 计划6ã€?7å?·å?ˆå?Œ 固定移动沙丘5863亩(建设è?‰ 拆分到更新计划 方格和ç?Œæœ¨æž—)。建设地点: 6ã€?7ã€?9ã€?10å?· â…¤å?·å­?项目区Ⅰ林ç?­40—51å°? å?ˆå?Œä¸­ã€‚ ç?­5863亩。建设内容包括扎设 â…¤å?·å­?项目区 è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水ã€?雨季点 PL-TJ-10 è?‰æ–¹æ ¼å’Œé€ æž— 8,119,962 1,288,883 æ’­ã€?è¡¥æ¤?ã€?病虫鼠害防治å?Š2å¹´ 2014-2015 的抚育管护,按照作业设计施工 ,æˆ?活率和ä¿?存率达到项目验 收标准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 5%çš„ä¸?å?¯é¢„è§?费) 第7页 å°?育30749亩。建设地点:Ⅲå?· å­?项目区Ⅱ林ç?­,1—7å°?ç?­3074 按照作业设计年 9亩。建设内容包括雨季点播ã€? â…¢å?·å­?项目区 度计划原采购计 补播ã€?病虫鼠害防治å?Š2年的抚 PL-TJ-11 å°?育 2,260,052 358,738 划9å?·å?ˆå?Œæ‹†åˆ† 育管护,按照作业设计施工,æˆ? 2014—2015 到更新计划11ã€? 活率和ä¿?存率达到项目验收标 18å?·å?ˆå?Œã€‚ 准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ ä¸?å?¯é¢„è§?费) å°?育32501亩。建设地点:Ⅰå?· 28个月(包 å­?项目区Ⅰ林ç?­38ã€?39å°?ç?­111 å?«ä¸€å¹´çš„å?Ž NCB å?Žå®¡ 2014.02 2014.03 2014.05 2015.08 6亩,Ⅱ林ç?­,18—20å°?ç?­2568 期抚育管ç?† 亩;Ⅱå?·å­?项目区Ⅰ林ç?­9—13 ) 按照作业设计年 å°?ç?­18296亩,Ⅱå?·å­?项目区Ⅱ â… ã€?â…¡å?·å­?项 度计划,原采购 æž—ç?­4—6å°?ç?­10521亩。。建设 PL-TJ-12 目区å°?育 2,388,824 379,178 计划8å?·å?ˆå?Œæ›´ 内容包括雨季点播ã€?补播ã€?ç—… 2014—2015 新为新计划12å?· 虫鼠害防治å?Š2年的抚育管护, å?ˆå?Œã€‚ 按照作业设计施工,æˆ?活率和 ä¿?存率达到项目验收标准。(å…¶ 中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ è§?费) 按照2015- 2016年作业设计 年度计划原采购 建设æµ?动沙丘防ç?«ä½œä¸šé?“44.56 计划12å?·å?ˆå?Œæ›´ 公里ã€?瞭望塔1处ã€?护林点2处 新为新计划13å?· 基础 ã€?项目标示牌1å?—ã€?防ç?«æŠ¤æž—è­¦ å?ˆå?Œï¼Œå‡?少作业 PL-TJ-13 设施2015- 示牌2å?—。按照作业设计施工, 3,464,659 549,946 é?“建设48.64å…¬ 2016 施工质é‡?达到项目验收标准。( 里,瞭望塔1座 其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ ,护林点1处, 预è§?费) 护林警示牌3å?— ,å‡?少投资3438 740元。 29个月(包 å?«ä¸€å¹´çš„å?Ž NCB å‰?审 2014.12 2015.1 2015.03 2016.7 期抚育管ç?† 第8页 ) 固定移动沙丘7339亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â…¢å?·å­?项目区Ⅲ林ç?­1—12å°?ç?­ 7339亩。建设内容包括扎设è?‰ â…¢å?·å­?项目区 方格ã€?æ¤?è‹—ã€?补水ã€?雨季点播 PL-TJ-14 è?‰æ–¹æ ¼å’Œé€ æž— 10,164,148 1,613,357 ã€?è¡¥æ¤?ã€?病虫鼠害防治å?Š2å¹´çš„ 2015-2016 抚育管护,按照作业设计施工, æˆ?活率和ä¿?存率达到项目验收 29个月(包 å?ˆå?Œæ‹†åˆ†æ˜¯æŒ‰ç…§ 标准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% å?«ä¸€å¹´çš„å?Ž 作业设计年度计 çš„ä¸?å?¯é¢„è§?费) NCB å‰?审 2014.12 2015.1 2015.03 2016.7 期抚育管ç?† 划进行。原采购 固定移动沙丘4814亩(建设è?‰ ) 计划4å?·å?ˆå?Œæ‹† 方格和ç?Œæœ¨æž—)。建设地点: 分到更新计划14 â…¢å?·å­?项目区Ⅰ林ç?­1—6å°?ç?­ ã€?15å?·å?ˆå?Œä¸­ã€‚ ã€?Ⅴ林ç?­1—7å°?ç?­4814亩。建 â…¢å?·å­?项目区 设内容包括扎设è?‰æ–¹æ ¼ã€?æ¤?è‹— PL-TJ-15 è?‰æ–¹æ ¼å’Œé€ æž— ã€?补水ã€?雨季点播ã€?è¡¥æ¤?ã€?ç—… 6,667,149 1,058,278 2015-2016 虫鼠害防治å?Š2年的抚育管护, 按照作业设计施工,æˆ?活率和 ä¿?存率达到项目验收标准。(å…¶ 中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ è§?费) 固定移动沙丘9220亩(建设è?‰ 方格和ç?Œæœ¨æž—)。建设地点: â…£å?·å­?项目区Ⅰ林ç?­1—11å°?ç?­ ã€?â…¡æž—ç?­1—5å°?ç?­ã€?Ⅲ林ç?­1— â…£å?·å­?项目区 3å°?ç?­2884亩。建设内容包括扎 原采购计划5å?· PL-TJ-16 è?‰æ–¹æ ¼å’Œé€ æž— 设è?‰æ–¹æ ¼ã€?æ¤?è‹—ã€?补水ã€?雨季 12,769,239 2,026,863 å?ˆå?Œæ›´æ–°åˆ°æ–°è®¡ 2015-2016 点播ã€?è¡¥æ¤?ã€?病虫鼠害防治å?Š2 划16å?·å?ˆå?Œä¸­ã€‚ 年的抚育管护,按照作业设计施 工,æˆ?活率和ä¿?存率达到项目 验收标准。(其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 第9页 å°?育20067亩。建设地点:Ⅳå?· å­?项目区Ⅱ林ç?­6—13å°?ç?­2006 按照作业设计年 7亩,Ⅳå?·å­?项目区Ⅲ林ç?­4å°? 度计划原采购计 â…£å?·å­?项目区 ç?­3097亩。建设内容包括雨季 划10å?·å?ˆå?Œä¸­â…£ PL-TJ-17 å°?育 点播ã€?补播ã€?病虫鼠害防治å?Š2 1,474,925 234,115 å?·å­?项目区å°?育 2015—2016 年的抚育管护,按照作业设计施 任务拆分到更新 工,æˆ?活率和ä¿?存率达到项目 计划17å?·å?ˆå?Œä¸­ 验收标准。(其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) NCB å?Žå®¡ 2015.02 2015.03 2015.05 2016.08 å°?育36103亩。建设地点:Ⅲå?· å­?项目区Ⅳ林ç?­1—9å°?ç?­22338 亩;Ⅴå?·å­?项目区Ⅰ林ç?­,52å°? 按照作业设计年 ç?­597亩,Ⅱ林ç?­1—5å°?ç?­1316 â…¢ã€?â…¤å?·å­?项 度计划原采购计 8亩。建设内容包括雨季点播ã€? PL-TJ-18 目区å°?育 2,653,571 421,202 划9å?·å?ˆå?Œæ‹†åˆ† 补播ã€?病虫鼠害防治å?Š2年的抚 2015—2016 到更新计划11ã€? 育管护,按照作业设计施工,æˆ? 18å?·å?ˆå?Œã€‚ 活率和ä¿?存率达到项目验收标 准。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ ä¸?å?¯é¢„è§?费) 工程总计 117,780,585 18,695,331 Ⅱ货物采购 PL-HW- 电脑ã€?照相机ã€?打å?°æœºã€?传真 shoppin 办公设备 20,000 3,175 —— 2013.6 2013.7 2013.9 2013.11 2个月 平罗县林业局 01 机 g 货物总计 20,000 3,175 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 第 10 页 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:平罗县林业局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° Brief Description 估算金é¢?(美 选择方å¼? 世行审查 实施安排 Selection Schedule Contract of Sevices å…ƒ) Cost Selection (PRIOR/POST) 采购过程 Selection Process å?ˆå?Œå®žæ–½ Name Estimate Method Contract 邀请建议书Expe 收到建议书Expe å?ˆå?ŒæŽˆäºˆExpe Implementation cted Inviting cted Receipt cted Duration for Proposals of Proposals Contract Award Date PL-ZX-01 施工监ç?† 223,905 NBF —— 2013.3 2013.4 2013.4 5å¹´ PL-ZX-02 详细设计 261,222 NBF —— 2012.12 2013.01 2013.01 3月 PL-ZX-03 招标代ç?† 74,635 NBF —— 2013.2 2013.3 2013.3 5å¹´ PL-ZX-04 项目培训 304,762 NBF —— PL-ZX-05 项目管ç?†éªŒæ”¶ 93,286 NBF —— 2013.3 2013.4 2013.4 5å¹´ å?ˆè®¡ 957,810 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:银å·?市兴庆区林业局 å?ˆå?Œç¼–å?· å?ˆå?Œæ??è¿° Description of å?ˆå?Œä¼°ç®—金é¢? Cost 采购方å¼? 世行审查 预计å?‘æ ‡ 预计开标 预计å?ˆå?Œ 预计完工/ä¾› 实施时间( 说明 Remarks Works Estimate Procureme (å‰?审/å?Ž 日期 日期 签署日期 货日期 月)Expec nt Method 审) Bank Expected Expected Expected Expected ted 人民å¸?å…ƒ 美元 Review Date of Date of Contract Starting Date Construct (Prior/P Issuing Bid Signing of Contract ion ost) Opening Duration (months) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程 è?¥é€ ä¹”木林1750亩,ç?Œæœ¨æž—75 滨河新区å­?项 0亩,并对其实施ç?Œæ°´ã€?病虫 XQQ-TJ- 目区203çœ?é?“ 害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?† 2,772,263 440,042 01 东侧林带2013- 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 2014å¹´ ä¸?å?¯é¢„è§?费) è?¥é€ ä¹”木林3500亩,ç?Œæœ¨æž—15 滨河新区å­?项 00亩,并对其实施ç?Œæ°´ã€?病虫 XQQ-TJ- 目区203çœ?é?“ 害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?