Sustainable Family Farming Modernization Project (P151963) Procurement Plan Country: Ecuador Region: LATIN AMERICA AND CARIBBEAN Approval Date: 5-May-2015 (original). General Procurement Notice published on: 4-March-2016 July 9, 2010 PROCUREMENT Ecuador : Ecuador - Sustainable Family Farming Modernization Project PLAN General Information Country: Ecuador Banks Approval Date of the Original Procurement Plan: 2017-03-02 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-23 Project ID: P151963 GPN Date: Project Name: Ecuador - Sustainable Family Farming Modernization Project Loan / Credit No: IBRD / 85150, COFN / C1410 Executing Agency(ies): Ministry of Agriculture,Livestock, Aquaculture and Fisheries WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-027 / Component 1: Investments for Single Stage - One Asociación de Productores IBRD / 85150 Post Request for Bids Open - National 253,597.88 287,876.44 Signed 2016-10-31 2017-03-29 2016-11-18 2016-12-19 2017-04-27 2017-02-07 2017-05-11 2017-04-01 2017-06-27 2017-07-31 climate-smart sub-projects Envelope Agrícolas San Rafael EC-MAGAP-8176-029 / Component 1: Investments for Single Stage - One Cooperativa Agropecuaria el IBRD / 85150 Post Request for Bids Open - National 240,663.07 247,158.58 Signed 2016-10-31 2016-11-15 2016-11-18 2016-12-19 2016-12-19 2017-02-02 2017-02-20 2017-03-04 2017-04-28 2017-06-30 climate-smart sub-projects Envelope Marco, Pintag EC-MAGAP-8176-030 / Component 1: Investments for Single Stage - One Asociación Campesina 15 de IBRD / 85150 Post Request for Bids Open - National 151,237.97 160,946.57 Signed 2016-11-11 2016-11-24 2016-11-25 2016-12-23 2016-12-23 2017-02-02 2017-03-14 2017-03-25 2017-04-12 2017-06-30 climate-smart sub-projects Envelope Diciembre, Campozano EC-MAGAP-8176-031 / Component 1: Investments for Single Stage - One Directorio de Agua del canal Palo IBRD / 85150 Post Request for Bids Open - National 282,495.04 465,506.99 Signed 2016-12-02 2016-12-16 2017-01-16 2017-02-23 2017-02-08 2017-02-23 2017-03-31 2017-03-24 2017-07-31 climate-smart sub-projects Envelope Marcado EC-MAGAP-8176-032 / Inversión Component 1: Investments for Single Stage - One - Asociación Santa Cecilia de IBRD / 85150 Post Request for Bids Open - National 288,011.72 283,055.88 Signed 2016-12-20 2017-03-22 2016-12-30 2017-01-30 2017-04-28 2017-02-13 2017-05-19 2017-03-31 2017-07-19 2017-06-30 climate-smart sub-projects Envelope Pucalpa EC-MAGAP-8176-033 / Inversión - Asociación de trabajadores Component 1: Investments for Single Stage - One agrícolas, autónomos IBRD / 85150 Post Request for Bids Open - National 537,557.30 769,439.81 Signed 2016-12-20 2016-12-30 2017-01-30 2017-01-30 2017-02-13 2017-02-22 2017-03-15 2017-03-27 2017-08-31 climate-smart sub-projects Envelope comerciantes, exportadores Voluntad de Dios" EC-MAGAP-8176-034 / Inversión - Asociación de desarrollo Component 1: Investments for Single Stage - One IBRD / 85150 Post Request for Bids Open - National 387,514.99 407,107.09 Signed 2016-12-20 2016-12-30 2016-12-30 2017-01-30 2017-01-30 2017-02-13 2017-02-17 2017-03-15 2017-04-13 2017-07-31 integral de la comunidad de climate-smart sub-projects Envelope Cutahua, Simiatug EC-MAGAP-8176-036 / Inversión Component 1: Investments for Single Stage - One - Junta de Regantes del sistema IBRD / 85150 Post Request for Bids Open - National 221,582.20 194,445.74 Signed 2016-12-02 2016-12-08 2016-12-16 2017-01-16 2017-01-16 2017-02-07 2017-02-23 2017-05-01 2017-03-27 2017-06-30 climate-smart sub-projects Envelope de riego La Era EC-MAGAP-8176-045 / 1. Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 66,120.00 65,477.67 Signed 2016-07-31 2017-01-06 2016-12-19 2017-02-15 Readecuación Oficinas Management Quotations Envelope EC-MAGAP-8176-035 / Inversión Component 1: Investments for Single Stage - One - Tecnificacion del sistema de IBRD / 85150 Post Request for Bids Open - National 163,125.09 174,085.22 Signed 2016-12-08 2016-12-21 2016-12-23 2017-01-23 2017-01-23 2017-02-06 2017-03-14 2017-05-01 2017-04-25 2017-06-30 climate-smart sub-projects Envelope riego Zhilla San Pedro EC-MAGAP-8176-028 / Inversión en 11 subproyectos de riego Component 1: Investments for Single Stage - One IBRD / 85150 Post Request for Bids Open - National 4,779,232.60 0.00 Canceled 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-01 2018-02-28 parcelario de la primera climate-smart sub-projects Envelope convocatoria EC-MAGAP-8176-038 / Inversión Component 1: Investments for Single Stage - One - Asociación Agropecuaria Santa IBRD / 85150 Post Request for Bids Open - National 316,415.09 0.00 Canceled 2017-02-13 2017-02-27 2017-03-30 2017-04-21 2017-05-08 2017-09-30 climate-smart sub-projects Envelope Clara de Tolontag EC-MAGAP-8176-044 / Inversión en 2 subproyectos de Component 1: Investments for Single Stage - One IBRD / 85150 Post Request for Bids Open - National 1,041,398.91 0.00 Canceled 2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-05-31 2017-12-31 microreservorios primera climate-smart sub-projects Envelope convocatoria EC-MAGAP-8176-042 / Inversión Component 1: Investments for Single Stage - One - Tecnificación del sistema de IBRD / 85150 Post Request for Bids Open - National 395,844.22 0.00 Canceled 2017-02-13 2017-02-27 2017-03-30 2017-04-21 2017-05-31 2017-11-27 climate-smart sub-projects Envelope riego Luis Cordero Etapa 1 EC-MAGAP-8176-041 / Inversión Component 1: Investments for Single Stage - One - Tecnificacion del sistema de IBRD / 85150 Post Request for Bids Open - National 476,881.35 0.00 Canceled 2017-02-13 2017-02-27 2017-03-30 2017-04-21 2017-05-08 2017-08-31 climate-smart sub-projects Envelope riego Putucay EC-MAGAP-8176-043 / Inversiones en 34 Component 1: Investments for Single Stage - One IBRD / 85150 Post Request for Bids Open - National 254,281.88 0.00 Canceled 2016-02-13 2016-02-27 2016-03-30 2016-04-21 2016-05-08 2017-10-31 Microreservorios en la parroquia climate-smart sub-projects Envelope Ingapirca-Coop. Vendeleche EC-MAGAP-32782-CW-RFQ / Component 3: Project Request for Single Stage - One Implementación de espacio físico IBRD / 85150 Post Open - National 10,000.00 0.00 Canceled 2017-11-20 2017-12-09 2018-01-23 Management Quotations Envelope para archivo EC-MAGAP-37039-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments for Single Stage - One Pending IBRD / 85150 Post Request for Bids Open - National 255,018.99 0.00 2018-09-24 2018-10-04 2018-11-03 2018-11-18 2018-12-23 2019-04-22 tecnificado a nivel parcelario del climate-smart sub-projects Envelope Implementation sistema de riego El Verde - Pacayunga. EC-MAGAP-37026-CW-RFB / Obra - Subproyecto: Component 1: Investments for Single Stage - One Pending Implementación del sistema de IBRD / 85150 Post Request for Bids Open - National 394,535.73 0.00 2018-09-03 2018-09-13 2018-10-13 2018-10-28 2018-12-02 2019-05-31 climate-smart sub-projects Envelope Implementation riego por aspersión en el predio "Santa Ana". Page 1 EC-MAGAP-36997-CW-RFB / Obra - Subproyecto: Implementación del sistema de Component 1: Investments for Single Stage - One Pending COFN / C1410 Post Request for Bids Open - National 181,122.08 0.00 2018-09-03 2018-09-13 2018-10-13 2018-10-28 2018-12-02 2019-04-01 riego por goteo y aspersión en la climate-smart sub-projects Envelope Implementation Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAGAP-37029-CW-RFB / Obra - Subproyecto: Implementación del sistema de Component 1: Investments for Single Stage - One Pending IBRD / 85150 Post Request for Bids Open - National 290,247.36 0.00 2018-09-10 2018-09-20 2018-10-20 2018-11-04 2018-12-09 2019-05-08 riego parcelario por aspersión climate-smart sub-projects Envelope Implementation para la "Asociación Agropecuaria Sierra Morena" EC-MAGAP-37032-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments for Single Stage - One Pending parcelario tecnificado, con las COFN / C1410 Post Request for Bids Open - National 801,843.83 0.00 2018-09-03 2018-09-13 2018-10-13 2018-10-28 2018-12-02 2019-04-01 climate-smart sub-projects Envelope Implementation ó alo familias de usuarios del v Pinguilí de la acequia Mocha Huachi. EC-MAGAP-37033-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments for Single Stage - One Pending COFN / C1410 Post Request for Bids Open - National 1,178,715.30 0.00 2018-09-03 2018-09-13 2018-10-13 2018-10-28 2018-12-02 2019-08-29 parcelario tecnificado en 15 climate-smart sub-projects Envelope Implementation módulos del sistema de riego Píllaro Ramal