40953 HIV/AIDS Assessment in Sub-Saharan Africa Transport Projects Africa Technical Transport (AFTTR) Jocelyne do Sacramento Ekong Emah March, 2007 Acknowledgement This assessment of the Africa transport portfolio was made possible through the participation and as- sistance of numerous individuals, and Global HIV/AIDS Program. Special thanks to Jody Zall Kusek, Lead Monitoring and Evaluation Specialist whose financial support made this study possible, particularly Act Africa steady presence in guidance to the transport sector. The authors are grateful to the Peer Reviewers, Alain Labeau, Lead Transport Specialist (AFTTR), Steve Brushett, Lead Transport Specialist (LCSTR), Julie Babinard, Consultant (ETWTR), Namdeem Mohammad, Senior Operations Officer (AFTHV), Abdelmoula Ghzala, Senior Transport Specialist (AFTTR), Pierre Pozzo di Borgo, Senior Transport Specialist (AFTTR), Gylfi Pálsson, Senior Trans- port Specialist (AFTTR), Ann Raynal May, Information Specialist (AFTTR), Sophie Bernard, Intern (AFTTR) Bertille Chantal Mapouata, Consultant (AFTTR), Tekie Sium, Resource Management (AFTTR), Monique Desthuis-Francis, Communication Officer (SSATP) for this significant contribu- tion and advice throughout the process. iii Table of Contents Acknowledgement......................................................................................................................................iii List of Acronyms.........................................................................................................................................vi Executive Summary ...................................................................................................................................vii Introduction .................................................................................................................................................1 Programming Context .................................................................................................................................5 The Assessment Process...............................................................................................................................7 Findings........................................................................................................................................................8 Major Shortcomings...................................................................................................................................11 Lessons Learned and Recommendations ..................................................................................................12 Conclusions ................................................................................................................................................15 The Way Forward......................................................................................................................................15 Appendix A. Key Challenges and Limitations..........................................................................................17 Appendix B. Elements in start-up, service delivery and management phases of AFTTR HIV/AIDS project implementation in client countries..............................................................................................19 Appendix C. Illustrative data flow chart ..................................................................................................20 Appendix D. Illustrative Checklist for Mainstreaming HIV into the Transport Sector ........................21 Appendix E. Illustrative Indicators for tracking progress at the project level........................................22 Appendix F. Key Informant Interview Guide (KIIQ?)(HIV/AIDS Focal Persons).................................25 Appendix G. Contact list for HIV/AIDS activities...................................................................................29 Appendix H. List of Documents Reviewed ..............................................................................................30 Appendix I. Terms of Reference ...............................................................................................................33 References ..................................................................................................................................................35 v List of Acronyms AIDS Acquired Immune Deficiency Syndrome ALCO Abidjan-Lagos Organization AFTTR Africa Technical Transport Sector ARV Antiretroviral ART Antiretroviral Therapy CBO Community Based Organization CIDA Canadian International Development Agency DFID UK Department for International Development EMB Environmental Monitoring Branch GFATM Global Fund for HIV/AIDS, TB and Malaria HIV Human Immunodeficiency Virus HIPC Highly Indebted Participating Countries IDA International Development Association IDPC Internally Displaced People's Camp ILO International Labor Organization KIIQ Key Informant Interview Questionnaire MAP Multi-Country HIV/AIDS Program for Africa MDG Millennium Development Goal M&E Monitoring and Evaluation MOT Ministry of Transport NGO Non Governmental Organization NSF National Strategic Framework PAP People Affected Populations PEPFAR President's Emergency Plan for AIDS Relief PLHA Persons Living with HIV and AIDS RSDSP Ethiopian Road Sector Development Project RAFU Road Agency Formation Unit SIDA Swedish International Development Cooperation Agency STI Sexually Transmitted Infections TTL Task Team Leader TOR Terms of Reference SADC Southern African Development Community UNAIDS Joint United Nations Program on HIV/AIDS USAID United States Agency for International Development VCT Voluntary Counseling and Testing WB World Bank vi Executive Summary The HIV/AIDS pandemic burdens Sub-Saharan Africa (SSA) and continues to constrain its social and economic advancement. UNAIDS estimated that in Southern Africa alone 930,000 adults and chil- dren died of AIDS, in 2005. This represents about one-third of AIDS deaths recorded globally that year. In addition, about 12 million children below the age of 17 in SSA are estimated to have lost one or both parents to AIDS. Transport workers, migrant workers, and local populations in border communities and migrant popu- lations in general are especially vulnerable to HIV/AIDS. The Transport Sector in the World Bank is implementing a multisectoral approach to combating AIDS. In particular, through its projects the Africa Region Transport (AFTTR) unit is piloting key initiatives aimed at complementing national HIV/AIDS prevention and control programs, which are usually managed outside the transport sector. One of the main objectives is to ensure that the sustain- ability of AFTTR roads projects is protected. AFTTR, started incorporating HIV/AIDS activities into its projects from 2000, and initiated this as- sessment to review the process, results, and challenges of mainstreaming HIV/AIDS prevention ac- tivities in the sector. This is not an impact study, but rather an attempt to determine the extent to which the mainstreaming effort reached targeted populations, the lessons learned, and the outlook for the future, using a more flexible methodology. Major milestones were achieved through HIV/AIDS activities initiated by AFTTR, including integra- tion of HIV/AIDS prevention activities in ongoing projects through the retrofitting exercise; incorpo- ration of HIV/AIDS clauses in bidding and contract documents, and enforcement of HIV/AIDS policy in workplace environment. The sector's spearhead operation has been the Abidjan-Lagos Transport Corridor HIV Project (ALCO). Bank's early support to the Transport sector enabled key donors to come forward and finance HIV initiatives in the sector. ALCO was recognized as an international agency, now able to receive funds from other donors. It not only provided a sub-regional platform for HIV care and prevention interventions, but also provided a platform for the five member countries to address other epidemics in the sub-region. The three major lessons learned are: a) the need to dialog with the HIV/AIDS teams in the client countries to accelerate the process of endorsing, disseminating, and operationalizing the policies; b) establishing simple and clear M&E procedures within the national strategic framework; and c) devel- oping evidence-based programs which will help for a better understand of the impact of HIV/AIDS on the transport sector. Variations of the countries experiences could be consulted on the Web link in the references list. vii Continuing to fund HIV/AIDS preventions activities that target the transport sector will remain criti- cal until Ministries of Transport are capable of fully mainstreaming HIV/AIDS prevention activities into their operations. viii Introduction The Transport Sector in the World Bank is implementing a multisectoral approach to combating AIDS. In particular, the Africa Region Transport unit (AFTTR) is piloting key initiatives aimed at complimenting national AIDS prevention programs. In addition to the overarching goal of main- streaming HIV/AIDS prevention activities into the transport sector, AFTTR aims to: a) prevent trans- port sector personnel, clientele and communities from becoming infected with HIV; b) provide care and support for those transport personnel and family members already infected with HIV; c) mitigate the adverse social and economic impact HIV/AIDS has on the sector. AFTTR addresses these objec- 1 tives by: a) tapping into the funding support provided by the World Bank Multi-country HIV/AIDS Program for Africa (MAP); b) working with transport ministries in countries to retrofit transport projects, in- troducing HIV/AIDS