† 5,544,525 880,083 02 西侧林带2013- 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 2014å¹´ 为加快滨河新 ä¸?å?¯é¢„è§?费) 42个月(包 区项目进度, è?¥é€ ä¹”木林4750亩,ç?Œæœ¨æž—17 å?«ä¸¤å¹´çš„å?Ž ä¿?è¯?项目质é‡? NCB å‰?审 2013.3 2013.4 2013.4 2014.12 50亩,并对其实施ç?Œæ°´ã€?病虫 期抚育管ç?† ,将该项目区 滨河新区å­?项 ) 分为三个标段 害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?† XQQ-TJ- 目区203çœ?é?“ 进行实施。 ;修建防ç?«ä½œä¸šé?“23.74公里, 8,801,274 1,397,028 03 西侧片林2013- 护林点1处ã€?项目标示牌1å?—, 2014å¹´ 防ç?«æŠ¤æž—警示牌6å?—(其中包å?« :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 红墩å­? å°?育16894亩,修建防ç?«ä½œä¸šé?“ XQQ-TJ- å­?项目区2013- 4公里。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 1,459,655 231,691 04 2014å¹´ 5%çš„ä¸?å?¯é¢„è§?费) 30个月(包 红墩å­? å°?育20000亩,修建防ç?«ä½œä¸šé?“ XQQ-TJ- å?«ä¸€å¹´çš„å?Ž å­?项目区2014- 4.12公里。(其中包å?«ï¼šå?ˆå?Œ 1,694,485 268,966 NCB å?Žå®¡ 2014.1 2014.2 2014.4 2015.10 05 期抚育管ç?† 2015å¹´ 金é¢?5%çš„ä¸?å?¯é¢„è§?费) ) å°?育20000亩,修建防ç?«ä½œä¸šé?“ 红墩å­? 4.12公里,瞭望塔1座ã€?护林 XQQ-TJ- å­?项目区2015- 点2处ã€?项目标示牌2å?—,防ç?« 2,150,185 341,299 06 2016å¹´ 护林警示牌4å?—。(其中包å?«ï¼š å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 30个月(包 å?«ä¸€å¹´çš„å?Ž NCB å?Žå®¡ 2015.1 2015.2 2015.4 2016.10 è?¥é€ ä¹”木林1707亩,ç?Œæœ¨æž—42 期抚育管ç?† 7亩,并对其实施ç?Œæ°´ã€?病虫 ) 害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?† XQQ-TJ- 兵沟å­?项目区 ;修建防ç?«ä½œä¸šé?“16.92公里, 3,480,750 552,500 07 2015-2016å¹´ 项目标示牌1å?—,防ç?«æŠ¤æž—è­¦ 示牌3å?—(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 5%çš„ä¸?å?¯é¢„è§?费) 替代生计 2,560,230 406,386 工程总计 28,463,367 4,517,995 Ⅱ货物 XQQ-HW- 办公设备 电脑ã€?照相机ã€?一体机 20000 3174.60 NBF —— 2013.3 2013.4 2013.6 2014.6 12个月 01 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:银å·?市兴庆区林业局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° 估算金é¢?(美元) 选择方å¼? 世行审查 实施安排 Selection Schedule Contract Brief Cost Estimate Selection (PRIOR/POST 采购过程 Selection Process å?ˆå?Œå®žæ–½ Contract Name Descripti Method ) Implementation on of 邀请建议书Expected 收到建议书Expected å?ˆå?ŒæŽˆäºˆExpected Duration Sevices Inviting for Receipt of Proposals Contract Award Date Proposals xqq-ZX-01 施工监ç?† 51,873 NBF —— 2013.3 2013.4 2013.4 44月 xqq-ZX-02 勘察设计 60,508 NBF —— 2012.10 2012.11 2013.1 3月 xqq-ZX-03 招标代ç?† 17,286 NBF —— 2013.2 2013.3 2013.3 5å¹´ xqq-ZX-04 项目管ç?† 21,603 NBF —— 2012.11 2012.12 2013.1 5å¹´ xqq-ZX-05 项目培训 116,476 NBF 783人次 2013 5å¹´ xqq-ZX-06 专家咨询 15,873 NBF 5人次 2013 5å¹´ å?ˆè®¡ 283,619 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ï¼›NBF:地方é…?套 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 采购计划 Procurement Plan å?ˆå?Œ ç¼–å?· å?ˆå?Œæ??è¿° Description of Works å?ˆå?Œä¼°ç®—金é¢? Cost 采 è´­æ–¹ 世行审 预计å?‘æ ‡ 预计开标日 预计å?ˆå?Œ 预计完工 实施时 说明 Estimate å¼? 查 日期 期 签署日期 /供货日 间(月 Remarks Procure (å‰? 审 / Expected Expected Expected 期 )Expe ment å?Žå®¡) Date of Date of Bid Contract Expected cted Method Bank Issuing Opening Signing Starting Constru Review Date of ction 人民å¸?å…ƒ 美元 (Prior/ Contract Duratio Post) n (months ) 1 3 4 5 6 7 8 9 10 11 12 13 14 Ⅰ工程采 è´­ 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—6000亩,防 ç?«ä½œ 业é?“65亩,11公里,瞭望塔1座, 大柳毛å­?项目区 护林点 1处,警示牌2å?—;并对其实 LW-TJ-DLM- è?‰æ–¹æ ¼+ç?Œæœ¨æž—, æ–½ è¡¥æ¤?å?Š2年的抚育管ç?†ã€‚(其中包 9,362,915 1,486,177 01 防ç?«ä½œä¸šé?“ å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 原1å?·å?ˆå?Œ 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—6624亩,防 更新为1ã€? ç?«ä½œ 业é?“73亩,12公里,瞭望塔1座, 2å?·å?ˆå?Œ 大柳毛å­?项目区 护林点 2处,项目标示牌1å?—,警示 LW-TJ-DLM- è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 牌 2å?—;并对其实施补æ¤?å?Š2抚育管 10,311,378 1,636,727 02 ç?†ã€‚ (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? 防ç?«ä½œä¸šé?“ å?¯ 预è§?费) 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—7191亩,防 白土岗å­?项目区 ç?«ä½œ 业é?“31亩,5.17公里;并对其实 LW-TJ-RTG- è?‰æ–¹æ ¼+ç?Œæœ¨æž—, æ–½ è¡¥æ¤?å?Š2抚育管ç?†ã€‚(其中包å?«ï¼š 10,310,356 1,636,564 03 防ç?«ä½œä¸šé?“ å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 42个月 (包å?« 两年的 NCB å‰?审 2013.3 2013.4 2013.4 2014.10 å?ŽæœŸ 抚 育管ç?† è?¥é€ é’ˆé˜”混交乔木林 475亩,护林点 1处;并对其实施ç?Œæ°´ã€?覆膜ã€?病虫 部分更新 LW-TJ-DLM- 大柳毛å­?项目区 害防治ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(å…¶ 1,330,455 211,183 到18ã€?27 04 防护林 中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ å?ˆå?Œ ) 42个月 (包å?« 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—5000亩,防 两年的 é¾™å?‘å­?项目区è?‰ ç?«ä½œ 业é?“9.5公里,并对其实施补æ¤? NCB å‰?审 2013.3 2013.4 2013.4 2014.10 LW-TJ-LK- å?ŽæœŸ 抚 原2å?·å?ˆå?Œ 方格+ç?Œæœ¨æž—,防 å?Š 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œ 7,570,053 1,201,596 05 育管ç?† 更新为5å?· ç?«ä½œä¸šé?“ 金 é¢?5%çš„ä¸?å?¯é¢„è§?费) ) 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—5000亩,防 é¾™å?‘å­?项目区è?‰ ç?«ä½œ 业é?“9.5公里,并对其实施补æ¤? 原2å?·å?ˆå?Œ 方格+ç?Œæœ¨æž—,防 å?Š 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œ LW-TJ-LK- 7,570,053 1,201,596 06 金 é¢?5%çš„ä¸?å?¯é¢„è§?费) 更新为6å?· ç?«ä½œä¸šé?“ å°?育 17000亩,瞭望塔1座;并对其 LW-TJ-DLM- 大柳毛å­?项目区 实施人工撒播ã€?è¡¥æ¤?å?Š 2年抚育管ç?† 1,438,500 228,333 07 å°?育 。 (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 预è§?费) 原10å?·å?ˆ å?Œæ›´æ–°ä¸º7 å°?育 18948亩,并对其实施人工撒播 ã€? 8å?· LW-TJ-DLM- 大柳毛å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 1,392,678 221,060 08 å°?育 å°?育 19000亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原15å?·å?ˆ 1,396,500 221,667 09 å°?育 :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) å?Œæ›´æ–°ä¸º9 å°?育 19150亩,并对其实施人工撒播 原15å?·å?ˆ LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 1,407,525 223,417 å?Œæ›´æ–°ä¸º1 10 å°?育 0 2013å¹´ 52,090,413 8,268,320 è?‰æ–¹æ ¼ +ç?Œæœ¨æž—9000亩,防ç?