Norte. EC-MAGAP-37034-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments for Single Stage - One Pending IBRD / 85150 Post Request for Bids Open - National 2,398,113.02 0.00 2018-09-10 2018-09-20 2018-10-20 2018-11-04 2018-12-09 2019-09-05 parcelario tecnificado en veinte climate-smart sub-projects Envelope Implementation módulos del sistema de riego Píllaro Ramal Sur. EC-MAGAP-37038-CW-RFB / Obra - Subproyecto: Component 1: Investments for Single Stage - One Pending Tecnificación de riego parcelario IBRD / 85150 Post Request for Bids Open - National 767,833.71 0.00 2018-09-24 2018-10-04 2018-11-03 2018-11-18 2018-12-23 2019-04-22 climate-smart sub-projects Envelope Implementation por micro aspersión para la comunidad Estero Piedras. EC-MAGAP-37040-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments for Single Stage - One Pending parcelario tecnificado por IBRD / 85150 Post Request for Bids Open - National 515,344.07 0.00 2018-09-17 2018-09-27 2018-10-27 2018-11-11 2018-12-16 2019-06-14 climate-smart sub-projects Envelope Implementation aspersión y goteo para el sistema de riego "Y de El Guineo". EC-MAGAP-37041-CW-RFB / Obra - Subproyecto: Implementación de riego por Component 1: Investments for Single Stage - One Pending COFN / C1410 Post Request for Bids Open - National 473,289.40 0.00 2018-09-17 2018-09-27 2018-10-27 2018-11-11 2018-12-16 2019-04-15 aspersión en la Asociación climate-smart sub-projects Envelope Implementation Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAGAP-37042-CW-RFB / Obra - Subproyecto: Implementación del sistema de Component 1: Investments for Single Stage - One Pending IBRD / 85150 Post Request for Bids Open - National 345,594.60 0.00 2018-09-17 2018-09-27 2018-10-27 2018-11-11 2018-12-16 2019-05-15 riego parcelario por aspersión climate-smart sub-projects Envelope Implementation para la "Comuna Jurídica La Libertad". EC-MAGAP-37050-CW-RFB / Obra - Subproyecto: Tecnificación de Riego a nivel Component 1: Investments for Single Stage - One Pending IBRD / 85150 Post Request for Bids Open - National 304,748.40 0.00 2018-09-10 2018-09-20 2018-10-20 2018-11-04 2018-12-09 2019-04-08 parcelario por aspersión para la climate-smart sub-projects Envelope Implementation Junta de Riego "Gúlac - Cruz Rumi". EC-MAGAP-37028-CW-RFB / Obra - Subproyecto: Implementación del sistema de Component 1: Investments for Single Stage - One Pending riego parcelario por aspersión IBRD / 85150 Post Request for Bids Open - National 264,072.75 0.00 2018-09-10 2018-09-20 2018-10-20 2018-11-04 2018-12-09 2019-05-08 climate-smart sub-projects Envelope Implementation para la "Asociación de productores agropecuarios la Nueva Esperanza". EC-MAGAP-37046-CW-RFB / Obra - Subproyecto: Component 1: Investments for Single Stage - One Pending Implementación del sistema de IBRD / 85150 Post Request for Bids Open - National 1,259,909.43 0.00 2018-09-03 2018-09-13 2018-10-13 2018-10-28 2018-12-02 2019-04-01 climate-smart sub-projects Envelope Implementation riego por aspersión en el predio "La Paquita" EC-MAG-74155-CW-RFB / Obra - Subproyecto: Implementación de riego parcelario tecnificado Component 1: Investments for Single Stage - One Pending COFN / C1410 Post Request for Bids Open - National 857,261.65 0.00 2018-09-17 2018-09-27 2018-10-27 2018-11-11 2018-12-16 2019-07-21 por aspersión en 152,44 ha para climate-smart sub-projects Envelope Implementation la Junta General de Riego "Canal Central Toacaso" EC-MAG-74161-CW-RFB / Obra - Subproyecto: Implementación Component 1: Investments for Single Stage - One Pending COFN / C1410 Post Request for Bids Open - National 448,238.82 0.00 2018-09-24 2018-10-04 2018-11-03 2018-11-18 2018-12-23 2019-05-22 de riego parcelario tecnificado en climate-smart sub-projects Envelope Implementation el predio Sucuso EC-MAGAP-37036-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 451,844.13 0.00 Canceled 2017-11-24 2017-12-04 2018-01-03 2018-01-18 2018-02-22 2018-08-21 climate-smart sub-projects Envelope Sistema de Riego Luis Cordero EC-MAGAP-37037-CW-RFB / Component 1: Investments for Single Stage - One Inversión - Tecnificación del IBRD / 85150 Post Request for Bids Open - National 343,109.13 0.00 Canceled 2018-05-01 2018-05-11 2018-06-10 2018-06-25 2018-07-30 2018-11-27 climate-smart sub-projects Envelope Sistema de Riego Tolontag EC-MAGAP-37025-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 1,867,958.40 0.00 Canceled 2018-02-15 2018-02-25 2018-03-27 2018-04-11 2018-05-16 2018-11-12 climate-smart sub-projects Envelope Sistema de Riego Las Mercedes EC-MAGAP-37051-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 2,638,944.00 0.00 Canceled 2018-07-01 2018-07-11 2018-08-10 2018-08-25 2018-09-29 2019-07-26 climate-smart sub-projects Envelope Sistema de Riego Bolo Dolores Page 2 EC-MAGAP-37044-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 879,648.00 0.00 Canceled 2018-05-01 2018-05-11 2018-06-10 2018-06-25 2018-07-30 2019-01-26 climate-smart sub-projects Envelope Sistema de Riego Chambitola EC-MAGAP-37048-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 382,905.60 0.00 Canceled 2018-07-01 2018-07-11 2018-08-10 2018-08-25 2018-09-29 2019-01-27 climate-smart sub-projects Envelope Sistema de Riego Jesús María EC-MAGAP-37346-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 538,457.85 0.00 Canceled 2017-11-24 2017-12-04 2018-01-03 2018-01-18 2018-02-22 2018-06-22 climate-smart sub-projects Envelope Sistema de Riego Putucay EC-MAGAP-37030-CW-RFB / Inversión - Tecnificación del Component 1: Investments for Single Stage - One Sistema de Riego Directorio de COFN / C1410 Post Request for Bids Open - National 859,281.16 0.00 Canceled 2017-12-01 2017-12-11 2018-01-10 2018-01-25 2018-03-01 2018-11-26 climate-smart sub-projects Envelope aguas de la acequia "Mundug Yamate" EC-MAGAP-37047-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 486,393.60 0.00 Canceled 2018-02-01 2018-02-11 2018-03-13 2018-03-28 2018-05-02 2018-08-30 climate-smart sub-projects Envelope Sistema de Riego La Belgica EC-MAGAP-37053-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 1,034,880.00 0.00 Canceled 2018-06-01 2018-06-11 2018-07-11 2018-07-26 2018-08-30 2019-02-26 climate-smart sub-projects Envelope Sistema de Riego Zhinzhon EC-MAGAP-37043-CW-RFB / Component 1: Investments for Single Stage - One Inversión Tecnificación del IBRD / 85150 Post Request for Bids Open - National 289,766.40 0.00 Canceled 2018-08-01 2018-08-11 2018-09-10 2018-09-25 2018-10-30 2019-02-27 climate-smart sub-projects Envelope Sistema de Riego Milagro GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-046 / Equipos Component 3: Project Request for Single Stage - One de cómputo, impresora y IBRD / 85150 Post Open - National 44,061.00 37,203.90 Signed 2016-05-17 2016-09-29 2016-09-29 2016-10-28 Management Quotations Envelope proyector UGP EC-MAGAP-8176-047 / Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 182,400.00 144,535.00 Signed 2016-05-17 2016-10-31 2016-10-31 2016-11-29 Vehículos (4) Management Quotations Envelope EC-MAGAP-8176-049 / Equipos Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 40,698.00 33,426.62 Signed 2017-02-15 2017-04-08 2017-05-18 2017-05-08 de cómputo Management Quotations Envelope EC-MAGAP-32767-GO-RFQ / IBRD / 85150 Component 3: Project Request for Single Stage - One Pending Post Open - National 39,566.13 0.00 2017-11-03 2017-11-22 2018-01-06 Mobiliario para oficinas COFN / C1410 Management Quotations Envelope Implementation EC-MAGAP-32776-GO-RFQ / Component 3: Project Request for Single Stage - One Pending IBRD / 85150 Post Open - National 4,592.00 0.00 2017-11-06 2017-11-25 2017-12-25 Materiales de oficina Management Quotations Envelope Implementation EC-MAGAP-32778-GO-RFQ / IBRD / 85150 Component 3: Project Request for Single Stage - One Pending Equipos y suministros Post Open - National 71,548.96 0.00 2017-11-06 2017-11-25 2018-01-09 COFN / C1410 Management Quotations Envelope Implementation informáticos EC-MAGAP-8176-050 / Equipo Component 3: Project Request for Single Stage - One topográfico: GPS Diferencial y IBRD / 85150 Post Open - National 2,234.40 0.00 Canceled 2017-02-17 2017-04-23 2017-05-08 Management Quotations Envelope Nivel EC-MAGAP-8176-048 / Component 3: Project Single Stage - One IBRD / 85150 Post Request for Bids Open - National 228,000.00 0.00 Canceled 2017-02-13 2017-02-17 2017-03-19 2017-03-29 2017-04-23 2017-05-23 Vehículos Management Envelope EC-MAG-74050-GO-RFB / IBRD / 85150 Component 3: Project Single Stage - One Pending Adquisición de Vehículos para la Post Request for Bids Open - National 170,240.00 0.00 2018-09-17 2018-09-22 2018-10-20 2018-10-25 2018-11-04 2018-12-31 COFN / C1410 Management Envelope Implementation UGP-PIT EC-MAGAP-32575-GO-RFQ / COFN / C1410 Component 3: Project Request for Single Stage - One Vehículos para Oficinas Técnicas Post Open - National 99,902.88 0.00 Canceled 2017-10-30 2017-11-18 2017-12-08 IBRD / 85150 Management Quotations Envelope Zonales (3) EC-MAGAP-32777-GO-RFQ / Component 3: Project Request for Single Stage - One Pending IBRD / 85150 Post Open - National 34,720.00 0.00 2018-11-08 2018-11-21 2018-12-06 Vestuario-Prendas de Proteccion Management Quotations Envelope Implementation EC-MAGAP-32781-GO-RFQ / IBRD / 85150 Component 3: Project Request for Single Stage - One Post Open - National 4,480.00 0.00 Canceled 2017-11-13 2017-12-02 2018-01-01 Kits para análisis de campo COFN / C1410 Management Quotations Envelope EC-MAGAP-32779-GO-RFQ / Component 3: Project Request for Single Stage - One COFN / C1410 Post Open - National 11,200.00 0.00 Canceled 2017-11-10 2017-11-29 2017-12-19 Equipo micromolinete Management Quotations Envelope NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-026 / Sistema informático MSE Financiero: Component 3: Project IBRD / 85150 Post Direct Selection Direct 8,550.00 8,550.00 Signed 2016-08-15 2016-08-23 2016-09-22 2016-09-29 2016-11-02 2016-11-01 2016-12-02 diseño, capacitación y Management mantenimiento EC-MAGAP-14944-NC-RFQ / Component 2: Capacity building EVENTO DE ESCUELA Request for Single Stage - One IBRD / 85150 for institutional stakeholders and Post Limited 16,121.24 16,120.00 Signed 2017-05-12 2017-05-15 2017-05-16 2017-05-17 2017-05-18 NACIONAL DE IIRIGACIÓN Quotations Envelope beneficiaries organizations CAMPESINA EC-MAGAP-8176-023 / Eventos Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 11,400.00 0.00 Canceled 2017-04-13 2017-06-30 2017-10-31 (Promoción y Difusión) Management Quotations Envelope EC-MAGAP-8176-024 / Avisos Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 11,400.00 0.00 Canceled 2017-04-13 2017-06-30 2017-10-31 de prensa (Promoción y Difusión) Management Quotations Envelope Page 3 EC-MAGAP-8176-025 / Pautaje Component 3: Project Request for Single Stage - One de radio locales cuñas/ spot de IBRD / 85150 Post Open - National 14,250.00 0.00 Canceled 2017-04-13 2017-06-30 2017-10-31 Management Quotations Envelope television (Promoción y Difusión) EC-MAGAP-8176-020 / Apoyo legal para legalización tenencia de la tierra, organizaciones y Component 1: Investments for Request for Single Stage - One IBRD / 85150 Post Open - National 8,550.00 0.00 Canceled 2017-06-13 2017-08-08 2018-02-04 concesiones de agua para climate-smart sub-projects Quotations Envelope pequeños reservorios individuales y/o colectivos EC-MAGAP-8176-021 / Apoyo legal para legalización tenencia Component 1: Investments for Request for Single Stage - One de la tierra, organizaciones y IBRD / 85150 Post Open - National 25,080.00 0.00 Canceled 2017-06-13 2017-08-02 2018-01-29 climate-smart sub-projects Quotations Envelope concesiones de agua para parcelas agrícolas EC-MAGAP-8176-022 / Component 3: Project Request for Single Stage - One Impresiones (Promoción y IBRD / 85150 Post Open - National 11,400.00 0.00 Canceled 2017-04-13 2017-06-30 2017-10-31 Management Quotations Envelope Difusión) EC-MAGAP-8176-017 / Asis. Component 1: Investments for Tec. & Cap. de climate-smart sub-projects Single Stage - One aproximadamente 14 IBRD / 85150 Component 2: Capacity building Post Request for Bids Open - National 583,121.58 0.00 Canceled 2017-08-01 2017-08-15 2017-09-12 2017-09-26 2017-10-10 2018-10-05 Envelope subproyectos de riego parcelario for institutional stakeholders and de la primera convocatoria beneficiaries organizations Component 1: Investments for EC-MAGAP-8176-011 / Asis. climate-smart sub-projects Single Stage - One Tec. & Capacitación de riego IBRD / 85150 Component 2: Capacity building Post Request for Bids Open - International 515,299.52 0.00 Canceled 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 2018-01-18 Envelope tecnificado parcelario. for institutional stakeholders and beneficiaries organizations EC-MAGAP-8176-019 / Asis. Component 1: Investments for Tec. & Cap. de climate-smart sub-projects aproximadamente 2 Single Stage - One IBRD / 85150 Component 2: Capacity building Post Request for Bids Open - National 100,713.35 0.00 Canceled 2016-05-01 2016-05-15 2016-06-12 2016-06-26 2016-07-10 2017-02-05 subproyectos de Envelope for institutional stakeholders and microreservorios primera beneficiaries organizations convocatoria EC-MAG-74026-NC-RFQ / Servicio logístico para realizar talleres de preparación y Component 1: Investments for Request for Single Stage - One Pending IBRD / 85150 Post Open - National 22,400.00 0.00 2018-09-19 2018-10-02 2018-12-31 evaluación, demandadas por la climate-smart sub-projects Quotations Envelope Implementation Coordinación del PIT y Dirección Técnica. EC-MAG-74029-NC-RFQ / Servicio logístico para realizar Component 1: Investments for Request for Single Stage - One Pending talleres de promoción, IBRD / 85150 Post Open - National 28,000.00 0.00 2018-09-19 2018-10-02 2018-12-31 climate-smart sub-projects Quotations Envelope Implementation demandadas por la Coordinación del PIT y la Dirección Técnica. EC-MAGAP-32577-NC-RFQ / Servicio logístico para el Component 1: Investments for Request for Single Stage - One desarrollo de eventos de IBRD / 85150 Post Limited 20,000.00 0.00 Canceled 2017-10-29 2017-11-09 2017-12-24 climate-smart sub-projects Quotations Envelope promoción y difusión de los subproyectos EC-MAGAP-37384-NC-RFQ / Component 1: Investments for Request for Single Stage - One Servicio logístico para eventos y IBRD / 85150 Post Open - National 72,800.00 0.00 Canceled 2018-03-03 2018-03-28 2018-12-31 climate-smart sub-projects Quotations Envelope talleres EC-MAGAP-37385-NC-RFQ / Component 1: Investments for Request for Single Stage - One Servicio de publicación en IBRD / 85150 Post Open - National 84,000.00 0.00 Canceled 2018-03-10 2018-04-04 2018-12-31 climate-smart sub-projects Quotations Envelope medios escritos EC-MAGAP-37386-NC-RFQ / Component 1: Investments for Request for Single Stage - One Servicio de difusión radial y IBRD / 85150 Post Open - National 32,704.00 0.00 Canceled 2018-03-26 2018-04-20 2018-12-31 climate-smart sub-projects Quotations Envelope promoción en redes sociales EC-MAGAP-18328-NC-RFQ / CONTRATACIÓN DEL SERVICIO DE EMISIÓN DE PASAJES AÉREOS, PARA LOS COFN / C1410 Component 3: Project Request for Single Stage - One Post Limited 17,920.00 0.00 Canceled 2017-06-16 2017-06-19 2017-12-16 FUNCIONARIOS Y IBRD / 85150 Management Quotations Envelope SERVIDORES DE LA UNIDAD DE GESTIÓN DEL PROYECTO PIT UGP-PIT EC-MAGAP-32784-NC-RFQ / Component 3: Project Request for Single Stage - One IBRD / 85150 Post Open - National 3,360.00 0.00 Canceled 2017-11-15 2017-12-04 2017-12-24 Licencias de software Management Quotations Envelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-051 / Component 3: Project Under IBRD / 85150 Post Least Cost Selection Open - National 20,000.00 0.00 2016-07-22 2016-08-17 2016-08-05 2016-09-30 2016-09-23 2016-10-14 2016-10-26 2016-10-21 2016-10-21 2016-10-28 2016-11-21 2016-11-12 2017-05-11 Auditoría Financiera Management Implementation EC-MAGAP-8176-052 / Sistema Component 3: Project Quality And Cost- IBRD / 85150 Post Open - National 102,727.78 102,697.98 Signed 2016-12-23 2016-11-28 2016-12-28 2017-01-13 2017-01-16 2017-01-15 2017-02-13 2017-02-04 2017-03-09 2017-02-21 2017-03-31 2017-03-19 2017-04-20 2018-03-19 informático gerencia de SMM&E Management Based Selection EC-MAGAP-8176-053 / Estudios de pre-inversión en Component 1: Investments for Quality And Cost- IBRD / 85150 Post Open - National 114,000.00 0.00 Canceled 2017-02-15 2017-02-20 2017-03-08 2017-03-30 2017-04-09 2017-04-21 2017-05-08 2018-05-08 pequeños reservorios individuales climate-smart sub-projects Based Selection y/o colectivos EC-MAGAP-8176-054 / Component 1: Investments for Quality And Cost- Estudios de pre-inversión en las IBRD / 85150 Post Open - National 202,759.85 0.00 Canceled 2017-02-15 2017-02-20 2017-03-08 2017-03-30 2017-04-09 2017-04-21 2017-05-08 2018-05-08 climate-smart sub-projects Based Selection parcelas agrícolas Page 4 EC-MAGAP-37592-CS-QCBS / Asistencia Técnica y Component 2: Capacity building Capacitación