Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 May 05, 2017 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packag Domesti Review Comments No. n d es c by Bank Cost Prefere (Prior / US$ nce Post) million (yes/no) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract the NCB for Prior (Goods) Review III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date For the Support for the 1 Post first year preparation of 20,000 IC 21/08/15 24/09/15 Statutory Instruments (30 days) 2 Study on the definition 40,000 Post 22/04/16 of a planning CQS 25/01/16 (03 methodology at months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the (03 communes and urban months) communities 4 Study for the 20,000 IC Post 19/02/16 24/03/16 establishment of local (30 days) public service in communes 5 Study on the 40,000 CQS Post 11/04/16 18/07/16 sustainability of the (03 PNDP months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization (03 process in months) Cameroon/supports to the finalization of the national strategy for decentralization 7 Selection of a 20,000 IC Post 20/11/15 30/12/15 consultant to develop (30 days) the practitioner's manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Conventio n) 9 Training of 100,000 SSS Prior NA Service procurement provided commissions by ARMP (Conventio n) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract project for the first 2 for 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date 12 Design and 90,000 CQS Post 12/02/16 22/08/16 development of an (06 internet portal on the months) PNDP and communes 13 Translation of 90,000 CQS Post 11/05/16 20/08/16 documents (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and 70,000 QCBS Post 13/12/16 26/06/17 Social Assessment (06 months) 17 Service Follow-up of training SSS Prior NA provided deployment and by AIMF 70,000 technical assistance to expert Sim_ba software in (Conventio communes n) 18 IC Post 27/05/15 Annual contract (the 10,000 current contract ends June Insurance advice 30, 2015) 19 QCBS Post 01/12/16 16/04/16 Preparation of CDPs for 80,000 (06 the 31 communes months) May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-05- 30 2021-08- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144637 GPN Date: 24 2016-09- Project Name: Community Development Program Support Project-Phase III 06 Loan / Credit No: IDA / 57180, IDA / D2990, IDA / 62240 CELLULE REGIONALE DE COORDONATION - EXTREME NORD Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati High SEA/SH Process Prequalification Bidding Documents Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Risk Status Evaluation Report as Issued Completion Type Amount (US$) Documents Justification / Invitation Opening / Minutes Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d CM-CRC EXTREME NORD- 8012-CW-RFQ / Petits Component C: travaux d'aménagement des Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-07- 2017- bureaux (cloisonnement des IDA / 57180 A posteriori Limited 5,600.00 4,722.91 Achevé monitoring and evaluation prix Envelope 10 26 05 22 06-04 bureaux, équipement and communication étagères pour classement, etc...) à la CRC EN CM-CRC EXTREME NORD- 8013-CW-RFQ / Construct et équipt d'01 bloc de 02 de sc et d'un bloc de Lt à trois comparts à l'EP de Dogba, Component A: Local Demande de Single Stage - One 154,638.0 139,405. 2017-03- 2017-06- 2017-05- 2017-10- 2017- au lycée de Gayack et IDA / 57180 A posteriori Limited Signé development support prix Envelope 0 62 25 12 20 30 09-17 Construction de 01 bloc de hangar de 52 pces et d'un bloc de Lt à trois comparts au marché de Papata,Commune de Mra II CM-CRC EXTREME NORD- 8016-CW-RFQ / Constructde 6 forages équipés de PMH à Tchékéhi, Component A: Local Demande de Single Stage - One 68,485.3 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 A posteriori Limited 96,000.00 Signé Mbokouré, Magaldao development support prix Envelope 0 25 30 20 12 08-18 Toupéo, Soukkoungo Galdima, Bourango et Bandalaré, commune de Pétté CM-CRC EXTREME NORD- 8035-CW-RFQ / Construct d'un magasin de stockage à Kéné-Kéné, Construct d'un Component A: Local Demande de Single Stage - One 68,573.2 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 A posteriori Limited 82,609.00 Signé bloc de 02 sc équipées à development support prix Envelope 6 25 30 20 12 08-18 l'EP de Djafgué, et Construct d'un bloc de Lt à l'EP de Djafgué commune de Pétté CM-CRC EXTREME NORD- 8036-CW-RFQ / Constr d'un forage pastoral à énergie solaire équipé de 02 abreuvoirs à Balaza Lawane Component A: Local Demande de Single Stage - One 76,928.1 2017-03- 2017-05- 2017-05- 2017-09- 2017- IDA / 57180 A posteriori Limited 82,196.00 Achevé (Tchalloudi mango) et development support prix Envelope 6 25 15 20 12 08-18 Constr d'un forage pastoral à énergie solaire équipé de 02 abreuvoirs à Kongola Saïd, Cne Maroua 3 CM-CRC EXTREME NORD- 8037-CW-RFQ / Construct d'un bloc de 02 sc équipées et d'un bloc de Lt à trois Component A: Local Demande de Single Stage - One 136,106.0 2017-03- 2017-05- 2017- IDA / 57180 A posteriori Limited 0.00 Annulé comparts à l'EP de Mayel development support prix Envelope 0 25 20 08-18 Béi, à l'EP de Bao Hosséré II et à l'EP de Palaoudi, commune Maroua 1 CM-CRC EXTREME NORD- 8040-CW-RFQ / construction d'un bloc Component A: Local Demande de Single Stage - One 46,402.6 2017-03- 2017-05- 2017-05- 2017-08- 2017- maternel à l'école Maternelle IDA / 57180 A posteriori Limited 57,421.00 Signé development support prix Envelope 2 25 15 20 17 08-18 de Zokok-Laddo et branchement au réseau d'alimentation en eau potable, commune de Maroua 1 CM-CRC EXTREME NORD- 8042-CW-RFQ / Construction de trois Component A: Local Demande de Single Stage - One 39,964.5 2017-03- 2017-05- 2017-05- 2017-09- 2017- forages équipés de pompe à IDA / 57180 A posteriori Limited 46,689.00 Signé development support prix Envelope 9 25 25 20 12 08-18 motricité humaine à Ouro Dow, Goni Bello et Yoldéo Guiziga, Commune Maroua 1 CM-CRC EXTREME NORD- 8043-CW-RFQ / Construction de d'un bloc de 02 salles de classe Component A: Local Demande de Single Stage - One 77,069.0 2017-03- 2017-04- 2017-05- 2017-07- 2017- IDA / 57180 A posteriori Limited 92,247.00 Signé équipées et d'un bloc de development support prix Envelope 7 25 25 20 07 08-18 latrines à trois compartiments à l'EP Masfaï et au CES de Boula, commune de Mokolo CM-CRC EXTREME NORD- 8045-CW-RFQ / Construction de 2 forages Component A: Local Demande de Single Stage - One 30,426.6 2017-03- 2017-04- 2017-05- 2017-07- 2017- IDA / 57180 A posteriori Limited 33,787.00 Signé équipés de PMH un à Ouro development support prix Envelope 4 25 05 20 07 08-18 Kessoum et à Mounam, commune de Mokolo CM-CRC EXTREME NORD- 8047-CW-RFQ / Construction d'un ouvrage Component A: Local Demande de Single Stage - One 81,284.7 2017-03- 2017-03- 2017-05- 2017-10- 2017- de franchissement et IDA / 57180 A posteriori Limited 87,751.00 Achevé development support prix Envelope 8 25 31 20 31 08-18 assainissement(radier-dalot) sur le Mayo Kwayaga, dans la commune de Mogodé CM-CRC EXTREME NORD- 8050-CW-RFQ / Construction d'un bloc de 02 salles de classe équipées Component A: Local Demande de Single Stage - One 85,878.4 2017-03- 2017-04- 2017-05- 2017-06- 2017- IDA / 57180 A posteriori Limited 90,443.00 Achevé et d'un bloc de latrines à development support prix Envelope 9 25 06 20 21 08-18 trois compartiments à l'EP de Saoudjo et au CES de Madaka, commune de Bogo CM-CRC EXTREME NORD- 8053-CW-RFQ / Component A: Local Demande de Single Stage - One 28,863.6 2017-03- 2017-04- 2017-05- 2017-07- 2017- Construction d'un forage IDA / 57180 A posteriori Limited 32,294.00 Signé development support prix Envelope 3 25 06 20 05 08-18 équipé de PMH à Dambaye et à Bagalaf commune de Bogo CM-CRC EXTREME NORD- 8054-CW-RFQ / construction d'un bloc de deux (02) salles de classe equipees et un (01) bloc Component A: Local Demande de Single Stage - One 178,787.0 163,753. 2017-03- 2017-07- 2017-05- 2017-10- 2017- IDA / 57180 A posteriori Limited Achevé latrine a trois (03) development support prix Envelope 0 46 25 07 20 27 09-17 compartiments a l'EP de honkol, a l'EP de darsala, a l'EP de dabanga et l'equipement en meubles a l'ecole maternelle de logone birni CM-CRC EXTREME NORD- 8056-CW-RFQ / construction de trois forages équipés de pompe à Component A: Local Demande de Single Stage - One 44,814.2 2017-03- 2017-04- 2017-05- 2017-06- 2017- IDA / 57180 A posteriori Limited 50,245.00 Achevé motricité humaines: un à development support prix Envelope 4 25 20 20 30 08-18 l'EP de Dabanga, un à l'EP de Honkol et un à l'EP de Darsala dans la Commune de Logone Birni CM-CRC EXTREME NORD- 8057-CW-RFQ / construction d'un forage Component A: Local Demande de Single Stage - One 41,388.9 2017-03- 2017-04- 2017-05- 2017-06- 2017- pastoral équipé de pompe IDA / 57180 A posteriori Limited 45,860.00 Achevé development support prix Envelope 5 25 20 20 30 08-18 immergée à énergie photovoltaique à Sahaba 1 dans la Commune de Logone Birni CM-CRC EXTREME NORD- 8068-CW-RFQ / réhabilitation de la mare artificielle et la construction Component A: Local Demande de Single Stage - One 114,601.0 91,831.5 2017-03- 2017-07- 2017-05- 2017-11- 2017- IDA / 57180 A posteriori Limited Achevé d'un forage pastoral à development support prix Envelope 0 8 25 07 20 27 09-17 energie photovoltaique à Mogong dans la commune de Moutourwa CM-CRC EXTREME NORD- 8072-CW-RFQ / construction de 2 blocs de deux salles de classe Component A: Local Demande de Single Stage - One 115,353.0 102,090. 2017-03- 2017-03- 2017-05- 2017-06- 2017- IDA / 57180 A posteriori Limited Signé équipées et de 2 blocs de development support prix Envelope 0 02 25 23 20 12 08-18 latrines à trois compartiments EP NGré et EP Afadé dans la commune de Makary CM-CRC EXTREME NORD- 38352-CW-RFB / Travaux de construction d'un forage PMH à Kaliao, Goulmoyo, Mbozo Mofou, Balewa et Component A: Local Single Stage - One 260,774.0 200,809. 2017-11- 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-01- 2018-03- 2018-04- 2018- Manguirdla (Lot 1), IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 46 27 01 02 13 15 12 19 19 04 06-17 Gadjawai, Guivel, Quartier Méri centre, Nguissar et Kilwo-Valta (Lot 2), Moundour Foulbé, Dogba Maliki, Magawa, Houloum et Tchaki djébé (Lot 3) C-MERI CM-CRC EXTREME NORD- 38353-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 36,949.0 2017-12- 2017-12- 2018-01- 2018-07- 2018- de deux salles de classe IDA / 57180 A posteriori Limited 51,198.00 Signé development support prix Envelope 6 02 23 27 12 04-27 équipées et un bloc de latrines au C.E.S de Manguirdla dans la commune de Meri CM-CRC EXTREME NORD- 38354-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Demande de Single Stage - One 67,277.8 2017-12- 2017-12- 2018-01- 2018-04- 2018- deux salles de classe IDA / 57180 A posteriori Limited 95,682.00 Signé development support prix Envelope 1 02 28 27 04 04-27 équipées avec latrines à l'EP de Domo Doukou et à l'EP de Riganda COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 38355-CW-RFQ / Travaux de construction d'un bloc de deux salles de classe Component A: Local Demande de Single Stage - One 82,938.9 2017-12- 2017-12- 2018-01- 2018-03- 2018- IDA / 57180 A posteriori Limited 99,316.00 Signé équipées et un bloc de development support prix Envelope 4 02 22 27 27 04-27 latrines à l'EP de Pitoa- Kolara et à l'EP de Badadji COMMUNE DE MOULVOUDAYE CM-CRC EXTREME NORD- 38356-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Demande de Single Stage - One 79,132.8 2017-12- 2017-12- 2018-01- 2018-04- 2018- deux salles équipées et un IDA / 57180 A posteriori Limited 91,386.00 Achevé development support prix Envelope 6 02 22 27 09 04-27 bloc de latrines à l'EP de Djagalaye et au CES de Hardé COMMUNE DE MAROUA Ier CM-CRC EXTREME NORD- 38357-CW-RFQ / Travaux de construction d'un bloc de deux salles équipées et un Component A: Local Demande de Single Stage - One 82,420.0 2017-12- 2017-12- 2018-01- 2018-04- 2018- bloc de latrines CES de IDA / 57180 A posteriori Limited 89,342.00 Achevé development support prix Envelope 0 02 22 27 04 04-27 Balda et Construction d'un bloc de deux salles de classe équipées à l'EP de Sedek Ouro-Gabdo COMMUNE DE BOGO CM-CRC EXTREME NORD- 38358-CW-RFQ / Travaux de Construction de 01 forage PMH A EM de Ldamtsai, Mandaka Component A: Local Demande de Single Stage - One 133,467.0 117,088. 2017-12- 2017-12- 2018-01- 2018-04- 2018- Mpoldok, Camp mission de IDA / 57180 A posteriori Limited Signé development support prix Envelope 0 54 02 26 27 08 04-27 Tourou, Koudougour II Loctcha, Katamsa Sikia, Gouldoum Moufou, Houdango Dandi et Ouro Bocki(2lots) dans la commune de Mokolo CM-CRC EXTREME NORD- 38359-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 14,057.2 2017-12- 2018-01- 2018-01- 2018-04- 2018- de construction d' un forage IDA / 57180 A posteriori Limited 15,816.00 Signé development support prix Envelope 0 02 31 27 05 03-28 équipé de PMH à l'EP de Riganda commune YAGOUA CM-CRC EXTREME NORD- 38360-CW-RFQ / Travaux de construction d'un forage équipé de PMH à l'EP de Component A: Local Demande de Single Stage - One 61,321.8 2017-12- 2017-12- 2018-01- 2018-03- 2018- IDA / 57180 A posteriori Limited 72,362.00 Signé Badadji, à l'EP de Pitoa- development support prix Envelope 8 02 22 27 26 04-27 Kolara, au lycée de Kolara et à Gadjia Padjonré COMMUNE DE MOULVOUDAYE CM-CRC EXTREME NORD- 38361-CW-RFQ / Travaux de construction d'un forage Component A: Local Demande de Single Stage - One 35,012.7 2017-12- 2017-12- 2018-01- 2018-04- 2018- équipé de PMH à l'EP de IDA / 57180 A posteriori Limited 48,640.00 Signé development support prix Envelope 5 02 22 27 09 04-27 Yamdjidjing, à l'EP de Djagalaye et à Zébé COMMUNE DE MAROUA Ier CM-CRC EXTREME NORD- 38362-CW-RFQ / Travaux de Construction d'un forage équipé de pompe à motricité humaine à l'EP de Component A: Local Demande de Single Stage - One 67,323.3 2017-12- 2017-12- 2018-01- 2018-04- 2018- IDA / 57180 A posteriori Limited 94,648.00 Signé Sedek Ouro Gabdo à Ardo development support prix Envelope 9 02 22 27 04 04-27 Foulbé Tankirou à Gagnéri Kourdaya à Guinlaye Guizigaré et Guinlaye Moufouré dans la commune BOGO CM-CRC EXTREME NORD- 38386-CW-RFQ / Travaux de construction d'un bloc de deux salles de classe équipées avec latrines à l'EP Component A: Local Single Stage - One 237,076.0 213,978. 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-04- 2018- de Mouftoum et à l'Ecole IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 48 27 19 02 13 25 12 01 19 09 06-17 Bilingue de Rhoumzou (Lot 1), au lycée de SIR et à l'EPB de Kwashimalda (Lot 2) , au CES de Goura (Lot 3) dans la commune de Mogode CM-CRC EXTREME NORD- 38387-CW-RFB / Travaux de construction d'un bloc de deux salles équipées et un bloc de latrines à l'EP de Component A: Local Single Stage - One 233,628.0 193,465. 2017-11- 2017-11- 2017-12- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018- IDA / 57180 A posteriori Appel d'offres Open - National Signé Ldamang et à l'EP de Ndrock development support Envelope 0 09 27 01 02 13 13 12 14 19 06 06-17 Tourou (Lot 1), l'EP de Moufou-sud et à l'EP de Zili Yolel (Lot 2),au CES de Mandaka (Lot 3) dans la commune de MokolO CM-CRC EXTREME NORD- 38388-CW-RFB / Travaux de construction d'un radier Component A: Local Single Stage - One 27,858.8 2017-11- 2017-12- 2017-12- 2018-01- 2018-02- 2018-02- 2018-02- 2018-03- 2018-04- 2018- IDA / 57180 A posteriori Appel d'offres Open - National 34,548.00 Signé de 12 ml sur le mayo Teki development support Envelope 7 27 11 02 13 19 12 19 19 04 06-17 dans la localité de Teki, dans la commune de Mogode CM-CRC EXTREME NORD- 58606-CW-RFQ / Travaux de Construct d'un bloc de Component A: Local Demande de Single Stage - One 73,189.1 2017-10- 2017-12- 2017-12- 2018- 02 sc équipées et d'un bloc IDA / 57180 A posteriori Open - National 86,221.00 Signé development support prix Envelope 1 08 03 04 03-03 de Lt à trois comparts à l'EP de Mayel Béi, et à l'EP de Palaoudi l cmne Maroua 1 CM-CRC EXTREME NORD- 58541-CW-RFQ / Travaux de construction d'un forage Component A: Local Demande de Single Stage - One 42,885.4 2018-05- 2018-05- 2018-07- 2018-09- 2018- productif équipé de pompe IDA / 57180 A posteriori Limited 63,894.00 Signé development support prix Envelope 1 06 17 08 11 10-06 manuelle à EP Louguéré à EP Ouro Nangué à Fakalao à Hodango CM-CRC EXTREME NORD- 58600-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Demande de Single Stage - One 67,400.3 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 93,735.00 Signé et construction d'un bloc de development support prix Envelope 4 06 17 01 11 09-29 latrines à trois compartiment à EP de WOUYANG et à l'EP de GONOZO CM-CRC EXTREME NORD- 58693-CW-RFQ / Travaux de Construction d'un atelier de maçonnerie au CETIC de Component A: Local Demande de Single Stage - One 43,242.0 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 68,198.00 Achevé Loulou et'un bloc de latrines development support prix Envelope 6 06 17 08 11 11-05 à trois compartiments au CETIC de Loulou COMMUNE DE NDOUKOULA CM-CRC EXTREME NORD- 58296-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées et d'un bloc de latrines à Component A: Local Demande de Single Stage - One 142,608.0 118,724. 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited Achevé trois compartiments à l'EP development support prix Envelope 0 87 06 10 08 10 10-06 de GUIRIOU CENTRE, (lot 01) au Lycée de DOM PYA, à la SAR/SM de Gobo(lot02) dans la cmne de GOBO Page 1 CM-CRC EXTREME NORD- 58490-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Demande de Single Stage - One 18,969.0 2018-05- 2018-09- 2018-07- 2018-12- 2018- latrines a quatre (04) IDA / 57180 A posteriori Limited 22,188.00 Signé development support prix Envelope 7 06 05 08 26 10-06 compartiments au marché de GOBO et de NOULDAINA dans la cmne de GOBO CM-CRC EXTREME NORD- 58375-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 13,046.6 2018-05- 2018-05- 2018-07- 2018-09- 2018- de construction d'un forage IDA / 57180 A posteriori Limited 15,668.00 Achevé development support prix Envelope 9 06 10 08 17 08-07 équipé de PMH à l'EP de GUIRIOU CENTRE CM-CRC EXTREME NORD- 58689-CW-RFQ / Travaux de construction d'un bloc de Component A: Local Demande de Single Stage - One 35,806.9 2018-05- 2018-06- 2018-07- 2018-10- 2018- 02 salles de classe équipées IDA / 57180 A posteriori Limited 47,536.00 Achevé development support prix Envelope 5 06 07 08 10 10-06 et d'un bloc de latrines à trois compartiments au CES de Doukroye CM-CRC EXTREME NORD- 58628-CW-RFQ / Travaux de construction d'un forage Component A: Local Demande de Single Stage - One 10,491.3 2018-05- 2018-06- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 15,272.00 Signé équipé de PMH à l'EP de development support prix Envelope 3 06 13 08 15 10-06 Daloa (Doukroye) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 58637-CW-RFQ / Travaux d'achevement de la Construction des ouvrages Component A: Local Demande de Single Stage - One 15,519.7 2018-05- 2018-07- 2018-10- 2018- annexes d'embarquement IDA / 57180 A posteriori Limited 33,961.00 Achevé development support prix Envelope 4 06 08 10 09-06 (quaie dembarquement et hangar d'abris)des pirogues à LOUGOUANG MASSOUANG dans la cmne de Kaikai CM-CRC EXTREME NORD- 58605-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Demande de Single Stage - One 73,407.1 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 95,312.00 Signé et d'un bloc de latrines à development support prix Envelope 8 06 29 08 10 10-06 trois compartiments à EP de Balane au CES de Sirlawé dans la cmne de KAR-HAY CM-CRC EXTREME NORD- 58552-CW-RFQ / Travaux de construction d'un forage équipé de PMH à l'EP de Component A: Local Demande de Single Stage - One 65,668.0 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 91,324.00 Signé Damdama à l'EP de development support prix Envelope 7 06 29 08 15 10-06 Gouloulou à l'EP Balane à l'EP de REY-FOULAYE à l'EP de Sadielle au CES de Sirlawe CM-CRC EXTREME NORD- 58690-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Demande de Single Stage - One 73,038.9 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 99,800.00 Signé et d'un bloc de latrines à development support prix Envelope 7 06 15 08 17 10-06 trois compartiments à l'EP de Bihoré à l'EP de Troké dans la, commue de Tchatibali. CM-CRC EXTREME NORD- 58610-CW-RFQ / Travaux de construction d'un forage Component A: Local Demande de Single Stage - One 33,727.6 2018-05- 2018-05- 2018-07- 2018-10- 2018- équipé de PMH à l'EP IDA / 57180 A posteriori Limited 47,159.00 Signé development support prix Envelope 8 06 15 08 16 10-06 Saouringwa, à Kada 'a et Glonheme dans la cmne de Tchatibali CM-CRC EXTREME NORD- 58611-CW-RFQ / Travaux de construction d'un forage Component A: Local Demande de Single Stage - One 35,580.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 48,115.00 Signé équipé de PMH à Bibalé - development support prix Envelope 0 06 08 08 11 10-06 Gambour à Goubara à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58489-CW-RFQ / Travaux de réhabilitation de la mare de Garey Kaélé, Component A: Local Demande de Single Stage - One 47,962.2 2018-05- 2018-05- 2018-07- 2018-09- 2018- Construction d'un forage IDA / 57180 A posteriori Limited 55,100.00 Signé development support prix Envelope 8 06 08 08 11 10-06 pastoral à énergie solaire Garey Kaélé et construction d'un forage équipé de PMH à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58682-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe équipées et d'un bloc Component A: Local Demande de Single Stage - One 188,121.0 154,981. 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited Achevé latrines a trois development support prix Envelope 0 86 06 08 08 27 10-06 compartiments à l'EP de Badjafe, à l'EP de Zouana, (lot 01 )à l'EP de Tchabeyel et EP de Goudjouing (lot 02) cmne de Kaele. CM-CRC EXTREME NORD- 58614-CW-RFQ / Travaux de construction d'un bloc de 02 salles de classe équipées Component A: Local Demande de Single Stage - One 72,592.8 2018-05- 2018-10- 2018-07- 2018-11- 2018- d'un bloc de latrines à EP IDA / 57180 A posteriori Limited 87,556.00 Signé development support prix Envelope 6 06 01 08 29 10-06 Mayel -Guinadj et un bloc de 02 salles de classe équipées à l'EP de KALAF cmne de Moutourwa. CM-CRC EXTREME NORD- 58527-CW-RFQ / Travaux de construction de 01 Component A: Local Demande de Single Stage - One 54,374.2 2018-05- 2018-10- 2018-07- 2018-11- 2018- forage équipé de PMH à IDA / 57180 A posteriori Limited 64,020.00 Signé development support prix Envelope 8 06 10 08 16 10-06 Ganaha, à EP de Dourloum à EP de KALAF et EP de Mayel- guinadji dans la cmne de moutourwa CM-CRC EXTREME NORD- 58849-CW-RFQ / Component A: Local Demande de Single Stage - One 30,049.0 2018-05- 2018-05- 2018-07- 2018-09- 2018- construction d'un forage IDA / 57180 A posteriori Limited 37,902.00 Signé development support prix Envelope 9 06 08 08 24 10-06 équipé de PMH à EM Moskota et à l'EP GOKORO CM-CRC EXTREME NORD- 58676-CW-RFQ / Travaux de Construction d'un bloc de deux salles de classe équipées et d'un bloc Component A: Local Demande de Single Stage - One 150,000.0 124,030. 2018-05- 2018-06- 2018-07- 2018-08- 2018- IDA / 57180 A posteriori Limited Signé latrines a trois development support prix Envelope 0 36 06 04 08 30 10-06 compartiments au CES de Mazaya à EP ZELE (Soulédé) (lot01) à EP de Doumbéré(lot02) cmne de ROUA CM-CRC EXTREME NORD- 58267-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 23,886.6 2018-05- 2018-08- 2018-07- 2018-10- 2018- de construction d'un forage IDA / 57180 A posteriori Limited 39,124.00 Signé development support prix Envelope 6 06 02 08 15 10-06 équipé de PMH à Koulang à Mangavé cmne de MORA CM-CRC EXTREME NORD- 58524-CW-RFQ / Travaux de construction de 01 Component A: Local Demande de Single Stage - One 2018-05- 2018-08- 2018-07- 2018-10- 2018- magasin de stockage à IDA / 57180 A posteriori Limited 69,155.00 2,421.57 Signé development support prix Envelope 06 02 08 22 11-05 cereale à Sera -Idoumda et un magasin de conservation d'oignon à Kourgui cmne de MORA CM-CRC EXTREME NORD- 58623-CW-RFQ / Travaux de Construction d'un forage équipé de PMH à l'EP GANCE Component A: Local Demande de Single Stage - One 63,149.4 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 79,756.00 Signé au CES Toltomari et development support prix Envelope 1 06 11 08 03 10-06 Réalisation d’un forage solaire avec borne fontaine à Kolofata cmne de Kolofata CM-CRC EXTREME NORD- 58445-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 131,092.0 110,625. 2018-05- 2018-05- 2018-07- 2018-09- 2018- de 02 salles de classe IDA / 57180 A posteriori Limited Signé development support prix Envelope 0 81 06 07 08 24 11-05 équipées s à EP Chéoulew, au CES de Makalingaï (lot01)à EP Tazang (lot02) cmne de Tokombere CM-CRC EXTREME NORD- 58679-CW-RFQ / Travaux de Construction de 01 Component A: Local Demande de Single Stage - One 35,355.2 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 29,122.00 Achevé forage équipé de PMH à development support prix Envelope 6 06 07 08 01 09-06 Baka-Fourwa et à Djaltar dans la cmne de Tokombere CM-CRC EXTREME NORD- 59466-CW-RFQ / TRAVAUX DE REHABILILATION DU Component A: Local Demande de Single Stage - One 81,782.2 2018-05- 2018-09- 2018-07- 2018-10- 2019- IDA / 57180 A posteriori Limited 93,480.00 Signé TRONCON HOTEL LE SAHEL- development support prix Envelope 2 06 14 08 15 01-04 MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58513-CW-RFQ / TRAVAUX Component A: Local Demande de Single Stage - One 74,376.6 2018-05- 2018-05- 2018-07- 2018-08- 2018- DE REHABILILATION DE LA IDA / 57180 A posteriori Limited 90,301.00 Signé development support prix Envelope 7 06 14 01 24 12-28 PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) CM-CRC EXTREME NORD- 58707-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Demande de Single Stage - One 45,015.4 2018-05- 2018-10- 2018-07- 2018-12- 2018- CLASSE EQUIPE ET D'UN IDA / 57180 A posteriori Limited 52,286.00 Achevé development support prix Envelope 5 06 01 08 20 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58839-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA CONSTRUCTION DE 04 Component A: Local Demande de Single Stage - One 68,084.6 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 A posteriori Limited 84,030.00 Signé GUICHETS, 04 MAGASINS, development support prix Envelope 6 06 01 08 20 11-05 D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 130 m A BLANGOUA CM-CRC EXTREME NORD- 58514-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Demande de Single Stage - One 21,590.5 2018-05- 2018-05- 2018-07- 2018-10- 2018- FORAGE EQUIPE DE PMH A la IDA / 57180 A posteriori Limited 35,201.00 Signé development support prix Envelope 5 06 31 08 04 09-06 gare routiere de BLANGOUA ET A L'EP DE KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58434-CW-RFQ / TRAVAUX DE CONSTRUCTION TRAVAUX DE CONSTRUCTION D’UNE MINI Component A: Local Demande de Single Stage - One 36,812.8 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 A posteriori Limited 47,598.00 Achevé AEP PASTORAL EQUIPE DE development support prix Envelope 0 06 02 08 20 10-06 DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A MAGALAKABIR, DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58286-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Demande de Single Stage - One 75,327.5 2018-05- 2018-06- 2018-07- 2018-10- 2018- FORAGE PASTORAL A IDA / 57180 A posteriori Limited 96,354.00 Achevé development support prix Envelope 8 06 01 08 04 10-06 ENERGIE SOLAIRE A KARENA ET A NAGA DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58688-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS Component A: Local Demande de Single Stage - One 76,025.4 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 89,200.00 Signé COMPARTIMENTS A L’EP development support prix Envelope 7 06 14 08 01 10-06 HILELLE (LOT01) ET CONSTRUCTION D'UN HANGAR AU MARCHE DE GOULFEY GANA (LOT02) cmne DE GOULFEY CM-CRC EXTREME NORD- 58840-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA CONSTRUCTION DE 04 Component A: Local Demande de Single Stage - One 69,011.4 2018-05- 2018-09- 2018-07- 2018-12- 2018- GUICHETS, 04 MAGASINS, IDA / 57180 A posteriori Limited 86,829.00 Signé development support prix Envelope 4 06 24 08 20 11-05 D’UN HANGAR D’ATTENTE, 02 BOUTIQUES ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 90 m A GOULFEY cmne DE GOULFEY CM-CRC EXTREME NORD- 58451-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGE EQUIPES DE POMPE Component A: Local Demande de Single Stage - One 40,595.7 2018-05- 2018-05- 2018-07- 2018-10- 2018- A MOTRICITE HUMAINE A IDA / 57180 A posteriori Limited 66,094.00 Achevé development support prix Envelope 8 06 14 08 01 10-06 MOUGALAM, A TAWOULWEBE, A GARE ROUTIERE ET A L'EP HILELE COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 58554-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Demande de Single Stage - One 46,481.6 2018-05- 2018-10- 2018-07- 2018-12- 2018- IDA / 57180 A posteriori Limited 52,286.00 Signé CLASSE EQUIPE ET D'UN development support prix Envelope 5 06 28 01 20 09-29 BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP GONONI CM-CRC EXTREME NORD- 58671-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A Component A: Local Demande de Single Stage - One 21,590.5 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 51,376.00 Achevé MOTRICITE HUMAINE A development support prix Envelope 5 06 31 08 04 10-06 MAFOULSO III, A FAMARE ET A L'EP DE GONONI commune DE HILE ALIFA CM-CRC EXTREME NORD- 58631-CW-RFQ / TRAVAUX DE CONSTRUCTION TRAVAUX DE CONSTRUCTION D’UNE MINI Component A: Local Demande de Single Stage - One 21,447.8 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 96,018.00 Achevé AEP PASTORAL EQUIPE DE development support prix Envelope 3 06 31 08 04 10-06 DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A ABASSOUNI, A DOLE BADA cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58426-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Demande de Single Stage - One 43,152.3 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 52,286.00 Signé CLASSE EQUIPE ET D'UN development support prix Envelope 1 06 11 08 24 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE cmne DE KOUSSERI CM-CRC EXTREME NORD- 58417-CW-RFQ / CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A MOTRICITE HUMAINE AU CES D'ADJAINE ET D'UNE Component A: Local Demande de Single Stage - One 104,068.0 82,972.