«ä½œä¸šé?“ 大柳毛å­?项目区 69亩,11.5公里,并对其实施补æ¤?å?Š LW-TJ-DLM- 原 7å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘ 13,245,706 2,102,493 11 æ›´æ–° 为 11å?· 防ç?«ä½œä¸šé?“ é¢? 5%çš„ä¸?å?¯é¢„è§?费) è?‰æ–¹æ ¼ +ç?Œæœ¨æž—9000亩,防ç?«ä½œä¸šé?“ 大柳毛å­?项目区 69亩,11.5公里,并对其实施补æ¤?å?Š LW-TJ-DLM- 原 7å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘ 13,245,706 2,102,493 12 æ›´æ–° 为 12å?· 防ç?«ä½œä¸šé?“ é¢? 5%çš„ä¸?å?¯é¢„è§?费) è?‰æ–¹æ ¼ +ç?Œæœ¨æž—9251亩,防ç?«ä½œä¸šé?“ 大柳毛å­?项目区 LW-TJ-DLM- 72亩,12公里,并对其实施补æ¤?ã€? 原 7å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 13,627,292 2,163,062 13 抚育管ç?†ã€‚ (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5 æ›´æ–° 为 13å?· 防ç?«ä½œä¸šé?“ %çš„ä¸?å?¯é¢„è§?费) è?‰æ–¹æ ¼ +ç?Œæœ¨æž—9000亩,防ç?«ä½œä¸šé?“ 大柳毛å­?项目区 75亩,12.5公里,并对其实施补æ¤?å?Š LW-TJ-DLM- è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘ 13,313,633 2,113,275 14 防ç?«ä½œä¸šé?“ é¢? 5%çš„ä¸?å?¯é¢„è§?费) è?‰æ–¹æ ¼ +ç?Œæœ¨æž—8096亩,防ç?«ä½œä¸šé?“ 原8å?·å?ˆå?Œ 大柳毛å­?项目区 68亩,11.3公里,并对其实施补æ¤?å?Š LW-TJ-DLM- 更新为14 è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘ 11,980,126 1,901,607 15 é¢? 5%çš„ä¸?å?¯é¢„è§?费) ã€?15ã€?16 防ç?«ä½œä¸šé?“ å?· è?‰æ–¹æ ¼ +ç?Œæœ¨æž—8000亩,防ç?«ä½œä¸šé?“ 大柳毛å­?项目区 67亩,11.2公里,并对其实施补æ¤?å?Š LW-TJ-DLM- è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 2年抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘ 11,840,378 1,879,425 16 é¢? 5%çš„ä¸?å?¯é¢„è§?费) 防ç?«ä½œä¸šé?“ 33个月 (包å?« 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨æž—13209亩, 一年的 NCB å‰?审 2013.11 2013.12 2014.2 2015.11 é¾™å?‘å­?项目区è?‰ 防ç?«ä½œ 业é?“26.59公里,并对其实施 å?ŽæœŸ 抚 LW-TJ-LK- 方格+ç?Œæœ¨æž—,防 è¡¥æ¤?å?Š 2年抚育管ç?†ã€‚(其中包å?«ï¼š 20,099,973 3,190,472 育管ç?† 原9å?·å?ˆå?Œ 17 æ›´æ–° 为 17å?· ç?«ä½œä¸šé?“ å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) ) 33个月 (包å?« 一年的 NCB å‰?审 2013.11 2013.12 2014.2 2015.11 å?ŽæœŸ 抚 育管ç?† ) è?¥é€ ä¹”ç?Œæ··äº¤æž— 5484亩(乔木4387 亩ã€?ç?Œæœ¨ 1097);并对其实施ç?Œæ°´ LW-TJ-DLM- 大柳毛å­?项目区 ã€?覆膜ã€?病虫害防治ã€? è¡¥æ¤?å?Š2年抚 原 4å?·å?ˆå?Œ 育管ç?†ã€‚ (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% 6,526,182 1,035,902 18 防护林 æ›´æ–° 为 18å?· çš„ä¸?å?¯ 预è§?费) å°?育 28329亩,龙å?‘å­?项目区瞭望塔 1座,护林点1处,项目标示牌1å?—ã€? LW-TJ-LK- é¾™å?‘å­?项目区å°? 防ç?«è­¦ç¤ºç‰Œ 4å?—;并对其实施人工撒 原 11å?·å?ˆå?Œ 2,406,632 382,005 19 育 æ’­ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包 æ›´æ–° 为 19å?· å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) å°?育 28000亩,并对其实施人工撒播 LW-TJ-LK- é¾™å?‘å­?项目区å°? ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 11å?·å?ˆå?Œ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 2,058,000 326,667 20 育 æ›´æ–° 为 20å?· å°?育 30000亩,护林点1处,项目标 示牌 1处,防ç?«è­¦ç¤ºç‰Œ5å?—,并对其 LW-TJ-BTG- 白土岗å­?项目区 实施人工撒播ã€?è¡¥æ¤?å?Š 2年抚育管ç?† 原 12å?·å?ˆå?Œ 2,341,500 371,667 21 å°?育 æ›´æ–° 为 21å?· 。 (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 预è§?费) å°?育 30000亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 12å?·å?ˆå?Œ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 2,205,000 350,000 22 å°?育 æ›´æ–° 为 22å?· 2014å¹´ 112,890,128 17,919,068 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨11897亩,防 大柳毛å­?项目区 ç?«ä½œ 业é?“72亩,12公里,并对其实 LW-TJ-DLM- 原 14å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, æ–½ è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 17,291,869 2,744,741 23 æ›´æ–° 为 23å?· 防ç?«ä½œä¸šé?“ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨10000亩,防 大柳毛å­?项目区 ç?«ä½œ 业é?“60亩,10公里,并对其实 LW-TJ-DLM- 原 14å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, æ–½ è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 14,528,766 2,306,153 24 æ›´æ–° 为 24å?· 防ç?«ä½œä¸šé?“ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨10000亩,防 大柳毛å­?项目区 ç?«ä½œ 业é?“60亩,10公里,并对其实 LW-TJ-DLM- 原 14å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, æ–½ è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 14,528,766 2,306,153 25 æ›´æ–° 为 25å?· 防ç?«ä½œä¸šé?“ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨5853亩,并对 大柳毛å­?项目区 å…¶ 实施补æ¤?å?Š2年抚育管ç?†ã€‚(其中 LW-TJ-DLM- 原 17å?·å?ˆå?Œ è?‰æ–¹æ ¼+ç?Œæœ¨æž—, 包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 8,106,112 1,286,684 26 æ›´æ–° 为 26å?· 防ç?«ä½œä¸šé?“ è?¥é€ ä¹”ç?Œæ··äº¤æž— 3713亩(乔木2970 亩ã€?ç?Œæœ¨ 743);并对其实施ç?Œæ°´ã€? 24个月 LW-TJ-DLM- 大柳毛å­?项目区 覆膜ã€?病虫害防治ã€? è¡¥æ¤?å?Š2年抚育 (包å?« 原4å?·å?ˆå?Œ 管ç?†ã€‚ (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 4,418,405 701,334 27 防护林 一年的 更新为27å?· ä¸?å?¯ 预è§?费) NCB å‰?审 2014.11 2014.12 2015.2 2016.11 å?ŽæœŸ 抚 育管ç?† è?¥é€ ç?Œæœ¨æž— 5090亩,乔木林967亩, ) 白土岗å­?项目区 人工 ç§?è?‰1900亩,并对其实施补æ¤? LW-TJ-BTG- 原 16å?·å?ˆå?Œ ç?Œæœ¨æž—ã€?人工ç§? ã€? 抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 4,658,688 739,474 28 æ›´æ–° 为 28å?· è?‰ 5%çš„ä¸?å?¯é¢„è§?费) å°?育 26000亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 18å?·å?ˆå?Œ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 1,911,000 303,333 29 å°?育 æ›´æ–° 为 29å?· å°?育 26703亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 18å?·å?ˆå?Œ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 1,962,671 311,535 30 å°?育 æ›´æ–° 为 30å?· å°?育 25000亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 19å?·å?ˆå?Œ :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 1,837,500 291,667 31 å°?育 æ›´æ–° 为 31å?· å°?育 25000亩,并对其实施人工撒播 LW-TJ-BTG- 白土岗å­?项目区 ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 原 19å?·å?ˆå?Œ 1,837,500 291,667 32 å°?育 :å?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) æ›´æ–° 为 32å?· 2015å¹´ å°?计 71,081,277 11,282,742 é•¿æµ?æ°´å­?项目区 å°?