Plan Productivo y Quality And Cost- Pending IBRD / 85150 for institutional stakeholders and Post Open - International 409,248.00 0.00 2018-11-25 2018-12-07 2018-12-24 2019-01-15 2019-01-25 2019-02-06 2019-02-23 2019-12-20 Ambiental - Junta General de Based Selection Implementation beneficiaries organizations Usuarios del Sistema de Riego Píllaro Ramal El Rosario EC-MAGAP-37383-CS-QCBS / Consultant Component 3: Project Pending Auditoría Financiera - Tercer IBRD / 85150 Post Qualification Open - National 56,000.00 0.00 2018-09-03 2018-09-23 2018-10-08 2018-10-18 2018-11-02 2019-04-01 Management Implementation Periodo Selection EC-MAG-74044-CS-LCS / Contratación del Servicio de Component 3: Project Pending IBRD / 85150 Post Least Cost Selection Open - National 56,000.00 0.00 2018-09-05 2018-09-19 2018-09-25 2018-10-25 2018-10-28 2018-11-03 2018-11-13 2019-05-12 Auditoria Financiera del Período Management Implementation Fiscal 2018 EC-MAG-74052-CS-LCS / Contratación de Servicio de Consultoría para la Component 3: Project Pending Implementación de un Software IBRD / 85150 Post Least Cost Selection Open - National 67,200.00 0.00 2018-09-28 2018-10-12 2018-10-18 2018-11-17 2018-11-20 2018-11-26 2018-12-06 2019-03-06 Management Implementation de Gestión Documental en el Á ea de Tecnología y Desarrollo r de la UGP-PIT EC-MAG-74057-CS-QCBS / Estudios de factibilidad y diseño definitivos integrales de Component 1: Investments for Quality And Cost- Pending COFN / C1410 Post Open - National 548,622.60 0.00 2018-10-07 2018-10-21 2018-10-27 2018-11-26 2018-11-29 2018-12-05 2018-12-15 2019-08-12 subproyectos: riego, social y climate-smart sub-projects Based Selection Implementation ambiental en las provincias con financiamiento AECID EC-MAG-74058-CS-QCBS / Estudios de factibilidad y diseño definitivos integrales de Component 1: Investments for Quality And Cost- Pending IBRD / 85150 Post Open - National 365,526.99 0.00 2018-10-07 2018-10-21 2018-10-27 2018-11-26 2018-11-29 2018-12-05 2018-12-15 2019-10-21 subproyectos: riego, social y climate-smart sub-projects Based Selection Implementation ambiental en las provincias con financiamiento BIRF EC-MAGAP-37589-CS-QCBS / Asistencia Técnica y Component 2: Capacity building Capacitación Plan Productivo y Quality And Cost- Pending IBRD / 85150 for institutional stakeholders and Post Open - National 167,357.12 0.00 2018-09-10 2018-10-10 2018-10-25 2018-11-04 2018-11-14 2018-11-26 2018-12-06 2019-12-01 Ambiental - Junta de riego Based Selection Implementation beneficiaries organizations acequia Mocha Huachi - Distribuidor Pinguilí EC-MAGAP-37271-CS-QCBS / Component 1: Investments for Quality And Cost- Supervisión de obra de riego - IBRD / 85150 Post Open - National 154,224.00 0.00 Canceled 2018-07-01 2018-07-06 2018-07-24 2018-07-28 2018-08-17 2018-09-03 2018-09-29 2019-07-26 climate-smart sub-projects Based Selection Bolo Dolores EC-MAGAP-37612-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Prior Open - International 359,856.00 0.00 Canceled 2019-04-01 2019-04-13 2019-04-30 2019-05-22 2019-06-01 2019-06-13 2019-06-30 2020-04-25 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - Bolo Dolores EC-MAGAP-37352-CS-QCBS / Estudios de factibilidad y diseño Component 1: Investments for Quality And Cost- definitivos integrales de IBRD / 85150 Post Open - International 453,600.00 0.00 Canceled 2018-01-10 2018-01-31 2018-03-12 2018-04-06 2018-04-21 2018-05-16 2018-06-09 2018-12-06 climate-smart sub-projects Based Selection subproyectos: riego, social y ambiental - Zona: Costa EC-MAGAP-37347-CS-QCBS / Estudios de factibilidad y diseño Component 1: Investments for Quality And Cost- definitivos integrales de IBRD / 85150 Prior Open - International 604,800.00 0.00 Canceled 2017-12-20 2018-01-01 2018-01-18 2018-02-09 2018-02-19 2018-03-03 2018-03-20 2018-09-16 climate-smart sub-projects Based Selection subproyectos: riego, social y ambiental - Zona: Sierra Norte EC-MAGAP-37351-CS-QCBS / Estudios de factibilidad y diseño definitivos integrales de Component 1: Investments for Quality And Cost- IBRD / 85150 Prior Open - International 621,600.00 0.00 Canceled 2017-12-20 2018-01-01 2018-01-18 2018-02-09 2018-02-19 2018-03-03 2018-03-20 2018-09-16 subproyectos: riego, social y climate-smart sub-projects Based Selection ambiental - Zona: Sierra Centro Sur EC-MAGAP-37613-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 141,120.00 0.00 Canceled 2018-11-13 2018-11-25 2018-12-12 2019-01-03 2019-01-13 2019-01-25 2019-02-11 2019-12-08 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - Zhinzhon EC-MAGAP-37055-CS-QCBS / Component 1: Investments for Quality And Cost- Supervisión de obra de riego - IBRD / 85150 Post Open - National 109,166.40 0.00 Canceled 2018-02-15 2018-02-20 2018-03-10 2018-03-14 2018-04-03 2018-04-20 2018-05-16 2018-11-12 climate-smart sub-projects Based Selection Las Mercedes EC-MAGAP-37587-CS-QCBS / Asistencia Técnica y Component 2: Capacity building Quality And Cost- Capacitación Plan Productivo y IBRD / 85150 for institutional stakeholders and Post Open - National 104,428.80 0.00 Canceled 2018-07-02 2018-07-14 2018-07-31 2018-08-22 2018-09-01 2018-09-13 2018-09-30 2019-07-27 Based Selection Ambiental - Directorio de aguas beneficiaries organizations de la acequia "Mundug Yamate" EC-MAGAP-37580-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 254,721.60 0.00 Canceled 2018-08-01 2018-08-13 2018-08-30 2018-09-21 2018-10-01 2018-10-13 2018-10-30 2019-08-26 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - Las Mercedes EC-MAGAP-37272-CS-QCBS / Consultant Component 1: Investments for Supervisión de obra de riego - IBRD / 85150 Post Qualification Open - National 60,480.00 0.00 Canceled 2018-06-01 2018-06-21 2018-07-06 2018-07-16 2018-07-31 2019-01-27 climate-smart sub-projects Zhinzhon Selection EC-MAGAP-37596-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 28,224.00 0.00 Canceled 2018-08-12 2018-09-01 2018-09-16 2018-09-26 2018-10-11 2019-08-07 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Tolontag EC-MAGAP-37606-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 66,326.40 0.00 Canceled 2018-05-18 2018-06-07 2018-06-22 2018-07-02 2018-07-17 2019-05-13 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - La Belgica EC-MAGAP-37603-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 39,513.60 0.00 Canceled 2018-11-15 2018-12-05 2018-12-20 2018-12-30 2019-01-14 2019-11-10 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental -Milagro Page 5 EC-MAGAP-37268-CS-QCBS / Consultant Component 1: Investments for Supervisión de obra de riego - IBRD / 85150 Post Qualification Open - National 51,408.00 0.00 Canceled 2018-05-01 2018-05-21 2018-06-05 2018-06-15 2018-06-30 2018-12-27 climate-smart sub-projects Chambitola Selection EC-MAGAP-37608-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 52,214.40 0.00 Canceled 2018-10-01 2018-10-21 2018-11-05 2018-11-15 2018-11-30 2019-09-26 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Jesús María EC-MAGAP-37257-CS-QCBS / Consultant Supervisión de obra de riego - Component 1: Investments for COFN / C1410 Post Qualification Open - National 50,363.40 0.00 Canceled 2017-12-11 2017-12-31 2018-01-15 2018-01-25 2018-02-09 2018-11-06 Directorio de aguas de la acequia climate-smart sub-projects Selection "Mundug Yamate" EC-MAGAP-37593-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 52,637.76 0.00 Canceled 2018-05-01 2018-05-21 2018-06-05 2018-06-15 2018-06-30 2019-04-26 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Luis Cordero EC-MAGAP-37594-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 88,997.33 0.00 Canceled 2018-05-01 2018-05-21 2018-06-05 2018-06-15 2018-06-30 2019-04-26 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Putucay EC-MAGAP-37604-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 119,952.00 0.00 Canceled 2018-09-20 2018-10-02 2018-10-19 2018-11-10 2018-11-20 2018-12-02 2018-12-19 2019-10-15 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental -Chambitola EC-MAGAP-37601-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 70,560.00 0.00 Canceled 2018-08-10 2018-08-30 2018-09-14 2018-09-24 2018-10-09 2019-08-05 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - La Magdalena EC-MAGAP-37583-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 23,856.34 0.00 Canceled 2018-04-02 2018-04-22 2018-05-07 2018-05-17 2018-06-01 2019-03-28 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental -Huaquer