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited Signé MINI AEP PASTORAL EQUIPE development support prix Envelope 0 2 06 11 08 24 10-06 DE DEUX ABREUVOIRS, D'UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A LACTA 1, ET A MASSAKI COMMUNE DE KOUSSERI CM-CRC EXTREME NORD- 58510-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN FORAGES EQUIPES DE POMPE Component A: Local Demande de Single Stage - One 40,954.4 2018-05- 2018-05- 2018-07- 2018-10- 2018- IDA / 57180 A posteriori Limited 49,640.00 Signé A MOTRICITE HUMAINE A development support prix Envelope 3 06 15 08 15 10-06 MASSIO-GOURGOURA, A NAGA NDIGUINI, A EP MALTAM. cmne DE MAKARI CM-CRC EXTREME NORD- 58677-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN Component A: Local Demande de Single Stage - One 40,757.6 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Open - National 46,901.00 Signé HANGAR AVEC BLOC development support prix Envelope 9 06 01 10 09-29 LATRINE AU MARCHE DE BIAMO, cmne DE MAKARI CM-CRC EXTREME NORD- 58398-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local Demande de Single Stage - One 43,675.8 2018-05- 2018-05- 2018-07- 2018-09- 2018- IDA / 57180 A posteriori Limited 52,286.00 Signé CLASSE EQUIPE ET D'UN development support prix Envelope 4 06 15 08 10 10-06 BLOC DE LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM cmne DE MAKARI CM-CRC EXTREME NORD- 58564-CW-RFQ / Travaux des MP D'INSTALLATION D'ECLAIRAGE PUBLIC (10 Component A: Local Demande de Single Stage - One 2018-05- 2018-07- 2018- IDA / 57180 A posteriori Limited 47,904.00 0.00 Annulé KITS)AVEC ENERGIE SOLAIRE development support prix Envelope 06 08 09-06 DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE Page 2 CM-CRC EXTREME NORD- 58697-CW-RFB / TRAVAUX DE CONSTRUCTION DE DEUX SALLES DE CLASSES EQUIPEES ET DE LATRINES AU CETIC DE OUZAL (LOT Component A: Local Single Stage - Two 230,463.0 2018-05- 2018-05- 2018-05- 2018-06- 2018-08- 2018-10- 2019- IDA / 57180 A posteriori Appel d'offres Open - National 0.00 Annulé N°1), CONSTRUCTION DE development support Envelope 0 01 08 06 17 30 04 02-01 DEUX SALLES DE CLASSES EQUIPEES A L'EP DE KORSAMBA ET L'EP DE KARAZAWA (LOT N°2), CONSTRUCTION D'UN BLOC MATERNEL L'EM DE MOZOGO CM-CRC EXTREME NORD- 58498-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe Component A: Local Demande de Single Stage - One 2018-05- 2018-07- 2018- IDA / 57180 A posteriori Limited 57,225.00 0.00 Annulé équipées à EP de Gance et development support prix Envelope 06 08 10-06 d'un bloc de latrines à trois compartiments à L'EP TOLKOMARI cmne de Kolofata CM-CRC EXTREME NORD- 58260-CW-RFQ / TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX (02) SALLES DE CLASSE EQUIPEES A EP Component A: Local Demande de Single Stage - One 151,984.0 120,021. 2018-05- 2018-09- 2018-07- 2018-11- 2018- DE GANCE ET D'UN BLOC IDA / 57180 A posteriori Limited Signé development support prix Envelope 0 73 06 24 08 29 10-06 DE LATRINES A L'EP TOLKOMARI ( LOT 01) CONSTRUCTION DE DEUX BLOC DE DEUX (02) SALLES DE CLASSE EQUIPEES CES TOLkomari CM-CRC EXTREME NORD- 111329-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 40,309.2 2019-04- 2019-06- 2019-10- 2019- de 02 salles de classe IDA / 57180 A posteriori Open - National 49,652.00 Signé development support prix Envelope 3 06 01 08 08-30 équipé et d'un bloc de latrines au CETIC de Tchévi dans la commune de Bourha CM-CRC EXTREME NORD- 111255-CW-RFQ / Travaux de Travaux de Construction Component A: Local Demande de Single Stage - One 54,869.3 2019-04- 2019-06- 2019-11- 2019- d'un forage PMH au CETIC IDA / 57180 A posteriori Open - National 65,429.00 Signé development support prix Envelope 8 06 01 04 08-30 de Tchévi, à Zouvou- yolde à DOUVA et à ZEU dans la commune de Bourha CM-CRC EXTREME NORD- 111381-CW-RFQ / Travaux de Construction des caniveaux en BA à Bourha Component A: Local Demande de Single Stage - One 52,560.1 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 A posteriori Open - National 69,336.00 Signé (axe Hamadou -ZRA-Bello development support prix Envelope 0 06 01 03 08-30 Hayatou) (lot 01) et à Boukoula face commissariat (lot 02) dans la Commune de Bourha CM-CRC EXTREME NORD- 111363-CW-RFB / Travaux de Construction de deux (02) blocs de dix (10) boutiques au marché de Component A: Local Single Stage - One 258,957.0 17,073,0 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-12- 2019- HINA cote A lot (01) et IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 76.62 01 24 06 18 21 17 24 22 19 11-19 Travaux de Construction de deux (02) blocs de dix (10) boutique et un bloc latrines vip au marché de HINA cote B lot (02), commune de HINA. CM-CRC EXTREME NORD- 111379-CW-RFQ / Travaux d'extension du reseau Component A: Local Single Stage - One 205,088.0 171,312. 2019-04- 2019-05- 2019-04- 2019-05- 2019-07- 2019-06- 2019-07- 2019-07- 2019-10- 2019- electrique de Dargala centre- IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 93 01 14 06 18 01 17 02 22 17 11-19 Roufirde, Roufirde- Gassayel, Gassayel- Guertogalwo dans la commune de Dargala CM-CRC EXTREME NORD- 111324-CW-RFQ / Travaux de Construction de 01 forage à PMH à Yoldé- Component A: Local Demande de Single Stage - One 100,326.0 80,042.1 2019-04- 2019-06- 2021-02- 2019- IDA / 57180 A posteriori Open - National Signé Naggué, à Tchakamadjé, development support prix Envelope 0 0 06 01 19 09-29 Yaga djibiwo, à Bakourebi (Abba wollo) Toukou mayel(Ouro-Bedem) et à MAYA ,commune de Pétté CM-CRC EXTREME NORD- 111354-CW-RFQ / Travaux de Construction d'un mini Component A: Local Demande de Single Stage - One 45,006.1 2019-04- 2019-06- 2021-02- 2019- adduction d'eau à energie IDA / 57180 A posteriori Open - National 52,340.00 Signé development support prix Envelope 5 06 01 26 08-30 photovoltaique pour usage agricole a fadare dans la commune de pette CM-CRC EXTREME NORD- 111372-CW-RFQ / Travaux de Construction de 01 Component A: Local Demande de Single Stage - One 22,465.4 2019-04- 2019-06- 2019-11- 2019- IDA / 57180 A posteriori Open - National 32,707.00 Achevé forage à PMH à EP lobokri et development support prix Envelope 8 06 01 04 08-30 à dahounga gholonguini, dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111360-CW-RFB / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Single Stage - One 207,364.0 160,942. 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019- équipées et d'un bloc de IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 65 01 09 06 18 10 17 11 22 30 11-19 latrines à trois compartiments à EP REBEDE EP LOBOKRI, (lot1) EP MBITOU et CES SOUEYE (lot2) dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111319-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 41,717.1 2019-04- 2019-06- 2019-08- 2019- de deux salles de classe IDA / 57180 A posteriori Open - National 47,483.00 Achevé development support prix Envelope 8 06 01 27 08-30 équipées et d'un bloc latrine à trois compartiments à l'EP de Ligazang, commune de Mindif CM-CRC EXTREME NORD- 111254-CW-RFQ / Travaux de Construction et équipement d'un centre de Component A: Local Demande de Single Stage - One 132,500.0 102,729. 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 A posteriori Open - National Signé santé intégré avec development support prix Envelope 0 06 06 01 27 09-29 incinerateur et un bloc de latrines à trois compartiments à MATFAI, dans la commune de Mindif CM-CRC EXTREME NORD- 111382-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 32,342.7 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National 38,095.00 Signé pastoral a energie development support prix Envelope 0 06 01 07 08-30 photovoltaique au marché à bétail à Moulvoudaye CM-CRC EXTREME NORD- 111373-CW-RFB / Travaux d'aménagement du marché à bétail en contruisant un Component A: Local Demande de Single Stage - One 42,683.0 2019-04- 2019-06- 2019-12- 2019- parc à betail une cloture un IDA / 57180 A posteriori Open - National 56,123.00 Signé development support prix Envelope 7 06 01 08 09-29 quai d'embarquement et un bloc latrine a trois compartiments dans la Commune de Moulvoudaye. CM-CRC EXTREME NORD- 111380-CW-RFB / Travaux de Construction de 02 sdc et 3 latriness à EP Component A: Local Single Stage - One 234,082.0 186,401. 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2019-10- 2019- KAOSSERE, à l'EP Ticheeo IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 14 01 02 06 18 31 17 01 22 11 10-20 Kolandi, à l'EP Tchoura-Bizili L1 et de 02 SDC EPB Touloum L2 et DE 2 SDC avec BUREAUX A L’EPP SAOTSAI L3 Cune de Touloum CM-CRC EXTREME NORD- 111358-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 13,255.7 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National 15,380.00 Signé équipé de PMH à lycee development support prix Envelope 0 06 01 26 07-31 bilingue dans la commue de Kaele CM-CRC EXTREME NORD- 111384-CW-RFQ / Travaux de Construction de 01 Component A: Local Demande de Single Stage - One 31,562.3 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National 50,833.00 Signé forage à PMH à Gai gai, à EP development support prix Envelope 7 06 01 10 08-30 Golonpoui et à EP Kankwa, dans la commune de Datcheka CM-CRC EXTREME NORD- 111395-CW-RFQ / Travaux de Construction d'un bloc de 02 salles de classe Component A: Local Demande de Single Stage - One 149,671.0 121,571. 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National Signé équipées et avec un bloc de development support prix Envelope 0 86 06 01 09 08-30 latrines à trois compartiments à EP Golonpoui , EP Kankrwa et EP Guidima , dans la commune de Datcheka CM-CRC EXTREME NORD- 111378-CW-RFQ / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Demande de Single Stage - One 175,994.0 67,097.9 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 A posteriori Open - National Signé équipées au CETIC de Vélé, development support prix Envelope 0 6 06 01 28 08-30 au CES de Widigue , au CES de Dabaye et au CES d'Agolla, dans la commune de Guémé CM-CRC EXTREME NORD- 111369-CW-RFQ / Travaux de Construction d'un hangar 52 places au marché de Component A: Local Demande de Single Stage - One 57,109.6 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 A posteriori Open - National 67,637.00 Signé Gabaraye et Travaux de development support prix Envelope 1 06 01 27 08-30 Construction d'un bloc de latrines au marché de Gabaraye, commune de Guémé CM-CRC EXTREME NORD- 111362-CW-RFQ / Travaux de Construction d'un centre Component A: Local Demande de Single Stage - One 127,436.0 106,966. 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 A posteriori Open - National Signé de santé intégré équipé et development support prix Envelope 0 95 06 01 08 09-29 un bloc de latrines au CSI à Nguéring, commune de Gueré CM-CRC EXTREME NORD- 111396-CW-RFQ / Component A: Local Demande de Single Stage - One 27,215.6 2019-04- 2019-06- 2019-10- 2019- Construction d'un bloc de IDA / 57180 A posteriori Open - National 32,708.00 Signé development support prix Envelope 4 06 01 09 08-30 05 boutiques au marché d'Ardaf Commune de Guere CM-CRC EXTREME NORD- 111388-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 12,359.6 2019-04- 2019-06- 2020-01- 2019- IDA / 57180 A posteriori Open - National 15,311.00 Signé équipé de PMH à l'EP de development support prix Envelope 6 06 01 23 07-31 DAMA Djougong, commune de Kai kai CM-CRC EXTREME NORD- 111390-CW-RFQ / CONSTRUCTION DEUX Component A: Local Demande de Single Stage - One 40,484.4 2019-04- 2019-06- 2019-08- 2019- IDA / 57180 A posteriori Open - National 69,678.00 Achevé BLOCS DE CINQ (05) development support prix Envelope 0 06 01 22 08-30 BOUTIQUES AU MARCHÉ DE KALFOU, DANS LA COMMUNE DE KALFOU CM-CRC EXTREME NORD- 111371-CW-RFQ / Travaux de Construction d'un forage équipé de pompe à Component A: Local Demande de Single Stage - One 57,350.2 2019-04- 2019-06- 2019-11- 2019- motricité humaine à Gandou IDA / 57180 A posteriori Open - National 67,386.00 Signé development support prix Envelope 9 06 01 22 08-30 Golopo, au CES de Zaria, à Djada, réhabilitation d'un forage PMH à Delta Guibéré et Mandara, dans la commune de Kalfou CM-CRC EXTREME NORD- 111398-CW-RFQ / En cours Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019- Équipement en matériel IDA / 57180 A posteriori Open - National 16,804.00 0.00 d'exécuti development support prix Envelope 06 01 07-31 médicaux au CSI de Takreo on yoldeo Commune Kar Hay CM-CRC EXTREME NORD- 111260-CW-RFQ / Electrification du nouveau Component A: Local Demande de Single Stage - One 152,907.0 134,395. 2019-04- 2019-06- 2019-12- 2019- marché de Guirvidig (lot 01) IDA / 57180 A posteriori Open - National Signé development support prix Envelope 0 99 06 01 06 09-29 et de la localité de Yangah (lot 02) , dans la commune de Maga CM-CRC EXTREME NORD- 111368-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 13,773.4 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National 15,759.00 Signé équipé de pompe à development support prix Envelope 0 06 01 06 07-31 motricité humaine à Bindiriel Danghou, commue de Tchatibali CM-CRC EXTREME NORD- 111259-CW-RFB / Travaux de Construction d'un bloc de 02 salles de classe équipées et d'un bloc de Component A: Local Single Stage - One 244,743.0 78,116.8 2019-04- 2019-05- 2019-04- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- 2019- latrines à IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 5 01 02 06 18 13 17 14 22 23 11-19 troiscompartiments au CES Kamargui, à EP Goulourgou (lot 02), EP Bigi, EP de Djenreng (lot 02)et EP Waimou (lot 03) COMMUNE DE WINA CM-CRC EXTREME NORD- 111383-CW-RFQ / Travaux de Construction D’UN BLOC DE DEUX SALLES DE CLASSE Component A: Local Demande de Single Stage - One 32,203.2 2019-04- 2019-06- 2019-12- 2019- IDA / 57180 A posteriori Open - National 96,762.00 Signé AVEC BUREAUX EQUIPES au development support prix Envelope 2 06 01 03 09-29 CES de DJOGOIDI et au lycee de Vounaloum Commune de yagoua CM-CRC EXTREME NORD- 111365-CW-RFQ / Travaux de Construction d'un hangar Component A: Local Demande de Single Stage - One 56,945.7 2019-04- 2019-06- 2019-10- 2019- IDA / 57180 A posteriori Open - National 76,074.00 Signé de 28 places et d'une development support prix Envelope 2 06 01 08 09-29 boucherie au marché de Velé, dans la commune de Guémé CM-CRC EXTREME NORD- 111374-CW-RFQ / Travaux En cours de Construction de 01 Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 A posteriori Open - National 38,095.00 0.00 d'exécuti forage à énergie solaire à development support prix Envelope 06 01 08-30 on CSI de Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- 111389-CW-RFQ / Travaux de Construction de 2 salles de classe et de latrines à l'EP de BIJE ( lot 01) , Component A: Local Demande de Single Stage - One 80,535.3 2019-04- 2019-06- 2019-05- 2019- Construction de 2 salles de IDA / 57180 A posteriori Open - National 96,542.00 Signé development support prix Envelope 6 06 01 27 08-30 classes à EPPB de TOKOMBERE et equipement en table bancs et bureaux au CES de makilingai (lot 02) dans la commune de Tokombere CM-CRC EXTREME NORD- 111392-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 55,757.8 2019-04- 2019-06- 2019-05- 2019- de deux salle de classe IDA / 57180 A posteriori Open - National 67,299.00 Achevé development support prix Envelope 5 06 01 25 08-30 équipés et d'un bloc latrines à Magala Djamene dans la commune de Darak CM-CRC EXTREME NORD- 111385-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 10,462.3 2019-04- 2019-06- 2019-05- 2019- de Construction de 01 IDA / 57180 A posteriori Open - National 19,048.00 Achevé development support prix Envelope 9 06 01 25 08-30 forage PMH à Magala Djamene, dans la commune de Darak CM-CRC EXTREME NORD- 111325-CW-RFB / Travaux de Construction d'un bloc de deux salles de classe Component A: Local Single Stage - One 226,885.0 94,907.5 2019-04- 2019-03- 2019-04- 2019-05- 2019-04- 2019-06- 2019-04- 2019-07- 2019-07- 2019- équipées et d'un bloc de IDA / 57180 A posteriori Appel d'offres Open - National Signé development support Envelope 0 3 01 28 06 18 24 17 25 22 10 11-19 latrines à trois compartiments à EP GADAFAI, au Lycée de Fotokol à EP Magadji et à EP de GUEGUERI, commune de Fotokol CM-CRC EXTREME NORD- 111261-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 31,367.2 2019-04- 2019-06- 2019-07- 2019- IDA / 57180 A posteriori Open - National 34,286.00 Achevé de Construction d'un development support prix Envelope 5 06 01 02 08-30 magasin de stockage à Goulfey CM-CRC EXTREME NORD- 111367-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 30,637.2 2019-04- 2019-06- 2019-05- 2019- de Construction d'une mini IDA / 57180 A posteriori Open - National 48,024.00 Signé development support prix Envelope 0 06 01 25 08-30 AEP pastorale à énergie solaire à fadja commune de Hilé Alifa CM-CRC EXTREME NORD- 111320-CW-RFQ / Travaux de Construction de 01 Component A: Local Demande de Single Stage - One 36,050.5 2019-04- 2019-06- 2019-05- 2019- forage PMH à Michiska IDA / 57180 A posteriori Open - National 49,510.00 Achevé development support prix Envelope 8 06 01 25 08-30 Mousgoum, OUNANGARE et NGADA 1, dans la commune de Logone Birni CM-CRC EXTREME NORD- 111327-CW-RFB / Travaux Component A: Local Demande de Single Stage - One 40,199.6 2019-04- 2019-06- 2019-09- 2019- de Construction d'un IDA / 57180 A posteriori Open - National 48,020.00 Signé development support prix Envelope 3 06 01 11 08-30 magasin de stockage à zigague, dans la commune de Waza CM-CRC EXTREME NORD- 111322-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 38,848.3 2019-04- 2019-06- 2019-07- 2019- de Construction d'un forage IDA / 57180 A posteriori Open - National 50,855.00 Achevé development support prix Envelope 8 06 01 15 08-30 PMH à malia, NDIGUINA et MADA dans la commune de Waza Page 3 CM-CRC EXTREME NORD- 111377-CW-RFQ / Travaux d’extension du réseau électrique en moyenne Component A: Local Demande de Single Stage - One 120,000.0 108,328. 2020-10- 2020-12- 2021-01- 2021- tension (MT) et basse IDA / 57180 A posteriori Open - National Signé development support prix Envelope 0 90 05 16 08 12-31 tension (BT) triphasé et un transformateur H61 160 KVA dans les quartiers de Wourndé II et III, commune de Maroua 2 CM-CRC EXTREME NORD- 111376-CW-RFQ / Travaux d’electrification en moyenne Component A: Local Demande de Single Stage - One 130,938.0 116,385. 2019-04- 2019-06- 2019-09- 2019- tension (MT) et basse IDA / 57180 A posteriori Open - National Signé development support prix Envelope 0 17 06 01 02 09-29 tension (BT) monophasé de l'axe Barzao- barza foulbe- Barza-Guiziga, commune de Gazawa CM-CRC EXTREME NORD- 111355-CW-RFQ / Fourniture et installation de 07 lampadaires solaires Component A: Local Demande de Single Stage - One 15,778.3 2019-04- 2019-06- 2019-08- 2019- composés de panneaux IDA / 57180 A posteriori Open - National 19,048.00 Signé development support prix Envelope 5 06 01 27 07-31 solaires monocristallins et de batteries de type gel dans le centre urbain de vele commune DE GUEME CM-CRC EXTREME NORD- 111331-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 A posteriori Open - National 15,238.00 0.00 Annulé équipé de pompe à development support prix Envelope 06 01 07-31 motricité humaine a Djafgadjie, commue de yagoua CM-CRC EXTREME NORD- 111386-CW-RFQ / Travaux de Construction d'un CSI Component A: Local Demande de Single Stage - One 152,381.0 2019-04- 2019-06- 2019- équipé avec case d'astreinte, IDA / 57180 A posteriori Open - National 0.00 Annulé development support prix Envelope 0 06 01 09-29 un incinérateur et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111433-CW-RFQ / Component A: Local Demande de Single Stage - One 2019-09- 2019-11- 2020- IDA / 57180 A posteriori Open - National 10,000.00 0.00 Annulé réalisation d'un parc à bétail development support prix Envelope 07 02 04-30 dans la commune de Wina (GP) CM-CRC EXTREME NORD- 111394-CW-RFQ / Travaux de Construction d’un forage Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019- IDA / 57180 A posteriori Open - National 29,376.00 0.00 Annulé à énergie solaire avec development support prix Envelope 06 01 08-30 château au centre de santé de Djiddéo, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111387-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019- de construction d'un forage IDA / 57180 A posteriori Open - National 15,238.00 0.00 Annulé development support prix Envelope 06 01 07-31 pmh à l'EP Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 196682-CW-RFQ / Travaux de Construction d'un CSI Component A: Local Demande de Single Stage - One 120,952.0 97,049.8 2020-11- 2021-01- 2021-01- 2021- équipé avec un incinérateur IDA / 57180 A posteriori Open - National Signé development support prix Envelope 0 5 04 15 26 05-15 et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 196726-CW-RFQ / Travaux de Construction et Component A: Local Demande de Single Stage - One 36,267.8 2020-11- 2021-01- 2021-01- 2021- équipement des blocs des IDA / 57180 A posteriori Open - National 45,714.00 Signé development support prix Envelope 2 04 15 26 04-15 salles de classes et d'un bloc de latrines au CES de GUINADJI Commune de Maroua III CM-CRC EXTREME NORD- 196667-CW-RFQ / Travaux En cours Component A: Local Demande de Single Stage - One 10,958.0 2020-11- 2021-01- 2021-01- 2021- de Construction d’un forage IDA / 57180 A posteriori Open - National 15,238.00 d'exécuti development support prix Envelope 5 04 15 26 03-16 PMH au centre de santé de on Djiddéo Commune de Maroua III CM-CRC EXTREME NORD- 196678-CW-RFQ / REALISATION D’UN FORAGE EQUIPE DE POMPE A MOTRICITE HUMAINE A Component A: Local Demande de Single Stage - One 40,280.6 2020-11- 2021-01- 2021-03- 2021- GUIVEL, QUARTIER MERI IDA / 57180 A posteriori Open - National 57,244.00 Signé development support prix Envelope 0 04 15 12 04-15 CENTRE ET KILWO-VALTA ET L’ACHEVEMENT DE LA CONSTRUCTION DES FORAGES DE GADJAWAI ET NGUISSAR DANS LA COMMUNE DE MERI CM-CRC EXTREME NORD- 196722-CW-RFQ / Travaux de CONSTRUCTION D’UN En cours FORAGE PASTORAL A Component A: Local Demande de Single Stage - One 35,428.7 2020-11- 2021-01- 2021- IDA / 57180 A posteriori Open - National 41,546.00 d'exécuti ENERGIE SOLAIRE EQUIPE development support prix Envelope 6 04 15 04-15 on D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DE DJONGDONG, COMMUNE DE WINA CM-CRC EXTREME NORD- 196724-CW-RFQ / Travaux de CONSTRUCTION D’UN FORAGE PASTORAL A Component A: Local Demande de Single Stage - One 36,344.1 2020-11- 2021-01- 2021-01- 2021- IDA / 57180 A posteriori Open - National 40,000.00 Signé ENERGIE SOLAIRE EQUIPE development support prix Envelope 7 04 15 26 04-15 D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DE MIZILING WAILA MAYO, COMMUNE DE GAZAWA CM-CRC EXTREME NORD- 196687-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 14,150.1 2020-11- 2021-01- 2021-01- 2021- de Construction d'un forage IDA / 57180 A posteriori Open - National 15,631.00 Signé development support prix Envelope 2 04 15 08 03-16 équipé de PMH de Yonkolel Commune de Dargala. CM-CRC EXTREME NORD- 196720-CW-RFQ / Travaux de Construction d'un forage équipé de PMH à lalepaki et Component A: Local Demande de Single Stage - One 13,208.2 2020-11- 2021-01- 2021-05- 2021- IDA / 57180 A posteriori Open - National 17,143.00 Signé Acquisition d’une caisse à development support prix Envelope 1 04 15 27 03-16 outils pour l’entretien des forages dans la commune de Commune de Touloum CM-CRC EXTREME NORD- 196723-CW-RFQ / TRAVAUX DE CONSTRUCT D’UN BLOC DE 2 SALLES DE CLASSE EQUIPEES ET D’UN Component A: Local Demande de Single Stage - One 72,237.9 2020-11- 2021-03- 2021-05- 2021- BLOC DE LATRINES À L'EP IDA / 57180 A posteriori Open - National 87,964.00 Signé development support prix Envelope 5 04 16 27 06-14 TCHOURA-BIZILI ET CONSTRUCTION D'UN BLOC DE 02 SALLES DE CLASSE ÉQUIPÉES À EP BILINGUE DE TOULOUM COMMUNE DE TOULOUM CM-CRC EXTREME NORD- 196721-CW-RFQ / TRAVAUX DE CONSTRUCTION D’UN BLOC En cours Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021- DE DEUX SALLES DE CLASSE IDA / 57180 A posteriori Open - National 45,113.00 0.00 d'exécuti development support prix Envelope 04 15 04-15 EQUIPEES ET D’UN BLOC DE on LATRINES À TROIS COMPARTIMENTS à l'EP de ZANYAO Commune de YAGOUA CM-CRC EXTREME NORD- 196681-CW-RFQ / Travaux de Construction d’un forage équipé de pompe à Component A: Local Demande de Single Stage - One 71,202.8 2020-11- 2021-01- 2021-01- 2021- IDA / 57180 A posteriori Open - National 80,952.00 Signé motricité humaine à Dinao, development support prix Envelope 6 04 15 08 04-15 Louggol palé, Kodadjiho, Hamadalao et Golombeswé Commune KALFOU CM-CRC EXTREME NORD- 196688-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 28,831.1 2020-11- 2021-01- 2021-03- 2021- IDA / 57180 A posteriori Open - National 32,381.00 Signé équipé de PMH à douang et development support prix Envelope 5 04 15 05 03-16 dingue-Gabaraye Commune de Gueme CM-CRC EXTREME NORD- 196677-CW-RFQ / Réalisation d’un (01) forage Component A: Local Demande de Single Stage - One 41,275.2 2020-11- 2021-01- 2021-01- 2021- pastoral photovoltaïque et IDA / 57180 A posteriori Open - National 47,200.00 Signé development support prix Envelope 8 04 15 08 04-15 de deux abreuvoirs au lieu- dit KOLOFATA GUIDI dans la commune de KOLOFATA CM-CRC EXTREME NORD- 196719-CW-RFQ / Travaux Component A: Local Demande de Single Stage - One 15,354.0 2020-11- 2021-01- 2021-03- 2021- de construction d'un forage IDA / 57180 A posteriori Open - National 13,742.00 Signé development support prix Envelope 5 04 15 01 04-15 équipé de PMH à Koulang Commune de MORA CM-CRC EXTREME NORD- 196685-CW-RFQ / Travaux de Construction d'un forage Component A: Local Demande de Single Stage - One 14,195.0 2020-10- 2020-12- 2021-01- 2021- IDA / 57180 A posteriori Open - National 16,190.00 Signé équipé de pompe à development support prix Envelope 1 05 16 08 02-14 motricité humaine à Guermé Kalfou Commune de Kalfou CM-CRC EXTREME NORD- 196671-CW-RFQ / Travaux de Construction d'un bloc de deux salle de classe équipées à l'EPB DE MADA Component A: Local Demande de Single Stage - One 83,269.0 2020-11- 2021-01- 2021-05- 2021- IDA / 57180 A posteriori Open - National 95,238.00 Signé KOLKOCH ET A LEP development support prix Envelope 1 04 15 27 05-15 MAMBEZA et Construction d'un bloc de latrines à l'EPB DE MADA KOLKOCH ET Commune de Tokombere CM-CRC EXTREME NORD- 196727-CW-RFQ / TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA CONSTRUCTION DE 04 Component A: Local Demande de Single Stage - One 78,043.0 2020-11- 2021-01- 2021-05- 2021- IDA / 57180 A posteriori Open - National 95,238.00 Signé GUICHETS, 04 MAGASINS, development support prix Envelope 1 04 15 27 05-15 D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 204463-CW-RFQ / travaux de construction d’un bloc Component A: Local Demande de Single Stage - One 48,124.0 2020-12- 2021-02- 2021-01- 2021- de deux salles de classe IDA / 62240 A posteriori Open - National 57,142.86 Signé development support prix Envelope 6 01 02 15 06-02 équipées avec bloc latrines à à l’EP d’Afadé Groupe 2 Commune Makary CM-CRC EXTREME NORD- Component C: 196964-CW-RFQ / Coordination, management, Demande de Single Stage - One 2020-11- 2020-12- 2021- Aménagement d'un parking IDA / 62240 A posteriori Limited 5,000.00 0.00 Annulé monitoring and evaluation prix Envelope 04 30 01-29 additionnel et des bureaux and communication de la crc-EN à maroua CM-CRC EXTREME NORD- 196679-CW-RFQ / Travaux de Construction d'un dalot mixte (BA et Beton Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 A posteriori Open - National 62,857.00 0.00 Annulé cyclopeen) de 2x2,5x6 m de development support prix Envelope 04 15 05-15 franchissement de 5 ml et 22 m de portée sur le mayo- Guili Commune de Bourha. CM-CRC EXTREME NORD- 196672-CW-RFQ / REALISATION D’UN FORAGE Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 A posteriori Open - National 15,238.00 0.00 Annulé EQUIPE DE POMPE A development support prix Envelope 04 15 03-16 MOTRICITE HUMAINE A Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 196725-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021- IDA / 57180 A posteriori Open - National 43,810.00 0.00 Annulé de deux salles de classe development support prix Envelope 04 15 04-15 équipées au lycee de Goundaye Commune de Dziguilao. CM-CRC EXTREME NORD- 196686-CW-RFQ / Travaux de Construction d'un bloc Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021- de 02 salles de classe IDA / 57180 A posteriori Open - National 48,949.00 0.00 Annulé development support prix Envelope 04 15 04-15 équipées et d'un bloc de latrines à trois compartiments a EP Waimou COMMUNE DE WINA CM-CRC EXTREME NORD- 222521-CW-RFQ / travaux de construct et équipement En cours Component A: Local Demande de Single Stage - One 152,380.0 2021-04- 2021-06- 2021- d’une salle d’hospitalisation IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope 0 13 08 10-06 et d'un bloc opératoire au on CMA de Logone birni Commune de Logone birni CM-CRC EXTREME NORD- 222525-CW-RFQ / travaux de construct d’1 bloc maternel et latrines à EM En cours Component A: Local Demande de Single Stage - One 148,470.0 2021-04- 2021-06- 2021- Logone birni (lot 01) et IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope 0 13 08 10-06 Réhabilitation de 6 salles de on classe avec bureau attenant et équipement a EP Logone birni GPE 1 A (lot 02) Commune de Logone birni CM-CRC EXTREME NORD- 222842-CW-RFQ / Travaux de construct et équipement En cours Component A: Local Demande de Single Stage - One 152,380.0 2021-04- 2021-06- 2021- d’une salle d’hospitalisation IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope 0 13 08 10-06 et d'un bloc opératoire au on CMA de Fotokol Commune de Fotokol (A2011B1) CM-CRC EXTREME NORD- 222748-CW-RFQ / Travaux de construct d’un forage équipé de pompe à En cours Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- motricité humaine à Mada IDA / 62240 A posteriori Open - National 73,180.00 0.00 d'exécuti development support prix Envelope 13 08 10-06 (Ngroh), à Goura 2 on (Mosquée), à Labado, à Chou et réhabilitation d’un forage à Mada 1 (quartier Sara) Commune de Makary CM-CRC EXTREME NORD- 222522-CW-RFQ / Travaux En cours Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- de construct d’une mini AEP IDA / 62240 A posteriori Open - National 38,020.00 0.00 d'exécuti development support prix Envelope 13 08 10-06 au camp des réfugiés on d’Afadé Commune de Makary CM-CRC EXTREME NORD- 222828-CW-RFQ / Travaux En cours Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- de construct d’un forage IDA / 62240 A posteriori Open - National 21,915.00 0.00 d'exécuti development support prix Envelope 13 08 09-06 équipé de PMH à Tagawa on Commune de Waza CM-CRC EXTREME NORD- 222782-CW-RFQ / Travaux de réalisation d’un forage productif équipé de pompe à motricité humaine dans En cours Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- les localités de : YEME, IDA / 62240 A posteriori Open - National 96,820.00 0.00 d'exécuti development support prix Envelope 13 08 10-06 DANDAYA, KOLDIMA, on MADJINA et MEHE EMMA (Camp refugié) dans la Commune de Mora, Département du Mayo Sava. CM-CRC EXTREME NORD- 222778-CW-RFQ / Travaux de construct d’1 logement d'astreint et d'un mur de En attente cloture à l’EP IGAWA MEME Component A: Local Demande de Single Stage - One 198,220.0 2021-04- 2021-06- 2021- IDA / 62240 A posteriori Open - National 0.00 d'exécuti (lot1) et de construct de 4 development support prix Envelope 0 13 08 10-06 on salles de classe équipées avec 1 bureau attenant et de latrines à l’EP de KOTCHEREHE (lot 02) Commune de Mora CM-CRC EXTREME NORD- 222959-CW-RFQ / TRAVAUX DE construct D’UN BLOC DE DEUX SALLES DE CLASSE EQUIPEES AVEC En cours BUREAU ET D’UN BLOC Component A: Local Demande de Single Stage - One 189,335.0 2021-04- 2021-06- 2021- IDA / 62240 A posteriori Open - National 0.00 d'exécuti LATRINE A TROIS development support prix Envelope 0 13 08 06-20 on COMPARTIMENTS A L’EPB DE KOSSEHONE, L'EP WANDAI (lot 01) ET L'EP NDROCK (lot 02) DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO-TSANAGA. CM-CRC EXTREME NORD- 222785-CW-RFQ / Travaux de construct de 01 forage à En cours Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- Zamai, à Ldagodja-Tourou, IDA / 62240 A posteriori Open - National 67,115.00 0.00 d'exécuti development support prix Envelope 13 08 10-06 à Ngolkodjala-Kosséhone et on à Wandaï-djamboutou Commune de Mokolo CM-CRC EXTREME NORD- 222977-CW-RFQ / TRAVAUX DE construct ET En attente EQUIPEMENT DU CENTRE DE Component A: Local Demande de Single Stage - One 152,380.0 2021-04- 2021-06- 2021- IDA / 62240 A posteriori Open - National 0.00 d'exécuti SANTE INTEGRE A development support prix Envelope 0 13 08 06-20 on KOSSEHONE DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO- TSANAGA.