Procurement Plan National Roads and Airport Infrastructure Project (P122007) I. General 1. Bank’s approval Date of the procurement Plan Original: September 6, 2017 in Excel format 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: The procurement period of project covered from year 2015 to 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods and Non- Above US$ 500,000 All Consultant Services) 2. NCB (Goods) Above US$ 50,000 None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 250,000 None 2. Prequalification. Not applicable. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P122007 04/10/2012 issued by AASANA III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT Bolivia : National Roads and Airport Infrastructure Project PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2017-04-19 2020-12-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P122007 GPN Date: Project Name: National Roads and Airport Infrastructure Project Loan / Credit No: IDA / 49230 Bolivian Road Administrator Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned No: LPI/015/2013 Segunda Convocatoria / MEJORAMIENTO Y CONSTRUCCION DEL TRAMO CARRETERO SAN Improving the San BUENAVENTURA - IXIAMAS Solicitud de Single Stage - One 115,986,578. 135,997,02 IDA / 49230 Buenaventura - Ixiamas Previa Open - International Firmado 2014-10-01 2014-12-04 Lote 1: Tramo I San ofertas Envelope 00 5.93 National Road Buenaventura - Tumupasa incluye variante y Accesos a Tumupasa (Avenida y Conexi n Variante - Avenida) Lote 2: Tramo II Tumupasa - Ixiamas BO-ABC-70411-CW-RFQ / CONSERVACION VIAL TRAMO Improving the San LP02R CR. RT A Solicitud de Single Stage - One 2019-05- IDA / 49230 Buenaventura - Ixiamas Posterior Limited 249,426.54 217,962.18 Firmado 2018-07-24 2018-09-04 2018-08-25 2018-10-10 RURRENABAQUE-TUMUPASA- cotizaciones Envelope 22 National Road IXIAMAS, TRAMO 1: SAN BUENAVENTURA-TUMUPASA BO-ABC-70415-CW-RFQ / CONSERVACION VIAL TRAMO Improving the San LP02R CR. RT A Solicitud de Single Stage - One 2019-05- IDA / 49230 Buenaventura - Ixiamas Posterior Limited 242,889.22 209,983.84 Firmado 2018-07-24 2018-09-04 2018-08-25 2018-10-10 RURRENABAQUE-TUMUPASA- cotizaciones Envelope 22 National Road IXIAMAS, TRAMO 2: TUMUPASA-IXIAMAS BO-ABC-91659-CW-RFB / Mejoramiento y Construcción del Tramo Carretero San Buenaventura-Ixiamas. LOTE 1: Tramo I San Buenaventura- Improving the San Solicitud de Single Stage - One 118,508,769. 2021-12- Tumupasa incluye Variante y IDA / 49230 Buenaventura - Ixiamas Previa Open - International 0.00 Cancelado 2018-12-21 2018-12-26 2019-02-09 2019-03-01 2019-04-01 ofertas Envelope 75 16 Accesos a Tumupasa National Road (Avenida y Conexión Variante- Avenida)LOTE 2:TramoII Tumupasa-Ixiamas.(con condición suspensiva) BO-ABC-201996-CW-RFB / Improving the San CONSTRUCCION DE PUENTES Solicitud de Single Stage - One 10,305,992.0 Ejecución 2022-06- IDA / 49230 Buenaventura - Ixiamas Previa Open - International 0.00 2020-11-20 2020-11-27 2021-01-08 2021-02-01 2021-03-20 SAN BUENAVENTURA - ofertas Envelope 0 pendiente 30 National Road TUMUPASA LOTE 1A BO-ABC-201998-CW-RFB / Improving the San CONSTRUCCION DE PUENTES Solicitud de Single Stage - One Ejecución 2022-06- IDA / 49230 Buenaventura - Ixiamas Previa Open - International 9,463,906.00 0.00 2020-11-20 2020-11-27 2021-01-08 2021-02-01 2021-03-20 SAN BUENAVENTURA - ofertas Envelope pendiente 30 National Road TUMUPASA LOTE 1B BO-ABC-202002-CW-RFB / Improving the San CONSTRUCCION DE PUENTES Solicitud de Single Stage - One Bajo 2022-06- IDA / 49230 Buenaventura - Ixiamas Previa Open - International 8,803,807.00 0.00 2020-11-20 2020-11-27 2021-01-08 2021-02-01 