育 950亩;è?¥é€ ç?Œæœ¨æž—779亩;è?¥ å°?育ã€?ç?Œæœ¨æž—ã€? 造 ä¹”ç?Œæ··äº¤æž—741亩:乔木林593亩 ä¹”ç?Œæ··äº¤æž— ã€?ç?Œæœ¨æž— 148亩;护林点1处ã€?项目 LW-TJ-CLS- 原 5å?·å?ˆå?Œ 标示牌 1处;并对其实施补水ã€?病虫 1,504,324 238,782 33 æ›´æ–° 为 33å?· 害防治ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(å…¶ 中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 银湖å­?项目区è?‰ è?‰æ–¹æ ¼ +ç?Œæœ¨950亩,ç?Œæœ¨æž—380亩, 方格+ç?Œæœ¨æž—ã€?ç?Œ 乔木林 950;护林点1处项目,标示 LW-TJ-YH- 木林ã€?乔木林 牌 1处;并对其实施补水ã€?病虫害防 原 6å?·å?ˆå?Œ 2,937,218 466,225 34 æ²»ã€? è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包 æ›´æ–° 为 34å?· å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?费) 18个月 (包å?« å?Šå¹´çš„ 人工扎 设è?‰æ–¹æ ¼+ç?Œæœ¨549亩,å°?育 7 NCB å?Žå®¡ 2015.11 2015.12 2016.2 2017.2 å?ŽæœŸ 抚 96亩,乔ç?Œæ··äº¤æž—(乔木林3257亩 + 北沙çª?å­?项目区 育管ç?† ç?Œæœ¨æž— 814亩);护林点1处项目, LW-TJ-BSW- è?‰æ–¹æ ¼+ç?Œæœ¨æž—ã€? ) 原 13å?·å?ˆå?Œ 标示牌 1处,防ç?«è­¦ç¤ºç‰Œ2å?—;并对 5,781,381 917,680 35 å°?育ã€?防护林造 æ›´æ–° 为 35å?· å…¶ 实施ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š 2 æž— å¹´ 抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 5%çš„ä¸?å?¯é¢„è§?费) (包å?« å?Šå¹´çš„ NCB å?Žå®¡ 2015.11 2015.12 2016.2 2017.2 å?ŽæœŸ 抚 育管ç?† ) è?¥é€ ä¹”木林 950亩;防ç?«è­¦ç¤ºç‰Œ1å?— ;北沙 çª?林场护林点1处。并对其实 LW-TJ-RCD- ä»?存渡林场å­?项 原 20å?·å?ˆå?Œ æ–½ç?Œæ°´ã€?病虫害防治ã€? è¡¥æ¤?å?Š2年抚 1,401,330 222,433 36 目区防护林 æ›´æ–° 为 36å?· 育管ç?†ã€‚ (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% çš„ä¸?å?¯ 预è§?费) 2016å¹´ 11,624,253 1,845,120 工程总计 247,686,071 39,315,249 Ⅱ货物采购 ç?µæ­¦å¸‚项 LW-HW-01 办公设备 电脑ã€?照相机ã€?一体机 20,000 3,077 NBF —— 2013.3 2013.4 2013.5 2013.6 1月 目办 货物总计 20,000 3,077 总计 247,706,071 39,318,326 注: 1ã€?ICB:国际竞争性招标,NCB:国内竞争性招标,shopping: 询价采购 2ã€?以2012å¹´12月26日采购计划为基础进行更新。ä¾?æ?®é¡¹ç›®è¯¦ç»†ä½œä¸šè®¾è®¡å’Œé¡¹ç›®å®žé™…建设情况编制此项目采购计划 3ã€?此采购计划中1-36å?·å·¥ç¨‹å?ˆå?Œå®žæ–½æœŸ36个月中,包括12个月工程建设期,24个月管护期(å?«ç¼ºé™·è´£ä»»æœŸ12个月)。 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?ˆå?Œå??称 å?ˆå?Œæ??è¿° 估算金é¢?(美元) Cost Estimate 选择方å¼? 世行审查 实施安排 Selection Schedule Contract Brief Selection (PRIOR/POST) 采购过程 Selection Process å?ˆå?Œå®žæ–½ Name Description Method Contract of Sevices 邀请建议书Expe 收到建议书Expe å?ˆå?ŒæŽˆäºˆExpe Implementation 人民å¸? 美元 cted Inviting cted Receipt cted Duration for Proposals of Proposals Contract Award Date LW-ZXFU- 项目管ç?† 1245800 197,746 NBF —— 2013.2 2013.3 2013.4 5å¹´ 01 LW-ZXFU- 勘察设计 3488300 553,698 NBF —— 2012.2 2012.3 2014.4 3月 02 LW-ZXFU- 工程监ç?† 2989900 474,587 NBF —— 2013.2 2013.3 2013.4 5å¹´ 03 LW-ZXFU- 招标代ç?† 996600 158,190 NBF —— 2013.2 2013.3 2013.4 5å¹´ 04 LW-ZXFU- 专家咨询 100000 15,873 NBF —— 2013.2 2013.3 2013.4 5å¹´ 05 项目培训 4800000 761,905 5å¹´ å?ˆè®¡ 13620600 2,162,000 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:é?’铜峡市林业局 å?ˆå?Œä¼°ç®—金é¢? Cost Estimate 世行审查 预计å?‘ 预计完工/ä¾› 实施时间( 预计å?ˆå?Œ 采购方å¼? (å‰?审/å?Žå®¡ 标日期 预计开标日 货日期 月)Expecte 签署日期 Procure ) Bank Expecte 期 Expected Expected d å?ˆå?Œç¼–å?· å?ˆå?Œæ??è¿° Description of Works Expected ment Review d Date Date of Bid Starting Constructio 人民å¸?å…ƒ 美元 Contract Method (Prior/Pos of Opening Date of n Duration Signing t) Issuing Contract (months) 1 2 3 4 5 6 7 8 9 10 11 12 Ⅰ工程采购 è?¥é€ ä¹”木林178.2亩,ä¹”ç?Œæ··äº¤æž—109 甘城å­?ã€?å?Œå?ˆå­?沟ã€? QTX-TJ- 7.5亩,针阔混交林42亩,并对其实 大å??æ¢?å­?项目区防护 GCZ&SHZ æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 1,543,543 245,007 G&DBL-1 æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ 育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 施建设(2013) 31个月(包 ä¸?å?¯é¢„è§?费) å?«ä¸€å¹´çš„å?Ž NCB å‰?审 2013.3 2013.4 2013.4 2013.11 è?¥é€ ä¹”木林231亩,乔ç?Œæ··äº¤æž—571. 期抚育管ç?† å?¡å­?庙ã€?广武å­?项目 QTX-TJ- 5亩,并对其实施ç?Œæ°´ã€?病虫害防治 ) 区防护林è?¥é€ å?ŠåŸºç®¡ QZM&GW- ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚标示牌1å?— 1,075,534 170,720 2 ç?†å?ŠåŸºç¡€è®¾æ–½å»ºè®¾ï¼ˆ 。防ç?«ä½œä¸šé?“1.2公里。(其中包å?« 2013) :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 甘城å­?ã€?å?Œå?ˆå­?沟å­? è?¥é€ ä¹”木林83.4亩,ä¹”ç?Œæ··äº¤æž—1002 QTX-TJ- 项目区防护林è?¥é€ ç®¡ .5亩,并对其实施ç?Œæ°´ã€?病虫害防 GCZ&SHZ 1,264,342 200,689 G-3 ç?†å?ŠåŸºç¡€è®¾æ–½å»ºè®¾ï¼ˆ æ²»ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包 2014) å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) è?¥é€ ä¹”木林592.5亩,ä¹”ç?Œæ··äº¤æž—858 大å??æ¢?å­?项目区防护 亩,针阔混交林189亩,并对其实施 QTX-TJ- DBL-4 æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 1,975,405 313,556 施建设(2014) 管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? å?¯é¢„è§?费) 20月包å?«ä¸€ NCB å?Žå®¡ 2014.1 2014.2 2014.3 2014.11 å¹´çš„å?ŽæœŸæŠš è?¥é€ ä¹”木林1351.7亩,ç?Œæœ¨æž—3293. 育管ç?†ï¼‰ 树新林场å­?项目区防 7亩,乔ç?Œæ··äº¤æž—660亩,并对其实 QTX-TJ- 护林è?¥é€ å?ŠåŸºç®¡ç?†å?Š SXLC-5 基础设施建设(2014 æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 4,200,376 666,726 育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ ) ä¸?å?¯é¢„è§?费) å?¡å­?庙ã€?广武å­?项目 è?¥é€ ä¹”木林537亩,乔ç?Œæ··äº¤æž—610. QTX-TJ- 区防护林è?¥é€ å?ŠåŸºç®¡ 5亩,并对其实施ç?Œæ°´ã€?病虫害防治 QZM&GW- 1,428,009 226,668 6 ç?†å?ŠåŸºç¡€è®¾æ–½å»ºè®¾ï¼ˆ ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 2014) :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 附件8_表2_24 è?¥é€ ä¹”ç?Œæ··äº¤æž—1944亩,并对其实 甘城å­?ã€?å?—庄ã€?å?¡å­? QTX-TJ- æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 庙å­?项目区防护林è?¥ GCZ&NZ& 育管ç?†ã€‚护林房1处。标示牌2å?—, 2,455,469 389,757 QZM-7 造管ç?†å?ŠåŸºç¡€è®¾æ–½å»º 防ç?«ä½œä¸šé?“1公里。(其中包å?«ï¼šå?ˆ 设(2015) å?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) è?¥é€ ä¹”ç?Œæ··äº¤æž—1080亩,并对其实 å?Œå?ˆå­?沟ã€?大å??æ¢?å­? QTX-TJ- æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 项目区防护林è?¥é€ ç®¡ SHZG&DB 育管ç?