(A2011B1) Page 4 CM-CRC EXTREME NORD- 222983-CW-RFQ / Travaux En attente de Construction de 01 Component A: Local Demande de Single Stage - One 2021-04- 2021-06- 2021- IDA / 57180 A posteriori Open - National 34,286.00 0.00 d'exécuti forage à énergie solaire au development support prix Envelope 13 08 09-06 on CSI de hile haoussa, dans la commune de kousseri (A2031C1) CM-CRC EXTREME NORD- 228212-CW-RFQ / travaux de construction d'un bloc En attente Component A: Local Demande de Single Stage - One 2021-05- 2021-07- 2021- latrines a troix IDA / 57180 A posteriori Open - National 9,000.00 0.00 d'exécuti development support prix Envelope 10 05 09-03 compartiement et on construction d'un incinerateur au CSI de hile haoussa dans la Commune de kousseri CM-CRC EXTREME NORD- 237615-CW-RFQ / construct de 6 SDC équipées avec bureau et Request for En cours latrines à EP de BIAMO (lot Component A: Local Demande de Single Stage - One 285,350.0 2021-06- 2021-08- 2022- IDA / 62240 A posteriori Open - National Quotations (Non 0.00 d'exécuti 01) construct de 2 SDC avec development support prix Envelope 0 06 01 01-28 Bank-SPD) on bureau a EP GRP 2 de BODO (lot 02) construct de 2 SDC avec bureau et latrines a EP de DJAMOUS (lot 03) Commune de Makary CM-CRC EXTREME NORD- 237617-CW-RFQ / travaux de construct de 4 salles de classe équipées avec 2 Request for En cours Component A: Local Demande de Single Stage - One 253,980.0 2021-06- 2021-08- 2022- bureau à EP Fotokol (lot 01) IDA / 62240 A posteriori Open - National Quotations (Non 0.00 d'exécuti development support prix Envelope 0 06 01 01-28 et construct de 4 salles de Bank-SPD) on classe équipées avec 2 bureau et de 3 blocs de latrines à EP Fotokol (lot 02) Commune de Fotokol CM-CRC EXTREME NORD- 196718-CW-RFQ / Travaux de Construction de 01 Component A: Local Demande de Single Stage - One 2020-10- 2020-12- 2021- IDA / 57180 A posteriori Open - National 38,095.00 0.00 Annulé forage à énergie solaire à development support prix Envelope 05 16 03-16 CSI de Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- Request for 243609-CW-RFQ / Travaux Quotations - de Construction de deux En attente Component A: Local Demande de Single Stage - One Small Works 115,576.0 2021-08- 2021-10- 2022- blocs de deux salles de IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 15 17 02-14 classe équipées et un bloc on SPD - latrien à l'EP LOGONE BIRNI Competitive GPE 1 B Commune de logone birni CM-CRC EXTREME NORD- Request for 243611-CW-RFQ / Travaux Quotations - de Construct d’un forage En attente Component A: Local Demande de Single Stage - One Small Works 2021-08- 2021-10- 2022- équipé PMH à Mlari à l’EP IDA / 62240 A posteriori Open - National 76,190.00 0.00 d'exécuti development support prix Envelope (Emergency) 15 17 01-15 Zimado I à l’EP Kalkoussam on SPD - au CSI de Kalakafra à Competitive Gawapata Commune de Logone Birni CM-CRC EXTREME NORD- 243612-CW-RFQ / Request for Construct d’un bloc de 02 Quotations - salles de classes equipées En attente Component A: Local Demande de Single Stage - One Small Works 236,190.0 2021-08- 2021-10- 2022- de tables bancs et d'un bloc IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 15 17 02-14 latrines à l'EP de ZIGAGUE à on SPD - l'EP de WAZA PLATARI à l'EP Competitive de WAZA GII et à l'EP de MALIA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243614-CW-RFQ / Construct d'1 forage PMH à Request for LAYOUNA à SALE à Samke à Quotations - Batkouna à l'EP de En attente Component A: Local Demande de Single Stage - One Small Works 274,285.0 2021-09- 2021-11- 2022- MICHIDIRE à l'EP de MALIA IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 12 14 03-14 (lot01) à l'EP de LAFIA à l'EP on SPD - de GOULOUADMA à BILE- Competitive MOUSGOUM à l'EP de ZIGAGUE à l'EP de TAGAWA II à TAGAWA 1 et à EP SAOUDE (lot02) Commune de Waza CM-CRC EXTREME NORD- 243615-CW-RFQ / Travaux de Construct de 2 salles de Request for classe équipées à l’EP de Quotations - Ngolake à l’EP de Nkidam En attente Component A: Local Demande de Single Stage - One Small Works 232,000.0 2021-09- 2021-11- 2022- (lot1) et à l’EP de Ngambaro- IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 21 03-21 mousgoum et à l’EP de on SPD - TILDE LOGONE et Competitive Équipement en tables bancs à l’EP de Gambarou Mouskoum (lot2) Commune de Logone Birni CM-CRC EXTREME NORD- 243616-CW-RFQ / Travaux Request for de Construct d’un forage Quotations - En attente équipé PMH à Bangalia à Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- IDA / 62240 A posteriori Open - National 91,430.00 0.00 d'exécuti Zimado doctori à EP Maham development support prix Envelope (Emergency) 19 21 02-19 on à l'EP Ngolaké à l’EM de SPD - Logone Birni à l’EP de Kabo Competitive Commune de Logone Birni CM-CRC EXTREME NORD- 243617-CW-RFQ / Request for TRAVAUX DE REALISATION Quotations - En attente D'UN FORAGE EQUIPÉ DE Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- IDA / 62240 A posteriori Open - National 51,429.00 0.00 d'exécuti PMH À AMTCHOUKOULI 1 À development support prix Envelope (Emergency) 19 14 03-14 on AMTCHOUKOULI 2 ET À SPD - GADAFAI COMMUNE DE Competitive FOTOKOL CM-CRC EXTREME NORD- 243618-CW-RFQ / TRAVAUX DE Construct de 2 Request for SALLES DE CLASSE AVEC Quotations - BLOC LATRINE À HAIGAYO , En attente Component A: Local Demande de Single Stage - One Small Works 136,000.0 2021-09- 2021-11- 2022- Construct D’1 BLOC DE IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 20 15 03-15 DEUX SALLES DE CLASSE on SPD - AVEC BLOC LATRINE À Competitive BELGUEDE ET FOURNITURE 60 TABLES BANCS À L’EP DE FOTOKOL COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243620-CW-RFQ / Construct de deux bloc de Request for deux salles équipées et d'un Quotations - bloc de latrine à trois En attente Component A: Local Demande de Single Stage - One Small Works 291,225.0 2021-09- 2021-11- 2022- compartiments (03) à l’EP IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 21 03-21 Bilingue de MAKARY (lot 01) on SPD - et à l’EP NGOUMA (lot 02) et Competitive Construct de la clôture de l’EPG3 de MAKARY . (lot 03) Commune de Makary CM-CRC EXTREME NORD- 243621-CW-RFQ / Travaux Request for de realisation d’un forage Quotations - équipé de PMH à l’EPB de En attente Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- MAKARY à l’EP de NGOUMA IDA / 62240 A posteriori Open - National 91,430.00 0.00 d'exécuti development support prix Envelope (Emergency) 20 15 03-15 à l’EPG1 de BODO à l’EP de on SPD - DJAMOUS à l’EP de MBLAME Competitive à AMBIRTCHA-Glao Commune de Makary CM-CRC EXTREME NORD- Request for 243624-CW-RFQ / Travaux Quotations - de RACCORDEMENT AU En attente Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- RESEAU D'AEP de l'EP de IDA / 62240 A posteriori Open - National 28,570.00 0.00 d'exécuti development support prix Envelope (Emergency) 19 21 02-19 WAZA PLATARI ET DE l'EP de on SPD - WAZA GII à l’EM de WAZA Competitive Commune de Waza CM-CRC EXTREME NORD- 243625-CW-RFQ / Construct d’un bloc de 02 Request for salles de classes équipées Quotations - de tables bancs et d'un bloc En attente Component A: Local Demande de Single Stage - One Small Works 302,855.0 2021-09- 2021-11- 2022- latrines à l'EP de MICHIDIRE IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 21 03-21 à EP SAOUDE à l'EP de on SPD - GOULOUADMA à l'EP de BILE Competitive et Construct d’un bloc de maternelle à l’EM de WAZA COMMUNE DE WAZA Request for CM-CRC EXTREME NORD- Quotations - 243626-CW-RFQ / Travaux En attente Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- de Construct d'un mini AEP IDA / 62240 A posteriori Open - National 47,620.00 0.00 d'exécuti development support prix Envelope (Emergency) 19 21 03-21 à énergie solaire à on SPD - Tchakramari Commune de Competitive MORA CM-CRC EXTREME NORD- 243628-CW-RFQ / Travaux de realisation d'un d'un forage équipé de PMH à Request for Kangarwa à Kangaléri- Quotations - En attente modou-tidjani 1 à Kangaléri- Component A: Local Demande de Single Stage - One Small Works 160,000.0 2021-09- 2021-11- 2022- IDA / 62240 A posteriori Open - National 0.00 d'exécuti modou-tidjani 2 à Kangaléri- development support prix Envelope (Emergency) 0 19 21 03-21 on modou-tidjani 3 à l'EP DE SPD - HOUMAKA, L'EP DE Competitive MAGRARI A L'EP DE KASSAWARA et à Kangaléri- blama-ousman Commune de MORA CM-CRC EXTREME NORD- 243631-CW-RFQ / Construct de 2 salles classe Request for et latrines à l'EP OURO TADA Quotations - au CES DE GAWAR à l'EP En attente Component A: Local Demande de Single Stage - One Small Works 345,550.0 2021-09- 2021-11- 2022- DZAVAYA-MOKOLA à l'EP IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 21 03-21 Mayo-Laddé (GAWAR) et de on SPD - 2 salles classe avec bureau Competitive et latrines à l'EP LDAMTSAI et de deux salles équipées à l'EP BAWADA Commune de Mokolo CM-CRC EXTREME NORD- 243632-CW-RFQ / travaux de realisation d'un forage Request for équipé de pompe à Quotations - motricité humaine à En attente Component A: Local Demande de Single Stage - One Small Works 137,145.0 2021-09- 2021-11- 2022- LDAGODJA au CAMP IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 21 03-21 DEPLACE/REFUGIE DE OURO on SPD - TADA à MOHOUR CSI à Competitive MBIKEM à WOULER - MENDEZE à l'EP Mayo-Laddé (GAWAR) à l'EP DE LDAMTSAI à CES DE GAWAR Commune de Mokolo CM-CRC EXTREME NORD- 243638-CW-RFQ / Travaux Request for de Construct de 2 salles Quotations - classe équipées avec En attente Component A: Local Demande de Single Stage - One Small Works 215,505.0 2021-12- 2022-01- 2022- bureaux et latrines à l’EPG2 IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 06 31 05-31 MAKARY à l’EP MBLAME et on SPD - Cloture de l'EP G1 et Competitive Acquisition en tables bancs à l’EPG2 et l’EPG1 de MAKARY Commune de Makary CM-CRC EXTREME NORD- 243642-CW-RFQ / Construct d’un bloc de 02 Request for salles de classes equipées Quotations - En attente de tables bancs d'un bloc Component A: Local Demande de Single Stage - One Small Works 222,855.0 2021-12- 2022-01- 2022- IDA / 62240 A posteriori Open - National 0.00 d'exécuti latrines et d'un logement development support prix Envelope (Emergency) 0 06 31 05-01 on d'astreinte à l'EP de SPD - TAGAWA à l'EP de LAFIA et Competitive Equipement en tables-bancs des EP de WAZA et ZIGAGUE COMMUNE DE WAZA CM-CRC EXTREME NORD- Request for 243643-CW-RFQ / Travaux Quotations - de Construct d’une mini AEP En attente Component A: Local Demande de Single Stage - One Small Works 2021-12- 2022-01- 2022- au CSI DE BILE et d'un IDA / 62240 A posteriori Open - National 83,810.00 0.00 d'exécuti development support prix Envelope (Emergency) 06 31 05-11 forage équipé de PMH à on SPD - l'EP OULZOUME à l'EP de Competitive NGAME Commune de Waza Request for CM-CRC EXTREME NORD- Quotations - 243646-CW-RFQ / Travaux En attente Component A: Local Demande de Single Stage - One Small Works 2021-12- 2022-01- 2022- de REALISATION D'UN MINI IDA / 62240 A posteriori Open - National 38,095.00 0.00 d'exécuti development support prix Envelope (Emergency) 06 31 05-11 AEP AU CSI DE AISSA HARDE on SPD - Commune de Mora Competitive CM-CRC EXTREME NORD- 243672-CW-RFQ / Travaux Request for de Construct d'un bloc de Quotations - deux salles équipées avec En attente Component A: Local Demande de Single Stage - One Small Works 180,950.0 2021-12- 2022-01- 2022- latrines à l'EP MAYO SANGUE IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 06 31 05-31 à l'EP DJALINGO AVIATION et on SPD - Construct d'un bloc Competitive maternel à l'école maternelle de de Djimeta Commune de Mokolo CM-CRC EXTREME NORD- 243673-CW-RFQ / Realisation d'un forage Request for équipé de pompe à Quotations - En attente motricité humaine à Component A: Local Demande de Single Stage - One Small Works 137,145.0 2021-12- 2022-01- 2022- IDA / 62240 A posteriori Open - National 0.00 d'exécuti MABASS à GADALA à development support prix Envelope (Emergency) 0 06 31 05-31 on GALTA à LDUBAM à ANCIEN SPD - SONEL à ZAMAI GREDE à Competitive CAMP DEPLACES DE OUDA GAZA à HELIPORT (MOFOLE) Commune de Mokolo CM-CRC EXTREME NORD- 243676-CW-RFQ / Request for Renforcement du système Quotations - En attente de pompage d’eau du Component A: Local Demande de Single Stage - One Small Works 2021-12- 2022-01- 2022- IDA / 62240 A posteriori Open - National 61,010.00 0.00 d'exécuti barrage de DOUVAR et development support prix Envelope (Emergency) 06 31 05-31 on réhabilitation des SPD - tuyauteries du réseau Competitive CAMWATER dans la ville de MOKOLO CM-CRC EXTREME NORD- 243679-CW-RFQ / Extension du réseau Request for CAMWATER au quartier Quotations - lycée technique de En attente Component A: Local Demande de Single Stage - One Small Works 285,715.0 2021-12- 2022-01- 2022- mokolo(700ml) au cetic de IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 06 31 05-31 Mokola (2000 ml) au on SPD - quartier mendeze-dayak Competitive (1500 ml) au quartier mboua -quartier mboikete- chefferie mboua /EP NDAMTSAI (1750 ml) Commune de Mokolo CM-CRC EXTREME NORD- 244067-CW-RFQ / Construction d'un bloc de Request for 02 salles de classe équipées Quotations - (60 tables bancs et 02 En attente Component A: Local Demande de Single Stage - One Small Works 285,714.0 2021-09- 2021-11- 2022- bureau de Maître) et latrines IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 14 16 03-16 à 03 compartiments à l’EP on SPD - de Homaka à l’EP de Competitive Magrari à l’EP de Djoundé à l’EP de Kassa-wara et à l’EP de Warba dans la Commune de Mora Request for CM-CRC EXTREME NORD- Quotations - 243644-CW-RFQ / Travaux En attente Component A: Local Demande de Single Stage - One Small Works 228,570.0 2021-12- 2022-01- 2022- de Construct et equipement IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 06 31 05-31 d’un CSI à BILE et on SPD - construction de la CLOTURE Competitive DU CMA DE WAZA CM-CRC EXTREME NORD- Request for 243633-CW-RFQ / Travaux Quotations - de Construction et En attente Component A: Local Demande de Single Stage - One Small Works 304,760.0 2021-09- 2021-11- 2022- equipement d’un bloc CSI IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 19 14 04-13 au centre de sante intégré à on SPD - Lamdtsai et à KOSSEONE Competitive Commune de Mokolo Request for CM-CRC EXTREME NORD- Quotations - 244059-CW-RFQ / Travaux En attente Component A: Local Demande de Single Stage - One Small Works 152,381.0 2021-12- 2022-01- 2022- de Construction d'un CSI IDA / 62240 A posteriori Open - National 0.00 d'exécuti development support prix Envelope (Emergency) 0 06 31 05-31 équipé AU CSI DE AISSA on SPD - HARDE Commune de Mora Competitive CM-CRC EXTREME NORD- 243623-CW-RFQ / Travaux Request for de Construction et Quotations - En attente équipement et cloture du Component A: Local Demande de Single Stage - One Small Works 411,430.0 2021-09- 2021-11- 2022- IDA / 62240 A posteriori Open - National 0.00 d'exécuti CSI de MADA (lot1) et development support prix Envelope (Emergency) 0 19 21 03-21 on Construct de la clôture du SPD - CSI de BIAMO du CSI de Competitive NGOUMA et du CSI de BODO (lot2) Commune de Makary CM-CRC EXTREME NORD- 243619-CW-RFQ / Request for TRAVAUX DE Quotations - En attente CONSTRUCTION D'UN BLOC Component A: Local Demande de Single Stage - One Small Works 2021-09- 2021-11- 2022- IDA / 62240 A posteriori Open - National 95,238.00 0.00 d'exécuti DE DEUX SALLES development support prix Envelope (Emergency) 19 21 03-21 on D’OBSERVATION ET SPD - EQUIPEMENT DU CSI DE Competitive SAGME DANS LA COMMUNE DE FOTOKOL GOODS Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual for Award Planned Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 7991-GO-RFQ / Acquisition Component C: des fournitures de bureaux Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-06- 2017-05- IDA / 57180 A posteriori Limited 10,000.00 8,556.39 Signé du matériels d'entretien et monitoring and evaluation prix Envelope 10 26 05 22 19 des fournitures diverses à la and communication CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- 8000-GO-RFQ / Acquisition des consomables Component C: Informatiques (Encres, clés Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-07- 2017-05- IDA / 57180 A posteriori Limited 10,000.00 5,074.65 Signé internet, CD, 2 disques durs monitoring and evaluation prix Envelope 10 26 05 22 19 externes Tera, 9 clés USB, and communication antivirus) à la CRC, Région de l'Extrême-Nord Page 5 CM-CRC EXTREME NORD- 8001-GO-RFQ / Acquisition des fournitures pour Component C: véhicules ((5pneusX3véh), 3 Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-05- boîtes à pharmacie, 3 IDA / 57180 A posteriori Limited 10,000.00 0.00 Annulé monitoring and evaluation prix Envelope 10 05 19 extincteurs,3 pelles, 6 and communication paires de gants, 3machettes, 3manteaux...) à la CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- Component C: 8003-GO-RFQ / acquisition, Coordination, management, Demande de Single Stage - One 2017-03- 2017-12- 2017-05- 2017-12- 2017-07- 2018-01- IDA / 57180 A posteriori Limited 9,000.00 4,880.26 Signé aménagement et monitoring and evaluation prix Envelope 10 04 05 29 04 19 équipement de 2 conteneurs and communication de 40 pieds Component C: CM-CRC EXTREME NORD- Coordination, management, Demande de Single Stage - One 2017-03- 2017-10- 2017-05- 2017-12- 2017-06- 2018-01- 8006-GO-RFQ / aquisition IDA / 57180 A posteriori Limited 6,000.00 5,492.69 Signé monitoring and evaluation prix Envelope 10 03 05 22 04 15 et installation de 10 splits and communication CM-CRC EXTREME NORD- 8008-GO-RFQ / acquisition Component C: du kit à outils du Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-06- CCI(scléromètre, lazermètre, IDA / 57180 A posteriori Limited 1,500.00 0.00 Annulé monitoring and evaluation prix Envelope 10 05 04 odomètre, pi à coulisse and communication électronique, EPI, Gilets de sauvetage CM-CRC EXTREME NORD- 8009-GO-RFQ / fourniture des services de maintenance Component C: électrique, climatiseurs, Coordination, management, Demande de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-07- 2018-05- IDA / 57180 A posteriori Limited 4,800.00 2,176.75 Signé groupe électrogène, monitoring and evaluation prix Envelope 10 26 05 24 05 plolmberie et menuiserie à and communication la CRC, Région de l'Extrême- Nord CM-CRC EXTREME NORD- 38389-GO-RFQ / Equipement en table bancs, tables et chaise pour Component A: Local Demande de Single Stage - One 2017-12- 2017-12- 2018-01- 2018-04- 2018-04- Enseignants et armoires au IDA / 57180 A posteriori Limited 16,265.00 12,882.93 Signé development support prix Envelope 02 19 27 09 27 CETIC de Mogodé, à l'EP de SIR, à l'EPB de Rhoumsiki et à l'EP de Tchanawa dans la commune de Mogode CM-CRC EXTREME NORD- 58709-GO-RFQ / Acquisition des consomables Informatiques Component A: Local Demande de Single Stage - One 2017-10- 2017-10- 2017-12- 2017-12- 2017-12- IDA / 57180 A posteriori Limited 2,600.00 1,816.76 Signé (Encres, clés internet, CD, 2 development support prix Envelope 08 03 03 07 17 disques durs externes Tera, 9 clés USB, antivirus) à la CRC, Région de l'Extrême- Nord VAGUE 2 CM-CRC EXTREME NORD- 58529-GO-RFP / Fourniture d' une pirogue à moteur 30CV type E40GMHL (avec coque en fibre de verre) et Component A: Local Demande de Single Stage - One 2018-05- 2018-06- 2018-07- 2018-10- 2018-08- 2018-12- IDA / 57180 A posteriori Limited 26,974.00 25,881.80 Achevé des équipements annexes: development support prix Envelope 06 13 01 23 30 21 portes tout tricycle tractable, pagaies, gilets de sauvetage, panneaux de labelisation) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 111400-GO-RFQ / Fourniture en mobilier et Component A: Local Demande de Single Stage - One 2019-04- 2019-06- 2019-08- 2019-07- petit materiel sanitaire de IDA / 57180 A posteriori Open - National 49,494.00 38,928.38 Signé development support prix Envelope 06 01 27 31 CSI de Mindif, de Modjombodi, de Maoudine et de Mogom dans la commune de Mindif. CM-CRC EXTREME NORD- 196822-GO-RFQ / Fourniture et installation de Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021-01- 2021-04- 39 lampadaires a énergie IDA / 57180 A posteriori Open - National 89,143.00 68,717.03 Signé development support prix Envelope 04 15 08 15 solaire dont 10 à Ndoukoula,14 à Dagaï Kola et de 15 à Loulou Commune de Ndoukoula CM-CRC EXTREME NORD- 196840-GO-RFQ / Fourniture et l'installation Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021-01- 2021-07- IDA / 57180 A posteriori Open - National 16,571.00 12,009.59 Signé de 3 poteaux solaires à development support prix Envelope 04 15 08 14 Ouro Bone et 03 à Modjombodi Commune de Mindif. CM-CRC EXTREME NORD- 196835-GO-RFQ / Fourniture et installation de Component A: Local Demande de Single Stage - One 2020-11- 2020-12- 2021-01- 2021-03- IDA / 57180 A posteriori Open - National 31,429.00 27,298.43 Signé 12 poteaux solaires de l’axe development support prix Envelope 04 30 08 30 Sous-préfecture- Ngaoundéréo Commune de Kalfou CM-CRC EXTREME NORD- 196829-GO-RFQ / En attente Fourniture et installation Component A: Local Demande de Single Stage - One 2020-11- 2020-12- 2021-02- IDA / 57180 A posteriori Limited 9,905.00 0.00 d'exécutio d’un kit solaire pour development support prix Envelope 04 30 28 n l’alimentation en energie électrique du lycée de gabaraye. Commune Gueme. CM-CRC EXTREME NORD- Component C: En cours 196917-GO-RFQ / Coordination, management, Demande de Single Stage - One 2020-11- 2020-12- 2021-01- IDA / 62240 A posteriori Limited 9,000.00 0.00 d'exécutio Fourniture et installation monitoring and evaluation prix Envelope 04 30 29 n des stores et moquettes à la and communication CRC EN CM-CRC EXTREME NORD- 196937-GO-RFQ / Fourniture et installation du Component C: matériel informatique (5 En cours Coordination, management, Demande de Single Stage - One 2020-11- 2020-11- 2020-12- 2021-01- ordinateurs portables pour IDA / 62240 A posteriori Limited 18,000.00 0.00 d'exécutio monitoring and evaluation prix Envelope 04 09 30 29 CR, RRSE, CPTR, CCI2 et n and communication ARPM) et de reprographie (deux photocopieurs professionnels) à la CRC de l’Extrême-nord CM-CRC EXTREME NORD- 196954-GO-RFQ / Achat de Component C: matériels, équipements et En attente Coordination, management, Demande de Single Stage - One 2020-11- 2020-12- 2021-01- mobilier de bureaux(chaises IDA / 62240 A posteriori Limited 8,400.00 0.00 d'exécutio monitoring and evaluation prix Envelope 04 30 29 réception(20), fauteuil n and communication directeur(10), 2bureaux) à la CRC Région de l'Extrême- Nord CM-CRC EXTREME NORD- 196957-GO-RFQ / Component C: Acquisition des fournitures Coordination, management, Demande de Single Stage - One 2020-11- 2020-11- 2020-12- 2020-12- 2021-01- IDA / 62240 A posteriori Limited 8,000.00 7,316.27 Signé de bureaux et divers pour le monitoring and evaluation prix Envelope 04 26 30 14 29 compte de la CRC, Région and communication de l'Extrême-Nord CM-CRC EXTREME NORD- Component C: 196959-GO-RFQ / Coordination, management, Demande de Single Stage - One 2020-11- 2020-10- 2020-12- 2020-12- 2021-06- Fourniture des services de IDA / 62240 A posteriori Limited 4,937.00 8,659.75 Signé monitoring and evaluation prix Envelope 04 26 30 31 28 gardiennage à la CRC, and communication Région de l'Extrême-Nord CM-CRC EXTREME NORD- 196961-GO-RFQ / Fournture de service de Maintenance informatique Component C: (photocopieur, scanner, Coordination, management, Demande de Single Stage - One 2020-11- 2020-10- 2020-12- 2020-12- 2021-12- IDA / 62240 A posteriori Limited 4,800.00 4,428.86 Signé ordinateur portable , monitoring and evaluation prix Envelope 04 26 30 31 25 desktop et copieur à la CRC- and communication EN lot 01 et maintenance électricité, climatisseur, groupe électrogène et plomberie lot 02 à la CRC- EN CM-CRC EXTREME NORD- 196962-GO-RFQ / Acquisition de 6 Kits solaires pour les communes Component B: Support to En attente Demande de Single Stage - One 2020-11- 2021-02- 2021-07- de Mora, Fotokol, Makary, IDA / 62240 the decentralization A posteriori Open - National 69,600.00 0.00 d'exécutio prix Envelope 21 01 31 Logone Birni, mokolo et process n Waza pour le fonctionnement de SIMBA dans la Region de l'Extreme- nord CM-CRC EXTREME NORD- 204462-GO-RFQ / Component A: Local Demande de Single Stage - One 2020-12- 2021-02- 2021-02- 2021-04- fourniture en equipements IDA / 62240 A posteriori Open - National 60,000.00 40,605.68 Signé development support prix Envelope 01 02 16 03 et medicaments aux CSI de Zizagué et CSI de Waza CM-CRC EXTREME NORD- 204459-GO-RFQ / fourniture en equipements Component A: Local Demande de Single Stage - One 2020-12- 2021-02- 2021-03- 2021-04- et medicaments aux CSI de IDA / 62240 A posteriori Open - National 60,000.00 36,998.61 Signé development support prix Envelope 01 02 12 03 Kossa et au CSI de Méhé Emma dans la commune de Commune de Mora CM-CRC EXTREME NORD- 196810-GO-RFQ / Fourniture en Equipement en 60 tables bancs et un Component A: Local Demande de Single Stage - One 2020-11- 2020-12- 2021-02- IDA / 57180 A posteriori Limited 9,905.00 0.00 Annulé bureau à l'EP Guinlaye et development support prix Envelope 04 30 28 111 tables bancs et un bureau à l'EP BOGO SIRATARE I Commune de BOGO CM-CRC EXTREME NORD- 196816-GO-RFQ / Fourniture en équipement Component A: Local Demande de Single Stage - One 2020-10- 2020-12- 2021-02- en 200 tables bancs, 4 IDA / 57180 A posteriori Open - National 12,952.00 0.00 Annulé development support prix Envelope 05 16 14 bureaux, 4 chaises rembourrées et 4 armoires à l'EP MAGA IIB Commune de Maga. CM-CRC EXTREME NORD- 196797-GO-RFQ / Component A: Local Demande de Single Stage - One 2020-11- 2021-01- 2021-03- Fourniture en Équipement IDA / 57180 A posteriori Open - National 12,801.00 0.00 Annulé development support prix Envelope 04 15 16 en matériel médicaux au CSI de Takreo yoldeo Commune Kar Hay CM-CRC EXTREME NORD- Component C: 222789-GO-RFQ / En attente Coordination, management, Demande de Single Stage - One 2021-04- 2021-06- 2021-12- Fourniture de Achat de 3 IDA / 62240 A posteriori Limited 6,000.00 0.00 d'exécutio monitoring and evaluation prix Envelope 13 08 05 scanners professionnels à la n and communication CRC de l’Extrême-nord ( C101203) CM-CRC EXTREME NORD- 222792-GO-RFQ / Component C: En attente Acquisition de Coordination, management, Demande de Single Stage - One 2021-04- 2021-06- 2021-07- IDA / 62240 A posteriori Limited 15,000.00 0.00 d'exécutio consommables monitoring and evaluation prix Envelope 13 08 08 n informatiques et autres and communication fournitures dela CRC, Région de l'EN ( C101303) CM-CRC EXTREME NORD- 222730-GO-RFQ / Component C: En attente Acquisition des fournitures Coordination, management, Demande de Single Stage - One 2021-04- 2021-06- 2021-07- IDA / 62240 A posteriori Limited 9,000.00 0.00 d'exécutio de bureaux et divers pour le monitoring and evaluation prix Envelope 13 08 08 n compte de la CRC, Région and communication de l'Extrême-Nord (C101301) CM-CRC EXTREME NORD- 222841-GO-RFQ / Component C: En attente Acquisition des fournitures Coordination, management, Demande de Single Stage - One 2021-04- 2021-06- 2021-12- IDA / 62240 A posteriori Limited 4,935.00 0.00 d'exécutio pour véhicules à la CRC, monitoring and evaluation prix Envelope 13 08 05 n Région de l'Extrême-Nord and communication (C101304) CM-CRC EXTREME NORD- 222795-GO-RFQ / Component C: En attente Acquisition d'un vehicule Coordination, management, Demande de Single Stage - One 2021-04- 2021-06- 2021-08- IDA / 62240 A posteriori Open - National 50,000.00 0.00 d'exécutio pick up pour le compte de monitoring and evaluation prix Envelope 13 08 07 n la CRC, Région de l'Extrême- and communication Nord (C101205) CM-CRC EXTREME NORD- 222798-GO-RFQ / FOURNITURE ET INSTALLATION D’UNE MINI En cours CENTRALE SOLAIRE AU CSI Component A: Local Demande de 2021-04- 2021-06- 2021-09- IDA / 62240 A posteriori 56,935.00 0.00 d'exécutio DE KOSSA, DANS LA development support prix 13 08 06 n COMMUNE DE MORA, DEPARTEMENT DU MAYO- SAVA, REGION DE L’EXTREME – NORD. (A2011B1) CM-CRC EXTREME NORD- 243687-GO-RFQ / En attente ALIMENTATION EN ÉNERGIE Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- IDA / 62240 A posteriori Open - National 66,667.00 0.00 d'exécutio SOLAIRE DU CMA DE DE development support prix Envelope 06 31 01 n FOTOKOL COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243691-GO-RFQ / En attente Electrification A ENERGIE Component A: Local Demande de Single Stage - One 2021-09- 2021-11- 2022-02- IDA / 62240 A posteriori Open - National 76,190.00 0.00 d'exécutio SOLAIRE du CMA de Logone development support prix Envelope 19 21 19 n birni Commune de Logone Birni CM-CRC EXTREME NORD- 243698-GO-RFQ / En attente Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- Electrification A ENERGIE IDA / 62240 A posteriori Open - National 76,190.00 0.00 d'exécutio development support prix Envelope 06 31 01 SOLAIRE du CSI DE MADA n dans la Commune de Makary CM-CRC EXTREME NORD- 243699-GO-RFQ / En attente Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- Alimentation du CMA de IDA / 62240 A posteriori Open - National 57,145.00 0.00 d'exécutio development support prix Envelope 06 31 01 WAZA en Energie Solaire n dans la Commune de waza CM-CRC EXTREME NORD- 243703-GO-RFQ / FOURNITURE ET En attente INSTALLATIONS DES TABLES Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- IDA / 62240 A posteriori Open - National 41,145.00 0.00 d'exécutio BANCS ET BUREAUX A EP development support prix Envelope 06 31 01 n DOULOU EP SAVA ET EP MOUVANE COMMUNE DE MORA CM-CRC EXTREME NORD- 243709-GO-RFQ / acquisition en 120 tables En attente Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- bancs et en 4 bureaux IDA / 62240 A posteriori Open - National 14,665.00 0.00 d'exécutio development support prix Envelope 06 31 01 maîtres à l’EP Ounangaré à n l’EP Zimado 3 dans la commune de Logone Birni CM-CRC EXTREME NORD- 243712-GO-RFQ / Acquisition des En attente equipements medicaux aux Component A: Local Demande de Single Stage - One 2021-12- 2022-01- 2022-05- IDA / 62240 A posteriori Open - National 60,950.00 0.00 d'exécutio CSI de Zimado au CSI de development support prix Envelope 06 31 01 n Houlouf au CSI de Dabanga au CMA de Logone birni commune de Logone Birni NON CONSULTING SERVICES Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 111430-NC-RFQ / Selection d'une agence d'edition pour la production d'un bulletin Component A: Local Demande de Single Stage - One 2019-06- 2019-08- 2019-11- 2020-08- IDA / 57180 A posteriori Open - National 47,000.00 31,781.53 Signé trimestriel d'informations development support prix Envelope 09 04 15 03 communales(47 communes) dans la region de l'Extreme- nord CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 8076-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 20,007.04 Achevé l'actualisation du PCD de la qualifications 10 04 31 14 10 13 22 18 06 14 05 process commune de Guéré, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 8082-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization A posteriori Open - National 26,970.00 22,183.49 Signé l'actualisation du PCD de la qualifications 10 04 31 14 10 13 22 18 11 14 process commune de Kalfou, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 8088-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 18,355.82 Signé l'actualisation du PCD de la qualifications 10 04 31 14 09 13 22 18 06 14 process commune de Mindif, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 8094-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization A posteriori Open - National 53,760.00 30,571.90 Signé l'actualisation du PCD de la qualifications 10 04 31 14 10 13 27 18 06 14 process commune de Gazawa., des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 8093-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-06- 2018-05- IDA / 57180 the decentralization A posteriori Open - National 15,570.00 29,601.16 Signé l'actualisation du PCD de la qualifications 10 04 31 14 09 13 22 18 27 14 process commune de Guidiguis, des consultants Région de l'Extrême-Nord Page 6 CM-CRC EXTREME NORD- 8097-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-03- 2017-05- 2017-03- 2017-05- 2017-06- 2017-06- 2018-03- 2017-07- 2018-07- 2018-05- IDA / 57180 the decentralization A posteriori Open - National 57,600.00 18,445.45 Signé l'actualisation du PCD de la qualifications 10 04 31 14 10 13 27 18 06 14 process commune de Dargala, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29268-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 8,628.26 Achevé l'actualisation du PCD de la qualifications 20 04 11 24 10 24 22 28 06 24 05 process commune de WINA, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 29270-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 26,460.00 29,798.62 Signé l'actualisation du PCD de la qualifications 20 23 11 24 09 24 27 28 16 24 process commune de BOURHA, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29272-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 23,663.61 Signé l'actualisation du PCD de la qualifications 20 04 11 24 10 24 27 28 06 24 process commune de Hina, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 29273-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-06- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 15,570.00 9,919.43 Signé l'actualisation du PCD de la qualifications 20 04 11 24 10 24 27 28 25 24 process commune de Koza, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 29274-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 53,760.00 37,441.16 Signé l'actualisation du PCD de la qualifications 20 04 11 24 10 24 27 28 06 24 process commune de Mozogo., des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29276-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-10- 2017-11- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 57,600.00 0.00 Annulé l'actualisation du PCD de la qualifications 20 11 24 24 28 24 process commune de Kolofata, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29277-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 57,600.00 0.00 Annulé l'actualisation du PCD de la qualifications 20 04 11 24 10 24 28 24 process commune de Kolofata, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29280-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-10- 2017-11- 2017-12- 2018-01- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 26,970.00 0.00 Annulé l'actualisation du PCD de la qualifications 20 11 24 24 28 24 process commune de Goulfey, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29281-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-10- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 26,460.00 17,141.65 Signé l'actualisation du PCD de la qualifications 20 04 11 24 14 24 22 28 06 24 process commune de FOTOKOL, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29282-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 -2,518.29 Achevé l'actualisation du PCD de la qualifications 20 04 11 24 15 24 20 28 06 24 05 process commune de Blangoua, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29284-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2017-09- 2017-05- 2017-10- 2017-11- 2017-06- 2017-12- 2018-03- 2018-01- 2018-07- 2018-11- IDA / 57180 the decentralization A posteriori Open - National 15,570.00 31,593.26 Signé l'actualisation du PCD de la qualifications 20 04 11 24 15 24 22 28 11 24 process commune de Darak, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 8089-CS-CQS / sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization A posteriori Open - National 26,460.00 19,922.77 Signé l'actualisation du PCD de la qualifications 15 28 06 19 07 18 21 23 01 19 process commune de Datcheka, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29269-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization A posteriori Open - National 26,970.00 18,485.99 Signé l'actualisation du PCD de la qualifications 15 28 06 19 07 18 21 23 01 19 process commune de TCHATIBALI, des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29278-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 63,060.00 -1,222.01 Achevé l'actualisation du PCD de la qualifications 15 28 06 19 10 18 21 23 01 19 05 process commune de Waza, Région des consultants de l'Extrême-Nord CM-CRC EXTREME NORD- 29285-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- IDA / 57180 the decentralization A posteriori Open - National 53,760.00 1,279.72 Signé l'actualisation du PCD de la qualifications 15 28 06 19 10 18 21 23 01 19 process commune deHILE-ALIFA., des consultants Région de l'Extrême-Nord CM-CRC EXTREME NORD- 58613-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-09- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 26,070.00 24,573.33 Achevé l'actualisation du PCD de la qualifications 15 28 06 19 10 18 21 23 01 19 05 process cmne de Goulfey, Région de des consultants l'Extrême-Nord CM-CRC EXTREME NORD- 58629-CS-CQS / Sélection Sélection fondée Component B: Support to d'un consultant pour sur les 2018-06- 2018-10- 2018-07- 2018-08- 2018-11- 2018-09- 2018-12- 2018-10- 2019-03- 2019-08- 2020-08- IDA / 57180 the decentralization A posteriori Open - National 57,600.00 -2,073.39 Achevé l'actualisation du PCD de la qualifications 15 02 06 19 06 18 21 23 01 19 05 process cmne de Kolofata, Région de des consultants l'Extrême-Nord CM-CRC EXTREME NORD- 58563-CS-CQS / Sélection Sélection fondée de deux consultants (OAL) Component A: Local sur les 2017-04- 2017-03- 2017-04- 2017-06- 2017-04- 2017-07- 2017-05- 2017-08- 2017-09- 2017-11- pour la collecte et la saisie IDA / 57180 A posteriori Open - National 85,727.00 546,754.14 Signé development support qualifications 05 30 26 09 19 09 27 13 27 11 des données du score cadre des consultants deans 21 cmnes , Région de l'Extrême-Nord CM-CRC EXTREME NORD- Sélection fondée 111119-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2020-09- 2019-06- 2019-08- 2019-09- 2019-10- 2020-08- d'un OAL pour IDA / D2990 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 14 22 05 04 09 04 l'actualisation légère du PCD process des consultants de la commune de KAI KAI CM-CRC EXTREME NORD- Sélection fondée 111118-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2021-05- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 31 l'actualisation légère du PCD process des consultants de la commune de YAGOUA CM-CRC EXTREME NORD- Sélection fondée 111218-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-12- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process des consultants de la commune de TOKOMBERE CM-CRC EXTREME NORD- Sélection fondée 111121-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process des consultants de la commune de NDOUKOULA CM-CRC EXTREME NORD- Sélection fondée 111120-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process des consultants de la commune de MOUTOURWA CM-CRC EXTREME NORD- Sélection fondée 111122-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process des consultants de la commune de MOGODE CM-CRC EXTREME NORD- Sélection fondée 111231-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 04 l'actualisation légère du PCD process des consultants de la commune de MAKARY CM-CRC EXTREME NORD- Sélection fondée 111232-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-09- 2019-10- 2019-11- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 29 04 14 09 08 l'actualisation légère du PCD process des consultants de la commune de LOGONE BIRNI CM-CRC EXTREME NORD- Sélection fondée 111123-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2020-07- 2019-09- 2020-05- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 14 04 26 09 04 l'actualisation légère du PCD process des consultants de la commune de KAELE CM-CRC EXTREME NORD- Sélection fondée 111124-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2019-07- 2019-06- 2019-08- 2020-07- 2019-09- 2020-05- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 25 22 05 15 04 26 09 04 l'actualisation légère du PCD process des consultants de la commune de BOGO CM-CRC EXTREME NORD- Sélection fondée 111230-CS-CQS / Sélection Component B: Support to sur les 2019-06- 2020-09- 2019-06- 2019-08- 2019-09- 2019-10- 2020-08- d'un OAL pour IDA / 57180 the decentralization A posteriori Open - National 13,000.00 0.00 Annulé qualifications 01 14 22 05 04 09 04 l'actualisation légère du PCD process des consultants de la commune de MOKOLO CM-CRC EXTREME NORD- 222975-CS-CQS / Sélection d'un consultant (OSC) pour Sélection fondée la collecte et la saisie des Component B: Support to sur les En attente 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization A posteriori Open - National 36,400.00 0.00 qualifications d'exécution 08 29 12 12 16 12 dans 7 communes (darak process des consultants hile alifa, blangoua, Fotokol, kousseri zina et waza) , Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222973-CS-CQS / Sélection d'un consultant (OSC) pour Sélection fondée la collecte et la saisie des Component B: Support to sur les En attente 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization A posteriori Open - National 36,400.00 0.00 qualifications d'exécution 08 29 12 12 16 12 deans 7 communes (mora, process des consultants kolofata, meri, maroua 1, Bourha, Koza et mokolo) , Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222960-CS-CQS / Sélection d'un consultant (OSC) pour Sélection fondée la collecte et la saisie des Component B: Support to sur les En attente 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization A posteriori Open - National 31,200.00 0.00 qualifications d'exécution 08 29 12 12 16 12 deans 6 communes (bogo, process des consultants pette, maroua 3, TOULOUM,Mindif , GUIDIGUIS°, Région de l'Extrême-Nord ( B201103) CM-CRC EXTREME NORD- 222968-CS-CQS / Sélection d'un consultant (OSC) pour Sélection fondée la collecte et la saisie des Component B: Support to sur les En attente 2021-04- 2021-04- 2021-06- 2021-07- 2021-08- 2022-02- données du score cadre IDA / 62240 the decentralization A posteriori Open - National 31,200.00 0.00 qualifications d'exécution 08 29 12 12 16 12 deans 6 communes (Krhay, process des consultants Kalfou, guere, wina datcheka et kaikai), Région de l'Extrême-Nord ( B201103) INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-CRC EXTREME NORD- 8103-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-12- 2017-06- IDA / 57180 A posteriori Individuel Limited 3,000.00 3,805.88 Signé environnementales de development support 06 08 11 12 01 16 06 28 20 Construction d'un bloc saitaire et d'un bloc de latrines au CSI de Djiddeo garre, commune de Maroua III CM-CRC EXTREME NORD- 8107-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-06- 2017-06- 2018-01- environnementales de IDA / 57180 A posteriori Individuel Limited 2,600.00 1,522.35 Achevé development support 06 08 11 13 01 16 06 19 20 25 Construction de 2 forages équipés de PMH, un à Dolddosewo et un Ngouroré et la construction d'un bief à Kossewa, commune Maroua II CM-CRC EXTREME NORD- 8110-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-06- environnementales de IDA / 57180 A posteriori Individuel Limited 3,000.00 0.00 Annulé development support 06 11 01 06 20 Construction d'un bloc sanitaire et d'un bloc de latrines au centre de santé de Rhumzou, dans la commune de Mogodé CM-CRC EXTREME NORD- 8112-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local 2017-03- 2017-05- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2017-10- 2017-06- 2017-10- IDA / 57180 A posteriori Individuel Limited 2,400.00 2,093.23 Achevé de Construction d'un bloc development support 06 08 11 05 01 12 06 20 20 23 de deux salles de classe équipées d'un bloc latrines a trois compartiements à l'EP de Sedek Ourogabdo et au CES de BOGO CM-CRC EXTREME NORD- 8114-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité MP de Component A: Local 2017-03- 2017-05- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- Construction d 6 forage IDA / 57180 A posteriori Individuel Limited 5,600.00 3,615.59 Achevé development support 06 08 11 05 01 12 06 20 20 23 équipé de pompe à motricité humaine et e deux (02) forages équipé de pompe à motricité humaine et rehabilitation de deux forages exista commune de BOGO CM-CRC EXTREME NORD- 8118-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction et équipement d'01 bloc de 02 Component A: Local 2017-03- 2017-04- 2017-03- 2017-04- 2017-04- 2017-10- 2017-05- 2017-11- 2017-08- IDA / 57180 A posteriori Individuel Limited 6,186.00 3,107.61 Signé salles de classe et d'un bloc development support 06 03 11 07 01 11 06 01 04 de latrines à trois compartiments à l'EP Dogba, Gayack dans Construction d1 hangar et d'un bloc de latrines A PAPATA CM-CRC EXTREME NORD- 8122-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-10- 2017-05- 2017-10- 2017-08- magasin de stockage à Kéné- IDA / 57180 A posteriori Individuel Limited 3,304.00 2,572.86 Signé development support 06 10 11 08 01 26 06 30 04 Kéné, Construction d'un bloc de 02 salles de classe équipées à l'EP de Djafgué, et Construction d'un bloc de latrines à l'EP de Djafgué cne CM-CRC EXTREME NORD- 8126-CS-INDV / sélection d'un consultant pour le sui/contrôle des travaux de réalisation de 6 forages Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- IDA / 57180 A posteriori Individuel Limited 3,840.00 0.00 Annulé équipés de PMH à Tchékéhi, development support 06 11 01 06 04 Mbokouré, Magaldao Toupéo, Soukkoungo Galdima, Bourango et Bandalaré dans la commune de Pétté CM-CRC EXTREME NORD- 8130-CS-INDV / sélection d'un consultant pour le suivi/controle des travaux de Construction d'un forage Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2017-11- 2017-08- IDA / 57180 A posteriori Individuel Limited 3,200.00 3,047.82 Signé pastoral à énergie solaire development support 06 10 11 08 01 08 06 20 04 Balaza Lawane (Tchalloudi mango) 1 forage pastoral à énergie solaire à Kongola Saïd, commune de Maroua 3 Page 7 CM-CRC EXTREME NORD- 8154-CS-INDV / sélection d'un consultant pour le suivi/controle des travaux de Construction d'un bloc Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- de 02 salles de classe IDA / 57180 A posteriori Individuel Limited 5,544.00 0.00 Annulé development support 06 11 01 06 04 équipées et d'un bloc de latrines à trois compartiments à l'EP de Mayel Béi, à l'EP de Bao Hosséré II et à l'EP de Palaoudi, commune Maroua 1 CM-CRC EXTREME NORD- 8157-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux de construction d'un bloc Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2017-08- IDA / 57180 A posteriori Individuel Limited 2,292.00 0.00 Annulé maternel à l'école Maternelle development support 06 11 01 06 04 de Zokok-Laddo et branchement au réseau d'alimentation en eau potable, commune de Maroua 1 CM-CRC EXTREME NORD- 8159-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Component A: Local 2017-03- 2017-04- 2017-03- 2017-06- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2018-02- de Construction de trois IDA / 57180 A posteriori Individuel Limited 1,840.00 1,591.10 Achevé development support 06 10 11 13 01 30 06 30 04 20 forages équipés de pompe à motricité humaine à Ouro Dow, Goni Bello et Yoldéo Guiziga, Commune Maroua 1 CM-CRC EXTREME NORD- 8161-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux de Construction d'un bloc Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- IDA / 57180 A posteriori Individuel Limited 3,690.00 3,041.89 Signé de 02 salles de classe development support 06 10 11 08 01 30 06 30 04 équipées et d'un bloc de latrines à trois compartiments à l'EP Masfaï et au CES de Boula, commune de Mokolo CM-CRC EXTREME NORD- 8163-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-09- 2017-08- IDA / 57180 A posteriori Individuel Limited 1,350.00 1,113.47 Signé de Construction de 2 development support 06 10 11 08 01 06 06 14 04 forages équipés de PMH un à Ouro Kessoum et à Mounam, commune de Mokolo CM-CRC EXTREME NORD- 8165-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-12- 2017-05- 2018-01- 2017-08- 2018-04- de construction d'un IDA / 57180 A posteriori Individuel Limited 3,510.00 3,246.38 Achevé development support 06 10 11 08 01 28 06 31 04 24 ouvrage de franchissement et d'assainissement sur le mayo-kwayaga, dans la commune de Mogodé CM-CRC EXTREME NORD- 8166-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux de Construction d'un bloc Component A: Local 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2017-09- IDA / 57180 A posteriori Individuel Limited 3,618.00 2,776.20 Achevé de 02 salles de classe development support 06 31 11 07 01 14 06 21 04 27 équipées et d'un bloc de latrines à trois compartiments à l'EP de Saoudjo et au CES de Madaka, commune de Bogo CM-CRC EXTREME NORD- 8246-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux de Construction d'un forage Component A: Local 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-06- 2017-05- 2017-06- 2017-08- 2017-08- équipé de PMH à Dambaye IDA / 57180 A posteriori Individuel Limited 4,913.00 1,125.49 Achevé development support 06 31 11 07 01 14 06 21 04 16 et à Bagalaf etAménagement d'un bas-fond avec un forage à énergie solaire à Ouro Mésséré pour les cultures maraichères, commune de Bogo CM-CRC EXTREME NORD- 8247-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux deconstruction d'un bloc de deux (02) salles de classe Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2017-11- 2017-09- IDA / 57180 A posteriori Individuel Limited 7,152.00 6,461.92 Signé equipees et un (01) bloc development support 06 10 11 08 01 10 06 15 03 latrine a trois (03) compartiments a l'EP de honkol, a l'EP de darsala, a l'EP de dabanga et l'equipement en me CM-CRC EXTREME NORD- 8248-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux deconstruction d'un forage Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-06- 2017-05- 2017-06- 2017-09- 2017-09- équipé d'une pompe à IDA / 57180 A posteriori Individuel Limited 3,280.00 3,398.97 Achevé development support 06 10 11 08 01 02 06 10 03 29 motricité humaine à l' EP de Darsala, l' EP de Dabanga, et un forage pastoral solaire au village Sahaba 1, l'EP groupe de Logone birni et à EP Ho CM-CRC EXTREME NORD- 8249-CS-INDV / sélection d'un consultant pour le Component A: Local 2017-03- 2017-04- 2017-03- 2017-05- 2017-04- 2017-11- 2017-05- 2018-01- 2017-09- 2018-06- suivi/contrôle des travaux IDA / 57180 A posteriori Individuel Limited 4,584.00 3,598.46 Achevé development support 06 10 11 08 01 24 06 20 03 13 de réalisation d'une mare artificielle à Mogon dans la commune de Moutourwa CM-CRC EXTREME NORD- 8250-CS-INDV / sélection d'un consultant pour le suivi/contrôle des travaux Component A: Local 2017-03- 2017-04- 2017-03- 2017-07- 2017-04- 2017-07- 2017-05- 2017-07- 2017-08- de construction d'un bloc de IDA / 57180 A posteriori Individuel Limited 4,614.00 4,102.81 Signé development support 06 10 11 17 01 24 06 24 04 deux salles de classe et de deux blocs de latrines à l'EP de Afadé et à l'EP de NGré dans la commune de Makary CM-CRC EXTREME NORD- 8251-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction de 6 Component A: Local 2017-03- 2017-04- 2017-03- 2017-09- 2017-04- 2017-09- 2017-05- 2018-01- 2017-08- IDA / 57180 A posteriori Individuel Limited 3,840.00 3,192.11 Signé forages équipés de PMH à development support 06 10 11 18 01 25 06 11 04 Tchékéhi, Mbokouré, Magaldao Toupéo, Soukkoungo Galdima, Bourango et Bandalaré dans la commune de Pétté CM-CRC EXTREME NORD- 8252-CS-INDV / Sélection de 3 consultants pour l'appui du CCI dans la Component A: Local 2017-03- 2017-03- 2017-04- 2017-05- 2018-05- IDA / 57180 A posteriori Individuel Limited 27,632.00 0.00 Annulé passation des marchés, le development support 06 11 01 06 06 suivi et l'exécution des projets à la CRC, Région de l'Extrême-Nord CM-CRC EXTREME NORD- 29287-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- IDA / 57180 A posteriori Individuel Limited 8,500.00 5,328.23 Achevé de Construction d'un forage development support 20 08 25 09 16 16 20 10 04 22 PMH à Guivel Méri centre, à Houloum, à Tchaki Djébé, à Kilwo, à Mbozo Mofou, à Balewa, à Nguissar, au quartier Hot CM-CRC EXTREME NORD- 29288-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- environnementales des MP IDA / 57180 A posteriori Individuel Limited 2,400.00 3,425.29 Achevé development support 20 08 25 12 16 16 20 10 04 22 de Construction d'un bloc de deux salles de classe équipées avec un bloc latrines au CES de Manguirdla et Construction d'un magasin de stockage à CM-CRC EXTREME NORD- 29289-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-11- 2017-08- 2018-01- 2017-10- environnementales des MP IDA / 57180 A posteriori Individuel Limited 2,000.00 2,367.54 Achevé development support 20 08 25 19 16 20 01 04 04 de Construction 01 bloc de deux salles de classe équipées avec un bloc latrines à l'EP de Djagalaï et au CES de Hardé dans la commune de MRA IER CM-CRC EXTREME NORD- 29291-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-10- environnementales des MP IDA / 57180 A posteriori Individuel Limited 1,600.00 1,694.12 Achevé development support 20 08 25 13 16 16 20 19 04 04 de Construction d'un forage équipé de pompe à motricité humaine à Nyamdjidim et à Zébé dans la commune de Maroua I (2 FORAGES PMH) CM-CRC EXTREME NORD- 29292-CS-INDV / Sélection d'un consultant pour les Etudes des des MP de Construction d'un bloc de Component A: Local 2017-09- 2017-05- 2017-11- 2017-06- 2017-11- 2017-06- 2018-01- 2017-07- 2018-02- 2017-09- 02 salles de classe équipées IDA / 57180 A posteriori Individuel Open 3,750.00 4,231.37 Achevé development support 21 08 09 12 30 16 04 04 18 21 avec 01 bloc de latrines à l'EP de Ndrock Tourou, à EP Zili Yolel, à EP Moufou Sud, EP de Ldamang et au CES Mandaka commune mokolo CM-CRC EXTREME NORD- 29293-CS-INDV / Sélection d'1 consultant pour Component A: Local 2017-09- 2017-05- 2017-11- 2017-06- 2017-11- 2017-09- 2018-01- 2017-09- 2018-02- 2017-09- l'élaboration des Etudes des IDA / 57180 A posteriori Individuel Open 5,000.00 3,001.30 Achevé development support 21 08 09 12 30 08 04 14 18 21 MP de Construction de 08 forage PMH dans la commune de mokolo CM-CRC EXTREME NORD- 29295-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-12- 2018-01- 2018-01- environnementales MP IDA / 57180 A posteriori Individuel Limited 1,600.00 2,664.12 Achevé development support 20 08 25 12 16 16 20 20 04 10 Construction d'1 bloc de deux salles de classe équipées et 1 bloc de latrine à l'EP de Pitoa Kolara et à l'EP de Badadji dans la cne de moulvoudaye CM-CRC EXTREME NORD- 29297-CS-INDV / Sélection d'un consultant pour Etudes de faisabilité des MP de Construction d'un forage Component A: Local 2017-09- 2017-05- 2017-09- 2017-05- 2017-10- 2017-06- 2017-11- 2017-08- 2018-01- 2017-09- PMH à Hourgoum, IDA / 57180 A posteriori Individuel Limited 3,000.00 2,568.97 Achevé development support 20 08 25 13 16 18 20 28 04 28 Goumlaye, Kadaye Djamboutou, à Gadja Padjonré et au Lycée de Kolara , EP piotao kaloara et Ep bardadji dans la commune de Moulvoudaye CM-CRC EXTREME NORD- 29299-CS-INDV / Sélection d'un consultant pour Etudes d des MP de Construction d'1 bloc de Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- deux salles de classe et d'1 IDA / 57180 A posteriori Individuel Limited 4,000.00 5,113.88 Achevé development support 20 08 25 12 16 16 20 10 04 22 bloc de latrine à l'EP MOUFTOUM , au CES GOURIA, Lycée de SIR, à l'EPB de RHUMZOU , à l'EPB de KWASHIMANDA et équipement tables banc cne de MOZOGO CM-CRC EXTREME NORD- 29300-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-09- 2018-01- 2017-09- environnementales des MP IDA / 57180 A posteriori Individuel Limited 2,000.00 2,534.91 Achevé development support 20 08 25 12 16 16 20 07 04 22 de Construction d'un ouvrage d'assainissement et de franchissement sur le Mayo Teki à TEKI commune de MOGODE CM-CRC EXTREME NORD- 29301-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Sélection d'un consultant Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-07- 2018-01- 2017-09- pour l'élaboration des IDA / 57180 A posteriori Individuel Limited 4,950.00 3,805.88 Achevé development support 20 08 