EMP for World Bank-Financed Anhui Aged Care System Demonstration Project SFG3789 Zhongzi Huayu G. H. P. Z. J. Zi No. 1051 World Bank-Financed Anhui Aged Care System Demonstration Project Environment and Social Management Plan (EMP) Commissioned by: Department of Civil Affairs of Anhui Province Prepared by: Beijing Zhongzi Huayu Environmental Protection Technology Co., Ltd. Prepared in: October 2017 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table of Contents Executive Summary .......................................................................................................................... 1 1 Project Overview ..................................................................................................................... 6 1.1 Project background .............................................................................................................. 6 1.2 Construction contractor ....................................................................................................... 7 1.3 Project Objectives................................................................................................................ 7 1.4 Project details ...................................................................................................................... 8 2 Basis and standard.................................................................................................................. 13 2.1 Basis for EMP Preparation ................................................................................................ 13 2.1.1 Chinese laws and regulations on environmental protection ............................................ 13 2.1.2 Technical specifications, industry norms, and ESH criteria............................................ 16 2.2 Assessment standard.......................................................................................................... 18 3 Environment........................................................................................................................... 22 3.1 The environment of Anqing City ....................................................................................... 22 3.1.1 Component III - The Integrated Medical and Elderly Care Institutions (the nursing facility of the First People's Hospital of Anqing) ............................................................................ 22 3.1.2 Subproject II - Current situation and surrounding sensitive spots of home-based aged-care service stations ................................................................................................................ 34 3.2 Environmental profile of Lu’an City ................................................................................. 44 3.2.1 Sub-project III - Medical and aged-care institution of Lu’an City (Multi-functional medical building of Traditional Chinese Hospital of LuAn) ........................................................... 44 3.2.2 Subproject II - current situation and surrounding sensitive spots of home-based aged-care service stations ................................................................................................................ 57 3.3 Wuhu City ......................................................................................................................... 61 3.3.1 Subprojetc II - Embedded Center for Disabled and Semi-disabled Elderly in Wuhu .. 61 3.4 Xuancheng City......................................................................................................................... 79 3.4.1 Sub-project II - Status and Surrounding Sensitive Spots of Xuancheng Municipal Social Welfare Home Relocation and Reconstruction Project ................................................................... 79 3.4.2 Supporting projects ................................................................................................................ 83 3.5 Ningguo City ............................................................................................................................. 87 3.5.1 Sub-project III - Status and Surrounding Sensitive Spots of Ningguo Social Welfare Service Center Upgrading Project................................................................................................................ 87 3.5.2 Supporting projects ................................................................................................................ 91 3.6 Suzhou City ............................................................................................................................... 94 3.6.1 Subproject III - Status and Surrounding Sensitive Spots of Rural Nursing Homes ............... 95 4 Main Environmental Impact and Mitigation Measures........................................................ 104 4.1 Environmental Impact Analysis and Mitigation Measures during Construction Period . 104 4.1.1 Brief on common construction impact ....................................................................... 104 4.1.2 Environmental impact and countermeasures for major sub-projects (Anqing, Lu'an, Wuhu, Xuancheng, Ningguo)........................................................................................................ 113 4.1.3 Environmental impact of other sub-projects during decorating ................................. 138 4.2 Environmental Influence and Protection Measures during Operational Period .............. 139 4.2.1 Environmental impact and countermeasures for major sub-projects (Anqing, Lu'an, Wuhu, Xuancheng, Ningguo)........................................................................................................ 139 4.2.2 Environmental impact of other sub-projects .............................................................. 152 4.3 Design Requirements for Facilities for Fire Control, Safety, Accessibility, Sewage Collection and Treatment .............................................................................................................. 152 4.3.1 Fire fighting ................................................................................................................ 152 4.3.2 Safety and accessibility of home-based elderly care sites and service centers for disabled or semi-disabled elders ................................................................................................... 155 4.3.3 Safety and accessibility of medical and aged-care institutions and welfare homes ... 156 4.3.4 Safety and accessibility of rural nursing homes ......................................................... 157 4.3.5 Design requirements for facilities for sewage collection and treatment..................... 158 5 Social management plan ...................................................................................................... 160 5.1 Reasonably arrange the spatial location of the elderly care sites in community ............. 160 5.2 Reduce the workload of government staff ....................................................................... 160 1 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 5.3 Reduce the negative impact of the project on elderly care service practitioners ............. 161 5.4 Reduce the negative impact of the project on the elderly ................................................ 161 5.5 Reduce the negative impact on other residents in community ........................................ 161 5.6 Reduce the migration influence of the project................................................................. 161 5.7 Establish the complaint mechanism ................................................................................ 161 6 Environmental monitoring plan ........................................................................................... 162 6.1 Monitoring purpose ......................................................................................................... 162 6.2 Monitoring Implementation............................................................................................. 162 6.3 Monitoring Plan............................................................................................................... 162 6.4 Environmental Supervision Scheme................................................................................ 167 6.4.1 Environmental Supervision Scope ................................................................................ 167 6.4.2 Specific Working Method for the Environmental Supervision ..................................... 167 6.4.3 Project Environmental Supervision Scheme ................................................................. 169 7 Institutional Arrangement .................................................................................................... 172 7.1 Environmental Management System Arrangement ......................................................... 172 7.1.1 Provincial Level ............................................................................................................ 172 7.1.2 Municipal and County Level ........................................................................................ 173 7.2 Responsibility and personnel staffing of environmental management system organization . 177 7.3 Environmental management training............................................................................... 179 8 Estimation of execution cost for environmental management plan ..................................... 182 8.1 Project description of execution cost ............................................................................... 182 8.2 Execution cost estimation ................................................................................................ 182 9 Information management of environmental management plan ............................................ 184 9.1 Information Exchange ..................................................................................................... 184 9.2 Records mechanism ......................................................................................................... 184 9.3 Reporting mechanism ...................................................................................................... 184 9.4 Grievance and Complaint Mechanism ............................................................................ 185 10 Public consultation and public notification ..................................................................... 187 10.1 Public notification of the Project ................................................................................ 187 10.2 Survey of public consultation ..................................................................................... 191 Appendixes ................................................................................................................................... 203 Appendix 1:General Management Specifications of Construction Environment ......................... 203 Appendix 2: Specific Protection Measures ................................................................................... 218 Appendix 3: List of Social Management Plan .............................................................................. 227 Appendix 4: Due Diligence Report ............................................................................................... 229 2 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Preface The project has four components: (i) Suppporting the development of government stewardship capacity for the elderly care system; (ii) Strengthening the delivery and management of community and home-based services; (iii) Strengthening the delivery and management of nursing care; and (iv) Project management, monitoring, and evaluation, along with capacity building. Component I includes developing a comprehensive aged-care service information system, creating an ability and demand evaluation system for the aged, developing aged-care service quality standards, and training people to be skilled elderly care providers. Component II includes upgrading 161 home-based aged care service stations in Anqing and Lu'an (16 stations in Lu'an will be upgraded later); purchasing 2 services by the municipal governments of Anqing and Lu'an; Component III includes and constructing or upgrading 7 community-based care centers (including nursing facility), 1 center for training and for recreational acvitities for the elderly, 1 central kitchen, and 1 big health management information data center in Wuhu; building 1 integrated medical and elderly care institution in Anqing and in Lu'an respectively; relocating and reconstructing Xuanzhou District Welfare Home and building 1 social welfare service center in Ningguo City; upgrading, expanding 35 rural nursing facilities in the Yongqiao District, Dangshan County, Xiao County, Si County and Lingbi County of Suzhou. Component IV will support project management-related work at the provincial and sub-provincial levels by establishing and maintaining Project Management Offices and by building the capacity of project management staff. This will ensure an effective and efficient implementation in compliance with the operations policies and procedures of the World Bank as well as with domestic rules. See table 1.4-1 for the project's components and details. The project funds primarily come from the World Bank loan, the supporting funds provided by local governments, and the funds raised by construction contractors. The World Bank loan is 965,384,000 Yuan (equivalent to 140 million USD), accounting for 52.49% of the total investment; the supporting funds provided by local governments amount to 298,488,600 Yuan, accounting for 16.23% of the total investment; the funds raised by construction contractors stand at 452,368,200 Yuan, accounting for 24.6% of the total investment; other funds (including funds for TCM inheritance project and construction of general practitioner training base) 123,000,000 1 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Yuan, accounting for 6.69% of the total investment. Analysis of the environmental impact during construction and mitigation measures During construction, the environmental impact of the five major sub-components (the nursing facility of the First People's Hospital of Anqing, the Multi-Functional Medical Building of Lu'an City Hospital of Traditional Chinese Medicine, Wuhu Health and Elderly Care Industry Base at Haoyan Rainbow Garden, Xuancheng Municipal Social Welfare Home Relocation and Reconstruction, and Ningguo Municipal Social Welfare Service Center Upgrades) has be analyzed. Exhaust: exhaust comes primarily from the dust procuded during construction and transportation. Dust pollution prevention and control measures include strengthening construction site management, putting up construction signs, watering the roads on which vehicles travel during construction, building a platform for vehicle washing, using dust covers such as tarpaulin, promptly removing construction waste from the construction site, reducing dust, and prohibiting the use of asbestos and other materials. Noise: noise is primarily produced by construction machinery and vehicles. Measures to reduce and prevent noise include properly scheduling time for using construction machinery, forbidding nighttime construction, using low noise mechanical equipment or preparing sound insulators or silencers, and properly arranging construction time and site. Wastewater: construction wastewater should be first treated through sedimentation tanks and oil-water separators and then reused for construction instead of being discharged outside. Domestic sewage should be discharged into the city's sewage treatment plant through the municipal sewage network. Solid waste: domestic waste should be collected separately based on their types and promptly removed. Construction waste should be dumped at the sites designated by competent authorities of cityscape and sanitation. See table 2-1 for details Analysis of the environmental impact during operation and mitigation measures Wastewater: wastewater discharged from the nursing facility of the First People's Hospital of Anqing and the Multi-functional Medical Building of Lu'an City Hospital of Traditional Chinese Medicine will be first treated through the sewage treatment 2 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project stations at the these two hospitals; if the treated wastewater meet the pretreatment standards in Table 2 of the Discharge Standard of Water Pollutants for Medical Organization (GB18466-2005), it will be discharged into the city's sewage plant. The medical wastewater and domestic sewage discharged from other sub-components will be disinfected and treated respectively, and then discharged into the city's sewage plant if they meet the Class 3 standards in Table 4 of Integrated Wastewater Discharge Standard (GB8978-1996). Solid waste: trash cans should be arranged for domestic waste; waste should be removed from trash cans everyday to the sites designated by the competent authorities of environmental sanitation for disposal. Special trash cans should be arranged for medical solid waste; medical solid waste should be disposed of by qualified organizations in a safe, harmless manner. See table 2-2 for details Social management plan and environment monitoring plan In order to achieve the potential benefits and proposed development objectives (PDO) of the project, the social impact assessment survey team has surveyed the workers at the departments of civil affairs, the elderly care service stations in the affected project areas, and the elderly care facilities, along with relevant elders, their families, and other main stakeholders. Based on this survey and the analysis of relevant data, the team has identified the potential social impact and risks that are related to the project design and implementation and might affect the achievement of the PDOs of the project, and has proposed the measures to mitigate the impact or avoid the risks. See attached table 3-1 for details. The project has impacts on the environment during construction and operation. In order to effectively control pollution and protect the environment, operation of environmental protection facilities and production equipment should be kept track of as a way to prevent pollution incidents. Moreover, the environment monitoring plan should be implemented. This plan includes monitoring period, environmental elements, monitoring sites/points, monitoring items, monitoring frequency, costs, and monitoring organizations. See Table 6.3-1 for details. Institutional capacity assessment Department of Civil Affairs of Anhui Province is responsible for the implementation of the project. This Department has set up a provincial project management office (PMO) for overall project management throughout project 3 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project implementation. The relevant civil affairs bureaus under the Department of Civil Affairs of Anhui Province have set up municipal PMOs for daily management of the project during its implementation. The provincial PMO will coordinate local PMOs during project preparation and implementation. Moreover, the provincial PMO will designate a person to be in charge of environmental management and staff this work with environmentalist and the employees from project management companies. All PMOs will be staffed with sufficient workers (including designated environmental managers). The PMOs will employ external monitoring agencies and resident supervisors to supervise the implementation of the environmental management plan (EMP). The capacity of the EMP implementation organizations will be enhanced by taking a few measures, including training the workers of PMOs and construction contractors, so as to efficiently implement the project. Many projects financed by the World Bank have been successfully implemented in Anhui province. During the preparation and implementation of the project, the Department of Finance of Anhui Province and the Anhui Development and Reform Commission will provide support and guidance to the Department of Civil Affairs of Anhui Province and the PMO. EMP implementation cost estimate The costs related to the environmental protection for the project consist of three parts: the cost of environmental protection measures (including the cost of commissioning independent organizations to dispose of hazardous waste), the cost of environmental monitoring and supervision, and the cost of capacity building (including the cost of environmental management training and the cost of environment consulting). These costs total 18.017 million yuan. See Table 8.2-1 for details. Public consultation and document disclosure Public consultation is conducted in forms of discussion meetings and questionnaire surveys. Questionnaire surveys and discussion meetings were conducted in the project areas in Anqing, Lu'an, Wuhu, Xuancheng, and Suzhou. Information about the project is posted on the website of the Department of Civil Affairs of Anhui Province on July 21st of 2017. The disclosed information includes the cities involved in the project and the overview of the project and its components, along with the link to the EMP for the project. The information was also published on Xin'an Evening News on July 20th of 2017. 98.1% of the respondents are supportive of the project, while 1.9% of the 4 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project respondents show indifference to the project. The respondents believe that the project is conducive to the development of local elderly care facilities. Through the project, more rehabilitation, nursing, medical, and health services will be provided to functionally impaired and disabled elders. 5 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 1 Project Overview 1.1 Project background Being a Chinese province that has a big population, the population of Anhui ages relatively earlier than the population of most other provinces in China. By the end of 2016, the number of Auhui's elders (aged 60 and above) reached 11.022 million, accounting for 18% of the resident population of the province, whereas the number of Chinese elders accounts for 16.7% of its total population, so the number of Anhui's elders is higher than that of Chinese elders on average. The number of Anhui's elders who receive elderly care accounts for 28.3% of the total population of Anhui's elders, whereas the number of Chinese elders who receive elderly care accounts for 25.44% of the total population of Chinese elders, so the number of Anhui's elders who receive elderly care is larger than the number of Chinese elders who receive elderly care on average. In order to cope with the social problems caused by an aging population,the Implementation Opinions of Anhui Provincial Government on Accelerating the Development of the Elderly Care Service Industry (W. Z. [2014] No. 60), Notice of Anhui Provincial Government on Implementation of 33 Projects in 2017 to Improve People's Wellbeing (W. Z. [2017] No. 10), and the 2017 Implementation Measures for Development of An Elderly Care Service System have proposed that by 2020, an elderly care service system that features complete functions and distinctive Anhui's characteristics will be established in Anhui to benefit its urban and rural residents. By then, every 1,000 elders in Anhui will have no less than 45 beds at elderly care facilities; standard community-based elderly care service facilities will be built in all urban communities; and integrated community-based elderly care service facilities and stations will be built in over 90% of township communities and over 80% of rural communities. However, Anhui's existing elderly care system is underdeveloped. According to the official data of the Department of Civil Affairs of Anhui Province, in 2016, there were a total of 366,000 beds at elderly care facilities in Anhui, which means there were 34 beds for every 1,000 elders; elderly care facilities were built at over 50% of rural communities; and the number of elderly care providers approached 10,000. Moreover, Anhui province faces the following problems: there is no unified system for assessing the elders' abilities and needs; there is no unified requirement on the assessment organizations and on the qualitifications of assessors or unified assessment standards; 16 elderly care service standards have been launched locally, 6 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project but no system for such standards is established. Therefore, there is still a long way to go before the development goals set for Anhui's elderly care service industry can be achieved; and efforts should be doubled to develop an efficient elderly care service system. Anhui Aged Care System Demonstration Project is proposed by Anhui Provincial Government based not only on its decision to accelerate the establishment of an elderly care service system, but also on its implementation opinions on accelerating the development of the elderly care service industry. This project is conducive to achieving the PDO(s). Financed by the World Bank, the project is an attempt at addressing problems in Anhui's elderly care industry by importing advanced technologies and equipment and drawing on advanced foreign operation management concepts and methods, based on China's national conditions and its institutional reforms, so as to develop an elderly care service system that can narrow the gap between the high demand for and low supply of elderly care services. 1.2 Construction contractor 1. Commissioning organization Department of Civil Affairs of Anhui Province 2. Project management organization There are 7 PMOs for the project, including Anhui Provincial PMO, Anqing PMO, Lu'an PMO, Wuhu PMO, Xuanzhou PMO, Ningguo PMO, and Suzhou PMO (the latter six PMOs are under the Anhui Provincial PMO). These 7 PMOs are responsible for project management and task assignment. 1.3 Project Objectives The Proposed Development Objective(s) of this project is to support the government of Anhui Province in establishing and managing a diversified (public and private) system of delivery of elderly care services, including home, community and residential services, that serves both urban and rural elders. This system will have three tiers: home-based care will be its bedrock, and it will be supported by community-based care and underpinned with institutional care. The main development objectives of the project are as follows: 1. Strengthening the capacity of the government of Anhui Province to exercise stewardship over the diversified elderly care service delivery system; 2. Strengthening the delivery capacity of the diversified service provision 7 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project systems of elderly care delivery in five municipalities (Anqing, Lu'an, Wuhu, Suzhou, and Xuancheng) in Auhui province. 3. Improving the balance of elderly care services in five municipalities in Anhui province; 4. Improving the affordability and quality of elderly care services in five municipalities in Anhui province. 1.4 Project details The project is implemented in Anhui Province, including the Yongqiao District, Dangshan County, Lingbi County, Xiao County and Si County of Suzhou City; various districts of Anqing; Lu'an City; Wuhu City; the Xuanzhou District of Xuancheng City; and Ningguo City. See map 1.4-1 for details. The project has four components: (i) Suppporting the development of government stewardship capacity for the elderly care system; (ii) Strengthening the delivery and management of community and home-based services; (iii) Strengthening the delivery and management of nursing care; and (iv) Project management, monitoring, and evaluation, along with capacity building. See table 1.4-1 for details. Component I includes developing a comprehensive aged-care service information system, creating an ability and demand evaluation system for the aged, developing aged-care service quality standards, and training people to be skilled elderly care providers. Component II includes upgrading 161 home-based aged care service stations in Anqing and Lu'an (16 stations in Lu'an will be upgraded later); purchasing 2 services by the municipal governments of Anqing and Lu'an. Component III includes and constructing or upgrading 7 community-based care centers (including nursing facility), 1 center for training and for recreational acvitities for the elderly, 1 central kitchen, and 1 big health management information data center in Wuhu; building 1 integrated medical and elderly care institution in Anqing and in Lu'an respectively; relocating and reconstructing Xuanzhou District Welfare Home and building 1 social welfare service center in Ningguo City; upgrading, expanding 35 rural nursing facilities in the Yongqiao District, Dangshan County, Xiao County, Si County and Lingbi County of Suzhou. Component IV will support project management-related work at the provincial and sub-provincial levels by establishing and maintaining Project Management Offices and by building the capacity of project management staff. This will ensure an effective and efficient implementation in 8 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project compliance with the operations policies and procedures of the World Bank as well as with domestic rules.See table 1.4-1 for the project's components and their sub-components. The project funds primarily come from the World Bank loan, the supporting funds provided by local governments, and the funds raised by construction contractors. The World Bank loan is 965,384,000 Yuan (equivalent to 140 million USD), accounting for 52.49% of the total investment; the supporting funds provided by local governments amount to 298,488,600 Yuan, accounting for 16.23% of the total investment; the funds raised by construction contractors stand at 452,368,200 Yuan, accounting for 24.6% of the total investment; other funds (including funds for TCM inheritance project and construction of general practitioner training base) 123,000,000 Yuan, accounting for 6.69% of the total investment. 9 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Legend: cities where the project and its components are located 1.4-1 Location of the cities where the project and its components are located 10 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table 1.4-1 The project's components and their details Components Construction items Developing an Building elderly-care data centers; developing integrated service platforms for elderly care, including data collection information system platform, service management platform, information disclosing platform, and elderly care service application platform; for the delivery of a establishing a unified standard for the information system; upgrading aged-care related information management system continuum of care Creating a system for disability Establishing standards for disability certification/ability evaluation; developing evaluation tools; training evaluation Component I certification/ability workers; evaluation implementation and supervision evaluation Developing service Developing a general service standard and service provision standard system, a service management standard system, a standard systems service quality guarantee standard system, and a service evaluation standard system. Building the capacity Training senior management of elderly care facilities; training the management of the department of civil affairs to of elderly care improve their management capabilities. providers It is proposed that 127 home-based care service stations will be updated in Anqing, with a gross floor area of 59915 square meters. The stations have residential elderly care centers and aged day care centers; they also provide elderly care Home-based care services at home; 200 beds are arranged for the time being for each residential elderly care center. service stations In the areas under the jurisdiction of Lu'an City, 34 home-based elderly care stations with a combined floor area of 20513.33m2 will be upgraded. Elderly care stations will contain aged day care centers, recreation rooms, libraries, gyms, and ancillary service rooms. The services purchased by the Anqing Municipal Government encompass visiting empty nesters, assessing the elders' Component II ability, providing home-based elderly care services to the elders to whom the local government guarantees food, clothing, housing, medical care and burial expenses, home-based elderly care services for thelow-income elderly people, caring and nursing services for the low-income disabled elderly people with dementia, and providing respite care service. This Government component does not involve construction and decoration. purchased services The services purchased by the Lu'an Municipal Government include caring and serving empty nesters, assessing the elders' ability/needs, buying necessities for the needy elders, providing home-based respite care service to disabled elderly, implement third party supervision of the project and carry out, mid-stage assessment, and post-assessment. This component does not involve construction and decoration. 11 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Components Construction items Care centers for functionally impaired In Wuhu, 7 community-based elderly care centers (including nursing homes), 1 center for training and for recreational or disabled elders in acvitities for the elderly, 1 central kitchen, and 1 big health management data center will be upgraded; these 10 centers which have a combined floor area of 66150.55m2 and 1,243 additional beds will be arranged at the centers (of the 1,243 beds, community-based 780 beds will be arranged at the base). There are exisiting buildings. This component involves decoration and equipment care has been purchase. integrated At Longshan Branch of the First People's Hospital of Anqing, 1 nursing facility will be built. This nursing facility consists of 4 buildings (2-6F), 1 podium (1F), and 1 physical examination center (1F). Construction items include rooms for the elderly (service room, living room, health care room, rehabilitation room, recreation room, and social work room), administrative offices, and ancillary rooms. The nursing facility will cover an area of about 54,000m2, with a gross floor Elderly care facilities area of 42,459.4 m2., and 1,000 beds. in which medical care At Lu'an City Hospital of Traditional Chinese Medicine (TCM), 1 multi-functional medical building will be built. This is integrated building has a footprint area of 19,250 m2 and a floor area of 92,100 m2. It will encompass restaurants, famous and time-honored TCM clinics, physical examination centers for disease prevention, TCM pharmacies, medical care streets, scientific research rooms, multi-disciplinary joint consultation rooms, clinical teaching and training areas, and wards Component III (including a planned police station and ambulance station); 600 additional beds will be arranged (including 500 beds for elders who receive elderly care). In Ningguo City, a new social welfare service center will be built with a gross floor area of 9,054m2, and 260 additional beds will be arranged. Urban welfare homes The existing welfare home in the Xuanzhou District of Xuancheng City will be relocated and rebuilt. This welfare home will have 3 floors, with a planned land area of 40,000 m² in total (about 60mu) and a gross floor area of 19,500m². 400 additional beds will be arranged. The existing 35 rural nursing facilities in Yongqiao District, Dangshan County, Lingbi County, Xiaoxian County, and Rural nursing Sixian County will be upgraded, including building renovation and equipment upgrading. The total area is 25994.3 square facilities meters; 1,446 additional beds will be arranged in these facilities. Project management, monitoring, Component IV Including achievement monitoring and evaluation; project management and institutional capacity building. evaluation, and capacity building 12 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 2 Basis and standard 2.1 Basis for EMP Preparation 2.1.1 Chinese laws and regulations on environmental protection 2.1.1.1 Relevant national laws and regulations (1) Environmental Protection Law of the People's Republic of China (implemented as of January 1, 2015); (2) Law of the People's Republic of China on Prevention and Control of Water Pollution (implemented as of June 27, 2017); (3) Law of the People's Republic of China on Prevention and Control of Atmospheric Pollution (implemented as of January 1, 2016); (4) Law of the People's Republic of China on Prevention and Control of Pollution from Environmental Noise (implemented as of March 1, 1997); (5) Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste (implemented as April 24, 2015); (6) Law of the People's Republic of China on Environmental Impact Assessment (implemented as of September 1, 2016); (7) Law of the People's Republic of China on Water and Soil Conservation (implemented as of March 1, 2011); (8) Water Law of the People's Republic of China (implemented as of July 2, 2016); (9) Regulations on Environmental Protection Management of Construction Projects (implemented as of November 29, 1998); (10) Law of the People's Republic of China on the Protection of Wildlife (implemented as of July 2, 2016); (11) Law of the People's Republic of China on the Protection of Cultural Relics (implemented as of December 19, 2007); (12) Flood Control Law of the People's Republic of China (implemented as of April 24, 2015); (13) Land Administration Law of the People's Republic of China (implemented as of August 28, 2004); (14) Regulations of the People's Republic of China on Nature Reserves (implemented as of December 1, 1994); 13 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (15) Regulations of the People's Republic of China on the Protection of Wild Plants (implemented as of January 1, 1991); (16) National Outline for Ecological Environment Protection (implemented as of April 10, 2001); (17) Notice on Issues Concerning Examining and Determining Total Emission Control Indicators of Major Pollutants of Construction Project, document of General Office of State Administration of Environmental Protection, H. B. [2003] No. 25; (18) Catalogue of Classified Management of Environmental Impact Evaluation of Construction Project (No. 41 Order of the Ministry of Environment Protection of the People's Republic of China, September 1, 2017); (19) Interim Measures for Public Participation in Environmental Impact Assessment (H. F. [2006] No. 28 of the State Administration of Environment Protection, February 14, 2006); (20) Standard for Environment and Sanitation of Construction Site (J. B. [2004] No. 66); (21) Medical Waste Management Regulation (No. 2003-380 Order of the State Council); (22) National Catalogue of Hazardous Wastes (No. 39 Order of the Ministry of Environment, August 1, 2016); (23) The Management Measures for Hazardous Wastes Manifests (No. 5 Order of the State Administration of Environment Protection, 1999); (24) The Measures for Medical Wastes Management of Medical and Health Institutions (No. [2003] 36 Order of the Ministry of Health of the PRC); 2.1.1.2 Relevant local laws and regulations (1) H. J. [2002] No. 46 Document of Environmental Protection Bureau of Anhui Province: Some Opinions on Further Improving the Quality of Environmental Impact Assessment (April 10, 2002); (2) H. P. [2006] No.113 Document of Environmental Protection Bureau of Anhui Province: Notice concerning Printing and Distributing Regulations on Standardizing Preparation of Environment Impact Report of Construction Project (Trial), June 16, 2006; (3) W. Z. [1997] No. 28 Document of Anhui Provincial People's Government: Decisions of Anhui Provincial People's Government on Effectively Strengthening Environmental Protection Work; 14 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (4) Environmental Protection Management Procedures of Anhui Province, Environmental Protection Bureau of Anhui Province; (5) Regulations of Anhui Province on the Protection of Agricultural Ecological Environment (revised), June 29, 2006; (6) Regulations of Anhui Province on Environmental Protection, promulgated by Standing Committee of the Eleventh People's Congress of Anhui Province and implemented as of November 1, 2010; (7) Water Environment Function Zoning of Anhui Province, Anhui Provincial People's Government, March 2003; (8) Notice Concerning Strengthening Public Consultation in Environmental Impact Assessment and Environmental Protection Final Acceptance of Construction Project (W. H. F. [2013] No. 91), Environmental Protection Department of Anhui Province; (9) Implementation Plan of Air Pollution Prevention and Control Action Plan of Anhui Province (W. Z. [2013] No. 89); (10) Decisions of Anhui Provincial People's Government concerning Accelerating Construction of Aged-care Service System (W. Z. [2011] No. 20) 2.1.1.3. Applicable safeguard policies of the World Bank See table 2.1-1 for the World Bank's operational policies and related explanations. Table 2.1-1 The World Bank's operational policies and related explanations World bank operational Involved Impact of the project and the involvement of the policy or not? World Bank operational policies in the project The project will have impacts on the environment Environmental OP4.01 Involved during construction and operation. It involves this assessment policy. The project is located in the areas that have been Natural Not seriously affected by human activities. No natural OP4.04 habitats involved habitat in the project areas will be disrupted by the project. The project is about the establishment of an elderly Pest Not OP4.09 care service system. It does not involve the production management involved and use of pest control products. None of the proposed project areas is located in the Ethnic Not OP4.10 regions where ethnic minorities are concentrated, so minorities involved the project does not involve this policy. Tangible No tangible cultural resources in the project areas are Not OP4.11 cultural disrupted by the project and its related activities, so the involved heritage project does not involve this policy. Land may be permanently and temporarily occupied Involuntary OP4.12 Involved for project construction. The project involves this resettlement policy. 