EC-MAGAP-37610-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 47,980.80 0.00 Canceled 2018-07-02 2018-07-22 2018-08-06 2018-08-16 2018-08-31 2019-06-27 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Chumblin EC-MAGAP-37598-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 31,752.00 0.00 Canceled 2018-04-25 2018-05-15 2018-05-30 2018-06-09 2018-06-24 2019-04-20 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - Verde Pacayunga EC-MAGAP-37602-CS-QCBS / Component 2: Capacity building Consultant Asistencia Técnica y IBRD / 85150 for institutional stakeholders and Post Qualification Open - National 56,448.00 0.00 Canceled 2018-08-10 2018-08-30 2018-09-14 2018-09-24 2018-10-09 2019-08-05 Capacitación Plan Productivo y beneficiaries organizations Selection Ambiental - La Libertad EC-MAGAP-37597-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 93,844.80 0.00 Canceled 2018-05-01 2018-05-13 2018-05-30 2018-06-21 2018-07-01 2018-07-13 2018-07-30 2019-05-26 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - Estero Piedras EC-MAGAP-37605-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 285,768.00 0.00 Canceled 2018-12-20 2019-01-01 2019-01-18 2019-02-09 2019-02-19 2019-03-03 2019-03-20 2020-01-14 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - La Paquita EC-MAGAP-37599-CS-QCBS / Component 2: Capacity building Asistencia Técnica y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 93,139.20 0.00 Canceled 2018-07-16 2018-07-28 2018-08-14 2018-09-05 2018-09-15 2018-09-27 2018-10-14 2019-08-10 Capacitación Plan Productivo y Based Selection beneficiaries organizations Ambiental - La Y del Guineo EC-MAGAP-37591-CS-QCBS / Asistencia Técnica y Component 2: Capacity building Capacitación Plan Productivo y Quality And Cost- IBRD / 85150 for institutional stakeholders and Post Open - National 215,208.00 0.00 Canceled 2018-09-03 2018-09-15 2018-10-02 2018-10-24 2018-11-03 2018-11-15 2018-12-02 2019-09-28 Ambiental - Junta General de Based Selection beneficiaries organizations Usuarios Píllaro - Ramal Norte (15 módulos) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-093 / Supervisión Asociación Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 7,401.36 7,401.36 Signed 2016-12-09 2016-12-08 2017-02-17 2017-03-16 2017-02-17 2017-03-16 2017-03-04 2017-04-07 2017-07-02 Campesina 15 de Diciembre, climate-smart sub-projects Selection Campozano EC-MAGAP-8176-094 / Component 1: Investments for Individual Consultant Supervisión Directorio de Agua IBRD / 85150 Post Open 16,630.56 16,630.56 Terminated 2016-12-23 2017-02-23 2017-02-10 2017-03-16 2017-02-10 2017-04-04 2017-03-10 2017-04-20 2017-07-08 climate-smart sub-projects Selection del canal Palo Marcado EC-MAGAP-8176-095 / Component 1: Investments for Individual Consultant Supervisión - Asociación Santa IBRD / 85150 Post Open 16,873.11 16,873.11 Signed 2016-12-30 2016-12-30 2017-02-17 2017-04-26 2017-02-17 2017-04-27 2017-03-15 2017-04-27 2017-07-13 climate-smart sub-projects Selection Cecilia de Pucalpa EC-MAGAP-8176-096 / Supervisión - Asociación de Component 1: Investments for Individual Consultant trabajadores agrícolas, IBRD / 85150 Post Open 26,877.86 27,877.86 Signed 2016-12-30 2016-12-30 2017-02-17 2017-05-16 2017-03-10 2017-03-16 2017-03-15 2017-04-03 2017-09-11 climate-smart sub-projects Selection autónomos comerciantes, exportadores Voluntad de Dios" EC-MAGAP-8176-097 / Supervisión - Asociación de Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 19,124.88 19,124.88 Signed 2016-12-30 2016-12-30 2017-02-17 2017-04-03 2017-03-04 2017-04-04 2017-03-15 2017-04-12 2017-08-12 desarrollo integral de la climate-smart sub-projects Selection comunidad de Cutahua, Simiatug Page 6 EC-MAGAP-8176-098 / Supervisión - Tecnificacion del Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 10,532.40 10,532.40 Signed 2016-12-23 2016-12-23 2017-02-10 2017-04-03 2017-02-25 2017-04-04 2017-03-08 2017-04-07 2017-07-06 sistema de riego Zhilla San climate-smart sub-projects Selection Pedro EC-MAGAP-8176-099 / Component 1: Investments for Individual Consultant Supervisión - Junta de Regantes IBRD / 85150 Post Open 12,984.05 12,984.05 Signed 2016-12-09 2017-02-23 2017-01-27 2017-03-16 2017-02-21 2017-03-20 2017-03-09 2017-04-05 2017-07-07 climate-smart sub-projects Selection del sistema de riego La Era EC-MAGAP-8176-071 / Técnico Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 27,086.40 36,176.98 2016-11-02 2017-04-19 2017-02-15 2017-05-09 2017-02-28 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Hidraúlico Zona 2 Management Selection Implementation EC-MAGAP-8176-060 / Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 56,329.22 150,240.59 2016-05-25 2016-07-04 2016-07-06 2016-12-01 2016-07-16 2016-12-01 2016-07-21 2016-12-01 2017-12-31 Especialista Ambiental UGP Management Selection Implementation EC-MAGAP-8176-072 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 32,077.05 Signed 2016-11-02 2016-12-01 2017-02-15 2017-03-29 2017-02-15 2017-03-30 2017-02-28 2017-04-07 2017-12-31 Agrícola Zona 2 Management Selection EC-MAGAP-8176-073 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 32,077.05 Signed 2016-11-02 2016-12-22 2017-02-15 2017-03-29 2017-02-15 2017-03-30 2017-02-28 2017-04-07 2017-12-31 Social Zona 2 Management Selection EC-MAGAP-8176-078 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 30,854.74 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Agrícola Zona 4 Management Selection EC-MAGAP-8176-079 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 17,749.14 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Social Zona 4 Management Selection EC-MAGAP-8176-081 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 28,193.62 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Agrícola Zona 5 Management Selection EC-MAGAP-8176-082 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 20,210.26 Signed 2016-11-02 2017-03-09 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Social Zona 5 Management Selection EC-MAGAP-8176-083 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 28,193.62 Signed 2016-11-02 2016-12-22 2017-02-15 2017-03-29 2017-02-15 2017-03-30 2017-02-28 2017-05-15 2017-12-31 Hidraúlico Zona 6 Management Selection EC-MAGAP-8176-084 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 28,193.62 Signed 2016-11-02 2016-12-22 2017-02-15 2017-03-29 2017-02-15 2017-03-30 2017-02-28 2017-05-15 2017-12-31 Agrícola Zona 6 Management Selection EC-MAGAP-8176-085 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 17,549.14 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Social Zona 6 Management Selection EC-MAGAP-8176-086 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 28,193.62 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Hidraúlico Zona 7 Management Selection EC-MAGAP-8176-087 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 28,193.62 Signed 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-15 2017-12-31 Agrícola Zona 7 Management Selection EC-MAGAP-8176-088 / Técnico Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 27,086.40 28,193.62 2016-11-02 2016-12-22 2017-02-15 2017-05-09 2017-02-15 2017-05-11 2017-02-28 2017-05-11 2017-12-31 Social Zona 7 Management Selection Implementation EC-MAGAP-8176-055 / 1 Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 56,329.22 61,727.79 2016-05-25 2016-04-16 2016-07-06 2016-09-01 2016-07-16 2016-09-01 2016-07-21 2016-09-01 2017-12-31 Especialista Hidráulico UGP Management Selection Implementation EC-MAGAP-8176-056 / 1 Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 56,329.22 136,800.61 2016-05-25 2016-07-04 2016-07-06 2016-08-16 2016-07-16 2016-08-16 2016-07-21 2016-08-16 2017-12-31 Especialista Agrícola UGP Management Selection Implementation EC-MAGAP-8176-057 / 1 Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 56,329.22 57,987.88 2016-05-25 2016-04-20 2016-07-06 2016-08-11 2016-07-16 2016-10-10 2016-07-21 2016-10-10 2017-12-31 Especialista Ambiental UGP Management Selection Implementation EC-MAGAP-8176-058 / 1 Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 56,329.22 76,253.56 2016-05-25 2016-04-19 2016-07-06 2016-08-16 2016-07-16 2016-08-16 2016-07-21 2016-08-16 2017-12-31 Especialista Social UGP Management Selection Implementation EC-MAGAP-8176-059 / 1 Component 3: Project Individual Consultant Under Especialista en Agronegocios IBRD / 85150 Post Open 56,329.22 60,547.05 2016-05-25 2016-07-04 2016-07-06 2016-08-16 2016-07-16 2016-08-16 2016-07-21 2016-08-16 2017-12-31 Management