25 06 16 16 20 10 04 22 Etudes de faisabilité techniques et environnementales des MP de Construction d'un forage équipé à PMH (8 Forages) da commune de MOGODE CM-CRC EXTREME NORD- 29302-CS-INDV / Sélection d'un consultant pour Elaboration étude des MP de Construction d'1 bloc de Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-09- deux salles de classe IDA / 57180 A posteriori Individuel Limited 4,000.00 4,894.14 Achevé development support 20 08 25 12 16 16 20 16 04 22 équipées et d'1 bloc de latrines à l'EP Souaye Dana, à l'EP Domo Doukou, à l'EP de Riganda, à l'EP Kao-Galak et à l'EP Bilingue Vounsia CNE YAGOUA CM-CRC EXTREME NORD- 29303-CS-INDV / Sélection d'un consultant pourétude des MP de Construction d'un forage equipe de PMH à l'EP Component A: Local 2017-09- 2017-05- 2017-09- 2017-06- 2017-10- 2017-06- 2017-11- 2017-06- 2018-01- 2017-09- IDA / 57180 A posteriori Individuel Limited 3,000.00 4,869.96 Achevé Souaye Dana, à l'EP Domo development support 20 08 25 12 16 16 20 18 04 22 Doukou, à l'EP de Riganda, à l'EP Kao-Galak et à l'EP Bi Vounsia dans la commune de Yagoua CM-CRC EXTREME NORD- 38284-CS-INDV / ÉTUDES DE FAISABILITÉ DES MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE ÉQUIPÉES À L'EP KOZA I, À Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 6,600.00 2,458.96 Achevé L'EP KOZA II, À L'EP development support 26 11 01 02 22 06 26 16 12 04 DAKOTCHERE, À L'EP DE KILDA ET À L'EP DE GABOUA, CONSTRUCTION D'UN BLOC LATRINES A L'EP DE GABOUA, DANS LA COMMUNE DE KOZA CM-CRC EXTREME NORD- 38285-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 1,000.00 1,134.91 Achevé équipé de pompe à development support 27 11 02 02 23 06 27 16 13 04 motricité humaine a l'EP de KILDA dans la commune de KOZA dans la commune de KOZA CM-CRC EXTREME NORD- 38286-CS-INDV / ETUDES de faisabilité des MP d'équipement en tables Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- banc et bureaux ( 60 tables IDA / 57180 A posteriori Individuel Limited 1,800.00 756.60 Achevé development support 27 11 02 02 23 06 27 16 13 04 banc + 02 bureaux et 02 Chaises) a l'EP de KOZA I , l'EP de KOZA II, a l'EP de GABOUA, dans la commune de KOZA CM-CRC EXTREME NORD- 38287-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe équipées et d'un bloc de Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 6,000.00 2,601.01 Achevé latrines à trois development support 27 11 02 02 23 06 27 16 13 06 compartiments au CES MAZAYA, à l'EPB de MIDRE, l'EP ZELE SOULEDE, l'EP BAO DALBAI et l'EP DOUMDERE dans la commune de ROUA dans la CM-CRC EXTREME NORD- 38288-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-12- 2018-03- 2018-03- équipé de pompe à IDA / 57180 A posteriori Individuel Limited 4,000.00 2,811.29 Achevé development support 26 11 01 02 22 06 26 20 12 06 motricité humaine à l'EP ZELE SOULEDE, à l'EP BAO DALBAI, au CES MAZAYA et à l'EP DOUMDERE dans la commune de ROUA CM-CRC EXTREME NORD- 38289-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- équipé de pompe à IDA / 57180 A posteriori Individuel Limited 3,000.00 2,054.80 Signé development support 27 14 02 14 23 06 27 06 13 motricité humaine au CETIC D'OUZAL, l'EP GOKORO et l'EM de MOSKOTA dans la commune MOZOGO Page 8 CM-CRC EXTREME NORD- 38290-CS-INDV / ETUDES des MP de Construction de deux salles de classe équipées et d'1 bloc latrines Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2018-10- 2018-03- au CETIC D'OUZAL, l'EP IDA / 57180 A posteriori Individuel Limited 9,600.00 10,413.78 Signé development support 27 14 02 14 23 06 27 09 13 NGUETCHEWE ,de deux salles de classe équipées à l'EPB MOZOGO, L'EP KORASAMBA, l'EP KARAZAWA l'EP GOKORO et d1 atelier à la SAR/SM et CETIC MOZOGO CM-CRC EXTREME NORD- 38291-CS-INDV / ETUDES de faisabilité des MP de Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- Construction d'un hangar de IDA / 57180 A posteriori Individuel Limited 2,400.00 2,680.17 Signé development support 27 14 02 14 23 06 27 09 13 marché au marché de MAWA MOZOGO et au marche de MOSKOTA CM-CRC EXTREME NORD- 38292-CS-INDV / ETUDES de faisabilité des MP de Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- Construction d'un bloc IDA / 57180 A posteriori Individuel Limited 2,400.00 2,405.98 Signé development support 27 14 02 14 23 06 27 09 13 maternelle équipée à L'EM DE MOSKOTA et d'une cloture a l'EM de MOZOGO CM-CRC EXTREME NORD- 38293-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-12- équipé de pompe à IDA / 57180 A posteriori Individuel Limited 4,000.00 1,903.46 Achevé development support 27 11 02 02 23 06 27 16 13 20 motricité humaine à Ildin- toungouloun, Wouro Wandou Moufou, Narewa Et Makoumba dans la commune de GAZAWA CM-CRC EXTREME NORD- 38294-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et d'un Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- bloc de latrines à l'EP de IDA / 57180 A posteriori Individuel Limited 3,600.00 2,577.87 Achevé development support 27 11 02 02 23 06 27 16 13 23 wouyang, à l'EP de GONOZO et construction d'un atelier de maçonnerie et d'un bloc latrine au CETIC de Loulou A NDOUKOULA CM-CRC EXTREME NORD- 38295-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de pompe PMH à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 5,600.00 2,575.26 Achevé l'EP de Ouro-Nangué, à l'EP development support 27 11 02 02 23 06 27 16 13 23 MOUDVAR, à l'EP de Gonozo, à Fakalao, à EP Louguéré, à Talandé et à Hodango CMNE NDOUKOULA CM-CRC EXTREME NORD- 38296-CS-INDV / ETUDES de faisabilité des MP d' Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2018-11- Extension du réseau IDA / 57180 A posteriori Individuel Limited 6,000.00 4,722.68 Achevé development support 27 11 02 02 23 06 27 16 13 17 électrique Loulou- Ndoukoula-Dagaï (22km) COMMUNE NDOUKOULA CM-CRC EXTREME NORD- 38297-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- d'un bloc de latrines à l'EP IDA / 57180 A posteriori Individuel Limited 5,400.00 2,161.74 Achevé development support 27 11 02 02 23 06 27 16 13 13 de Bihoré, à l'EP de Troké, à l'EP de Goua et à l'EP de Youaye Mbogue et équipement des salles de classe au lycée de TCHATIBALI CM-CRC EXTREME NORD- 38298-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de pompe à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 4,500.00 2,368.41 Achevé motricité Humaine à Gané development support 27 11 02 02 23 06 27 16 13 13 (quartier bili), à L'EP de Saouringwa, à Danglao(quartier Bidomo), Kada'a Glonhene, Bindiriel Danghou commune Tchatibali CM-CRC EXTREME NORD- 38299-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées et d'un bloc de IDA / 57180 A posteriori Individuel Limited 6,000.00 2,593.97 Achevé development support 27 11 02 02 23 06 27 11 13 06 latrines à trois compartiments l'EP de Balané, au CES de Sirlawé, l'EP de Rey-foulaye, l'EP de Datchéka-takréo,l'EP de Sadielle COMMUNE DE KARHAY. CM-CRC EXTREME NORD- 38300-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de pompe à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- motricité Humaine à l'EP de IDA / 57180 A posteriori Individuel Limited 5,600.00 2,577.87 Achevé development support 27 11 02 02 23 06 27 16 13 06 Balané, à l'école des parents de Gouloulou, à l'EP de Rey- foulaye, à l'EP de Sadielle, à l'EP de Damdama, au CES de Sirlawé, au CSI de Doukoula 1 CM-CRC EXTREME NORD- 38301-CS-INDV / ETUDES de faisabilité des MP de Construction d'un Centre de Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- Santé intégré équipé, un IDA / 57180 A posteriori Individuel Limited 2,800.00 2,828.45 Achevé development support 27 11 02 28 23 06 27 16 13 06 incinérateur, et un bloc de latrines au Centre de Santé Intégré de Doukoula 1 commune KARHAY CM-CRC EXTREME NORD- 38302-CS-INDV / ETUDES de faisabilité des MP de Construction de deux salles de classe équipées et d'un  Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- bloc latrines au Lycée tech IDA / 57180 A posteriori Individuel Limited 6,000.00 3,045.09 Signé development support 27 11 02 02 23 06 27 09 13 de Gobo, l' EP GUIRIOU CENTRE, Lycée de DOM PYA, la SAR/ SM Gobo, et la construction d'un bloc latrines au marché de GOBO et de NOULD CM-CRC EXTREME NORD- 38303-CS-INDV / ETUDES de faisabilité des MP de construction d'un forage pastoral équipé de pompe à énergie photovoltaïque à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- IDA / 57180 A posteriori Individuel Limited 4,000.00 3,026.19 Signé GALAM BASSA et la development support 27 11 02 02 23 06 27 09 13 construction d'un forage équipé de PMH au CES de POLGUE, à l'EP GUIRIOU CENTRE et à la SAR/ SM de Gobo CM-CRC EXTREME NORD- 38304-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe équipées et construction Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 4,800.00 2,819.53 Achevé d'un  bloc latrine à trois development support 27 11 02 02 23 06 27 09 13 14 compartiment au CES de Doukroye, au CETIC de Doreissou, à l'EP de Dama - Djougong et à l'EP de DJOWELNANDJI communeKAIKAI CM-CRC EXTREME NORD- 38305-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de PMH au CETIC de Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- Doressou, a l'EP de Daram - IDA / 57180 A posteriori Individuel Limited 5,400.00 2,819.53 Achevé development support 27 11 02 02 23 06 27 09 13 14 Djougong, à l' EP de Daloa (Doukroye), au Lycée de Bégué Palam, au Lycée de Daram-Doreissou centre, à l'EP de Memié COMMUNE DE KAI-KAI CM-CRC EXTREME NORD- 38306-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe équipées et de construction Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- IDA / 57180 A posteriori Individuel Limited 8,000.00 4,728.78 Achevé d'un  bloc de latrines à trois development support 27 11 02 02 23 06 27 16 13 30 compartiments à l'EP de Doumrou, à l'EP Mizao, à l'EP de Bipaing, a l' EP de Goudjouing, au lycée de Mindjil, à E CM-CRC EXTREME NORD- 38307-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage équipé de PMH à Bibalé - Gambour, à Goubara, à Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-11- IDA / 57180 A posteriori Individuel Limited 5,400.00 4,699.43 Achevé Kourong, à Kassilé. Et development support 27 11 02 02 23 06 27 16 13 30 l'actualisationdes microprojets de réhabilitation de la mare de Garey Kaélé et la construction d'un forage pastoral à énergie so CM-CRC EXTREME NORD- 38308-CS-INDV / ETUDES de faisabilité des MP de Construction d'un  bloc de deux salles de classe Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées à EP Dourdoum, IDA / 57180 A posteriori Individuel Limited 3,000.00 2,689.95 Achevé development support 27 11 02 02 23 06 27 18 13 15 à EP Kalaf, à EP Mayel - Guinadji et Construction d'un  bloc latrine à trois compartiment à EP Mayel - Guinadji COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38309-CS-INDV / ETUDES de faisabilité du MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 1,000.00 2,086.45 Achevé équipé de PMH À development support 27 11 02 02 23 06 27 17 13 15 GANAHA,EP DOURDOUM, À EP KALAF, À EP MAYEL - GUINADJI COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38310-CS-INDV / ETUDES de faisabilité du MP Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- d'électrification en énergie IDA / 57180 A posteriori Individuel Limited 3,600.00 1,879.77 Signé development support 27 11 02 02 23 06 27 16 13 solaire de la localité de Magada carrefour COMMUNE DE Moutourwa CM-CRC EXTREME NORD- 38311-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-12- 2018-03- 2017-12- équipées à l'EP de IDA / 57180 A posteriori Individuel Limited 6,000.00 4,905.06 Achevé development support 27 14 02 14 23 25 27 05 13 09 Gouvaka, à l'EP de Majé, à l'EP de Malika et construction de 01 magasin de stockage à Oignon à Sera -Idoumda et à Kourgui COMMUNE DE MORA CM-CRC EXTREME NORD- 38312-CS-INDV / ETUDES de faisabilité des MP de Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-12- 2018-01- 2017-12- 2018-03- 2017-12- Construction d'un forage IDA / 57180 A posteriori Individuel Limited 2,000.00 2,633.18 Achevé development support 27 14 02 14 23 05 27 05 13 09 équipé de pompe à motricité Humaine à Koulang, à Mangavé COMMUNE DE MORA CM-CRC EXTREME NORD- 38313-CS-INDV / ETUDES de faisabilité des MP de Construction d'un forage Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipé de pompe à IDA / 57180 A posteriori Individuel Limited 3,000.00 1,962.54 Achevé development support 27 14 02 28 23 06 27 16 13 19 motricité humaine dans les localités de WOLORDE- TCABAWOL, BAKA FOURWA ET DJALTAR dans la commune de TOKOMBERE CM-CRC EXTREME NORD- 38314-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de Component A: Local 2017-11- 2017-09- 2017-12- 2017-10- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- deux salles de classe IDA / 57180 A posteriori Individuel Limited 3,200.00 2,689.95 Achevé development support 27 11 02 02 23 06 27 06 13 19 équipées à l'EP DE TSABATSABA,L'EP CHEOULEW, l'EP TAZANG ET AU CES DE MAKALINGAI dans la commune de TOKOMBERE CM-CRC EXTREME NORD- 38315-CS-INDV / ETUDES de faisabilité des MP de Construction d'un bloc de deux salles de classe Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- équipées à l'EP DE GANCE, IDA / 57180 A posteriori Individuel Limited 3,000.00 3,961.78 Achevé development support 27 14 02 14 23 25 27 25 13 14 AU CES DE TOLKOMARI et Construction d'un bloc de latrines a trois compartiments au CES de TOLKOMARI, commune de KOLOFATA CM-CRC EXTREME NORD- 38316-CS-INDV / ETUDES de faisabilité du MP de Construction d'un forage pastoral équipé de pompe à énergie solaire avec Component A: Local 2017-11- 2017-09- 2017-12- 2017-09- 2017-12- 2017-10- 2018-01- 2017-10- 2018-03- 2017-12- IDA / 57180 A posteriori Individuel Limited 2,800.00 3,961.78 Achevé réservoir et abreuvoirs à development support 27 14 02 14 23 25 27 25 13 14 Kolofata-Guidi et Construction d'un forage équipé de pompe à motricité humaine au CES de TOLKOMARI dans la commune de KOLO CM-CRC EXTREME NORD- 38317-CS-INDV / ETUDES DE FAISABILITE DU MP CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,650.00 1,505.22 Achevé EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 22 LATRINES A TROIS COMPARTIMENTS A L'EP KOUTOULA COMMUNE DE BLANGOUA CM-CRC EXTREME NORD- 38318-CS-INDV / ETUDES DE FAISABILITE DU MP Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 2,700.00 2,409.68 Achevé CONSTRUCTION D'UNE development support 27 06 02 06 23 17 27 20 13 22 GARE ROUTIERE AVEC BLOC LATRINES A BLANGOUA CM-CRC EXTREME NORD- 38319-CS-INDV / ELABORATION DES ETUDES DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 2,000.00 1,880.84 Achevé CONSTRUCTION D'UN development support 27 06 02 06 23 17 27 17 13 25 FORAGE EQUIPE DE PMH A ABINKRO ET A KOUTALA DANS LA COMMUNE DE BLANGOUA CM-CRC EXTREME NORD- 38320-CS-INDV / ETUDES DE FAISABILITE DU MP D CONSTRUCTION D'UN Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 2,700.00 2,539.13 Achevé FORAGE PASTORAL A development support 27 06 02 06 23 17 27 17 13 21 ENERGIE SOLAIRE A MAGALAKABIR, A KARENA ET A NAGA COMMUNE DE DARAK CM-CRC EXTREME NORD- 38321-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,650.00 1,472.58 Achevé EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 23 LATRINES A TROIS COMPARTIMENTS A L'EP HILELLE COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38322-CS-INDV / ETUDES DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 A posteriori Individuel Limited 1,170.00 1,099.00 Achevé development support 27 06 02 06 23 17 27 20 13 23 HANGAR AU MARCHE DE GOULFEY GANA COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38323-CS-INDV / ETUDES DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 A posteriori Individuel Limited 1,140.00 1,017.42 Achevé development support 27 06 02 06 23 17 27 20 13 23 MAGASIN DE STOCKAGE A GOULFEY COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38324-CS-INDV / ETUDES DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UNE IDA / 57180 A posteriori Individuel Limited 2,700.00 2,409.68 Achevé development support 27 06 02 14 23 17 27 20 13 23 GARE ROUTIERE AVEC BLOC LATRINES A GOULFEY COMMUNE DE GOULFEY Page 9 CM-CRC EXTREME NORD- 38325-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN FORAGE PASTORAL A ENERGIE SOLAIRE A Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 4,000.00 3,761.68 Achevé DJAGALAT, A AKMASSIRAK development support 27 06 02 06 23 17 27 17 13 23 ET DE LA CONSTRUCTION D'UN FORAGE EQUIPES DEPMH A MOUGALAM, A LA GARE ROUTIERE DE GOULFEY, A TAWOULWEBE ET A L'EP HILELE COMMUNE DE GOULFEY CM-CRC EXTREME NORD- 38326-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN CENTRE DE SANTE INTEGRE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- EQUIPE, AVEC BLOC DE IDA / 57180 A posteriori Individuel Limited 4,500.00 4,016.14 Achevé development support 27 06 02 14 23 17 27 20 13 23 LATRINES ET UN INCINERATEUR A HILE HAOUSSA COMMUNE DE HILE ALIFA " CM-CRC EXTREME NORD- 38327-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,650.00 1,472.58 Achevé EQUIPE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 23 LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38328-CS-INDV / TUDE DES MICROPROJETS DE CONSTRUCTION D'UN FORAGE PASTORAL A ENERGIE SOLAIRE A LACTA Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 2,800.00 2,633.18 Achevé 1, MASSAKI ET development support 27 06 02 06 23 17 27 17 13 23 CONSTRUCTION D'UN FORGAE EQUIPE DE POMPE A MOTRICITE HUMAINE AU CES D'ADJAINE ET AU CSI DE HILE HAOUSSA COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38329-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION DE QUATRE FORAGES EQUIPES DE POMPE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- A MOTRICITE HUMAINE AU IDA / 57180 A posteriori Individuel Limited 2,800.00 2,554.31 Achevé development support 27 06 02 06 23 17 27 17 13 22 MARCHE A BETAIL DE MADA, A MASSIO- GOURGOURA, A NAGA NDIGUINI, A EP MALTAM COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38330-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UNE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,500.00 1,338.71 Achevé CLOTURE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 22 LATRINES AU MARCHE A BETAIL DE MADA COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38331-CS-INDV / ETUDES DE FAISABILITE DU MP DE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- CONSTRUCTION D'UN IDA / 57180 A posteriori Individuel Limited 1,170.00 1,044.20 Achevé development support 27 06 02 06 23 17 27 20 13 22 HANGAR AVEC BLOC LATRINE AU MARCHE DE BIAMO, COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38332-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,650.00 1,505.22 Achevé EQUIPE ET D'UN BLOC DE development support 27 06 02 06 23 17 27 20 13 23 LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM COMMMUNE DE MAKARY CM-CRC EXTREME NORD- 38333-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE CLASSE Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,650.00 1,472.58 Achevé EQUIPE ET D'UN BLOC DE development support 27 06 02 14 23 17 27 20 13 25 LATRINES A TROIS COMPARTIMENTS A L'EP GONONI COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38334-CS-INDV / ETUDES DE FAISABILITE DU MP DE CONSTRUCTION D'UN FORAGE PASTORAL A ENERGIE SOLAIRE A Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 5,700.00 5,360.39 Achevé ABASSOUNI, A HILE ALIFA 1, development support 27 06 02 06 23 17 27 17 13 25 A FADJA, A DOLE BADA ET CONSTRUCTION D'UN FORAGE EQUIPE DE PMH A MAFOULSO III, A FAMARE ET A L'EP DE GONONI COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38335-CS-INDV / ETUDES DE FAISABILITE DES MP D'INSTALLATION D'ECLAIRAGE PUBLIC (10 Component A: Local 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2017-11- 2018-01- 2017-11- 2018-03- 2018-03- IDA / 57180 A posteriori Individuel Limited 1,600.00 1,504.67 Achevé KITS)AVEC ENERGIE SOLAIRE development support 27 06 02 06 23 17 27 17 13 25 DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE COMMUNE DE HILE ALIFA CM-CRC EXTREME NORD- 38336-CS-INDV / Suivi/contrôle de la Construction de deux salles de classe équipées avec latrines à l'EP Mouftoum et Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-03- 2018-01- 2018-04- 2018-05- IDA / 57180 A posteriori Individuel Limited 9,483.00 7,714.59 Signé à l'EPB Rhoumzou, au lycée development support 27 05 02 28 23 06 27 10 27 SIR et à l'EPB Kwashimalda, Et CES Goura et Equipment au CETIC Mogodé, à l'EP SIR, à l'EPB Rhoumsiki et à l'EP Tchanawa CM-CRC EXTREME NORD- 38337-CS-INDV / Suivi/contrôle des Travaux Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- construction d'un radier de IDA / 57180 A posteriori Individuel Limited 13,819.00 1,115.61 Signé development support 27 05 02 28 23 06 27 10 27 12 ml sur le mayo Teki dans la localité de Teki, Commune de Mogode CM-CRC EXTREME NORD- 38338-CS-INDV / Suivi/contrôle des Travaux de construction d'un bloc de deux salles équipées et un Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- bloc de latrines à l'EP de IDA / 57180 A posteriori Individuel Limited 9,345.00 6,782.81 Signé development support 27 05 02 07 23 06 27 10 27 Ldamang et à l'EP de Ndrock Tourou, à l'EP de Moufou- sud et à l'EP de Zili Yolel et au CES de Mandaka COMMUNE DE MOKOLO CM-CRC EXTREME NORD- 38339-CS-INDV / Suivi/contrôle des Travaux Construction de 01 forage équipé dePMH à EM de Ldamtsai, Mandaka Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-05- IDA / 57180 A posteriori Individuel Limited 5,339.00 2,320.44 Signé Mpoldok, Camp mission de development support 27 05 02 28 23 06 27 10 27 Tourou, Koudougour II Loctcha, Katamsa Sikia, Gouldoum Moufou, Houdango Dandi et Ouro Bocki(2lots) COMMUNE DE MOKOLO CM-CRC EXTREME NORD- 38341-CS-INDV / Suivi/contrôle des Travaux de construction d'un forage Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- équipé de PMH dans les IDA / 57180 A posteriori Individuel Limited 3,477.00 2,737.83 Signé development support 27 05 02 02 23 04 27 06 27 localités de Gadjawai, Guivel, Quartier Méri centre, Nguissar et Kilwo-Valta (Lot 2) COMMUNE DE MERI CM-CRC EXTREME NORD- 38343-CS-INDV / Suivi/contrôle des Travaux Construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 2,047.00 1,429.35 Signé deux salles de classe development support 27 05 02 07 23 04 27 06 27 équipées et un bloc de latrines au C.E.S de Manguirdla commune de MERI CM-CRC EXTREME NORD- 38344-CS-INDV / Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 3,827.00 2,945.17 Signé deux salles de classe development support 27 05 02 07 23 05 27 10 27 équipées avec latrines à l'EP de Domo Doukou et à l'EP de Riganda commune de yagoua CM-CRC EXTREME NORD- 38345-CS-INDV / Suivi/contrôle des Travaux Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-03- IDA / 57180 A posteriori Individuel Limited 623.00 526.56 Signé de construction d' un forage development support 27 05 02 07 23 05 27 10 28 équipé de PMH à l'EP de Riganda de yagoua CM-CRC EXTREME NORD- 38346-CS-INDV / Suivi/contrôle des Travaux construction d'un forage Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- équipé de PMH à l'EP de IDA / 57180 A posteriori Individuel Limited 2,895.00 2,945.17 Signé development support 27 05 02 08 23 05 27 10 27 Badadji, à l'EP de Pitoa- Kolara, au lycée de Kolara et à Gadjia Padjonré commune de moulvoudaye CM-CRC EXTREME NORD- 38347-CS-INDV / Suivi/contrôle des Travaux construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 3,973.00 2,945.17 Signé deux salles de classe development support 27 05 02 28 23 05 27 10 27 équipées et un bloc de latrines à l'EP de Pitoa- Kolara et à l'EP de Badadji CM-CRC EXTREME NORD- 38348-CS-INDV / Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 3,655.00 3,010.44 Signé deux salles équipées et un development support 27 05 02 28 23 04 27 06 27 bloc de latrines à l'EP de Djagalaye et au CES de Hardé commune de Maroua I CM-CRC EXTREME NORD- 38349-CS-INDV / Suivi/contrôle des Travaux construction d'un forage Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 1,946.00 1,350.14 Signé équipé de PMH à l'EP de development support 27 05 02 28 23 04 27 06 27 Yamdjidjing, à l'EP de Djagalaye et à Zébé commune de MAROUA I CM-CRC EXTREME NORD- 38350-CS-INDV / Suivi/contrôle de Travaux de construction d'un bloc de deux salles équipées et un Component A: Local 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- 2019-08- IDA / 57180 A posteriori Individuel Limited 3,574.00 2,976.37 Achevé bloc de latrines CES de development support 27 14 02 21 23 04 27 06 27 08 Balda et Construction d'un bloc de deux salles de classe équipées à l'EP de Sedek Ouro-Gabdo commune de BOGO CM-CRC EXTREME NORD- 38351-CS-INDV / Suivi/contrôle de Travaux de Construction d'un forage équipé de pompe à Component A: Local 2017-11- 2018-02- 2017-12- 2018-02- 2017-12- 2018-04- 2018-01- 2018-04- 2018-05- motricité humaine à l'EP de IDA / 57180 A posteriori Individuel Limited 3,786.00 2,477.61 Signé development support 27 05 02 28 23 04 27 12 27 Sedek Ouro Gabdo à Ardo Foulbé Tankirou à Gagnéri Kourdaya à Guinlaye Guizigaré et Guinlaye Moufouré dans la commune BOGO CM-CRC EXTREME NORD- 58686-CS-INDV / Sélection d'un consultant pour etudes de faisabilité DU Component A: Local 2017-11- 2017-11- 2018-01- 2017-12- 2018-02- 2018-12- 2018-03- 2018-02- 2018-04- MICROPROJET DES TRAVAUX IDA / 57180 A posteriori Individuel Open 3,000.00 2,587.10 Signé development support 27 27 15 14 05 21 12 21 26 DE REHABILILATION DU TRONCON HOTEL LE SAHEL- MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58621-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2017-11- 2017-11- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-11- 2018-04- IDA / 57180 A posteriori Individuel Open 3,000.00 2,648.73 Signé REHABILILATION DE LA development support 27 28 15 25 05 01 12 19 26 PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) dans la cmne de Pette. CM-CRC EXTREME NORD- 58856-CS-INDV / Sélection d'un consultant pour lEtudes de faisabilité des MP de Construction de 01 Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- IDA / 57180 A posteriori Individuel Open 2,200.00 1,902.66 Achevé batiment abritant le bloc development support 27 08 15 22 05 02 09 16 24 20 opératoire, la salle d'échographie au CMA avec clôture et un bloc de latrine au CMA de Gazawa dans la cmne de Gazawa. CM-CRC EXTREME NORD- 58511-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-07- construction de 01 forage à IDA / 57180 A posteriori Individuel Open 3,000.00 2,596.59 Achevé development support 27 08 15 22 05 02 09 06 24 20 PMH à Yoldé-Naggué à Hodema à Tchakamadjé à Yaga -Djibiwo à Bakourehi cmne de Pette. CM-CRC EXTREME NORD- 58487-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- construction de 01 forage à IDA / 57180 A posteriori Individuel Open 2,400.00 2,089.44 Signé development support 27 08 15 22 05 02 09 09 24 PMH au CES de Guinadji à DJARELOL ALIOUM et un forage solaire au CSI de Djiddéo cmne de MAROUA III. CM-CRC EXTREME NORD- 58620-CS-INDV / Sélection d'un consultant pour etudes Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- de faisabilité des MP de IDA / 57180 A posteriori Individuel Open 1,000.00 3,935.36 Signé development support 27 08 15 15 05 02 09 06 24 Contruction d'un bloc de 2 salles de classe au CES GOBIO dans la cmne de Kalfou. CM-CRC EXTREME NORD- 58492-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de construct d'un forage à PMH Component A: Local 2018-05- 2018-05- 2018-07- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- à Meskina Tifouli à Djabéwal IDA / 57180 A posteriori Individuel Open 4,600.00 3,940.34 Achevé development support 27 08 15 05 02 09 06 24 27 à Gandou Guinane au CES de Zaria à Delta Guibéré et Rehabilitation d'un forage à Djada à Mandara dans la cmne de Kalfou. CM-CRC EXTREME NORD- 58568-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- Construction de 01 forage IDA / 57180 A posteriori Individuel Open 2,400.00 2,439.92 Achevé development support 27 02 15 22 05 02 09 06 24 30 equipé de PMH au CETIC de Tchévi à ZEU à ZOUVOU - YOLDE à DOUVA cmne DE BOURHA(04 MP) CM-CRC EXTREME NORD- 58678-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Rehabilitation de la route Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- Guili-ZEU, construction des IDA / 57180 A posteriori Individuel Open 4,000.00 3,148.29 Achevé development support 27 08 15 15 05 02 09 06 24 30 caniveaux à Bourha (axe Hamadou -ZRA-Bello Hayatou) et Construction des caniveaux à Boukoula face commissariat cmne de Bourha. CM-CRC EXTREME NORD- 58538-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-05- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- construction d'un bloc de 02 IDA / 57180 A posteriori Individuel Open 1,300.00 1,136.88 Achevé development support 27 02 15 24 05 02 09 06 24 30 salles de classe équipées et d'un bloc de latrines à trois compartiments au CETIC de Tchevi cmne de Bourha. Page 10 CM-CRC EXTREME NORD- 58385-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de construct bloc de 02 SC Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 4,750.00 3,128.80 Achevé equipés et d'un bloc de development support 27 08 15 15 05 02 09 04 24 09 latrines à EP KAOSSERE à EP LIOUDE à L'EP B de TOULOUM à L'EP TCHOURA BIZILI à EP SAOTSAI cmne de TOULOUM CM-CRC EXTREME NORD- 58328-CS-INDV / Sélection d'un consultant pour etudes Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- de faisabilité des MP de IDA / 57180 A posteriori Individuel Open 1,000.00 1,394.24 Achevé development support 27 08 15 15 05 02 09 04 24 09 Construction de 01 forage à PMH à L'EP TCHOURA BIZILI cmne de Touloum CM-CRC EXTREME NORD- 58649-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 1,600.00 1,401.01 Achevé construction d'un bloc de 03 development support 27 08 15 22 05 02 09 04 24 09 boutiques au marché centrale de Touloum et 02 boutiques au marché de SAOTSAI 1 CM-CRC EXTREME NORD- 58694-CS-INDV / Sélection d'un consultant pour etudes de faisabilité des MP de Component A: Local 2018-05- 