15 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The project will not affect the health and quality of Forest Not forests, nor will it affect the interests of forest owners OP4.36 protection involved and their dependency on the forests. The project does not involve this policy. The project does not involve any dam construction and Not OP4.37 Safety of dams restoration or rely on any existing dams or the dams involved under construction, so it does not involve this policy. All construction sites for the project are located in International Not OP7.50 China, so the project does not involve international waters involved waters. Not All construction sites for the project are located in OP7.60 Disputed areas involved Anhui province; there is no disputed areas. All documents concerning environmental impact Information assessment (EIA) for the project will be disclosed to BP17.50 Involved disclosure the public; public consultation in this regard will be conducted. Environment,Safety and Health (ESH) guidelines for international financial Involved Applicable to the project-related activities. corporations and ESH guidelines for the financial industry 2.1.2 Technical specifications, industry norms, and ESH criteria (1) Technical Guidelines for Environmental Impact Assessment of Construction Project--General Outline (HJ 2.1-2016); (2) Technical Guidelines for Environmental Impact Assessment-Ecological Impacts (HJ 19-2011); (3) Technical Guidelines for Environmental Impact Assessment-Surface Water Environment (HJ/T2.3-93); (4) Technical Guidelines for Environmental Impact Assessment-Atmospheric Environment (HJ/T2.2-2008); (5) Technical Guidelines for Environmental Impact Assessment-Acoustic Environment (HJ/T2.4-2009); (6) Technical Guidelines for Environmental Impact Assessment-Ground Water Environment (HJ 610-2016); (7) Technical Guidelines for Environmental Impact Assessment of Construction Project (HJ 616-2011); (8) Technical Specifications for Hospital Sewage Treatment Project (HJ2009-2013); Ministry of Environmental Protection, July 1, 2013; (9) Technical Guidelines for Hospital Sewage Treatment, H. F. [2003] No. 197, December 10, 2003; 16 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (10) Standard for Design of Residential Building for the Elderly (GB/T 50340-2016); (11) Code for Design on Accessibility (GB 50763-2012); (12) Code for Design of Buildings of General Hospital (GB 51039-2014); (13) Code for Design of Aged-care Facilities and Buildings (GB50867-2013); (14) Code for Fire Protection Design of Buildings (GB50016-2014); (15) Standard for Construction of Nursing Home for the Elderly People (J. B. 144-2010); (16) Standard for Construction of General Hospital (J. B. [2008] No. 164); (17) Code for Design of Buildings of General Hospital (GB 51039-2014); (18) Standard for Construction of Community Day-care Center for the Elderly People (J. B. 143-2010); (19) Standard for Construction of Nursing Home for the Elderly People (J. B. 144-2010); (20) Code for Fire Prevention in Design of Interior Decoration of Building (GB50222-1995); (21) Technical Code for Fire Protection Water Supply and Hydrant Systems (GB50974-2014); (22) Code for Construction and Acceptance of Pipeline Works for Water-supply and Drainage (GB50268-2008); (23) Standard for Design of Automatic Sprinkling System (GB50084-2001) (2005 edition); (24) Code for Design of Automatic Fire Alarm System (GB50116-2008); (25) Standard for Construction of TCM Hospital (J. B. [2008] No. 97); (26) Code for Design of Urban Roads and Buildings for Convenience of the Disabled (JGJ50-88); (27) Standards of Social Welfare Institution for the Elderly (MZ008-2001); (28) Service Standards, Technical Standards, Management Standards and Work Standards of the Aged-care Institution (DB11T304-2005); (29) Needs, Evaluation and Improvement of Standard Service System of Aged-care Institutions (DB11T303-2005); (30) Standard for Construction of General Social Welfare Home (J. B. 179-2016); (31) Standard for Construction of Rural Nursing Homes (draft for comment); 17 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (32) Basic Standards of Rehabilitation Hospital (2012 edition); (33) Standard for Evaluation of the Capacity of the Elderly (MZ/T039-2013); 2.2 Assessment standard Table 2.2-1 Environmental standards for the implementation of the project Standards Anhui Province Environmental Quality Standards for Class III and Class IV Surface Water (GB3838-2002) Environmental Ambient Air Quality Standards Class II quality standards (GB3095-2012) Environmental Quality Standard for Class 2, 4a Noise (GB3096-2008) Integrated Wastewater Discharge Class III standards in table 4 Standard (GB8978-1996) Discharge Standard of Water Pollutants for Medical Organization Pretreatment standards in table 2 (GB18466-2005) Integrated Emission Standard of Air Class II Pollutants (GB12697-1996) Emission Standard of Cooking Fume Standard (GB18483-2001) Pollutant Emission Standard of Environment emission/discharge Noise for Boundary of Construction Standard standards Site (GB 12523-2011) Emisson Standard for Industrial Enterprises Noise at Boundary (GB Class 2 12348-2008) Standard for Pollution Control on Hazardous Waste Storage Standard (GB18597-2001) and its 2013 revision Discharge Standard of Water Pollutants for Medical Organization Control standards in table 4 (GB18466-2005) Environmental quality standards 1. Surface water environment: surface water in the project areas should meet the Class III and IV standards of Environmental Quality Standards for Surface Water (GB3838-2002), see table 2.2-2 for details Table 2.2-2 Limits in Environmental Quality Standards for Surface Water (Unit mg/L, pH is dimensionless) Item Class III Class IV standards Source standards pH 6~9 6~9 COD ≤20 ≤30 BOD5 ≤4 ≤6 Environmental Quality Standards for Surface Water NH ≤1.0 ≤1.5 (GB3838-2002) TP (by P) ≤0.05 ≤0.3 Number of ≤10000 /L ≤20000 /L fecal coliform 18 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 2. Atmospheric environment: within the assessment scope, ambient air quality should meet Class II standards of Ambient Air Quality Standards (GB3095-2012), see Table 2.2-3 for details. Table 2.2-3 Ambient Air Quality Standards (Unit: ug/m3) Concentration limits for each pollutant Pollutant Basis 1 hour on 24 hours on average average SO2 500 150 Class II standards of Ambient Air Quality NO2 200 80 Standards (GB3095-2012) PM10 - 150 3. Acoustic environment: noise in the project areas should not exceed the Class 2 limits set for functional areas according to Environmental Quality Standard for Noise (GB3096-2008); noise in the areas on both sides of highways shoud not exceed Class 4a standards, see Table 2.2-4. Table 2.2-4 Environmental quality standards for noise limits Category of Standard values [dB (A)] Scope of standards application standards Daytime Nighttime Items to be protected from noise within the Class 2 60 50 project areas and their surrounding areas Areas on both sides of main highways in cities Class 4a 70 55 (35m) Pollutant emission/discharge standards 1. Water pollutant discharge standards: discharge of water pollutants produced by the project should meet Class III standards in Table 4 of Integrated Wastewater Discharge Standard (GB8978-1996) or Table 2 Pretreatment Standards of Discharge Standard of Water Pollutants for Medical Organization (GB18466-2005), See Table 2.2-5. Table 2.2-5 Wastewater discharge standards Table 2 Pretreatment Class III standards in table 4 of Standards of Discharge Integrated Wastewater Item Standard of Water Pollutants Discharge Standard for Medical Organization (GB8978-1996) (GB18466-2005) pH 6~9 6~9 COD (mg/L) 250 500 BOD5 (mg/L) 100 300 SS (mg/L) 60 400 NH (mg/L) -- 15 Number of fecal coliform 5000 - (MPN/L) 19 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 2. Standards for air pollutant emissions: air pollutant emissions should meet Class II standards of Integrated Emission Standard of Air Pollutants (GB16297-1996); cooking fume emissions should meet the Emission Standard of Cooking Fume (Trial) (GB18483-2001), see the table below; see Tables 2.2-6 and 2.2-7 for detailed standard values. Table 2.2-6 Integrated Emission Standard of Air Pollutants Permissible Permissible maximum rate Unorganized emissions monitoring maximum of emission (kg/h) point concentration limits (mg/m3) Pollutant emission Height of concentration exhaust Class II Monitoring point Concentration (mg/m3) funnel (m) Particles 120 15 3.5 The highest 1.0 SO2 550 25 2.6 concentration 0.40 outside the NOx 240 15 0.77 boundary 0.12 Table 2.2-7 Emission Standard of Cooking Fume Scale Small Medium Large Permissible maximum emission concentration 2.0 (mg/m3) Minimum removal efficiency of purification 60 75 85 facility (%) 3. Noise emission standards: noise at the boundary of construction sites during construction should not exceed the limits set out in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), see Table 2.2-8 for noise limits. Noise emission at the boundaries of the project construction sites should meet the Class 2 standards of Emisson Standard for Industrial Enterprises Noise at Boundary (GB12348-2008), see table 2.2-9. Table 2.2-8 Emission Standard of Environment Noise for Boundary of Construction Site (GB 12523-2011) Unit: dB(A) Noise limits Daytime Nighttime 70 55 Table 2.2-8 Excerpt of Emisson Standard for Industrial Enterprises Noise at Boundary Unit: dB(A) Category of standards Daytime Nighttime (GB12348-2008) Class 2 60 50 (GB12348-2008) Class 4 70 55 4. Solid waste: disposal of the medical waste produced by the project should meet 20 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project the Control standards in Table 4 of Discharge Standard of Water Pollutants for Medical Organization (GB18466-2005) and the Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001) and its 2013 revision. 21 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3 Environment 3.1 The environment of Anqing City As of the end of 2015, Anqing City had jurisdiction over 3 districts and 6 counties along with 1 county-level city (Anqing's jurisdiction over this county-level city is authorized by authorities at higher levels). Anqing Municipal Government is located at No. 123, Wanjiang Road in New Town in the east of New Anqing District. The built-up area of Anqing covers a total of 100km2; the city has 1.06 million permanent residents. Affected by subtropics monsoon climate, Anqing has four distinct seasons, abundant rainfall, mild weather, and long frost-free period. In this city, the average annual precipitation is 1,363mm, the annual maximum precipitation is 2,294.2mm, the maximum continuous precipitation is 520.3mm (from July 11th to 18th of 1951), and the daily maximum precipitation is 247.0mm (on July 15th of 1996). Moreover, precipitation is concentrated from June to September, accounting for about 65% of annual precipitation; the annualamount of rainwater that evaporates is 1,617.4mm and relative humidity is 60% to 70%; the highest temperature is 44.7 ℃, the lowest temperature is -12.5 ℃, and the maximum depth of frozen ground is 13cm; the frost free period lasts 210 to 235 days. Anqing has 2,030-hour sun exposure per year. In Anqing, 52% of the time the observed direction of the wind was from northeast; 24% of the time the observed direction of the wind was from southwest; 15% of the time of the observed wind is calm. The annual average wind speed is 3.2m/s and the maximum wind speed is 20m/s. 3.1.1 Component III - The Integrated Medical and Elderly Care Institutions (the nursing facility of the First People's Hospital of Anqing) 3.1.1.1 The nursing facility of the First People's Hospital of Anqing At Longshan Branch of the First People's Hospital of Anqing, 1 nursing facility will be built. This nursing facility consists of 4 buildings (2-6F), 1 podium (1F), and 1 physical examination center (1F). Construction items include rooms for the elderly (service room, living room, health care room, rehabilitation room, recreation room, and social work room), administrative offices, and ancillary rooms. The gross floor area of the nursing facility has been determined as 42,459.4 m2. Of the 42,459.4 m2, the ground floor area is 41,467 m2 and the underground floor area is 992.4 m2.1,000 22 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project additional beds will be arranged at the nursing facility. Of the 1,000 beds, 200 are arranged for disabled elders, 450 are arranged for functionally impaired elders, 50 are arranged for elders who need terminal care, and 300 are arranged for elders who need elderly care in general. With regard to the project, the construction period begins in August of 2016 and ends in December of 2017; decoration and equipment purchase will start in 2018. This sub-component only involves interior decoration and equipment purchase rather than construction. This sub-component (the nursing facility) is located in the east of the First People's Hospital of Anqing in the New Town of Northern Anqing. To the east of the sub-component is Huanggan Road (Jingsan Road) and across Jingsan Road is Zongpu Community (Beiyuan Housing Estate); to its south is Yixiu Road and across Yixiu Road is Anqing Zhonghua Vocational School (closed down now); to its west is Xuefu Road and to its northwest at the corner is the government of Dalongshan Town; and to its north is Weidansan Road and across this road is a vacant lot. The sub-component site is generally leveled and construction has begun. See picture 3.1-1 for the sub-component site and sensitive points. 23 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.1-1 Project Land Utilization and Surrounding Sensitive Spots According to investigations into the project site and visits to units concerned, there are no ecologically sensitive and vulnerable areas, areas requiring special protection, areas of social concerns and other environmental sensitive areas (e.g. graves). The sensitive spot surrounding this project is the Zongpu Community (Beiyuan Housing Estate). Zongpu Community (Beiyuan Housing Estate): It is a resettlement complex established in 2012. The construction area of this Community is 100000 m², including 50 blocks of 6-storey buildings accommodating about 3600 people from 1000 households. 14 buildings and about 1000 people therein are near to the project site. See Table 3.1-1 for sensitive spots surrounding the project site and Figure 3.1-2 for the surrounding environment. Table 3.1-1 Schedule of Sensitive Spots around the Project Site Environmental Subproject Distance Environmental Applicable protection Position Size name (m) impact factors standard target Nursing Home Zongpu Class-2 Standard for the Elderly 300 Community in Environmental People of the households (Beiyuan 60 E Noise Quality Standard First People’s /1000 Housing for Noise Hospital of people Estate) (GB3096-2008). Anqing Note: The First People’s Hospital of Anqing is not considered as the sensitive spot as the project will be completed and put into use simultaneously with this hospital. 24 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project This Zongpu project Community The First Dalongshan People’s Town Hospital of Anqing Anqing Secondary Vocational School (closed down) Figure 3.1-2 Environment Surrounding the Project Site 25 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3.1.1.2 Supporting projects 1. Longshan Branch of the First People’s Hospital of Anqing Longshan Branch of the First People’s Hospital of Anqing is located at the new urban district in the north of Anqing (the east of Xuefu Road, south of Weisan Road, west of Jingsan Road, and north of Yixiu Avenue). The total area of used land and total construction area are 188444.2 m² and 243450 m² respectively. The area of the constructed general hospital, old people’s home, general practice training base, nuclear medicine and radiotherapy complex building, underground garage and underground radiotherapy complex building total to 201685m², 42958m², 7500m², 3727m², 40000m² and 1765m² respectively. This hospital is categorized into the Grade 3, Class A general hospital based on its construction scale, and its investment totals to 610,000,000 Yuan. The constructed hospital owns 2700 beds in total, including 1500 sickbeds, 200 beds of the Occupational Disease Precaution Department and 1000 beds of the Nursing Home for the Elderly People. 36000 patients are received by this hospital annually. The civil engineering of this project starts on August 2016 and ends on December 2017. EIA documents containing environment impact assessments of the construction project of Longshan Branch of the First People’s Hospital of Anqing were firstly announced on Anqing Environmental Protection Bureau website on September 8, 2015 for 10 working days. On November 3, 2015, environment impact assessments of this project were announced for the second time on Anqing Environmental Protection Bureau website for 10 working days. During those two announcements, the construction unit carried out a questionnaire survey for the project by distributing 100 questionnaires to the public. Finally, 100 questionnaires were recovered, contributing to a recovery rate of 100%. According to the survey result, no objection was identified and 80 respondents showed the favorability, representing a favorability rate of 80%. 20 respondents were indifferent to this project, accounting 20% of total respondents. It can be found that the majority of the public were favorable to this project. The Environment Impact Report on the Construction of Longshan Branch of the First People’s Hospital of Anqing was accepted by Anqing Yixiu District Environmental Protection Bureau. The publicity period lasted 10 working days from December 10, 2015 to December 23, 2015. Anqing Yixiu District Environmental Protection Bureau proposed to approve the Environment Impact Report on the Construction of Longshan Branch of the First People’s Hospital of Anqing which would be announced for 5 26 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project working days from December 24, 2015 to December 30, 2015. On December 31, 2015, this report was examined and approved by Anqing Yixiu District Environmental Protection Bureau, with the approval document numbered Y. X. H. J. H. [2015] No. 75. By consulting with the First People’s Hospital of Anqing and Anqing Yixiu District Environmental Protection Bureau, Longshan Branch of the First People’s Hospital of Anqing has implemented the “three simultaneous� system of environmental protection, carried out the pollution control measures in EIA Report and met the standards of pollutants discharge in EIA Report during the construction. No offence was reported by the public to Anqing Yixiu District Environmental Protection Bureau. So, there is no environmental problem during the construction period and the environmental impact is acceptable. Table 3.1-2 Major environmental protection measures of Longshan Branch of the First People’s Hospital of Anqing Category Pollution Main contents of environmental Expected treatment effect source protection project Take special medical wastewater pretreatment measures, install a sewage Meet the pretreatment standards in Waste Hospital treatment station for the hospital for Table 2 of Discharge Standard of water sewage non-infectious diseases (with the design Water Pollutants for Medical treatment capacity of 3080m3/d), and Organization (GB18466-2005). construct the rainwater and sewage pipe network Natural Install one 8m high (or higher) exhaust Meet the emission standard of flue gas funnel gas for gas-fired boiler in Table 2 of Waste gas boiler GB13271-2014. Sewage Fan+ activated carbon adsorption Meet the exhaust emission treatment deodorizing device+ 15m exhaust funnel requirements mentioned in station GB18466-2005 Use low noise equipment, install a Fan silencer on the fan outlet, use sound insulating materials and sound absorbing materials for outer wall Provide vibration reducing and fixing Sewage measures for the pipeline base, and Buildings in the hospital can meet Noise pump install sound absorbing materials and the Class 2 Standards in silencers Environmental Quality Standard for Cooling Control the noise from water drops, Noise (GB3096-2008). tower install a silencer on the fan outlet, use unit sound insulating materials and sound absorbing materials for outer wall. Boiler Install soundproof doors and windows Room Transport the garbage to Provide a number of garbage collecting environmental sanitation department bins in hospital for centralized disposal. Clean up the garbage produced every day. Provide a number of medical solid waste Solid Solid collecting bins throughout the hospital, waste waste and set up a temporary storage yard for The disposal of solid waste is medical solid waste at the basement of entrusted to Anqing Development, Inpatient Building No.3, with the Investment and Environmental construction area of 64 m² Protection Technology Co., Ltd. A temporary sludge storage tank of which the volume is 5m3. 27 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Note: The environment impact of the radiation caused by the construction and operation of this project will be separately evaluated by the construction unit after the project is completed in accordance with the Law of the People’s Republic of China on Environmental Impact Assessment, Regulations on Environmental Protection Management of Construction Projects, Notice on Strengthening the Environmental Impact Assessment and Management of the Construction of Hazardous Waste, Medical Waste and Radioactive Waste Disposal Project (H. B. [2004] No. 11) , other relevant regulations and requirements stipulated by departments concerned. 2. Sewage treatment facility of Longshan Branch of the First People’s Hospital of Anqing Waste water of this project will be treated by sewage treatment facilities of Longshan Branch of the First People’s Hospital of Anqing which is under the construction currently. According to the Environment Impact Report on the Construction of Longshan Branch of the First People’s Hospital of Anqing, a sewage treatment station (3080m3/d) will be constructed to treat the waste water to meet the pretreatment standards mentioned in Table 2 of Discharge Standard of Water Pollutants for Medical Organization (GB18466-2005). Pretreated waste water will be directed to Anqing Northern New Town Sewage Treatment Plant via pipelines. According to Technical Specifications for Hospital Sewage Treatment Project (HJ2009-2013), mixed waste water from the hospital shall be treated by the Class I intensified primary treatment process which is applicable for the treatment of waste water from the hospital for non-infectious diseases as indicated in Figure 1 therein. The Class I intensified treatment process is as follows: Predisinfection Waste water from the hospital Dechlorination Grille tank for infectious diseases Urban Coagulating sewage Waste water from the hospital for Grille Regulating reservoir Disinfection pipeline sedimentation non-infectious diseases Sludge treatment system Sludge tank Figure 3.1-3 Treatment process of the sewage treatment station of the hospital in this project 28 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3. Anqing Northern New Town Sewage Treatment Plant In 2008, Anqing Northern New Town Investment and Development Limited Liability Company acquired 36 mu lands (6.0 ha in the long-term planning) at the northwest corner of the intersection between the Yixiu Avenue and Huanyi Road in the Northern New Town of Anqing City at the expense of 82,580,000 Yuan. This land was used to construct a sewage treatment plant which is capable of treating 20,000 m3 waste water per day (60,000 m3 waste water per day in the long-term planning). In 2011, the Report Form of Environment Impacts of the Phase-I Project of Anqing Northern New Town Sewage Treatment Plant was approved by Anqing Environmental Protection Bureau under the approval document numbered H. J. H. [2011] No. 420. In 2015, Anqing North Drainage and Environment Development Co., Ltd. continued the construction of the Phase-I project of Anqing Northern New Town Sewage Treatment Plant. This company planned to implement the advanced treatment project to upgrade this plant basing on original treatment process. On May 4, 2016, the upgrading and reconstruction proposal was approved by Anqing Yixiu District Environmental Protection Bureau under the approval document numbered Y. X. H. J. H. [2016] No. 11. Based on demonstration results, Anqing North Drainage and Environment Development Co., Ltd. proposed to replace the improved oxidation ditch technology with the A2/O technology and reserve the advanced treatment project for the upgrading and reconstruction of this plant at the end of 2016. The construction of Anqing Northern New Town Sewage Treatment Plant has been completed and this plant is to be put into operation in December, 2017. By consulting with Anqing Northern New Town Investment and Development Limited Liability Company and Anqing Yixiu District Environmental Protection Bureau, Anqing Northern New Town Sewage Treatment Plant has strictly implemented the “three simultaneous� system of environmental protection, carried out the pollution control measures in EIA Report and met the standards of pollutants discharge in EIA Report. No offence was reported by the public to Anqing Yixiu District Environmental Protection Bureau. So, there is no environmental problem during the construction period. In this project, the waste water treated by the sewage treatment station can be directed to Anqing Northern New Town Sewage Treatment Plant for further treatment via pipelines. 4. Medical waste disposal center 29 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The medical waste produced due to the project is temporarily stored in the temporary storage room for medical waste in Longshan Branch of the First People’s Hospital of Anqing, and those waste is entrusted to the centralized medical waste disposal center of Anqing Development, Investment and Environmental Protection Technology Co., Ltd. for safe and harmless disposal. To this end, the Consignment Agreement on the Disposal of Medical Waste has been signed on March 1, 2017. (1) Introduction to the centralized medical waste disposal center As one of those 300 medical waste disposal projects stipulated by the National Planning on the Construction of Hazardous Waste and Medical Waste Disposal Facilities, the centralized medical waste disposal center of Anqing City is mainly responsible for the centralized and harmless disposal of medical wastes from the urban area and seven counties (county-level cities). This project adopts the incineration technology and it can treat 5 tons of medical wastes per day. The construction site is located at the Huijiachong, Liansheng Village, Shankou Town, Daguan District, Anqing City. The occupied area totals to 12.03 mu, and the total investment amounts to 1,940,3700 Yuan. In November 2007, Anqing Development, Investment and Environmental Protection Technology Co., Ltd. was established by Anqing Development and Investment (Group) Corporation upon the request of Anqing Municipal Government and the approval from State-owned Assets Supervision and Administration Commission of Anqing Municipal Government. Anqing Development, Investment and Environmental Protection Technology Co., Ltd., acting as the project entity for the construction of the centralized medical waste disposal center, is responsible for the construction, operation and management of this project. (2) Project operation The centralized medical waste disposal center was formally put into trial operation on April 21, 2011. On January 22, 2013, Anhui Development and Reform Commission, Environmental Protection Department of Anhui Province jointly organized an expert group and convened a meeting for the final acceptance of the medical waste disposal project in Yixiu District. After the review and discussion, the final acceptance of this project was approved. On April 23, 2013, the Environmental Protection Department of Anhui Province issued the approval document for the final acceptance of the medical waste project. 30 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Since then, the medical waste project entered the formal operation stage. By consulting with Anqing Development, Investment and Environmental Protection Technology Co., Ltd. and Anqing Environmental Protection Bureau, the centralized medical waste disposal center has strictly implemented the “three simultaneous� system of environmental protection, carried out the pollution control measures in EIA Report and met the standards of pollutants discharge in EIA Report during construction. No offence was reported by the public to Anqing Environmental Protection Bureau. So, there is no environmental problem left. 5. Waste incineration plant Domestic waste generated by this project is collected by Anqing municipal environment and sanitation management department, and then sent to the Phase-I Incineration Power Plant operated by Anhui Wenergy China Sciences Environmental Protection Power Company Limited. Anhui Wenergy China Sciences Environmental Protection Power Company Limited is jointly invested and registered by Anhui Wenergy Environmental Protection Power Company Limited and Beijing China Sciences General Energy & Environment Co., Ltd. This company is located at Shankou Town, Daguan District, Anqing City, and the land it covers is about 105 mu. The construction of this project is divided into two phases. The Phase-I Project costs a total investment of 280,000,000 Yuan and it covers 71 mu lands. It can treat 800 tons of wastes per day and generate 120,000,000 kWh of electricity annually. The Environment Impact Report on Anqing Domestic Waste Incineration Power Generation Project of Phase-I Project was approved by the original Environmental Protection Bureau of Anhui Province on May 23, 2008 (H. P. H. [2008] No.556). The Phase-I Project is mainly proposed to construct the circulating fluidized bed waste incineration boiler (2×500t/d) and the condensation steam power unit (2×12MW). Supporting facilities to be constructed include the waste reception system, waste storehouse, coal house, ash storehouse, dregs storehouse, cooling water and circulating water system, flue gas purification system and sewage treatment facilities etc. This project was inspected and accepted by Environmental Protection Department of Anhui Province on December 31, 2012 (the document is numbered H. J. H. [2012] No. 1583). According to the approval document, major constructions and major environmental protection facilities were in conformity with approved ones. By consulting with Anhui Wenergy China Sciences Environmental Protection 31 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Power Company Limited and Anqing Environmental Protection Bureau, the domestic waste incineration power plant has strictly implemented the “three simultaneous� system of environmental protection, carried out the pollution control measures in EIA Report and met the standards of pollutants discharge in EIA Report during construction. No offence was reported by the public to Anqing Environmental Protection Bureau. So, there is no environmental problem left. 32 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Location of the project Figure 3.1-3 Position Relationship between Supporting Projects and this Project 33 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3.1.2 Subproject II - Current situation and surrounding sensitive spots of home-based aged-care service stations There are 127 home-based aged-care service stations in Anqing City, including 26 in Daguan District, 12 in Anqing Economic and Technological Development Zone, 60 in Yixiu District and 29 in Yingjiang District. The occupied area of this project remains unchanged, without new construction area. Instead, the construction of this project is based on the upgrading and decoration of existing buildings. See Figure 3.1-4, 3.1-5, 3.1-6 and 3.1-7 for the detailed locations of projects in various districts of Anqing City Table 3.1-3 Table of Home-based Aged-care Service Stations in Anqing City Construction area Jurisdiction No. Community name Location (m²) Binjiangyuan Community, Yulinlu 1 No. 44, Binjiangyuan 600 Street Taipingshi Community, Yulin 1st Floor, Building 2, Longmen 2 300 Street Housing Estate Sifangcheng Community, No. 115, Dekuan Road, Daguan 3 300 Longshanlu Street District Daguanting Community, Dekuanlu 4 No. 82 Guanyin Street 300 Street No. 14, Fangzhi West Road, 5 Huamao Community, Linghu Street 300 Daguan District 6 Yiyuan Community, Linghu Street No. 16, Hubin Street 630 7 Caishan Community, Jixianlu Street No. 3, Majialing 300 Next to Gaohuating Primary 8 Huatinglu Street 800 School Nancun Community, Huatinglu Building 15-1, Huatingnan 9 300 Street Village 10 Dahu Community, Shihualu Street No. 2-3, Anqing Water Park 300 No. 3, Jingyi Road, Shihuayi Daguan 11 Tianqiao Community, Shihua Street 300 Village District Yaertang Community, Shihualu No. 151, Caishan Road, Anqing 12 400 Street City Shuangtang Group, Liansheng 13 Liansheng Village,Shankou Town 300 Village, Shankou Town Wancheng Road, Shankou Town (Diagonally opposite to 14 Toupo Community, Shankou Town 300 the Neighborhood Committee of Toupo Community ) Shankouzhen Village,Shankou Wancheng Group, 15 400 Town Shankouzhen Village Nangeng Group, Nangeng 16 Nangeng Village, Haikou Town 700 Village Hekou Street (former marine 17 Hegang Community, Haikou Town 350 department) Near to the memorial gateway 18 Haikou Village, Haikou Town 500 of Haikou New Village Committee of Zhenjiang 19 Zhenjiang Village, Haikou Town 300 Village 34 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 20 Juwang Village, Haikou Town Yushan Group, Juwang Village 500 21 Peiwen Village, Haikou Town Xincun Group, Peiwen Village 600 22 Baoying Village, Haikou Town Committee of Baoying Village 300 Ermiao Group, Anyuan 23 Anyuan Community, Haikou Town 400 Community Former Village Hall of 24 Changning Village, Haikou Town 500 Changning Village 25 Wuli Village, Shilipu Town Village Hall of Wuli Village 300 Former Village Hall, Chengwu 26 Maoling Community, Shilipu Town 600 Group, Maoqing Road Fangxingyuan Housing Estate, 27 Huihuang Phase II 600 Laofeng Town Fangxingyuan Housing Estate, Resettlement site of 28 600 Laofeng Town Fangxingyuan in Laofeng Town Fangxingyuan Housing Estate, The 2nd resettlement site in 29 600 Laofeng Town Laofeng Town Jinxing Community, Laofeng 30 Jinxing Community, Laofeng Town 480 Town Xinyuan Community, Laofeng Yuanqiao Group, Yuanqiao 31 600 Town Village, Laofeng Town Anqing No. 311, Minsheng Road, Economic and 32 Wuling Community, Lingbei Street 300 Anqing City Technological Luochong Community, Lingbei Development 33 Building 75, Yingbin Beiyuan 210 Street Zone Near to Building 7, Jinghai 34 Jinghai Community, Lingbei Street 200 Garden, Zhongxing Street No.18, 3rd Floor, Central Guangcai Community, Lingbei 35 Business District G1, Phase III, 240 Street Guangcai Market No. 36, Huangtukeng East 36 Youlin Community, Lingbei Street 200 Road Shugang Community, Lingbei 37 No. 56, Linghu North Road 200 Street 38 Tianzhu Community, Lingbei Street No. 318, Jixian North Road 200 Yuexing Community, Baizehu Resettlement site of Yuexing 39 1200 Town Community 40 Baize Community, Baizehu Town Heju Group, Baize Community 600 Zhaojia Group, Duxiu 41 Duxiu Community, Baizehu Town 700 Community 42 Dafeng Community, Baizehu Town Dafeng Crossroad 2000 Diagonally opposite to Baize 43 Shitang Community, Baizehu Town 860 Secondary School Bomao Group, Huangshi 44 Huangshi Village, Baizehu Town 1080 Village Yixiu District, 45 Bamao Village, Baizehu Town Zhushan Group, Bamao Village 800 Anqing City 46 Longhua Village, Baizehu Town Zhuoju Group, Longhua Village 1200 Xiaoxue Group, Xianfeng 47 Xianfeng Village, Baizehu Town 1400 Village Taoyuan Community, Dalongshan Huangwu Group, Taoyuan 48 300 Town Community Central Community, Dalongshan No. 8, Xingyi Road, Yixiu 49 300 Town District Liaoyuan Community, Dalongshan Qiwa Group, Liaoyuan 50 620 Town Community Xinxin Community, Dalongshan Lianhua Group, Xinxin 51 300 Town Community 35 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Baihua Community, Dalongshan Yaotang Village, Baihua 52 300 Town Community Yonglin Community, Dalongshan Yonglin Housing Estate, 53 500 Town Yonglin Community Yong’an Community, Dalongshan Simin Group, Yong’an 54 300 Town Community Zongpu Community, Dalongshan Nanshanyuan Housing Estate, 55 800 Town Zongpu Community Bamaoxiang Community, Daqiao 56 No. 283, Longmianshan Road 1200 Street Xiaokeng Community, Daqiao Building 9, Sanjiao Housing 57 726 Street Estate, Xiaokeng Community Hongguang Community, Daqiao 58 Hongguang Community 300 Street Complex Building of Shengbu 59 Shengbu Community, Daqiao Street 400 Primary School 60 Wuzui Community, Daqiao Street Wuzui Housing Estate 800 Former site of Meishan Primary 61 Meishan Village, Daqiao Street 300 School Neighborhood Committee of 62 Sugang Community, Daqiao Street 300 Sugang Community Eastern District of Yeci 63 Yeci Community, Daqiao Street 600 Housing Estate 64 Sanyi Community, Daqiao Street Inside Sanyi New Village 150 Qianting Group, Shaqiao 65 Shaqiao Community, Daqiao Street 200 Community 66 Taiping Village, Daqiao Street Zhafan Group, Taiping Village 200 Building 9, Sanjiao Housing 67 Qiaobei Community, Daqiao Street 150 Estate, Xiaokeng Community Wuxiang Community, Daqiao No.8, Keshan Group, Wuxiang 68 300 Street Community Committee of Jiutang Village, 69 Village Hall of Jiutang Village 1300 Daqiao Street Chaoyang Community, Daqiao 70 Chaoyang Community 550 Street Qingfeng Community, Daqiao Winners Residence, Qingfeng 71 200 Street Community 72 Xiangshan Village, Daqiao Street Xiangshan Village 210 Zhuxinwu Group, Huangmei 73 Huangmei Village, Luoling Town 600 Village Wangling Group, Linchun 74 Linchun Village, Luoling Town 300 Village Liuchong Group, Miaoshan 75 Miaoshan Village, Luoling Town 530 Village Xiaolongshan Community, Luoling Luochong Group, 76 300 Town Xiaolongshan Community Bamiao Group, Fengxi 77 Fengxi Community, Luoling Town 300 Community Longtang Group, Luoling 78 Luoling Community, Luoling Town 480 Community Laoshan Community, Luoling Qianjin Group, Laoshan 79 300 Town Community Central Group, Huayuan 80 Huayuan Village, Luoling Town 300 Village Yuegong Community, Wuheng Dawu Group, Yuegong 81 1000 Town Community 36 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Wuheng Community, Wuheng Yueqiao Group, Wuheng 82 1700 Town Community Dengchong Group, Bailin 83 Bailin Village, Wuheng Town 900 Village Forestry Station, Yangting 84 Yangting Village, Wuheng Town 330 Village Comfortable Dwelling Center 85 Hushan Village, Wuheng Town 300 of Hushan Village Longshan Community, Yangqiao 86 Shewa Group 300 Town Xuandian Community, Yangqiao 87 Xuanlou Group 320 Town Yangqiao Community, Yangqiao 88 Guantang Group 300 Town Cangfang Community, Yangqiao 89 Heshan Group 300 Town Poganghu Community, Yangqiao 2nd Resident Group, Poganghu 90 300 Town Community 91 Yudun Village, Yangqiao Town Xibian Group 300 92 Yuwan Village, Yangqiao Town Tuanjie Group 300 93 Xi’an Village, Yangqiao Town Shewan Group 400 94 Lushan Village, Yangqiao Town Huaizhuang Group 400 95 Guanbing Village, Yangqiao Town 5th Group 300 Baochonghu Village, Yangqiao 96 Caolou Group 300 Town 97 Huashan Village, Yangqiao Town 5th Group 300 98 Luoshan Village, Yangqiao Town Longwan Group 300 99 Mawo Community, Binjiang Street Fangxingyuan Housing Estate 750 100 Xihu Community, Binjiang Street Pinghu Housing Estate 330 Qintanhu Community, Binjiang Anqing Country Garden No.1 101 550 Street Park st Demonstration Community, 1 Cluster, Phase IV, DFL 102 841 Binjiang Street Graceful Scenery Town 103 Xinhe Community, Xinhelu Street Shengcheng Sunny City 720 104 Dizhi Community, Xinhelu Street No. 21, Linghu South Road 300 Demonstrative Aged-care Service 105 Future Land inJoy Plaza 700 Center, Xinhelu Street Qianpailou Community, Yicheng 2nd Floor, Building 12, Jianshe 106 300 Street Road Tianhougong Community, Yicheng 107 No. 1-3, Yicheng Road 300 Yingjiang Street District, Nanshui Hui Nationality No. 1, East Lane, Dananmen 108 600 Anqing City Community, Yicheng Street Street 109 Wuyue Community, Yicheng Street No. 118, Jianshe Road 300 Hehuatang Community, Xiaosu 110 No. 56, Menweikou Street 550 Street Committee of Shuangjing 111 No. 37, Ximazhuang Street 400 Community, Xiaosu Street Neighborhood Committee of 112 Shuanglian Community, Xiaosu No. 9, Jiechu Lane 298 Street 113 Xilin Community, Xiaosu Street Building 5, No. 2, Xiaosu Road 320 Dongzheng Community, Renminlu Room 201, No. 5-1, 114 250 Street Yangjiashan Street Hongqi Community, Longshiqiao South 2nd Land, Huazhong East 115 400 Town Road 37 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Qianjin Community, Longshiqiao 116 No.497, Huazhong Road 300 Town Changqing Community, No.284, Huazhong East Road, 117 350 Longshiqiao Town Yingjiang District Airport Community, Longshiqiao 118 No.109, Wanjiang Avenue 350 Town Rendian Community, Longshiqiao 119 Rendian New Village 400 Town Yuqiao Community, Longshiqiao Building 33, District A, Yuqiao 120 350 Town New Village Yurun Community, Longshiqiao Building 13-15, District B, 121 620 Town Gelin Town Tianran Village, Xinzhou Town, 122 Tianran Village, Xinzhou Town 300 Yingjiang District Kangning Village, Xinzhou Town, Kangning Village, Xinzhou 123 300 Yingjiang District Town Nanmu Village, Xinzhou Town, 124 Nanmu Village, Xinzhou Town 300 Yingjiang District Hexing Village, Changfeng Town, Hexing Village, Changfeng 125 260 Yingjiang District Town Jiangjun Village, Changfeng Town, Jiangjun Village, Changfeng 126 260 Yingjiang District Town Yingpan Village, Changfeng Town, Yingpan Village, Changfeng 127 300 Yingjiang District Town Total 59915 38 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.1-4 Location of 26 Home-based Aged-care Service Stations in Daguan District of Anqing City 39 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.1-5 Location of 12 Home-based Aged-care Service Stations in Anqing Economic and Technological Development Zone 40 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.1-6 Location of 60 Home-based Aged-care Service Stations in Yixiu District of Anqing City 41 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.1-7 Location of 29 Home-based Aged-care Service Stations in Yingjiang District of Anqing City 42 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Since all constructions of 127 home-based service stations in Anqing City are based on the upgrading and decoration of existing buildings and the increase of necessary service facilities, this EIA is carried out at the Home-based Aged-care Service Station in Huamao Community located at the Linghu Street to assess the current situation and surrounding sensitive spots. The Home-based Aged-care Service Station in Huamao Community is located at Fangzhi West Village, No. 14, Fangzhi West Road, Linghu Street, Daguan District, Anqing City. This project proposes to upgarde the existing aged-care buildings and its construction area is 300m². The project will upgrade the existing water and power utilities, fire-fighting facilities, wheelchair accessible passages and building appearance. Necessary service facilities will be increased, too. The details are shown in Figure 3.1-8 Project Status and Surrounding Sensitive Spots. Figure 3.1-8 Project Status and Surrounding Sensitive Spots After investigating the project site and visiting the relevant units, we find that the sensitive spots around the project are residential buildings, and the main impact factor of the project on the sensitive spots is the decoration noise. Reasonable arrangements shall be made for the use of noise-producing equipment. Constructions shall be avoided during the nap and at night. Strict avoidance, prevention and mitigation measures shall be taken throughout the project in the light of possible pollution impacts. 43 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3.2 Environmental profile of Lu’an City Lu’an City has jurisdiction over Jin’an District, Yu’an District, Shouxian County, Huoqiu County, Jinzhai County, Huoshan County, Shucheng County, Lu’an Economic and Technological Development Zone, Yeji Reform and Development Pilot Zone and Lu’an Industrial Transfer Demonstration Park. Lu’an City has 156 towns, 8 streets, 92 urban communities and 2081 village committees. The total area of this city is 17976 square kilometers, and 7,096,000 people live in this city. Lu’an City is located at the climate transition zone and the north margin of the northern subtropical humid monsoon climate. Thus, this city is featured by the moderate climate, abundant rainfall and sunlight, and long frost-free season. It is hot and rainy in summer while cold and dry in winter. The rainfall is unevenly distributed during the year and the interannual variation of rainfall is large. The average annual rainfall is 1093.5mm, the maximum rainfall is 1448.6mm and minimum rainfall within the year is 647.7mm. The maximum rainfall per hour is 63.2mm and the maximum rainfall within 24 hours can reach 250.22mm. The mean perennial air temperature is 15.4℃, the absolute maximum air temperature is 41.0℃, and the absolute minimum air temperature can be -18.9℃. The perennial average relative humidity is 76%, the maximum relative humidity is 99%, and the minimum relative humidity is 10%. The maximum snow depth is 44cm and the maximum frozen soil depth is 10cm. In Lu’an City, the prevailing wind direction of the whole year is ESE and SE, and the wind direction frequency is 10%. In summer (June, July and August), the prevailing wind direction is SE and the wind direction frequency is 11%. The secondary prevailing wind direction is ESE and the wind direction frequency is 10%. In winter (December, January and February), the prevailing wind direction is ESE and the wind direction frequency is 10%. The maximum wind speed and average wind speed over the years is 20m/s and 2.4 m/s respectively. 3.2.1 Sub-project III - Medical and aged-care institution of Lu’an City (Multi-functional medical building of Traditional Chinese Hospital of LuAn) 3.2.1.1 Multi-functional medical building of Traditional Chinese Hospital of LuAn One multi-functional medical building will be built in Traditional Chinese Hospital of LuAn. The floor area and construction area of this building are 19,250 m² 44 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project and 92,100 m² respectively, including 56,300 m² aboveground construction area and 38,500 m² underground construction area (including 28,000 m² parking lot). The building has 23 floors aboveground and 2 floors underground. It will encompass restaurants, famous and time-honored TCM clinics, physical examination centers for disease prevention, TCM pharmacies, medical care aisles, scientific research rooms, multi-disciplinary joint consultation rooms, clinical teaching and training areas, and wards (including a planned police station and ambulance station). 