into project's contracts, initiating corridor projects that focus on transport workers and communities; and c) lobbying for funds from the Poverty Reduction Strategy Papers (PRSP) and Highly Indebted Participating Countries (HIPC) initiatives. But MAP remains the major funding source fuelling the response in the transport sector. Launched in 2000, MAP is one of the major sources of financial support for the multi-sector response against HIV/AIDS in African countries. MAP support is available to countries eligible for IDA fund- ing.2 Some key prerequisites for IDA funding are evidence of strategic approach to HIV/AIDS, exis- tence of a coordinating body with multisectoral representation, government willingness to use multi- ple implementation agencies including NGOs and CBOs and a willingness to channel funds to civil society and private sectors..3 AFTTR started incorporating HIV/AIDS activities into its projects in 2000 and initiated this assess- ment to review its HIV/AIDS activities and the process, results and challenges of mainstreaming HIV/AIDS prevention activities in the transport sector. According to the UNAIDS, mainstreaming HIV/AIDS prevention is a process that enables the development community to address the causes and effects of HIV/AIDS in an effective and sustained manner, both through their usual work and within their workplaces.4 Mainstreaming thus occurs both in the internal and external domains with the former referring to the internal workplace while the latter refers to the wider sector that includes "the transport services' clientele (passengers) and the variety of persons in transport occupation or communities."5 1AIDS and Transport in Africa, A framework for meeting the challenge, July 2003, p 2 2Oomman, Nandini "An Overview of the World Bank's response to the HIV/AIDS epidemic in Africa, with focus on the Multi-Country HIV/AIDS Program 3Ibid 4UNAIDS, "Support to mainstreaming AIDS in development" 5AIDS and Transport in Africa, a Framework for meeting the challenge, July 2003, p 9&10 1 Attempts have been made to differentiate between mainstreaming and integration. While main- streaming in HIV/AIDS is about adapting core business to cope with the reality of HIV and AIDS. Integration on the other hand is limited and is seen as the introduction of HIV/AIDS into a project without necessarily affecting or interfering with the core business of the institution involved. Activi- ties implemented through integration in an HIV/AIDS project are thus seen as add-on.6 Following the lessons learned during the process of operationalizing the concept of mainstreaming in the context of development, there is growing consensus of what mainstreaming is, what mainstream- ing is not, and the essential guiding principles of mainstreaming as reflected in the table below. The World Bank, UNDP, UNAIDS, and the Swiss Agency for Development and Cooperation are some of the institutions that have been involved in shaping this consensus. What Mainstreaming Is: What Mainstreaming is Not: Essential Principles of Main- streaming: All sectors, including the Mainstreaming is not about: Identify a focal person or en- transport sector determine: pushing HIV/AIDS into try point how HIV is spread in the programs where it is not Work within existing institu- sector relevant tional structures ­ consistent how the epidemic is likely changing core functions with the Three Ones8 to affect their sector's goals, and responsibilities in or- Focus on advocacy, continu- objectives and programs; der to turn all cooperation ous education and capacity where their sector has a activities into HIV/AIDS building. Mainstreaming can- comparative advantage to programs not be expected to develop on respond to and limit the simply introducing its own spread of HIV and mitigate HIV/AIDS awareness rais- Focus on the domestic domain the impact of the epidemic. ing in all our activities as well as the external domain that we all have to become Identify strategic partnerships AIDS specialists Maintain exceptional action business as usual7 to ensure that HIV and AIDS responses remain relevant and effective as the epidemic evolves9 When mainstreaming HIV/AIDS prevention activities is the target in a project, the organization in- volved is likely to refocus its work, infusing HIV/AIDS into every part of its management cycle. It will clarify how HIV affects its work, develop and implement policies that protect staff from infection and support those who are living with HIV and AIDS. In its planning for example, the organization 6UNAIDS, 2002 "Mainstreaming HIV/AIDS: A Conceptual Framework and Implementing Principles", p 5. 7Swiss Agency for development and cooperation, "Mainstreaming HIV/AIDS in Practice". 8Three Ones principles launched in Washington on 25 April 2004, by UNAIDS are: One agreed HIV/AIDS ac- tion framework that provides the basis for coordinating the work of all partners. One national AIDS coordinat- ing authority, with a broad based multi-sector mandate. One agreed AIDS country-level monitoring and evaluation system. 9Ibid 2 prioritizes HIV/AIDS, taking into account likely disruption from an increase in morbidity and mor- tality. It will ensure that those infected and affected are taken care of, and at the sectoral level, it will contribute towards ensuring that "sector activities do not increase the vulnerability of the community it serves, or undermine their options for coping with the affects of the pandemic"10 The HIV/AIDS projects supported by AFTTR have been implemented in client countries at multiple levels in the internal and external domains. Typically, this involves different institutions: host minis- try, parastatal or government agency; contractor companies, implementing Non Governmental Or- ganizations (NGOs) and other partners. The HIV/AIDS prevention activities implemented through the AFTTR, and the mainstreaming proc- ess are being assessed. The outcome of this assessment is expected to contribute to decisions that will shape the future of the HIV/AIDS prevention initiative in the transport sector. 10H. Elsey et al, 2005, "Mainstreaming HIV/AIDS in development sectors: Have we learnt the lessons from gen- der mainstreaming?" 3 Programming Context HIV/AIDS overburdens sub-Saharan Africa and continues to constrain its social and economic ad- vancement. According to UNAIDS, 64 percent of those living with HIV reside in sub-Saharan Africa while 72 percent of those in need of antiretroviral therapy live in the same region. By 2005, about 3.2 million in the region became newly infected while three quarters (13.2 million) out of a total of 17.3 million women worldwide living with HIV are found in the same region. UNAIDS estimated that 930,000 adults and children died of AIDS in Southern Africa alone in 2005. This represents about one-third of AIDS deaths recorded globally that year. In addition, about 12 million children below age 17 in sub Saharan Africa are also estimated to have lost one or both parents to AIDS. Transport workers, migrant workers, local populations in the border communities and transport routes are especially vulnerable to HIV/AIDS. Every year about 300,000 persons infected with HIV travel along the Abidjan-Lagos transport corridor alone.11 Itinerant transport workers who pass through the borders and transport routes often have multiple sexual partners and are generally known to be clients of female sex workers. Because they maintain concurrent sexual relationships, the truck drivers, sex workers, and men in the communities along major transportation routes remain bridge populations for the spread of the epidemic. Support from other Development Partners Several development partners, especially bilateral donors through such institutions as the United States Agency for International Development (USAID), Department for International Development (DFID), Canadian International Development Agency (CIDA), and the Swedish International Devel- opment Cooperation Agency (SIDA), target high risk groups like truck drivers and sex workers in their HIV prevention interventions. Donor support was often channeled directly to the private sector especially non governmental organizations, whose capacities were built to intervene with the truck drivers and sex workers. While capacities grew in the private sector, the public sector, represented by the ministries of transport, lagged behind in the response. Two critical areas: a) engagement of com- munities in border areas and trucking routes and b) integration of donor-led HIV/AIDS prevention activities within national transport sector programs - were often left out by the development part- ners. The Era of Treatment Following the injection of new funds into the HIV/AIDS program in Africa, especially through MAP, the US President's Emergency fund on AIDS Relief (PEPFAR), the Global Fund for HIV/AIDS, TB and malaria (GFATM) and private foundations, treatment, including the provision of ARVs, started becoming available. This development has afforded the Transport Sector in client countries the op- 11Lessons learned to date from HIV/AIDS transport corridor projects, June 2005, p 11. 