†ã€‚标示牌1å?—,防ç?«è­¦ç¤ºç‰Œ2 2,074,813 329,335 L-8 ç?†å?ŠåŸºç¡€è®¾æ–½å»ºè®¾ï¼ˆ å?—,防ç?«ä½œä¸šé?“10.8公里。(其中包 2015) å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) è?¥é€ ä¹”木林2779.5亩,并对其实施 树新林场å­?项目区防 QTX-TJ- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 护林è?¥é€ ç®¡ç?†å?ŠåŸºç¡€ 3,761,856 597,120 SXLC-9 管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? 设施建设(2015) 20个月(包 å?¯é¢„è§?费) è?¥é€ ä¹”木林4062亩,并对其实施ç?Œ å?«ä¸€å¹´çš„å?Ž 树新林场å­?项目区防 NCB å?Žå®¡ 2015.1 2015.2 2015.3 2015.11 QTX-TJ- æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 期抚育管ç?† 护林è?¥é€ ç®¡ç?†å?ŠåŸºç¡€ 5,497,629 872,639 ) SXLC-10 ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 设施建设(2015) 预è§?费) è?¥é€ ä¹”木林2425.6亩,并对其实施 树新林场å­?项目区防 QTX-TJ- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 护林è?¥é€ ç®¡ç?†å?ŠåŸºç¡€ 3,282,877 521,092 SXLC-11 管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? 设施建设(2015) å?¯é¢„è§?费) è?¥é€ ä¹”木林13.9亩,ç?Œæœ¨æž—1318.5 树新林场å­?项目区防 QTX-TJ- 亩,并对其实施ç?Œæ°´ã€?病虫害防治 护林è?¥é€ ç®¡ç?†å?ŠåŸºç¡€ 705,114 111,923 SXLC-12 ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚(其中包å?« 设施建设(2015) :å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) è?¥é€ ä¹”木林3550.5亩,并对其实施 广武å­?项目区防护林 QTX-TJ- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾æ–½ 4,805,350 762,754 GW-13 管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? 建设(2015) å?¯é¢„è§?费) è?¥é€ ä¹”木林1986亩,并对其实施ç?Œ 树新林场å­?项目区防 QTX-TJ- æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 护林è?¥é€ ç®¡ç?†å?ŠåŸºç¡€ 2,693,160 427,486 SXLC-14 ç?†ã€‚防ç?«è­¦ç¤ºç‰Œ5å?—。(其中包å?«ï¼š 设施建设(2016) å?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) è?¥é€ ç?Œæœ¨æž—4225.5亩,并对其实施 滑石沟å­?项目区防护 QTX-TJ- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 20个月(包 æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ 2,199,442 349,118 HSG-15 管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? å?«ä¸€å¹´çš„å?Ž 施建设(2016) NCB å?Žå®¡ 2016.1 2016.2 2016.3 2016.11 å?¯é¢„è§?费) 期抚育管ç?† è?¥é€ ä¹”ç?Œæ··äº¤æž—1366.5亩,å°?育403 ) 8亩,并对其实施ç?Œæ°´ã€?病虫害防治 滑石沟å­?项目区防护 QTX-TJ- ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚护林房1处 æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ 2,613,034 414,767 HSG-16 。项目标示牌2å?—,防ç?«ä½œä¸šé?“7.8K 施建设(2016) m。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 预è§?费) 附件8_表2_25 è?¥é€ ä¹”木林4809亩,并对其实施ç?Œ 滑石沟å­?项目区防护 QTX-TJ- æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ 6,508,640 1,033,117 HSG-17 ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 施建设(2017) 预è§?费) è?¥é€ ä¹”ç?Œæ··äº¤æž—1372.5亩,并对其 10个月(包 滑石沟å­?项目区防护 QTX-TJ- 实施ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2å¹´ å?«å?Šå¹´çš„å?Ž æž—è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾ 1,576,447 250,230 NCB å?Žå®¡ 2017.1 2017.2 2017.3 2017.6 HSG-18 抚育管ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% 期抚育管ç?† 施建设(2017) çš„ä¸?å?¯é¢„è§?费) ) è?¥é€ ä¹”木林1117亩,并对其实施ç?Œ 中滩å­?项目区防护林 QTX-TJ-ZT- æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 è?¥é€ ç®¡ç?†å?ŠåŸºç¡€è®¾æ–½ 1,511,780 239,965 19 ç?†ã€‚(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 建设(2017) 预è§?费) 工程总计 51172818.39 8122669.59 Ⅱ货物采购 QTX-HW-1 笔记本电脑ã€?照相机ã€?一体机 20000 3174.603175 货物总计 20,000 3174.603175 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 附件8_表2_26 posed Ningxia Desertification Contro and Ecological Protection Project å?•ä½?:é?’铜峡市林业局 说明 Remarks 13 原2012å¹´å?Œå?ˆå­?沟 ã€?大å??æ¢?ã€?甘城å­? å­?项目区任务部分 分解此处。 原2012å¹´å?¡å­?庙ã€? 广武å­?项目区部分 任务分解此处。 原2012å¹´å?Œå?ˆå­?沟 ã€?甘城å­?å­?项目区 部分任务分解此处 。 原2012年大å??æ¢?å­? 项目区任务部分分 解此处。 原2012年树新林场 å­?项目区任务部分 分解此处。 原2012å¹´å?¡å­?庙ã€? 广武å­?项目区部分 任务分解此处。 附件8_表2_27 原2012年甘城å­?ã€? å?—庄ã€?å?¡å­?庙å­?项 目区部分任务分解 此处。 å­?项目区间造林地 方相隔较远。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 é?’铜峡市林业局 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 附件8_表2_28 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 拆分是因为让多家 å…¬å?¸å½¢æˆ?竞争,确 ä¿?工程质é‡?。 2012年已栽完 (等待项目中期调整 ) 附件8_表2_29 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:é?’铜峡市林业局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° Brief 估算金é¢?(美 选择方å¼? 世行审查 实施安排 Selection Schedule Contract Name Description of å…ƒ) Cost Selection (PRIOR/POST) 采购过程 Selection Process å?ˆå?Œå®žæ–½ Sevices Estimate Method 邀请建议书Expected 收到建议书Expecte å?ˆå?ŒæŽˆäºˆExpected Contract Inviting for d Receipt of Contract Award Implementation Proposals Proposals Date Duration QTX-ZX-01 施工监ç?† 95,032 NBF 2013.3 2013.4 2013.4 9月 QTX-ZX-02 勘察设计 110,857 NBF 2011.12 2012.1 2012.2 3月 QTX-ZX-03 招标代ç?† 31,683 NBF 2013.3 2013.4 2013.4 5å¹´ QTX-ZX-04 项目管ç?† 39,603 NBF 2013.12 2013.12 2013.12 5å¹´ QTX-ZX-05 项目培训 78,889 NBF 490人次 2013 5å¹´ QTX-ZX-06 专家咨询 3,175 NBF 1人次 2013 5å¹´ å?ˆè®¡ 359,238 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:利通区林业局 å?ˆå?Œç¼–å?· å?ˆå?Œæ??è¿° Description of å?ˆå?Œä¼°ç®—金é¢? Cost Estimate 采购方å¼? 世行审查 预计å?‘æ ‡ 预计开标 预计å?ˆå?Œ 预计完工/ 实施时间( 说明 Works Procurem (å‰?审/å?Ž 日期 日期 签署日期 供货日期 月)Expec Remarks 人民å¸?å…ƒ 美元 ent 审) Bank Expected Expected Expected Expected ted Method Review Date of Date of Contract Starting Construct (Prior/ Issuing Bid Signing Date of ion Post) Opening Contract Duration (months) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程采购 在西沟沿å­?项目区è?¥é€ 3800亩 ä¹”ç?Œæ··äº¤æž—,乔木3040亩,ç?Œ 西沟沿å­?项 木760亩(示范点建设594亩) 目区乔ç?Œæ·· 。并对其实施ç?Œæ°´ã€?病虫害防 LT-TJ-XGY-1 4,762,380 755,933 交林ã€?基础 æ²»ã€?è¡¥æ¤?å?Š2年抚育管ç?†ã€‚西 设施建设. 沟沿å­?项目区设立防ç?«è­¦ç¤ºç‰Œ 1å?—。