600 additional beds will be arranged (including 500 beds for elders who receive elderly care). The civil engineering of this project will start from August 2018 to August, 2019. The project is located on the east side of Traditional Chinese Hospital of LuAn. Jin’an Lijingyuan Resettlement Complex (under construction) at Bagongshan Road is located at the east side, the II Project of Traditional Chinese Hospital of LuAn Phase (under construction) is at the south side, the Phase I Project of Traditional Chinese Hospital of LuAn is at the west side and the green belt is at the north side of this project. The project site is currently used for the temporary spoil ground and camp buildings of the Phase II project. The details are shown in Figure 3.2-1 Project Status and Surrounding Sensitive Spots. Traditional Chinese Hospital Project site status of LuAn (Phase II) Jin’an Lijingyuan Traditional Chinese Hospital of LuAn (Phase I) 45 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.2-1 Project Site Status and Surrounding Sensitive Spots According to investigation of project site and visit to units concerned, there is no ecologically sensitive and vulnerable area, areas requiring special protection, areas of social concerns and other environmental sensitive areas (e.g. graves) within the project impact area. The sensitive spots around the project site include Phase I and Phase II projects of Traditional Chinese Hospital of LuAn and Jin'an Lijingyuan Resettlement Complex under construction. Jin'an Lijingyuan Resettlement Complex under construction: The "Jin'an Lijingyuan Resettlement Complex Project" in Lu'an City mainly includes the construction of 15 residential buildings, 1 office building and provision of partial supporting commercial facilities; lands used: residential lands. See Table 3.2-1 for environment sensitive spots around the project site and Table 3.2-2 for surrounding environment of project site. Table 3.2-1 Schedule of Sensitive Spots around the Project Site Environmental Distance Environmental Applicable Subproject name Orientation Scale protection target (m) impact factors standard Traditional 1000 Grade 2 Chinese Hospital households Standards as 50 S of LuAn, Phase /3500 mentioned in II people Ambient Air Construction of Traditional Quality Multi-functional Chinese Hospital 20 W 1500 beds Standards Medical of LuAn, Phase I Construction (GB3095-2012); Building of dust and noise Class 2 Traditional Jin'an Standards as Chinese Hospital 2000 Lijingyuan mentioned in of LuAn households Resettlement 150 E Environmental /7000 Quality Complex under people Standard for construction Noise 46 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Green belts Project site (Phase III) Jin’an Lijingyuan Resettlement Complex under construction Phase II projects of Existing projects of Traditional Chinese Traditional Chinese Hospital of LuAn Hospital of LuAn Sunshine Venice Figure 3.2-2 Peripheral Relation Diagram around Aged-care Center of Traditional Chinese Hospital of LuAn 47 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3.2.1.2 Supporting projects 1. Traditional Chinese Hospital of LuAn Traditional Chinese Hospital of LuAn is a large Class-III, Grade-A general traditional Chinese medicine (TCM) hospital integrating medical treatment, teaching and scientific research. Founded in 1978, the hospital is located in the downtown of Lu'an City, covering an area of 5.5 hectares. It has 1,500 open beds and 1,560 staff, with over 360,000 outpatient visits annually and over 36,000 inpatients annually. The Environmental Impact Report on Traditional Chinese Hospital of LuAn Reconstruction and Extension Project (including New General Ward Building Project) was approved by Lu'an Environmental Protection Bureau on July 30, 2008 (H. J. [2008] No. 51) and the project was accepted by Lu'an Environmental Protection Bureau on November 5, 2013 (L. H. P. [2013] No. 85), confirming that the main construction content and environmental protection facilities were consistent with that of being approved. The Environmental Impact List of Accelerator and Other Ray Apparatus, Afterloading Unit, Nuclear Medicine and Other Nuclear Technology Application Projects in Traditional Chinese Hospital of LuAn was approved by Environmental Protection Department of Anhui Province (Anhui Radiation Report [2013] No. 12) in March 2013 and the project was accepted by Environmental Protection Department of Anhui Province (W. H. H. [2015] No. 674) on June 5, 2015, confirming that the main construction content and environmental protection facilities were consistent with that of being approved. The environmental impact assessment (EIA) documents for complex building and multi-functional medical building projects of Traditional Chinese Hospital of LuAn (including Phase II and Phase III) were loaded to Lu'an Environmental Protection Bureau website on November 19, 2014 for the first announcement of the project environment impact assessment for 10 working days. The EIA documents were loaded to Anqing Environmental Protection Bureau website on January 24, 2015 for the second announcement of the project environment impact assessment for 10 working days. During the second announcement period, the construction unit carried out a questionnaire survey for the project. It issued 50 questionnaires to the public and took back 49 questionnaires, with a recovery rate of 100%. The construction of this project was supported by all the public with no objection. Thus, Lu'an Environmental Protection Bureau proposed to approve the Environmental Impact Report on Complex 48 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Building and Multi-functional Medical Building of Traditional Chinese Hospital of LuAn which would be announced from February 13, 2015 to February 26, 2015 (5 working days). The report was examined and approved by Lu'an Environmental Protection Bureau on February 27, 2015, with approval No.: L. H. P. [2015] No. 20. The Phase II project is the construction of Complex Building, with construction area of 44,000 m2 and with 20 floors above ground and 2 floors underground. The building is provided with emergency center, emergency operation room, rehabilitation department, department of radiotherapy, hospital ward etc. The Phase II project is expected to be completed in July 2018. By consulting with Traditional Chinese Hospital of LuAn and Lu'an Environmental Protection Bureau, the complex building and multi-functional medical building projects of Traditional Chinese Hospital of LuAn (Phase II) has strictly implemented the "three simultaneous" system of environmental protection, carried out the pollution control measures mentioned in EIA Report and met the standards of pollutants discharge mentioned in EIA Report during construction. And the Lu'an Environmental Protection Bureau has received no report from the masses. So, there is no environmental problem during the construction period and the environmental impact is acceptable. Table 3.2-2 List of Major Environmental Protection Measures for Complex Building and Multi-functional Medical Building Project of Traditional Chinese Hospital of LuAn Pollution Main contents of environmental protection Category Expected treatment effect source project Treat the medical and living sewage in the expansion project with the existing sewage Meet the pretreatment standards in treatment station (1200m3/d). After the Waste Hospital Table 2 of Discharge Standard of sewage is treated up to standard, discharge water sewage Water Pollutants for Medical it into the sewage treatment plant in the Organization (GB18466-2005). north of Lu'an City. Construct a rainfall and sewage pipe network. Natural Meet the emission standard of flue gas One 8m high (or higher) exhaust funnel gas for gas-fired boiler in Table 2 boiler of GB13271-2014 Waste gas Sewage Ultraviolet disinfection+ activated carbon Meet the exhaust emission treatment adsorption deodorizing device+ 15m requirements mentioned in station exhaust funnel GB18466-2005 Use low noise equipment. Install a silencer The Hospital buildings can meet on the fan outlet. Use sound insulating the Class 2 standards in Noise Fan materials and sound absorbing materials Environmental Quality Standard for outer wall. for Noise (GB3096-2008). 49 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Provide vibration reducing and fixing Sewage measures for the pipeline base. Install pump sound absorbing materials and silencers. Control the drip of water. Install a silencer Cooling on the fan outlet. Use sound insulating tower materials and sound absorbing materials unit for outer wall. Boiler Soundproof doors and windows Room Haul the garbage to environmental Provide a number of garbage collecting sanitation department for bins in hospital centralized disposal. Clean up the garbage produced every day. Solid Solid Provide a number of medical solid waste waste waste collecting bins in hospital and set up a Entrust the Lu'an Medical Solid temporary storage yard for medical solid Waste Disposal Center for disposal waste. A temporary sludge storage tank Table 3.2-2 List of Major Environmental Protection Measures for Accelerator and Other Ray Apparatus, Afterloading Unit, Nuclear Medicine and Other Nuclear Technology Application Projects in Traditional Chinese Hospital of LuAn SN Object Acceptance content Install indicator lamp and set radiation warning signs in striking place outside the room. Install door-machine interlocking safety facility. The 1 Accelerator wire conduits passing through shielding walls shall not reduce the room shielding effects of the walls. The ventilation capacity of the room shall be no less than 3m3/h. The room shall be constructed in accordance with design strictly. Install indicator lamp and set radiation warning signs in striking place outside the room. Install door-machine interlocking safety facility. The Afterloading wire conduits passing through shielding walls shall not reduce the 2 unit room shielding effects of the walls. The room shall be constructed in accordance with design strictly. The afterloading unit shall be relocated during the replacement of radioactive sources, to avoid danger caused by handling of radioactive sources in the hospital. Carry out construction in accordance with the design strictly. Establish a standing book of nuclear medicine department. Strengthen the management of radioactive solid wastes and temporarily store and dispose of radioactive solid wastes in accordance with EIA requirements. Post up Nuclear on the wall the total a 17.2m/s) is 10.3 days. 3.6.1 Subproject III - Status and Surrounding Sensitive Spots of Rural Nursing Homes There are 35 rural nursing homes in Suzhou City, including 5 in Dangshan County, 8 in Lingbi County, 5 in Si County, 6 in Xiao County, and 11 in Yongqiao District. The occupied area of this project remains unchanged; some area is expanded on the basis of the original land, and the existing buildings are upgraded. See Figure 3.6-1, 3.6-2, 3.6-3, 3.6-4 and 3.6-5 for the detailed locations of projects in various districts and counties of Suzhou City. Table 3.6-1 Location of Rural Nursing Homes in Suzhou Region SN Name Location Upgrading construction area (m2) 1 Guandimiao Nursing Home Guandimiao 1125 Nursing Home of Zhulou Zhulou Town 1125 2 Town Dangshan Nursing Home of Lizhuang Lizhuang Town 1610 3 Town County Nursing Home of Linchang, Linchang, 1610 4 Xuanmiao Town Xuanmiao Town Nursing Home of Jiangzhuang, 1610 5 Jiangzhuang, Zhaotun Town Zhaotun Town 6 Nursing Home of Lingcheng Lingcheng Town 700 Town Center 7 Fengmiao Nursing Home Fengmiao Town 1400 8 Nursing Home of Huangwan Huangwan Town 700 Town 9 Nursing Home of Qiumiao, Yangtuan Town 700 Yangtuan Town Lingbi County 10 Nursing Home of Yugou Yugou Town 700 Town 11 Nursing Home of Fuzhai, Xialou Town 700 Xialou Town 12 Nursing Home of Gaolou Gaolou Town 700 Town 13 Nursing Home of Yuji Yuji Township 700 Township 14 Nursing Home of Caomiao Caomiao Town 560 Town 15 Nursing Home of Changgou Changgou Town 615 Town Si 16 Nursing Home of Dalukou Dalukou Township 195 County Township 17 Nursing Home of Pingshan Pingshan Town 230 Town 18 Nursing Home of Dazhuang Dazhuang Town 180 Town Xiao Nursing Home of Sanlizhuang, County 19 Sanlizhuang, Longcheng Longcheng Town 428 Town 95 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Nursing Home of Shengquan Xiezhuang, 20 Township Shengquan 275 Township Nursing Home of South Zhuzhuang Village, 100 21 Huangkou Town Huangkou Town Nursing Home of South Wangzhai Village, 205 22 Wangzhai Town Wangzhai Town Nursing Home of Xinzhuang Douzhuang, 380 23 Town Xinzhuang Town Jinqiao, The First Nursing Home of Zhangzhuangzhai 24 Zhangzhuangzhai Town Village, 308.5 Zhangzhuangzhai Town 25 Beiyangzhai Nursing Home Beiyangzhai 1536 Bianhe Aged-care Service Bianhe 2170 26 Center 27 Caocun Sihou Nursing Home Caocun Sihou 924 Nursing Home of Chengdong Chengdong 1221.8 28 Township Township 29 Fuli Hengkou Nursing Home Fuli Hengkou 0 Yongqiao 30 Fuli Shenwei Nursing Home Fuli Shenwei 1308 District 31 Langan Luding Nursing Home Langan Luding 0 Nursing Home of Qibei Qibei Xincheng, Qi 1210 32 Xincheng, Qi County County 33 Yongan Daxu Nursing Home Yongan Daxu 768 34 Nursing Home of Shunhe Shunhe Township 0 Township 35 Nursing Home of Shichun Shichun Town 0 Town 96 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.6-1 Location of 5 Rural Nursing Homes in Dangshan County, Suzhou City 97 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.6-2 Location of 8 Rural Nursing Homes in Lingbi County, Suzhou City 98 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.6-3 Location of 5 Rural Nursing Homes in Si County, Suzhou City 99 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Figure 3.6-4 Location of 6 Rural Nursing Homes in Xiao County, Suzhou City 100 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 10 11 Figure 3.6-5 Location of 11 Rural Nursing Homes in Yongqiao District, Suzhou City 101 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The existing 35 rural nursing homes in Yongqiao District, Dangshan County, Lingbi County, Xiao County, and Si County of Suzhou City will be upgraded, including building renovation and equipment upgrading. The renovation and expansion involves a total area of 32,850 m2; 1,060 additional beds will be arranged in these nursing homes. Therefore, the EIA will be represented by the status and surrounding sensitive spots of Nursing Home of Linchang, Xuanmiao Town, Dangshan County. The Nursing Home of Linchang, Xuanmiao Town, Dangshan County is located in the former site of the Nursing Home of Linchang, Xuanmiao Town, Suzhou City, and the renovation and expansion are carried out on the basis of the former site. The Nursing Home of Linchang, Xuanmiao Town was built in October 2004, with an area of 3960m2, brick-concrete structure, and 76 elderly. Since the building has been built for a long time, the appearance and internal facilities have been aging, the circuit has been seriously aging, and fire and safety and other facilities are not perfect. The project intends to carry out exterior and interior renovation and decoration of existing buildings, set up related aged-care service facilities, expand 1610m2 of area, add 100 new beds, build 100m of road, make green of 200m2, and purchase a total of 1240 sets of living service facilities. During the renovation and expansion of the project, the elderly will be resettled on the spot or in nearby nursing homes. The details are shown in Figure 3.3-7 Project Status and Surrounding Sensitive Spots. 3.6-6 Details of Project Status and Surrounding Sensitive Spots According to investigations of project site, the project is surrounded by forest land, with beautiful environment, which is suitable for the living of retired people. The project drainage is treated by septic tank, which is cleaned regularly for 102 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project fertilization. No asbestos waste was generated in the renovation and expansion. The project has little impact on the environment, however, decoration waste shall be timely removed, reasonable arrangements shall be made for the use of noise producing equipment, and construction shall be avoided during the nap and at night; and strict avoidance, prevention and mitigation measures shall be taken throughout the project in the light of possible pollution impacts. 103 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4 Main Environmental Impact and Mitigation Measures 4.1 Environmental Impact Analysis and Mitigation Measures during Construction Period 4.1.1 Brief on common construction impact The construction of the Project will have some impact on the surrounding environment, which will be mainly from dust and wastewater generated during construction and transport, noise from construction machinery and vehicles and construction wastes piled. (I) Analysis on environmental impact of wastewater during construction The wastewater generated during the construction mainly includes the domestic sewage from construction workers and construction wastewater. Construction wastewater includes the effluent from earthwork and concrete curing and flush water of construction materials on the site and vehicles, with the main pollutant being SS. The main pollutants in the domestic sewage are SS, BOD5, and CODcr. A small amount of domestic sewage will be generated and discharged into the municipal sewage pipe network after treatment in the septic tank. The construction wastewater will be discharged in an intermittent way with unstable discharging amount. Therefore, the construction will feature excessive water use and a large amount of discharging wastewater. And if no appropriate measures are taken, the water will flow freely on the construction site, having adverse impacts on the surrounding water environment and landscape. For construction wastewater, it is suggested that a temporary effluent settling chamber should be provided on the construction site to collect various wastewater generated and discharged during construction. The wastewater after settling may be reused for construction, thus saving water and reducing the pollution on the surface water environment. (II) Analysis on atmospheric environmental impact during construction During construction of the Project, main atmospheric pollutants are: (1) Exhaust gas It is mainly the exhaust gas from construction machinery and vehicles. (2) Flying powder and dust During construction, the dust pollution is mainly from: Flying powder of construction materials (such as cement, lime and sand) borne 104 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project by the wind during handling, transport and piling; Flying dust from the ground caused by running vehicles; Flying dust from construction wastes during their piling, removing and transport; The exhaust gas and flying dust and powder generated during construction will cause atmospheric pollution, especially flying powder and dust. The flying powder and dust pollution during construction mainly depends on construction methods, piling of materials and wind in particular. According to analogy of on-site measurements, under general meteorological conditions, the average wind velocity is 3.2m/s, TSP concentration is 1.28-0.16 times its control point upwind, the affecting range of flying dust from construction is 96m down the wind, TSP average concentration in the affecting range is 0.31mg/m 3. Where the fence is provided, the affecting range under same conditions is shortened by 40%. When the wind velocity is greater than 5m/s, TSP concentration on the construction site and the area down the wind will exceed Grade II criteria of air quality standards. And with the increase of wind velocity, the pollution and above-standard degree of construction dust will go up. The flying power and dust generated during construction will have adverse impact on the surrounding atmosphere. The wind velocity of the Project site is relatively slow, and therefore the flying power and dust occurs only on windy and dry days on the construction site and the area down the wind. According to the field survey, the environmental sensitive area near the boundary of construction site of the Project is mainly Tenth Higher School of Hefei. As construction dust is main contributor to atmospheric pollution during construction, the following measures to control construction dust shall be taken: 1. Specifications and content of construction signs. During construction, the Contractor shall provide the general layout plan of construction site and signboards for project overview, safe production, fire fighting and security, housekeeping, environment protection, and supervision telephone sign and the list of management. 2. Provision of enclosures, fences and anti-overflow device. During construction, the civil works sites are located at urban trunk roads, landscaping area and bustling area, and shall be provided with enclosures with the height of over 2.5m; the sites for laying pipelines shall be provided with closed or semi-closed fences with the height of over 1.5m; and the fences with the height of over 1.8m shall be provided for other works sites. The height of these enclosures and fences may be increased in 105 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project line with local regulatory requirements. The bottom of the enclosures and fences shall be provided with anti-overflow device, and no gap is allowed between two enclosures and between each enclosure and its anti-overflow device. Where it is impossible to provide enclosures, fences and anti-overflow devices, warning signs must be provided. 3. Measures of dust prevention for earthwork. The earthwork includes earth excavation, transport and filling and such possible preparation as drainage, dewatering and soil wall support. In case of dry and dusty earthwork, watering is necessary and the operations generating dust shall be shortened as possible. On days with moderate breeze or above, earthwork shall be suspended and the earthwork sites shall be covered with dust screens. 4. Dust prevention measures for construction materials. For such construction materials easy to generate flying powder during construction, such as cement, lime, sand, stones, paintings, and paving materials, one of the following measures shall be taken: a) Enclosed storage; b) Provision of fences or enclosures; c) Covering with dust tarpaulin; and d) Other effective dust prevention measures. 5. Dust prevention measures for construction wastes. The spoil, discarded materials and other construction wastes generating during construction shall be removed and transported. In case of piling on the construction site for more than one week, one of the following measures shall be taken to prevent aeolation, dusting and ablation: a) Covering with dust tarpaulin or dust screens; b) Regular spraying of dust suppressant; c) Regular watering to prevent dust; d) Other effective dust prevention measures. 6. Provision of vehicle wash platforms and improving drainage facilities to prevent sludge adhering to the vehicles. During construction, vehicle wash platforms shall be set up at the inner side of the exit of the construction site, and all vehicles (tire and body) shall be washed till no sludge is found. Around the car wash platform be provided with anti-overflow device, drainage ditch, wastewater tank, settling tank, and other related device to collect the wastewater and slurry generated from vehicle 106 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project washing, construction and dewatering. The paved road at the exit of the construction site with visible clay left by traveling vehicles shall be shorter than 10 m, and shall be cleaned in a timely manner. 7. Dust prevention measures and transport route and time of vehicles carrying materials, slag and spoil, and wastes into and out of the construction site. The vehicles carrying materials, slag and spoil, and wastes into and out of the construction site shall adopt an enclosed bucket to prevent leakage of load. If the enclosed bucket is unavailable, the loading height of materials, slag and spoil, and wastes shall not exceed the upper edge of the bucket walls, and the vehicle bucket shall be covered with tarpaulin tightly. The tarpaulin shall cover at least the area of 15cm below the upper edge of the bucket walls to prevent exposure of materials, slag and spoil, and wastes. The vehicles shall transport materials, slag and spoil, and wastes in line with approved route and time. 8. Dust prevention measures for access roads on the construction site. During construction, one of the following measures shall be taken on the roads for vehicles within the construction site and from the exit of the construction site to the road to be paved to keep the road clean and prevent dust from running vehicles: a) Paving of steel plates; b) Paving of cement concrete; c) Paving of asphalt concrete; d) Paving of reef slag, fine stones and equivalent materials, and taking such auxiliary measures as watering and spraying of dust suppressants; and e) Other effective dust prevention measures. 9. Dust cleaning measures for construction roads. Dust collection or flushing may be adopted to remove the dust accumulated on the access roads on the construction site, and dust suppression measures such as watering must be taken before cleaning. 10. Dust prevention measures for bare ground within the construction site. During construction, one of the following measures shall be taken for bare ground within the construction site: a) Covering with dust tarpaulin or dust screens; b) Paving of reef slag, fine stones and equivalent materials; c) Vegetation; d) Watering twice to seven times a week as the case may be on sunny days, and 107 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project watering more in case of severe flying dust; e) Regular spraying of dust suppressant based on its performance; f) Other effective dust prevention measures. 11. During construction, the effective dense-mesh dust screen (no less than 2000 meshes/ 100 cm2) and dust tarpaulin shall be provided at the outer side of the scaffold around the structure under construction. 12. Dust prevention measures for concrete. When concrete is required during construction, ready-mixed concrete may be used or enclosed mixing may be adopted with the provision of dust prevention and removal device. Concrete mixing, lime slaking and mixing of lime soil in open air on the construction site are not allowed. Finished products or semi-finished products made of stones or wood shall be used as possible for fabricated construction to minimize pollution from flying powder and dust from cutting of stones and wood. 13. Dust prevention measures for longitudinal conveying of materials, slag and spoil, and wastes. During construction, materials, slag and spoil, and wastes easy to generate powder or dust on the superstructure of the building under construction shall be conveyed to the ground or underground via elevator shaft, internal pipelines or enclosed conveying pipelines or be packed and boxed before removing. Dropping in the air is prohibited. 14. Full-time personnel shall be designated for implementation and supervision of dust prevention measures at large and medium construction sites. At each construction site, there shall be personnel dedicated for enclosing, covering, watering of fugitive materials, wastes, slag and spoil and ground, vehicle washing, and recording the dust prevention measures taken. 15. Keep the surrounding area of the construction sites clean. The size of area around the construction site where the Contractor shall keep clean depends on the affecting range of flying dust from construction, generally 20m from the construction site. (III) Analysis on environmental impact of noise during construction 1. Construction noise pollution source During construction, a number of construction machinery and vehicles will be used and constitute the largest contributor to construction noise. The noise from construction machinery is characterized by high sound pressure level and continuous emission, while the traffic noise from running vehicles is featured by multiple sound 108 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project sources and high mobility. During construction, the noise is mainly from construction machinery, field operations and running vehicles. The noise from construction machinery is from excavators and hoists etc., featuring multiple sound sources; operation noise is from occasional striking, crash from loading and unloading construction materials, yo-heave-ho of construction workers, and crash from installation and removing of formwork, featuring instantaneity. The noise from running vehicles is traffic noise. Among them, the noise from construction machinery has biggest impact on the surrounding acoustic environment. According to Guideline for Environmental Noise and Vibration Control Technologies (HJ 2034—2013), the noise source intensity of main construction machinery to be used for construction are shown in Table 4.1-1. When multiple machinery and equipment are in operation at the same time, the noise will be superimposed. According to the analogy survey, superimposed noise will increase by 3-8dB (A), generally not exceeding 10dB (A). Table 4.1-1 Construction Noise Source Intensity From From Construction Noise sound From sound Construction From sound Sound source sound STAGE source source 5 source 10 m stage source 10 m source 5 m m Electric Bulldozer 83~88 80~85 100~105 95~99 hammer Woodwork Electrical 80~86 75~83 and electric 93~99 90~95 excavator saw Angle Earthwork and Road roller 80~90 76~86 90~96 84~90 grinder stonework Heavy duty phase carrier 82~90 78~86 Cutting tools 90~96 84~90 vehicle Vibratory Air 92~100 86~94 88~92 83~88 rammer compressor Wheel Fitting-out and 90~95 85~91 loader installation Concrete phase 88~95 84~90 pump Concrete 80~88 75~84 vibrator Electric 93~99 90~95 Base plate and saw structure Commercia phase l concrete 85~90 82~84 mixer tank Air 88~92 83~88 compressor Static pile 70~75 68~73 driver 109 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 2. Analysis on environmental impact of noise during construction During construction, the running construction machinery and equipment and vehicles will inevitably generate noise pollution, and constitute the source of noise. The noise impact value under the most adverse condition is analyzed, namely the noise impact value of single noise-generating equipment on the boundary of the Project site with the shortest distance from the sensitive site at each construction phase. According to related data, the noise source intensity of main construction machinery is listed in Table 4.1-1. Based on the sound source features of proposed construction machinery and equipment and acoustics environment and equipment sound source as point source and according to Technical Guide for Environmental Impact Assessment - Acoustics Environment (HJ 2.4-2009), the geometric divergence and attenuation prediction mode for non-directional sound source is adopted to predict noise from the construction site. Prediction method and mode The prediction mode is as follows: LP  LP0  20 lg r  �L Where: LP—sound pressure level of prediction points, dB (A); LP0— noise source intensity, dB (A); r— distance between prediction point and noise source, m; �L — extra attenuation (not considered). If sound barriers are not considered on the construction site, the noise levels and influence distance of construction machinery are shown in Table 4.1-2 as predicted based on the announced point sound source attenuation. Table 4.1-2 Noise Transmission of Construction Machinery Construction Noise levels at different distances from sound source, dB (A) equipment 20m 40m 60m 80m 100m 120m 150m 200m 300m Bulldozer 79 73 69 67 65 63 61 59 55 Electrical 77 71 67 65 63 61 59 57 53 excavator Road roller 80 74 70 68 66 64 62 60 56 Heavy duty carrier 80 74 70 68 66 64 62 60 56 vehicle Vibratory 88 82 78 76 74 72 70 68 64 rammer Wheel 85 79 75 73 71 69 67 65 61 loader 110 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Concrete 84 78 74 72 70 68 66 64 60 pump Concrete 88 82 78 76 74 72 70 68 64 vibrator Electric saw 89 83 79 77 75 73 71 69 65 Commercial concrete 88 82 78 76 74 72 70 68 64 mixer tank Air 82 76 72 70 68 66 64 62 58 compressor Static pile 67 61 57 55 53 51 49 47 43 driver Electric 93 87 83 81 79 77 75 73 69 hammer Woodwork and electric 89 83 79 77 75 73 71 69 65 saw Angle 84 78 74 72 70 68 66 64 60 grinder Cutting tools 84 78 74 72 70 68 66 64 60 As shown in Table 4.1-2, single noise attenuates with the increase of distance from the sound source. According to construction site boundary noise control requirements, average A sound level at 200m from construction equipment in the daytime and nighttime fails to comply with Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), namely 70 dB (A) for daytime and 55dB(A) for night. Therefore, countermeasures must be taken for construction noise. This EIA requires the Employer to strictly implement the noise control measures during construction. Coverings shall be provided for the construction sites, and mobile sound barriers shall be provided around high-noise equipment (vibratory rammer, concrete vibrator, electrical saw, electrical hammer and commercial concrete mixer tanker), with the average sound insulation no less than 30 dB (A). For the Project, all of the noise levels of nearest sensitive points fail to comply with Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), namely 70 dB(A) in the daytime. The acoustic environment of the Project site is subject to the criteria for Zone II in the daytime under the Environmental Quality Standard for Noise (GB3096-2008). High-noise equipment must not be used at night. During construction, there will be a number of construction machines in operation at the same time, various noise source radiations will be superposed, with higher noise level and broader radiation scope. In order to protect the acoustic environment quality of surrounding sensitive points of the Project site, the emission of noise to the neighborhood during the construction shall meet the requirements of the Law of the 111 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project People’s Republic of China on the Prevention and Control of Environmental Noise Pollution and be strictly subject to Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011) so as to reduce the impact of noise on the lives of surrounding residents during the construction. (1) The advanced low-noise equipment shall be selected by the Contractor, and the noise barrier shall be properly set around high-noise equipment to reduce the influence of noise on the surrounding environment. In addition, the noises in boundary of construction site shall be controlled and not exceed limit specified in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011). The Contractor may monitor and record the noise level on the construction sites. (2) Make arrangement carefully to reduce the duration of impact by construction noise, excluding continuous works (for example drilling, hole cleaning and concreting by cast in-situ piling machine, foundation ditch excavation, basement concreting and roof concreting) due to construction technology, and forbid the construction at night. Where the night works generating above-standard noise is necessary for production or other special needs, the Employer shall apply to relevant departments for approval three days in advance. The night works shall not be started until it is approved. (3) During construction, the maintenance of construction machinery shall be strengthened to avoid higher mechanical noise due to poor performance of the equipment. (4) The vehicles carrying materials into the construction site at night must not sound sirens, and materials shall be loaded and unloaded with care. (5) In order to minimize the impact of construction noise on the surrounding environment, the following control measures shall be taken: ① Strengthen construction management, make reasonable arrangement of working time, and forbid high-noise operation at night; ② Construction machinery shall be placed as possible at positions with least impact on the surrounding environment; ③ Use hydraulic tools instead of pneumatic tools; ④ Provide coverings on the construction site, and provide mobile sound barriers around high-noise equipment; ⑤ Minimize the number and density of vehicles running on the construction site, and control sirens of the vehicles. 112 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (IV) Analysis on environmental impact of solid waste during construction The solid wastes generated during the construction mainly includes spoil, construction wastes and domestic waste from construction workers. Spoil is from grooving earthwork. The excavated earth will be discarded except for use for backfilling. The spoil shall be strictly disposed at the place designated by competent environmental sanitation department. The construction wastes are the solid wastes from construction, such as residual or hardened cement, lime, sand and stones, bricks and tiles. These wastes contain no toxic and harmful ingredients; however their powder will be blown into air by wind, causing secondary pollution. Arbitrary piling of these wastes will have adverse impact on surrounding landscape, traffic and residents’ traveling. Therefore, control measures shall be taken for solid wastes during construction, such as removing construction wastes and domestic wastes in a timely manner, no arbitrary discarding and piling, protection against wind and rain, and avoiding drop from vehicles during transport. 4.1.2 Environmental impact and countermeasures for major sub-projects (Anqing, Lu'an, Wuhu, Xuancheng, Ningguo) For construction period, the environmental impact of five major sub-projects (Elderly Care Institution of Anqing First People's Hospital, Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine, Haoyan Rainbow Garden Wuhu health Aged-care Service Industry Base of Haoyan Rainbow Garden, Relocation Project of Xuancheng Municipal Social Welfare Home, and Improvement Project of Ningguo City Social Welfare Service Center)is analyzed. 4.1.2.1 Elderly Care Institution of Anqing First People's Hospital The Subproject of Elderly Care Institution of Anqing First People's Hospital is part of construction of Longshan Branch of Anqing First People's Hospital, for which the Environmental Impact Assessment Report for Project of Longshan Branch of Anqing First People's Hospital has been prepared. The Project was approved by Yixiu District Environment Protection Bureau of Anqing City on December 31, 2015 (YXHJH [2015] No. 75). For the Project, the civil works period is from August 2016 to December 2017 and the fitting-out and procurement of equipment is to be commenced in 2018. This World Bank Loan Project involves no civil works and only internal fitting-out and procurement of equipment. 113 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The main influences of the Project, which is mainly built buildings, are waste gas and water, solid waste and noise. 1. Exhaust gas The air pollution during construction of the Project is mainly from flying dust generated during foundation restructuring and organic gases generated during internal fitting-out. For the Project, construction dust is mainly flying dust and power generated during foundation transformation. According to analogy analysis and calculation based on monitor data of similar projects, the construction dust concentration on a construction site is around 0.5~0.7mg/m3. The fitting-out works include paving of floor tiles and porcelain pieces, painting of walls and ceilings (melamine paint), and installation of doors and cabinets. The paints to be used contain calcium carbonate and polyvinyl alcohol, and polyvinyl alcohol generates a small amount of organic waste gas. The emission of such waste gas is fugitive and not subject to quantitative analysis. For the Project, construction dust is mainly flying dust and power generated during foundation transformation. According to analogy analysis and calculation based on monitor data of similar projects, the construction dust concentration on a construction site is around 0.5~0.7mg/m3. The settling speed of particle increases rapidly as the particle size increases. When the particle size is 250μm, the settling speed is 1.005m/s, so it can be inferred that when the particle size is over 250μm, the main affected range is within the downwind close area of the dust point, while what really affects external environment is some small dust and particle. The affected range will vary with whether conditions on the site. A simple and effective measure for suppressing flying dust is watering. Sprinkling the roads where vehicles run 4-5 times per day during the construction will reduce dust emission by around 70%. Air storage and mixing of construction materials also generates a large amount of flying dust, which is significantly affected by wind velocity when the works is under way. Therefore, such works is prohibited on windy days and air storage of construction materials shall be reduced. The sensitive site around 200m of the Project is Zongpu Community (Beiyuan Estate), which will be certainly influenced by the waste gas during construction period. 114 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Hence, sprinkling measures (four-five times a day) shall be applied momentarily to the roads in the Project for dust control. In addition, the Employer shall enhance management on each section that possibly generates flying dust on the construction site to control the impact of flying dust on surrounding environment and environment-sensitive targets. As construction dust is main contributor to atmospheric pollution during construction, the following measures to control construction dust shall be taken: 1. Specifications and content of construction signs. During construction, the Contractor shall provide the general layout plan of construction site and signboards for project overview, safe production, fire fighting and security, housekeeping, environment protection, and supervision telephone sign and the list of management. 2. Dust prevention measures for construction materials. For such construction materials easy to generate flying powder during construction, such as cement, lime, sand, stones, paintings, and paving materials, one of the following measures shall be taken: a) Enclosed storage; b) Provision of fences or enclosures; c) Covering with dust tarpaulin; and d) Other effective dust prevention measures. 3. Dust prevention measures for construction wastes. The spoil, discarded materials and other construction wastes generating during construction shall be removed and transported. In case of piling on the construction site for more than one week, one of the following measures shall be taken to prevent aeolation, dusting and ablation: a) Covering with dust tarpaulin or dust screens; b) Regular spraying of dust suppressant; c) Regular watering to prevent dust; d) Other effective dust prevention measures. 4. Dust cleaning measures for construction roads. Dust collection or flushing may be adopted to remove the dust accumulated on the access roads on the construction site, and dust suppression measures such as watering must be taken before cleaning. 5. Keep the surrounding area of the construction sites clean. The size of area around the construction site where the Contractor shall keep clean depends on the 115 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project affecting range of flying dust from construction, generally 20m from the construction site. (2) Waste gas from fitting-out The air pollution at the fitting-out phase is mainly from such gases as methanal volatilized from fitting-out material, building materials and paints. Therefore, indoor ventilation shall be strengthened. In addition, there are cooking fumes discharged from ovens used by construction teams. It is suggested that clean fuel, such as coal gas and liquefied gas should be used to minimize the impact on surrounding atmosphere. If conditions allow, it is suggested that the Contractor organize the workers to order takeouts or eat at nearby restaurants. Avoid dropping or flying dust when loading, unloading and storing materials. The construction wastes will be transported sealed. Watering and other dust suppressing measures shall be taken to control flying dust from traveling vehicles and temporary storage yards. At the fitting-out phase, the indoor environmental pollution control shall be subject to the code for fitting-out works of residences and conform to relevant provisions under the Code for Indoor Environmental Pollution Control of Civil Building Engineering. The low-toxic and low-pollution environmental-friendly fitting-out materials shall be adopted as possible in the design and construction. 2. Waste water The water pollution source during fitting-out is mainly the flushing water in construction area. The flushing water is mainly generated from cleaning of building materials like stones, and the main pollutant is SS. The flushing water will be discharged in an intermittent way with unstable discharging amount. The construction will feature excessive water use and a large amount of discharging wastewater. And if no appropriate measures are taken, the water will flow freely on the construction site, having adverse impacts on the surrounding water environment. There will be quite a small amount of domestic sewage generated during fitting-out, but if not properly treated, it will also cause environmental degradation of the construction area. Especially in summer, it will generate mosquitoes and flies which spread pathogen, having adverse impact on the health of construction workers. The Project is the re-fitting-out of houses, and the fitting-out works is conducted indoors. Part of flushing water to be discharged shall be precipitated before reuse for production, and arbitrary discharging is prohibited. 116 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3. Solid waste For the Project, the building wastes generated are mainly from consuming of construction materials, including sand, stones, cement, scrap wood, sawdust, scrap metal, rebar, wire and other wastes. A small amount of building wastes (50t) will be generated, of which the rebar heads and scrap wood take up 20% (10t) and will be all recycled. The rest building wastes (40t) shall stacked at the designated place which is approved by the government department of city appearance and environmental sanitation. During fitting-out, the solid wastes are mainly building wastes generated by fitting-out workers. Part of solid wastes shall be recycled, and those unable to recycle shall be transferred to the environment and sanitation department of the development area for disposal. In addition, the waste paints and waste solvent bottles generated during fitting-out are hazardous, and shall be centralized and transferred to a qualified organization for disposal. Arbitrary discarding is prohibited. According to the Regulations on Management of Urban Building Wastes (Decree No. 139 of the Ministry of Construction, 2005), building wastes shall be disposed subject to the principles of minimization, reutilization, hazard-free and who generates shall dispose. The organization disposing building wastes shall apply to competent environment and sanitation department (waste disposal office) of the municipal government for approval of disposing urban building wastes before disposal. The Contractor shall not transfer the building wastes to individuals or the organizations not approved to engage in transport of building wastes for transport. 4. Noise During fitting-out, main noise sources are fitting-out machinery, such as electric saw, abrasive-disk cutter, cutting machine, and electric drill. According to Guideline for Environmental Noise and Vibration Control Technologies (HJ 2034—2013), the noise source intensity of main construction machinery to be used for fitting-out are shown in Table 5.3-1. When multiple machinery and equipment are in operation at the same time, the noise will be superimposed. According to the analogy survey, superimposed noise will increase by 3-8dB (A), generally not exceeding 10dB (A). According to Guideline for Environmental Noise and Vibration Control Technologies (HJ 2034—2013), the noise source intensity of main construction machinery to be used for construction are shown in Table 4.1-3. 