5 portunity to refer project beneficiaries for ART services. Only Burkina Faso has used credit funds to directly procure and provide ARVs to project beneficiaries. The Transport Sector's Response The AFTTR has three priority aims for HIV/AIDS prevention and care: a) prevent transport sector personnel, clientele and communities from becoming infected with HIV; b) provide care and support for those transport personnel and family members already infected with HIV; c) mitigate the adverse social and economic impact HIV/AIDS has on the sector, and the adverse impact the sector has on the epidemic.12 In sub-Saharan Africa, investments in HIV/AIDS in the transport sector have been most prominent in the roads sub-sector. AFTTR has supported a variety of projects in the roads sub-sector including the Abidjan-Lagos transport corridor project, the Road Sector Development project in Ethiopia, the Zam- bia public-private partnership, and road contract projects in Kenya, Burkina Faso, Senegal, Nigeria, Niger, Tanzania, Malawi, Uganda, Mozambique, Cape Verde, and DR Congo. The World Bank's (WB) transport sector portfolio has 39 projects, of which 25 are mainstreamed including 1 stand alone pro- ject: Abidjan-Lagos Transport Corridor Project. The major thrust of the HIV/AIDS initiative in the transport sector is mainstreaming; and in the road sub sector where AFTTR's operations are most prominent, the mainstreaming objectives are two-fold: To prevent road construction project from being vehicles of HIV infections, and To help client countries better define their HIV/AIDS prevention strategies in the transport sector Basically, client countries used the project credit, MAP funds, or combined both to retrofit and main- stream. In the absence of MAP funds, some countries have had to rely on funding support from do- nors and/or leveraged funds from the private sector to support the work as indicated in figure 1. Figure 1: Funding Scenarios in AFTTR HIV/AIDS Portfolio 9 s 8 ectjorPforeb 7 6 5 4 3 muN 2 1 0 Under MAP Preparation ort Transp Project Transport Transport Map Transport Other Credit Project Project Bank & PrivateSector creditCredit Project Tra... & MAP Credit& Private Credit& Other ... D... Source of Fund 12The World Bank, Africa Technical Transport Sector "AIDS and Transport in Africa, A Framework for Meet- ing the Challenge" p 2. 6 The Assessment Process The assessment had three principal objectives: a) to evaluate the mainstreaming program in the trans- port sector b) prepare an instrument that could serve as a learning tool or accountability tool and c) determine how well the transport projects contribute to the national strategy of each client country. This is not an impact study, but rather an attempt to determine the extent to which the mainstream- ing effort had gone, the lessons learned, and the outlook for the future, using a less-rigorous method- ology. An impact evaluation of the HIV/AIDS program in the Bank's transport sector should be un- dertaken in future. Methodology The assessment was undertaken through a desk review of literature, including project activity reports, analysis of project reports, feedback from HIV/AIDS focal persons in the transport sector of selected client countries using a key informant interview questionnaire (KIIQ). The KIIQ was sent to 22 focal persons, and 13 (59percent) responded with written responses. Questions were asked in the following thematic areas: Mainstreaming, HIV/AIDS prevention, care, support and treatment; coordination and capacity building; management; monitoring and evaluation; quality assurance of data and sustainabil- ity. The instrument was designed and used to gain an insight into the program, rather than generate quantitative data. Follow-up interviews were either conducted or emails sent to seek clarification, obtain more information or to strengthen existing information. Additional information was gleaned through phone calls with Task Team Leaders (TTLs). On the other hand, the desk review included a wide range of documents that varied in length and areas covered. They include activity reports, pro- ject review reports, quarterly project implementation report, power point presentation, and briefing notes. In all, 54 documents were reviewed. Limitations Project reports from countries were not up to date and most of the reports found contained very little information about the project activities. Also, inconsistency in data collection in the client countries and the inability of majority of key informants to answer some of the questions in the questionnaire made it impossible to undertake any form of comparative analysis or determine any trend. For exam- ple, information about actual funding for HIV/AIDS activities could not be obtained. The HIV/AIDS prevention activities are disbursed under the social component hence, making it challenging to track. In spite of these limitations, the findings in this report provide valuable insights into the HIV/AIDS initiative in the transport sector. 7 Findings Findings from the different methods were analyzed and collated to address the key questions that the assessment sought to answer, namely a) to what extent was mainstreaming achieved? b) How does the transport sector contribute to the national strategic framework in client countries c) how are re- sults tracked? We give a summary of these findings and highlight some of AFTTR's accomplishments in the boxes below. To What Extent was Mainstreaming Achieved? Mainstreaming has been achieved in twenty five (25) out of the thirty nine (39) projects in the AFTTR portfolio, with partner institutions in the ministries of transport of client countries making HIV/AIDS feature in their operational schedule. This represents 61percent success for projects under supervision and 67percent when projects under lending are approved (See Figure 2). All the projects have focal persons, and those estimated to cost $10 m have contract clauses. Interventions are being implemented at the organizational level and at the external level, and the host ministry in client countries have, through the transport sector projects been empowered to take the leadership role in developing policies to guide sector-wide response. Through the process of "learning by doing" each project overcomes mainstreaming challenges. Box 1: Awareness campaign on road construction site in Uganda Pakwach-Olwiyo road construction project, a project funded by the World Bank through the Road Agency Formation Unit (RAFU). This road construction project goes through communities, in this case, referred to as Project Affected Populations (PAP) among which are 7 IDPC internally Displaced People Camps. During the awareness campaigns, the facilitator emphasized that knowledge is power. When one acquires adequate knowledge on HIV/AIDS, he/she will know the right thing to do when HIV/AIDS strikes. Seeking help is paramount. In this way, one is able to keep HIV in check and there- fore stop its progress to the AIDS stage. The facilitator explained the benefits of VCT and encouraged all participants that had not tested to seek VCT services. He emphasized that knowing ones status early enough is very important. The HIV/AIDS campaign program will be evolving even through the liabili- ties period after project completion. Figure 2 a. Illustration of mainstreaming achieved AFTTR LEN 0% AFTTR SPN NOT YET MAINSTREAM AFTTR SPN ED HIV/AIDS MAINSTREAM 39% ED /HIV/AIDS 61% 8 Figure 2 b. Illustration of mainstreaming achieved If the twelve (12) projects under preparation are approved at the end of this fiscal year FY07, then the scenario will be as follow: Box 2: ERA Commitment to fight the disease The GTZ together with the ERA introduced one AFTTR LEN 16% condom dispenser at the ERA headquarters in Ad- dis Ababa and some offices of the ERA districts. A AFTTR SPN MAINSTREAMED HIV/AIDS AFTTR SPN NOT comprehensive HIV/AIDS prevention and control 51% YET MAINSTREAMED strategy, including policy, IEC, condom distribution HIV/AIDS 33% at workplaces, VCT and treatment was developed and successfully implemented by the World Bank and the ERA. As result, the program received wider recognition and was later adopted by the Ethiopian Parliament as its workplace strategy. The degree of mainstreaming differs from country to country. While a country like Kenya is at the early stage of the mainstreaming exercise, Ethiopia is at an advanced stage, having succeeded in get- ting management and staff to own the process (See Box 2). In all the projects, the starting point for of HIV/AIDS prevention and treatment was the incorporation of HIV/AIDS clauses in bidding docu- ments, requesting contractors in the road infrastructure projects to provide HIV/AIDS prevention and control services to their workers. Two factors may have contributed to the lack of mainstreaming HIV/AIDS prevention and control in the AFTTR portfolio: a) lack of funding support from the MAP, and b) TTLs are yet to request for Mainstreaming HIV/AIDS prevention and control in their projects. Mozambique and Ethiopia were the first ones to be innovative and included HIV/AIDS in their road contracts. Ethiopia was on the fore front of addressing the disease; it developed and finalized the workplace policies which served as a road map for Malawi, Zambia, Kenya, Lesotho, and Uganda. Malawi and Zambia are now implementing their workplace policies. The process of Mainstreaming The process of mainstreaming in the AFTTR projects involved the following steps: Inclusion of HIV/AIDS clauses in works contracts Identification of focal persons Development of an action plan with the involvement of stakeholders Hiring consultants or NGOs to implement HIV prevention activities targeting workers de- ployed on site, and communities around the project sites, including truck and bus drivers and their passengers Bank team assist client nations to ask for MAP funding Bank team works with client to prepare concept paper Bank team prompt sector strategy development 9 Box 3: Building Public-Private Partnership Partnership and coordination are perhaps the strongest points of the Zambia program. Through the Ministry of Transport and Communication, the WB's assistance to the sector has helped