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% 干沟å­?项目 çš„ä¸?å?¯é¢„è§?费) 32个月包å?« 区å°?育4491 NCB å‰?审 2013.3 2013.4 2013.4 2013.12 两年的å?ŽæœŸ 亩2012年未 在干沟å­?项目区å°?育4491亩, 抚育管ç?†ï¼‰ 实施,列入2 并对其实施人工撒播ã€?è¡¥æ¤?å?Š 013年实施 干沟å­?项目 2年的抚育管ç?†.麻黄沟å­?项目 区å°?育,麻黄 区å°?育3822亩,并对其实施人 LT-TJ-GG- 沟å­?项目区 工撒播ã€?è¡¥æ¤?抚育管ç?†.在麻 947,415 150,383 MHG-2 å°?育ã€?基础 黄沟å­?建设护林点1处,项目 设施建设, 标识牌1å?—,防ç?«è­¦ç¤ºç‰Œ1å?—。 (其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? å?¯é¢„è§?费) æ²™å??沟å­?项目区è?¥é€ ä¹”ç?Œæ··äº¤ æž—8002亩,乔木6402亩,ç?Œæœ¨ æ²™å??沟å­?项 1600亩,并对其实施ç?Œæ°´ã€?ç—… 21个月(包 目区乔ç?Œæ·· 虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 å?«ä¸€å¹´çš„å?Ž 利通区项目 LT-TJ-SBG-3 10,378,095 1,647,317 NCB å?Žå®¡ 2013.12 2014.1 2014.3 2014.12 交林ã€?基础 ç?†ã€‚在沙å??沟å­?项目区建设护 期抚育管ç?† 办 设施建设 林点1处,项目标识牌1å?—,防 ) ç?«è­¦ç¤ºç‰Œ1å?—。(其中包å?«ï¼šå?ˆ å?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 西沟沿å­?项目区人工ç§?è?‰5700 西沟沿å­?项 20个月(包 亩。并对其实施人工撒播ã€?è¡¥ 目区人工ç§? å?«ä¸€å¹´çš„å?Ž 利通区项目 LT-TJ-XGY-4 æ¤?ã€?抚育管ç?†.修建防ç?«è­¦ç¤º 1,653,120 262,400 NCB å?Žå®¡ 2015.1 2015.2 2015.4 2015.12 è?‰ã€?防ç?«è­¦ 期抚育管ç?† 办 牌1å?—。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢? 示牌 ) 5%çš„ä¸?å?¯é¢„è§?费) 在麻黄沟å­?项目区人工栽æ¤?ç?Œ 麻黄沟å­?项 木林634亩,栽æ¤?ä¹”ç?Œæ··äº¤æž—2 目区人工栽 56.5亩(乔木205.5亩,ç?Œæœ¨5 æ¤?ç?Œæœ¨æž—ã€? 1亩),并对其进行实施ç?Œæ°´ 利通区项目 LT-TJ-XGY-5 1,075,725 170,750 ä¹”ç?Œæ··äº¤æž— ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 办 ã€?防ç?«ä½œä¸š 育管ç?†ã€‚修建防ç?«ä½œä¸šé?“6.83 21个月(包 é?“ 公里(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% å?«ä¸€å¹´çš„å?Ž çš„ä¸?å?¯é¢„è§?费) NCB å?Žå®¡ 2015.12 2016.1 2016.3 2016.12 期抚育管ç?† ) 在沙å??沟å­?项目区人工栽æ¤?ç?Œ æ²™å??沟å­?项 木林1757亩,并对其进行实施 目区人工栽 ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?ã€?抚 利通区项目 LT-TJ-SBG-6 1,040,655 165,183 æ¤?ç?Œæœ¨æž—ã€? 育管ç?†ã€‚修建防ç?«è­¦ç¤ºç‰Œ1å?— 办 防ç?«è­¦ç¤ºç‰Œ 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ ä¸?å?¯é¢„è§?费) 工程采购共计 18,911,800 3,005,785 II. 货物采购 利通区项目 LT-TJ-8 办公室设备 电脑ã€?照相机ã€?一体机 20,000 3179 NBF —— 2013.5 2013.6 2013.7 2013..9 4月 办 å?ˆè®¡ 18,931,800 3,008,964 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 ;NBF:国内é…?套资金 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:利通区林业局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° Brief Description 估算金é¢?(美 选择方å¼? 世行审查 实施安排 Selection Schedule Contract of Sevices å…ƒ) Cost Selection (PRIOR/POST) 采购过程 Selection Process å?ˆå?Œå®žæ–½ Name Estimate Method Contract 邀请建议书Expe 收到建议书Expe å?ˆå?ŒæŽˆäºˆExpe Implementation cted Inviting cted Receipt cted Duration for Proposals of Proposals Contract Award Date LT-ZX-1 工程监ç?† 37,414 NBF —— 2013.3 2013.4 2013.4 5å¹´ LT-ZX-2 勘察设计 43,660 NBF —— 2012.2 2012.2 2012.3 1个月 LT-ZX-3 招标代ç?† 12,477 NBF —— 2013.3 2013.4 2013.4 5å¹´ LT-ZX-4 项目培训 47,363 NBF —— 5å¹´ LT-ZX-5 专家咨询 15,893 NBF —— 2013.1 2013.2 2013.2 5å¹´ LT-ZX-6 项目管ç?† 15,592 NBF —— å?ˆè®¡ 172,399 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?è?’漠化治ç?†å’Œç”Ÿæ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:ç›?池县林业局 å?ˆå?Œä¼°ç®—金é¢? Cost 采购方 世行审 预计å?‘ 预计开标 预计å?ˆå?Œç­¾ 预计完 实施时间 Estimate å¼? 查 标日期 日期 署日期 å·¥/供货 (月)Exp ected Procure (å‰?审/ Expecte Expected Expected 日期 Constructio å?ˆå?Œæ??è¿° Description of ment å?Žå®¡) d Date Date of Contract Expected n Duration 说明 å?ˆå?Œç¼–å?· Method Bank of Bid Signing Starting (months) Works Review Date of Remarks 人民å¸?å…ƒ 美元 (Prior/Po Issuing Opening Contract st) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程采购 æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—1981.5亩,ç?Œæœ¨ è?‰æ–¹æ ¼ã€?造林 æž—2482.5亩,å°?育16189.2亩,并对 YC-TJ- å’Œå°?育2013- 其实施ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2 5,735,783 910,442 -1 2014å¹´ 年抚育管ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5% çš„ä¸?å?¯é¢„è§?费) æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—582亩,ç?Œæœ¨æž—79 è?‰æ–¹æ ¼ã€?造林 47亩,å°?育9210亩,并对其实施ç?Œæ°´ YC-TJ- å’Œå°?育2013- ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?†( 6,616,338 1,050,212 -2 2014å¹´ 其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—427.5亩,ç?Œæœ¨æž— è?‰æ–¹æ ¼ã€?造林 2398.5亩,å°?育5632.5亩,并对其实 YC-TJ- å’Œå°?育2013- æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 2,411,225 382,734 -3 2014å¹´ 育管ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? å?¯é¢„è§?费) ç›?池县 2012å¹´6个 æ—§å?ˆå?Œåˆ† 解到2013 å¹´9个新å?ˆ å?Œä¸­ã€‚å?ˆ å?Œåˆ†è§£çš„ 38个月( 原因是考 包å?«ä¸¤å¹´ NCB å‰?审 2013.3 2013.4 2013.4 2014.6 虑自然æ?‘ çš„å?ŽæœŸæŠš 区域,ä½? 育管ç?†ï¼‰ ç›?池县 æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—1498.5亩,ç?Œæœ¨ 2012å¹´6个 è?‰æ–¹æ ¼ã€?造林 æž—8134.5亩,å°?育2802亩,并对其实 æ—§å?ˆå?Œåˆ† YC-TJ- å’Œå°?育2013- æ–½ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚 解到2013 6,877,666 1,091,693 -4 2014å¹´ 育管ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸? å¹´9个新å?ˆ å?¯é¢„è§?费) å?Œä¸­ã€‚å?ˆ å?Œåˆ†è§£çš„ æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—2671.5亩,ç?Œæœ¨ 38个月( 原因是考 è?‰æ–¹æ ¼ã€?造林 æž—8559亩,å°?育2010亩,并对其实施 包å?«ä¸¤å¹´ YC-TJ- NCB å‰?审 2013.3 2013.4 2013.4 2014.6 虑自然æ?‘ å’Œå°?育2013- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 8,701,375 1,381,171 çš„å?ŽæœŸæŠš -5 区域,ä½? 2014å¹´ 管ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 育管ç?†ï¼‰ 置。按照 预è§?费) 项目详细 æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—1530亩,ç?Œæœ¨æž—1 作业设计 è?‰æ–¹æ ¼ã€?造林 555.5亩,å°?育8364亩,并对其实施 YC-TJ- å’Œå°?育2013- ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 çš„æž—ç?­ï¼Œ 3,725,560 591,359 便于工程 -6 2014å¹´ 管ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 施工和管 预è§?