Selection Implementation UGP EC-MAGAP-8176-090 / Supervisión Asociación de Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 14,869.21 14,869.21 Signed 2016-12-09 2017-02-23 2017-01-27 2017-03-16 2017-01-27 2017-03-20 2017-03-09 2017-04-03 2017-07-07 Productores Agrícolas San climate-smart sub-projects Selection Rafael EC-MAGAP-8176-092 / Component 1: Investments for Individual Consultant Supervisión Cooperativa IBRD / 85150 Post Open 14,549.64 14,549.63 Signed 2016-12-09 2016-12-08 2017-02-17 2017-05-16 2017-02-17 2017-03-20 2017-03-04 2017-04-30 2017-08-11 climate-smart sub-projects Selection Agropecuaria el Marco, Pintag EC-MAGAP-8545-CS-INDV / Component 3: Project Individual Consultant Pending IBRD / 85150 Post Open 31,294.03 0.00 2017-02-26 2017-03-11 2017-03-14 2017-03-15 2017-12-31 Especialista de Capacitación Management Selection Implementation EC-MAGAP-32740-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant Pending IBRD / 85150 for institutional stakeholders and Post Direct 12,073.88 0.00 2017-10-27 2017-11-01 2017-11-03 2017-11-06 2018-01-05 marcha del sistema de riego - Selection Implementation beneficiaries organizations Junta de Aguas de Riego Palmar Grande EC-MAGAP-32742-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant IBRD / 85150 for institutional stakeholders and Post Direct 5,521.88 5,521.88 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 marcha del sistema de riego - Selection beneficiaries organizations Asociación de Productores Agrícolas San Rafael EC-MAGAP-32744-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant IBRD / 85150 for institutional stakeholders and Post Direct 11,637.08 11,637.08 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 marcha del sistema de riego - Selection beneficiaries organizations Asociación Santa Cecilia de Pucalpa Page 7 EC-MAGAP-32746-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant Under IBRD / 85150 for institutional stakeholders and Post Direct 12,073.88 0.00 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2018-01-05 marcha del sistema de riego - Selection Implementation beneficiaries organizations Cooperativa Agropecuaria El Marco, Pintag EC-MAGAP-32747-CS-INDV / Asistencia técnica y capacitación para la puesta en Component 2: Capacity building Individual Consultant marcha del sistema de riego - IBRD / 85150 for institutional stakeholders and Post Direct 12,073.88 12,073.88 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 Selection Asociación de desarrollo integral beneficiaries organizations de la comunidad de Cutahua, Simiatug EC-MAGAP-32748-CS-INDV / Asistencia técnica y capacitación para la puesta en Component 2: Capacity building marcha del sistema de riego - Individual Consultant Pending IBRD / 85150 for institutional stakeholders and Post Direct 12,292.28 0.00 2017-10-27 2017-11-01 2017-11-03 2017-11-06 2018-01-05 Asociación de trabajadores Selection Implementation beneficiaries organizations agrícolas, autónomos comerciantes, exportadores "Voluntad de Dios" EC-MAGAP-32750-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant IBRD / 85150 for institutional stakeholders and Post Direct 11,637.08 11,637.08 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 marcha del sistema de riego - Selection beneficiaries organizations Asociación Campesina 15 de Diciembre EC-MAGAP-32751-CS-INDV / Asistencia técnica y Component 2: Capacity building Individual Consultant capacitación para la puesta en IBRD / 85150 for institutional stakeholders and Post Direct 11,637.08 11,637.08 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 Selection marcha del sistema de riego - beneficiaries organizations Zhilla San Pedro EC-MAGAP-32753-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant IBRD / 85150 for institutional stakeholders and Post Direct 12,073.88 12,073.88 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 marcha del sistema de riego - Selection beneficiaries organizations Junta de Regantes del sistema de riego La Era EC-MAGAP-32754-CS-INDV / Asistencia técnica y Component 2: Capacity building capacitación para la puesta en Individual Consultant IBRD / 85150 for institutional stakeholders and Post Direct 11,418.68 11,418.68 Signed 2017-10-27 2017-12-15 2017-11-01 2017-11-03 2017-12-18 2017-11-06 2017-12-19 2018-01-05 marcha del sistema de riego - Selection beneficiaries organizations Directorio de Agua del canal Palo Marcado EC-MAGAP-8176-101 / Supervisión - Asociación Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 19,094.76 0.00 Canceled 2017-02-23 2017-04-13 2017-04-24 2017-05-08 2017-10-05 Agropecuaria Santa Clara de climate-smart sub-projects Selection Tolontag EC-MAGAP-8176-100 / Component 1: Investments for Individual Consultant Supervisión - Asociación de IBRD / 85150 Post Open 18,400.00 0.00 Canceled 2017-03-20 2017-05-08 2017-05-19 2017-06-02 2017-11-29 climate-smart sub-projects Selection Agricultores Huaquer EC-MAGAP-8176-106 / Supervisiones en 34 Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 25,231.95 0.00 Canceled 2017-02-23 2017-04-13 2017-04-24 2017-05-08 2017-11-04 Microreservorios en la parroquia climate-smart sub-projects Selection Ingapirca-Coop. Vendeleche EC-MAGAP-8176-107 / Component 1: Investments for Individual Consultant Supervisión en microreservorios IBRD / 85150 Post Open 60,664.02 0.00 Canceled 2017-06-15 2017-08-03 2017-08-24 2017-09-07 2018-03-06 climate-smart sub-projects Selection primera convocatoria EC-MAGAP-8176-089 / Supervisión de aproximadamente Component 1: Investments for Individual Consultant 14 subproyectos de riego IBRD / 85150 Post Open 278,401.90 0.00 Canceled 2017-06-01 2017-08-15 2017-08-15 2017-09-01 2018-02-28 climate-smart sub-projects Selection parcelario de la primera convocatoria EC-MAGAP-8176-104 / Component 1: Investments for Individual Consultant Supervisión - Tecnificacion del IBRD / 85150 Post Open 28,502.01 0.00 Canceled 2017-02-23 2017-04-13 2017-04-24 2017-05-08 2017-09-05 climate-smart sub-projects Selection sistema de riego Putucay EC-MAGAP-8176-105 / Supervisión - Tecnificación del Component 1: Investments for Individual Consultant IBRD / 85150 Post Open 23,589.12 0.00 Canceled 2017-02-23 2017-04-13 2017-04-24 2017-05-08 2017-11-04 sistema de riego Luis Cordero climate-smart sub-projects Selection Etapa 1 EC-MAGAP-32990-CS-CDS / Component 3: Project Under IBRD / 85150 Prior Direct Selection Direct 56,000.00 0.00 2017-10-27 2017-11-15 2017-11-29 2017-11-27 2018-03-27 Auditoría Financiera II Management Implementation EC-MAGAP-36882-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 2,661.12 10,644.48 Signed 2017-11-24 2017-10-24 2017-11-28 2017-11-29 2017-11-30 2017-12-01 2017-11-30 2017-12-31 Técnico Social Zona 6 Management Selection EC-MAGAP-37387-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 2,811.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Social - Zona 2 Management Selection EC-MAGAP-37388-CS-INDV / Component 3: Project Individual Consultant TécnicoAgropecuario y de IBRD / 85150 Post Direct 40,602.24 2,811.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 2 EC-MAGAP-37389-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 2,811.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 2 Management Selection EC-MAGAP-37390-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 4 EC-MAGAP-37392-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 4 Management Selection EC-MAGAP-37393-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 5 Page 8 EC-MAGAP-37396-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 40,602.24 2,961.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 6 EC-MAGAP-37397-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 2,961.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 6 Management Selection EC-MAGAP-37398-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 2,961.