to build strong public-private partnership that is driving the response in the sector. The Tanzania-Zambia Railway (TARAZA), the National Drivers Association of Zambia (NDAZ), Truck Drivers Association of Zambia (TDAZ), National Council for Con- struction, Road Development Agency, and Zambia Railways are institutions partnering in the response to HIV/AIDS in the road sub sector in Zambia. Workplace policies have been developed, and peer educators trained in all the institutions to facilitate HIV-risk reduc- tion education, and promote referral to treatment and care services including VCT ser- vices. The partners use their comparative advantage to intensify local campaign against HIV/AIDS. For example, the NDAZ conducts sensitization sessions in bus stops, reaching their members and passengers. TARAZA on its part distributed condoms and conducted outreach to the workers and communities around the rail line, while the TDAZ reached out to the truck drivers. As the Zambia initiative matured, the government of Zambia, the Global Fund, and the HIPC have provided additional funds. Project activities are not du- plicated, and quarterly reports submitted by HIV/AIDS Coordinator specify activities sup- ported by each funds provider. Linkage with the National Strategic Framework All responses received from focal persons within the ministries claimed that the project HIV/AIDS activities were in line with the expectations in the national strategic framework. In addition, through the mainstreamed projects, AFTTR is helping to activate the response in the transport sector of client countries by starting the process that empowered ministries of transport to coordinate the develop- ment of sector policies and strategies. Upon the prompting of the Bank team, stakeholders in the sec- tor, especially the Anglophone countries, have developed sector level policies and strategies that draw from, and compliment the national strategic framework. The draft policies further clarify the priori- ties in the transport sector. These sector policies and strategies now offer opportunity for long term sectoral response to HIV/AIDS. Contributing to the uptake of HIV voluntary counseling and testing In the Zambia project for example, 43 percent members of the target population took the HIV test 2005, surpassing the national level, 37 percent. Increased knowledge of their HIV status is a major step in empowering project beneficiaries to further prevent HIV infection or enroll in treatment at some point. 10 Major Shortcomings Lack of Baseline Information In Senegal, a baseline study was conducted in or- der to provide a national transport action plan to Box 4: Promoting A Work Place Policy the National Program. In a meantime, intermedi- The Bank financed a workshop for partici- ary's activities took place such as pilot program pants from five countries to prepare the design to improve the knowledge and competence HIV/AIDS prevention policies for their of workers of the Port Authority, the national workplaces. Although the road sub-sector railways company and the regional public trans- is the predominant mode of transport for portation of Dakar. As a result of the program, the majority of Africans; the other sub- other companies started implementing prevention sectors should not be neglected. The road programs and now, all transport sub-sectors have sub-sector, however, took the lead in get- been reached. An important accomplishment of ting the other transport sub-sectors (rail- NGO interventions in informal transport includes ways, marine and air) on board the changes in attitudes and perceptions toward HIV HIV/AIDS prevention effort. Today, Zam- testing and toward infected people. Nevertheless, bia and Malawi, are implementing their in all cases, there was lack of baseline information policies, and had mainstreamed HIV/AIDS or start-up assessment to inform project design prevention activities into the Human Re- and respond more accurately to the needs of the source Management Departments. beneficiary population. In some of the client countries such as Ethiopia and Zambia where baseline studies were commissioned at some point, de- lays in the completion of assessment reports by consultants denied the projects the benefit of allow- ing the findings to appropriately guide implementation. Sometimes the reports arrived almost after the completion of the first phase of the project. In countries where situational assessment or baseline was not done, lack of funds was mostly responsible for not undertaking the activity. No standardized Monitoring and Evaluation (M&E) procedures M&E procedures were not developed prior to project implementation. The projects were constrained by inconsistent reporting perhaps due to lack of clear reporting requirements and guidelines on re- porting. Guidelines and indicators for mainstreaming are not clear, and there is no specific budget allocated for monitoring and evaluation at the project site level. Also, most of the key informants did not know about the national monitoring and evaluation framework, hence could not tell if the indi- cators reported on the project were in alignment with the national M&E framework. See appendix A for detailed table showing challenges and limitations. 11 Lessons Learned and Recommendations Facilitate adoption of policies Draft HIV/AIDS policies have been developed in most of the client countries. These policies provide framework for guiding HIV/AIDS programs in the transport sector. The Bank needs to dialogue with the HIV/AIDS teams in the client countries to accelerate the process of endorsing, disseminating and operationalizing the policies. Francophone countries should take a stand and adhere to these policies as well. Continue funding support for HIV/AIDS Programs Until the ministries of transport are able to fully mainstream HIV/AIDS into their operations, the continued funding of HIV/AIDS activities in the transport sector is critical in maintaining the gains already made. The drive towards keeping more people on the job, properly aligning the HIV/AIDS prevention activities in the transport sector with the national HIV/AIDS program under the "Three Ones", and improving the economy of the transport sector through prevention of HIV infection or access to treatment will be compromised should the bank funding cease abruptly. Also, the sector needs to continue with mainstreamed initiatives such as the inclusion of HIV/AIDS in contracts, and adequately budgeting for project activities tied to these contracts. Establish simple and clear M&E procedures AFTTR should work with client countries to develop simple and clear monitoring and evaluation procedures. The WB should treat capacity development in M&E as a priority by hiring consultants to help establish simple M&E procedures that the HIV/AIDS team in the client countries can use. This will include working with the HIV/AIDS teams and the implementing NGOs to clarify the M&E pro- cedures, co-develop simple reporting forms to capture relevant indicators (see illustrative indicators in Appendix B), agree on the time-frame for routine data collection, identify the data collection sources, and further clarify the data flow system. Client countries do not fully contribute to the cur- rent data flow system depicted in Appendix C. Encourage projects to use the AFTTR Framework as a guide The AFTTR framework for meeting the HIV/AIDS challenges is an important tool that projects need to use to guide their work in the field. This framework should be expanded to include simple "how to" tools like reporting forms, referral forms and checklists that can be adapted and used locally for quality assurance. Because of the limited time devoted to the project by focal persons, consultants and NGOs should be tasked with both implementation and quality assurance. Develop evidence-based programs A better understanding of the impact of AIDS on the transport sector, levels of risks and vulnerabili- ties of the mobile populations in the sector, and behaviors that predispose people in the transport sec- tor in the client countries is needed. Sexual transmission is understood to be the major mode of HIV transmission, but what are the determinants of HIV sexual transmission in the transport sector? 