117 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table 4.1-3 Sound Pressure Levels at Different Distances from Noise Sources of Construction Equipment (dB (A)) From sound source From sound source Construction stage Noise source 5m 10 m Electric hammer 100~105 95~99 Woodwork and 93~99 90~95 electric saw Fitting-out and installation phase Angle grinder 90~96 84~90 Grinder 90~96 84~90 Electric drill 90~96 84~90 Air compressor 88~92 83~88 During fitting-out, the running of fitting-out equipment will inevitably generate noise pollution. The noise impact value under the most adverse condition is analyzed, namely the noise impact of single noise-generating equipment used for fitting-out on the boundary of the Project site with the shortest distance from the sensitive site at each construction phase. According to related data, the noise source intensity of main fitting-out equipment is listed in Table 4.1-3. Based on the sound source features of fitting-out equipment to be used for the Project and acoustics environment and equipment sound source as point source and according to Technical Guide for Environmental Impact Assessment - Acoustics Environment (HJ 2.4-2009), the geometric divergence and attenuation prediction mode for non-directional sound source is adopted to predict noise from the construction site. Prediction method and mode The prediction mode is as follows: LP  LP0  20 lg r  �L Where: LP—sound pressure level of prediction points, dB (A); LP0— noise source intensity, dB (A); r— distance between prediction point and noise source, m; �L — extra attenuation (not considered). As the fitting-out works is indoor, the sound insulation of the building will be considered (reduction of 20dB (A)). The noise levels and influence distance of fitting-out equipment are shown in Table 4.1-4 as predicted based on the announced point sound source attenuation. 118 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table 4.1-4 Noise Transmission of Fitting-out Equipment Construction Noise levels at different distances from sound source, dB (A) equipment 20m 40m 60m 80m 100m 120m 150m 200m 300m Grinder 68 62 58 56 54 52 50 48 44 Electric drill 73 67 63 61 59 57 55 53 49 Grinder 47 41 37 35 33 31 29 27 23 Electric 73 67 63 61 59 57 55 53 49 hammer Woodwork and electric 69 63 59 57 55 53 51 49 45 saw Angle 64 58 54 52 50 48 46 44 40 grinder As shown in Table 4.1-4, single noise attenuates with the increase of distance from the sound source. According to construction site boundary noise control requirements for the Project, average A sound level at 34m from fitting-out tools in daytime and at night fails to comply with Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), namely 70 dB (A) for daytime and no operation for night. According to the field investigation, Anqing First People's Hospital is nearest to the Project and will be put into operation at the same time as the Project. Therefore, the impact of fitting-out noise on the Hospital is not considered. However, Zongpu Community (Beiyuan Estate) is 60m from the east side of the Project, and the noise impact value during fitting-out will exceed the criteria for Zone II under Environmental Quality Standard for Noise (GB3096-2008). It can be known from the above prediction that the equipment shall be kept indoors during fitting-out and that various machines and equipment shall not be used at the same time so as to reduce the impact on acoustic environment of Zongpu Community (Beiyuan Estate). In order to minimize the impact of fitting-out on surrounding acoustic environment, it is suggested that the following measures should be taken to minimize noise pollution: The Contractor shall arrange the operation time of fitting-out machines reasonably, minimize high-noise fitting-out machines in operation at the same time, minimize the impact of sound source superposition as possible; the equipment with obvious vibration shall be provided with damping foundation; for noise sources such as material conveying and striking, the Contractor shall follow the housekeeping principle and strengthen effective management to minimize the impact. In order to minimize the impact of the construction on surrounding residents’ life, it is recommended taking the following control measures: 119 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (1) During fitting-out, the Contractor shall strictly implement Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011) and regulations of Anqing City on construction noise control, avoiding disturbance to nearby residents from construction. (2) The Contractor shall arrange construction time reasonably and forbid to use high-noise equipment for construction at 12:00-14:00 and 19:00-22:00, and forbid construction at 22:00-6:00 to avoid disturbance to surrounding residents taking rest. In order to further ensure no disturbance to surrounding residents, the Contractor shall make reasonable arrangement of the positions of construction machines to keep them far away from sensitive sites as possible. (3) As the noises from fitting-out equipment normally feature suddenness, irregularity, discontinuity and high intensity, the Contractor shall arrange the operation time of fitting-out machines reasonably, minimize high-noise fitting-out machines in operation at the same time, and minimize the impact of sound source superposition as possible. (4) The high-noise equipment shall be arranged reasonably, far away from east boundary of the Project. (5) For noise sources such as material conveying and striking, the Contractor shall follow the housekeeping principle and strengthen effective management to minimize the impact. (6) The PIU shall mark complaint call number at construction site; in case of receiving complaints, the PIU shall timely contact local environment protection department, so as to handle environmental disputes promptly. 4.1.2.2 Multi-functional Medical Building of Lu'an Hospital of Traditional Chinese Medicine The Project of Multi-functional Medical Building of Lu'an Hospital of Traditional Chinese Medicine is part of the construction of Comprehensive Building and Multi-functional Medical Building of Lu'an Hospital of Traditional Chinese Medicine, for which the Environmental Impact Assessment Report for Project of Comprehensive Building and Multi-functional Medical Building of Lu'an Hospital of Traditional Chinese Medicine has been prepared. The Project was approved by Environment Protection Bureau of Lu'an City on February 27, 2015 (LHPH[2015] No. 20). For the Project, the civil works period is from August 2018 to August 2019. 120 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 1. Waste gas from construction (1) Dust from running vehicles During construction, the flying dust from running vehicles takes up over 60% of total flying dust. The table below lists the amount of flying dust generated by a 10t truck traveling on a road of 1km at different road cleanliness and running speed. As shown in the table, flying dust increases with the increase of the truck’s speed at same road conditions; the dustier the road, the more the flying dust at same speed of the truck. Table 4.1-5 Dust Emission of Vehicle at Different Speed and Under Different Ground Cleanliness (Unit: kg/km Vehicle) Cleanliness 0.1 0.2 0.3 0.4 0.5 1.0 Speed (kg/m2) (kg/m2) (kg/m2) (kg/m2) (kg/m2) (kg/m2) 5(km/h) 0.0511 0.0859 0.1164 0.1444 0.1707 0.2871 10(km/h) 0.1021 0.1717 0.2328 0.2888 0.3414 0.5742 15(km/h) 0.1532 0.2576 0.3491 0.4332 0.5121 0.8613 25(km/h) 0.2553 0.4293 0.5819 0.7220 0.8536 1.4355 Watering roads where vehicles run 4-5 times per day during the construction will reduce dust emission by around 70%. The following table shows the result of tests of sprinkling for dust control at the construction site. Table 4.1-6 Test Result of Sprinkling for Dust Control at Construction Site (Unit: mg/m3) Distance (m) 5 20 50 100 No watering 10.14 2.89 1.15 0.86 TSP Hour Average Sprinkling Concentration water 2.01 1.40 0.67 0.60 It can be concluded from the table above that watering 4-5 times per day will effectively control dust emission and narrow down the pollution distance of TSP to 20-50m. There are many sensitive objects around the construction site of the Project. According to test results, all sensitive site are within the affected range stated above. Therefore, the Contractor shall strength the sprinkling dust control measure in the construction site and on the roads where vehicles run to keep roads wet and prevent dust emission. On dry or windy days, times of watering the ground must be guaranteed. Meanwhile, sealing measures must be taken to prevent vehicles that are used to transport muck and building materials from running with leakage, and throwing while loading is prohibited. Vehicle wash platforms shall be set up at the inner side of the entrance and exit of the construction site, and all vehicles (tire and body) shall be washed and rinsed until no sludge is found. Transport vehicles shall be 121 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project parked away from sensitive sites when possible, and trolleys shall be used to transport materials to construction spots near these sensitive sites. (2) Dust emission during construction For the whole construction period, dust is emitted mainly at the civil construction stage. Causes of dust emission include dust emission by wind and dust emission by force. Dust emission by wind refers to dust caused by road digging, building materials stacking and on the surface of bare construction areas under dry and windy weather, while dust emission by force refers to dust caused by external forces such as spoil loading and unloading, building materials loading, unloading and mixing, among which dust caused by construction and loading and unloading vehicles are the most severe. Of the two causes, dust emission by wind is the main cause of pollution. This kind of dust emission is affected by the speed of the wind during construction. Generally speaking, the ranged affected by dust caused by natural wind at construction sites is within 100m. The speed of wind that causes dust is related to the particle size and water content. The diffusion and dilution of dust in the air is related to weather conditions such as wind speed, as well as the settling speed of the dust itself. Take dust as an example. Settling speed of dust of different particle sizes is shown on Table 4.1-7. Table 4.1-7 Settling Speed of Dust of Different Particle Sizes Particle size of 10 20 30 40 50 60 70 dust (μm) Settling speed 0.003 0.012 0.027 0.048 0.075 0.108 0.147 (m/s) Particle size of 80 90 100 150 200 250 350 dust (μm) Settling speed 0.158 0.170 0.182 0.239 0.804 1.005 1.829 (m/s) Particle size of 450 550 650 750 850 950 1050 dust (μm) Settling speed 2.211 2.614 3.016 3.418 3.820 4.222 4.624 (m/s) It can be concluded from the above table that the settling speed of dust increases as the particle size increases. When the particle size is 250μm, the settling speed is 1.005m/s, so it can be inferred that when the particle size is over 250μm, the main affected range is within the downwind close distance range of the dust point, while what really affects external environment is some dust of small particle size. According to analogy survey analysis, if no effective dust prevention measures are taken during construction, dust emission will for sure affect the construction site and the area 122 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project nearby, especially during seasons when it rains less and dust pollution is more severe. There are sensitive sites around the construction site, so dust prevention during the construction of the Project shall be paid special attention to, and dust prevention measures shall be taken. Especially during the period of earth excavation, backfilling and site leveling, management shall be reinforced and dust prevention shall be intensified to reduce the affected range and degree on adjacent surroundings caused by dust during the construction. Since the impact of dust ends with the completion of the construction, it is suggested that the construction progress be sped up and construction period be shortened as much as possible to reduce the time affected by the dust. In order to reduce the pollution of construction dust on the adjacent area, the following shall be paid attention to during the construction: ① Dust control measures at the construction site shall be worked out before the commencement of the construction by the construction company; ② The construction site shall be enclosed by enclosures with a height of no less than 1.8m. The bottom of the enclosures, where anti-overflow settling basins shall be set up, shall be sealed to prevent mud pumping; ③ The entrance and exit roads of the construction site shall be hardened by concrete and vehicle washing facilities shall be equipped. Vehicles leaving the site must be washed and rinsed well before it leaves; ④ Bare areas within the site shall be covered or greened; ⑤ Sprinklers and dust reducing facilities shall be provided at the construction site to sprinkle water to working planes and earth stacks when excavating and drilling, to keep a certain degree of humidity and reduce flying dust quantity. Excavated earth and building waste shall be carried away in a timely manner to prevent dust emission caused by dry surface due to long time of stacking or being washed out by rain. Loose and dried surface soil shall also be watered often to prevent dust emission. During backfilling, water dry surface soil to stop dust from floating around. Personnel shall be assigned to water regularly to reduce dust; ⑥ After excavation begins, backfilling shall be completed as soon as possible. Management of backfill stacking site shall be reinforced, and measures such as compacting backfill surface, sprinkling backfill with water and covering backfill shall be worked out. For sites that cannot be backfilled in time, dust-proof measures such as covering shall be taken. Granular materials such as gravels shall be stacked together and covered. For transporting spoil and waste residues, enclosed transport vehicles 123 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project shall be used, and discharging waste residues along the road is prohibited; ⑦ For trucks transporting soil and vehicles transporting building materials, special covered vehicles shall be used, or anti-leakage facilities shall be equipped. Overloading shall be avoided, and covering and enclosing measures shall be taken. Transport route and time shall be planned ahead of time. Discharging along the road shall be reduced, and soil and building materials left on the road shall be cleaned in a timely manner. Rinse tires and spray water regularly to suppress dust to reduce dust emission during transport. Construction waste such as spoil shall be classified, stacked together, well enclosed, and carried away in closed pipes or bags. Throwing them away from height is prohibited. ⑧ It is prohibited to burn asphalt, asphalt felt, rubber, plastic, leather, rubbish and materials that produce toxic smoke, dust and odor at the construction site; ⑨ Materials entering or leaving the construction site that are prone to creating dust, such as earthworks, gravels and construction waste shall be transported in enclosed vehicles. In the event of strongly windy weather, operations shall be paused and building materials such as stacked gravels shall be covered. According to Heavy Pollution Weather Emergency Plan of Anhui Province, when Level Three (Yellow) alert is put on or forecast wind speed reaches over Level Five, operations that are prone to creating dust emission such as backfilling and transporting, removal and air blower blowing ashes on the road shall all be prohibited. If above measures are taken, waste gas caused during the construction will not have an obvious adverse impact on the adjacent surroundings, and the impact will fade away as the construction ends. 2. Construction wastewater Wastewater includes domestic sewage, and the water for sprinkling on site, curing and for washing facilities. ① Construction wastewater refers mainly to wastewater caused by vehicle rinsing and material mixing, main pollutants of which are SS and oils. During the construction, temporary oil-separating tanks and sedimentation tanks shall be set up where construction wastewater will be treated and then be reused for the construction, and the bottom sediment left will be carried out of the site and disposed. ② Domestic sewage refers mainly to the sewage caused by construction workers dining and toilet flushing. It goes into the municipal sewage pipe network. Wastewater discharge mainly comes from the domestic sewage from the 124 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project construction workers and mud and wastewater from the construction. Say there are 100 construction workers on average, and each may use 120L/p·d of domestic water. That gives a total 12m3/d of domestic water. Assuming the discharge of domestic sewage is 0.85 of domestic water, it would be 10.2m3/d. Pollutants of such sewage are mainly COD, SS and ammonia nitrogen. Compared to domestic sewage content of the same kind, the pollutant concentrations of COD, SS and ammonia nitrogen are respectively around 350mg/L, around 200mg/L and around 35mg/L. Discharge of domestic sewage on site will be conducted via existing facilities. Construction of high building foundation and basement often creates plenty of wastewater with mud. Main pollutant is SS, and the discharge is hard to estimate. Such wastewater shall be dammed up and treated altogether, or else it will bring onsite sediment into the urban sewage system and block the municipal pipe network. (2) Precautions ① Reinforce management during the construction. Take applicable measures to effectively control the production of pollutants in the wastewater based on the discontinuous and single type nature of the wastewater. ② Everything at the construction site shall be adjusted properly. Temporary wastewater treatment facilities such as sedimentation tanks and oil-separating tanks shall be built. Water that have been used to wash or rinse construction machines with high oil content or other wastewater with high suspended solids content must be treated before it is discharged. Waste liquid such as mortar and lime slurry shall be treated together and disposed with solid waste after being dried. ③ Building materials such as cement, yellow sand and lime shall be stored together, and certain rain-proof measures shall be taken. The above-mentioned materials spilled over or thrown out during construction or transport shall be cleaned up in time to prevent them from being carried away by rain and thus polluting adjacent water. ④ Apparatus of small flow shall be installed to reduce water consumption during the construction. The above-mentioned measures will effectively help control wastewater pollution during the construction and the measures are practical and feasible. 3. Solid waste Most of the construction waste is solid waste produced during the construction or demolition. If every 100m2 construction area produces 2t construction waste, the 125 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Project is estimated to produce 1,842t construction waste. The Employer shall entrust a qualified company to transport the residue soil in a timely manner. In the Project, the cut is 187,000 m3, the fill 62,000 m3, and the spoil 125,000 m3. Constructors will also produce a certain amount of domestic waste during the construction. Assuming there are 100 construction workers and each of them will produce domestic waste of 0.8kg/p·d, that gives a total production of domestic waste of 80kg/d. Such domestic waste shall be collected and be transported and disposed by the Sanitation Department. Construction waste refers to any substance produced or discarded during the demolition and construction of subgrade or channels. The content of such waste is rather complicated, mainly including waste gravels, bricks and tiles, waste concrete, waste metal and packaging materials. Domestic waste mainly includes plastic and waste paper. Not only is construction waste, if not taken care of in a timely manner, a pain to look at, it will also raise dust on windy and dry days. Domestic waste from construction workers, if not taken care of in a timely manner, will stink, attract mosquitoes and bugs and spread diseases under certain weather, and have an adverse impact on the surroundings nearby. ① Enclosed vehicles shall be used for the transport of construction waste. Tossing is prohibited. Construction waste shall be classified as required by applicable regulations and shall be recycled as much as possible and transported and disposed in a timely manner. ② Domestic waste shall be collected by the waste cans or bags on site and transported to the domestic waste landfill of the Project for disposal. ③ Spoil (residues) can be used for either backfilling or bedding for the subgrade of nearby road. Separate spoil disposal area will not be set up to reduce land occupation. ④ Toxic and harmful materials cannot be burned on site. Disposal of such materials shall be in compliance with applicable regulations. 4. Noise In the environmental impact assessment, it is predicted based on the geometric divergent attenuation mode and noise superposition mode of the point source in Technical Guide for Environmental Impact Assessment — Acoustic Environment (HJ2.4--2009). The prediction software is the calculation software developed by Ningbo Scientific Research and Design Institute of Environmental Protection. 126 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The evanescent formula of the point acoustic source is as follows: L(r)= L(r0)-20lg(r/r0)-△ L Where, L(r) refers to the sound pressure level of the noise source at the prediction point; L(r0) refers to the sound pressure level of the reference position; △ L refers to evanescent volume caused by factors such as shading. The noise superposition mode is as follows: n L�  10 lg( 10 Li / 10 ) i 1 Where, L∑ refers to the noise source intensity after the addition; N refers to the number of the sound sources; Li refers to the sound pressure level of the ith noise source The noise superposition mode is as follows: n L�  10 lg( 10 Li / 10 ) i 1 Where, L∑ refers to the noise source intensity after the addition; N refers to the number of the sound sources; Li refers to the sound pressure level of the ith noise source During the construction, when a single construction machine is working, it can be regarded as a point acoustic source. The noise of the machine decreases as the distance gets further. Decreasing of noise of construction machine can be seen at Table 4.1-8. Impact that noise of machine has on sensitive sites during all construction stages can be seen at Table 4.1-8. Table 4.1-8 Noise disturbing radius of all construction machineries (Unit: m) Noise Stage r75 r70 r65 r60 r55 sources Excavator 16 29 50 89 159 Earthwork Bulldozer 10 17 30 54 95 and Dumper 10 17 30 54 95 stonework Loader 18 32 57 100 178 Crane 9 15 27 48 85 Cast in-situ Forbid piling 63 35 11 / den machine Static Foundation pressure Forbid 55 28 6 / piling den machine Air 22 38 68 120 213 compressor 127 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Crane 9 15 27 48 85 Vibrator 8 15 26 45 80 (50mm) Structure Eddy-type - 3 5 8 15 mixer Electric saw 26 45 80 142 252 Note: ①r is disturbing radius, for instance r55 means distance to sound source when noise of equipment decrease to 55dB (A). All noises, which are produced by all mechanical equipment in all construction stages, exceed standard limit in day and night specified in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011). From Table 4.1-6, it can be concluded that: The predicted noise level at the sensitive point (the first and second phases of Lu'an Hospital of Traditional Chinese Medicine) near the Project caused by the noises produced by all operating mechanical equipment in construction stage exceed the daytime criteria for Zone II as specified in Environmental Quality Standard for Noise (GB3096-2008). Thus, the Contractor shall strictly implement Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), avoiding disturbing residents due to construction. The following measures are suggested to be taken in the Project: (1) The advanced low-noise equipment shall be elected by the Contractor, and the noise barrier shall be properly set around high-noise equipment to reduce the influence of noise on the surrounding environment. In addition, the noises in boundary of construction site shall be controlled and not exceed limit specified in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011). The movable noise barrier shall be set to reduce impact of noise during constructing near the sensitive site. (2) Make preparation carefully to reduce the duration of impact by construction noise, excluding continuous works (for example drilling, hole cleaning and concreting by cast in-situ piling machine, foundation ditch excavation, basement concreting and roof concreting) due to construction technology, and forbid the construction at night (22:00-6:00). Where the night work that produces excessive noise is necessary for production or other special needs, the Employer should apply to relevant departments for approval in advance and get permission of neighboring residents. The night work shall not be started until it is approved. (3) During construction, the maintenance of construction machinery shall be 128 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project strengthened to avoid higher mechanical noise due to poor performance of the equipment. (4) The vehicles carrying materials into the construction site at night must not sound sirens, and materials shall be loaded and unloaded with care. (5) The Contractor and PIU shall mark complaint call number at construction site; in case of receiving complaints, the PIU shall timely contact local environment protection department, so as to handle environmental disputes promptly. (6) Reasonably arrange construction site, try to put high-noise equipment in the center of the lot. If above measures are taken, construction noises caused during construction of the Project will not have an obvious adverse impact on the adjacent surroundings, and the impact will fade away as the construction ends. 5. Social impact analysis Short-term impact on around social environment during construction mainly include: ① The construction will occupy roads, which will enhance load of existing roads and influence transportation of neighboring residents; ② The construction vehicles will frequently pass the densely populated areas (like residential quarters and hospitals), which may cause hidden peril of accident. ③ Uncivilized behavior of partial construction personnel will also influence the local residents. All influences above can be greatly avoided or totally eliminated by reasonably arranging construction plan and housekeeping; hence the Contractor shall make perfect construction plan and strictly manage construction personnel, so as to relieve social impact caused by construction. (2) Precautions ① Make traffic control plan in advance and release notice. ② Leave road and evacuate and guide pedestrian and vehicles to avoid traffic jam; or apply other method to inform related institutions to choose other roads and set significant mark of temporary detouring road lines in main crossings. ③ Reasonably arrange construction time, forbid to use high-noise equipment for construction during 12:00-14:00 and 19:00-22:00, and forbid to constructing during 22:00-6:00. ④ Hang signs in dangerous areas, devices and materials to remind the local 129 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project residents. 4.1.2.3 “Haoyan Rainbow Garden� (Base) The main influences of the Project, which is mainly built buildings, are waste gas and water, solid waste and noise. 1. Waste gas from construction The actual influence analysis of construction waste gas shall refer to 4.1.2.1 - multi-functional medical building of Elderly Care Institution of Anqing First People's Hospital. And this chapter only analyzes influence on sensitive sites. The sensitive sites around 200m of the Project are Wuhu Sixth People’s Hospital and Polka International Garden, which will be certainly influenced by the waste gas during construction period. Hence, sprinkling measures (four-five times a day) shall be applied momentarily to the roads in the Project for dust control. In addition, the Employer shall enhance management on each section that possibly generates flying dust on the construction site to control the impact of flying dust on surrounding environment and environment-sensitive targets. As construction dust is main contributor to atmospheric pollution during construction, the measures to control construction dust shall refer to 4.1.2.1 - Elderly Care Institution of Anqing First People's Hospital. 2. Construction wastewater The waste water during construction mainly are construction waste water in construction site. The water pollution source during decoration mainly is the washing waste water in construction area. The washing waste water is mainly produced by cleaning of building materials like stones and the main waste pollutant is SS; and the washing waste water will be discharged in an intermittent way with unstable discharging amount. The construction will feature excessive water use and a large amount of discharging wastewater. And if no appropriate measures are taken, the water will flow freely on the construction site, having adverse impacts on the surrounding water environment. There will be quite a small amount of domestic sewage generated during fitting-out, but if not properly treated, it will also cause environmental degradation of the construction area. Especially in summer, it will generate mosquitoes and flies which spread pathogen, having adverse impact on the health of construction workers. The Project is the redecoration of the rental housing and the decoration project is conducted indoors; 130 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project and the partial washing waste water shall be discharged to urban sewage pipeline through sewer lines without randomly discharging. The domestic sewage shall be discharged to urban sewage pipeline through sewer lines, and then sent to Wuhu Zhujiaqiao Sewage Treatment Plant through municipal sewage pipe network for treatment, for no influencing quality of the surface water. 3. Solid waste For the Project, the building wastes generated are mainly from consuming of construction materials, including sand, stones, cement, scrap wood, sawdust, scrap metal, rebar, wire and other wastes. With low quantity generated, the produced building wastes are 75t. Among which, the steel heads and waste woods take up 20% (15t) which are recycled totally, and the rest building wastes (60t) shall stacked at the designated place which is approved by the government department of city appearance and environmental sanitation. The management of solid wastes shall refer to Elderly Care Institution Project of Anqing First People's Hospital. 4. Noise The actual influence analysis of construction noise shall refer to 4.1.2.1 - Elderly Care Institution of Anqing First People's Hospital. And this chapter only analyzes influence on sensitive sites. According to the field investigation, the nearest sensitive points from the Project are Wuhu Sixth People’s Hospital (60m from the north) and Polka International Garden (40m from the west); and the noise impact value during fitting-out will exceed the criteria for Zone II specified in Environmental Quality Standard for Noise (GB3096-2008). It can be known from the above predictive results that the equipment shall be ensured to be in the room during construction and all machines and equipment shall not be used at the same time, so as to reduce acoustic environmental influence on sensitive sites. In order to minimize the impact of fitting-out on surrounding acoustic environment, it is suggested that the following measures should be taken to minimize noise pollution: The Contractor shall arrange the operation time of fitting-out machines reasonably, minimize high-noise fitting-out machines in operation at the same time, minimize the impact of sound source superposition as possible; the equipment with obvious vibration shall be provided with damping foundation; for 131 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project noise sources such as material conveying and striking, the Contractor shall follow the housekeeping principle and strengthen effective management to minimize the impact. This evaluation recommend to take the following control measures in accordance with section 4.1.2.1 - Elderly Care Institution of Anqing First People's Hospital, in order to reduce bad influence of the Project construction on surrounding residents’ lives. 4.1.2.4 The Project of Relocation and Rebuilding of Xuancheng Municipal Social Welfare Home The main influences of the Project are waste gas and water, solid waste and noise. 1. Waste gas from construction The actual influence analysis of construction waste gas shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. And this chapter only analyzes influence on sensitive sites. There are sensitive sites around the construction site, so dust prevention during the construction of the Project shall be paid special attention to, and dust prevention measures shall be taken. Especially during the period of earth excavation, backfilling and site leveling, management shall be reinforced and dust prevention shall be intensified to reduce the affected range and degree on adjacent surroundings caused by dust during the construction. Since the impact of dust ends with the completion of the construction, it is suggested that the construction progress be sped up and construction period be shortened as much as possible to reduce the time affected by the dust. In order to reduce the pollution of construction dust on the adjacent area, the environment-protection measures for construction shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 2. Construction wastewater Wastewater includes sprinkling water on site, maintenance water and water used to wash facilities. ① Construction wastewater refers mainly to wastewater caused by vehicle rinsing and material mixing, main pollutants of which are SS and oils. During the construction, temporary oil-separating tanks and sedimentation tanks shall be set up where construction wastewater will be treated and then be reused for the construction, and the bottom sediment left will be carried out of the site and disposed. The Project will not set construction camps. And the construction workers shall 132 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project rent the existing houses in Xiaduxincheng Residential Quarter. (2) Precautions ① Reinforce management during the construction. Take applicable measures to effectively control the production of pollutants in the wastewater based on the discontinuous and single type nature of the wastewater. ② Everything at the construction site shall be adjusted properly. Temporary wastewater treatment facilities such as sedimentation tanks and oil-separating tanks shall be built. Water that have been used to wash or rinse construction machines with high oil content or other wastewater with high suspended solids content must be treated before it is discharged. Waste liquid such as mortar and lime slurry shall be treated together and disposed with solid waste after being dried. ③ Building materials such as cement, yellow sand and lime shall be stored together, and certain rain-proof measures shall be taken. The above-mentioned materials spilled over or thrown out during construction or transport shall be cleaned up in time to prevent them from being carried away by rain and thus polluting adjacent water. ④ Apparatus of small flow shall be installed to reduce water consumption during the construction. The above-mentioned measures will effectively help control wastewater pollution during the construction and the measures are practical and feasible. 3. Solid waste Most of the construction waste is solid waste produced during the construction or demolition. If every 100m2 construction area produces 2t construction waste, the Project is estimated to produce 348t construction waste. The Employer shall entrust a qualified company to transport the residue soil in a timely manner. In the Project, the cut is 20,000 m3, the fill 10,000 m3, and the spoil 10,000 m3. Constructors will also produce a certain amount of domestic waste during the construction. Assuming there are 50 construction workers and each of them will produce domestic waste of 0.8kg/p·d, that gives a total production of domestic waste of 40kg/d. Such domestic waste shall be collected and be transported and disposed by the Sanitation Department. The environmental management for solid wastes in the Project shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 133 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4. Noise All noises, which are produced by all mechanical equipment in all construction stages, exceed standard limit in day and night specified in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011). The noises, which are produced by all mechanical equipment in construction stage, affect the sensitive sites around the Project - Xiaduxincheng Residential Area and Yucun Village. And the predictive value of noise exceeds the daytime criteria for Zone II as specified in Environmental Quality Standard for Noise (GB3096-2008). Thus, the Contractor shall strictly implement Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), avoiding disturbing residents due to construction. The control measures for noises in the Project shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 5. Ecological environment impact The influence of the Project construction on environment mainly is water and soil loss caused by surface excavation, transportation and stack of construction materials and production equipment. Water and soil loss means the process the soil dispersion, movement and deposition under eroding force of precipitation. Factors influencing water and soil loss are varied, mainly including rainfall, soil, vegetation, landforms and project construction and so on. As far as construction of the Project, the main factors influencing water and soil loss during construction are rainfall and project construction. Strengthen management during earthwork excavation and filling, so as to decrease scattering as far as possible to avoid water and soil loss. And the main bad environmental influences are: ① Affect landscape effect inside the zone; and ② Bring bad impact, damages and losses and so on to the local residents and safety operation of the Project. (2) Precautions ① Reasonably arrange construction time, try to avoid rain and flood season; and in case of no way to avoid it, conduct the production and drainage work during rainy season to ensure the smooth drainage during construction without any water-immersed working surface. ② Timely protect the earthwork works, convey it since it was excavated, and 134 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project ram it since it was filled without any loosened soil, so as to reduce exposed time of the loosened surface. Make sure that protect once section when constructed the section to reduce the new water and soil loss. ③ Reasonably optimize arrangement of the construction site and reduce the construction ranges to decrease degree of damage of project construction on vegetation. The construction machines and construction workers shall operate in the planned construction plane position and channel, and shall not disorderly occupy lands; and the construction machines, earth and stones and other construction materials shall not be placed mussily, so as to prevent vegetation deterioration (which will aggravate water and soil loss); and ④ The outsourced materials for construction, which integrates bricks, stones, sand, cement, wood and so on, shall be transported when it is required to reduce occupied lands and as far as possible with less damage to vegetation; and after the completion of the Project, the construction site shall be timely cleaned up and afforested, restoring the damaged vegetation to the greatest extent. 6. Social impact analysis Short-term impact on around social environment during construction mainly include: ① The construction will occupy roads, which will enhance load of existing roads and influence transportation of neighboring residents; ② The construction vehicles will frequently pass the densely populated areas (like residential quarters and hospitals), which may cause hidden peril of accident. ③ Uncivilized behavior of partial construction personnel will also influence the local residents. All influences above can be greatly avoided or totally eliminated by reasonably arranging construction plan and housekeeping; hence the Contractor shall make perfect construction plan and strictly manage construction personnel, so as to relieve social impact caused by construction. (2) Precautions ① Make traffic control plan in advance and release notice. ② Leave road and evacuate and guide pedestrian and vehicles to avoid traffic jam; or apply other method to inform related institutions to choose other roads and set significant mark of temporary detouring road lines in main crossings. ③ Reasonably arrange construction time, forbid to use high-noise equipment for 135 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project construction during 12:00-14:00 and 19:00-22:00, and forbid to constructing during 22:00-6:00. ④ Hang signs in dangerous areas, devices and materials to remind the local residents. 4.1.2.5 Improvement Project of Ningguo City Social Welfare Service Center Removal of the existing buildings Removal of the old buildings concerned with the Project has been verified with the Ningguo City Social Welfare Service Center, no asbestos materials during removal. The removed waste bricks, bamboos and woods and other materials shall be transported by the special vehicles for waste soil transportation of municipal companies. During the removal of existing buildings, the Employer shall take sufficient measures to protect workers and the public from the dropping detritus and gravels. These measures include: (1) Leave a designated wastes-dropping zone or discharge chute to guarantee the safety pouring of the wastes; (2) Control the processes, like sawing, digging, grinding, sand paving and cutting, and take reasonable anchoring method to guide dropping of the waste stones; (3) Keep clean during transporting and avoid polluting pavement and atmosphere due to wastes dropping caused by overloading of vehicles; (3) Employ the temporary dropping-protection measures (like handrails and toe boards) in the boundary of the lifting scaffolds to prevent dropping of wastes; and (4) Provide safety glasses, side shields, masks, helmets, safety boots or shoes to all relevant staff. The main influences of the Project are waste gas and water, solid waste and noise. 1. Waste gas from construction The actual influence analysis of construction waste gas shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. And this chapter only analyzes influence on sensitive sites. There are sensitive sites around the construction site, so dust prevention during the construction of the Project shall be paid special attention to, and dust prevention measures shall be taken. Especially during the period of earth excavation, backfilling and site leveling, management shall be reinforced and dust prevention shall be 136 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project intensified to reduce the affected range and degree on adjacent surroundings caused by dust during the construction. Since the impact of dust ends with the completion of the construction, it is suggested that the construction progress be sped up and construction period be shortened as much as possible to reduce the time affected by the dust. In order to reduce the pollution of construction dust on the adjacent area, the environment-protection measures for construction shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 2. Construction wastewater Wastewater includes domestic sewage, and the water for sprinkling on site, curing and for washing facilities. ① Construction wastewater refers mainly to wastewater caused by vehicle rinsing and material mixing, main pollutants of which are SS and oils. During the construction, temporary oil-separating tanks and sedimentation tanks shall be set up where construction wastewater will be treated and then be reused for the construction, and the bottom sediment left will be carried out of the site and disposed. ② Domestic sewage refers mainly to the sewage caused by construction workers dining and toilet flushing. It goes into the municipal sewage pipe network. The Project will not set construction camps. And the construction workers shall rent the existing houses in the surrounding residential quarters. Wastewater discharge mainly comes from the domestic sewage from the construction workers and mud and wastewater from the construction. Say there are 50 construction workers on average, and each may use 120L/p·d of domestic water. That gives a total 6m3/d of domestic water. If the discharge of domestic sewage is 0.85 of domestic water, it would 5.1m3/d. Pollutants of such sewage are mainly COD, SS and ammonia nitrogen. Compared to domestic sewage content of the same kind, the pollutant concentrations of COD, SS and ammonia nitrogen are respectively around 350mg/L, around 200mg/L and around 35mg/L. The domestic sewage during construction period shall be discharged to Ningguo City Sewage Treatment Plant for treatment. The control measures for waste water shall refer to section 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 3. Solid waste Most of the construction waste is solid waste produced during the construction or 137 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project demolition. If every 100m2 construction area produces 2t construction waste, the Project is estimated to produce 180t construction waste. The Employer shall entrust a qualified company to transport the residue soil in a timely manner. In the Project, the cut is 5,000 m3, the fill 3,000 m3, and the spoil 2,000 m3. Constructors will also produce a certain amount of domestic waste during the construction. Assuming there are 50 construction workers and each of them will produce domestic waste of 0.8kg/p·d, that gives a total production of domestic waste of 40kg/d. Such domestic waste shall be collected and be transported and disposed by the Sanitation Department. The environmental management for solid wastes in the Project shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 4. Noise All noises, which are produced by all mechanical equipment in all construction stages, exceed standard limit in day and night specified in Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011). The noises, which are produced by all mechanical equipment in construction stage, affect the sensitive sites around the Project. And the predictive value of noise exceeds the daytime criteria for Zone II as specified in Environmental Quality Standard for Noise (GB3096-2008). Thus, the Contractor shall strictly implement Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011), avoiding disturbing residents due to construction. The control measures for noises in the Project shall refer to 4.1.2.2 “Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine�. 