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Social - Zona 6 Management Selection EC-MAGAP-37399-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Social - Zona 7 Management Selection EC-MAGAP-37400-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 7 EC-MAGAP-37401-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 3,036.12 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 7 Management Selection EC-MAGAP-37402-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Direct 40,602.24 5,622.24 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 1 Management Selection EC-MAGAP-37405-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Direct 40,602.24 5,622.24 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Técnico Hidráulico - Zona 3 Management Selection EC-MAGAP-37407-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de COFN / C1410 Post Direct 40,602.24 5,622.24 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection Comercialización - Zona 3 EC-MAGAP-37408-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Especialista Hidráulico UGP Management Selection EC-MAGAP-37409-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 41,126.40 0.00 Canceled 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-13 2018-01-01 2018-12-31 Especialista Social UGP Management Selection EC-MAGAP-37410-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Especialista Ambiental 1 UGP Management Selection EC-MAGAP-37411-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-28 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Especialista Agrícola UGP Management Selection EC-MAGAP-37412-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-09 2018-12-31 Especialista Ambiental 2 UGP Management Selection EC-MAGAP-37413-CS-INDV / Component 3: Project Individual Consultant Especialista en Agronegocios IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection UGP EC-MAGAP-37414-CS-INDV / Component 3: Project Individual Consultant Especialista de Capacitación IBRD / 85150 Post Direct 41,126.40 3,750.41 Signed 2017-11-28 2018-03-28 2017-12-14 2018-03-29 2017-12-19 2018-04-04 2018-01-01 2018-04-06 2018-12-31 Management Selection UGP EC-MAGAP-53287-CS-INDV / Component 3: Project Individual Consultant Pending IBRD / 85150 Post Open 27,086.40 0.00 2016-11-02 2017-02-15 2017-02-15 2017-02-28 2017-12-31 Técnico Hidraúlico Zona 4 Management Selection Implementation EC-MAG-64103-CS-INDV / Component 3: Project Individual Consultant CONSULTOR ESPECIALISTA IBRD / 85150 Post Limited 26,252.86 3,750.41 Signed 2018-05-25 2018-05-29 2018-05-28 2018-05-29 2018-05-30 2018-06-07 2018-06-01 2018-06-07 2018-12-31 Management Selection SOCIAL EC-MAG-65890-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Open 17,916.72 11,919.48 Signed 2018-06-18 2018-06-21 2018-07-09 2018-06-27 2018-07-10 2018-07-02 2018-07-12 2018-07-10 2018-12-31 Técnico Social Carchi Management Selection EC-MAG-65891-CS-INDV / Component 3: Project Individual Consultant Pending COFN / C1410 Post Open 16,566.72 0.00 2018-06-18 2018-07-09 2018-07-10 2018-07-12 2018-12-31 Técnico Hidráulico Tungurahua Management Selection Implementation EC-MAG-65893-CS-INDV / Component 3: Project Individual Consultant Under IBRD / 85150 Post Open 20,016.72 0.00 2018-06-18 2018-06-21 2018-07-09 2018-07-10 2018-07-12 2018-12-31 Técnico Social Manabí Management Selection Implementation EC-MAG-65896-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Open 18,336.72 2,961.12 Signed 2018-06-18 2018-06-21 2018-07-09 2018-06-27 2018-07-10 2018-07-02 2018-07-12 2018-07-10 2018-12-31 Técnico Social Loja Management Selection EC-MAG-65897-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Direct 19,302.84 2,736.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Hidráulico Imbabura Management Selection EC-MAG-65898-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 19,302.84 2,736.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Management Selection Comercialización Pichincha EC-MAG-65899-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 19,302.84 2,736.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Hidráulico Pichincha Management Selection EC-MAG-65900-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 19,302.84 2,735.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Social Pichincha Management Selection EC-MAG-65901-CS-INDV / Component 3: Project Individual Consultant Under COFN / C1410 Post Direct 19,302.84 0.00 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-12-31 Técnico Hidráulico Cotopaxi Management Selection Implementation EC-MAG-65902-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 23,277.84 3,261.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Management Selection Comercialización Manabí EC-MAG-65903-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 23,277.84 3,261.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Hidráulico Manabí Management Selection EC-MAG-65904-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 19,302.84 2,736.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Management Selection Comercialización Bolivar Page 9 EC-MAG-65905-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 21,197.84 2,961.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-07-10 2018-12-31 Management Selection Comercialización Azuay EC-MAG-65906-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 21,197.84 2,961.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Hidráulico Azuay Management Selection EC-MAG-65907-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 21,197.84 2,961.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Técnico Social Azuay Management Selection EC-MAG-65908-CS-INDV / Component 3: Project Individual Consultant Under IBRD / 85150 Post Direct 21,297.84 0.00 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-12-31 Técnico Hidráulico Loja Management Selection Implementation EC-MAG-65909-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de IBRD / 85150 Post Direct 21,237.84 2,961.12 Signed 2018-06-08 2018-06-11 2018-06-11 2018-06-11 2018-06-12 2018-06-12 2018-06-12 2018-06-13 2018-12-31 Management Selection Comercialización El Oro EC-MAGAP-37273-CS-INDV / Fiscalización - Subproyecto: Implementación del sistema de Component 1: Investments for Individual Consultant Pending COFN / C1410 Post Open 12,377.75 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 riego por goteo y aspersión en la climate-smart sub-projects Selection Implementation Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAGAP-37277-CS-INDV / Fiscalización de Obra de Riego - Implementación del sistema de Component 1: Investments for Individual Consultant Pending riego parcelario por aspersión IBRD / 85150 Post Open 16,852.82 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-05-05 climate-smart sub-projects Selection Implementation para la "Asociación de productores agropecuarios La Nueva Esperanza". EC-MAGAP-37278-CS-INDV / Fiscalización de obra de riego - Subproyecto: Implementación del Component 1: Investments for Individual Consultant Pending IBRD / 85150 Post Open 15,627.85 0.00 2017-12-22 2018-01-28 2018-02-04 2018-02-20 2018-08-19 sistema de riego parcelario por climate-smart sub-projects Selection Implementation aspersión para la "Asociación Agropecuaria Sierra Morena". EC-MAGAP-37330-CS-INDV / Fiscalización de obra de riego - Subproyecto: Implementación de Component 1: Investments for Individual Consultant Pending IBRD / 85150 Post Open 15,182.97 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 riego tecnificado a nivel climate-smart sub-projects Selection Implementation parcelario en el sistema de riego El Verde - Pacayunga. EC-MAGAP-37276-CS-INDV / Fiscalización - Subproyecto: Implementación de riego por Component 1: Investments for Individual Consultant Pending COFN / C1410 Post Open 21,073.07 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 aspersión en la Asociación climate-smart sub-projects Selection Implementation Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAGAP-37332-CS-INDV / Fiscalización - Subproyecto: Implementación del sistema de Component 1: Investments for Individual Consultant Pending IBRD / 85150 Post Open 24,191.62 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-05-05 riego parcelario por aspersión climate-smart sub-projects Selection Implementation para la "Comuna Jurídica La Libertad". EC-MAGAP-37339-CS-INDV / Fiscalización - Subproyecto: Tecnificación de Riego a nivel Component 1: Investments for Individual Consultant Pending IBRD / 85150 Post Open 15,142.44 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 parcelario por aspersión para la climate-smart sub-projects Selection Implementation Junta de Riego "Gúlac - Cruz Rumi" Chumblín. EC-MAG-74171-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments for Individual Consultant Pending Implementación de riego COFN / C1410 Post Open 25,738.66 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-05-05 climate-smart sub-projects Selection Implementation parcelario tecnificado en el predio Sucuso EC-MAG-74176-CS-INDV / Fiscalización - Subproyecto: Implementación de riego Component 1: Investments