12 Proper segmentation of the beneficiary populations and an analysis of the environmental, behavioral and biomedical determinants are required to ensure that the response is tailored to the particular needs of the populations being served. Also, it is important to ensure that this analysis is done with the national strategic framework as a frame of reference. Move away from awareness creation to behavior change Where there is evidence that awareness is high, projects should focus more on behavior change in- stead of committing huge resources to awareness creation. In Uganda, Ethiopia, Senegal, Tanzania, and Zambia where baseline studies or situation assessments were done, HIV awareness was extremely high, above 80 percent; yet a significant part of the interventions focused on awareness programs for the workers. Also, as the projects expand into care and support, those with peer educators may have to retrain them to acquire fresh skills in these areas. Build linkages with other stakeholders in HIV/AIDS care and support Projects should build or strengthen collaboration with stakeholders in care and treatment. This will facilitate referral linkages. Areas of possible collaboration include formation of post test clubs, linking up with existing PLHA groups for psychosocial support, and formally linking with STI, VCT and ART facilities and service providers. There is also the need to build synergy with other development part- ners in order to maximize resources meant to serve beneficiary populations. Institutionalize management of HIV/AIDS and integrate focal persons in national AIDS Councils Client countries that located management of HIV/AIDS within an existing structure had better sup- port of management. They implemented the program with a team of workers, thus avoiding the situation where one person is overburdened by the management of the program. When the positions responsible for HIV/AIDS are integrated within a structure and mainstreaming is clearly included in the scope of work of the personnel, the duties stand the chance of getting into the department's budget in future. Also, the AFTTR should encourage focal persons in client countries to work partner at the client country level to work with the National AIDS council or body responsible for coordinating the mul- tisectoral response to determine the role of the transport sector HIV/AIDS team in its structure. This should be part of the process of integrating the team's work into the multisectoral response. If this is not done, the sectoral teams and the national coordinating teams may not see themselves as pursuing a common goal. The national council should not just see the sector team as data collection center, but as an integral part of the multisectoral response. Establish two regional hubs for capacity strengthening To facilitate capacity strengthening of client countries, AFTTR should consider establishing two re- gional hubs (one for Francophone countries and the other for Anglophone countries--Lusophone countries will link with either one) that will serve as centers of excellence to support the HIV/AIDS program. A short assessment could be done to determine the two countries best positioned to host the centers of excellence. Once operational, the hubs become a platform for facilitating south-south ex- change and networking, conduct capacity assessment to meet the training needs of a variety of groups 13 in the geographically contiguous client countries. For example, capacity building of NGOs needs to be identified and directed to the National Program's training design and budget. A capacity strengthen- ing hub can be used through workshops to enhance the operational capacities of the NGOs engaged to implement HIV/AIDS interventions targeting men and women in the transport sector in client countries. Also, the hubs should be responsible for facilitating regular information exchange among focal per- sons, study tours or teams from different countries. Exchange visits and the development of a com- puter-based list service are recommended. The hubs should also coordinate the evaluation of the WB's HIV/AIDS program in the transport sec- tor. The bank should consider establishing country implemented trust fund to support this idea. With the centers of excellence in place, the management of the HIV/AIDS program will, over time, shift to the field while WB staff will only need to provide oversight technical assistance. 14 Conclusions The HIV/AIDS initiative in the transport sector, buoyed by additional MAP funding, is a pivotal ef- fort that has been instrumental in kick-starting the process of mainstreaming of HIV/AIDS into the transport sector in client countries. It has helped ministries of transport in many countries to play central roles in the development of sector policies and strategies. These policies and strategies provide a basis for the ministries of transport to mainstream HIV/AIDS within the national transport pro- grams over the long term. The development of policies and strategies and direct implementation of HIV/AIDS prevention and care activities in the infrastructure development worksites compliment the national AIDS program. The core objectives of AFTTR's HIV/AIDS program are relevant in helping transport sector personnel remain healthy and contributing to projects sustainability. By refining and intensifying the imple- mentation of HIV/AIDS project activities in the transport sector in line with these core objectives, the bank will be helping to keep workers on the job, thus contributing to one of the eight millennium development goals of reducing poverty through fighting HIV/AIDS and other contagious diseases. AFTTR needs to continue with its current program, strengthening the prevention component and expanding into care and support to meet the growing needs of the population being served. This ex- pansion will require a doubling of resources. Improvements are required in the following areas ­ project management, selection of an appropriate mix of interventions, performance evaluation, and linkages with other service providers. Information exchange and dissemination of best practices should be a priority in the next phase of the project. The Way Forward Short Term Renew project funding and dialogue with HIV/AIDS teams in the client countries to accelerate the process of endorsing, disseminating, and operationalizing the sectors HIV/AIDS policies. Establish simple and clear M&E procedures linked with the national M&E framework. Medium Term At the program level, move from sensitization and condom distribution to behavior change in- terventions. To address the problem of lack of data, the reporting system should be incorporated at a certain stage of the procurement: draft conditions of contract, request for proposal, or the TOR. In ad- 15 dition, TTLs should be provided updated information on the HIV/AIDS component in the quar- terly report from the PIU. Long Term Establish two hubs (one in an Anglophone country, and the other in a Francophone country) to serve as centers of excellence to strengthen the capacities of client countries to serve as a forum for consultations regarding bilateral transport corridor policies and interventions and regional initiatives, at a same time, promote the consolidation of networks. This will shift direct techni- cal assistance to the client countries and projects. Establish a Country implemented Trust Fund to support the hubs. 16 APPENDICES Appendix A. Key Challenges and Limitations Category Issues Remarks Situation Analysis Lack of baseline in- Baseline data was not collected in 13 of the projects that returned the questionnaire. Only formation or start-up Ethiopia and Zambia did baseline study. Delay in the completion of assessment reports by assessment to inform consultants denied the projects the benefit of allowing the findings to appropriately guide project design and implementation. Sometimes the reports arrived almost after the completion of the first phase respond to the needs of the project. of the beneficiary In countries where situational assessment or baseline was not done, lack of funds was mostly population responsible for not undertaking the activity. Project Management Inadequate support for Focal persons get minimal support from top management. They are allowed little time, and focal persons lack necessary finances and moral support. Most focal persons have HIV/AIDS as an added responsibility. They are expected to pay more attention to their primary assignments. Public sector in Sub Saharan Africa is very hierarchical, hence mid level and junior focal per- sons are not likely to be in a position to dialogue with, and influence the top-level policy makers on their own. Focal persons require training in HIV/AIDS project management in the context of the peculi- arities of the types of organizations or agencies in which they work. Training workshops meant to empower focal persons to do their jobs are often too general, and have no direct relationship with project management. Such workshops are often designed to help focal persons "gain an understanding of the HIV/AIDS epidemic, the importance of HIV/AIDS mainstreaming and the concept of behavior change."13. Absence of committed leadership Increase in program Most programs grew from providing sensitization and condoms to providing care and support. portfolio not matched Despite this growth, some client nations have maintained one focal person who spends part with increase in staff time on the program 13ROMARP project completion training and HIV/AIDS mainstreaming report 17 NGOs engaged some- Project implementation sometimes suffered a lull or came to a complete stop when imple- times withdraw from menting NGOs were not paid the project NGOs engaged lack monitoring and evaluation system Contractors delay payment to NGOs Reports of activities not submitted on time Priority not placed on Lack of a detailed capacity and situation assessment often led to the assumption that NGOs supporting NGO ca- had all the capacity required to implement projects. pacity building Program design omitted NGO capacity building as part of sustainability plan No standardized M&E Monitoring and Evaluation procedures were not developed prior to project implementation procedures Inconsistent reporting No clear reporting requirements No budget allocated for M&E Project management and NGO staff lack M&E skills No guidelines on how to implement the contract clauses Indicators for mainstreaming not clear Policy Policies still in draft Development, approval, and adoption of sector policy require time. In virtually all countries where they have been developed, sector policies meant to guide the mainstreaming of HIV/AIDS are still in draft. Gender Inadequate gender From all the project reports and documents reviewed, it was apparent that gender inequities consideration in pro- may have been ignored in both design and implementation of project activities in the trans- gramming port sector. Coordination Role of sector focal Under the principle of "Three Ones", each country has one national coordinating