4.1.3 Environmental impact of other sub-projects during decorating Home-based Elderly Care Site, Rural Nursing Homes, Embedded Center for Disabled or Semi-disabled Elders (the other four sub-projects not included in the Base). This project possesses small scale and its main influence on surroundings mainly is waste gas and noises caused by decoration. The Contractor shall meet the following requirements to control noise and dust: 1. Try to keep noise of machines and equipment under 90 db; 2. More stringent measures need to be implemented in sensitive areas 138 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project (including residential areas, hospitals, etc.) to prevent harsh noise; 3. Try to reduce dust and particulate matters, so as to avoid influence on residents’ lives and commercial activities around, and focus on protection of vulnerable people (like children and the elderly); 4. Forbid to use high-noise equipment for construction during 12:00-14:00 and 19:00-22:00, and forbid to constructing during 22:00-6:00; 5. Take the correct measures to reduce influence of noises and vibration produced by construction on surroundings; and 6. It has been verified by all PMOs that the old houses have not asbestos materials. In case of finding asbestos wastes during rebuilding and decorating, the Employer shall draw up a management plan for dangerous wastes (it shall include field investigation for decreasing exposed asbestos wastes; the specially-trained personnel for collecting and handling asbestos wastes; and the processes for conveying and treating asbestos), in accordance with management of hazardous wastes. This plan shall be approved by the Project Engineer and be applicable to all personnel taking part in operation and transportation. The hazardous wastes in construction site shall be removed and handled by specially-trained personnel on the basis of national and provincial regulations or internationally-recognized process. 4.2 Environmental Influence and Protection Measures during Operational Period 4.2.1 Environmental impact and countermeasures for major sub-projects (Anqing, Lu'an, Wuhu, Xuancheng, Ningguo) In this operation period, environmental influence and protection measures of five major sub-projects are detailedly analyzed (Elderly Care Institution of Anqing First People's Hospital, Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine, “Haoyan Rainbow Garden� (base), Relocation Project of Xuancheng Municipal Social Welfare Home, and Improvement Project of Ningguo City Social Welfare Service Center). 4.2.1.1 Elderly Care Institution of Anqing First People's Hospital 1. Waste water 1000 beds and 300 staffs are added. Based on the consumption of domestic water of 0.2t/person·d, 365 days, and the generation coefficient of domestic wastewater of 0.85, the total generation volume of wastewater of the project is 221m3/ d. See Table 139 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4.2-1 for generation and emission of waste water In accordance with Environmental Impact Assessment Report of Construction Project of Anqing First People's Hospital (Longshan Branch, after the treatment supported by hospital’s oil separator, septic tank and sewage treatment station, the domestic sewage generated of the project meets the pretreatment in Table 2 of Discharge Standard of Water Pollutants for Medical Organization (GB18466-2005) and the acceptance criteria of Anqing North New Town Sewage Treatment Plant, and then discharged into Anqing North New Town Sewage Treatment Plant. The wastewater discharge volume of the Project is 221m3/d, and the capacity of Phase I of Anqing North New Town Sewage Treatment Plant is 20,000m3/d, so there is room for sewage storage. The sewage volume of the Project accounts for 1.1% of its treatment capacity, which is a relatively small proportion. Meanwhile, the water quality of the Project is simple without pollution factors affecting the water quality of sewage treatment plants, so the acceptance of the Project’s sewage to Anqing North New Town Sewage Treatment Plant won’t impact the plant’s water quality. Based on the above analysis, the sewage of the Project can be discharged into Anqing North New Town Sewage Treatment Plant after being treated by self-built sewage treatment facilities, and will have little effect on the sewage treatment plant. 2. Solid waste ① Domestic waste 1,000 beds are added, and the domestic waste generated per bed per day is calculated at 1.0 kg, which results in domestic waste generated of 1t/d. The domestic waste generated per person per day of the staffs (based on 300 persons) is calculated at 0.5 kg, which results in domestic waste generated of 0.15 t/d, so the total amount of the domestic waste generated of the Project is 1.15 t/d (about 420t/a). The several waste collection buckets are uniformly cleared and transported by the environmental sanitation department every day. The domestic waste generated by the Project is uniformly collected by the Municipal Environmental Sanitation Department and sent to Domestic Waste Incineration Power Plant of Anqing Wenergy Zhongke Environmental Protection Power Co., Ltd. ② Medical waste A certain amount of medical wastes will be added after project operation, and the generating amount is calculated as follows: If the medical waste is calculated at 0.1 kg per bed per day, the medical waste 140 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project generated shall be 0.1t/d (about 36.5t/a). The main medical waste of the Project is infectious waste, injury waste, drug waste, chemical waste, etc. Set several medical solid waste collection buckets (all corners in hospital) near medical waste’s temporary storage place of Anqing First People's Hospital (basement of 3# Inpatient Building, construction area: 64m2). The medical waste shall be managed in accordance with Regulations on the Administration of Medical Waste strictly, and the medical waste produced by the institution shall be timely collected and separately set in anti-seep and anti-piercing special packing materials or sealed containers by type. The special packing materials and containers for medical waste shall be equipped with significant signs and warning messages. The Project shall apply anti-seep and anti-scattering special conveying tools and collect and convey medical wastes to temporary storage location in accordance with determined internal conveying time and lines for medical waste. The conveying tools shall be disinfected and cleaned in designated location of the hospital after being used. Medical waste transport vehicle shall be subject to requirements stipulated in Technical Standard for Medical Waste Transport Vehicle (GB19217-2003). Temporary storage facilities and equipment for medical waste shall be disinfected and cleaned termly, and be subject to Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001) and its revision in 2013. The medical waste generated of the construction project is entrusted to be treated by Environmental Protection and Technology Co., Ltd. of Anqing Development and Investment (Group) Corporation. See Table 4.2-2 for generation and disposal of solid waste of the Project. 4.2.1.2 Multi-functional Medical Building Project of Lu'an Hospital of Traditional Chinese Medicine 1. Waste water 600 beds and 180 staffs are added. Based on the consumption of domestic water of 0.2t/person·d, 365 days, and the generation coefficient of domestic wastewater of 0.85, the total generation volume of wastewater of the project is 133m3/ d. See Table 4.2-1 for generation and emission of waste water. In accordance with Environmental Impact Assessment Report for Project of Comprehensive Building and Multi-functional Medical Building of Lu'an Hospital of Traditional Chinese Medicine, after the treatment supported by hospital’s oil separator, septic tank and sewage treatment station, the domestic sewage generated of the project 141 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project meets the pretreatment in Table 2 of Discharge Standard of Water Pollutants for Medical Organization(GB18466-2005) and the acceptance criteria of Lu’an Chengbei Sewage Treatment Plant, and then discharged into Lu’an Chengbei Sewage Treatment Plant. The wastewater discharge volume of the Project is 133m3/d, and recent construction scale of Lu’an Chengbei Sewage Treatment Plant is 80,000m3/d, so there is room for sewage storage. The sewage volume of the Project accounts for 0.16% of its treatment capacity, which is a relatively small proportion. Meanwhile, the water quality of the Project is simple without pollution factors affecting the water quality of sewage treatment plant, so the acceptance of the Project’s sewage to Lu’an Chengbei Sewage Treatment Plant won’t impact the plant’s water quality. The Project is located in the central area of the city, which is included in the treatment range of Chengbei Sewage Treatment Plant. After the sewage of the Project has been treated by the self-built sewage treatment station up to standard, it will discharge into the municipal sewage pipe network of Renmin Road, then import into the urban sewage main pipe of Meishan Middle Road, and at last import into Chengbei Sewage Treatment Plant. The sewage is discharged into Lu’an Chengbei Sewage Treatment Plant to be retreated, which makes it will not have obvious effect on the water quality of the Pihe River. Based on the above analysis, the sewage of the Project can be discharged into the Lu’an Chengbei Sewage Treatment Plant after being treated of self-built sewage treatment facilities, and will have very small effect on the sewage treatment plant. 2. Solid waste ① Domestic waste 600 beds are added, and the domestic waste generated per bed per day is calculated based on 1.0 kg, which results in domestic waste generated of 0.6t/d. The domestic waste generated per person per day of the staffs (based on 180 persons) is calculated based on 0.5 kg, which results in domestic waste generated of 0.09 t/d, so the total amount of the domestic waste generated of the Project is 0.69 t/d (about 252t/a). The several waste collection buckets are uniformly cleared and transported by the environmental sanitation department every day. The domestic waste generated by the Project is uniformly collected by the Municipal Environmental Sanitation Department and sent to the Lu’an City Domestic Waste Incineration Power Plant. ② Medical waste 142 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project A certain amount of medical wastes will be added after project operation, and the generating amount is calculated as follows: If the medical waste is calculated at 0.1 kg per bed per day, the medical waste generated shall be 0.06t/d (about 21.9t/a). The main medical waste of the Project is infectious waste, injury waste, drug waste, chemical waste, etc. The medical waste generated of the Project is temporarily stored in the completed medical waste storage room of Lu'an Hospital of Traditional Chinese Medicine, and the medical waste has been conducted safe and harmless treatment that is entrusted to Lu'an Jiekang Environmental Protection Medical Waste Concentration Disposal Limited Liability Company. The medical waste shall be managed in accordance with Regulations on the Administration of Medical Waste strictly, and the medical waste produced by the institution shall be timely collected and separately set in anti-seep and anti-piercing special packing materials or sealed containers by type. The special packing materials and containers for medical waste shall be equipped with significant signs and warning messages. The Project shall apply anti-seep and anti-scattering special conveying tools and collect and convey medical wastes to temporary storage location in accordance with determined internal conveying time and lines for medical waste. The conveying tools shall be disinfected and cleaned in designated location of the hospital after being used. Medical waste transport vehicle shall be subject to requirements stipulated in Technical Standard for Medical Waste Transport Vehicle (GB19217-2003). Temporary storage facilities and equipment for medical waste shall be disinfected and cleaned termly, and be subject to Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001) and its revision in 2013. The medical waste generated of the construction project is treated by Lu'an Jiekang Environmental Protection Medical Waste Concentration Disposal Limited Liability Company. See Table 4.2-2 for generation and disposal of solid waste of the Project. 4.2.1.3 “Haoyan Rainbow Garden� (Base) 1. Waste water 780 beds and 262 staffs are added. Based on the consumption of domestic water of 0.2t/person·d, 365 days, and the generation coefficient of domestic wastewater of 0.85, the total generation volume of wastewater of the project is 208.4m3/ d. See Table 4.2-1 for generation and emission of waste water. 143 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project The sewage entered into sewage treatment station and is treated by the sewage treatment process of “enhanced primary treatment + disinfection� (design scale: 320m3) after being pretreated by the canteen wastewater septic tank of base project (design scale: 60m3), and then entered into Wuhu city Zhujiaqiao sewage treatment plant through municipal pipelines. The wastewater discharge volume of the Project is 208.4m3/d, and Phase I project (100,000 t/d) of the sewage treatment plant of Wuhu Zhujiaqiao has been put into use, so there is room for sewage storage. The sewage volume of the Project accounts for 0.2% of its treatment capacity, which is a relatively small proportion. Meanwhile, the water quality of the Project is simple without pollution factors affecting the water quality of sewage treatment plant, so the acceptance of the Project’s sewage to Wuhu Zhujiaqiao sewage treatment plant won’t impact the plant’s water quality. Based on the above analysis, the sewage of the Project can be discharged into the Wuhu Zhujiaqiao sewage treatment plant after being treated of self-built sewage treatment facilities, and will have very small effect on the sewage treatment plant. 2. Solid waste ① Domestic waste 780 beds are added, and the domestic waste generated per bed per day is calculated based on 1.0 kg, which results in domestic waste generated of 0.78t/d. The domestic waste generated per person per day of the staffs (based on 262 persons) is calculated based on 0.5 kg, which results in domestic waste generated of 0.131 t/d, so the total amount of the domestic waste generated of the Project is 0.911 t/d (about 333t/a). The several waste collection buckets are uniformly cleared and transported by the environmental sanitation department every day. The domestic waste generated by the Project is uniformly collected by the Municipal Environmental Sanitation Department and sent to the domestic waste incineration power plant of Wuhu Oasis Environmental Protection Energy Co., Ltd. ② Medical waste A certain amount of medical wastes will be added after project operation, and the generating amount is calculated as follows: If the medical waste is calculated at 0.1 kg per bed per day, the medical waste generated shall be 0.078t/d (about 28.47t/a). The main medical waste of the Project is infectious waste, injury waste, drug waste, chemical waste, etc. Set several medical 144 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project solid waste collection buckets and one temporary storage yard for medical solid waste of the Project (construction area 20m2). The hospital shall set temporary storage facilities and equipment for medical waste, and shall not store medical waste in the open air; the storage period of the medical waste at normal temperature shall not exceed one day and shall be refrigerated under 5 degrees Celsius within 7 days. The temporary storage facilities and equipment of medical waste shall be far away from the medical area, food processing area, staff activity area and domestic waste storage places, and set up clear warning signs. And anti-leakage, rat proof, flies proof, cockroach proof, thievery prevention, children’s exposure prevention and other safety measures shall be taken. Temporary storage facilities and equipment for medical waste shall be disinfected and cleaned termly, and be subject to Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001) and its revision in 2013. The medical waste generated of the construction project is treated by Wuhu City Medical Waste Concentration Disposal Engineering Limited Liability Company. The medical waste shall be managed in accordance with Regulations on the Administration of Medical Waste strictly, and the medical waste produced by the institution shall be timely collected and separately set in anti-seep and anti-piercing special packing materials or sealed containers by type. The special packing materials and containers for medical waste shall be equipped with significant signs and warning messages. The Project shall apply anti-seep and anti-scattering special conveying tools and collect and convey medical wastes to temporary storage location in accordance with determined internal conveying time and lines for medical waste. The conveying tools shall be disinfected and cleaned in designated location of the hospital after being used. Medical waste transport vehicle shall be subject to requirements stipulated in Technical Standard for Medical Waste Transport Vehicle (GB19217-2003). See Table 4.2-2 for generation and disposal of solid waste of the Project. 4.2.1.4 The Project of Relocation and Rebuilding of Xuancheng Municipal Social Welfare Home 1. Waste water 400 beds and 100 staffs are added. Based on the consumption of domestic water of 0.2t/person·d, 365 days, and the generation coefficient of domestic wastewater of 0.85, the total generation volume of wastewater of the project is 85m3/ d. See Table 145 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4.2-1 for generation and emission of waste water. The sewage entered into sewage treatment station and is treated by the sewage treatment process of “enhanced primary treatment + disinfection" (design scale: 100m3) after being pretreated by the canteen wastewater septic tank of base project (design scale: 30m3), and then entered into Xuancheng city (Jingtingwei) sewage treatment plant through municipal pipelines. The wastewater discharge volume of the Project is 85 m3/d, and the sewage treatment plant (100,000 t/d) of Xuancheng city (Jingtingwei) has been put into use, so there is room for sewage storage. The sewage volume of the Project accounts for 0.1% of its treatment capacity, which is a relatively small proportion. Meanwhile, the water quality of the Project is simple without pollution factors affecting the water quality of sewage treatment plant, so the acceptance of the Project’s sewage to Xuancheng city (Jingtingwei) sewage treatment plant won’t impact the plant’s water quality. Based on the above analysis, the sewage of the Project can be discharged into the sewage treatment plant in Xuancheng city (Jingtingwei) after being treated of self-built sewage treatment facilities, and will have very small effect on the sewage treatment plant. 2. Solid waste ① Domestic waste 400 beds are added, and the domestic waste generated per bed per day is calculated based on 1.0 kg, which results in domestic waste generated of 0.4t/d. The domestic waste generated per person per day of the staffs (based on 100 persons) is calculated based on 0.5 kg, which results in domestic waste generated of 0.05 t/d, so the total amount of the domestic waste generated of the Project is 0.45 t/d (about 164t/a). The several waste collection buckets are uniformly cleared and transported by the environmental sanitation department every day. The domestic waste generated by the Project is uniformly collected by the Municipal Environmental Sanitation Department and sent to the Xuancheng domestic waste incineration power plant. ② Medical waste A certain amount of medical wastes will be added after project operation, and the generating amount is calculated as follows: If the medical waste is calculated at 0.1 kg per bed per day, the medical waste generated shall be 0.04t/d (about 14.6t/a). The main medical waste of the Project is 146 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project infectious waste, injury waste, drug waste, chemical waste, etc. Set several medical solid waste collection buckets and one temporary storage yard for medical solid waste of the Project (construction area 10m2). The hospital shall set temporary storage facilities and equipment for medical waste, and shall not store medical waste in the open air; the storage period of the medical waste at normal temperature shall not exceed one day and shall be refrigerated under 5 degrees Celsius within 7 days. The temporary storage facilities and equipment of medical waste shall be far away from the medical area, food processing area, staff activity area and domestic waste storage places, and set up clear warning signs. And anti-leakage, rat proof, flies proof, cockroach proof, thievery prevention, children’s exposure prevention and other safety measures shall be taken. Temporary storage facilities and equipment for medical waste shall be disinfected and cleaned termly, and be subject to Standard for Pollution Control on Hazardous Waste Storage (GB18597-2001) and its revision in 2013. The medical waste generated of the construction project is treated by Xuancheng City Jiuding Medical Waste Concentration Disposal Center. The medical waste shall be managed in accordance with Regulations on the Administration of Medical Waste strictly, and the medical waste produced by the institution shall be timely collected and separately set in anti-seep and anti-piercing special packing materials or sealed containers by type. The special packing materials and containers for medical waste shall be equipped with significant signs and warning messages. The Project shall apply anti-seep and anti-scattering special conveying tools and collect and convey medical wastes to temporary storage location in accordance with determined internal conveying time and lines for medical waste. The conveying tools shall be disinfected and cleaned in designated location of the hospital after being used. Medical waste transport vehicle shall be subject to requirements stipulated in Technical Standard for Medical Waste Transport Vehicle (GB19217-2003). See Table 4.2-2 for generation and disposal of solid waste of the Project. 4.2.1.5 Improvement Project of Ningguo City Social Welfare Service Center 1. Waste water 260 beds and 100 staffs are added. Based on the consumption of domestic water of 0.2t/person·d, 365 days, and the generation coefficient of domestic wastewater of 0.85, the total generation volume of wastewater of the project is 61.2m3/ d. See Table 147 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4.2-1 for generation and emission of waste water The canteen wastewater of the Project entered into the septic tank after being pretreated by the oil separator (design scale 20m 3), the medical wastewater entered into the septic tank (design scale 80m3) after being disinfected by the disinfection tank (chlorine dioxide, design scale 20 m3), the wastewater of the Project entered into Ningguo City Sewage Treatment Plant through municipal pipelines after being pretreated by self-built oil separator, disinfection tank and septic tank. The wastewater discharge volume of the Project is 61.2m3/d, and the treatment capacity of Ningguo Sewage Treatment Plant is 40,000m3/d and it has been put into use since February 2010, so there is room for sewage storage. The sewage volume of the Project accounts for 0.15% of its treatment capacity, which is a relatively small proportion. Meanwhile, the water quality of the Project is simple without pollution factors affecting the water quality of sewage treatment plant, so the acceptance of the Project’s sewage to Ningguo City Sewage Treatment Plant won’t impact the plant’s water quality. Based on the above analysis, the sewage of the Project can be discharged into the Ningguo City Sewage Treatment Plant after being treated of self-built sewage treatment facilities, and will have very small effect on the sewage treatment plant. 2. Solid waste ① Domestic waste 260 beds are added, and the domestic waste generated per bed per day is calculated based on 1.0 kg, which results in domestic waste generated of 0.26t/d. The domestic waste generated per person per day of the staffs (based on 100 persons) is calculated at 0.5 kg, which results in domestic waste generated of 0.05 t/d, so the total amount of the domestic waste generated of the Project is 0.31 t/d (about 113t/a). The several waste collection buckets are uniformly cleared and transported by the environmental sanitation department every day. The domestic waste generated by the Project is uniformly collected by the Municipal Environmental Sanitation Department and sent to the Ningguo domestic waste disposal center. 148 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table 4.2-1 Generation and emission of water pollutant of the Construction Project Generation volume of Sewage Pollutant emission volume Sub-project Contaminant pollutant Preprocessing quantity Acceptance criteria activity Name Concentration Quantity of Measures Concentration Discharge amount (m3/a) (mg/L) output (t/a) (mg/L) (t/a) COD 300 24.22 Supported by 280 22.60 The sewage discharge meets the Elderly Care SS 180 14.52 hospital oil 120 9.67 pretreatment standards in Table Institution of Ammonia-nitrogen 25 2.03 separator, 25 2.03 2 of Discharge Standard of the First Animal and septic tank, Water Pollutants for Medical 80665 35 20 People's vegetable oil 2.82 sewage 1.62 Organization (GB18466-2005) Hospital of treatment and the acceptance criteria of Anqing BOD5 150 station and 150 Anqing North New Town 12.11 pipe network 12.11 Sewage Treatment Plant. Multi-functional COD 300 14.56 Supported by 280 13.59 The sewage discharge meets the Medical SS 180 8.73 hospital oil 120 5.81 pretreatment standards in Table Building Project Ammonia-nitrogen 25 1.22 separator, 25 1.22 2 of Discharge Standard of of Lu'an Animal and septic tank, Water Pollutants for Medical 48545 35 1.70 20 0.98 Hospital of vegetable oil sewage Organization (GB18466-2005) Traditional treatment and the acceptance criteria of Chinese BOD5 150 7.28 station and 150 7.28 Lu’an Chengbei Sewage Medicine pipe network Treatment Plant. COD 300 22.77 Self-built oil 280 21.24 SS 180 13.66 separator, 120 9.11 Ammonia-nitrogen 25 1.89 sewage 25 1.89 Animal and treatment The sewage meets the 35 2.66 process of 20 1.52 requirements of Grade III “Haoyan vegetable oil “enhanced criteria under Table 4 of Rainbow 76066 primary Integrated Wastewater Garden� (Base) treatment + Discharge Standard BOD5 150 11.40 disinfection" 150 11.40 (GB8978-1996) (design scale: 320 m3) and pipe network 149 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project COD 300 9.31 Oil separator, 280 8.69 SS 180 5.58 sewage 120 3.72 The Project of Ammonia-nitrogen 25 0.77 treatment 25 0.77 The sewage meets the Relocation and Animal and process of 35 20 requirements of Grade III Rebuilding of vegetable oil 1.09 “enhanced 0.62 criteria under Table 4 of Xuancheng 36500 primary Integrated Wastewater Municipal treatment + Discharge Standard Social Welfare disinfection" BOD5 150 150 (GB8978-1996) Home (design scale 100 m3) and 4.66 pipe network 4.66 COD 300 6.70 280 6.26 Improvement Meet the requirements of Grade SS 180 4.02 120 2.68 Project of Oil separator, III criteria under Table 4 of Ammonia-nitrogen 25 0.56 25 0.56 Ningguo City 22338 septic tank and Integrated Wastewater Animal and Social Welfare 35 pipe network 20 Discharge Standard vegetable oil 0.78 0.45 Service Center (GB8978-1996) BOD5 150 3.36 150 3.36 150 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Table 4.2-2 Generation and disposal of solid waste of the Construction Project Quantity of Sub-project activity Name Proposed disposal way output (t/a) The several waste collection buckets are uniformly cleared and transported by the environmental Domestic waste 420 sanitation department every day and finally sent to Domestic Waste Incineration Power Plant of Elderly Care Institution Anqing Wenergy Zhongke Environmental Protection Power Co., Ltd. of the First People's Set several medical solid waste collection buckets, depend on medical waste’s temporary storage Hospital of Anqing Medical waste 36.5 place of Anqing First People's Hospital and entrust Environmental Protection and Technology Co., Ltd. of Anqing Development and Investment (Group) Corporation. The several waste collection buckets are uniformly cleared and transported by the Environmental Elderly Care Center of Domestic waste 252 Sanitation Department every day and finally sent to the Lu’an City Domestic Waste Incineration Lu'an Hospital of Power Plant. Traditional Chinese Set several medical solid waste collection buckets, depend on medical waste’s temporary storage Medicine Medical waste 21.9 place of Lu'an Hospital of Traditional Chinese Medicine and entrust Lu’an City Medical Waste Concentration Disposal Engineering Limited Liability Company. The several waste collection buckets are uniformly cleared and transported by the environmental Domestic waste 333 sanitation department every day and finally sent to the domestic waste incineration power plant of “Haoyan Rainbow Wuhu Oasis Environmental Protection Energy Co., Ltd. Garden� (Base) Set several medical solid waste collection buckets and one temporary storage yard for medical solid Medical waste 28.47 waste of the Project (construction area 20m2), and entrust Wuhu City Medical Waste Concentration Disposal Engineering Limited Liability Company to dispose them. The several waste collection buckets are uniformly cleared and transported by the environmental The Project of Domestic waste 164 sanitation department every day and finally sent to the Xuancheng Guquan domestic waste landfill Relocation and site. Rebuilding of Set several medical solid waste collection buckets and one temporary storage yard for medical solid Xuancheng Municipal Medical waste 14.6 waste of the Project (construction area 10m2), and entrust Xuancheng City Jiuding Medical Waste Social Welfare Home Concentration Disposal Center to dispose them. Improvement Project of The several waste collection buckets are uniformly cleared and transported by the environmental Ningguo City Social Domestic waste 113 sanitation department every day and finally sent to the Ningguo domestic waste disposal center. Welfare Service Center 151 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 4.2.2 Environmental impact of other sub-projects Rural nursing homes in Suzhou Sewage water: domestic sewage is cleared regularly and used as fertilizer after treatment in the septic tank. Solid waste: domestic waste is collected and transported by sanitation workers to the waste disposal units of the district. Check with the PMOs of the corresponding district or county that no medical waste is included. Home-based elderly care sites in Anqing and Lu’an. Sewage water: domestic sewage is discharged into the sewage treatment plant through municipal sewage pipe network after treatment in the septic tank of the residential quarters. Solid waste: domestic waste is collected and transported by sanitation workers to the municipal waste disposal units. Check with the Municipal Project Management Office that no medical waste is included. Embedded Center for Disabled or Semi-Disabled Elders (the other four sub-projects not included in the Base) Sewage water: after disinfection, medical wastewater is discharged together with domestic sewage into Wuhu Zhujiaqiao Sewage Treatment Plant or Wuhu South Sewage Treatment Plant. Solid waste: domestic waste is collected and transported by sanitation workers to the municipal waste disposal units in Wuhu city. Set up a number of medical solid waste collection buckets, and entrust Wuhu Medical Waste Centralized Disposal Engineering Co. Ltd. for the disposal of the collected waste. 4.3 Design Requirements for Facilities for Fire Control, Safety, Accessibility, Sewage Collection and Treatment 4.3.1 Fire fighting As per the requirements in Code for Fire Protection Design of Building, the project is equipped with an outdoor fire hydrant system and an outdoor fire water supply system which is combined with the domestic water supply system. The fire water consumption is calculated as 10L/s as per the fire frequency of one time in the same time. The outdoor ground-type fire hydrants shall be installed along the road of the project site with a distance between every two hydrants less than 120m and no more than 2.0m from the curb line. 152 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Fire water supply system: the outdoor fire water supply system is arranged into a loop pipe network with two water inlets, which is a shared water supply network with the domestic water supply system; the indoor fire hydrant system is a temporary high pressure system with no vertical zoning, which is also designed into a loop pipe network. Set up a pump room for regional fire water supply in the basement of the outpatient building, where the water supply pumps for indoor fire hydrant of high and low areas and automatic fire sprinkler system are installed. The fire pump room in the basement is equipped with two fire hydrant water pumps (one working pump, one spare pump) for the building's indoor hydrant water supply. In addition, a fire water tank with an effective volume of 18m3 is installed on the roof for storage of fire water for beginning extinguishing of a fire. Outdoor fire water pump adapters, with the flow volume of 15L/s each, are equipped for the fire truck to feed water to the indoor fire hydrant system. Independent pressurization air supply system is provided respectively for smoke-proof staircase, lift elevator antechamber or common antechamber. The underground garage is equipped with a mechanical exhaust system and a supporting air supply system. The corridor with a length of more than 20m is designed with a mechanical exhaust system as well. As per applicable specifications, mechanical exhaust facilities are provided for underground rooms more than 50m2 large and aboveground rooms with a size of more than 100m2. The smoke exhaust fan is specialized for fire system. The fire protection design of this project is carried out as per applicable codes and standards to ensure the accessibility of the fire engine and configure the indoor and outdoor fire hydrant system as well as the portable fire extinguishers. Fire-fighting measures to be taken: 1. Fire water supply Configure independent fire water pipes and domestic water pipes, while the former is in a loop configuration around the building body. 2. Outdoor fire-fighting facilities As per the requirements in Code for Fire Protection Design of Building, the layout of the project of multistory buildings is designed to ensure the proper fire separation distance and the absolute accessibility of the fire engine with a circular fire lane and meanwhile the proper location of outdoor fire hydrant is designed for the fire water system to ensure the fire water supply. 153 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project 3. Indoor fire-fighting facilities As per requirements for multistory building in Code for Fire Protection Design of Building, fire zoning, interior fire hydrant system and regional gas extinguishing system for key parts are designed for the project. 4. Other fire-fighting measures (1) According to the applicable specifications, design sufficient space around the buildings for fire-fighting and allocate sufficient fire extinguishing equipment and facilities. (2) The buildings in use should be attended by designated personnel who are in charge of the daily maintenance and inspection of the fire-fighting facilities. (3) Establish a strict fire control system and carry out extensive and profound fire-fighting education to avoid possible fires; (4) Keep good communication with the fire safety management department that is in charge of the district and report immediately in case of fire. Fire safety facilities 1. To avoid fires, in addition to the fire-fighting education, it is very important to establish and constantly perfect the fire control system to ensure that all fire safety facilities work properly. 2. To ensure the accessibility of the fire engine to each building, a road grid is required with sufficient space between buildings as per the standards of Code for Fire Protection Design of Building. 3. The outdoor fire hydrants are installed in accordance with the applicable specifications and the water main is also the main fire water supply pipe. 4. Provide indoor fire hydrants and fire extinguishers according to the applicable provisions of Code for Design of Fire Extinguisher Distribution in Buildings and ensure that the fire water is available 24h and that the flow volume and hydraulic pressure satisfy the requirements for fire water supply. 5. In the process of selection and installation of electrical equipment, the grounding and explosion-proof function should be considered as part of lightning protection and explosion-proof measures for the buildings. 6. According to applicable specifications, all the buildings shall be designed with evacuation exits which should be unblocked all the time and an escape stair, the width and evacuation distance of which shall meet the requirements of specifications. 7. Provide automatic fire alarm system for the service rooms and mechanical 154 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project exhaust system for closed corridors. 8. Evacuation distance and evacuation crowd are calculated according to applicable specifications. The most disadvantageous evacuation crowd shall meet the standard and the evacuation width should not be less than 2.4 meters. 9. Fire prevention construction: all the doors in the building are A-class fire proof doors. 10. The fire resistance rating of the building is Grade II, and the fire endurance of non-load-bearing walls is 1.5 hours. All the walls should meet the requirements of the code. 4.3.2 Safety and accessibility of home-based elderly care sites and service centers for disabled or semi-disabled elders Develop home-based elderly care projects in communities including the upgrading or extension of 147 home-based elderly care sites in Anqing and Lu’an; Build and rebuild or extend 8 community-embedded service centers for disabled or semi-disabled elders (7 community-embedded service centers for disabled or semi-disabled elders and 1 smart health elderly care management center). Despite the large amount, wide distribution and different community situation of home-based elderly care sites, their architectural design should conform to the provisions of Code for Design of Residential Building for the Aged and Codes for Design on Accessibility of Urban Roads and Buildings: The building is decorated neatly, beautifully and practically with eco-friendly and easy-to-clean materials both inside and outside; According to the characteristics of aged-care service and function requirements of different facilities, the elderly care center shall be planned uniformly with easy communication between function distributions, necessary compartments, and sufficient access space for fire engine; Control the area of auxiliary parts of the building such as the lobbies, corridors and stair halls to a reasonable percentage to ensure a minimum usable area coefficient of 60%; The story height of the building is generally not less than 3m. The size of the bedroom should be right for 2-4 elders, with sufficient space between beds and furniture for wheelchairs and daily care; The bedroom should include washroom and the washroom floor should be easy to clean and anti-skid; The balcony and closet are also necessary as well as the call system; The site should be enclosed with fences which are 2.5-3.0m high. Community service institutions for the aged should be decorated to meet the 155 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project demand of the elders and their physical conditions, most importantly barrier-free. The respective net width of outer doors and inner doors should be 1.10m and 0.8m minimally with no threshold for the access of wheelchairs; The stair slope should be suitable for the aged, with smooth yet anti-skid stair treads and also handrails are absolutely necessary in staircases as well as corridors; Make sure the furniture and equipment have no obvious sharp corners and protruding parts; All rooms should be equipped with screen windows to ensure ventilation and anti-mosquito measures in hot season. Use warm tone for the indoor decoration. Inflammable or fragile materials or chemical fiber materials that emit poisonous gases are not allowed. Use wood or plastic flooring for bedrooms and corridors; Lay anti-skid tiles for the kitchen and washroom; Use high-quality wood or other materials that feels good for handrails; Equip the washroom with toilet and for men’s room pedestal urinal is also needed; At the height of 0.7m, mount a L-shaped hand bar on the wall near the toilet for the aged to hold, or a floor mounted Ⅱ-shaped hand bar with the same height. The door of the washroom should have an observation window and a door bolt which can be opened both inside and outside. Necessary fire-fighting facilities and installations shall be provided. A zone of 1.5m×1.5m or more is required for the wheelchair to turn both inside and outside the entrance of the building. Design and mark the entrance to be easily recognized by the aged. The hallway shall have sufficient space for wheelchairs and stretchers to turn and no threshold or height difference is allowed in the hallways, corridors and rooms that the aged use. Consider the physical and mental condition of the aged when determine the slope rate of the stairs; In addition to the public dining room, a small shared kitchen is also needed as well as a shared washroom, a shared bathroom and a shared laundry room. Design a private washroom in the ward for the aged. Local air conditioning system is provided to improve the life quality of the aged. All rooms are included in the mechanical exhaust system. For the bathroom, the ventilation volume is calculated based on the parameter of 9 times/h and for the changing room, 4 times/h. Air inlet is non-mechanical. 4.3.3 Safety and accessibility of medical and aged-care institutions and welfare homes The medical and aged-care institution projects include enlarging the nursing 156 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project home for the elderly people in Anqing First People's Hospital and expanding the multi-functional medical building in Lu'an Hospital of Traditional Chinese Medicine. This project includes rebuilding Xuancheng Municipal Social Welfare Home at a new location and building an additional social welfare center in Ningguo Welfare Institution. This project has the function of aged-care institutions and rehabilitated medical institutions. The overall building style is neat, modern and of warm tone. The project stands with large body of skirt building, which gives a message of steadiness and trustworthiness to the aged. Good lighting, ventilation and vision, green roofs, and warm color appearances transmit an aesthetic of comfort and peace. The institution is semi-closure, which looks good from the street as well as form a courtyard, providing a safe and comfortable environment for the elderly. The concept of resort hotel is taken into the plan design which distinguish our project from the common ward. The layout of the nursing room is single corridor, which means open space and good vision. Considering the theme of the building and the harmonious appearance of the integral neighborhood, the color of the building is mainly white vertically to emphasize its modesty and dignity, with unique style yet not too different or special. Split type air conditioners shall be installed for heating. The design of exhaust system and calculation of exhaust volume shall be based on the function and fresh air volume of the section. Also the exhaust system shall be able to control the air flow direction. Mechanical ventilation systems shall be adopted in the underground garage, refrigeration plant room, transformer room and pump room. The exhaust outlet of the garage shall avoid crowded places and its height shall be no less than 3m. 4.3.4 Safety and accessibility of rural nursing homes Rural nursing home projects include the upgrading, and expansion of 35 nursing homes in Yongqiao District, Lingbi County, Dangshan County, Xiao County, and Si County under Suzhou. The plan design of the buildings for nursing home shall meet the demand of the elderly care and also conform to national compulsory standards and specifications and other relevant standards or specifications. The civil engineering parts of the project consist of bedrooms, dining rooms and recreation rooms. The section design of the buildings shall consider their functions, their 157 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project architectural images and the landform or height differences of the site. The story height shall be 3.60m. As for the elevation design, give personality to every single building while keeping in mind the consistency and harmony of the complex in style which shall be neat and modest. Apply fireproof and energy-saving bricks for the outer wall and for facing brick, machine made tiles like ceramic tiles, clay tiles, splitting tiles and dry-mixed tiles shall be suitable. The color of the facing brick is traditional gray. The architectural design of the entrances, corridors, living rooms, washrooms and doors and windows in this project shall meet the standards of Code for design of Residential Building for the Aged (GB 50340-2016). The accessibility design of the project shall conform to Codes for Accessibility Design (GB50763-2012). In the building, it is necessary to install a mechanical ventilation system that meets the requirements of indoor sanitation, and adopt a bidirectional ventilation device with heat recovery function. In the shared kitchen, shared washroom and private washroom, ventilation ducts and mechanical devices with the function of air reversing prevention shall be provided. For the shared kitchen, natural ventilation that fully ventilates the room shall also be provided. The designed indoor heating temperature of buildings of elderly facilities shall not be lower than the standard stipulated in Design Code for Buildings of Elderly Facilities (GB 50867-2013) 4.3.5 Design requirements for facilities for sewage collection and treatment The projects of building and rebuilding 10 community-embedded service centers for disabled or semi-disabled elders and the project of relocation and reconstruction of Xuancheng Municipal Social Welfare Home all involve medical service. So their sewage waste shall be disposed in accordance with the technical specifications for wastewater treatment. To meet the requirements of Technical Guide for Hospital Sewage Treatment and Technical Specifications for Hospital Sewage Treatment (HJ2029—2013), also considering that municipal sewage treatment plants are available for medical sewage discharging of this project, Enhanced Primary Treatment + Disinfection shall be adopted. 