费) ç?†è€Œè¿›è¡Œ æ?Žåº„å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—1005亩,ç?Œæœ¨æž—3 分解的。 è?‰æ–¹æ ¼ã€?造林 225亩,å°?育4589亩,并对其实施ç?Œ YC-TJ- å’Œå°?育2013- æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 3,598,030 571,116 -7 2014å¹´ ç?†(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ è§?费) é­?庄å­?项目区 人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—4417.5亩,å°?育12 è?‰æ–¹æ ¼ã€?造林 18亩,并对其实施ç?Œæ°´ã€?病虫害防治 YC-TJ- å’Œå°?育2013- ã€?è¡¥æ¤?å?Š2年抚育管ç?†(其中包å?«ï¼šå?ˆ 6,330,532 1,004,846 -8 2014å¹´ å?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) æ?Žåº„å­?ã€?é­?庄 æ?Žåº„å­?ã€?é­?庄å­?项目区基础设施建设: å­?项目区基础 防ç?«ä½œä¸šé?“46.64公里,æµ?动沙丘防ç?«ä½œ YC-TJ- 设施建设2013- 业é?“5.51公里;瞭望塔2处,护林点6处 ,项目标识牌5å?—,防ç?«æŠ¤æž—警示牌16å?— 4,082,081 647,949 -9 2014å¹´ 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 1.生æ€?建设:人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—528 9亩,å°?育6706.4亩,并对其实施ç?Œ æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 二é?“湖项目区 ç?†ã€‚2.项目区基础设施建设:防ç?«ä½œ YC-TJ- è?‰æ–¹æ ¼ã€?造林 业é?“1.74公里,æµ?动沙丘防ç?«ä½œä¸šé?“ 9,746,804 1,547,112 -10 å’Œå°?育2014- 11.01公里;瞭望塔1处,护林点2处 2015å¹´ ,项目标识牌2å?—,防ç?«æŠ¤æž—警示牌1 å?—。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯ 27个月( 预è§?费) 包å?«ä¸€å¹´ ç›?池县 NCB å?Žå®¡ 2014.1 2014.2 2014.3 2015.6 çš„å?ŽæœŸæŠš 项目办 1.生æ€?建设:人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—389 育管ç?†ï¼‰ 5.5亩,å°?育5956.5亩,并对其实施 ç?Œæ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育 皖记沟项目区 管ç?†ã€‚2.项目区基础设施建设:防ç?« YC-TJ- è?‰æ–¹æ ¼ã€?造林 作业é?“3.37公里,æµ?动沙丘防ç?«ä½œä¸š 8,280,494 1,314,364 -11 å’Œå°?育2014- é?“3.21公里;护林点1处,项目标识 2015å¹´ 牌1å?—,防ç?«æŠ¤æž—警示牌7å?—。(其中 包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„è§?费) 1.生æ€?建设:人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—541 5亩,å°?育50590.5亩,并对其实施ç?Œ æ°´ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管 野湖井项目区 ç?†ã€‚2.项目区基础设施建设:防ç?«ä½œ YC-TJ- è?‰æ–¹æ ¼ã€?造林 业é?“1.15公里,æµ?动沙丘防ç?«ä½œä¸šé?“ ç›?池县 12,703,909 2,016,494 -12 å’Œå°?育2015- 6.43公里;瞭望塔1处,护林点1处, 项目办 2016å¹´ 项目标识牌1å?—,防ç?«æŠ¤æž—警示牌2å?— 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ 27个月( è§?费) 包å?«ä¸€å¹´ NCB å?Žå®¡ 2015.1 2015.2 2015.3 2016.6 çš„å?ŽæœŸæŠš 1.生æ€?建设:人工è?‰æ–¹æ ¼+ç?Œæœ¨æž—801 育管ç?†ï¼‰ 3亩,å°?育2354亩,并对其实施ç?Œæ°´ å?—æµ·å­?项目区 ã€?病虫害防治ã€?è¡¥æ¤?å?Š2年抚育管ç?† YC-TJ- è?‰æ–¹æ ¼ã€?造林 。2.项目区基础设施建设:æµ?动沙丘 ç›?池县 12,653,800 2,008,540 -13 å’Œå°?育2015- 防ç?«ä½œä¸šé?“14.85公里;护林点1处, 项目办 2016å¹´ 项目标识牌2å?—,防ç?«æŠ¤æž—警示牌3å?— 。(其中包å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ä¸?å?¯é¢„ è§?费) 工程总计 91,463,595 14,518,031 Ⅱ货物采购 YC-HW- ç›?池县 办公设备 电脑ã€?照相机ã€?一体机 20,000 3,175 NBF —— 2013.1 2013.2 2013.3 2013.6 3月 01 项目办 货物总计 20,000 3,175 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 世界银行贷款å®?å¤?è?’漠化治ç?†ä¸Žç”Ÿæ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:ç›?池县林业局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° Brief Description 估算金é¢?(美 选择方å¼? 世行审查 实施安排 Selection Schedule Contract of Sevices å…ƒ) Cost Selection (PRIOR/POST) 采购过程 Selection Process å?ˆå?Œå®žæ–½ Name Estimate Method Contract 邀请建议书Expe 收到建议书Expe å?ˆå?ŒæŽˆäºˆExpe Implementation cted Inviting cted Receipt cted Duration for Proposals of Proposals Contract Award Date YC-ZX-01 施工监ç?† 188,131 NBF —— 2013.3 2013.4 2013.4 4å¹´ YC-ZX-02 详细设计 219,486 NBF —— 2012.5 2012.6 2012.7 3月 YC-ZX-03 招标代ç?† 62,710 NBF —— 2013.3 2013.4 2013.4 4å¹´ YC-ZX-04 项目验收 78,387 NBF —— 4å¹´ YC-ZX-05 项目培训 320,057 NBF 4å¹´ å?ˆè®¡ å?ˆè®¡ 868,771 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Protection Project 土建和货物采购计划 Procurement Plan å?•ä½?:中å?«å¸‚林业生æ€?建设局 å?ˆå?Œç¼–å?· å?ˆå?Œæ??è¿° å?ˆå?Œä¼°ç®—金é¢? Cost Estimate 采购方å¼? 世行审查 预计å?‘æ ‡ 预计开标 预计å?ˆå?Œ 预计完工/ 实施时间 说明 Remarks Description of Procuremen (å‰?审/å?Ž 日期 日期 签署日期 供货日期 (月)Ex Works 人民å¸?å…ƒ 美元 审) Bank Expected pected t Method Expected Expected Expected Review Date of Date of Contract Starting Construc (Prior/P Issuing Bid Signing Date of tion ost) Opening Contract Duration (months) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ⅰ工程采购 一碗泉201çœ?é?“ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ å?—项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—500 格固沙 0亩,并对其实施ç?Œ ã€?è?¥é€ é˜²é£Žå›ºæ²™ æ°´ã€?病虫害防治ã€? æž— (2013) è¡¥æ¤?å?Š2年抚育管ç?† 中å?«å¸‚项目办2 。è?‰æ–¹æ ¼æ??料:麦 012年项目未批 ZW-TJ--1 6,924,750.00 1,099,166.67 改为2013年实 è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( æ–½ 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 31个月( 一碗泉201çœ?é?“ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ å?—项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—500 格固沙 0亩,并对其实施ç?Œ ã€?è?¥é€ é˜²é£Žå›ºæ²™ æ°´ã€?病虫害防治ã€? æž— (2013) è¡¥æ¤?å?Š2年抚育管ç?† 中å?«å¸‚项目办2 。è?‰æ–¹æ ¼æ??料:麦 012年项目未批 ZW-TJ--2 6,924,750.00 1,099,166.67 改为2013年实 è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( æ–½ 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 一碗泉项目区基 建设防ç?«é?“21.8å…¬ 础设施建设(20 里ã€?嘹望塔2座ã€?护 中å?«å¸‚项目办2 13) 林点3处ã€?标示牌2 012年项目未批 å?—ã€?防ç?«è­¦ç¤ºç‰Œ6å?— 改为2013年实 。(其中包å?«ï¼šå?ˆå?Œ ZW-TJ--3 金é¢?5%çš„ä¸?å?¯é¢„è§? 2,243,099.88 356,047.60 施,并且按照作 费) 31个月( 业设计年度计划 包å?«ä¸¤å¹´ çš„è¦?求比以å‰?上 NCB å‰?审 2013.3 2013.4 2013.4 2013.11 报数é‡?å‡?å°‘ å?ŽæœŸçš„抚 育管ç?†ï¼‰ 一碗泉201çœ?é?“ å°?沙育林20000亩 å?—项目区å°?育( ,并对其实施ç?Œæ°´ 2013) ã€?病虫害防治ã€?è¡¥ 中å?«å¸‚项目办2 æ¤?å?Š2年抚育管ç?†ã€‚ 012年项目未批 ZW-TJ--4 1,470,000.00 233,333.33 改为2013年实 (其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ æ–½ ) 育管ç?†ï¼‰ 一碗泉201çœ?é?“ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ å?