authority teams or persons un- with a broad based multisectoral mandate for HIV/AIDS. The roles of the focal persons or clear in the national teams in the transport sector have not been properly defined in the national coordinating coordinating structure structure. Care & support Weak referral system Often there is no specific system in place for treatment of opportunistic infections, and little or no money available to support PLHA. In virtually all the project however, the referral system has remained weak as enough project time and financial resources have not been devoted to building referral systems for effective linkages. Stigma & discrimina- Minimal attention Stigma and discrimination are yet to be properly addressed. Activities are often not clearly tion paid to stigma and defined. They are folded into the sensitization activities implemented by the projects discrimination Knowledge manage- No system of informa- Multiple lessons learnt in countries are not commonly shared and used. ment tion sharing in place 18 Appendix B. Elements in start-up, service delivery and management phases of AFTTR HIV/AIDS project implementation in client countries. Start-up Service Delivery Management Definition of objectives Prevention Human resource manage- Appointment of focal person Advocacy with management ment Identification of an imple- (client country transport Project management menting partner, usually an sector, contractor company, Monitoring and evaluation NGO and community leaders in Documentation Development of an action neighboring communities) Institutional capacity build- plan for mainstreaming with HIV risk reduction educa- ing the involvement of stake- tion and communication Partnerships, and network- holders Referral to HIV counseling ing Stakeholder analysis to and testing services Sustainability identify strategic partners Quality assurance Other sources of finance ob- Linkage with the national Condom distribution tained by the transport sec- HIV/AIDS coordinating in- tor, apart from MAP stitution or structure Care and Support Linkage with the national Client recruitment HIV/AIDS strategic frame- Provision of or referral to work HIV counseling and testing Linkage with the national services M&E system Laboratory support Training of personnel Provision of or referral to Procurement of equipment STI services and supplies Provision of or linkage to services for opportunistic infections Referral to antiretroviral therapy services Quality assurance Condom distribution 19 Appendix C. Illustrative data flow chart WB PIU Contractor Nat Prog Monthly report to PIU NGO Construction site Community 20 Appendix D. Illustrative Checklist for Mainstreaming HIV into the Transport Sector The following are some key actions to ensure mainstreaming of HIV/AIDS into the transport sector in coun- tries implementing the multisectoral HIV/AIDS program: SN Recommended Actions Yes No 1 Is there a focal person or focal team for HIV/AIDS? 2 Has a situation assessment been done to determine areas where HIV/AIDS mainstreaming needs to be addressed in the sector? 3 Has a baseline evaluation been conducted? 4 Has stakeholder analysis been done to identify key partners for the mainstreaming? 5 Do stakeholders in the sector understand HIV/AIDS to be a devel- opment issue? 6 Has mainstreaming action plan been developed? 7 Does the plan have clear goals, activities, and timelines? 8 Has the commitment of the decision makers been secured for the mainstreaming initiative? 9 Have activities been clearly outlined in the mainstreaming action plan? 10 Do the activities reflect the objectives prioritized in the national strategic framework? 11 Has a committee or structure been established to manage the proc- ess? 12 Were stakeholders in the public and private sectors, including PLWHA involved in the mainstreaming process? 13 Have indicators been developed for monitoring and evaluating the mainstreaming process and result? 14 Are the indicators in line with prioritized indicators in the national M&E framework 15 Have resources been allocated for supporting the mainstreaming process? (materials, human and financial) 16 Has a sector policy and strategy been developed? 17 Has the sector's comparative advantage been taken into considera- tion in designing and implementing project activities? 18 Are the activities related to the core business of the sector? 21 Appendix E. Illustrative Indicators for tracking progress at the project level Activities Illustrative indicators Data Source Frequency of Responsible Data Collection Behavior change Communication Through Peer Education and Outreach Activities Formative Re- Baseline level established Baseline evaluation Once Consulting firm search with key target popula- tions # of formative research Formative research Once " reports completed Strengthening # of peer educators re- Monthly report Monthly NGO peer education cruited # of peer educators trained Monthly reports Monthly NGO # of group meetings con- Peer educator reporting Monthly NGO ducted by trained peer forms Quarterly educators Monthly reports Quarterly narrative reports # of persons participating Peer educator reporting Monthly NGO in group meetings forms Quarterly Monthly reports Quarterly narrative reports # of one-to-one meetings Peer educator reporting Monthly NGO held forms Quarterly Monthly reports Quarterly narrative reports # of persons reached by Peer educator reporting Monthly NGO trained peer educators forms Quarterly Monthly reports Quarterly narrative reports 22 Activities Illustrative indicators Data Source Frequency of Responsible Data Collection Strengthening # of outreach workers Monthly report Monthly NGO outreach ac- identified and recruited Quarterly narrative report Quarterly tivities # of training sessions held Monthly report Monthly NGO # of outreach workers Training workshop reports As the activity is NGO trained performed # of monthly meetings Monthly report Monthly Quar- NGO conducted by trained out- Quarterly report terly reach workers # persons reached by NGO Quarterly NGO trained outreach workers Development # of IEC materials devel- Pretest report As activity takes NGO of IEC materi- oped and pretested Quarterly narrative report place; als Quarterly # of IEC materials pro- Materials development re- As activity takes NGO duced port place; Quarterly # of IEC materials distrib- IEC distribution log book Monthly NGO uted Quarterly report Quarterly Condom pro- # of condom distribution Monthly project report Monthly NGO motion and outlets established distribution # of male condoms dis- Monthly project report Monthly NGO tributed # of female condoms dis- Monthly project report Monthly NGO tributed Provide STI # of STI clinics established Monthly project report Monthly NGO services Quarterly narrative report Quarterly # of male clients diagnosed Monthly project report Monthly NGO and treated at STI clinics Quarterly narrative report Quarterly # of female clients diag- Monthly project report Monthly NGO nosed and treated at STI Quarterly narrative report Quarterly clinics # of partners diagnosed Monthly project report Monthly NGO and treated at STI clinics Quarterly narrative report Quarterly Laboratory # of referral linkages with Monthly project report Monthly NGO testing private/public lab devel- Quarterly narrative report Quarterly oped/established 23 Activities Illustrative indicators Data Source Frequency of Responsible Data Collection HIV Voluntary # of VCT centers identi- Monthly project report Monthly NGO Counseling fied for referral Quarterly narrative report Quarterly and Testing # of referral links estab- Monthly project report Monthly NGO referral ser- lished Quarterly narrative report Quarterly vices estab- # of project beneficiaries Monthly project report Monthly NGO lished referred for VCT services Quarterly narrative report Quarterly # of project beneficiaries Monthly project report Monthly NGO who take the HIV test Quarterly narrative report Quarterly # of individuals counseled Monthly project report Monthly NGO in VCT centers Quarterly narrative report Quarterly Post test club # of post test clubs estab- Monthly project report Monthly NGO for follow-up lished Quarterly narrative report Quarterly counseling, # of regular post test club Monthly project report Monthly NGO psychological meetings held Quarterly narrative report Quarterly support and # of persons attending post Monthly project report Monthly NGO care linkages test club meetings Quarterly narrative report Quarterly established # of persons referred to Monthly project report Monthly NGO existing post test clubs Quarterly narrative report Quarterly *Outcome In- dicators Examples of outcome and impact indicators are already provided in the AFTTR framework for meeting the challenge (pg 19) This is a long list of suggested indicators from which to select. They may be adapted and used locally. 24 Appendix F. Key Informant Interview Guide (KIIQ?)