158 EMP for World Bank-Financed Anhui Aged Care System Demonstration Project Sewage of hospitals for Adjusting Coagulation Disinfection Municipal non-infectious diseases Grid tank sedimentation sewage pipe network Sludge treatment system Sludge tank Figure 4.3-1 Process Flowchart for Enhanced Primary Treatment 159 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 5 Social management plan World Bank-financed Anhui Aged Care System Demonstration PMO hired dedicated experts from Involuntary Resettlement Research Center of China Three Gorges University to conduct the investigation and assessment for the possible social impact of the Project, and has completed the Social Impact Assessment Report. By fully understanding the relevant laws and regulations at all levels, and after fully discussed with the affected primary stakeholder like the residents / villagers, the relevant administrative departments and enterprises in the proposed Project region of counties and cities in Anhui Province, the SIA team identified the main social risks which may affect the Project construction, development goals achievements regarding the Project implementation based on field surveys and statistical analysis. Accordingly, the following action plans and suggestions of mitigation and avoidance were proposed. In order to promote the realization of Project benefits and goals and on the premise of the full discussion with such primary stakeholders as the civil administration department, the employees and the elderly in the elderly care sites and elderly care institutions covered by the Project as well as the family members of the elderly, the social judgment group has put up with some measures to relieve and avoid risks regarding the possible major social impacts and risks which are identified on the basis of the field investigation and data analysis, and are relevant to the design and implementation of the Project, and may affect the development goals of the Project. The measures mainly involve the following aspects: 5.1 Reasonably arrange the spatial location of the elderly care sites in community The layout of standard social elderly care sites should be planned reasonably. In the places where the demand for elderly care is large, the sites may be constructed a little more, while in the places where the demand for elderly care is small, such as industrial area, commercial area, the sites might be less. 5.2 Reduce the workload of government staff Hire experienced experts or expert team as soon as possible to effectively reduce the workload of government staff. 160 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 5.3 Reduce the negative impact of the project on elderly care service practitioners The implementation of the project involves civil engineering, government's purchasing healthcare service, and training of new employees, which may increase the workload of some existing staff in nursing homes, welfare institutions and social elderly care institutions. Suggestions 1) Formulate the transition plan for the implementation period of the Project, eliminate the environmental impact and potential risks during construction, and reasonably arrange the work of staff and the transition of the elderly; 2) Develop talent motivation and training programs as soon as possible to address the need for human resources during the implementation and operation of the Project; 5.4 Reduce the negative impact of the project on the elderly 1) Formulate temporary transition plan for the construction period to help the elderly to adapt to the new environment as soon as possible and to reduce the environmental impact and potential risks during the construction; 2) Deliberate the change of service price. 5.5 Reduce the negative impact on other residents in community The existing community activities can’t be weakened. 5.6 Reduce the migration influence of the project Formulate the “Resettlement Action Plan�. 5.7 Establish the complaint mechanism During the preparation, implementation and operation of the project, the complaint channel should be established to provide people affected by the project with the opportunity to complain when they meet any problems or they are dissatisfied with the project. Therefore, it is suggested that the project institutions assign specific officer to handle the complaints and keep the complaint record and remedial measures. See Appendix 3 for the List of Social Management Plan. 161 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 6 Environmental monitoring plan 6.1 Monitoring purpose Environmental protection monitoring includes the construction period and operation period, which is designed to control the dynamic pollution situation of the proposed Project in a comprehensive and timely manner, and to acknowledge the environmental quality variation and the effect within the affected area and the dynamic change during the operation period, so that feedback information can be submitted to the competent department as a scientific basis for environmental management of the Project. 6.2 Monitoring Implementation Based on the environmental impact forecast results, the sensitive site where the pollution may be significant shall be selected as the monitoring site. Select the surface water environment, groundwater environment, soil environment which have been affect by the environment significantly; determine the monitoring factors according to the characteristic contaminant obtained in the engineering analysis; adopt the monitoring and analysis methods in accordance with the Environmental Monitoring Technical Specifications issued by the State Environmental Protection Administration for the specific items; implement the evaluation criteria based on the national standard of the environmental impact assessment. The local environmental monitoring stations or the social environment monitoring agencies with the qualification for monitoring shall be selected as the monitoring organization. Department of Civil Affairs of Anhui Province shall be responsible for the monitoring, and the Environmental Protection Authority of the cities and counties at the Projects sites shall act as the supervisory agency. 6.3 Monitoring Plan The Project has a certain impact on the environment during the construction and operation period. To protect the environment, effectively controlling the pollution and remaining attentive to the operating condition of the environmental facilities and equipment to prevent the pollution accident. See Table 6.3-1 for the Suggested Environmental Monitoring Plan. 162 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 6.3-1 Environmental Monitoring Plan for the Sub-Projects Annual Unit Price Sub-project Monitoring Environment Monitored cost Monitoring Unit in Supervising Monitoring place Monitoring frequency (CNY_/period activity period element items (CNY_/ organization charge agency ) year) 2 monitoring sites 4 periods / year, 1 day / shall be set up at: period, 1 time / day, existing works at increase the monitoring Ambient air PM10 3000 12000 social welfare frequency once the situation institution, Gelin of exceeding permitted Chuntian levels are found 4 monitoring sites shall be set up at: Constructio Improveme existing works at n period 4 periods / year, 1 day / nt Project of children welfare Ningguo Ningguo period, 2 times / day, 1 time Qualified Ningguo institution, Municipal Environmen / day or night Increase the environmental City Social Noise Ningguo LeqdB(A) 1500 6000 Social tal monitoring frequency once monitoring Welfare Municipal Social Welfare Protection the situation of exceeding organization Service Welfare Home, Home Bureau permitted levels are found Center and Ningguo senile apartment, Gelin Chuntian 4 periods / year, 1 day / 1 monitoring site pH, CODCr, period, 4 times / day, 1 time shall be set up at Operation BOD5, / 6 hours Increase the Water quality the water outlet of 6000 12000 period NH3-N, monitoring frequency once the wastewater SS the situation of exceeding treatment plant permitted levels are found The Project 4 periods / year, 1 day / 2 monitoring sites of period, 1 time / day, shall be set up at: Xuancheng Xuancheng Relocation increase the monitoring Qualified Ambient air Xiadu Xincheng PM10 3000 12000 Municipal Environmen and Constructio frequency once the situation environmental and Yucun Social tal Rebuilding n period of exceeding permitted monitoring Village Welfare Protection of levels are found organization Home Bureau Xuancheng 2 monitoring sites 4 periods / year, 1 day / Noise LeqdB(A) 750 3000 Municipal shall be set up at: period, 2 times / day, 1 time 163 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Social Xiadu Xincheng / day or night Increase the Welfare and Yucun monitoring frequency once Home Village the situation of exceeding permitted levels are found 1 temporary storage yard for medical solid Medical waste Monitoring / supervision of waste disposal — — waste (construction area Operation 10m2) period 2 periods / year, 1 day / 1 monitoring site period, 2 times / day, 1 time shall be set up at pH, CODCr, / day or night Increase the Water quality the water outlet of BOD5, 6000 12000 monitoring frequency once the wastewater NH3-N, SS the situation of exceeding treatment plant permitted levels are found 2 monitoring sites 4 periods / year, 1 day / shall be set up at: period, 1 time / day, Wuhu Sixth increase the monitoring Ambient air People’s Hospital PM10 3000 12000 frequency once the situation and Polka of exceeding permitted International levels are found Constructio Garden n period 2 monitoring sites 4 periods / year, 1 day / shall be set up at: period, 2 times / day, 1 time Wuhu Sixth Anhui / day or night Increase the Wuhu “Haoyan Noise People’s Hospital LeqdB(A) 750 3000 Qualified Haoyan monitoring frequency once Environmen Rainbow and Polka environmental Aged-care the situation of exceeding tal Garden� International monitoring Service permitted levels are found Protection (Base) Garden organization Investment Bureau 1 temporary Co. Ltd. storage yard for medical solid Medical waste Monitoring / supervision of waste disposal — — waste Operation (construction area period 10m2) 1 monitoring site 2 periods / year, 1 day / pH, CODCr, shall be set up at period, 2 times / day, 1 time Water quality BOD5, 6000 12000 the water outlet of / day or night Increase the NH3-N, SS the wastewater monitoring frequency once 164 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project treatment plant the situation of exceeding permitted levels are found 4 periods / year, 1 day / 1 monitoring site period, 1 time / day, shall be set up at: increase the monitoring Ambient air Zongpu PM10 1500 6000 frequency once the situation Community of exceeding permitted (Beiyuan Estate) Constructio levels are found n period 2 monitoring sites 4 periods / year, 1 day / shall be set up at: period, 2 times / day, 1 time Zongpu / day or night Increase the Elderly Care Noise LeqdB(A) 750 3000 Community monitoring frequency once Anqing Institution Qualified (Beiyuan Estate) the situation of exceeding Anqing First Environmen of the First environmental and Project site permitted levels are found People's tal People's monitoring Temporary Hospital Protection Hospital of organization storage yard for Bureau Anqing Medical waste medical solid Monitoring / supervision of waste disposal — — waste relying on hospital Operation 2 periods / year, 1 day / period 1 monitoring site period, 2 times / day, 1 time shall be set up at pH, CODCr, / day or night Increase the Water quality the water outlet of BOD5, 6000 12000 monitoring frequency once the wastewater NH3-N, SS the situation of exceeding treatment plant permitted levels are found 2 monitoring sites shall be set up at: Jinan Lijingyuan 4 periods / year, 1 day / Resettlement period, 1 time / day, Elderly Care Complex under increase the monitoring Ambient air PM10 3000 12000 Center of construction, and frequency once the situation Lu'an Qualified Traditional Lu'an Lu'an Hospital of of exceeding permitted Environmen Constructio environmental Chinese Hospital of Traditional levels are found tal n period monitoring Hospital of Traditional Chinese Medicine Protection organization Lu’an Chinese (Phase I) Bureau Medicine 2 monitoring sites 4 periods / year, 1 day / shall be set up at: period, 2 times / day, 1 time Noise Jinan Lijingyuan LeqdB(A) / day or night Increase the 750 3000 Resettlement monitoring frequency once Complex under the situation of exceeding 165 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project construction, and permitted levels are found Lu'an Hospital of Traditional Chinese Medicine (Phase I) Temporary storage yard for Medical waste medical solid Monitoring / supervision of waste disposal — — waste relying on hospital Operation 2 periods / year, 1 day / period 1 monitoring site period, 2 times / day, 1 time shall be set up at pH, CODCr, / day or night Increase the Water quality the water outlet of BOD5, 6000 12000 monitoring frequency once the wastewater NH3-N, SS the situation of exceeding treatment plant permitted levels are found 166 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 6.4 Environmental Supervision Scheme Environmental supervision during the construction period is the environmental protection measure implemented during the construction period of the Project. During the construction period, the environmental supervision work shall be entrusted by the Employer with the corresponding qualified construction supervision organization. The construction supervision organization is required to be equipped with full-time environmental protection supervision engineer, who is responsible for the environmental management and supervision during the construction period. Environmental supervision organization shall set up environmental monitoring working group to implement the specific work for environmental monitoring audit. The environmental supervision working group shall propose the environmental supervision work plan according to the contents of environmental supervision of the Environmental Management Plan and the actual situation of the Project construction and submit it to relevant environmental management department and the Employer. 6.4.1 Environmental Supervision Scope (1) Environmental supervision scope Project construction area and the areas directly affected by the Project, including the construction site and construction access of the main works and temporary works. Supervision contents: including environmental protection work in terms of ecological protection, greening, pollution prevention and social environment. (2) Scope of project The construction site, construction Project and the areas of environmental pollution caused by construction in the above mentioned scopes. (3) Supervision period The engineering environmental supervision of the Project is consisted of construction preparation, construction and Project acceptance and defect liability. 6.4.2 Specific Working Method for the Environmental Supervision Environmental supervision is a third party independent to the PIU and the Contractor, and it works independently by strictly following the terms of the contract and relevant environmental laws, regulations. As an important part of engineering supervision, the environmental supervision is closely related to engineering supervision and relatively independent with its own characteristic. Specific Working Method for the Environmental Supervision 167 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project are as follows: (1) Review whether the environmental protection measures in the preliminary design of the Project and the construction drawing design correctly implement the environmental protection measures put forward by the approved environmental impact report. (2) Assist the Employer in organizing the environmental protection training for the engineering construction, design and management personnel. (3) Review relevant environmental protection provisions in the bidding documents and engineering contracts. (4) Give improvement suggestions in the respect of environmental protection on the construction organization design, the construction technology plan and the construction schedule proposed by the Contractor and review the environmental index for the mobilized construction equipment etc. (5) Reduce the measures affecting the environment protection to protect the ecological, water, gas, sound environment during the construction process. Supervise the construction quality for the environmental protection Project and carry out the intermediate acceptance and signature in accordance with the standard. (6) Carry out the daily inspection supervision for the construction site and keep systematic records of the environmental impact of the construction, the effectiveness of environmental protection measures, environmental protection construction quality. (7) Record the environmental problems found in the supervision, and require the Contractor to make rectifications within a time limit by oral or memorandum. (8) The pollution sources causing serious environmental pollution to the construction site are required to be monitored, if necessary, the PIU shall be suggested to hire professionals and qualified monitoring organization to monitor, and targeted measures against the existing environmental problem shall be carried out by the Contractor based on the monitoring result. Require the Contractor to solve the major environmental problems within a time limit, and distribute the "environmental issues rectification notice "after negotiating with the PIU. (9) Timely bring the unexpected problems regarding the environmental protection and design to the environmental supervision leading group and propose solutions. (10) Responsible for drafting work plan and summary of the Project environmental supervision. 168 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 6.4.3 Project Environmental Supervision Scheme Based on the characteristics of the construction of the Project, environmental supervision shall implement dynamic management in accordance with the construction process. Environmental supervision working is mainly based on the routine patrol, supplemented by the necessary environmental monitoring so as to timely adjust the environmental monitoring. The main pollution process applies the principle of control from the time of manufacture to that of obsolescence to ensure that the Contractor's construction behavior is subject to environmental protection provisions of relevant environmental laws, regulations and contracts. (1) Construction preparation stage Check the implementation of environmental protection provisions in the construction contract, review the environmental protection measures in the construction organization design, and carry out on-site inspection, optimization and examination for the construction site along with the Employer, the design unit, the Engineer and the Contractor. See Table 6.4-1 for Supervision Scheme Table 6.4-1 Environmental Supervision Emphasis in Construction Preparation Stage Construction Supervision emphasis Supervision method Means Activities Prepare work plan of the Project environmental supervision Review the environmental terms in the construction Documents review contract Review the sensitive sites and protection objectives at the Patrol on-spot record construction segment site Review the Contractor's Construction environmental protection Documents inspection tendering and measures in organizational bidding arrangement for construction Review the Contractor's environmental management plan during the construction period Review the construction plan and the corresponding environmental protection measures in commencement permit for the sub-divisional works (2) Construction stage The environmental supervision of the construction process shall be carried out 169 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project combined with the construction process. See Table 6.4-2 for the supervision pan. Table 6.4-2 Main environmental supervision content during the construction Disposal method Main Environment Supervision Main supervision against excessive supervision element Subjects content discharge or method violation 1. The reasonability of the construction site selection, strengthen the management and Notify the construction Construction Employer and Water machinery to maintain temporarily Construction sites the Contractor to environment waste water occupied land take remedial operations to prevent patrol measures the waste water flow into river. 2. Reasonable treatment for domestic sewage 1. Transport vehicles adopts closed product transfer for Monitor the material cover and ambient air, 1. Building the material uploading inspect the Notify the materials and unloading site construction Employer and transportation, shall be provided with Ambient air site and the the Contractor to stacking; dust suppression temporary take remedial 2. Topsoil measures and construction measures storage yard regulated watering; site during the 2. The topsoil yard construction is at least 300m away from the residential area 1. Rationally arrange the Monitor construction schedule sound 2. Use of low-noise environment, Notify the 1. Construction equipment inspect the Employer and Acoustic Access 3. Arrange construction the Contractor to environment 2. Construction temporary fence at the site and the take remedial site sensitive site temporary measures 4. Sound construction environment quality site during the monitoring during construction construction Monitor sound 1. Surface soil environment, Notify the stripping utilization inspect the Employer and 2. Domestic waste Solid waste Construction sites construction the Contractor to disposal site and the take remedial 3. Construction temporary measures waste disposal construction site during the 170 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project construction During the 1. By transporting at construction, Notify the off-peak visit the local Employer and Social Main construction transportation hours residents for the Contractor to environment sites etc. to reduce the the opinions take remedial impact on traffic of of the Project measures the location construction. Before the construction, specify the 1. Ecological temporarily recovery of the occupied land temporarily occupied location of land each section 2. The rationalities and the patrol Notify the of site selection for during the Employer and Ecological Temporarily borrow yard and construction, the Contractor to environment occupied land waste slag plant check the take remedial 3. Waste processing recovery measures is rational or not condition for 4. The rationalities the of site selection for construction construction access temporarily and construction camp occupied land after the construction finished. (3) Supervision in handover and defects liability period This working of this stage mainly consists of the data gathering for the environmental protection acceptance upon the completion of the Project, the construction of environmental protection Projects, as well as the supervision for the recovery and maintenance for the temporarily used land like construction site during the defects liability period. 171 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 7 Institutional Arrangement World Bank-financed Anhui Aged Care System Construction Demonstration Project will be implemented at Anhui provincial, city, county levels, and the Department of Civil Affairs of Anhui Province will be responsible for the implementation coordination of the Project and the implementation of the provincial level Project. In order to strengthen the Project management and implementation, as well as the coordination between departments to have the Project to be completed as scheduled, the Project will introduce a leading group involves many departments to guide the Project. At the same time, strengthen the institutional capacity at all levels by carrying out Project implementation management consulting services, security monitoring and the corresponding training and investigate study. 7.1 Environmental Management System Arrangement The Project is composed of 17 implementing agencies, including: the province's Project implementation agencies are Department of Civil Affairs of Anhui Province; Anqing First People's Hospital; Lu'an Hospital of Traditional Chinese Medicine; Wuhu City; the implementation agencies for Wuhu City are Wuhu Bureau of Civil Affairs; Anhui Haoyan Aged-care Service Investment Co., Ltd.; the implementation agencies for Xuanzhou District are Xuanzhou District Civil Affairs Bureau, Xuanzhou District Social Welfare Home; the implementation agencies for Ningguo City are Xuancheng Ningguo Civil Affairs Bureau, Ningguo Municipal Social Welfare Home; the implementation agencies for Suzhou City are: Suzhou Municipal Civil Affairs Bureau, Yongqiao District Civil Affairs Bureau, Dangshan County Civil Affairs Bureau, Xiao County Civil Affairs Bureau, Lingbi County Civil Affairs Bureau and Si County Civil Affairs Bureau. 7.1.1 Provincial Level The provincial leading group, headed by the leader in charge of the office of Department of Civil Affairs of Anhui Province, is composed of the member units like Anhui Provincial Department of Finance, Anhui Development and Reform Commission and Environmental Protection Department of Anhui Province, which provides guidance and coordination of the policies and institutions relating to the Project. Anhui Provincial Department of Finance is responsible for Project financial management, including financial management guidance for the PMO, Project municipal finance bureau and PIU, and the management of the Project special 172 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project account. Anhui Development and Reform Commission (LPDRC) will be responsible for the overall planning of the Project facilities, the feasibility study and design approval of each sub-Project, and provide relevant policy guidance for the Project to promote economic reform and development. Environmental Protection Department of Anhui Province will be responsible for organizing relevant experts on technical review for the Project environmental impact assessment. Provincial PMO: relevant departments of Department of Civil Affairs of Anhui Province and the Environmental Protection Department of Anhui Province jointly set up a PMO for the Project overall management during the Project implementation period. 7.1.2 Municipal and County Level Municipal PMO: relevant regional civil affairs bureau and regional environmental protection bureau subsidiary to the Department of Civil Affairs of Anhui Province jointly set up a PMO for the Project overall management during the Project implementation period. Implementation organization of each city and county (PIU): the Employers of 5 cities where the Project located are the executive body (PIU) who manages the execution of each Project. The PMO will: (1) be responsible for the overall Project implementation management; (2) Project owners and relevant agencies coordination; (3) progress and quality of the Project supervision, text preparation agency work assessment; (4) Liaison and communication with World Bank and relevant government agencies. The municipal PMO and the performing organization of each city and county will be responsible for the implementation of routine environmental management throughout the Project (including construction period and operation period), including the implementation, inspection, supervision and reporting of the environmental management plans, social action plans and RAP inspection, and implementation of mitigation measures for the environmental influence. The specific organization is shown as follows. 173 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project World Bank Anhui Province Project Leading Group Provincial PMO (including 1 environmental protection specialist) 5 Prefectural and Municipal PMO (including 1 environmental protection specialist) Anhui Provincial Department of Finance Project Management Organization Performing organization of the Project at each district and county (PIU, the Employer) (each including at least 1 full-time environmental responsibility person responsible for the environmental protection work during the Project implementation period) Anhui Development and Reform Commission Loan Project implementation and its Qualified environmental monitoring Environmental Protection organization (responsible for the Department of Anhui Province consulting team (2 environmental environmental monitoring during the expert consultants) implementation of the Project based on EMP) Figure 7.1-1 Organization chart of Project environment and social management organization Provincial PMO (1) the full implementation of the environmental management plan; (2) report The implementation of the environmental management plan to the leading group office and the World Bank; (3) supervise and inspect the progress, implementation and effectiveness of environmental impact assessment during the Project construction and operation period. Environmental protection specialist of the municipal PMO the Environmental leader of the Project owner: The municipal PMO and the Project PIU unit appoint at least one full time environmental responsible person of their own during the implementation of the Project: (1) the specific implementation of the environmental management plan; (2) the supervision and inspection of implementation and result of the environment impact mitigation measures during the construction and operation period; (3) supervise the internal environmental inspection 174 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project of the Contractor and The Engineer, and supervise, inspect and coordinate external monitoring and target reaching supervision; (4) ensuring that the Project implementation operations manual including relevant clauses of environmental management, monitoring and mitigation; (5) report the implementation of the environmental management plan to the municipal PMO and the World Bank; (6) work with the social commissioner of the PMO to deal with public complaints; (7) make emergency response and disposal to the effect and damage on the environment which are unforeseen by the environmental impact assessment and environmental management plan. The environmental consultants from the loan implementation consultant panel will provide technical support to the environmental specialist of the urban construction PMO and PIU unit. The Environmental professionals will receive supervision from the Provincial Environmental Protection Office and the Municipal Environmental Protection Bureau of each Project. During the construction drawing design stage, the municipal PMO provides the environmental management plan to the design institute through the PIU unit to ensure that the environmental protection and environmental impact mitigation measures are included in the construction drawing design. The environmental management plan will be updated according to the changes in the design of the construction drawings and become a component of the Project construction management. Expert consult of loan implementation environment: The contract for the environmental consulting expert is included in the technical assistance consulting service contract of the loan implementation. The expert will provide advisory services in terms of environmental management and monitoring to municipal PMO, PIU, the Contractor and construction supervisor during the Project implementation period. The expert will: (1) assist the municipal PMO and the PIU to update the environmental management plan and the environmental monitoring plan according to the actual situation; (2) implement and continuously improve the environmental impact mitigation measures in the environmental management plan; (3) review the internal environment monitoring reports, semi-annual external environmental monitoring report; (4) direct and conduct training for the PMO, PIU, construction supervision unit and the Contractor, and the content of training includes China's environmental laws and regulations, policies and standards, the Bank's security policy, environmental management plan and public complaints mechanism etc. (5) determine all the environmental issues at the implementation stage of the Project, and develop the 175 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project necessary governance and corrective measures to implement it in action plan; (6) assist the municipal PMO and PIU in writing the semi-annual environmental monitoring and progress report which is submitted to the World Bank; (7) implement regular and irregular environment inspection for The Project site. The Contractor: the Contractor will be responsible for implementing the environmental impact mitigation measures and internal environmental inspection / monitoring during the construction period with the help of the Engineer and under the supervision of the municipal environmental protection bureau. The Engineer: The engineer shall arrange at least 1 environmental engineer at each construction site to responsible for: (1) supervise the implementation of the Contractor's environmental management plan; (2) guide the internal environmental inspection and monitoring; (3) complete the monthly environmental performance report and submit it to the urban construction PMO, implement the technical assistance experts and PIU by loan; (4) prepare the environmental management section of the monthly progress report submitted to the municipal PMO with the Contractor. Environmental monitoring stations of the Project location city: ensure that the environmental monitoring stations of each Project location city shall be subject to the external monitoring of the Project and target reaching monitoring in accordance with the related environmental standards, norms in China, and according to the requirements of the environmental management and monitoring plans during the construction period and operation period. Table 7.1-1 Project office and Project implementation institution list PMOs PIUs PMO of Department of Civil Affairs 1 Department of Civil Affairs of Anhui Province of Anhui Province PMO of Anqing Municipal Civil Anqing Municipal Civil Affairs Bureau 2 Affairs Bureau Anqing First People's Hospital PMO of Lu'an Municipal Civil Lu'an Municipal Civil Affairs Bureau 3 Affairs Bureau Traditional Chinese Hospital of Lu’an Suzhou Municipal Civil Affairs Bureau Yongqiao District Municipal Civil Affairs Bureau PMO of Suzhou Municipal Civil Lingbi County Civil Affairs Bureau 4 Affairs Bureau Dangshan County Civil Affairs Bureau Xiao County Civil Affairs Bureau Si County Civil Affairs Bureau Wuhu Civil Affairs Bureau 5 PMO of Wuhu Civil Affairs Bureau Anhui Haoyan Aged-care Service Investment Management Co., Ltd. 6 PMO of Xuanzhou District Civil Xuanzhou District Civil Affairs Bureau, Xuancheng 176 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project PMOs PIUs Affairs Bureau, Xuancheng City City Social Welfare Institution in Xuanzhou District Civil Affairs Bureau in Ningguo City, Xuancheng PMO of Civil Affairs Bureau of 7 City Ningguo City, Xuancheng City Ningguo Municipal Social Welfare Home 7.2 Responsibility and personnel staffing of environmental management system organization In the environmental management system of the Project, some are internal organizations of the Project, some are engaged advisory services of the Project, and some are external organizations of the Project. These organizations together constitute a complete Project environmental management system, but have different work contents and different scopes of official duty. The constituent organization of environmental management system, and content and personnel staffing of environmental management at different stages are shown in Table 7.2-1. Table 7.2-1 Schedule of the Phased Environmental Management organization, Content and Personnel Staffing of the Project Institution Allocation Stage Main environmental management content name of personnel Government organization of administrative supervision and administration shall conduct Provincial, supervision and management of the environment Municipal and in the whole process for the Project in County accordance with the law, including the approval Unlimited Environmental of Project environmental impact assessment Protection report, and the environmental supervision and Bureau management of Project construction, and final acceptance and operation of environmental protection Project, etc. Be responsible for contacting with the Provincial environment agencies of government at all levels 1 PMO and coordinating to implement environmental management matters. Be responsible for the implementation and Design & management of sub-Project in each city, preparation including management of Project environment, Municipal One person environmental monitoring and environmental PMO in each city supervision, and for the supervision and inspection and report of implementation of environmental management plan. 1. Incorporate environmental protection measures into the design plan and budget; Designer 2. Write the mitigation measures in the 2 environmental management plan in the technical specifications of the biding document. 1. Provide technical support for the Environmental environmental protection of Project design; Impact 2. Prepare the environmental impact 6 Assessment assessment report; Organization 3. Make environmental management plan. Constructio 1. Be responsible for a series of environmental One person Sub-Projects n period protection management during the Project for each 177 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project construction period, and implement the sub-Project expenditure of environmental protection; 2. Manage and supervise the environmental protection during the construction period, as well as investigate and deal with the problems of nuisance or pollution in the construction process; 3. Be responsible for coordinating with the environment agencies of government to implement environmental management matters; 4. Follow up the implementation of environmental management plan, and regularly report to the competent department of same level, Provincial PMO, County PMO and World Bank; 5. Accept and handle public complaints. 1. Carry out environmental protection measures and work in accordance with the bidding document, contract and environmental management plan; 2. Accept the guidance and supervision of County PMO of the Project, environment management personnel of community service center, environment supervision engineer and relevant functional department of government; 3. Accept the technical support from the environmental protection advisory body; 4. Adopt safety protection measures, such as Two persons setting up information sign on the construction Contractor for each site, and make fence for the boundary on the Project construction site to build up the communication channels with the public and to ensure the construction safety; 5. Implement environmental management plan; 6. Before the mobilization, prepare specific environmental management plan (including construction activities management, traffic management, occupational safety and health, environmental and social impact management, complaints mechanism, etc.) in accordance with EMP. 1. Supervise the Contractor to implement the environmental management plan, and perform the environmental mitigation measures in the Contract; 2. Supervise the implementation of the Project/environ Contractor on site; mental 5 3. Cooperate with the Employer for supervision environmental management; 4. Record the implementation of the environmental management plan to produce a report, and regularly report the same to the operator; Complete the monitoring work according to the Environmental entrustment of Project operator and the monitoring 5 environmental monitoring plan proposed in the organization evaluation. 1. Supervise and inspect the environmental Municipal and protection measures of the operator and County Contractor; Environmental 1 2. Receive the report on the implementation of Protection environmental management plan submitted by Bureau the operator and PMO, and conduct 178 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project administrative management according to the report; 3. Arrange emergency measures if abnormal environmental conditions occur in the construction; 4. Accept public complaints, and coordinate and handle them. 1. Provide technical support for the environmental protection of Project during the construction period in accordance with the entrustment of Project operator and the Technical environmental impact report as well as the assistance/cons Unlimited environmental protection design results; ultation 2. Provide technical guidance to the Contractor on environmental protection, and conduct environmental protection training well during the construction period; 1. Be responsible for the environmental protection management after operation, the environmental management plan during the implementation period as well as the mitigation measures and monitoring during the operation period; 2. Be responsible for contacting with the Operating governmental authorities and coordinating to 2 institution implement environmental management matters; 3. Be responsible for emergency treatment of environmental accidents; 4. Carry out training for personnel regularly to improve their capabilities and actively conduct exchange activities on environmental technology and experience to further improve environmental management at the same time; Operation 1. According to the entrustment of Project period operator, complete the environmental Environmental monitoring during the Project operation period On the basis monitoring in accordance with the environmental of entrusted organization monitoring plan; task 2. Conduct routine monitoring related to the Project. 