2018-05- 2018-07- 2018-05- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- 2018-12- Construction d'un CSI d'un IDA / 57180 A posteriori Individuel Open 5,600.00 4,897.34 Achevé development support 27 08 15 24 05 02 09 06 24 08 logement d'astreinte et d'un incinerateur et d'un bloc latrine à Danigué et à Nguéring (06 MP) CM-CRC EXTREME NORD- 58325-CS-INDV / sélection d1 consultant pour le suivi/controle des travaux de Construction d'un bloc Component A: Local 2017-09- 2017-09- 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-11- 2018-02- de 02 salles de classe et de IDA / 57180 A posteriori Individuel Limited 6,200.00 5,558.23 Signé development support 12 12 17 12 08 04 12 06 10 latrines à l'EP de Mayel Béi et l'EP de Palaoudi et travaux de construction d'un bloc maternel à EM de Zokok-Laddeo cmne de Maroua 1 CM-CRC EXTREME NORD- 58591-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2019-02- IDA / 57180 A posteriori Individuel Open 3,936.00 3,082.22 Signé TRAVAUX DE development support 02 01 20 16 11 27 15 18 11 REHABILILATION DU TRONCON HOTEL LE SAHEL- MAYO-KALIAO (0,7 KM) cmne DE MAROUA Ier CM-CRC EXTREME NORD- 58842-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-11- 2019-02- Suivi/contrôle des TRAVAUX IDA / 57180 A posteriori Individuel Open 3,802.00 3,274.86 Signé development support 02 03 20 08 11 16 15 29 11 DE REHABILILATION DE LA PISTE SOUKOUDJO- BAGRISSE-FARARE (28 KM) CM-CRC EXTREME NORD- 58553-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- de construction d'un forage IDA / 57180 A posteriori Individuel Open 2,690.00 2,075.63 Signé development support 02 01 20 16 11 27 15 27 13 productif équipé de pompe manuelle à EP Louguéré à EP Ouro Nangué à Fakalao à Hodango CM-CRC EXTREME NORD- 58315-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 3,947.00 2,940.47 Signé 02 salles de classe équipées development support 02 01 20 16 11 27 15 25 13 et construction d'un bloc de latrines à trois compartiment à EP de WOUYANG et à l'EP de GONOZO CM-CRC EXTREME NORD- 58549-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- de Construction d'un atelier IDA / 57180 A posteriori Individuel Open 2,871.00 1,729.69 Signé development support 02 01 20 16 11 27 15 25 13 de maçonnerie au CETIC de Loulou et'un bloc de latrines à trois compartiments au CETIC de Loulou CM-CRC EXTREME NORD- 58669-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction de 02 salles Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- 2019-06- IDA / 57180 A posteriori Individuel Open 8,006.00 4,880.90 Achevé de classe et d'un bloc de development support 02 01 20 16 11 27 15 01 13 18 latrines au Lycée Tech de Gobo, à l'EP de GUIRIOU CENTR, au Lycée de DOM PYA, à la SAR/SM de Gobo dans la cmne de GOBO CM-CRC EXTREME NORD- 58684-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-10- 2019-05- de construction d'un bloc de IDA / 57180 A posteriori Individuel Open 934.00 748.35 Achevé development support 02 01 20 16 11 27 15 01 14 22 latrines a quatre (04) compartiments au marché de GOBO et de NOULDAINA dans la cmne de GOBO CM-CRC EXTREME NORD- 58850-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-09- 2019-03- Suivi/contrôle des Travaux IDA / 57180 A posteriori Individuel Open 660.00 574.90 Achevé development support 02 01 20 16 11 27 15 15 29 01 de construction d'un forage équipé de PMH à l'EP de GUIRIOU CENTRE CM-CRC EXTREME NORD- 58558-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-12- 2018-11- de construction d'un bloc de IDA / 57180 A posteriori Individuel Open 2,002.00 1,433.49 Signé development support 02 03 20 23 11 03 15 27 13 02 salles de classe équipées et d'un bloc de latrines à trois compartiments au CES de Doukroye CM-CRC EXTREME NORD- 58560-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-12- 2018-09- IDA / 57180 A posteriori Individuel Open 643.00 517.42 Signé de construction d'un forage development support 02 03 20 27 11 03 15 18 14 équipé de PMH à l'EP de Daloa (Doukroye) dans la cmne de KAIKAI CM-CRC EXTREME NORD- 58636-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- 2019-05- IDA / 57180 A posteriori Individuel Open 4,013.00 2,853.99 Achevé 02 salles de classe équipées development support 02 01 20 16 11 27 15 01 13 30 et d'un bloc de latrines à trois compartiments à EP de Balane au CES de Sirlawé dans la cmne de KAR-HAY CM-CRC EXTREME NORD- 58634-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un forage Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- équipé de PMH à l'EP de IDA / 57180 A posteriori Individuel Open 3,845.00 2,594.54 Signé development support 02 01 20 16 11 27 15 01 13 Damdama à l'école des parents de Gouloulou à l'EP Balane à l'EP de REY- FOULAYE à l'EP de Sadielle au CES de Sirlawe CM-CRC EXTREME NORD- 58701-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construction d'un bloc de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- IDA / 57180 A posteriori Individuel Open 4,332.00 2,789.46 Signé 02 salles de classe équipées development support 02 01 20 16 11 27 15 17 13 et d'un bloc de latrines à trois compartiments à l'EP de Bihoré à l'EP de Troké dans la, commue de Tchatibali. CM-CRC EXTREME NORD- 58848-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-11- 2018-11- de construction d'un forage IDA / 57180 A posteriori Individuel Open 1,986.00 1,394.73 Signé development support 02 01 20 16 11 27 15 05 13 équipé de PMH à l'EP Saouringwa, à Kada et 'a Glonheme dans la cmne de Tchatibali CM-CRC EXTREME NORD- 58615-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-10- Suivi/contrôle des Travaux IDA / 57180 A posteriori Individuel Open 2,026.00 1,917.50 Signé development support 02 01 20 16 11 27 15 03 14 de construction d'un forage équipé de PMH à Bibalé - Gambour à Goubara à Kassilé CM-CRC EXTREME NORD- 58667-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de réhabilitation de la mare Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-11- de Garey Kaélé, IDA / 57180 A posteriori Individuel Open 2,320.00 1,917.50 Signé development support 02 01 20 23 11 30 15 18 13 Construction d'un forage pastoral à énergie solaire Garey Kaélé et construction d'un forage équipé de PMH à Kassilé dans la commue de Kaele CM-CRC EXTREME NORD- 58555-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de construct de 02 salles Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 7,921.00 5,839.65 Signé de classe équipées et bloc development support 02 01 20 16 11 27 15 15 13 latrines à l'EP de Badjafe, à l'EP de Zouana à l'EP de Tchabeyel et EP de Goudjouing cmne de Kaele. CM-CRC EXTREME NORD- 58641-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-11- 2018-11- de construction de 02 salles IDA / 57180 A posteriori Individuel Open 3,687.00 2,782.38 Signé development support 02 03 20 26 11 03 15 07 13 de classe et d'un bloc de latrines à EP Mayel -Guinadj et 02 salles de classe à l'EP de KALAF cmne de Moutourwa. CM-CRC EXTREME NORD- 58703-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-11- 2018-08- 2018-11- 2018-11- de construction de 01 IDA / 57180 A posteriori Individuel Open 2,696.00 2,086.79 Signé development support 02 03 20 26 11 03 15 19 13 forage équipé de PMH à Ganaha, à EP de Dourloum à EP de KALAF et EP de Mayel- guinadji dans la cmne de moutourwa CM-CRC EXTREME NORD- 58306-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôletravaux de construction de 02 salles de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- 2019-01- classe et d'un bloc de IDA / 57180 A posteriori Individuel Open 2,339.00 1,656.24 Achevé development support 02 01 20 23 11 30 15 25 13 03 latrines à l'EP de GABOUA et Equipements en tables- bancs et bureauxà l'EP de KOZA 1, Koza 2 et Gaboua dans la cmne de KOZA CM-CRC EXTREME NORD- 58522-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-10- Suivi/contrôle des Travaux IDA / 57180 A posteriori Individuel Open 1,596.00 1,391.14 Signé development support 02 01 20 16 11 30 15 15 14 de construction d'un forage équipé de PMH à EM Moskota et à l'EP GOKORO CM-CRC EXTREME NORD- 58708-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de travaux de construction Component A: Local 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-11- 2018-11- IDA / 57180 A posteriori Individuel Open 3,809.00 3,138.14 Signé de 02 salles de classe et development support 02 01 20 23 11 30 15 07 13 d'un bloc de latrines au CETIC D'OUZAL et Construction d'un bloc de deux salles de classe équipées à l'EP KARAZAWA CM-CRC EXTREME NORD- 58298-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2018-08- 2018-11- 2018-09- de construction d'un bloc IDA / 57180 A posteriori Individuel Open 4,136.00 3,312.48 Signé development support 02 01 20 23 11 30 15 07 29 maternelle à EM de MOSKOTA et Construction d'un bloc de salle de classe équipé à l'EP KORSAMBA CM-CRC EXTREME NORD- 58692-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux de Construction d'un bloc de deux salles de classe Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 6,000.00 3,504.25 Signé équipées et d'un bloc development support 02 01 20 23 11 30 15 25 13 latrines a trois compartiments au CES de Mazaya à EP ZELE (Soulédé) (lot01) à EP de Doumbéré(lot02) cmne de ROUA CM-CRC EXTREME NORD- 58291-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des construct de 02 SC equipées Gouvaka Component A: Local 2018-05- 2018-08- 2018-06- 2018-09- 2018-07- 2018-10- 2018-08- 2018-10- 2018-09- Chefferie et équipement IDA / 57180 A posteriori Individuel Open 5,825.00 4,178.33 Signé development support 02 03 20 03 11 16 15 22 29 bureau et construct de 02 SC equipées à L'EP de Majéconstruct de 02 SC equipées et équipement SC existantes à L'EP de Malika CM-CRC EXTREME NORD- 58612-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-11- 2018-10- Suivi/contrôle des Travaux IDA / 57180 A posteriori Individuel Open 1,647.00 1,220.39 Signé development support 02 03 20 06 11 16 15 06 14 de construction d'un forage équipé de PMH à Koulang à Mangavé cmne de MORA CM-CRC EXTREME NORD- 58556-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-10- 2018-11- de construction de 01 IDA / 57180 A posteriori Individuel Open 2,912.00 2,440.77 Signé development support 02 03 20 08 11 16 15 22 13 magasin de stockage de cereale à Sera -Idoumda et de conservation d'oignon àà Kourgui cmne de MORA CM-CRC EXTREME NORD- 58593-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle de Travaux de Construction d'un bloc Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- IDA / 57180 A posteriori Individuel Open 2,409.00 2,085.86 Signé de 02 salles de classe development support 02 01 20 01 11 27 15 14 13 équipées à EP de Gance et d'un bloc de latrines à trois compartiments à L'EP TOLKOMARI cmne de Kolofata CM-CRC EXTREME NORD- 58609-CS-INDV / Selction d un consultant pour le suivi/controle Travaux de Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-11- 2019-08- IDA / 57180 A posteriori Individuel Open 3,990.00 2,789.46 Achevé Construction de deux bloc development support 02 01 20 16 11 27 15 24 13 02 de 02 salles de classe équipées aux CES TOLKOMARI I cmne de Kolofata. CM-CRC EXTREME NORD- 58666-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle de Travaux de Construction d'un forage Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-11- IDA / 57180 A posteriori Individuel Open 3,358.00 2,615.12 Signé équipé de PMH à l'EP GANCE development support 02 01 20 16 11 27 15 16 13 au CES Toltomari et Réalisation d’un forage solaire avec borne fontaine à Kolofata cmne de Kolofata CM-CRC EXTREME NORD- 58646-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-08- 2018-06- 2018-10- 2018-07- 2018-10- 2018-08- 2018-10- 2018-11- 2019-03- de Construction d'un bloc IDA / 57180 A posteriori Individuel Open 5,520.00 3,897.16 Achevé development support 02 03 20 05 11 08 15 12 13 12 de 02 salles de classe équipées s à EP Chéoulew au CES de Makalingaï (lot01)à EP Tazang (lot02) cmne de Tokombere Page 11 CM-CRC EXTREME NORD- 58545-CS-INDV / Sélection d'un Consultant pour le Suivi/contrôle des Travaux Component A: Local 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-10- 2018-10- 2018-12- IDA / 57180 A posteriori Individuel Open 1,226.00 1,420.87 Achevé de Construction de 01 development support 02 01 20 01 11 27 15 22 14 18 forage équipé de PMH à Baka-Fourwa et à Djaltar dans la cmne de Tokombere CM-CRC EXTREME NORD- 58642-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- BLOC DE DEUX SALLES DE IDA / 57180 A posteriori Individuel Open 2,201.00 1,817.81 Signé development support 02 23 20 13 11 20 15 13 13 CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58705-CS-INDV / SUIVI CONTROLE DES TRAVAUX D'AMENAGEMENT D'UNE GARE ROUTIERE PAR LA Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-12- 2019-09- CONSTRUCTION DE 04 IDA / 57180 A posteriori Individuel Open 3,600.00 2,707.83 Achevé development support 02 23 20 13 11 20 15 23 13 08 GUICHETS, 04 MAGASINS, D'UN HANGAR D'ATTENTE ET D'UN BLOC LATRINE AVEC UN MUR D'ENCEINTE DE 130 m A BLANGOUA CM-CRC EXTREME NORD- 58559-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Component A: Local 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- DE CONSTRUCTION D'UN IDA / 57180 A posteriori Individuel Open 1,482.00 856.87 Signé development support 02 23 20 19 11 20 15 27 13 FORAGE EQUIPE DE PMH A la gare routiere de BLANGOUA ET A L'EP DE KOUTOULA DANS LA CMNE DE BLANGOUA CM-CRC EXTREME NORD- 58681-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- 2019-02- DE CONSTRUCTION D'UN IDA / 57180 A posteriori Individuel Open 4,057.00 4,474.93 Achevé development support 02 23 20 13 11 20 15 24 13 02 FORAGE PASTORAL A ENERGIE SOLAIRE A KARENA ET A NAGA DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58838-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN BLOC DE DEUX SALLES DE Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- 2019-07- CLASSE EQUIPE ET D'UN IDA / 57180 A posteriori Individuel Open 3,756.00 3,047.10 Achevé development support 02 23 20 16 11 20 15 03 13 05 BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP HILELLE ) ET CONSTRUCTION D'UN HANGAR AU MARCHE DE GOULFEY GANA cmne DE GOULFEY CM-CRC EXTREME NORD- 58567-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- 2019-10- CONSTRUCTION DE 04 IDA / 57180 A posteriori Individuel Open 3,656.00 2,698.86 Achevé development support 02 23 20 16 11 20 15 17 13 11 GUICHETS, 04 MAGASINS, D’UN HANGAR D’ATTENTE, 02 BOUTIQUES ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE DE 90 m A GOULFEY cmne DE GOULFEY CM-CRC EXTREME NORD- 58594-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 A posteriori Individuel Open 2,087.00 853.74 Signé FORAGE EQUIPES DE POMPE development support 02 23 20 13 11 20 15 27 13 A MOTRICITE HUMAINE A MOUGALAM,A TAWOULWEBE ET A L'EP HILELE cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58565-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 A posteriori Individuel Open 2,477.00 1,859.26 Signé BLOC DE DEUX SALLES DE development support 02 23 20 11 20 15 22 13 CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS A L’EP GONONI CM-CRC EXTREME NORD- 58519-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- IDA / 57180 A posteriori Individuel Open 2,163.00 853.74 Signé FORAGE EQUIPE DE POMPE A development support 02 23 20 13 11 20 15 27 13 MOTRICITE HUMAINE A MAFOULSO III, A FAMARE ET A L'EP DE GONONI cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58608-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTIOND’UNE Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- MINI AEP PASTORAL EQUIPE IDA / 57180 A posteriori Individuel Open 4,043.00 3,065.26 Signé development support 02 23 20 13 11 20 15 27 13 DE DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A ABASSOUNI, A DOLE BADA cmne DE HILE ALIFA CM-CRC EXTREME NORD- 58557-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- BLOC DE DEUX SALLES DE IDA / 57180 A posteriori Individuel Open 2,350.00 1,735.98 Signé development support 02 23 20 16 11 20 15 24 13 CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS AU CES D'ADJAÏNE A HILE HAOUSSA cmne DE KOUSSERI CM-CRC EXTREME NORD- 58569-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-12- 2018-11- IDA / 57180 A posteriori Individuel Open 1,975.00 1,629.76 Signé DE CONSTRUCTION D'UN development support 02 23 20 16 11 20 15 03 13 HANGAR AVEC BLOC LATRINE AU MARCHE DE BIAMO, cmne DE MAKARI CM-CRC EXTREME NORD- 58691-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2018-11- 2019-07- IDA / 57180 A posteriori Individuel Open 2,201.00 1,629.76 Achevé BLOC DE DEUX SALLES DE development support 02 23 20 16 11 20 15 24 13 20 CLASSE EQUIPE ET D'UN BLOC DE LATRINES A TROIS COMPARTIMENTS A L'EP DE MALTAM cmne DE MAKARI CM-CRC EXTREME NORD- 58495-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DEs MP D'INSTALLATION Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-10- IDA / 57180 A posteriori Individuel Open 2,017.00 0.00 Annulé D'ECLAIRAGE PUBLIC (10 development support 02 20 11 15 14 KITS)AVEC ENERGIE SOLAIRE DE L'AXE MAIRIE DE HILE ALIFA-BRIGADE DE GENDARMERIE DE HILE CM-CRC EXTREME NORD- 38340-CS-INDV / Suivi/contrôle des Travaux construction d'un forage Component A: Local 2017-11- 2018-02- 2017-12- 2017-12- 2018-01- 2018-04- équipé de PMH dans les IDA / 57180 A posteriori Individuel Limited 3,477.00 0.00 Annulé development support 27 05 02 23 27 27 localités de Kaliao, Goulmoyo, Mbozo Mofou, Balewa et Manguirdla (Lot1) COMMUNE DE MERI CM-CRC EXTREME NORD- 38342-CS-INDV / Suivi/contrôle technique et environnemental des travaux de construction d'un forage équipé de PMH Component A: Local 2017-11- 2018-02- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-04- IDA / 57180 A posteriori Individuel Limited 6,954.00 5,699.52 Signé dans les localités de Kaliao, development support 27 05 02 28 23 04 27 06 27 Goulmoyo, Mbozo Mofou, Balewa et Manguirdla, Moundour Foulbé, Dogba Maliki, Magawa, Houloum et Tchaki djébé Commune de MERI CM-CRC EXTREME NORD- 83169-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-06- 2018-10- 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-10- 2018-11- 2019-12- IDA / 57180 A posteriori Individuel Open 4,500.00 3,858.02 Achevé environnementales des MP development support 15 08 03 26 24 27 28 27 12 19 d'électrification de la localité de Dargala centre- Lycée de Dargala et Dargala- Hodande Commune de Dargala. CM-CRC EXTREME NORD- 83165-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-06- 2018-10- 2018-08- 2018-10- 2018-08- 2018-10- 2018-09- 2018-10- 2018-11- 2018-12- construction d'un (01) IDA / 57180 A posteriori Individuel Open 3,500.00 3,542.39 Achevé development support 15 08 03 25 24 27 28 27 12 19 forage à PMH à Dargala- Centre à Hardéo-Golo à Yonkolel à Toupouré- Sirataré à Wirdiwo à Ouro- Domayo à Ouro-Hitgo Commune de Dargala. CM-CRC EXTREME NORD- 83171-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2019-01- IDA / 57180 A posteriori Individuel Open 4,000.00 4,048.44 Achevé environnementales des MP development support 15 08 03 25 24 27 28 29 14 03 de Rehabilitation des routes dans les quartiers de Wourndé II, III, VI long d'environ 3 km Commune de Maroua II. CM-CRC EXTREME NORD- 83155-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-12- 2019-03- 2019-01- IDA / 57180 A posteriori Individuel Open 4,000.00 4,223.60 Achevé environnementales des MP development support 15 08 03 25 24 27 28 06 14 03 d'extension du réseau électrique dans les quartiers de Wourndé II, III, VI Commune de Maroua II. CM-CRC EXTREME NORD- 83158-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 A posteriori Individuel Open 1,600.00 1,709.83 Achevé environnementales des MP development support 15 10 03 26 24 27 28 29 14 22 de Construction d’une aire d’abattage d’un bloc latrines et d’un forage à Doursoungo Commune de Maroua III. CM-CRC EXTREME NORD- 83143-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-02- 2018-11- IDA / 57180 A posteriori Individuel Open 3,000.00 3,570.54 Achevé d'éclairage public à energie development support 15 08 03 24 24 27 28 29 27 08 solaire dans les localités de Mindif, Ouro Bouné, Modjombodi, Djodjong et Djouta Wade Commune de Mindif CM-CRC EXTREME NORD- 83159-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilitédes MP de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- construction et équipement IDA / 57180 A posteriori Individuel Open 5,000.00 5,149.62 Achevé development support 15 08 03 26 24 27 28 29 14 08 d'un CSI à Hoppo et fourniture en équipement dans les CSI de Mindif de Modjombodi de Maoundine et de Mogom Commune de Mindif. CM-CRC EXTREME NORD- 83145-CS-INDV / Sélection d'1 consultant pour EF des MP de Construction d'1 bloc de 02 salles classe et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- d'1 bloc de latrines à EP IDA / 57180 A posteriori Individuel Open 5,400.00 5,984.42 Achevé development support 15 10 03 25 24 27 28 27 14 23 Rebede au CES de Dongrosse au CES de Soueye,à EP Mbiteu à EP Lobokri à EP SAIGA et équipements à l'EP Danhou Commune de Dziguilao. CM-CRC EXTREME NORD- 83147-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- IDA / 57180 A posteriori Individuel Open 1,200.00 2,665.22 Achevé environnementales des MP development support 15 08 03 23 24 27 28 23 14 23 de construction d'un (01) forage à PMH à l’EP de SAIGA et de Lobokri dans la Commune de Dziguilao. . CM-CRC EXTREME NORD- 83160-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité de Construction Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- IDA / 57180 A posteriori Individuel Open 3,369.00 3,040.99 Signé d'un bloc de 02 salles de development support 15 08 03 26 24 27 28 28 14 classe équipées et d'un bloc de latrines à EP Guidima, à EP Kankrwa, à EP Golonpoui dans la Commune de Datcheka. CM-CRC EXTREME NORD- 83188-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- construction d'1 forage à IDA / 57180 A posteriori Individuel Open 3,500.00 3,625.14 Achevé development support 15 08 03 27 24 27 28 27 14 27 PMH à EP Kankrwa, à EP Golonpoui, à l'abattoir du marché de Zouaye, à Gaï Gaï, à Tining, à Tibali et à Lara dans la Commune de Datcheka. CM-CRC EXTREME NORD- 83167-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- faisabilité techniques et IDA / 57180 A posteriori Individuel Open 1,130.00 1,519.93 Achevé development support 15 08 03 26 24 27 28 29 14 27 environnementales des MP de construction d'un abattoir au marché de Zouaye Commune de Datcheka. CM-CRC EXTREME NORD- 83151-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2019-12- Construction d'un bloc de IDA / 57180 A posteriori Individuel Open 4,500.00 4,385.81 Achevé development support 15 10 03 26 24 27 28 27 14 12 deux salles de classe équipées au CES d'Agolla, au CES de Dabaye, au CES de Widigue, au CETIC de Vele et au Lycée de Kartoua Commune de Gueme. CM-CRC EXTREME NORD- 83168-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 A posteriori Individuel Open 1,900.00 1,910.99 Achevé environnementales des MP development support 15 10 03 26 24 27 28 29 14 12 de Construction d'un hangar au marché de Dabaye et d'un bloc de latrines VIP au marché de Gabaraye commune de Gueme. CM-CRC EXTREME NORD- 83191-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- faisabilité techniques et IDA / 57180 A posteriori Individuel Open 1,900.00 1,909.51 Achevé development support 15 08 03 26 24 27 28 29 14 12 environnementales des MP de Construction d'une boucherie et d'un hangar au marché de Vele commune de Gueme. Page 12 CM-CRC EXTREME NORD- 83148-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-12- 2019-03- 2018-12- d'extention de l'électricité IDA / 57180 A posteriori Individuel Open 6,000.00 5,903.98 Achevé development support 15 08 03 26 24 27 28 06 14 14 dans la localité de Maga et electrification du marché de Guirvidig des quartiers environnant et de la localité de Yanga Commune de Maga. CM-CRC EXTREME NORD- 83187-CS-INDV / Sélection d'1 consultant élaboration des EF des MP Construction d'1 bloc de 02 salles de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- classe équipées et 01 bloc IDA / 57180 A posteriori Individuel Open 5,600.00 4,723.18 Achevé development support 15 08 03 25 24 27 28 29 14 15 latrines à EP Djenreng à EP Djarwar à EP Vaidou à EP Waimou à EP Bigdi à EP Guidoua à EP Goulourgou au CES de Kamargui Commune Wina. CM-CRC EXTREME NORD- 83153-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-11- construction de 01 forage à IDA / 57180 A posteriori Individuel Open 2,400.00 3,469.96 Achevé development support 15 08 03 25 24 27 28 29 14 15 énergie solaire au CSI de Bosgoye d’01 forage pastoral à énergie solaire à Djongdong et d’un forage à PMH à EP Vaidou Comune de Wina CM-CRC EXTREME NORD- 83156-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-05- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-09- 2018-07- 2018-10- faisabilité techniques et IDA / 57180 A posteriori Individuel Open 2,400.00 4,853.80 Signé development support 27 08 15 26 05 02 09 06 24 environnementales des MP de contruction d’un mini AEP aux CSI de Danigué et Nguéring Commune de Guere. CM-CRC EXTREME NORD- 83184-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-12- 2018-10- 2018-12- 2018-10- 2019-01- 2018-10- 2019-03- 2018-12- IDA / 57180 A posteriori Individuel Open 3,000.00 3,037.47 Achevé environnementales des MP development support 15 08 03 26 24 27 28 29 14 07 de construction de 04 blocs de 10 boutique et Construction de latrines VIP au marché de HINA CM-CRC EXTREME NORD- 83185-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- environnementales des MP IDA / 57180 A posteriori Individuel Direct 1,600.00 1,633.42 Signé development support 15 11 25 13 15 18 20 06 03 de Construction d'un bloc de deux salles de classe équipées et un bloc latrines a trois compartiments à Magala-Djamene Commune Darak. CM-CRC EXTREME NORD- 83146-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- faisabilité techniques et IDA / 57180 A posteriori Individuel Direct 3,700.00 3,357.24 Signé development support 15 11 25 18 15 25 20 25 03 environnementales des MP d'electrification en énergie solaire de l'auberge municipal et hôtel de ville de Darak CM-CRC EXTREME NORD- 83164-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- 2018-12- Construction d'1 bloc de IDA / 57180 A posteriori Individuel Direct 5,000.00 6,462.69 Achevé development support 15 11 25 17 15 18 20 05 03 14 deux salles de classe équipées et un bloc latrines à EP DEGA, à EP GADAFAI, à EP NIGUE et à EP WAROU I Commune Fotokol. CM-CRC EXTREME NORD- 83190-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 A posteriori Individuel Direct 3,000.00 2,685.79 Signé Construction d’un (01) development support 15 11 25 25 15 25 20 25 03 forage PMH dans les lotalités de Amssadeck, de Barkari II, de Djabrari, de Haigayo II Commune Fotokol. CM-CRC EXTREME NORD- 83142-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- 2018-12- Construction d'un bloc de IDA / 57180 A posteriori Individuel Direct 2,500.00 3,277.70 Achevé development support 15 01 25 11 15 18 20 05 03 14 deux salles de classe équipées et un bloc latrines a trois compartiments à EP WAROU II et à EP OH HAMADIE Commune Fotokol. CM-CRC EXTREME NORD- 83149-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité des MP de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 A posteriori Individuel Direct 3,000.00 2,685.79 Signé Construction d’un (01) development support 15 11 25 11 15 18 20 23 03 forage PMH dans les lotalités de Kabetoua, de OH Isseini, de Warou II et de Worokaime Commune Fotokol. CM-CRC EXTREME NORD- 83152-CS-INDV / Sélection d'1 consultant pour l'élaboration des EF des MP de Construction d'1 bloc de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- deux salles de classe IDA / 57180 A posteriori Individuel Direct 3,800.00 5,427.12 Signé development support 15 11 25 11 15 18 20 05 03 équipées et 01 bloc latrines à EP DAVA à EP Kabéla et à EP Beré et fourniture en equipement pour les EP Commune Logone-Birni. CM-CRC EXTREME NORD- 83141-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques des Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2019-10- 2018-12- 2018-11- 2019-02- MP de Construction d’un IDA / 57180 A posteriori Individuel Direct 4,200.00 5,091.18 Signé development support 15 11 25 11 15 18 20 06 03 (01) forage PMH dans les lotalités de Ounangaré de Ngada I de Ngada II de Michiska Mousgoum de Marafine I de SHI commune de Logone-Birni CM-CRC EXTREME NORD- 83162-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- faisabilité techniques et IDA / 57180 A posteriori Individuel Direct 1,600.00 1,678.62 Signé development support 15 11 25 17 15 18 20 06 03 environnementales des MP de Construction d'un magasin de stockage de cereale à Zigagué Commune de Waza CM-CRC EXTREME NORD- 83150-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 A posteriori Individuel Direct 2,400.00 2,280.74 Signé environnementales des MP development support 15 11 25 11 15 18 20 31 03 de Construction d’un (01) forage PMH dans les lotalités de Ndiguina, de Malia et de Mada 1 Commune de Waza CM-CRC EXTREME NORD- 83140-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2019-02- IDA / 57180 A posteriori Individuel Direct 4,000.00 5,913.04 Signé environnementales des MP development support 15 11 25 11 15 13 20 16 03 de construction d’une mini approvisionement en eau potable à Zigagué Commune de Waza CM-CRC EXTREME NORD- 83154-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2019-02- environnementales des MP IDA / 57180 A posteriori Individuel Direct 2,000.00 2,044.34 Signé development support 15 11 25 11 15 18 20 06 03 de Construction d'un bloc de deux salles de classe équipées et un bloc latrines a trois compartiments à EP de Davagang Commune Zina. CM-CRC EXTREME NORD- 83161-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité techniques et Component A: Local 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-02- IDA / 57180 A posteriori