(HIV/AIDS Focal Persons) Mainstreaming What was the process of mainstreaming? How and who were stakeholders involved in the main- streaming process? How were PLHA involved in the mainstreaming process? Was there a mainstreaming action plan? How was this developed? What has been the scope and target of mainstreaming so far (Internal mainstreaming of HIV/AIDS, sector-wide mainstreaming of HIV/AIDS, or mainstreaming of components of HIV/AIDS program). Please explain. To the best of your knowledge, what challenges did you face in mainstreaming HIV/AIDS into the transport sector? What do you consider as gaps in the mainstreaming effort? HIV/AIDS Prevention How did baseline or pre-assessment findings inform the mix of interventions? How were stakeholders involved in the development and implementation of the project? Did the interventions borrow from the National Strategy Framework? Were the target populations properly segmented, and interventions tailored to meet the specific needs of each segment? (E.g. transport workers who are MSM, transport workers who consume alco- hol; transport workers who consume drugs?) How is the project reaching other populations associated with transport workers? (E.g. sex workers) 25 How was stigma addressed? How were stakeholders involved? What were the major challenges encountered implementing the prevention program? How can the prevention program be improved? How will the prevention program be sustained? Care, Support and Treatment What are the care, support and treatment components/activities in your program? Describe the referral system into which target population is linked What is the percentage of those receiving ARVs in the transport sector compared to the general population? What is the percentage of those who know their sero-status in the transport sector compared to the general population? How have the health centers in the projects been linked to the national system of data collection? Coordination and capacity building How have the MAP-supported HIV/AIDS activities been linked to the National Strategic Frame- work? How have the MAP-supported HIV/AIDS activities been linked to the National M&E framework? Describe the extent of collaboration and strategic partnerships with other partners/sectors, including the private sector? Are there policy/strategic framework of action for the transport sector? What specific capacity building activities were implemented? (Organizational capacity, technical ca- pacity, and administrative capacity) 26 Management Is there an HIV/AIDS team or an HIV/AIDS focal person in the transport sector? What percentage of time does the focal person dedicate to HIV/AIDS work? Is HIV/AIDS main- streaming the primary assignment of the focal person or is it an add-on responsibility to existing workload for the focal point? Involvement of the ministry of transport in activities Is there a project document and implementation plan? Is there a mechanism for the involvement of stakeholders in the implementation of the project? M&E How are activities currently being monitored? What is the frequency of data collection? Reporting system Quality assurance of data What indicators do you track? Are these indicators similar to those envisaged for the target popula- tion in the National M&E framework? How do stakeholders receive feedback? How are the M&E results used to refine and improve program? What reporting tools are being used? Describe the dissemination plan in place Sustainability What funding was available for activities in the transport sector before MAP? Apart from MAP money, what are the other sources of funding for the HIV/AIDS program in the transport sector? 27 Are there specific budget lines in the Ministry of Transport and the other tiers (state/provincial and local councils) to support the HIV/AIDS program in the transport sector? What additional funds will be required to scale up the existing program? What are the sustainability plans? 28 Appendix G. Contact list for HIV/AIDS activities KIIQ responses Countries Focal Points Burkina Faso Ernest Kologo ­ E-mail: kologo ernest ernestkologo@yahoo.fr Tel. 226 70 27 36 01 Cape Verde Mr. Lucio Spencer Email: Lucio Spencer" rssp@cvtelecom.cv Direct Phone Number: (238)-261-48-20 Cameroon Tarcicius Manga ­ E-mail: Tarcisius.Manga@camrail.net Tel. 234 - 340 61 19 Cell.985 44 78 Ghana Rita Ohene Sarfoh Focal Person at Ghana Highway Authority Email: "Rita Ohene Sarfoh" Tel. 233 208121799 Lesotho Ms. Maselomo Pama Email: "Maselomo Pama" itppm@mopwt.gov.ls Direct Phone: (266)-22-32-6973 Madagascar Paul-Jean Feno ­ E-mail: pfeno@worldbank.org Tel. 261 20 22 516 92 Cell. 261 0 32 050 01 39 Malawi Rose Ligomeka ­ E-mail: "Rose Ligomeka" rligomeka@NRAMW.com , roseligomeka@yahoo.com Tel. 265 ­ 884 3597 Mozambique Vera Zuca ­ E-mail: "Vera Zuca" vzuca@ane.gov.mz Tel. 84 22 76 570 Niger Monsieur Sina Moumouni pri@intnet.ne Tel: 227 73 54 38 Senegal Birahim Fall - E-mail: "El Hadji Birahim FALL" transrur@sentoo.sn Tel. 229 ­ 869 02 50 Tanzania Josephine Mwankusye - Josephine Mwankusye josephinemwankusye@yahoo.com Tel. 255 754 266147 0r 0787 266146 Uganda Mr. Francis Byaruhanga (acting) FMByaruhanga@rafu.or.ug Tel. 225 754 266 147 Zambia Raphael Mabenga ­ E-mail: mabenga@nrfa.org.zm Tel. 260 1 253145 29 Appendix H. List of Documents Reviewed Country Document Date Burundi République du Burundi, Projet de Développement du Secteur NA Routier Mission de Suivi des Activités du Projet (du 1er au 8 oc- tobre 2005), Aide-Mémoire République du Burundi, Projet de Développement du Secteur NA Routier Mission de Suivi des Activités du Projet (du 26 juin au 1er juillet 2006), Aide-Memoire Cameroon CAMRAIL/CNLS, Programme de lutte contre le VIH/SIDA, Rap- June 2005 port 2eme semestre 2005 CAMRAIL/CNLS Programme de lutte contre le VIH/SIDA rap- June 2005 port MI parcours Campagne de lutte contre le VIH/SIDA à CAMRAIL March-April, 2005 Programme de facilitation des transports en zone CEMEC, Mis- June 5-17, 2006 sion en République du Cameroun et en République Centrafricaine Chad République du Tchad, Projet D'Appui au Programme National des June 16-30, 2005 Transports (PAProNaT), Aide-Memoire Mission de supervision du PAproNat et suivi du secteur des transports Ethiopia Africa Transport-Technical Note: Working with Road Contrac- NA tors on HIV/AIDS Prevention HIV/AIDS Implementation Report (2003 ­ April 2006) NA Malawi ROMARP project: Completion Training and HIV/AIDS Main- NA streaming Mozambique Implementation Strategy for the HIV/AIDS sub-component of the July 2003 social unit's action plan (2003 ­ 2005), final report Senegal Second Programmed Sector of Transportation (PST2) NA Second Sector Program of Transportation (PST2) (PowerPoint) " Tanzania Republic of Tanzania, Second Integrated Roads Project, " TANROADS initiative on HIV/AIDS Uganda A report on STDs/HIV/AIDS sub county sensitization workshops September 2005 in Katunguru-Kikorongo Mpondwe Road construction project No. RDP/HIV/C009 A report on STDs/HIV/AIDS sensitization workshop in Fortpor- August 2005 tal-HIMA Road construction project No. RDP/HIV/C007 Activities conducted during the last two months; November ­ NA December 2005 under C003, Pakwach ­ Olwiyo Road project Progress report on HIV/AIDS sensitization workshop in Katun- May 2005 guru-Kikorongo, Mpondwe road construction project A report of STD/HIV/AIDS needs assessment under road con- NA struction project No. RDP/HIV/C007 Fortportal-HIIMA 30 Country Document Date A second report on STD/HIV/AIDS needs assessment under road " construction project No. RDP/HIV/C009 Katunguru-Kikorongo A report on STD/HIV/AIDS needs assessment Karuma-Olwiyo " road construction project A report on STD/HIV/AIDS needs assessment Pakwach-Olwiyo " road construction project A report on the launch of Pakwach-Olwiyo HIV clinic/VCT " Report on HIV/AIDS sensitization campaign in Puringo Inter- July 16, 2005 nally Displaced People's camp (IDPC), July 16, 2005 Progress report on HIV/AIDS for the month of February 2006, NA under C003; Pakwach-Olwiyo Road Construction project Progress report on HIV/AIDS for the month of February 2006, " under C009; Katunguru-Kikorongo Road construction project A report on STD/HIV/AIDS sub county sensitization workshops January 2006 in Fortportal-HIMA road construction project RDP/HIV/C007 A report on STDs/HIV/AIDS IDP camps sensitization workshops February 2006 in Pakwach-Olwiyo road construction project Progress report on HIV/AIDS for the month of February 2006, NA under C003; Pakwach-Olwiyo Road Construction project Progress report on HIV/AIDS for the month of January 2006, un- " der C004; Karuma-Olwiyo Road Construction project Progress report on HIV/AIDS for the month of January 2006, un- " der C009; Katunguru-Kikorongo Road Construction project A report on STDs/HIV/AIDS Teachers' Sensitization Workshop in February 2006 Karuma-Olwiyo Road Construction project, C004 Progress report for Karuma-Olwiyo road sector HIV/AIDS pro- May 2005 gramme for the month of May 2005 Report on the launch of Katunguru-kikorongo HIV clinic/VCT NA Zambia Republic of Zambia Project to support a road sector investment program (ROADSIP) IDA credit 3866, HIV/AIDS and Transport Second quarter report on the HIV/AIDS project 3rd quarter 2004, Road Sector HIV/AIDS project report 4th quarter 2004, Road Sector HIV/AIDS project report Quarterly report on HIV/AIDS project, Republic of Zambia, by April, 2005 Edna Kalaluka, HIV/AIDS Coordinator, Ministry of Communica- tions and Transport, submitted April 2005 Quarterly report on HIV/AIDS project, Republic of Zambia, by July, 2005 Edna Kalaluka, HIV/AIDS Coordinator, Ministry of Communica- tions and Transport, submitted July 2005 3rd Quarter, HIV/AIDS Program in the Road Sector 4th Quarter progress report in the road sector Quarterly report on HIV/AIDS project in the Transport Sector, 31 Country Document Date Fourth Quarter, 2005 by Edna Kalaluka First quarter report on HIV/AIDS project, April 2006 April 2006 Transport Sector HIV/AIDS project, July 2004 ­ June 2006, Les- June 2006 sons Learnt during the implementation of an HIV/AIDS response in the transport sector in Zambia by Edna Kalaluka, HIV/AIDS Coordinator, Ministry of Communication and Transport OTHERS Transport and HIV/AIDS: A Survey of the Issues at Stake; Trans- May 5, 2004 portation Social Responsibility; Thematic Group by Julie Babinard (TUDTR) and Nina Schuler (TUDUR), May 5, 2004 (PowerPoint presentation) World Bank Program for week of World AIDS Day, 2005, focus November 30, on Transport against AIDS Sessions. (Brief for Kathy Sierra) 2005 HIV/AIDS and Transport Retrofitting Exercise, Africa Transport, World Bank Africa Region (PowerPoint presentation) Interview with Jocelyn Do Sacramento: World Bank HIV/AIDS Partnership with Air France Transport Against AIDS: Minutes of the 2005 Transport World November 28 ­ 29, AIDS Events, November 28 ­ 29, 2005, Washington DC 2005 Multi-Country HIV/AIDS Program (MAP) for Africa; The World Bank (a PowerPoint presentation) Programme RÉgional de Facilitation des Transports; Ghana- June 2005 Burkina Faso- Mali by Violet Sida, Ouagadougou, 30 May ­ 3rd June, 2005 (PowerPoint) Concept Note: HIV/AIDS Agenda for Action in sub-Saharan Af- rica Proposed Abidjan-Lagos Transport and Transit Facilitation Pro- ject (ALTTFP) Project Identification Mission to Benin, Togo and Ghana (May 31 ­ June 9, 2006) Aide Memoire AIDS and Transport in Africa, a framework for meeting the chal- July 2003 lenge, Africa Technical Transport Sector Unit (AFTTR), The World Bank 32 Appendix I. Terms of Reference HIV/AIDS Mainstreaming in the Transport Portfolio TOR for the Assessment Study The overall purpose of the TOR is to assess the mainstreaming in the transport portfolio. 