—项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—747 格固沙ã€?è?¥é€ é˜² 4亩,并对其实施ç?Œ 中å?«å¸‚项目办2 风固沙林(2013 æ°´ã€?病虫害防治ã€? 012年项目未批 ) è¡¥æ¤?å?Š2年抚育管ç?† 改为2013年实 ZW-TJ--5 。è?‰æ–¹æ ¼æ??料:麦 10,351,116.30 1,643,034.33 施,并且按照作 è?‰ï¼Œè§„格:1X1米; 业设计年度计划 ç?Œæœ¨æž—密度1X3。( çš„è¦?求比以å‰?上 其中包å?«ï¼šå?ˆå?Œé‡‘ 报é?¢ç§¯å¢žåŠ  é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 一碗泉201çœ?é?“ å°?沙育林18035亩 å?—项目区å°?育( ,并对其实施ç?Œæ°´ 中å?«å¸‚项目办2 2013) ã€?病虫害防治ã€?è¡¥ 012年项目未批 æ¤?å?Š2年抚育管ç?†ã€‚ 改为2013年实 ZW-TJ--6 (其中包å?«ï¼šå?ˆå?Œé‡‘ 1,325,572.50 210,408.33 施,并且按照作 é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ 业设计年度计划 ) çš„è¦?求比以å‰?上 报é?¢ç§¯å¢žåŠ  é•¿æµ?水包兰é“?è·¯ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ 北项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—500 格固沙ã€?è?¥é€ é˜² 0亩,并对其实施ç?Œ 风固沙林(2013- æ°´ã€?病虫害防治ã€? 2014) è¡¥æ¤?å?Š2年抚育管ç?† 。è?‰æ–¹æ ¼æ??料:麦 ZW-TJ--7 è?‰ï¼Œè§„格:1X1米; 6,924,750.00 1,099,166.67 中å?«é¡¹ç›®åŠž ç?Œæœ¨æž—密度1X3。( 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) 24个月( é•¿æµ?水包兰é“?è·¯ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ 北项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—500 格固沙ã€?è?¥é€ é˜² 0亩,并对其实施ç?Œ 风固沙林(2013- æ°´ã€?病虫害防治ã€? 2014) è¡¥æ¤?å?Š2年抚育管ç?† ZW-TJ--8 。è?‰æ–¹æ ¼æ??料:麦 6,924,750.00 1,099,166.67 中å?«é¡¹ç›®åŠž è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水包兰é“?è·¯ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ 24个月( 北项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—464 包å?«ä¸€å¹´ NCB å?Žå®¡ 2013.12 2014.1 2014.2 2014.11 格固沙ã€?è?¥é€ é˜² 9亩,并对其实施ç?Œ å?ŽæœŸçš„抚 风固沙林(2013- æ°´ã€?病虫害防治ã€? 育管ç?†ï¼‰ 2014) è¡¥æ¤?å?Š2年抚育管ç?† ZW-TJ--9 。è?‰æ–¹æ ¼æ??料:麦 6,438,632.55 1,022,005.17 中å?«é¡¹ç›®åŠž è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水项目区基 建设防ç?«é?“2.58å…¬ 础设施建设(20 里ã€?嘹望塔1座ã€?æ ‡ 13-2014) 示牌1å?—ã€?防ç?«è­¦ç¤º ZW-TJ--10 牌1å?—。(其中包å?« 381,045.00 60,483.33 中å?«é¡¹ç›®åŠž :å?ˆå?Œé‡‘é¢?5%çš„ä¸? å?¯é¢„è§?费) 一碗泉201çœ?é?“ è?¥é€ ç?Œæœ¨æž—6474亩 å?—项目区è?¥é€ é˜² ,并对其实施ç?Œæ°´ 风固沙林(2013- ã€?病虫害防治ã€?è¡¥ ZW-TJ--11 2014) æ¤?å?Š2年抚育管ç?†ã€‚ 3,500,815.50 555,685.00 中å?«é¡¹ç›®åŠž (其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水包兰é“?è·¯ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ 北项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—400 格固沙ã€?è?¥é€ é˜² 0亩,并对其实施ç?Œ 风固沙林(2014- æ°´ã€?病虫害防治ã€? 2015) è¡¥æ¤?å?Š2年抚育管ç?† ZW-TJ--12 。è?‰æ–¹æ ¼æ??料:麦 5,539,800.00 879,333.33 中å?«é¡¹ç›®åŠž è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水包兰é“?è·¯ 扎è?‰æ–¹æ ¼å¹¶åœ¨è?‰æ–¹ 北项目区扎è?‰æ–¹ 格中è?¥é€ ç?Œæœ¨æž—466 格固沙ã€?è?¥é€ é˜² 9亩,并对其实施ç?Œ 风固沙林(2014- æ°´ã€?病虫害防治ã€? 2015) è¡¥æ¤?å?Š2年抚育管ç?† ZW-TJ--13 。è?‰æ–¹æ ¼æ??料:麦 6,466,331.55 1,026,401.83 中å?«é¡¹ç›®åŠž è?‰ï¼Œè§„格:1X1米; ç?Œæœ¨æž—密度1X3。( 其中包å?«ï¼šå?ˆå?Œé‡‘ 24个月( é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ 包å?«ä¸€å¹´ NCB å?Žå®¡ 2014.12 2015.1 2015.2 2015.11 ) å?ŽæœŸçš„抚 é•¿æµ?水项目区基 建设防ç?«é?“防ç?«è­¦ 育管ç?†ï¼‰ 础设施建设(20 示牌1å?—。(其中包 ZW-TJ--14 14-2015) å?«ï¼šå?ˆå?Œé‡‘é¢?5%çš„ 1,050.00 166.67 中å?«é¡¹ç›®åŠž ä¸?å?¯é¢„è§?费) 24个月( 包å?«ä¸€å¹´ NCB å?Žå®¡ 2014.12 2015.1 2015.2 2015.11 å?ŽæœŸçš„抚 育管ç?†ï¼‰ é•¿æµ?水包兰é“?è·¯ è?¥é€ ä¹”木林2252亩 北项目区è?¥é€ é˜² ,并对其实施ç?Œæ°´ 风固沙林(2014- ã€?病虫害防治ã€?è¡¥ ZW-TJ--15 2015) æ¤?å?Š2年抚育管ç?†ã€‚ 3,045,604.80 483,429.33 中å?«é¡¹ç›®åŠž (其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水包兰é“?è·¯ è?¥é€ ç?Œæœ¨æž—563亩, 北项目区è?¥é€ é˜² 并对其实施ç?Œæ°´ã€? 风固沙林(2014- 病虫害防治ã€?è¡¥æ¤? ZW-TJ--16 2015) å?Š2年抚育管ç?†ã€‚( 304,451.70 48,325.67 中å?«é¡¹ç›®åŠž 其中包å?«ï¼šå?ˆå?Œé‡‘ é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ ) é•¿æµ?水包兰é“?è·¯ è?¥é€ ä¹”木林5347.5 北项目区è?¥é€ é˜² 亩,并对其实施ç?Œ 风固沙林(2015- æ°´ã€?病虫害防治ã€? 2016) è¡¥æ¤?å?Š2年抚育管ç?† ZW-TJ--17 。(其中包å?«ï¼šå?ˆå?Œ 7,231,959.00 1,147,930.00 中å?«é¡¹ç›®åŠž 金é¢?5%çš„ä¸?å?¯é¢„è§? 费) é•¿æµ?水包兰é“?è·¯ è?¥é€ ç?Œæœ¨æž—1336.5 24个月( 北项目区è?¥é€ é˜² 亩,并对其实施ç?Œ 包å?«ä¸€å¹´ NCB å?Žå®¡ 2015.12 2016.1 2016.2 2016.11 风固沙林(2015- æ°´ã€?病虫害防治ã€? çš„å?ŽæœŸæŠš 2016) è¡¥æ¤?å?Š2年抚育管ç?† 育管ç?†ï¼‰ ZW-TJ--18 722,712.38 114,716.25 中å?«é¡¹ç›®åŠž 。(其中包å?«ï¼šå?ˆå?Œ 金é¢?5%çš„ä¸?å?¯é¢„è§? 费) é•¿æµ?水项目区基 建设护林点1处。( 础设施建设(20 其中包å?«ï¼šå?ˆå?Œé‡‘ ZW-TJ--19 15-2016) é¢?5%çš„ä¸?å?¯é¢„è§?è´¹ 115,500.00 18,333.33 中å?«é¡¹ç›®åŠž ) 工程å?ˆè®¡ 76,836,691.16 12,196,300.18 Ⅱ货物采购 中å?«å¸‚项目办2 笔记本ã€?æ•°ç ?相机 012年项目未批 ZW-HW-1 办公设备 ã€?一体机 20,000.00 3,174.60 NBF —— 2013.3 2013.4 2013.5 2013.6 4月 改为2013年采 è´­ 货物总计 注:ICB:国际竞争性招标,NCB:国内竞争性招标,shopping:询价采购 世界银行贷款å®?å¤?防沙治沙和生æ€?ä¿?护项目 Proposed Ningxia Desertification Contro and Ecological Prot 咨询æœ?务采购计划 Procurement Plan for Selection of Consultants å?•ä½?:中å?«å¸‚林业生æ€?建设局 å?ˆå?Œå??称 å?ˆå?Œæ??è¿° 估算金é¢?(美元 选择方å¼? 世行审查 实施安排 Selection Schedule Contract Brief ) Cost Selection (PRIOR/POST 采购过程 Selection Process Name Description Estimate Method ) 邀请建议书Expected of Sevices Inviting for Proposals ZW-ZX-1 施工监ç?† 144,738 NBF —— 2013.3 ZW-ZX-2 详细设计 168,861 NBF —— 2011.12 ZW-ZX-3 招投标费 48,246 NBF —— 2013.3 ZW-ZX-4 项目管ç?† 60,307 NBF —— 2013.3 ZW-ZX-5 项目培训 47,301 NBF 320人次 2012 å?ˆè®¡ 469,453 注:QCBS/QBS:质é‡?和费用为基础的选择/è´¨é‡?为基础的选择;CQS:基于咨询者资质的选择;IC:个体咨询者选择; PRIOR:事先审查;POST:事å?Žå®¡æŸ¥ã€‚ Desertification Contro and Ecological Protection Project Plan for Selection of Consultants 林业生æ€?建设局 实施安排 Selection Schedule 采购过程 Selection Process å?ˆå?Œå®žæ–½ 收到建议书Expec å?ˆå?ŒæŽˆäºˆExpect Contract ted Receipt of ed Contract Implementation Proposals Award Date Duration 2013.4 2013.4 5å¹´ 2012.1 2012.2 3月 2013.4 2013.4 5å¹´ 2013.4 2013.5 5å¹´ 5å¹´ 咨询者资质的选择;IC:个体咨询者选择;