2021-03-20 TUMUPASA - IXIAMAS LOTE ofertas Envelope Revision 30 National Road 2A BO-ABC-202004-CW-RFB / Improving the San Solicitud de Single Stage - One 2022-06- CONSTRUCCION DE PUENTES IDA / 49230 Buenaventura - Ixiamas Previa Open - International 9,147,370.00 0.00 En ejecución 2020-11-20 2020-11-27 2021-01-08 2021-02-01 2021-03-20 ofertas Envelope 30 TUMUPASA - IXIAMAS LOTE 2B National Road GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-ABC-205616-NC-RFB / IMPRESIÓN, RE Improving the San DIAGRAMACIÓN, Solicitud de Single Stage - One IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 10,000.00 0.00 Cancelado 2020-12-12 2021-02-06 2021-04-07 PUBLICACIÓN Y DIFUSIÓN DEL cotizaciones Envelope National Road LIBRO DE LA CULTURA TACANA BO-ABC-210850-NC-RFQ / IMPRESIÓN, Improving the San REDIAGRAMACIÓN, Solicitud de Single Stage - One Ejecución IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 10,000.00 0.00 2020-12-26 2021-02-07 2021-03-09 PUBLICACIÓN Y DIFUSIÓN DEL cotizaciones Envelope pendiente National Road LIBRO DE LA CULTURA TACANA CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 BO-ABC-63413-CS-LCS / AUDITORIA FINANCIERA EXTERNA DE CREDITOS FINANCIADOS POR EL BANCO Improving the San MUNDIAL- GESTION 2017 Selección basada IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 6,936.59 8,581.62 Finalizado 2018-05-18 2018-01-17 2018-06-02 2018-06-17 2018-07-15 2018-07-17 2018-07-20 2018-07-17 2018-07-28 2018-07-19 2018-08-12 2018-08-21 2018-09-06 2018-08-31 CREDITO 4923-BO PROYECTO en el menor costo National Road MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA SAN BUENA VENTURA - IXIAMAS BO-ABC-87963-CS-LCS / AUDITORIA FINANCIERA EXTERNA DE CRÉDITOS FINANCIADOS POR EL BANCO Improving the San MUNDIAL - GESTIÓN 2018, Selección basada IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 11,700.00 12,251.65 Finalizado 2018-12-06 2019-02-06 2018-12-11 2018-12-24 2019-01-28 2019-01-21 2019-03-22 2019-01-31 2019-03-27 2019-02-21 2019-04-05 2019-03-14 2019-06-12 2019-04-18 2019-06-12 CRÉDITO 4923-BO PROYECTO en el menor costo National Road MEJORAMIENTO Y CONSTRUCCIÓN DE LA CARRETERA SAN BUENA VENTURA - IXIAMAS BO-ABC-91672-CS-LCS / SERVICIO DE CONSULTORIA PARA LA ACTUALIZACIÓN DEL PLAN DE REASENTAMIENTO E Improving the San INDEMNIZACIÓN DE Selección basada IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 100,000.00 0.14 Firmado 2019-01-14 2019-03-22 2019-01-28 2019-09-04 2019-02-12 2019-07-25 2019-03-12 2019-12-09 2019-03-27 2019-11-29 2019-04-15 2019-12-11 2019-05-16 2020-02-27 2019-10-13 POBLACIONES AFECTADAS en el menor costo National Road (PRIPA) Y CONCLUSIÓN DE LA LIBERACIÓN DEL DERECHO DE VÍA DEL PROYECTO SAN BUENAVENTURA - IXIAMAS BO-ABC-93262-CS-QCBS / Supervisión Técnica y Socioambiental de las Obras Improving the San de Mejoramiento y Selección basada IDA / 49230 Buenaventura - Ixiamas Previa Open - International 5,439,221.00 0.00 En ejecución 2019-01-10 2019-04-11 2019-01-24 2019-02-15 2019-03-15 2019-03-30 2019-04-24 2019-05-23 2022-02-06 Construcción del Tramo en calidad y costo National Road Carretero San Buenaventura - Ixiamas LOTE 1 y LOTE 2 (con condición suspensiva) BO-ABC-188361-CS-LCS / AUDITORIA FINANCIERA EXTERNA DEL CRÉDITO 4923- Improving the San BO PROYECTO MEJORAMIENTO Selección basada IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 7,185.00 0.00 En ejecución 2020-08-14 2020-08-16 2020-08-14 2020-08-17 2020-08-18 2020-09-14 2020-09-16 2020-09-21 2020-09-17 2020-09-25 2020-09-22 2020-10-06 2020-11-15 Y CONSTRUCCIÓN DE LA en el menor costo National Road CARRETERA SAN BUENA VENTURA - IXIAMAS GESTIÓN 2019 BO-ABC-202008-CS-QCBS / SUPERVISION DE OBRAS DE Improving the San Selección basada CONSTRUCCION DE PUENTES IDA / 49230 Buenaventura - Ixiamas Previa Open - International 1,886,054.00 0.00 En ejecución 2020-11-11 2020-12-10 2020-11-25 2020-12-11 2020-12-11 2021-01-08 2021-01-20 2021-02-09 2021-03-10 2022-07-31 en calidad y costo SAN BUENAVENTURA . National Road IXIAMAS BO-ABC-206147-CS-LCS / AUDITORIA FINANCIERA EXTERNA DEL CREDITO 4923- Improving the San BO PROYECTO MEJORAMIENTO Selección basada IDA / 49230 Buenaventura - Ixiamas Posterior Open - National 3,645.00 0.00 En ejecución 2020-12-01 2020-12-17 2020-12-01 2020-12-04 2021-01-01 2021-01-08 2021-01-12 2021-01-23 2021-02-27 Y CONSTRUCCION DE LA en el menor costo National Road CARRETERA SAN BUENAVENTURA – IXIAMAS GESTION 2020 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual No CI 1 / Consultor a para la Improving the San elaboraci n de Pueblos IDA / 49230 Buenaventura - Ixiamas Previa Individual Open 10,000.00 9,531.11 Firmado 2014-09-04 2014-09-17 Indigenas (PPI) National Road BO-ABC-133503-CS-INDV / Improving the San CONSULTOR/A IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 3,246.00 1,792.18 Firmado 2019-09-23 2017-06-08 2019-10-20 2019-10-10 2019-10-30 2019-10-18 2019-11-24 2019-11-08 2020-02-22 ADMINISTRADOR DEL PPI ESSE National Road EJJA BO-ABC-133508-CS-INDV / CONSULTOR/A DE LÍNEA Improving the San TECNICO/A FORESTAL DE IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 3,246.00 1,792.18 Firmado 2019-09-23 2019-10-09 2019-10-23 2019-10-10 2019-11-13 2019-10-18 2019-12-12 2019-11-08 2020-03-11 EQUIPO TÉCNICO DE PLANES National Road DE PUEBLOS INDÍGENAS (ET- PPI) BO-ABC-133511-CS-INDV / CONSULTOR/A Improving the San Ejecución ADMINISTRADOR DE EQUIPO IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 3,246.00 0.00 2019-09-23 2019-10-23 2019-11-02 2019-11-27 2020-02-25 pendiente TÉCNICO DEL PLANES DE National Road PUEBLOS INDÍGENAS (ET-PPI) BO-ABC-133513-CS-INDV / CONSULTOR/A ABOGADO/A Improving the San DE EQUIPO TÉCNICO DE IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 3,246.00 1,792.18 Firmado 2019-09-23 2019-10-09 2019-10-23 2019-10-10 2019-11-02 2019-11-07 2019-11-27 2019-11-08 2020-02-25 PLANES DEL PUEBLOS National Road INDIGENAS (ET- PPI) BO-ABC-156949-CS-CDS / AUDITORIA FINANCIERA EXTERNA DEL CREDITO 4923- Improving the San BO PROYECTO MEJORAMIENTO Selección directa IDA / 49230 Buenaventura - Ixiamas Posterior Direct 4,200.00 0.00 Cancelado 2020-02-10 2020-03-17 2020-03-01 2020-03-26 2020-05-05 Y CONSTRUCCIÓN DE LA de consultores National Road CARRETERA SAN BUENA VENTURA – IXIAMAS GESTIÓN 2019 BO-ABC-205613-CS-INDV / Improving the San Ejecución FISCALIZACION DE OBRA, JEFE IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 38,636.00 0.00 2020-12-04 2021-01-22 2021-02-12 2021-03-05 2022-07-28 pendiente DE FISCALIZACION National Road Page 2 BO-ABC-205614-CS-INDV / Improving the San Ejecución FISCALIZACION DE OBRA, IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 35,070.00 0.00 2020-12-04 2021-01-22 2021-02-12 2021-03-19 2022-08-11 pendiente FISCAL DE OBRA National Road BO-ABC-205615-CS-INDV / Improving the San Ejecución FISCALIZACION DE OBRA, IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 35,070.00 0.00 2020-12-04 2021-01-22 2021-02-12 2021-03-05 2022-07-28 pendiente FISCAL AMBIENTAL National Road BO-ABC-210865-CS-INDV / INGENIERO DE SEGUIMIENTO TÉCNICO DE OBRAS - Improving the San Ejecución CONSTRUCCIÓN DE LOS IDA / 49230 Buenaventura - Ixiamas Posterior Individual Open 40,180.00 0.00 2021-01-08 2021-02-26 2021-03-19 2021-04-23 2022-08-23 pendiente PUENTES DE LA CARRETERA National Road SAN BUENAVENTURA - IXIAMAS Page 3