1. Conduct the acceptance of environmental protection Project; Municipal and 2. Manage and supervise the environmental County protection standards during the operation Environmental 2 period; Protection 3. Carry out supervision and inspection on the Bureau operation of existing environmental protection facilities. Social citizen and civil Social supervision Unlimited organization 7.3 Environmental management training 1. Objective of Training The purpose of environmental management training is to ensure the smooth and effective implementation of environmental management, make relevant personnel familiar with the content and procedure of environmental management, improve the environmental management capacity of environment managers, and ensure the 179 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project effective implementation of environmental protection measures. Table 7.3-1 Enhancement and Training Plan for Provincial Environmental Management Organization Number Budget of Training Participants Contents Times Days (CNY Attendee 10,000) s � Security policy of World Bank and EHS; Environmental PMO, PIU, the � Relevant Chinese laws, Contractor and environmental laws, regulations and relevant personnel policies, regulations and 2 1 30 10.0 policies of of Municipal standards; World Bank Environmental � Best case of and China Protection Bureau environmental management of civil works; PMO, PIU, the Contractor, the � The composition, Engineer, principle, responsibility representatives of and time frame of residents and Public complaints mechanism; villagers in the complaints � Type and 2 1 30 10.0 vicinity of the mechanism qualification of Project, and complaints; relevant personnel � Complaint filing of Municipal and report procedure. Environmental Protection Bureau � Responsibilities and specific implementation methods stipulated in the environmental management plan; PMO, PIU, the � Main Implementation Contractor, the environmental of Engineer, protection contents environmental Environmental 2 1 30 10.0 during the construction management Protection Bureau, period and operation plan environmental period; expert consultant � Environmental forms and reports (daily and monthly report); � Update of environmental management plan. Environmental The Contractor, the � Project monitoring, Engineer, environmental 1 1 20 4 inspection and monitoring station, monitoring of World report Environmental Bank, method of 180 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Number Budget of Training Participants Contents Times Days (CNY Attendee 10,000) s Protection Bureau, inspection, data environmental collection and expert consultant processing, as well as interpretive and reporting program; � QA/QC of environment monitoring Total 34 Department of Civil Affairs of Anhui Province is responsible for the implementation of the whole Project. Department of Civil Affairs of Anhui Province has set up the provincial PMO, which is responsible for the overall implementation of the Project during the implementation period. Civil Affairs Bureau of relevant city under the Department of Civil Affairs of Anhui Province has set up Municipal PMO, which is responsible for the comprehensive daily management of the Project during the implementation period. Provincial PMO will be responsible for the overall coordination with PMO of various regions during the Project preparation and implementation. Provincial PMO appoints one person as the environmental manager and get Project management company involved in it, including environmental experts. All PMO will be equipped with sufficient personnel (including designated environmental management personnel). PMO will employ external monitoring agency and on-site Engineer to supervise the implementation of environmental management plan. The institutional capacity shall be enhanced according to the environmental management plan, including training for PMO and civil works contractor, to achieve satisfactory results in the implementation process of the Project. Anhui Province has successfully implemented many Projects funded by the World Bank. During the planning and implementation of the Project, the Provincial Department of Finance of Anhui Province and Provincial Development and Reform Commission will provide support and guidance to the Department of Civil Affairs of Anhui Province and the PMO. 181 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 8 Estimation of execution cost for environmental management plan 8.1 Project description of execution cost The costs associated with environmental protection of the Project consists of three parts: the costs of environmental protection measures (including the handling expenses of hazardous wastes consigned to external parties, etc.), and the costs of environmental monitoring and supervision, and capacity reinforcement (including environmental management training, environmental consulting). Relevant environmental protection costs included in the civil works costs shall not be listed repeatedly in the plan. The costs incurred in the implementation of the Construction Environment Management Regulations shall be counted in the total Project cost by the Contractor and shall not be listed separately in the plan. 8.2 Execution cost estimation The costs of Project implementation environmental management plan have been included in the total investment of the Project. Table 8.1-1 lists the implementation costs for environmental management plan of the Project. 182 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 8.2-1 Schedule of Environmental Management Costs of the Project Unit: CNY 10,000 Costs of environmental monitoring and Costs of capacity Costs of environmental protection measures supervision reinforcement Environme Environmen Environmental ntal Sub-project activity Construction period Operation period Environment monitoring tal Total supervision managemen consulting t training Atmosph Construction Operation Construction Water Noise Solid waste Water Solid waste — — ere period period period The Project of Relocation and Rebuilding of Xuancheng 20 10 10 20 30 20 2 1 2 2 2 119 Municipal Social Welfare Home Improvement Project of Ningguo City Social Welfare 20 10 10 20 20 10 2 1 2 2 2 99 Service Center Haoyan Rainbow Garden - Wuhu Health Aged-care 40 10 20 40 20 20 1 2 7 5 5 170 Service Industry Base Embedded Center for Disabled or Semi-Disabled 5 0 5 10 10 10 — — — 10 20 70 Elders (the other four Projects not included in the Base) Elderly Care Institution of Anqing First People’s 40 10 20 40 10 30 1 2 7 5 5 170 Hospital Construction of Anqing Home-based Care Services 10 0 5 10 10 5 — — — 10 2 52 Station Construction of Lu’an Home-based Care Services 2 0 1 2 2 1 — — — 1 1 10 Station Elderly Care Center of Lu'an Hospital of Traditional 100 20 50 40 10 30 1.5 1.5 5 5 5 268 Chinese Medicine Transformation and Upgrading of Suzhou Rural 14 0 14 28 155 70 0 0 0 17.5 17.5 316 Nursing Homes Total 1119 38 117 1274 183 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 9 Information management of environmental management plan plan 9.1 Information Exchange Environmental management requires the necessary information exchange between different departments and different positions within the organization, and the PMO shall report relevant information to the outside party (interested party, the public, etc.). Internal information exchange could be conducted in various ways, such as meeting and internal briefing, but there must be one formal meeting every month, and all communication information shall be recorded and archived. External information exchange shall be carried out every six months or once a year, and information exchange with the cooperative unit shall be made into meeting minutes and archived. 9.2 Records mechanism In order to make the effective operation of environmental management system, it is necessary to establish a perfect recording system and keep the following records: (1) Legal and regulatory requirements; (2) Permits; (3) Environmental factors and relevant environmental impacts; (4) Training. (5) Inspection, verification and maintenance activities; (6) Monitoring data; (7) Effectiveness of corrective and preventive measures (8) Information of interested party; (9) Approved by: (10) Review. In addition, necessary control for the above records must be carried out, including: the identification, collection, cataloging, archiving, storage, management, maintenance, querying, retention period, disposal of records and other aspects. 9.3 Reporting mechanism The Contractor, monitoring organization and the PMO shall record the Project progress, implementation of the management plan (EMP) and environmental quality 184 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project monitoring results during the Project implementation process and report to relevant departments in time. Including the following three aspects: (1) Monitoring organization and the Contractor shall carry out detailed records for the implementation of EMP, and report to the PMO in time; (2) The Project progress report (such as monthly, quarterly and annual report, etc.) prepared by the PMO shall include the content of EMP progress, such as the implementation progress and effect of EMP; (3) The implementation report of environmental management plan shall be submitted to the Department of Civil Affairs of Anhui Province every six months and the report consists of two parts, including summary report on the implementation of environmental management plan and a professional monitoring report, that is, environmental quality monitoring report. (4) The implementation report of Project EMP must be completed by the Department of Civil Affairs of Anhui Province every six months and submitted to the World Bank. The EMP implementation report could include the followings: (1) Project progress; (2) Implementation and monitoring of EMP plan; (3) Implementation of training plan; (4) Whether there are public complaints. In case of complaints, record the main contents, solutions of complaints and public satisfaction; regular consultation to the public and public consultation; (5) EMP implementation plan of the next year. 9.4 Grievance and Complaint Mechanism In order to better maintain satisfactory environmental quality and interests of local villagers, the Project has established a convenient, open and effective complaint mechanism, and affected persons could lodge complaints at any time on any issue in the environmental management plan. (1) Complaint acceptance institution The PMO at all levels shall arrange special personnel to take charge of public complaints, publish complaint hotline, and receive public consultation and complaints. (2) Complaint procedures 185 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project ① Phase 1 If the residents in the Project area are dissatisfied with the environmental management plan, or if the local environmental quality is affected by the construction and operation of the Project, oral or written complaints could be submitted to the County PMO; the County PMO shall deal with these complaints and make written records, and shall handle them within two weeks upon receipt of complaints for reasonable request or suggestion. ② Phase 2 If the complainant is still dissatisfied with the handling decision of County PMO, he could lodge a complaint to the Provincial PMO after receiving the decision; the Provincial PMO shall make a decision within two weeks upon receipt of the complaint. ③ Phase 3 If the complainant is still dissatisfied with the handling decision of Provincial PMO, he could report or lodge a complaint to the local environmental protection department after receiving the decision. (3) Feedback mechanism of complaints The feedback mechanism of complaints includes the standardized recording, tracking and periodic report system. Standardized recording: the complaint record sheet mainly includes the basic information of complainants, basic information of complaints, basic information of repliers, solutions, and effects achieved. Tracking: interview the complainant again for investigating whether the complaint is dealt with, and whether the complainant is satisfied with the result of handling, etc. Periodic report: the complaints shall be reported in writing regularly to the upper management office and written in the plan of next year to avoid the occurrence of similar events. 186 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 10 Public consultation and public notification Public consultation and public notification are an important part of Project environmental impact assessment. The purpose of public notification is to keep the public and interested party probably affected by the Project informed of relevant information of the Project, so that Project PIU and management organization could understand the cognition and comprehension degree of the public and interested party on the Project and their attitudes towards the Project and concerns about environmental and social impacts, and their views and suggestions on the Project. The purpose of public consultation is to obtain the views of the public and relevant organization in the area affected by the Project, so that the Project PIU and decision-making department could discover potential problems and modify, improve the design and Project plan in time. Therefore, the problems proposed by the public could be properly resolved, and the design, construction methods, environmental protection measures, environmental monitoring and management will be more perfect and reasonable, so as to optimize the Project construction in terms of environmental, social and economic benefits. The object of public consultation and public notification is mainly the unit and individual within the scope of Project environmental impact. The public notification and public consultation of the Project are based on the legal provisions in: 1) Regulation of Chinese Environmental Protection; 2) Ordinance on Administration for Environmental Protection of Construction Projects (Decree No. 253 of the State Council); 3) the Temporary Act of Environmental Impact Assessment of Public Participating of Ministry of Environmental Protection (HF 2006 [28]); 4) Social Risk Assessment on Large Investment Projects (August 2012) of NDRC; 5) BP17.50 Information Disclosure in OP/BP4.01 Environmental Assessment of the World Bank. The media of public notification of the Project is website and newspaper; public consultation is mainly conducted in the form of discussion and questionnaires. 10.1 Public notification of the Project The public notification of sub-Project in each city is carried out on the website of Department of Civil Affairs of Anhui Province by the environmental impact assessment organization and PMO. The contents of public notification include: 1) the Project name, PIU, management organization and financial sourcing; 2) construction contents of the Project and planned construction methods (introduction); 3) expected Project construction period (commencement and completion time); 4) the scope of 187 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Project and expected types and scope of environmental impact; 5) environmental impact, environmental measures and monitoring plan proposed in the environmental management plan; 6) main contents of environmental management plan; and 7) contact information of relevant departments for Municipal PMO, Provincial PMO, environmental impact assessment organization and local Environmental Protection Bureau (telephone, E-MAIL, etc.). The public notification of the Project is published on July 21, 2017 at the website of the Department of Civil Affairs of Anhui Province (http://www.ahmz.gov.cn/list_Show.asp?id=24745). The contents consist of the participating city of the Project and brief introduction to the Project content, as well as the link to the Project’s environmental management plan. On July 20, 2017, the public notification was conducted in the Xin’an Evening News. The time and media of public notification is shown in Table 10.1-1, and the public screenshots are shown in Figure 10.1-1 to Figure 10.1-2. Table 10.1-1 Date and media of public notification Date Public media July 20, 2017 Xin’an Evening News Website of Department of Civil Affairs of July 21, 2017 Anhui Province Future consultation: during the entire Project implementation period, the conversation of Project PIU and management organization with the affected population and interested party will be effectively conducted in a public consultation manner, which will ensure that the concerned issues of the public are fully understood and dealt with in time. The public consultation and participation plan during the construction and operation period are a constituent part of the Project’s environmental management plan. Future consultation will be conducted through: (1) questionnaire survey, home visit, discussion and public hearing (consulting conference); (2) participation of affected population and interested party during the inspection and monitoring of environmental management plan; (3) public consultation after the completion of the Project. The consultation will help evaluate public attitudes and perspectives towards the Project performance. 188 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Figure 10.1-1 Screenshot of Xin’an Evening News 189 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Figure 10.1-2 Screenshot of the website of Department of Civil Affairs of Anhui Province 190 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 10.2 Survey of public consultation The public consultation adopts the methods of discussion and questionnaire survey and the survey time is conducted on June 29, 2017 to July 7, 2017. The statistics of gender, age and occupational information of participants are shown in Table 10.2-1; the opinions of the public consulted are shown in Table 10.2-2. 191 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 10.2-1 Information statistics for public consultation participants Anqing Lu’an Wuhu Xuancheng Ningguo Suzhou Total Information of public Total Total Total Total number participants Total number of (%) number of (%) number of (%) number of (%) number of (%) of (%) people: 85 people: 41 people: 30 people: 46 people: 34 people: 40 Male 59 69.47 24 58.54 15 50.00 21 45.65 18 53 24 60.00 Gender Female 26 30.59 17 41.46 15 50.00 25 54.35 16 47 16 40.00 ˂20 0 0 12 29.27 0 0 0 0 0 0 0 0 20-40 49 57.64 13 31.71 14 46.67 7 15.22 15 44 16 40.00 Age 41-59 31 36.47 9 21.95 14 46.67 26 56.52 13 38 19 47.50 ≥60 5 5.89 7 17.07 2 6.67 13 28.26 6 18 5 12.50 Primary school 12 14.11 11 26.83 0 0 10 21.74 1 3 1 2.5 and below Middle school (senior middle Educational school and junior 17 20.00 17 41.46 3 10.00 28 60.87 19 56 32 80.00 level middle school) College degree or 56 65.89 6 14.63 23 76.67 8 17.39 14 41 6 15.00 above Incomplete 0 0 7 17.07 4 13.33 0 0 0 0 1 2.5 Worker 37 43.52 6 14.63 6 20.00 15 32.61 11 32 3 7.5 Peasant 16 18.82 0 0 0 0 6 13.04 1 3 26 65 Cadres / teachers / 10 11.76 6 14.63 3 10.00 6 13.04 12 35 10 25 Occupation doctors Migrant workers 0 0 0 0 18 60.00 0 0 0 0 0 0 Retirees 0 0 6 14.63 0 0 13 28.26 0 0 0 0 Incomplete 22 25.88 23 56.10 3 10.00 6 13.04 10 29 1 2.5 192 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 10.2-2 Results summary on questionnaire survey of public consultation Anqing Lu’an Wuhu Xuancheng Ningguo Suzhou Choice of Total Total Total Total Total Total Problems reply number of (%) number of (%) number of (%) number of (%) number of (%) number of (%) people: 85 people: 41 people: 30 people: 46 people: 34 people: 40 1. What’s your Agree 85 100 40 97.56 30 100.00 42 91.30 34 100 40 100 attitude towards Disagree 0 0 0 0 0 0 0 0 0 0 0 0 the Project? Neutral 0 0 1 2.44 0 0 4 8.70 0 0 0 0 (Single selection) 2. What are your suggestions for the See the following paragraph environmental impact assessment document? 3. Can you Yes 72 84.71 21 51.22 16 53.33 20 43.48 34 100 38 97.5 accept the negative Basically 5 5.89 18 43.90 6 20.00 19 41.30 0 0 2 5 environmental acceptable impact during the Basically renovation of the 5 5.89 2 4.88 8 26.70 7 15.22 0 0 0 0 unacceptable Project? (Single selection) No 3 3.51 0 0 0 0 0 0 0 0 0 0 Insufficient 4. The greatest government 39 45.89 20 48.78 26 86.67 29 63.04 4 12 10 25 difficulty of the attention Project in the Insufficient further capital 30 35.29 21 51.22 2 6.67 12 26.09 25 74 3 7.5 development of investment combination of Lack of medical and health 43 50.59 8 19.51 1 3.33 10 21.74 3 9 13 32.5 talents care (multiple choice) Imperfect 71 83.52 0 0 0 0 8 17.39 23 68 14 35 infrastructure 5. After the Reduce the 77 90.59 15 36.59 21 70.00 28 60.87 12 35 0 0 completion of the cost Project, what is Relieve the 69 81.18 18 43.90 1 3.33 8 17.39 18 53 18 45 the improvement bed pressure for the current Rich 2 2.35 10 24.39 6 20.00 6 13.04 15 44 2 5 193 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project situations of entertainment aged-care service institutions in the Convenient to 80 94.18 8 19.51 2 6.67 6 13.04 27 79 20 50 region? (multiple see the doctor choice) To the 6. If your work 60 70.59 18 43.90 5 16.67 21 45.65 28 82.4 4 10 Contractor and life are To the Civil affected by the Affairs 15 17.64 8 19.51 17 56.67 9 19.56 2 5.8 1 2.5 construction of Bureau this Project, what To the way will you Environmenta choose to reflect 10 11.76 15 36.59 8 26.66 16 34.78 4 11.8 35 87.5 l Protection it? Bureau Noise from 68 80.00 18 43.90 21 70.00 27 58.70 22 65 6 15 decoration 7. What is the Dust from impact of this 49 57.64 12 29.27 6 20.00 12 26.09 8 24 9 22.5 decoration Project on your Transport life? (multiple 25 29.41 8 19.51 6 20.00 8 17.39 4 12 8 20 vehicle choice) Waste 63 74.11 6 14.63 2 6.67 6 13.04 4 12 17 42.5 disposal 8. What are your suggestions See below or requirements for the Project? 194 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project A total of 276 copies of public questionnaires are handed out in six cities, and 276 copies are taken back, with women accounting for 43.9% (comprehensive statistics of six cities, the same as below); in terms of age structure, the number of people under 20 years old accounts for 4.9%, 39.2% between 20 and 40 years old, 41.2% between 41 and 59 years old and 14.7% at age of 60 and above; in terms of the composition of educational level, the elementary school students and the unfilled public account for 8.4% of the total, 44.7% of junior and high school students, and 46.9% of bachelor or higher degree; in terms of occupational structure, workers account for 25%, 16.6% of cadres/teachers/doctors, 10% of migrant workers, 7.1% of retirees, and 22.6% of the unfilled. The questionnaire survey of public consultation in six cities indicates that 1) 98.1% of the surveyed public is in favor of the construction of the Project, and 1.9% is neutral. They believe that the Project is conducive to the construction of aged-care service institutions for the local elderly, providing professional practice location of rehabilitation care and medical care for the disabled and semi-disabled elders. 2) 71.7% of the surveyed public can accept the negative environmental impact during the renovation of the Project, 18.4% can basically accept, 9% basically cannot accept, and 0.9% cannot accept. 3) For the greatest difficulty of the Project in the further development of combination of medical and health care (multiple choice), 46.9% of the surveyed public choose the option of insufficient government attention, 33.5% choose insufficient capital investment, 22.8% choose lack of talents, and 34% choose imperfect infrastructure. 4) For the improvement for the current situations of aged-care service in the region after the completion of the Project (multiple choice), 48.8% of the surveyed public holds the idea that it can reduce the cost, 40.6% holds the idea that it can relieve the bed pressure, 18.1% chooses the option of rich entertainment and 43.7% thinks it is convenient to see the doctor. 5) For the problem that the work and life are affected by the construction of this Project, 44.9% of the surveyed public will reflect it to the Contractor, 20.3% will reflect to the Civil Affairs Bureau and 34.8% will reflect to the Environmental Protection Bureau. 6) For the impact of the construction of the Project on their own lives (multiple choice), 55.4% of investigated public chose the impact from decoration noise; 29.9% of investigated public chose the impact from decoration dust; 19.7% of investigated public chose the impact from transport vehicles; and 27.2% of investigated public chose the impact from waste disposal. Other opinions of the public including: 1) they hope that the Project will be completed as soon as possible and the construction period will be shortened; 2) they 195 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project hope that the current situation of the local aged-care service construction will be improved by the Project; 3) they hope that incoming and outgoing vehicles will be properly managed and washed for disinfection during the construction to reduce the impact on the lives of residents; 4) they hope that the Project will be implemented as soon as possible to benefit the public; 5) the impact of the construction of all Projects on the surrounding residents shall be clearly put forward in the environmental impact assessment document of the Project. Among the opinions and advice proposed by the public on the construction of the Project, the key requirements are: (1) The Employer shall ensure that the environment and sanitation of the construction site meet the corresponding standards during the construction. The emission of noise to the neighborhood during the construction shall meet the requirements of the Law of the People’s Republic of China on the Prevention and Control of Environmental Noise Pollution and be strictly controlled in accordance with the Emission Standard of Environment Noise for Boundary of Construction Site (GB12523-2011) so as to reduce the impact of noise on the lives of surrounding residents during the construction. (2) The greening work shall be carried out to create an eco-friendly living environment; (3) The laws and regulations of the related national departments shall be followed to safeguard the vital interests of residents and the related standards shall be strictly executed; and (4) The construction schedule shall be accelerated. The Employer promises to refer to the opinions and advice proposed by the public and carry out environment protection in the construction process of the Project to minimize the impact on the surrounding environment. At the symposium, some residents also asked about the arrangement of incoming and outgoing vehicles, flying dust and the noise in the process of decoration. Besides, some residents asked about the construction schedule of the Project. The representatives of the environmental impact assessment unit and the PMO explained the issues concerned by residents. For the proposed environmental issues during the construction and decoration, the representatives of the Designer and the Employer gave an explanation in terms of construction site layout, transport route of construction vehicles and construction schedule arrangement. 196 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Figure 10.2-1 Public Participation Consulting Meeting for the Project of Nursing Home for the Elderly People of Anqing First People’s Hospital Figure 10.2-2 Public Participation Consulting Meeting for the Project of Multi-functional Medical Building Construction of Lu'an Hospital of Traditional Chinese Medicine Figure 10.2-3 Public Participation Consulting Meeting for “Haoyan Rainbow Garden� (Base) 197 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Figure 10.2-4 Public Participation Consulting Meeting for the Project of Relocation and Rebuilding of Xuancheng Municipal Social Welfare Home Figure 10.2-5 Public Participation Consulting Meeting for the Improvement Project of Ningguo City Social Welfare Service Center 198 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 10.2-3 List of Public Consultation Object of Content of How to reflect the opinions in Time Location Main opinions consultation consultation EMP and design Person in charge: The funds and government Public participated attention of the Project are insufficient. EMP: For the noise impact Employees of the questionnaire, design Residents: 1) Individual aged-care service is during the construction, PMO of First People’s scheme and the draft not acceptable and continuous aged-care construction at night is Anqing First Hospital of for the environmental service is expected. prohibited. People’s Anqing, management plan of 2017.06.29 2) Construction at night is not allowed to Design plan: The list of Hospital Municipal Civil World Bank-financed avoid the impact of noise on residents’ normal construction schedule shall be (Longshan Affairs Bureau Anhui Aged Care night rest. improved and the construction Branch) and Beiyuan System 3) The construction of the Project is period shall be controlled Estate Demonstrative supported for the increasingly prominent strictly. Project aged-care service. The Employer: The construction of the Project EMP: The sewage and solid has small impacts on the surroundings and will Employees of Public participated waste of the Project can be not influence the travel of the neighboring Lu'an Hospital of questionnaire, design disposed by relying on the residents. Traditional scheme and the draft sewage treatment station and PMO of Lu'an Residents: 1) Sewage and garbage shall be Chinese for the environmental temporary storeroom for Hospital of disposed at a fixed place in accordance with Medicine, management plan of medical waste built by Lu'an 20.17.07.04 Traditional strict requirements after the completion of the Municipal Civil World Bank-financed Hospital of Traditional Chinese Chinese Project. Affairs Bureau Anhui Aged Care Medicine. Medicine 2) The periphery greening shall be carried and residents of System Design plan: Fences will be out during the construction. Sunny Venice Demonstrative built and greening will be 3) The construction of the Project is Estate Project properly increased during the supported because it brings the convenience of construction. seeing a doctor to the neighboring residents. 199 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Residents: The Project is supported and attention shall be paid to noise control and the centralized treatment of garbage during the Employees of Public participated EMP: The Project includes construction. They hope that the Project can be Anhui Haoyan questionnaire, design decoration and equipment implemented as soon as possible to let the Office Aged-care scheme and the draft purchase. Decoration shall not elderly in their homes enjoy the service at an Building of Service for the environmental be carried out at night and early date. “Haoyan Investment Co., management plan of garbage shall be intensively 2017.07.06 The Employer: Support. The civil engineering Rainbow Ltd. and World Bank-financed collected and delivered to Wuhu of the Project has finished and the decoration Garden� residents of Anhui Aged Care Oasis Environmental Protection works are going to start. The decoration noise (Base) Polka System Co., Ltd. will not influence the surrounding residents and International Demonstrative Design plan: The decoration the health and elderly care center will be Garden Project time shall be strictly controlled. established to bring convenience of seeing a doctor to nearby residents. The Project is expected to be boosted as soon as possible. Person in charge: The funds and government EMP: The chapters on Anhui Materials attention of the Project are insufficient. environmental impact analysis Engineering Public participated The elderly: They are quite satisfied with the shall clearly put forward School, questionnaire, design diet and sanitary conditions of current welfare specific requirements on Municipal Civil scheme and the draft homes. construction period Affairs Bureau, for the environmental Nearby residents: For the dust produced management. Ningguo senile representatives management plan of during the construction, spray equipment shall Design plan: Sprinklers and 2017.07.06 apartment of Ningguo World Bank-financed be provided to prevent flying dust. They hope dust reducing facilities shall be Yijingyuan Municipal Social Anhui Aged Care that the Project can be completed as soon as provided at the construction site Welfare Home System possible. to sprinkle water to working and residents of Demonstrative Teachers of Anhui Materials Engineering planes and earth stacks when Nanshanyayuan Project School: They support the construction of the excavating and drilling, to keep Estate Project for the small impact of the Project on a certain degree of humidity and the school. reduce flying dust quantity. 200 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Xuancheng Municipal Social Welfare Home, Public participated residents of questionnaire, design Person in charge: The aging problem is Yuzhaung scheme and the draft severe. The position of the home is suitable but Village, EMP: Xuancheng for the environmental rooms are insufficient, so the home is Municipal Civil Design plan: The construction Municipal management plan of overcrowded. The home hopes to obtain the 2017.07.07 Affairs Bureau, at night is prohibited and the Social Welfare World Bank-financed financial support of the World Bank. Neighborhood construction site management Home Anhui Aged Care Residents: They want to negotiate with the Committee of shall be standardized. System Contractor about flying dust, noise and the Xiangyang Demonstrative avoidance of construction at rest time. Community and Project residents of Xiadu Xincheng Estate 201 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project After the public investigation, the environmental impact assessment unit reflected the above public opinions to the PMO and the Designer respectively. Targeted measures to mitigate the impact on environment have been added to the revised environmental management plan, including: 1) the noise barrier shall be installed during the construction of high noise equipment; 2) measures, such as sprinkling water at the construction site and covering transport vehicles and the temporarily stacked earthwork and construction materials at the construction site, are adopted to control the flying dust during the construction; 3) the installation of temporary separating walls, control of construction time (8:00-18:00) and other ways are adopted to reduce the impact of noise on residents; and 4) public notices shall be posted before construction and decoration to specify the construction schedule. 202 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Appendixes Appendix 1:General Management Specifications of Construction Environment 1 Overview I. The Employer and construction personnel shall implement various mitigation measures proposed in the Specifications to prevent the Project from causing impact and inconvenience to local people’s life during the implementation and reduce the impact of the Project on the environment during the construction period and operation period. II. The remedial measures that cannot be implemented effectively during the construction shall be carried out when the Project is completed: 1. The vegetation landscape of all affected regions shall be repaired in time, such as planting grass and trees; 2. The debris and silt left over after the construction shall be cleaned to ensure the smooth flowing of water; and 3. The crushed stones and waste materials left over at all construction sites shall be cleaned and the surplus construction materials left over shall be properly disposed. 2 Conduct code for Construction Personnel and Environmental Standards This part is formulated to guide the behavior of construction personnel by combining national and local laws and regulations. The Employer shall draw up a Project construction plan for the Project before the construction and clarify the implementing rules to follow the Specifications in the plan. The construction of the Project shall be carried out after the plan is approved by the responsible engineer of the Project. 2.1 Prohibited actions: The following actions are prohibited at the construction sites or peripheral areas of the Project: 1) Logging for any reason outside the allowed range of the Project; 2) Hunting, fishing, capturing wild animals and picking plants; 3) Using unapproved toxic materials, including leady paint and asbestos; 4) Affecting other art buildings and buildings with historical value; 5) House fire; and 6) Construction after drinking. 2.2 Transportation 203 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project The selection of the route to the construction site shall obtain the approval of the responsible engineer of the Project. Appropriate vehicles with limited load shall be selected in accordance with the local road grade to prevent damage to local roads and bridges. The Employer shall repair the damage to local roads and bridges caused by overload with the approval of the responsible engineer of the Project. The Employer shall not use vehicles with heavy exhaust emission and strong noise. Noise reduction devices shall be installed in the completed areas and the normal operation of the devices shall be guaranteed. During the execution of the contract, the Employer could take necessary transportation control measures with the approval of the responsible engineer of the Project. 2.3 Construction Personnel and Construction Camps The Employer shall recruit workers locally as much as possible and provide proper training. The Employer shall build temporary septic tanks for workers who live on the site and the excrement shall be disposed intensively to avoid affecting nearby rivers. The Employer shall establish a set of systems and methods for the storage of construction materials and the production and disposal of solid waste at the construction site. The Employer shall arrange the construction personnel to eat out or adopt the system of food delivery. The Employer shall ensure that the construction site and material stacking site are in the right place, at least 500m far away from settlements and that the asphalt manufacturing point shall be at least 1,000m far away from settlements; meanwhile, the arrangement plan shall obtain the approval of the responsible engineer of the Project. The Employer shall dig trenches around the construction site and build settling ponds and catcher grooves at the exit. Areas for construction production and living shall be independently arranged in accordance with sub-Projects. All sub-Projects shall be arranged at higher places according to the practical conditions of the Project. 2.4 Waste Management and Water and Soil Loss Solid waste, sanitation facilities and hazardous waste can be effectively controlled by implementing the following measures: 204 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 2.4.1 Management of wastes 1. The amount of waste to be disposed and removed shall be reduced. 2. Produced waste shall be identified and classified. For hazardous waste, appropriate storage, collection, transportation and treatment procedures must be taken. 3. Treatment areas shall be identified and divided and the materials and substances that can be stored shall be indicated clearly. 4. The construction waste (including excavated earth) shall be transported to the designated place for storage and disposal (the place shall be at least 300m far away from rivers, lakes or wetlands). The system for the recycling, separation and classification of solid waste shall be set up at the designated disposal place to dispose the produced waste during the construction and the surplus construction materials. 2.4.2 Control of water and soil loss 1. The use of damaged land shall be minimized and the damaged land that has been used shall be reinforced as soon as possible. The regions sewage will flow through shall be controlled and the sediment shall be disposed locally. The barrier for water and soil loss shall be provided around the groove, well and road. 2. The leaf cover and organic matter that protect the topsoil shall be backfilled to the damaged regions to promote the growth of native plants. The eroded barren regions shall be covered with native grass and plants or the soil surface of the region shall be hardened. 3. Erosion control measures shall be carried out before the rainy season to better implement the following work. The corresponding erosion measures shall be perfect after the completion of each construction site. 4. Deposition control measures shall be provided at all construction sites to slow the runoff speed, change the flow direction and deposit mud and sand before the recovery of vegetation. Those deposition control facilities include material piles, stone roads, grit chambers, straw bales, hedges and hedge piles. 5. Measures of setting ditches, berms, grass fences and piling up stones shall be taken to prevent the water flow from flowing into or disturbing the construction site. 6. Erosion control measures shall be maintained and used till the complete recovery of vegetation. 7. Dirt roads, excavated regions and the regions for padding and soil storage shall be watered when necessary to reduce soil erosion. 2.4.3 Protection zone 205 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project The protection zone of equipment shall be identified and classified (15m far away from rivers, lakes and wetlands). It shall be ensured that all equipment shall be used only in the protection zone. All overspill should be treated in accordance with standard environmental procedures/instructions. 2.5 Earthworks and Slope Excavation and Filling Works The construction of earthworks shall be arranged reasonably, especially in the rainy season. The fastness of the slope excavation and filling works shall be ensured at any time during the construction to reduce the interference to the regions beyond the restricted regions of the construction as much as possible. Especially in the rainy season, the construction shall be continuous to finish the excavation and filling works of the same section as soon as possible to try to avoid the slope surface erosion caused by the interruption of construction because of the rain. Intercepting ditches and drains shall be built and turfs or other plants shall be planted at the top and bottom of the slope surface in accordance with the drawings to protect the excavated and filled slope from being eroded. Intercepting ditches shall be built at places that are higher than the excavation place of the slope to reduce the erosion of the slope caused by the water flow. The excavated soil and stones and other materials that cannot be used shall be transported to the designated place for disposal with the approval of the responsible engineer of the Project. The disposal place shall not be built at places that may cause landslides and not affect other farmland or private land. At the same time, the flowing of stacked substances into the surface water by the rain shall be avoided. Drains shall be built around the stacking area in accordance with the instructions of the responsible engineer of the Project. 2.6 Setting of Temporary Soil Stacking Areas 1. The selection of temporary soil stacking areas shall be identified and classified. It shall be ensured that temporary soil stacking areas are more than 15m far away from sensitive areas (high steep slopes, the soil that can be eroded easily and the areas where draining water directly flows into sensitive water). 2. If there are drains in construction regions, the trenches shall be prevented from being blocked by ingoing soil. 3. All waste residues generated during the construction should be cleaned from the construction site after the completion of the construction. 206 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 2.7 Construction Waste and Transportation The Contractor shall establish and implement the treatment procedures for daily waste of the construction site and provide enough treatment facilities of construction waste. The rubble generated from demolishing old buildings can be recycled properly as the building materials of other Projects (for example, laying the subgrade). Those waste materials shall be recycled with the approval of the Project Engineer after being identified and evaluated at the construction site. The Contractor shall meet the following requirements: 1. Do not construct within the established forest areas. 2. Do not influence natural water. 3. Do not influence endangered or rare flora. 4. Do not dispose any waste material in any environmentally sensitive area. The residue or sludge stacked at the ground near the construction site during the construction shall be removed at once. The stacking ground shall be repaired to its original conditions and the repair shall obtain the approval of the Project Engineer. The planning of transport arrangement of the whole construction period (including the preparation period, the repair period, and the period of demolishing and residue cleaning) shall be carried out and the treatment measures of emergencies shall be considered under the guidance of the Project Engineer. 2.8 Safety Issues during the Construction The responsibility of the Contractor includes protecting every person at the construction site and surrounding areas and avoiding the impact of the construction on the personal and property safety. The Contractor is responsible for complying with all national and local safety regulations, and taking any necessary measure to avoid the accidents, including the followings: 1. Signs for pedestrian safety shall be clearly provided at the transportation roads and the inlet and outlet of the construction site; 2. Enough traffic warning signboards (including figures, frames and markers), road signs and protective handrails shall be provided to ensure the pedestrian safety during the construction; 3. Safety training for construction workers shall be carried out before the construction; 4. Personal protective equipment and clothing (goggles, gloves, masks, dust 207 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project masks, helmets, etc.) for construction workers shall be provided and the use of those equipment shall be mandatory; 5. There shall be bulletin boards for safety information at each construction site; 6. All workers shall be asked to know about safety information of various materials, the risk caused by the use of various materials to construction personnel and their families, especially the pregnant families or families having a pregnant plan, shall be explained to construction personnel, and workers shall be encouraged to share the related information; 7. It shall be ensured that the specially trained workers remove or dispose the asbestos-containing materials or other toxic substances; 8. The construction shall be suspended in case of heavy rain or other emergencies; and 9. Power equipment and mechanical equipment should be able to withstand the seismic impact of a certain level. 2.9 Control of Noise and Dust The Contractor shall meet the following requirements to control damage and dust: 1. The speed of all construction vehicles on the road outside the construction site shall not exceed 25km/h; 2. The speed of vehicles at the construction site shall not exceed 15km/h; 3. Try to keep noise of machines and equipment under 90 db; 4. More stringent measures need to be implemented in sensitive areas (including residential areas, hospitals, etc.) to prevent harsh noise; 5. Try to reduce dust and particulate matters, so as to avoid influence on residents’ lives and commercial activities around, and focus on protection of vulnerable people (like children and the elderly); 6. The working time of various construction machinery shall be arranged properly during the construction to try to avoid the simultaneous construction of plentiful high noise equipment and avoid the sensitive time of surroundings to noise. The construction of high noise equipment shall be arranged in the daytime and night transportation shall be reduced. Night construction (22:00~6:00) shall be forbidden. For the construction must be carried at night, the approval of the related local environment protection departments shall be obtained. 