1. Background Africa is the continent with the highest prevalence of HIV/AIDS infections in the world. World Bank estimates suggest that HIV-AIDS is the leading cause of death in Sub-Saharan Africa and the para- mount threat to the region's development. Findings of international studies of HIV/AIDS in work places conclude that the road sector is a breeding ground and a vehicle for the HIV/AIDS Pandemic. People working in the road sector have to be mobile; they spend much time away from their homes and seek sexual companionship on the road. Therefore, migration, short term or long term, increase opportunities for sexual relationships with multiple partners, thus becoming a critical factor in the propagation of HIV/AIDS. Recognizing the magnitude of the problem, many African countries have now National AIDS Coun- cils. To support those programs, the World Bank has developed the MAP as the financing instrument. Clients 'efforts to tackle the issue in the transport sector have been poor and inadequate. HIV/AIDS prevention strategies of the transport sector among client countries have yet to be defined and main- streamed to become part of the ordinary project process and implementation. 2. Rationale The Assessment study aims at: a) looking at the specific issues pertaining to the transport sector in comparison with activities that are relevant to the country; b) see if transport activities fit into the national strategy and how the transport projects contribute to the National strategy of each country; and c) see if activities are aligned into the specific country 3. Project objective The objective of the study has three folds: a) evaluate the mainstreaming program in the transport projects; b) Prepare an instrument that could serve as a learning tool or an accountability tool; c) Improve the framework establish with national program (MAP) 33 4. Scope of work and task The consultant will: a) meet with the M&E team at the Global HIV/AIDS unit for further instruction on the study to conduct; b) to collect HIV/AIDS preventions data with the projects TTLs and with the HIV/AIDS Focal person; c) quarterly reports will be made available, aide-memoire and other relevant documen- tation 5. Qualifications - Mater degree in the relevant field - Strong experience in HIV/AIDS activities, preferably in the field. - Some knowledge of the transport sector - Experience in M&E with a transport background is possible. - Experience with project system/related program documentation, design and development. 6. Timeframe The target period for the start of the consultancy is April 17, 2006. It is anticipated that the Consult- ant would complete the outputs of the work over a maximum duration of 4 weeks with a daily rate of $490. 7. Reporting Consultant will produce the first inception report the 2nd week. The work of the Consultant will be supervised by the HIV/AIDS Focal Person in consultations with a resource person in Act Africa. The Consultant should obtain comments from the TTLs in the Transport Division before submitting the final report. The final report should be delivered in World Bank format with pictures and maps. 34 References A Framework for meeting the Challenge: http://www.worldbank.org/afr/ssatp/ Contract Clauses in the World Bank Operational System: http://web.worldbank.org/WBSITE/EXTERNAL/PROJECTS/PROCUREMENT/0,,contentMDK:20483 254~menuPK:84284~pagePK:84269~piPK:60001558~theSitePK:84266,00.html Variations of the countries experiences: www.worldbank.org/afr/ssatp Botswana National HIV/AIDS Strategic Framework, 2003-2009 Bucher, Kate, John Snow International Research & Training/DfID Uganda (2003) "Lessons Learned From Mainstreaming HIV into the Poverty Eradication Action Plan in Uganda Braithwaite, Mary, Africa Region, The World Bank, "Sub-Saharan Africa Transport Policy Review of National Transport Reduction Strategies" Centre for AIDS Development, Research and Evaluation, (2001) "HIV/AIDS and the South African Media, Workplace Policies and Programmes" Economic Commission for Africa, Commission on HIV/AIDS and Governance in Africa, "HIV/AIDS and the World of Work, Discussion Outcomes, A report on the CHGA interactive session on HIV/AIDS and the world of work, Accra, Ghana 18 ­ 19 November 2004" Elsey, Helen & Kutengule (2003), "HIV/AIDS Mainstreaming: A Definition, Some Experiences and Strategies, A resource developed by HIV/AIDS focal points from government sectors and those that have been working on HIV/AIDS mainstreaming." Elsey, H., Tolhurst R, & Theobald, S. Liverpool School of Tropical Medicine, Liverpool, UK, "Main- streaming HIV/AIDS in development sectors: Have we learnt the lessons from gender mainstream- ing" Ethiopia National HIV/AIDS Prevention and Control Office (HAPCO), (2003), "National Monitoring and Evaluation Framework for the Multi-Sectoral Response to HIV/AIDS in Ethiopia Family Health International, (2000) "Southern African Cross Border Initiative, Assessment Dissemi- nation and Stakeholders Workshop Report, Chirundu-Chirundu, Chirundu Valley Motel, Zimbabwe 23-25 May, 2000" 35 Family Health International, (2000), Round 1, Behavioral and Biologic Surveillance Survey: Zambia Female Sex Workers (www.fhi.org) Family Health International, (2000), Round 1, Behavioral and Biologic Surveillance Survey: Zambia Long Distance Truck Drivers (www.fhi.org) ILO Project on HIV/AIDS Prevention in the Transport Sector of Southern Africa ­ Project Advisory Committee: Zimbababwe, "HIV/AIDS Policy for the Transport Sector of Zimbabwe Liverpool School of Tropical Medicine, "Mainstreaming HIV/AIDS in Practice" Martin, Janean, (2004), "Corridors of Hope Regional HIV/AIDS Cross Border Prevention Program, Secondary Analysis and Document Review" Mashiri, Mac "Community Responses to HIV/AIDS Along Transit Corridors & Areas of Transport Operations in Eastern and Southern Africa, Synthesis of Literature" Ministry of Transport, South Africa (2001), National HIV/AIDS Transport Sector Coordinating Com- mittee, "Transport Sector Strategic HIV/AIDS Plan" (http://www.transport.gov.za/library/docs/aidsplan/aidsplan.html) Mohammed Nadeem; Gikonyo, Juliet, (2005) "Operational Challenges, Community Home Based Care (CHBC) for PLWHA in Multi-Country HIV/IDS Programs (MAP) for Sub-Saharan Africa Odero, Kenneth K, (2004) "Zimbabwe, A Scoping Study on Community Response to HIV/AIDS along Transport Corridors and Other areas of Intense Transport Operations" Oomman, Nandini "An Overview of the World Bank's Response to the HIV/AIDS Epidemic in Af- rica, with a focus on the Multi-Country HIV/AIDS Program" Osika, John Stephen & Brushett, Stephen, (2005) The International Bank for Reconstruction and De- velopment/The World Bank, "The Global HIV/AIDS Program, Lessons Learned to Date From HIV/AIDS Transport Corridor Projects' Population Services International, (October 2003 ­ September 2004) Corridors of Hope, Year-end Performance Report for Zimbabwe, Namibia, Mozambique, Lesotho, Swaziland, South Africa, Zam- bia (http://pdf.dec.org/pdf_docs/pdacf106.pdf) The World Bank, (2005) "Committing to Results: Improving the Effectiveness of HIV/AIDS Assis- tance, An OED Evaluation of the World Bank's Assistance for HIV/AIDS Control Theobald, S, Tolhurst, R, Elsey H & Standing, H (2005), "Engendering the bureaucracy? Challenges and opportunities for mainstreaming gender in Ministries of Health under sector-wide approaches" 36 The World Bank, Africa Technical Transport Sector Unit, (2003) "AIDS and Transport in Africa, A Framework for Meeting the Challenge" UNAIDS, UNDP, World Bank, (2005), "Mainstreaming AIDS in Development Instruments and Proc- esses at the National Level, A Review of Experiences UNAIDS, The World Bank & UNDP, "Mainstreaming HIV and AIDS in Sectors & Programmes, An Implementation Guide for National Responses" UNAIDS, (2002) "Mainstreaming HIV/AIDS: A Conceptual Framework & Implementing Principles" United Nations Development Programme, South East Asia HIV and Development Programme, "Mainstreaming HIV Prevention in the Military, A case study from Cambodia" Uganda AIDS Commission, 2003, "Mainstreaming HIV/AIDS issues into the poverty eradication ac- tion plan (EAP), Guidance for sector and PEAP revision teams" Worldfish Center, Responding to HIV and AIDS in Fishery Sector in Africa: Proceedings of the In- ternational Workshop, February 20 -21 2006, Lusaka, Zambia (Cairo, Egypt: WorldFish Center, 2006) 37