Individuel Direct 2,400.00 2,182.21 Signé environnementales des MP development support 15 11 25 25 15 25 20 25 03 de Construction d’un (01) forage PMH dans les lotalités de ZAMA et de Gadabou Commune de ZINA CM-CRC EXTREME NORD- 58303-CS-INDV / Sélection d'un Consultant pour le Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-09- IDA / 57180 A posteriori Individuel Open 1,735.00 0.00 Annulé Suivi/contrôle des Travaux development support 02 20 11 15 29 Construction d'une clôture à EM de MOZOGO CM-CRC EXTREME NORD- 58550-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE CONSTRUCTION D’UNE MINI Component A: Local 2018-05- 2018-06- 2018-07- 2018-08- 2018-10- AEP PASTORAL EQUIPE DE IDA / 57180 A posteriori Individuel Open 2,004.00 0.00 Annulé development support 02 20 11 15 14 DEUX ABREUVOIRS, D’UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A MAGALAKABIR, DANS LA CMNE DE DARAK CM-CRC EXTREME NORD- 58544-CS-INDV / SUIVI/CONTROLE CONSTRUCTION D'UN FORAGE EQUIPE DE POMPE A MOTRICITE HUMAINE AU Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-11- IDA / 57180 A posteriori Individuel Open 4,382.00 0.00 Annulé CES D'ADJAINE ET D'UNE development support 02 23 20 11 15 13 MINI AEP PASTORAL EQUIPE DE DEUX ABREUVOIRS, D'UNE POMPE IMMERGEE A ENERGIE PHOTOVOLTAÏQUE A LACTA 1, MASSAKI CM-CRC EXTREME NORD- 58518-CS-INDV / SELECTION CONSULTANT SUIVI/CONTROLE TRAVAUX DE CONSTRUCTION D'UN Component A: Local 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-11- IDA / 57180 A posteriori Individuel Open 2,090.00 0.00 Annulé FORAGES EQUIPES DE POMPE development support 02 23 20 11 15 13 A MOTRICITE HUMAINE A MASSIO-GOURGOURA, A NAGA NDIGUINI, A EP MALTAM. cmne DE MAKARI CM-CRC EXTREME NORD- 111116-CS-INDV / suivi controle des travaux de construction d'un bloc de 02 Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-10- 2019-12- IDA / 57180 A posteriori Individuel Open 1,986.00 2,044.34 Signé salles de classe équipé et development support 03 17 22 11 12 05 16 09 15 d'un bloc de latrines au CETIC de Tchévi dans la commune de Bourha CM-CRC EXTREME NORD- 111253-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2020-03- 2019-12- construction d'un forage IDA / 57180 A posteriori Individuel Open 2,617.00 2,253.55 Signé development support 03 17 22 24 12 05 16 02 15 PMH au CETIC de Tchévi, à Zouvou- yolde à DOUVA et à ZEU dans la commune de Bourha CM-CRC EXTREME NORD- 111266-CS-INDV / suivi controle des travaux de construction des caniveaux Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-08- 2019-09- 2019-10- 2019-12- IDA / 57180 A posteriori Individuel Open 2,774.00 2,545.59 Signé en BA à Bourha (axe development support 03 17 22 24 12 05 16 09 15 Hamadou -ZRA-Bello Hayatou) et à Boukoula face commissariat ( dans la Commune de Bourha CM-CRC EXTREME NORD- 111262-CS-INDV / suivi controle des travaux de construction de 2 blocs de 10 boutiques au marché de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-11- 2020-01- IDA / 57180 A posteriori Individuel Open 10,360.00 13,312.67 Signé HINA cote A l1 et development support 03 17 22 24 12 01 16 15 14 construction de 2 blocs de 10 boutiques au marché de HINA et latrines vip au marché de HINA cote B lot (02), commune de HINA. CM-CRC EXTREME NORD- 111341-CS-INDV / suivi controle des travaux de construction de 01 forage à Component A: Local En cours 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- PMH à Yoldé-Naggué, à IDA / 57180 A posteriori Individuel Open 4,014.00 0.00 development support d'exécution 03 06 22 12 16 15 Tchakamadjé, Yaga djibiwo, à Bakourebi (Abba wollo) Toukou mayel(Ouro-Bedem) et à MAYA ,commune de Pétté CM-CRC EXTREME NORD- 111359-CS-INDV / suivi controle des travaux de construction d'un mini Component A: Local En cours 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- IDA / 57180 A posteriori Individuel Open 2,094.00 0.00 adduction d'eau à energie development support d'exécution 03 06 22 12 16 15 photovoltaique pour usage agricole a fadare dans la commune de pette CM-CRC EXTREME NORD- 111337-CS-INDV / suivi controle des travaux de construction d'un bloc de deux salles de classe Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2020-01- IDA / 57180 A posteriori Individuel Open 8,296.00 8,954.03 Signé équipées et d'un bloc de development support 03 17 22 24 12 25 16 15 14 latrines à trois compartiments à EP SAIGA, EP LOBOKRI, EP MBITEU et CES SOUEYE dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111334-CS-INDV / suivi controle des travaux de construction d'un bloc de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- IDA / 57180 A posteriori Individuel Open 1,900.00 1,678.62 Signé deux salles de classe development support 03 17 22 24 12 28 16 06 15 équipées et d'un bloc latrine à trois compartiments à l'EP de Ligazang, commune de Mindif CM-CRC EXTREME NORD- 111352-CS-INDV / suivi controle des travaux de construction et équipement d'un csi avec incinerateur et Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2020-01- latrines à MATFAI, et IDA / 57180 A posteriori Individuel Open 7,281.00 5,108.10 Signé development support 03 17 22 24 12 05 16 06 14 Fourniture en mobilier et petit materiel sanitaire de CSI de Mindif, de Modjombodi, de Maoudine et de Mogom dans la commune de Mindif CM-CRC EXTREME NORD- 111263-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-11- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2019-12- construction d'un forage IDA / 57180 A posteriori Individuel Open 1,524.00 1,702.70 Signé development support 03 25 22 24 12 22 16 06 15 pastoral a energie photovoltaique au marché à bétail à Moulvoudaye CM-CRC EXTREME NORD- 111348-CS-INDV / suivi controle des travaux d'aménagement du marché à bétail en contruisant un Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2020-01- IDA / 57180 A posteriori Individuel Open 2,245.00 2,000.67 Signé parc à betail une cloture un development support 03 17 22 24 12 22 16 06 14 quai d'embarquement et un bloc latrine a trois compartiments dans la Commune de Moulvoudaye. CM-CRC EXTREME NORD- 111264-CS-INDV / suivi controle des travaux de construction de 02 SDC et de latrines à EP KAOSSERE, à Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2020-01- l'EP Ticheeo Kolandi à l'EP IDA / 57180 A posteriori Individuel Open 9,364.00 4,784.86 Signé development support 03 17 22 24 12 28 16 25 14 Tchoura-Bizili et de SDC à EPB Touloum et de 2 SDC AVEC BUREAUX A L’EPP SAOTSAI.Commune de Touloum Page 13 CM-CRC EXTREME NORD- 111272-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- construction de 01 forage à IDA / 57180 A posteriori Individuel Open 2,034.00 1,699.43 Signé development support 03 17 22 24 12 05 16 06 15 PMH à Gai gai, à EP Golonpoui et à EP Kankwa, dans la commune de Datcheka CM-CRC EXTREME NORD- 111265-CS-INDV / suivi controle des travaux de construction d'un bloc de 02 Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-12- 2019-12- salles de classe équipées et IDA / 57180 A posteriori Individuel Open 5,988.00 4,866.93 Signé development support 03 17 22 24 12 06 16 06 15 avec un bloc de latrines à trois compartiments à EP Golonpoui , EP Kankrwa et EP Guidima , dans la commune de Datcheka CM-CRC EXTREME NORD- 111236-CS-INDV / suivi controle des travaux de construction d'un bloc de deux salles de classe Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- IDA / 57180 A posteriori Individuel Open 7,041.00 10,911.03 Signé équipées au CETIC de Vélé, development support 03 17 22 24 12 24 16 18 15 au CES de Widigue (lot01), au CES de Dabaye et au CES d'Agolla, (lot02) dans la commune de Guémé CM-CRC EXTREME NORD- 111273-CS-INDV / suivi controle des travaux de construction d'un hangar 52 Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- places au marché de IDA / 57180 A posteriori Individuel Open 2,706.00 3,058.97 Signé development support 03 17 22 24 12 23 16 05 15 Gabaraye et suivi controle des travaux de construction d'un bloc de latrines au marché de Gabaraye, commune de Guémé CM-CRC EXTREME NORD- 111252-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-07- 2019-07- 2019-10- 2019-08- 2019-11- 2019-09- 2020-01- 2020-01- construction d'un centre de IDA / 57180 A posteriori Individuel Open 5,098.00 3,615.78 Signé development support 03 24 22 29 12 05 16 06 14 santé intégré équipé et un bloc de latrines au CSI à Nguéring, commune de Gueré CM-CRC EXTREME NORD- 111335-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- IDA / 57180 A posteriori Individuel Open 1,308.00 1,678.62 Signé construction d'un bloc de 05 development support 03 17 22 24 12 23 16 05 15 boutiques au marché d'Ardaf Commune de Guere CM-CRC EXTREME NORD- 111277-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- 2019-09- 2019-11- 2019-12- 2020-01- CONSTRUCTION DEUX IDA / 57180 A posteriori Individuel Open 2,787.00 2,182.21 Achevé development support 03 17 22 24 12 28 16 09 15 22 BLOCS DE CINQ (05) BOUTIQUES AU MARCHÉ DE KALFOU, DANS LA COMMUNE DE KALFOU CM-CRC EXTREME NORD- 111340-CS-INDV / suivi controle des travaux de construction d'un forage équipé de pompe à Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-12- 2019-12- IDA / 57180 A posteriori Individuel Open 2,696.00 2,375.46 Signé motricité humaine à Gandou development support 03 17 22 24 12 05 16 06 15 Golopo, au CES de Zaria, à Djada, réhabilitation d'un forage PMH à Delta Guibéré et Mandara, dans la commune de Kalfou CM-CRC EXTREME NORD- 111338-CS-INDV / suivi controle des travaux de construction d'un bloc de 02 salles de classe équipées et Component A: Local 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2019-11- 2019-09- 2019-11- 2020-01- IDA / 57180 A posteriori Individuel Open 9,791.00 82,526.23 Signé d'un bloc de latrines à development support 03 17 22 24 12 08 16 06 14 troiscompartiments au CES Kamargui, à EP Goulourgou , EP Bigi, EP de Djenreng et EP Waimou commune de wina CM-CRC EXTREME NORD- 111256-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-10- 2019-07- 2019-11- 2019-11- construction d'un hangar de IDA / 57180 A posteriori Individuel Open 3,051.00 3,357.24 Signé development support 01 17 20 24 10 23 15 05 12 28 places et d'une boucherie au marché de Veleé, dans la commune de Guémé CM-CRC EXTREME NORD- 111346-CS-INDV / suivi controle des travaux Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-12- 2019-07- 2019-12- 2019-10- d'éclairage public à energie IDA / 57180 A posteriori Individuel Open 762.00 923.86 Signé development support 01 17 20 24 10 05 15 06 13 solaire de 07 poteaux solaires dans le centre urbain de vele Commune GUEME CM-CRC EXTREME NORD- 111351-CS-INDV / suivi controle des travaux de Component A: Local En cours 2019-04- 2021-01- 2019-05- 2019-06- 2019-07- 2019-10- construction de 01 forage à IDA / 57180 A posteriori Individuel Open 1,524.00 0.00 development support d'exécution 01 07 20 10 15 13 énergie solaire à CSI de Bosgoye, dans la commune de Wina CM-CRC EXTREME NORD- 111361-CS-INDV / suivi controle des travaux de construction 02 salles de classe et de latrines à l'EP Component A: Local 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- 2019-07- 2019-07- 2019-08- 2019-10- IDA / 57180 A posteriori Individuel Open 3,862.00 3,886.40 Signé BIJE construction de 2 development support 01 17 20 24 10 30 15 02 13 salles de classeà EPPB de TOKOMBERE et equipement CES de makilingaidans la commune de Tokombere CM-CRC EXTREME NORD- 111326-CS-INDV / suivi controle des travaux de construction d'un bloc de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- IDA / 57180 A posteriori Individuel Open 2,692.00 2,517.93 Achevé deux salle de classe équipés development support 01 08 20 06 10 16 15 25 13 25 et d'un bloc latrines à Magala Djamene dans la commune de Darak CM-CRC EXTREME NORD- 111332-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- IDA / 57180 A posteriori Individuel Open 762.00 839.08 Achevé construction de 01 forage development support 01 08 20 07 10 16 15 21 13 17 PMH à Magala Djamene, dans la commune de Darak CM-CRC EXTREME NORD- 111257-CS-INDV / suivi controle des travaux de construction d'un bloc de deux salles de classe Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019-11- IDA / 57180 A posteriori Individuel Open 9,077.00 10,679.58 Signé équipées et d'un bloc de development support 01 08 20 07 10 16 15 10 12 latrines à trois compartiments à EP GADAFAI, au Lycée de Fotokol à EP Magadji et à EP de GUEGUERI, commune de Fotokol CM-CRC EXTREME NORD- 111345-CS-INDV / suivi Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-07- 2019-10- 2019-07- controle des travaux de IDA / 57180 A posteriori Individuel Open 1,372.00 1,184.55 Achevé development support 01 08 20 08 10 16 15 02 13 02 construction d'un magasin de stockage à Goulfey CM-CRC EXTREME NORD- 111330-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- IDA / 57180 A posteriori Individuel Open 1,921.00 1,687.46 Signé construction d'une mini AEP development support 01 08 20 07 10 16 15 25 13 pastorale à énergie solaire à fadja commune de Hilé Alifa CM-CRC EXTREME NORD- 111342-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-10- 2019-07- construction de 01 forage IDA / 57180 A posteriori Individuel Open 1,981.00 2,531.19 Achevé development support 01 08 20 08 10 16 15 27 13 05 PMH à Michiska Mousgoum, OUNANGARE et NGADA, dans la commune de Logone Birni CM-CRC EXTREME NORD- 111258-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-09- 2019-10- IDA / 57180 A posteriori Individuel Open 1,921.00 2,531.19 Signé construction d'un magasin development support 01 08 20 07 10 16 15 21 13 de stockage à zigague, dans la commune de Waza CM-CRC EXTREME NORD- 111356-CS-INDV / suivi controle des travaux de Component A: Local 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-07- 2019-10- IDA / 57180 A posteriori Individuel Open 2,034.00 2,328.61 Signé construction d'un forage development support 01 08 20 07 10 16 15 19 13 PMH à malia, NDIGUINA et MADA dans la commune de Waza CM-CRC EXTREME NORD- 83186-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de Component A: Local 2018-10- 2018-12- 2018-12- 2019-01- 2019-03- faisabilité techniques et IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé development support 15 03 24 28 14 environnementales des MP de Construction d'un centre multimédia à Dziguilao dans la Commune de Dziguilao CM-CRC EXTREME NORD- 111318-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2019-11- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 A posteriori Individuel Open 610.00 0.00 Annulé development support 03 25 22 12 16 15 équipé de pompe à motricité humaine a Djafgadjie, commue de yagoua CM-CRC EXTREME NORD- 111349-CS-INDV / suivi controle des travaux de construction D’UN BLOC DE Component A: Local 2019-06- 2019-11- 2019-07- 2019-08- 2019-09- 2020-01- DEUX SALLES DE CLASSE IDA / 57180 A posteriori Individuel Open 3,871.00 0.00 Annulé development support 03 25 22 12 16 14 AVEC BUREAUX EQUIPES au CES de DJOGOIDI et au lycee de Vounaloum Commune de yagoua CM-CRC EXTREME NORD- 111370-CS-INDV / Sélection d'un consultant pour l'élaboration des Component A: Local 2018-10- 2019-11- 2018-12- 2018-12- 2019-01- 2019-02- Etudes de faisabilité IDA / 57180 A posteriori Individuel Open 2,200.00 0.00 Annulé development support 15 25 03 24 28 27 techniques et environnementales de CONSTRUCTION D'UN BLOC DE MATERNITÉ ÉQUIPÉ AU CMA DE GAZAWA CM-CRC EXTREME NORD- 111234-CS-INDV / Sélection d'un consultant pour l'élaboration des Component A: Local 2019-01- 2020-01- 2019-02- 2019-03- 2019-04- 2019-05- Etudes de faisabilité IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé development support 02 06 20 13 17 17 techniques et environnementales d'un microprojet de construction d'un parc à bétail dans la commune de WINA CM-CRC EXTREME NORD- 111353-CS-INDV / suivi controle des travaux de construction d'un CSI équipé Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2020-01- IDA / 57180 A posteriori Individuel Open 6,096.00 0.00 Annulé avec case d'astreinte, un development support 03 04 22 12 16 14 incinérateur et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111235-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local 2019-04- 2020-03- 2019-05- 2019-06- 2019-07- 2019-08- techniques et IDA / 57180 A posteriori Individuel Open 2,400.00 0.00 Annulé development support 01 04 20 10 15 29 environnementales de construction d'un forage agricole à énergie solaire à Doumer et d'un construction d'un forage à énergie solaire à Djaodé CM-CRC EXTREME NORD- 111344-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 A posteriori Individuel Open 615.00 0.00 Annulé development support 03 04 22 12 16 15 équipé de PMH à lycee bilingue dans la commue de Kaele CM-CRC EXTREME NORD- 111350-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2021-01- 2019-07- 2019-08- 2019-09- 2019-12- construction d’un forage à IDA / 57180 A posteriori Individuel Open 1,178.00 0.00 Annulé development support 03 06 22 12 16 15 énergie solaire avec château au centre de santé de Djiddéo, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 111357-CS-INDV / suivi Component A: Local 2019-04- 2020-03- 2019-05- 2019-06- 2019-07- 2019-10- controle des travaux de IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé development support 01 04 20 10 15 13 réalisation d'un parc à bétail dans la commune de Wina (GP) CM-CRC EXTREME NORD- 111347-CS-INDV / suivi controle des travaux de Component A: Local 2019-06- 2020-03- 2019-07- 2019-08- 2019-09- 2019-11- construction d'un forage IDA / 57180 A posteriori Individuel Open 630.00 0.00 Annulé development support 03 04 22 12 16 15 équipé de pompe à motricité humaine à Bindiriel Danghou, commue de Tchatibali CM-CRC EXTREME NORD- 196621-CS-INDV / Suivi controle des travaux de Construction d'un CSI Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-06- IDA / 57180 A posteriori Individuel Open 4,838.00 0.00 équipé avec un incinérateur development support d'exécution 30 06 27 17 21 21 et un bloc de latrines au CSI Djiddeo Garre, dans la commune de Maroua 3 CM-CRC EXTREME NORD- 196857-CS-INDV / Suivi controle des travaux de Construction et équipement Component A: Local En cours 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- IDA / 57180 A posteriori Individuel Direct 1,829.00 0.00 des blocs des salles de development support d'exécution 30 26 18 09 13 13 classes et d'un bloc de latrines au CES de GUINADJI Commune de Maroua III CM-CRC EXTREME NORD- 196547-CS-INDV / Suivi controle des travaux de Construction D’UN FORAGE Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- PASTORAL A ENERGIE IDA / 57180 A posteriori Individuel Open 1,662.00 0.00 development support d'exécution 30 06 27 17 21 22 SOLAIRE EQUIPE D’UN FORAGE ET DE (02) ABREUVOIRS DANS LA LOCALITE DE DJONGDONG, COMMUNE DE WINA, CM-CRC EXTREME NORD- 196622-CS-INDV / Suivi controle des travaux de CONSTRUCTION D’UN Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- FORAGE PASTORAL A IDA / 57180 A posteriori Individuel Open 1,600.00 0.00 development support d'exécution 30 06 27 17 21 22 ENERGIE SOLAIRE EQUIPE D’UN château ET DE (02) ABREUVOIRS DANS LA LOCALITE DEMIZILING WAILA MAYO, COMMUNE DE GAZAWA CM-CRC EXTREME NORD- 196544-CS-INDV / Suivi controle des travaux deTravaux d'Eclairage public Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- en énergie solaire de 10 IDA / 57180 A posteriori Individuel Open 3,566.00 0.00 development support d'exécution 30 06 27 17 21 22 poteaux à Ndoukoula de 14 poteaux à Dagaï Kola et de 15 poteaux à Loulou Commune de Ndoukoula CM-CRC EXTREME NORD- 196628-CS-INDV / Suivi controle des travaux de Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un bloc de IDA / 57180 A posteriori Individuel Open 1,752.00 0.00 Annulé development support 30 26 18 08 12 13 deux salles de classe équipées au lycee de Goundaye Commune de Dziguilao. CM-CRC EXTREME NORD- 196564-CS-INDV / Suivi controle des travaux de Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un bloc de IDA / 57180 A posteriori Individuel Open 1,805.00 0.00 development support d'exécution 30 06 27 17 21 22 deux salles de classe équipées à l'EP de ZANYAO Commune de YAGOUA CM-CRC EXTREME NORD- 196526-CS-INDV / Suivi controle des travaux de construction d’un forage Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- équipé de pompe à IDA / 57180 A posteriori Individuel Open 3,238.00 0.00 development support d'exécution 30 06 27 17 21 22 motricité humaine à Dinao, Louggol palé, Kodadjiho, Hamadalao et Golombeswé Commune KALFOU CM-CRC EXTREME NORD- 196638-CS-INDV / Suivi controle des travaux de Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- Construction d'un forage IDA / 57180 A posteriori Individuel Open 1,295.00 0.00 development support d'exécution 30 06 27 17 21 22 équipé de PMH à douang et dingue-Gabaraye Commune de Gueme Page 14 CM-CRC EXTREME NORD- 196889-CS-INDV / Suivi controle des travaux d'eclairage public par la Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-02- fourniture et l'installation de IDA / 57180 A posteriori Individuel Open 1,295.00 0.00 development support d'exécution 30 06 18 08 12 21 12 poteaux solaires de l’axe Sous-préfecture- Ngaoundéréo Commune de Kalfou CM-CRC EXTREME NORD- 196540-CS-INDV / Suivi controle des travaux de Construction d'un bloc de deux salle de classe Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- équipées à l'EPB DE MADA IDA / 57180 A posteriori Individuel Open 3,810.00 0.00 development support d'exécution 30 06 27 17 21 22 KOLKOCH ET A LEP MAMBEZA et Construction d'un bloc de latrines à l'EPB DE MADA KOLKOCH ET Commune de Tokombere CM-CRC EXTREME NORD- 196623-CS-INDV / Suivi controle des TRAVAUX D’AMENAGEMENT D’UNE GARE ROUTIERE PAR LA Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- CONSTRUCTION DE 04 IDA / 57180 A posteriori Individuel Open 3,810.00 0.00 development support d'exécution 30 06 27 17 21 22 GUICHETS, 04 MAGASINS, D’UN HANGAR D’ATTENTE ET D’UN BLOC LATRINE AVEC UN MUR D’ENCEINTE COMMUNE DE YAGOUA CM-CRC EXTREME NORD- 196853-CS-INDV / Suivi contrôle de la fourniture en en equipement en 200 Component A: Local 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- IDA / 57180 A posteriori Individuel Direct 445.00 0.00 Annulé tables bancs, 4 bureaux, 4 development support 30 30 18 09 13 13 chaises rembourées et 4 armoires à l'EP MAGA IIB Commune de Maga. CM-CRC EXTREME NORD- 196553-CS-INDV / Suivi controle des travaux d'Eclairage public par la Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-05- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 fourniture et l'installation de development support d'exécution 30 06 27 17 21 22 3 poteaux solaires à Ouro Bone et 03 à Modjombodi Commune de Mindif CM-CRC EXTREME NORD- 196619-CS-INDV / Suivi controle des travaux de Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Construction d’un forage development support d'exécution 30 06 27 17 21 22 PMH au centre de santé de Djiddéo Commune de Maroua III CM-CRC EXTREME NORD- 196626-CS-INDV / Suivi controle des travaux de Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Construction d'un forage development support d'exécution 30 06 27 17 21 22 équipé de PMH de Yonkolel Commune de Dargala. CM-CRC EXTREME NORD- 196535-CS-INDV / Suivi controle des travaux de Construction d'un forage Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- équipé de PMH à lalepaki et IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 development support d'exécution 30 06 27 17 21 22 Acquisition d’une caisse à outils pour l’entretien des forages dans la commune de Commune de Touloum CM-CRC EXTREME NORD- 196576-CS-INDV / Suivi controle des travaux de fourniture et installation Component A: Local En cours 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-02- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 d’un kit solaire pour development support d'exécution 30 25 27 17 21 27 l’alimentation en energie électrique du lycée de gabaraye. Commune Gueme. CM-CRC EXTREME NORD- 196627-CS-INDV / Suivi controle des travaux de Component A: Local En cours 2020-10- 2021-01- 2020-12- 2021-01- 2021-02- 2021-04- Construction d'un forage IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 development support d'exécution 30 06 27 17 21 22 équipé de pompe à motricité humaine à Guermé Kalfou Commune de Kalfou CM-CRC EXTREME NORD- 196845-CS-INDV / Suivi contrôle de la fourniture en Equipement en 60 tables Component A: Local 2020-10- 2020-11- 2020-11- 2020-12- 2021-01- 2021-04- bancs et un bureau à l'EP IDA / 57180 A posteriori Individuel Direct 1,000.00 0.00 Annulé development support 30 26 18 09 13 13 Guinlaye et 111 tables bancs et un bureau à l'EP BOGO SIRATARE I Commune de BOGO CM-CRC EXTREME NORD- 204438-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 3,800.00 0.00 de Construction de salles de development support d'exécution 16 21 12 16 02 classe équipées dans le complexe d'écoles publiques Grpe 1, 2, 3 et 4 de Fotokol, commune fotokol. CM-CRC EXTREME NORD- 204457-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En cours 2020-11- 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Limited 4,200.00 0.00 development support d'examen 16 13 21 12 16 02 de travaux Rénovation et équipement du CMA de Fotokol Commune de FOTOKOL CM-CRC EXTREME NORD- 204439-CS-INDV / Elaboration des Etudes de faisabilité des MP de Construction d’un forage Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 3,400.00 0.00 équipé de pompe à development support d'exécution 16 21 12 16 02 motricité humaine à Mada (Ngroh), à Goura 2, à Labado, à Chou et réhabilitation d’un forage à Mada 1 Commune de Makary CM-CRC EXTREME NORD- 204435-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-01- IDA / 62240 A posteriori Individuel Limited 2,200.00 0.00 environnementales des MP development support d'exécution 16 21 12 16 19 de Construction d’une mini AEP au camp des réfugiés d’Afadé Commune de Makary CM-CRC EXTREME NORD- 204447-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- de Construction d’un bloc IDA / 62240 A posteriori Individuel Limited 2,400.00 0.00 development support d'exécution 16 21 12 16 02 de deux salles de classe équipées avec bloc latrines à l’EP de Djamous à l’EP BODO (1 ET 2) et à l'EP BIAMO Commune de Makary CM-CRC EXTREME NORD- 204456-CS-INDV / Elaboration des Etudes de faisabilité des MP de Construction d’un bloc de Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- deux salles de classe IDA / 62240 A posteriori Individuel Limited 3,000.00 0.00 development support d'exécution 16 21 12 16 02 équipées dans les EP gpe 1A, 1B et Construction d’un bloc maternel à l’école maternelle de Logone Birni Commune de Logone Birni CM-CRC EXTREME NORD- 204441-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 3,000.00 0.00 de Construction et development support d'exécution 16 21 12 16 02 équipement d’une salle d’hospitalisation et bloc opératoire au CMA de Logone birni Commune de Logone Birni CM-CRC EXTREME NORD- 204443-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Direct 1,600.00 0.00 development support d'exécution 16 26 17 21 07 d'Equipement et fourniture de médicaments aux CSI de Zizagué et CSI de Waza Commune de waza CM-CRC EXTREME NORD- 204436-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Limited 1,600.00 0.00 development support d'exécution 16 21 12 16 02 de Construction d’un forage équipé de PMH à Tagawa Y/C etude complementaire Commune de Waza CM-CRC EXTREME NORD- 204381-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 1,600.00 0.00 environnementales des MP development support d'exécution 16 21 12 25 11 d'Alimentation en énergie solaire du CSI de Kossa Commune de Mora CM-CRC EXTREME NORD- 204454-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Direct 1,300.00 0.00 development support d'exécution 16 26 17 21 07 de Equipement et fourniture de médicaments au CSI de Kossa et au CSI de Méhé Emma Commune de Mora CM-CRC EXTREME NORD- 204455-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 2,900.00 0.00 de Construction d’un forage development support d'exécution 16 21 12 16 02 équipé de PMH à Yémé, Dandaya, à Koldima, Madina et au Camp des réfugiés de Méhé Emma Commune de Mora CM-CRC EXTREME NORD- 204445-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Limited 2,200.00 0.00 development support d'exécution 16 21 12 16 02 de Construction d’un bloc de deux salles équipées à l’EP d’Igawa et kotcherehe Commune de Mora CM-CRC EXTREME NORD- 204444-CS-INDV / Elaboration des Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- IDA / 62240 A posteriori Individuel Limited 3,600.00 0.00 Construction d’un bloc de development support d'exécution 16 21 12 16 02 02 salles de classe à EPB Kosséhone, à EP NDROCK Tourou, EP de Wandaï Commune de Mokolo CM-CRC EXTREME NORD- 204458-CS-INDV / suivi- contrôle des travaux de construction d’un bloc de Component A: Local En cours 2020-11- 2021-01- 2020-12- 2020-12- 2021-01- 2021-05- IDA / 62240 A posteriori Individuel Limited 2,285.71 0.00 deux salles de classe development support d'exécution 26 06 01 22 26 26 équipées avec bloc latrines à à l’EP d’Afadé Groupe 2 Commune Makary CM-CRC EXTREME NORD- 204386-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-02- IDA / 62240 A posteriori Individuel Limited 1,800.00 0.00 environnementales des MP development support d'exécution 16 21 05 09 23 de Construction d'un bloc de CSI au CSI de kossehone Commune de Mokolo CM-CRC EXTREME NORD- 204453-CS-INDV / Elaboration des Etudes de faisabilité techniques et Component A: Local En attente 2020-11- 2020-11- 2020-12- 2021-01- 2021-03- environnementales des MP IDA / 62240 A posteriori Individuel Limited 2,600.00 0.00 development support d'exécution 16 21 12 16 02 deConstruction de 01 forage à Zamai, à EP FERDE, à Kosséhone et à Ldendeng Commune de Mokolo CM-CRC EXTREME NORD- 196625-CS-INDV / Suivi contrôle de la fourniture en Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé en Équipement en matériel development support 30 25 27 