7. Plants shall be removed periodically to prevent the extensive exposure of 208 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project land; 8. For the construction at the sites generating much dust, such as roads, excavation areas and spoil grounds, water can be properly sprinkled to reduce dust; and 9. Take the correct measures to reduce influence of noises and vibration produced by construction on surroundings; and 2.10 Removal of Existing Waste Piles During the removal of existing waste piles, the Employer shall take sufficient measures to protect workers and the public. These measures include: 1. Keep clean during transporting and avoid polluting pavement and atmosphere due to wastes dropping caused by overloading of vehicles; 2. Provide safety glasses, masks, helmets, safety shoes to all workers. 2.11 Removal of the existing buildings During the removal of existing buildings, the Employer shall take sufficient measures to protect workers and the public from the dropping detritus and gravels. These measures include: 1. Leave a designated wastes-dropping zone or discharge chute to guarantee the safety pouring of the wastes; 2. Control the processes, like sawing, digging, grinding, sand paving and cutting, and take reasonable anchoring method to guide dropping of the waste stones; 3. Keep clean during transporting and avoid polluting pavement and atmosphere due to wastes dropping caused by overloading of vehicles; 4. Employ the temporary dropping-protection measures (like handrails and toe boards) in the boundary of the lifting scaffolds to prevent dropping of wastes; and 5. When blasting work is carried out near populated areas and other buildings, all personnel at the areas that are influenced by the blasting should be evacuated and blasting mats and other deflection methods shall be used to minimize the impact of flying rocks and spattering materials. 6. Provide safety glasses, side shields, masks, helmets, safety boots or shoes to all relevant staff. 2.12 Pipeline and Road Works 1. When the soil is temporarily stacked on the road side, the corresponding protection measures should be taken. The construction time shall be reasonably allocated during the construction to avoid rainfall concentration periods and try to 209 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project shorten the exposure time; 2. In order to prevent the Project being influenced by the water and soil loss caused due to the construction or the ingoing rainwater that is flushed into excavated pipelines, the surface soil near the excavated soil shall be covered and protected with soil containing straw bags to prevent soil collapse. The surface soil shall be temporarily covered with cloth of colored strip in the rainy season or strong wind weather. 3. Pipeline and road works shall be carried out by stages and the excavation and filling shall be completed as soon as possible; 4. For the construction near public facilities, pay special attention to build temporary access roads and the transportation of materials shall avoid peak traffic hours to reduce the traffic pressure of cities; for the construction near villages, try to build special access roads for construction to reduce the use of village roads and avoid the damage of the running of large equipment and vehicles to roads; 5. Before the construction, tell the public about the time and road section of the construction of the Project in advance, and place warning boards and relevant signs. Explain the Project content and construction time, kindly ask the public’s understanding of the inconvenience caused by the construction, and tell the contact person and hotline for complaints and other information. 2.13 Social Influence The Contractor shall do the following things to reduce the adverse impact on social life during the construction: 1. Inform the public of information in time such as the construction plan, explanation of environmental impacts, information on construction roads, information on temporary bus routes, and announcements of blasting and demolition; 2. Restrict the construction at night; when the construction must be carried out at night, reasonably arrange the night construction and inform the masses to be affected in advance to take necessary precaution measures. 3. If public facilities (water pipes, power, telephone and bus routes) cannot work normally due to the construction, inform the public at construction sites, bus stations and affected areas at least five days before the abnormal operation of facilities. 2.14 Treatment of the Cultural Relics and Remains Found during the Construction 210 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project The historical sites, remains, tombs or personal graveyards found during the excavation and construction shall be disposed in accordance with the following procedures: 1. Stop the construction at the place where the cultural relics and remains are located; 2. Draw the places and areas where the signs are found; 3. Protect the site to avoid any damage to cultural relics. When finding movable cultural relics or sensitive fossil remains, send protection personnel to ensure the safety of cultural relics till the they are taken by relevant departments of the local government or national administrative department of cultural relics; 4. After the cultural relics are found, report to the patrol Engineer within 24 hours who shall contact relevant departments of the local government and national administrative department of cultural relics; 5. Before deciding the subsequent working procedures, relevant departments of the local government or national administrative department of cultural relics shall protect the finding places or cultural relics. The experts of national administrative department of cultural relics will, according to various relevant assessment standards for cultural relics, analyze the aesthetic, historical, scientific, social and economic value and importance of cultural relics, and then issue a preliminary assessment report. 6. Relevant departments of the local government and national administrative department of cultural relics will decide how to dispose the cultural relics. They will also decide how to modify the construction scheme (for example when finding immovable cultural relic or archaeological relics), and how to preserve, repair and use the cultural relics; 7. Relevant departments of the local government shall report the disposal decision on cultural relics in writing to the construction Project manager; 8. To protect the safety of cultural relics, the Project construction shall continue after approval of local government or national administrative department of cultural relics. 2.15 Hazardous wastes If the construction site may produce hazardous wastes or suspected hazardous wastes, the Employer shall develop a hazardous waste management plan. This plan shall be approved by the Project Engineer and be applicable to all personnels taking 211 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project part in operation and transportation. The hazardous wastes in construction site shall be removed and handled by specially-trained personnels on the basis of national and provincial regulations or internationally-recognized process. 2.16 Health Services and AIDS Education The Contractor shall provide the workers with basic first aid services and emergency relief facilities, including medical equipment and operation mode for the individual, and the degree of treatment to the injured worker before being delivered to the hospital. The Contractor has the responsibility to develop a plan for prevention the spread of diseases between workers, especially including HIV / AIDS. The Contractor shall include a health plan outline in the construction scheme to provide health advice to the construction workers, and shall obtain the approval of the Project engineers before the start of the Project. 212 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 1-1 Common Environmental Protection Regulations and Mitigation / Prevention Measures at the Infrastructure Construction Stage Supervision Stage Major negative impact Mitigation / prevention measures Unit in charge unit The design of fire safety facilities and traffic safety shall meet the national regulations, norms and standards. The design plan shall include qualified traffic safety facilities, fire-fighting equipment and waste water Project site selection, occupation and garbage collection / treatment facilities. All buildings of the of land, construction operation PMO (the Design period infrastructure Project will use outsourcing materials. No stockyard and The Designer and impact on sensitive sites Employer) borrow area will be set. The excavated earthwork and stonework will be around the Project - backfilled, so there is no need to set spoil area. According to the site investigation, the Project does not occupy the basic farmland, fertile farmland and woodland, so the vegetation will not be damaged. 1. The arrangement of construction site shall be correct, the construction period shall be reasonable, and the earthwork and stonework excavation shall not be performed in rainy season and on rainy days. The construction procedures shall be reasonable, i.e., the earthwork excavated shall be timely backfilled and used to minimize the Earthwork and County stacking time of temporary earth and rock. 0-30 cm mellow soil layer of stonework Environmental farmland or woodland for temporary use shall be removed or collected excavation, site Protection and preserved for rehabilitation of lands after the construction is leveling, stacking Bureau, Bureau completed. The soil shall be transported, paved and compacted timely to The Contractor of spoil and of Housing and reduce loose soil. and the Project Construction Ecological waste stone and Construction 2. A soil drainage ditch shall be set according to the topography and construction and period environment other and Forestry landform of construction site, and a soil grit chamber shall be set at the implementation construction Bureau, and outlet of soil drainage ditch, so that catchment slows down and the management unit activities, Municipal sediment subsides in the grit chamber. destruction of Urban 3. Engineering measures and vegetation measures shall be taken for vegetation, water Administration water and soil conservation and surface protection. Engineering and soil loss, etc. Bureau measures are major measures, which work quickly and have safeguard function. Vegetation measures are supplementary measure for water conservation and shall be taken to conserve water and soil for long time, and afforest and beautify the surrounding environment of the Project. 4. Scientific and reasonable soil and water conservation measures 213 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project shall be taken during construction. Occupation of land shall be minimized. Temporary facilities shall be removed timely after the construction is completed. 5. Publicity and education for environmental protection shall be done. 1. Advanced construction technology and low-dust blasting Environment and technology shall be adopted. The aggregate processing system and air will be concrete system shall use wet crushing and be equipped with dust affected by collection equipment. The vehicle speed, vehicle exhaust and coal aggregate combustion exhaust shall be controlled. The road in the construction area processing, shall be watered on time. The construction team shall use liquefied concrete mixing petroleum gas, electricity and other clean energy. The greening of and material construction area shall be strengthened and construction workers shall be County transportation provided with labor protection to reduce impact on the environment and The Contractor Environmental that produce air. and the Project Protection Ambient air dust, blasting, 2. During the construction, a vehicle washing platform shall be set on construction and Bureau and transport vehicle the inside of the entrances of materials and waste soil transport vehicle. implementation Bureau of that exhausts The platform shall meet the following requirements: an anti-overflowing management unit Housing and emissions, road base shall be set around the platform to prevent the waste water from Construction dust, residential overflowing from the construction site, and a waste water collection pit energy and grit chamber shall be set. Before leaving the construction site, the consumption of tires and body of vehicle shall be washed on the platform and the surface construction of vehicle shall be free of sludge. The height of materials and waste soil team and other loaded in the transport vehicle shall not exceed the upper margin of activities. ledge of vehicle. The vehicle hopper shall be covered with tarpaulin or be closed. I. Earthwork and stonework: County 1. At the beginning of the construction, the site shall be excavated. Environmental The Project construction shall make full use of the natural terrain gap The Contractor Protection Construction and high excavation and deep filling shall be avoided. and the Project Bureau and spoil, building Solid waste 2. Excavated earthwork can be used for leveling of planting land at construction and Bureau of debris, domestic later stages, and excavated stonework can be used for foundation of implementation Housing and waste and so on irrigation canal and side ditch. Excavated earthwork and stonework shall management unit Construction, not be stacked in the farmlands because that will affect the agricultural and Municipal production and operation of irrigation ditches. Urban 214 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 3. Temporary stockyard of earthwork and stonework shall be arranged Administration rationally, keeping far away environment sensitive sites (peasant Bureau and households). The earthwork and stonework piled temporarily shall be Health Bureau tamped and compacted, and covered with felt. Retaining wall and drainage facility shall be set around the piled earthwork and stonework so as to minimize the dust and water and soil loss due to piling of earthwork and stonework. 4. A soil drainage ditch shall be set around the temporary stockyard of waste soil, and a soil grit chamber shall be set at the outlet of soil drainage ditch, so that catchment slows down and the sediment subsides in the grit chamber. II. Construction spoil: 1. Recyclable waste shall be classified and recycled (waste iron, scrap steel and material packing bags shall be sold to recycling station, and waste brick shall be used for road base material); 2. Unrecyclable waste shall be transported to the designated construction spoil stockyard for stacking in a timely manner, and the transport vehicle shall be sealed during transportation to avoid the waste from spilling; 3. Temporary stockyard shall be provided with waterproof and windproof measures. Domestic waste of construction workers: a domestic waste storage tank shall be set in the construction area, and the waster shall be cleaned away, collected and classified by special person, and regularly be transported to the nearby domestic waste landfill for disposal. 1. Waste water of aggregate processing system: grit chamber + The Contractors flocculation and sedimentation basin. The processed waste water will be County of sub-Projects at used for concrete mixing, construction anti-dust watering, etc., and will Environmental county (city, not be discharged; Protection Water Production district) level and 2. Washing waste water of concrete system: grit chamber + adding Bureau and environment wastewater the Project flocculant for processing + reservoir. The waste water will automatically Water Affairs construction and flow into the reservoir after precipitation for more than 6h, and be used Management implementation for concrete mixing, construction anti-dust watering, etc., and will not be Department management unit discharged; 215 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project 3. Waste water of foundation pit: grit chamber + flocculation and sedimentation basin. The processed waste water will be used for concrete curing, concrete mixing, construction anti-dust watering, etc., and will not be discharged; 4. Waste water of dry pail latrine used by the construction team and domestic sewage will be used as farming fertilizer after disinfection in the septic tank. 1. Strengthen observation of the surrounding surface and building settlement. In case of any abnormality, immediately stop groundwater pumping and drainage and construction. 2. During the construction of the Project, the operating area shall keep clean, and the sewage and pollutants shall not enter the excavated grooves because that will cause sewage penetration. 3. The warehouse for oil storage on site shall be provided with Pollution of anti-seepage measures. Measures for oil storage and usage shall be taken ground water to prevent water pollution due to oil escaping, emitting, leaking and dripping. 4. Temporary storage room of domestic waste shall be provided with anti-seepage and anti-loss measures to prevent pollution of underground water due to sewage and leachate infiltration. 5. The construction of site foundation shall be carried out in non-flood season to reduce impact of shallow groundwater on the construction. Noise produced 1. Signs of “No horn� shall be set in the road that is sensitive to sound by construction environment, and low-noise equipment shall be used. The noise source, machinery, mode of transmission, traffic noise and blasting noise shall be controlled. County transport vehicle, The construction staff shall be provided with anti-noise earplugs. The The Contractor Environmental aggregate construction schedule shall be arranged reasonably. and the Project Protection Acoustic processing 2. The construction schedule shall be arranged reasonably according construction and Bureau and environment system and other to Emission Standard of Environment Noise for Boundary of Construction implementation Bureau of construction Construction Site (GB12523-2011). Construction is not allowed at nights management unit Housing and activities have a or only low-noise construction is allowed at night. Construction Construction certain impact on machinery producing noise (such as pile drivers) shall stop operation at the acoustic night (22: 00-6: 00). At sensitive sites, construction shall not be carried environment of out at night or only low-noise construction is allowed. At the same time, 216 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project nearby village noise reduction measures shall be taken to minimize the impact of and construction construction noise on resident. Continuous night construction shall be workers. approved by relevant departments, and communication with resident in advance is necessary. Impact on traffic: 1. The vehicle frequently in and out the site shall drive according to specified route, shall be washed before entering the road. The vehicle for transport of materials that are likely to spill and leak shall be sealed to effectively prevent dust pollution. 2. Overloaded vehicle and vehicle with mud are not allowed to drive on the road so as to prevent pollution of the road and reduce the secondary dust pollution. 3. Special personnel shall be assigned to direct the traffic in one-way Road Transport road and in the neighborhood of the entrance of construction site to Bureau, prevent road traffic jam. At the same time, traffic wardens shall be The Contractor Education Impact on society (such as travel assigned to command safe traffic of transport vehicles. and the Project Bureau, Culture of resident, going to school and 4. Before construction, the construction information shall be published construction and Bureau, Urban farm work) on mass media, including the construction sections in which traffic jams implementation Management may occur and related solutions (such as time-limited traffic). management unit Bureau and 5. The Contractor shall set warning signs in the construction sections, Health Bureau such as signs of "Construction Ahead, Slow Down� and "Construction Ahead, Changing Route" to remind the drivers to pay attention to the situation and facilitate traveling of residents. 6. To facilitate the passing of vehicles at night and reduce accident rate, warning lights shall be set in the construction sections to guide the vehicles. Impact on landscape: after the completion of the main Project, site clearing, greening and road rehabilitation and other ancillary works shall be completed as soon as possible so that to ensure coordination with the environment. 217 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Appendix 2: Specific Protection Measures Table 2-1 Specific Environmental Protection Regulations and Mitigation / Prevention Measures during Constriction Period Costs of environmental Treatment effect, executive Sub-project Pollutant Pollution prevention and control Unit in Supervision protection Contaminant standard or proposed activity source measures charge unit measures requirements (CNY 10,000) Strengthen the construction site 10 management and set construction signs Satisfy the limit for During the construction period, water uncontrolled emission the roads where the vehicle is driving Atmospheric concentration in Table 2 of 20 Raised dust for dust depression and cover the roads pollutant Integrated Emission with dust-proof cloth. Standard of Air Pollutants Clear the stacked construction waste in (GB16297-1996). a timely manner to reduce dust, and 10 asbestos is strictly prohibited. Make appropriate arrangements for Noise for boundary of Elderly Care operation of construction machinery; construction site during Anqing Anqing Institution of no night construction; use low-noise construction period shall be First Environmental Anqing First mechanical equipment or in accordance with People's Protection People’s Noise Noise 20 sound-insulation and noise-absorption Emission Standard of Hospital Bureau Hospital equipment; and make appropriate Environment Noise for arrangements for construction and Boundary of Construction construction sites Site (GB12523-2011) Flushing Be used for production after Waste water — 10 wastewater sedimentation Domestic Be stacked at designated sites, General solid waste shall be 10 waste classified, and timely cleared in accordance with Solid waste Transportation of construction waste Standard for Pollution Construction shall be approved by the government Control on the Storage and 20 waste department of city appearance and Disposal Site for General 218 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project environmental sanitation (municipal Industrial Solid Waste construction waste office), and shall (GB18599-2001) not be transported by individual or units who don’t get approval for construction waste transportation Strengthen the construction period management, strengthen watering and dust suppression measures on site and 50 Satisfy the limit for vehicle in and out of the site, and set a uncontrolled emission vehicle washing platform Atmospheric concentration in Table 2 of Raised dust Close the construction site with fence; pollutant Integrated Emission cover or green the exposed site; reduce Standard of Air Pollutants dust by watering; backfill the (GB16297-1996). 50 excavated earthwork as soon as possible; and adopt closed transport for spoil Elderly Care Use low-noise mechanical equipment Noise for boundary of Center of or sound-insulation and construction site during Traditional Lu'an Lu'an noise-absorption equipment; make construction period shall be Chinese Environmental Hospital of appropriate arrangements for in accordance with Hospital of Protection Traditional Noise Noise 50 construction and construction sites; set Emission Standard of Lu’an Bureau Chinese up mobile sound barriers on the west Environment Noise for Medicine side of the Project; and no night Boundary of Construction construction Site (GB12523-2011) Meet the acceptance criteria Domestic Be discharged to municipal sewage of Lu’an Chengbei Sewage — wastewater pipe network Treatment Plant Waste water Be used for construction water after Construction treatment of grid, grit chamber and — 20 wastewater oil-water separator Domestic Be stacked at designated sites, General solid waste shall be 10 Solid waste waste classified, and timely cleared in accordance with Construction Be transported by closed vehicle and Standard for Pollution 30 219 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project waste can be used for pavement of road Control on the Storage and subgrade. Toxic and hazardous Disposal Site for General substances shall not be burned. Industrial Solid Waste (GB18599-2001) Strengthen the construction period management, strengthen watering and dust suppression measures on site and 20 Satisfy the limit for vehicle in and out of the site, and set a uncontrolled emission vehicle washing platform Atmospheric concentration in Table 2 of Raised dust Close the construction site with fence; pollutant Integrated Emission cover or green the exposed site; reduce Standard of Air Pollutants dust by watering; backfill the (GB16297-1996). 20 excavated earthwork as soon as The Project possible; and adopt closed transport for of spoil Relocation Use low-noise mechanical equipment Noise for boundary of and or sound-insulation and construction site during Xuancheng Xuancheng Rebuilding noise-absorption equipment; make construction period shall be Municipal appropriate arrangements for in accordance with Environmental of Noise Noise Social 20 Protection Xuancheng construction and construction sites; set Emission Standard of Welfare up mobile sound barriers on the Environment Noise for Bureau Municipal Home Social northeast side of the Project; and no Boundary of Construction Welfare night construction Site (GB12523-2011) Home Be discharged to municipal sewage Meet the acceptance criteria Domestic pipe network after pretreatment of of Jingtingwei Sewage — wastewater septic tanks of Xiadu Xincheng Estate Treatment Plant Waste water Be used for construction water after Construction treatment of grid, grit chamber and — 10 wastewater oil-water separator Be classified and stacked at designated General solid waste shall be Domestic sites of Xiadu Xincheng Estate, and be in accordance with — Solid waste waste timely cleared Standard for Pollution Construction Be transported by closed vehicle and Control on the Storage and 20 220 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project waste can be used for pavement of road Disposal Site for General subgrade. Toxic and hazardous Industrial Solid Waste substances shall not be burned. (GB18599-2001) Strengthen the construction period management, strengthen watering and dust suppression measures on site and 10 Satisfy the limit for vehicle in and out of the site, and set a uncontrolled emission vehicle washing platform Atmospheric concentration in Table 2 of Raised dust Close the construction site with fence; pollutant Integrated Emission cover or green the exposed site; reduce Standard of Air Pollutants dust by watering; backfill the (GB16297-1996). 10 excavated earthwork as soon as possible; and adopt closed transport for spoil Noise for boundary of Improvement Use low-noise mechanical equipment construction site during Project of or sound-insulation and Ningguo construction period shall be Ningguo Ningguo noise-absorption equipment; make Municipal in accordance with Environmental City Social Noise Noise appropriate arrangements for Social 10 Emission Standard of Protection Welfare construction and construction sites; set Welfare Environment Noise for Bureau Service up mobile sound barriers around the Home Boundary of Construction Center Project; and no night construction Site (GB12523-2011) Be discharged to municipal sewage Meet the acceptance criteria Domestic pipe network after pretreatment of of Ningguo City Sewage — wastewater septic tanks of surrounding residential Treatment Plant Waste water quarter Be used for construction water after Construction treatment of grid, grit chamber and — 10 wastewater oil-water separator Be classified and stacked at designated General solid waste shall be Domestic sites of surrounding residential quarter, in accordance with — Solid waste waste and be timely cleared Standard for Pollution Construction Waste bricks, bamboos and woods and Control on the Storage and 50 221 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project waste other materials produced by demolition Disposal Site for General of original buildings shall be Industrial Solid Waste transported by the special vehicles for (GB18599-2001) waste soil transportation of municipal companies, and all workers shall be provided with necessary security equipment, such as helmets and masks. The vehicles for transportation of waste soil during construction shall be sealed, and the waste soil can be used for subgrade pavement. Toxic and hazardous substances shall not be 10 burned. Cement, sand and other building materials shall be stacked at one specific location, and measures shall be taken to prevent the materials from rain. Strengthen the construction period management, strengthen watering and dust suppression measures on site and 20 Satisfy the limit for vehicle in and out of the site, and set a uncontrolled emission Haoyan vehicle washing platform Atmospheric concentration in Table 2 of Rainbow Raised dust Close the construction site with fence; Anhui pollutant Integrated Emission Garden - cover or green the exposed site; reduce Haoyan Wuhu Standard of Air Pollutants Wuhu Health dust by watering; backfill the Aged-care Environmental (GB16297-1996). 20 Aged-care excavated earthwork as soon as Service Protection Service possible; and adopt closed transport for Investment Bureau Industry spoil Co. Ltd. Base Use low-noise mechanical equipment Noise for boundary of or sound-insulation and construction site during Noise Noise noise-absorption equipment; make construction period shall be 30 appropriate arrangements for in accordance with construction and construction sites; and Emission Standard of 222 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project do not carry on construction at night Environment Noise for Mark the complaint hotline at Boundary of Construction construction site; in case of any Site (GB12523-2011) 5 complaint, timely contact local environment protection department. Flushing Be used for production after Waste water — 20 wastewater sedimentation Domestic Be stacked at designated sites, 20 waste classified, and timely cleared General solid waste shall be The construction waste produced in accordance with during the renovation can be recycled Standard for Pollution and cannot be disposed by the Solid waste Control on the Storage and Construction sanitation department. Coating and Disposal Site for General 40 waste waste paint are hazardous waste, so Industrial Solid Waste shall be treated by qualified units. It is (GB18599-2001) strictly prohibited to dispose the hazardous waste carelessly. 223 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 2-2 Environmental Protection Regulations and Mitigation / Prevention Measures during Operation Costs of environmental Treatment effect, executive Pollutant Unit in Supervision protection Subitem Control measures standard or proposed source charge unit measures requirements (CNY 10,000) Build a new sewage treatment station (treatment Meet the pretreatment capability: 3080m3 / d) with support of Anqing First standards in Table 2 of Waste People's Hospital. The waste water produced by the Discharge Standard of — water Project is 221m3 / d, accounting for 1.1% of treatment Water Pollutants for Medical capability of Anqing North New Town Sewage Treatment Institutions (GB18466-2005) Plant. Therefore, the plant can accept it. Elderly Care The amount of domestic waste is about 420t / a and Anqing Anqing Institution of medical waste is about 36.5t / a. A large number of First Environmental Anqing First garbage cans and medical solid waste collecting tanks People's Protection People’s will be set, and the temporary medical solid waste storage Hospital Bureau Hospital Solid site of Anqing First People's Hospital will also be used. Harmless treatment 30 waste Domestic waste will be sent to the sanitation department for centralized disposal, and shall be disposed timely. Medical waste will be disposed by Environmental Protection and Technology Co., Ltd. of Anqing Development and Investment (Group) Corporation. Build an underground sewage treatment station (treatment capability: 1200 m3 / d) in Lu'an Hospital of Traditional Meet the pretreatment Elderly Care Chinese Medicine, relying on the rain water and sewage standards in Table 2 of Center of Waste pipe network of Lu'an Hospital of Traditional Chinese Discharge Standard of Traditional Lu'an Lu'an — water Medicine. The waste water produced by the Project is 133 Water Pollutants for Medical Chinese Environmental Hospital of m3 / d, accounting for 0.2% of treatment capability of Institutions (GB18466-2005) Hospital of Protection Traditional Lu’an Chengbei Sewage Treatment Plant. Therefore, the Lu’an Bureau Chinese plant can accept it. Medicine Solid The amount of domestic waste is about 252 t / a and Harmless treatment 30 waste medical waste is about 21.9 t / a. A large number of 224 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project garbage cans and medical solid waste collecting tanks will be set, and the temporary medical solid waste storage site of Lu'an Hospital of Traditional Chinese Medicine will also be used. Domestic waste will be sent to the sanitation department for centralized disposal, and shall be disposed timely. Medical waste will be disposed by Lu'an Jiekang Environmental Protection Centralized Medical Waste Disposal Co., Ltd. Waste water produced by The Project is located in the Project area, and the amount infirmary after treatment in The Project of waste water produced by the Project is 85 m3 / d. The disinfection tank and of waste water will be pretreated by oil separator (30m3 / d), Waste domestic sewage after Relocation septic tank and disinfection tank, and then be discharged 50 water pretreatment shall meet and into the sewage treatment station (design capacity: Xuancheng Level 3 standard in Table 4 Xuancheng Rebuilding 100m3) and Jingtingwei Sewage Treatment Plant for Municipal of Integrated Discharge Environmental of treatment. Social Standard (GB8978-1996) Protection Xuancheng Welfare The amount of domestic waste is about 164 t/ a, and the Bureau Municipal Home amount of medical waste is about 14.6 t / a. Domestic Social Solid waste will be uniformly collected and disposed by Welfare Harmless treatment 20 waste sanitation department. Medical waste produced by Home infirmary will be collected and disposed by Xuancheng Jiuding Medical Waste Disposal Co., Ltd. The Project is located in the Project area, and the amount Domestic sewage pretreated Improvement of waste water produced by the Project is 61.2 m3 / d. The shall meet Level 3 standard Project of Waste Ningguo waste water will be pretreated by oil separator (20 m3 / d), in Table 4 of Integrated Ningguo 50 Ningguo water Municipal septic tank (80 m3 / d) and disinfection tank, and then be Discharge Standard Environmental City Social Social treated by Ningguo City Sewage Treatment Plant. (GB8978-1996) Protection Welfare Welfare The amount of domestic waste is about 113 t / a. The Bureau Service Solid Home domestic waste will be collected uniformly and treated by Harmless treatment 10 Center waste the sanitation department. Haoyan The Project is located in “Haoyan Rainbow Garden�, and Domestic sewage pretreated Anhui Wuhu Waste Rainbow the amount of waste water produced by the Project is shall meet Level 3 standard Haoyan Environmental 100 water Garden - 208.4 m3 / d. The waste water will be pretreated by oil in Table 4 of Integrated Aged-care Protection 225 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Wuhu Health separator (60 m3 / d), septic tank and disinfection tank, Discharge Standard Service Bureau Aged-care and then be discharged into the sewage treatment station (GB8978-1996) Investment Service (design capacity: 320 m3) and Zhujiajiao Sewage Co. Ltd. Industry Treatment Plant for treatment. Base The amount of domestic waste is about 333 t/ a, and the amount of medical waste is about 28.47 t / a. Domestic Solid waste will be uniformly collected and disposed by Harmless treatment 50 waste sanitation department. Medical waste produced by infirmary will be collected and disposed by Wuhu Lansheng Medical Waste Centralized Disposal Co., Ltd. 226 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Appendix 3: List of Social Management Plan 3-1 List of Social Management Plan Target Action suggestions Specific measures or actions Actor Action time Monitoring index group In the places where the demand for elderly care Project office, Reasonably arrange the is large, the sites may be constructed a little implementation Operating spatial location of the more, while in the places where the demand for institution and 2018- institution elderly care sites elderly care is small, such as industrial area, operating institution at commercial area, the sites might be less. each city Personnel of Hire experienced experts or expert team as Reduce the workload of Degree of satisfaction of relevant soon as possible to effectively reduce the Project Office 2018- government staff government staff department workload of government staff. 1) Formulate the transition plan for the implementation period of the Project, eliminate 1) See the relevant Reduce the negative the environmental impact and potential risks content of environmental impact of the project on during construction, and reasonably arrange the Project impact assessment elderly care service Employees work of staff and the transition of the elderly; implementation 2018- 2) The implementation practitioners during its 2) Develop talent motivation and training institution plan and the number of implementation programs as soon as possible to address the trainers of the training need for human resources during the program implementation and operation of the Project; 1) Formulate temporary transition plan for 1) See the relevant the construction period to help the elderly to content of environmental Reduce the negative adapt to the new environment as soon as Project impact assessment impact of the project on The elderly possible and to reduce the environmental implementation 2018- 2) Public price hearing the elderly during its impact and potential risks during the institution 3) Formulate the implementation construction; transition plan for the 2) Deliberate the change of service price. elderly Reduce the impact on Community The existing public activities of the community Number and content of other residents in PMO, community 2018- residents are not affected. community activities community 227 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project See the external Reduce the migration monitoring of Immigrant Formulate the Resettlement Action Plan Project Office 2018- influence of the project resettlement of immigrants It is suggested that the Project institutions All the Project office and Establish the complaint assign specific officer to handle the complaints The complaint record people in implementation 2018- mechanism and keep the complaint record and remedial and handling. project area institution measures. 1) In all the community-based elderly care service sites, nursing homes, social welfare institutions and hospitals funded by the Project, there should be a board to publicize the Project. 2) On the uniforms of the staff of the government's purchasing health-care service, Project Office, 1) Various publicity All the there should be the mark showing the support Vigorous publicize the implementation materials people in of World Bank loan; 2018- World Bank projects institution and 2) Seminars and project area 3) Publicize the World Bank Projects with operating institution symposiums various media; 4) Hold seminars and symposiums, in the name of the World Bank project, to promote a series of hot and cutting-edge topics, such as the socialization of elderly care services, and the combination of medical and health care. 1) Women’s salary 1) Give priority to women in terms of Project operating 2) The percentage of Give priority to women Female training, promotion, and post; institution, Project 2018- female managers and in terms of opportunities employees 2) Make sure that the women and men are Office female technicians in all equally paid when the they do the same work. the female employees 228 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Appendix 4: Due Diligence Report See Table 4-1 for sewage treatment plants related to the Project; see Table 4-2 for waste landfills related to the Project; see Table 4-3 for medical waste disposal units related to the Project. Table 4-1 List of Sewage Treatment Plants Related to the Project Percentage Introduction to the Sewage Treatment Plants Related to the Project of amount Access to Amount Treatment Whether of sewage sewage Name of Whether there of capacity EIA the S/N Description Project Site in sewage treatment sewage Completion Treatment are remaining sewage (ten acceptance emissions treatment plant treatment time (year) process environmental (m3/d) thousand t or not? meet capacity recently? plant problems / d) standards (%) Anqing Elderly Care North New Institution of Yes. HJH Anqing North Town Oxidation 1 Anqing First 221 1.1% Yes 2009.09 6 [2011] No. Yes No New Town Sewage ditch process People’s 420 Treatment Hospital Plant Elderly Care East side of Lu’an Center of Lu'an Yes. Lu'an Hospital Chengbei Hospital of Improved A2 Accepted 2 of Traditional 199 0.25% Yes Sewage 2004.6 8 Yes No Traditional /O on March Chinese Treatment Chinese 12, 2015 Medicine Plant Medicine North side of Haoyan Yinhu Lake, Wuhu Rainbow Garden Yes. Yuexiu Road, Zhujiaqiao - Wuhu Health Oxidation Accepted 3 Economic and 270 0.27% Yes Sewage 2009.9 6 Yes No Aged-care ditch process in October Technological Treatment Service Industry 2010 Development Plant Base Zone Improvement No. 15, Use Orbal Ningguo Project of Ningyang oxidation City Sewage 4 Ningguo City Middle Road, 61.2 0.15% Yes 2009 4 ditch sewage Yes Yes No Treatment Social Welfare Ningguo City, treatment Plant Service Center Anhui Province process 229 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Yes. Accepted The Project of in June Relocation and Southwestern Jingtingwei 2010 for Rebuilding of Xiaduxincheng, Sewage Improved A2 5 85 0.1% Yes 2009.10 10 Phase I and Yes No Xuancheng Xuanzhou Treatment /O in Municipal Social District Plant November Welfare Home 2010 for Phase II. 230 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 4-2 List of Waste Landfills Related to the Project Introduction to the Waste Landfills Related to the Project Amount Whether there are Treatment Whether the S/N Description Project Site Completion of solid Treatment EIA acceptance or remaining Description capacity emissions meet time (year) waste (t process not? environmental (t/d) standards / d) problems Domestic Waste Incineration Elderly Care Power Plant of Yes. Accepted on Institution of Incineration Anqing North Anqing Wenergy December 31, 1 Anqing First 2011 1.15 800 power Yes No New Town Zhongke 2012. HJH [2012] People’s generation Environmental No. 1583 Hospital Protection Power Co., Ltd. Elderly Care East side of 600 for Center of Lu’an City Lu'an Hospital Phase I, Incineration Lu'an Hospital Domestic Waste 2 of Traditional 2014.9 1.04 and 1200 power Yes Yes No of Traditional Incineration Chinese for Phase generation Chinese Power Plant Medicine II Medicine Haoyan North side of Rainbow Yinhu Lake, Wuhu Lvzhou Garden - Yuexiu Road, Environmental 3 Wuhu Health Economic and 2011.1 1.18 600 Incineration Yes Yes No Protection Energy Aged-care Technological Co., Ltd. Service Development Industry Base Zone Improvement No. 15, Modified Project of Ningyang Domestic Waste anaerobic Yes. XHZH (2015) 4 Ningguo City Middle Road, Disposal Center of 2010.7 0.31 175 Yes No sanitary No. 124 Social Welfare Ningguo City, Ningguo landfill Service Center Anhui Province The Project of Relocation and Southwestern Xuancheng City Incineration Rebuilding of Xiaduxincheng, Domestic Waste 5 2017.5 0.23 400 power Yes Yes No Xuancheng Xuanzhou Incineration generation Municipal District Power Plant Social Welfare Home 231 Environmental Management Plan of World Bank-financed Anhui Aged Care System Project Table 4-3 List of Medical Waste Disposal Units Related to the Project Introduction to the Medical Waste Disposal Units Related to the Project. Amount Treatment Whether the S/N Description Project Site Completion of medical Treatment EIA acceptance or Whether there are remaining Description capacity emissions meet time (year) waste (t / process not? environmental problems (t/d) standards d) Environmental Elderly Care Protection and Institution of Technology Co., Anqing North 0.10 Yes. Accepted on 1 Anqing First Ltd. of Anqing 2011.4 5 Incineration Yes No New Town April 23, 2013 People’s Development and Hospital Investment (Group) Corporation Elderly Care Lu'an Jiekang East side of Center of Lu'an Environmental Lu'an Hospital High temperature Hospital of Protection 0.09 Yes. WHW [2008] 2 of Traditional 2007 1650 and high pressure Yes No Traditional Centralized No. 5 Chinese steam sterilization Chinese Medical Waste Medicine Medicine Disposal Co., Ltd. Haoyan North side of Rainbow Yinhu Lake, Wuhu Lansheng Garden - Wuhu Yuexiu Road, Centralized 0.10 Yes. Accepted in 3 Health Economic and 20010.4 15 Incineration Yes No Medical Waste February 2011 Aged-care Technological Disposal Co., Ltd. Service Development Industry Base Zone The Project of Relocation and Southwestern Rebuilding of Xuancheng Jiuding Xiaduxincheng, 0.04 High temperature 4 Xuancheng Medical Waste 2011.12 3 Yes Yes No Xuanzhou steaming Municipal Disposal Co., Ltd. District Social Welfare Home 232