for Individual Consultant Pending parcelario tecnificado por COFN / C1410 Post Open 51,416.83 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-07-11 climate-smart sub-projects Selection Implementation aspersión en 152,44 ha para la Junta General de Riego "Canal Central Toacaso" EC-MAGAP-37328-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - IBRD / 85150 Post Open 20,263.99 0.00 Canceled 2018-05-30 2018-07-06 2018-07-13 2018-07-29 2018-11-26 climate-smart sub-projects Selection Tolontag EC-MAGAP-37337-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - IBRD / 85150 Post Open 22,377.60 0.00 Canceled 2018-07-31 2018-09-06 2018-09-13 2018-09-29 2019-01-27 climate-smart sub-projects Selection Jesús María EC-MAGAP-37279-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - IBRD / 85150 Post Open 26,509.07 0.00 Canceled 2017-12-22 2018-01-28 2018-02-04 2018-02-20 2018-08-19 climate-smart sub-projects Selection Luis Cordero EC-MAGAP-37326-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - IBRD / 85150 Post Open 31,290.36 0.00 Canceled 2017-12-20 2018-01-26 2018-02-02 2018-02-18 2018-06-18 climate-smart sub-projects Selection Putucay EC-MAGAP-37336-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - La IBRD / 85150 Post Open 28,425.60 0.00 Canceled 2018-02-15 2018-03-24 2018-03-31 2018-04-16 2018-08-14 climate-smart sub-projects Selection Belgica EC-MAGAP-37333-CS-INDV / Component 1: Investments for Individual Consultant Supervisión de obra de riego - IBRD / 85150 Post Open 16,934.40 0.00 Canceled 2018-08-30 2018-10-06 2018-10-13 2018-10-29 2019-02-26 climate-smart sub-projects Selection Milagro EC-MAGAP-33018-CS-CDS / Estudios de factibilidad y diseños definitivos integrales de Component 1: Investments for IBRD / 85150 Prior Direct Selection Direct 72,866.08 0.00 Canceled 2017-10-27 2017-11-15 2017-11-27 2018-03-27 subproyectos: riego, social y climate-smart sub-projects ambiental para la Provincia de Chimborazo Page 10 EC-MAGAP-33019-CS-CDS / Estudios de factibilidad y diseños definitivos integrales de Component 1: Investments for IBRD / 85150 Prior Direct Selection Direct 95,133.92 0.00 Canceled 2017-10-27 2017-11-15 2017-11-27 2018-03-27 subproyectos: riego, social y climate-smart sub-projects ambiental para las Provincias Cotopaxi y Azuay EC-MAGAP-37395-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Open 40,602.24 0.00 Canceled 2017-11-24 2017-12-20 2017-12-22 2018-01-01 2018-12-31 Técnico Hidráulico - Zona 5 Management Selection EC-MAG-65889-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Open 17,916.72 0.00 Canceled 2018-06-18 2018-07-09 2018-07-10 2018-07-12 2018-12-31 Técnico Hidráulico Carchi Management Selection EC-MAGAP-38879-CS-INDV / Component 3: Project Individual Consultant Asistente Administrativo Planta IBRD / 85150 Post Direct 733.00 0.00 Canceled 2017-11-30 2017-11-30 2017-11-30 2017-12-01 2017-12-31 Management Selection Central EC-MAGAP-38881-CS-INDV / Especialista de Procesos y Component 3: Project Individual Consultant IBRD / 85150 Post Direct 1,676.00 0.00 Canceled 2017-11-30 2017-11-30 2017-11-30 2017-12-01 2017-12-31 Gestión de Sub-proyectos Planta Management Selection Central EC-MAGAP-8176-080 / Técnico Component 3: Project Individual Consultant IBRD / 85150 Post Open 27,086.40 0.00 Canceled 2016-11-02 2017-02-15 2017-02-15 2017-02-28 2017-12-31 Hidraúlico Zona 5 Management Selection EC-MAGAP-38872-CS-INDV / Component 3: Project Individual Consultant Analista Administrativo IBRD / 85150 Post Direct 817.00 0.00 Canceled 2017-11-30 2017-11-30 2017-11-30 2017-12-01 2017-12-31 Management Selection Financiero Zona 2 EC-MAGAP-37394-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Direct 40,602.24 0.00 Canceled 2017-11-28 2017-12-14 2017-12-19 2018-01-01 2018-12-31 Técnico Social - Zona 5 Management Selection EC-MAGAP-37403-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Direct 40,602.24 0.00 Canceled 2017-11-28 2017-12-14 2017-12-19 2018-01-01 2018-12-31 Técnico Social - Zona 1 Management Selection EC-MAGAP-37404-CS-INDV / Component 3: Project Individual Consultant Técnico Agropecuario y de COFN / C1410 Post Open 40,602.24 0.00 Canceled 2017-11-24 2017-12-20 2017-12-22 2018-01-01 2018-12-31 Management Selection Comercialización - Zona 1 EC-MAGAP-37406-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Direct 40,602.24 0.00 Canceled 2017-11-28 2017-12-14 2017-12-19 2018-01-01 2018-12-31 Técnico Social - Zona 3 Management Selection EC-MAGAP-38880-CS-INDV / Component 3: Project Individual Consultant Especialista de Planificación IBRD / 85150 Post Direct 1,676.00 0.00 Canceled 2017-11-30 2017-11-30 2017-11-30 2017-12-01 2017-12-31 Management Selection Planta Central EC-MAG-65892-CS-INDV / Component 3: Project Individual Consultant COFN / C1410 Post Open 17,916.72 0.00 Canceled 2018-06-18 2018-07-09 2018-07-10 2018-07-12 2018-12-31 Técnico Hidráulico Chimborazo Management Selection EC-MAGAP-32571-CS-CDS / Component 3: Project Individual Consultant Ingeniero Civil - Especialista IBRD / 85150 Post Direct 9,407.68 0.00 Canceled 2017-10-27 2017-11-01 2017-11-03 2017-11-06 2018-01-05 Management Selection Hidráulico 1 EC-MAGAP-32574-CS-INDV / Component 3: Project Individual Consultant Ingeniero Civil - Especialista IBRD / 85150 Post Direct 9,407.68 0.00 Canceled 2017-10-27 2017-11-01 2017-11-03 2017-11-06 2018-01-05 Management Selection Hidráulico 2 EC-MAGAP-37391-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Open 40,602.24 0.00 Canceled 2017-11-24 2017-12-20 2017-12-22 2018-01-01 2018-12-31 Técnico Social - Zona 4 Management Selection EC-MAG-65894-CS-INDV / Component 3: Project Individual Consultant IBRD / 85150 Post Open 20,036.72 0.00 Canceled 2018-06-18 2018-07-09 2018-07-10 2018-07-12 2018-12-31 Técnico Hidráulico Guayas Management Selection EC-MAG-74340-CS-INDV / Fiscalización de obra de riego - Component 1: Investments for Individual Consultant Pending Implementación del sistema de IBRD / 85150 Post Open 22,753.95 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-06-04 climate-smart sub-projects Selection Implementation riego por aspersión en el predio "Santa Ana". EC-MAG-74361-CS-INDV / Fiscalización de Obra de Riego - Implementación de riego Component 1: Investments for Individual Consultant Pending COFN / C1410 Post Open 47,892.21 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 parcelario tecnificado con las climate-smart sub-projects Selection Implementation Ó alo familias de usuarios del v Pinguilí EC-MAG-74365-CS-INDV / Fiscalización de Obra de Riego - Component 1: Investments for Individual Consultant Pending Tecnificación de riego parcelario IBRD / 85150 Post Open 34,469.01 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-04-05 climate-smart sub-projects Selection Implementation por micro aspersión para la Comunidad "Estero Piedras" EC-MAG-74366-CS-INDV / Fiscalización de Obra de Riego - Implementación de riego Component 1: Investments for Individual Consultant Pending parcelario tecnificado por IBRD / 85150 Post Open 25,734.87 0.00 2018-11-06 2018-11-27 2018-11-30 2018-12-06 2019-06-04 climate-smart sub-projects Selection Implementation aspersión y goteo para el sistema de riego "Y de El Guineo" EC-MAG-74526-CS-INDV / Component 3: Project Individual Consultant Pending IBRD / 85150 Post Open 16,305.60 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Hidráulico Manabí Management Selection Implementation EC-MAG-74528-CS-INDV / Component 3: Project Individual Consultant Pending COFN / C1410 Post Open 13,680.60 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Social Tungurahua Management Selection Implementation EC-MAG-74530-CS-INDV / Component 3: Project Individual Consultant Pending COFN / C1410 Post Open 13,680.60 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Social Imbabura Management Selection Implementation EC-MAG-74532-CS-INDV / Component 3: Project Individual Consultant Pending COFN / C1410 Post Open 13,680.60 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Social Cotopaxi Management Selection Implementation EC-MAG-74533-CS-INDV / Component 3: Project Individual Consultant Pending COFN / C1410 Post Open 14,805.60 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Social Chimborazo Management Selection Implementation Page 11 EC-MAG-65895-CS-INDV / Component 3: Project Individual Consultant Pending IBRD / 85150 Post Open 13,750.05 0.00 2018-09-03 2018-09-24 2018-09-25 2018-09-27 2018-12-31 Técnico Hidráulico Bolívar Management Selection Implementation Page 12