17 21 22 médicaux au CSI de Takreo yoldeo Commune Kar Hay CM-CRC EXTREME NORD- 196620-CS-INDV / Suivi controle des travaux de Component A: Local 2020-10- 2020-11- 2020-12- 2021-01- 2021-02- 2021-04- REALISATION D’UN FORAGE IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé development support 30 25 27 17 21 22 EQUIPE DE POMPE A MOTRICITE HUMAINE A Dolgaye Commune Kar Hay CM-CRC EXTREME NORD- 222830-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 A posteriori Individuel Open 3,600.00 0.00 techniques et development support d'exécution 08 27 17 22 05 environnementales des MP d'Alimentation en énergie solaire au CMA de de Fotokol Commune de Fotokol (A101201) CM-CRC EXTREME NORD- 222746-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 A posteriori Individuel Open 3,600.00 0.00 techniques et development support d'exécution 08 27 17 22 05 environnementales des MP de construct d’une mini AEP au cma de Logone birni Commune de Logone birni (A101201) CM-CRC EXTREME NORD- 222774-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 A posteriori Individuel Open 3,000.00 0.00 techniques et development support d'exécution 08 27 17 22 05 environnementales des MP d'Alimentation en énergie solaire au cma de Logone birni Commune de Logone birni (A101201) CM-CRC EXTREME NORD- 222796-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 A posteriori Individuel Open 1,300.00 0.00 techniques et development support d'exécution 08 27 17 22 05 environnementales des MP construct d’un bloc de 02 salles de classe à EP mokola djavdjaya Commune de Mokolo (A101201) CM-CRC EXTREME NORD- 222805-CS-INDV / Sélection d'un consultant pour l'élaboration des Etudes de faisabilité Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-09- IDA / 62240 A posteriori Individuel Open 1,800.00 0.00 techniques et development support d'exécution 08 27 17 22 05 environnementales des MP deconstruct de 01 forage À Zamai, à ferdé et Ldendeng Commune de Mokolo (A101201) CM-CRC EXTREME NORD- 222751-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- construct et équipement IDA / 62240 A posteriori Individuel Open 6,095.00 0.00 development support d'exécution 08 27 17 22 19 d’une salle d’hospitalisation et d'un bloc opératoire au CMA de Logone birni Page 15 CM-CRC EXTREME NORD- 222781-CS-INDV / suivi controle des travaux de construct d’1 bloc maternel et latrines à EM Logone Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 5,940.00 0.00 birni et Réhabilitation de 6 development support d'exécution 08 27 17 22 19 salles de classe avec bureau attenant et équipement a EP Logone birni GPE 1 A Commune de Logone birni CM-CRC EXTREME NORD- 222801-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2022-01- construct et équipement IDA / 62240 A posteriori Individuel Open 6,095.00 0.00 development support d'exécution 08 27 17 22 18 d’une salle d’hospitalisation et d'un bloc opératoire au CMA de Fotokol CM-CRC EXTREME NORD- 222786-CS-INDV / suivi controle des travaux de construct de 4 salles de classe équipées avec 2 Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 9,145.00 0.00 bureau à EP Fotokol et development support d'exécution 08 27 17 22 19 construct de 4 salles de classe équipées avec 2 bureau et de 3 blocs de latrines à EP Fotokol Commune de Fotokol CM-CRC EXTREME NORD- 222787-CS-INDV / suivi controle des travaux de construct de deux blocs de deux salles de classe Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- équipées, d'un bloc de deux IDA / 62240 A posteriori Individuel Open 6,505.00 0.00 development support d'exécution 08 27 17 22 19 salles de classe équipées avec bureau pour enseignants et d'un bloc latrines a trois compartiments à EP de BIAMO Commune de Makary CM-CRC EXTREME NORD- 222777-CS-INDV / suivi controle des construct de 6 SDC équipées avec bureau et latrines à EP de BIAMO Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- construct de 2 SDC avec IDA / 62240 A posteriori Individuel Open 4,910.00 0.00 development support d'exécution 08 27 17 22 19 bureau a EP GRP 2 de BODO, construct de 2 SDC avec bureau et latrines a EP de DJAMOUS Commune de Makary CM-CRC EXTREME NORD- 222823-CS-INDV / suivi controle des travaux de construct d’un forage équipé de pompe à Component A: Local En cours 2021-04- 2021-05- 2021-06- 2021-07- 2021-08- IDA / 62240 A posteriori Individuel Open 2,925.00 0.00 motricité humaine à Mada development support d'exécution 08 27 17 22 03 (Ngroh), à Goura 2 (Mosquée), à Labado, à Chou et réhabilitation d’un forage à Mada 1 (quartier Sara) Commune de Makary CM-CRC EXTREME NORD- 222826-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 1,520.00 0.00 construct d’une mini AEP au development support d'exécution 08 27 17 22 19 camp des réfugiés d’Afadé Commune de Makary CM-CRC EXTREME NORD- 222762-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-10- IDA / 62240 A posteriori Individuel Open 1,000.00 0.00 construct d’un forage development support d'exécution 08 27 17 22 20 équipé de PMH à Tagawa Commune de Waza CM-CRC EXTREME NORD- 222808-CS-INDV / suivi controle des travaux de réalisation d’un forage productif équipé de pompe à motricité humaine dans Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 3,875.00 0.00 les localités de : YEME, development support d'exécution 08 27 17 22 19 DANDAYA, KOLDIMA, MADJINA et MEHE EMMA (Camp refugié) dans la Commune de Mora, Département du Mayo Sava. CM-CRC EXTREME NORD- 222824-CS-INDV / suivi controle des de construct d’1 logement d'astreint et d'un mur de cloture à l’EP Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 7,930.00 0.00 IGAWA MEME,et de development support d'exécution 08 27 17 22 19 construct de 4 salles de classe équipées avec 1 bureau attenant et de latrines à l’EP de KOTCHEREHE Commune de Mora CM-CRC EXTREME NORD- 222799-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE construct D’UN BLOC DE DEUX SALLES DE CLASSE EQUIPEES AVEC BUREAU ET Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- D’UN BLOC LATRINE A IDA / 62240 A posteriori Individuel Open 7,575.00 0.00 development support d'exécution 08 27 17 22 19 TROIS COMPARTIMENTS A L’EPB DE KOSSEHONE, L'EP WANDAI ET L'EP NDROCK DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO-TSANAGA. CM-CRC EXTREME NORD- 222768-CS-INDV / Suivi contrôle des travaux de construct de 01 forage à Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- IDA / 62240 A posteriori Individuel Open 2,685.00 0.00 Zamai, à Ldagodja-Tourou, development support d'exécution 08 27 17 22 19 à Ngolkodjala-Kosséhone et à Wandaï-djamboutou Commune de Mokolo CM-CRC EXTREME NORD- 222737-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE construct ET Component A: Local En attente 2021-04- 2021-05- 2021-06- 2021-07- 2021-11- EQUIPEMENT DU CENTRE DE IDA / 62240 A posteriori Individuel Open 6,095.00 0.00 development support d'exécution 08 27 17 22 19 SANTE INTEGRE A KOSSEHONE DANS LA COMMUNE DE MOKOLO, DEPARTEMENT DU MAYO- TSANAGA. CM-CRC EXTREME NORD- 222987-CS-INDV / Suivi contrôle des Travaux de Component A: Local En attente 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- Construction de 01 forage IDA / 57180 A posteriori Individuel Open 1,371.00 0.00 development support d'exécution 05 23 14 18 17 à énergie solaire au CSI de hile haoussa, dans la commune de kousseri (A2031C1) CM-CRC EXTREME NORD- 228207-CS-INDV / Suivi contrôle des travaux de construction d'un bloc Component A: Local En attente 2021-05- 2021-06- 2021-07- 2021-08- 2021-10- IDA / 62240 A posteriori Individuel Open 1,000.00 0.00 latrines a troix development support d'exécution 05 23 14 18 17 compartiement et construction d'un incinerateur au CSI de hile haoussa dans la Commune de kousseri CM-CRC EXTREME NORD- 222755-CS-INDV / suivi controle des travaux de FOURNITURE ET INSTALLATION D’UNE MINI Component A: Local En attente 2021-06- 2021-07- 2021-08- 2021-09- 2022-01- IDA / 62240 A posteriori Individuel Open 2,275.00 0.00 CENTRALE SOLAIRE AU CSI development support d'exécution 01 20 10 14 12 DE KOSSA, DANS LA COMMUNE DE MORA, DEPARTEMENT DU MAYO- SAVA, REGION DE L’EXTREME – NORD. CM-CRC EXTREME NORD- 243905-CS-INDV / Etudes de faisabilité des MP de Construct d'1 forage PMH à l'EP de LAFIA à l'EP de Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- GOULOUADMA à BILE- IDA / 62240 A posteriori Individuel Open 4,200.00 0.00 development support d'exécution 10 27 03 05 20 MOUSGOUM à l'EP de ZIGAGUE à l'EP de TAGAWA II et à EP SAOUDE et Construct d’une mini AEP au CSI DE BILE Commune de Waza CM-CRC EXTREME NORD- 243903-CS-INDV / Etudes de faisabilité des MP de RACCORDEMENT AU RESEAU Component A: Local En attente 2021-08- 2021-09- 2021-09- 2021-10- 2021-11- IDA / 62240 A posteriori Individuel Open 1,200.00 0.00 D'AEP de l'EP de WAZA development support d'exécution 10 05 12 10 24 PLATARI ET DE l'EP de WAZA GII à l’EM de WAZA Commune de Waza CM-CRC EXTREME NORD- 243909-CS-INDV / Etudes de faisabilité des MP de Construct de 02 salles de classes équipées et de Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- latrines à l'EP de MICHIDIRE IDA / 62240 A posteriori Individuel Open 3,000.00 0.00 development support d'exécution 10 27 03 06 21 à EP SAOUDE à l'EP de GOULOUADMA à l'EP de BILE et Construct d’un bloc de maternelle à l’EM de WAZA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243928-CS-INDV / Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 3,700.00 0.00 de Construct d’un CSI avec development support d'exécution 10 27 03 05 20 équipement à BILE ET CLOTURE DU CMA DE WAZA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243927-CS-INDV / Etudes de faisabilité techniques et Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- environnementales des MP IDA / 62240 A posteriori Individuel Open 1,900.00 0.00 development support d'exécution 10 27 03 05 20 d'Alimentation du CMA de WAZA en Energie Solaire COMMUNE DE WAZA CM-CRC EXTREME NORD- 243728-CS-INDV / Etudes de faisabilité des MP de realisation d'un forage Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-05- IDA / 62240 A posteriori Individuel Open 1,600.00 0.00 equipé de PMH À development support d'exécution 10 28 19 23 22 AMTCHOUKOULI 1 À AMTCHOUKOULI 2 ET À GADAFAI COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243767-CS-INDV / ETUDES DE FAISABILITÉ DES MP DE CONSTRUCT DE 2 SALLES DE CLASSE AVEC BLOC LATRINE À HAIGAYO , TRAVAUX DE Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-01- IDA / 62240 A posteriori Individuel Open 2,400.00 0.00 CONSTRUCT D’UN BLOC DE development support d'exécution 10 28 19 23 07 DEUX SALLES DE CLASSE AVEC BLOC LATRINE À BELGUEDE ET FOURNITURE 60 TABLES BANCS À L’EP DE FOTOKOL COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243917-CS-INDV / Etudes de faisabilité techniques et environnementales des Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 2,000.00 0.00 MPDE Construct D'un BLOC development support d'exécution 10 27 03 05 20 DE DEUX SALLES D’OBSERVATION ET EQUIPEMENT DU CSI DE SAGME Commune de Fotokol CM-CRC EXTREME NORD- 243920-CS-INDV / Etudes de faisabilité techniques et environnementales des MP de Construct d’un forage Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 2,500.00 0.00 équipé PMH à Bangalia à development support d'exécution 10 27 03 05 20 Zimado doctori à EP Maham à l'EP Ngolaké à l’EM de Logone Birni à l’EP de Kabo Commune de Logone Birni CM-CRC EXTREME NORD- 243948-CS-INDV / Etudes des MP de Construct de 2 salles de classe équipées à l’EP de Ngolake et à l’EP de Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- Nkidam, Construct de 2 IDA / 62240 A posteriori Individuel Open 3,400.00 0.00 development support d'exécution 10 27 03 05 20 salles de classe équipées à l’EP de Ngambaro- mousgoum et à l’EP de TILDE LOGONE et Équipement tables bancs à l’EP de Gambarou Mouskoum CM-CRC EXTREME NORD- 243951-CS-INDV / Etudes de faisabilité techniques et environnementales des MP d'Équipement en 120 tables Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- bancs et en 4 bureaux IDA / 62240 A posteriori Individuel Open 2,100.00 0.00 development support d'exécution 10 27 03 05 20 maîtres à l’EP Ounangaré à l’EP Zimado 3 et équipement au CSI de Zimado au CSI de Houlouf au CSI de Dabanga au CMA de Logone birni CM-CRC EXTREME NORD- 243935-CS-INDV / Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- de Construct d’un forage IDA / 62240 A posteriori Individuel Open 1,500.00 0.00 development support d'exécution 10 27 03 05 20 équipé de PMH à l’EP de DJAMOUS à l’EP de MBLAME à AMBIRTCHA-Glao Commune de Makary CM-CRC EXTREME NORD- 243924-CS-INDV / Etudes de faisabilité techniques et Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- environnementales des MP IDA / 62240 A posteriori Individuel Open 2,500.00 0.00 development support d'exécution 10 27 03 05 20 de Construct équipement du CSI de MADA Commune de Makary CM-CRC EXTREME NORD- 243943-CS-INDV / Etudes des MP de Construct de 2 salles équipées et de latrines à l’EPG2 MAKARY ET Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- Cloture de l'EP G1 IDA / 62240 A posteriori Individuel Open 2,400.00 0.00 development support d'exécution 10 27 03 05 20 Acquisition en tables bancs à l’EPG2 ET l’EPG1 de MAKARY Construct de 2 salles équipées avec bureaux et de latrines à l’EP MBLAME Commune de Makary CM-CRC EXTREME NORD- 243908-CS-INDV / Etudes de faisabilité techniques et Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- environnementales des MP IDA / 62240 A posteriori Individuel Open 1,600.00 0.00 development support d'exécution 10 26 02 05 20 d'électrification A ENERGIE SOLAIRE du CSI DE MADA Commune de Makary CM-CRC EXTREME NORD- 243912-CS-INDV / Etudes de faisabilité techniques et environnementales des MP Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- de FOURNITURE EN IDA / 62240 A posteriori Individuel Open 1,200.00 0.00 development support d'exécution 10 27 03 11 26 EQUIPEMENT DES TABLES BANCS ET BUREAUX A EP DOULOU EP SAVA ET EP MOUVANE COMMUNE DE MORA CM-CRC EXTREME NORD- 243879-CS-INDV / Etudes des MP de Construct d'une mini AEP à énergie solaire à Tchakramari et realisation Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- d'un forage PMH à IDA / 62240 A posteriori Individuel Open 3,600.00 0.00 development support d'exécution 10 28 19 23 23 Kangaléri-modou-tidjani 1 à Kangaléri-modou-tidjani 2 à Kangaléri-modou- tidjani 3 et à Kangaléri- blama-ousman Commune de MORA CM-CRC EXTREME NORD- 243913-CS-INDV / Etudes de faisabilité techniques et Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- environnementales des MP IDA / 62240 A posteriori Individuel Open 3,000.00 0.00 development support d'exécution 10 27 03 05 20 de Construct d'un CSI équipé AU CSI DE AISSA HARDE Commune de Mora CM-CRC EXTREME NORD- 243949-CS-INDV / Etudes de faisabilité des MP de Construct d'1 bloc de 2 salles équipées avec latrines à l'EP OURO TADA au CES Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 4,200.00 0.00 DE GAWAR à l'EP DZAVAYA- development support d'exécution 10 27 03 05 20 MOKOLA à l'EP Mayo-Laddé (GAWAR) à l'EP LDAMTSAI et Construct d'1 bloc de 2 salles équipées à l'EP BAWADA Cne mokolo Page 16 CM-CRC EXTREME NORD- 243945-CS-INDV / Etudes de faisabilité des MP de Construct d'1 forage équipé de PMH à LDAGODJA au CAMP DEPLACE/REFUGIE DE Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- IDA / 62240 A posteriori Individuel Open 4,000.00 0.00 OURO TADA à MOHOUR CSI development support d'exécution 10 27 03 05 20 à MBIKEM à WOULER - MENDEZE à l'EP Mayo-Laddé (GAWAR) à l'EP DE LDAMTSAI à CES DE GAWAR AR) Commune de Mokolo CM-CRC EXTREME NORD- 243939-CS-INDV / Etudes de faisabilité techniques et Component A: Local En attente 2021-08- 2021-08- 2021-09- 2021-09- 2021-10- environnementales des MP IDA / 62240 A posteriori Individuel Open 3,000.00 0.00 development support d'exécution 10 27 03 05 20 de Construct d’un centre de sante intégré à Lamdtsai Commune de Mokolo CM-CRC EXTREME NORD- 243853-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- Construct d'un bloc de deux IDA / 62240 A posteriori Individuel Open 4,623.00 0.00 development support d'exécution 10 28 19 23 23 salles de classe équipées a l'EP grp 1 B de logone birni Commune de Logone Birni CM-CRC EXTREME NORD- 243809-CS-INDV / suivi controle des travaux de Construct d’un forage Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- IDA / 62240 A posteriori Individuel Open 3,050.00 0.00 équipé PMH à Mlari à l’EP development support d'exécution 10 28 19 23 23 Zimado I à l’EP Kalkoussam au CSI de Kalakafra à Gawapata Commune de Logone Birni CM-CRC EXTREME NORD- 243779-CS-INDV / suivi controle des travaux Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- d'électrification A ENERGIE IDA / 62240 A posteriori Individuel Open 3,050.00 0.00 development support d'exécution 10 28 19 23 23 SOLAIRE du CMA de Logone birni Commune de Logone Birni CM-CRC EXTREME NORD- 243741-CS-INDV / suivi controle des travaux de Construct d’un bloc de 02 salles de classes equipées Component A: Local En attente 2021-08- 2021-09- 2021-10- 2021-11- 2022-03- IDA / 62240 A posteriori Individuel Open 9,450.00 0.00 de tables bancs et d'un bloc development support d'exécution 10 28 19 23 23 latrines à l'EP de ZIGAGUE à l'EP de WAZA PLATARI à l'EP de WAZA GII et à l'EP de MALIA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243848-CS-INDV / suivi controle de realisation d'1 forage PMH à LAYOUNA à SALE à Samke à Batkouna à l'EP de MICHIDIRE à l'EP de Component A: Local En attente 2021-09- 2021-10- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 9,900.00 0.00 MALIA à l'EP de LAFIA à l'EP development support d'exécution 07 26 16 21 20 de GOULOUADMA à BILE- MOUSGOUM à l'EP de ZIGAGUE à l'EP de TAGAWA II à TAGAWA et à EP SAOUDE Commune de Waza CM-CRC EXTREME NORD- 243826-CS-INDV / suivi controle de la Construct 2 salles de classe équipées à l’EP de Ngolake et à l’EP de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- Nkidam à l’EP de Ngambaro- IDA / 62240 A posteriori Individuel Open 9,280.00 0.00 development support d'exécution 15 03 24 29 28 mousgoum et à l’EP de TILDE LOGONE et équipement en tables bancs à l’EP de Gambarou Mouskoum Commune de Logone Birni CM-CRC EXTREME NORD- 243830-CS-INDV / suivi controle des travaux de Construct d’un forage Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- équipé PMH à Bangalia à IDA / 62240 A posteriori Individuel Open 3,655.00 0.00 development support d'exécution 15 03 24 29 28 Zimado doctori à EP Maham à l'EP Ngolaké à l’EM de Logone Birni à l’EP de Kabo Commune de Logone Birni CM-CRC EXTREME NORD- 243804-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE REALISATION D'UN Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- FORAGE EQUIPÉ DE PMH À IDA / 62240 A posteriori Individuel Open 2,055.00 0.00 development support d'exécution 15 03 24 29 28 AMTCHOUKOULI 1 À AMTCHOUKOULI 2 ET À GADAFAI COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243781-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE Construct D'1 BLOC DE 2 SALLES DE CLASSE AVEC BLOC LATRINES À HAIGAYO Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 5,180.00 0.00 , Construct DE 2 SALLES DE development support d'exécution 15 03 24 29 28 CLASSE AVEC BLOC LATRINES À BELGUEDE ET FOURNITURE DE TABLES BANCS À L’EP DE FOTOKOL COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243822-CS-INDV / SUIVI CONTROLE DES TRAVAUX Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-04- D'ALIMENTATION EN IDA / 62240 A posteriori Individuel Open 2,665.00 0.00 development support d'exécution 01 18 04 12 12 ÉNERGIE SOLAIRE AU CMA DE DE FOTOKOL COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243832-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE Construct D'UN BLOC DE Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-05- IDA / 62240 A posteriori Individuel Open 3,810.00 0.00 DEUX SALLES development support d'exécution 15 03 24 29 28 D’OBSERVATION ET EQUIPEMENT DU CSI DE SAGME COMMUNE DE FOTOKOL CM-CRC EXTREME NORD- 243869-CS-INDV / suivi controle des travaux de Construct de deux bloc de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- deux salles équipées et d'un IDA / 62240 A posteriori Individuel Open 4,835.00 0.00 development support d'exécution 15 03 24 29 28 bloc de latrine à trois compartiments (03) à l’EP Bilingue de MAKARY Commune de Makary CM-CRC EXTREME NORD- 243775-CS-INDV / suivi controle des travaux de Construct de deux bloc de deux salles équipées et d'un Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- bloc de latrine à trois IDA / 62240 A posteriori Individuel Open 4,835.00 0.00 development support d'exécution 15 03 24 29 28 compartiments (03) à l’EP NGOUMA (lot 02) et Construct de la clôture de l’EPG3 de MAKARY . Commune de Makary CM-CRC EXTREME NORD- 243864-CS-INDV / suivi controle des travaux de Construct d’un forage équipé de PMH à l’EPB de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 3,655.00 0.00 MAKARY à l’EP de NGOUMA development support d'exécution 15 03 24 29 28 à l’EPG1 de BODO à l’EP de DJAMOUS à l’EP de MBLAME à AMBIRTCHA-Glao Commune de Makary CM-CRC EXTREME NORD- 243770-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 9,600.00 0.00 Construct équipement et development support d'exécution 15 03 24 29 28 cloture du CSI de MADA Commune de Makary CM-CRC EXTREME NORD- 243824-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- Construct de la clôture du IDA / 62240 A posteriori Individuel Open 7,680.00 0.00 development support d'exécution 15 03 24 29 28 CSI de BIAMO du CSI de NGOUMA et du CSI de BODO Commune de Makary CM-CRC EXTREME NORD- 243802-CS-INDV / suivi controle des travaux deRACCORDEMENT AU Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-03- IDA / 62240 A posteriori Individuel Open 1,145.00 0.00 RESEAU D'AEP de l'EP de development support d'exécution 15 03 24 29 29 WAZA PLATARI ET DE l'EP de WAZA GII à l’EM de WAZA Commune de Waza CM-CRC EXTREME NORD- 243835-CS-INDV / suivi controle des travaux deConstruct d’un bloc de 02 salles de classes équipées Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 9,920.00 0.00 de tables bancs et d'un bloc development support d'exécution 15 03 24 29 28 latrines à l'EP de MICHIDIRE à EP SAOUDE à l'EP de GOULOUADMA à l'EP de BILE COMMUNE DE WAZA CM-CRC EXTREME NORD- 243859-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 2,800.00 0.00 Construct d’un bloc de development support d'exécution 15 03 24 29 28 maternelle à l’EM de WAZA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243860-CS-INDV / suivi controle des travaux de Construct d'un bloc de 02 salles de classe équipées Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-01- (60 tables bancs et 02 IDA / 62240 A posteriori Individuel Open 6,855.00 0.00 development support d'exécution 15 03 24 29 10 bureau de Maître) et latrines à 03 compartiments à l’EP de Homaka à l’EP de Magrari à l’EP de Djoundé dans la Commune de Mora CM-CRC EXTREME NORD- 243761-CS-INDV / SUIVI CONTROLE DES TRAVAUX DE Construct DE 02 SALLES DE CLASSE ÉQUIPÉES ET LATRINES À L’EP DE KASSA- Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- WARA ET À L’EP DE WARBA IDA / 62240 A posteriori Individuel Open 6,215.00 0.00 development support d'exécution 15 03 24 29 28 DANS LA COMMUNE DE MORA ET FOURNITURE EN TABLES BANCS ET BUREAUX A EP DOULOU EP SAVA ET EP MOUVANE COMMUNE DE MORA CM-CRC EXTREME NORD- 243844-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 1,905.00 0.00 Construct d'une mini AEP à development support d'exécution 15 03 24 29 28 énergie solaire à Tchakramari Commune de MORA CM-CRC EXTREME NORD- 243736-CS-INDV / suivi controle de la realisation d'1 forage PMH à Kangarwa à Kangaléri-modou-tidjani 1, Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 6,400.00 0.00 2,3 à l'EP DE HOUMAKA, L'EP development support d'exécution 15 03 24 29 28 DE MAGRARI A L'EP DE KASSAWARA et à Kangaléri- blama-ousman Commune de MORA CM-CRC EXTREME NORD- 243870-CS-INDV / suivi controle des travaux de Construct d'un bloc de deux Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- salles équipées avec latrines IDA / 62240 A posteriori Individuel Open 9,145.00 0.00 development support d'exécution 15 03 24 29 28 à l'EP OURO TADA au CES DE GAWAR à l'EP DZAVAYA- MOKOLA à l'EP Mayo-Laddé (GAWAR) Commune de Mokolo CM-CRC EXTREME NORD- 243865-CS-INDV / suivi controle des travaux de Construct d'un bloc de deux salles équipées avec bureau Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- IDA / 62240 A posteriori Individuel Open 4,680.00 0.00 attenant avec latrines à l'EP development support d'exécution 15 03 24 29 28 LDAMTSAI et Construct d'un bloc de deux salles équipées à l'EP BAWADA Commune de MOKOLO CM-CRC EXTREME NORD- 243733-CS-INDV / suivi controle des travaux de Construct d'un forage équipé de pompe à motricité humaine à Component A: Local En attente 2021-09- 2021-11- 2021-11- 2021-12- 2022-04- LDAGODJA au CAMP IDA / 62240 A posteriori Individuel Open 5,485.00 0.00 development support d'exécution 15 03 24 29 28 DEPLACE/REFUGIE DE OURO TADA à MOHOUR CSI à MBIKEM à WOULER - MENDEZE à l'EP Mayo-Laddé (GAWAR) à l'EP DE LDAMTSAI à CES DE GAWAR COMMUNE DE MOKOLO CM-CRC EXTREME NORD- 243885-CS-INDV / suivi controle des travaux de Component A: Local En attente 2021-09- 2021-10- 2021-10- 2021-11- 2022-03- Construct d’un centre de IDA / 62240 A posteriori Individuel Open 9,900.00 0.00 development support d'exécution 15 11 18 01 31 sante intégré à Lamdtsai et à KOSSEONE Commune de MOKOLO CM-CRC EXTREME NORD- 243882-CS-INDV / suivi contrôle de la fourniture en Équipement de 20 tables bancs et en 4 bureaux Component A: Local En attente 2021-12- 2022-01- 2022-01- 2022-01- 2022-03- IDA / 62240 A posteriori Individuel Open 3,025.00 0.00 maîtres à l’EP Ounangaré à development support d'exécution 06 01 08 22 23 l’EP Zimado 3 et Equipement au CSI de Zimado au CSI de Houlouf au CSI de Dabanga au CMA de Logone birni CM-CRC EXTREME NORD- 243872-CS-INDV / suivi contrôle des travaux de Construct de 2 salles classe équipées avec bureaux et Component A: Local En attente 2021-12- 2021-12- 2021-12- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 8,620.00 0.00 latrines à l’EPG2 MAKARY à development support d'exécution 01 22 29 19 19 l’EP MBLAME et Cloture de l'EP G1 Acquisition en tables bancs à l’EPG2 et l’EPG1 de MAKARY Commune de Makary CM-CRC EXTREME NORD- 243861-CS-INDV / suivi contrôle des travaux Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-04- IDA / 62240 A posteriori Individuel Open 3,050.00 0.00 d'électrification A ENERGIE development support d'exécution 01 27 03 24 24 SOLAIRE du CSI DE MADA Commune de Makary CM-CRC EXTREME NORD- 243839-CS-INDV / suivi contrôle des travaux de Construct de 02 salles de classes equipées d'un bloc Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- latrines et d'un logement IDA / 62240 A posteriori Individuel Open 8,915.00 0.00 development support d'exécution 01 27 03 24 24 d'astreinte à l'EP de TAGAWA à l'EP de LAFIA et Equipement en tables-bancs des EP de WAZA et ZIGAGUE COMMUNE DE WAZA CM-CRC EXTREME NORD- 243868-CS-INDV / suivi contrôle des travaux de Construct d’une mini AEP au Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 3,350.00 0.00 CSI DE BILE et d'un forage development support d'exécution 01 27 03 24 24 équipé de PMH à l'EP OULZOUME à l'EP de NGAME COMMUNE DE WAZA CM-CRC EXTREME NORD- 243874-CS-INDV / suivi contrôle des travaux de Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- Construct d’un CSI avec IDA / 62240 A posteriori Individuel Open 9,145.00 0.00 development support d'exécution 01 30 06 20 20 équipement à BILE ET CLOTURE DU CMA DE WAZA COMMUNE DE WAZA CM-CRC EXTREME NORD- 243738-CS-INDV / suivi contrôle des travaux Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-04- IDA / 62240 A posteriori Individuel Open 2,285.00 0.00 d'alimentation du CMA de development support d'exécution 01 27 03 24 24 WAZA en Energie Solaire COMMUNE DE WAZA CM-CRC EXTREME NORD- 243863-CS-INDV / suivi contrôle des travaux de Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 6,095.00 0.00 Construct d'un CSI équipé development support d'exécution 01 25 01 22 22 AU CSI DE AISSA HARDE Commune de Mora Page 17 CM-CRC EXTREME NORD- 243742-CS-INDV / suivi contrôle des travaux de Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 1,525.00 0.00 REALISATION D'UN MINI AEP development support d'exécution 01 27 03 24 24 AU CSI DE AISSA HARDE Commune de Mora CM-CRC EXTREME NORD- 243857-CS-INDV / suivi contrôle des travaux de Construct d'un bloc de deux salles équipées avec latrines Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 7,240.00 0.00 à l'EP MAYO SANGUE à l'EP development support d'exécution 01 27 03 24 24 DJALINGO AVIATION et Construct d'un bloc maternel à l'école maternelle de de Djimeta Commune de Mokolo CM-CRC EXTREME NORD- 243753-CS-INDV / suivi contrôle des travaux de Construct d'un forage équipé de pompe à Component A: Local En attente 2021-12- 2021-12- 2022-01- 2022-01- 2022-05- motricité humaine à IDA / 62240 A posteriori Individuel Open 5,485.00 0.00 development support d'exécution 01 27 03 24 24 MABASS à GADALA à GALTA à LDUBAM à ANCIEN SONEL à ZAMAI GREDE à CAMP DEPLACES DE OUDA GAZA à HELIPORT (MOFOLE) Commune de Mokolo CM-CRC EXTREME NORD- 243756-CS-INDV / suivi contrôle des travaux de Renforcement du système Component A: Local En attente 2021-12- 2021-12- 2021-12- 2022-01- 2022-05- de pompage d’eau du IDA / 62240 A posteriori Individuel Open 2,440.00 0.00 development support d'exécution 01 23 30 20 20 barrage de DOUVAR et réhabilitation des tuyauteries du réseau CAMWATER dans la ville de MOKOLO CM-CRC EXTREME NORD- 243850-CS-INDV / suivi contrôle des travaux Component A: Local En attente 2021-12- 2021-12- 2021-12- 2022-01- 2022-05- IDA / 62240 A posteriori Individuel Open 11,430.00 0.00 d'extension du réseau development support d'exécution 01 23 30 18 18 CAMWATER dans la Commune de Mokolo Page 18