Zarafshon Irrigation Rehabilitation and River Basin Management (ZIRP) Project Procurement Plan (P158576) Procureme Estimated Bank Reference Selection Contract Description nt amount in oversigh No method t signing date approach (USD $) GOODS ZIRP-RFQ- National, Vehicles RFQ 90,000.00 Post 002 Open ZIRP-RFQ- National, Furniture for PMU and PCU RFQ 20,000.00 Post 004 Open CONSULTING SERVICES Detailed design, including Author supervision for Mastchohi kuhi, Ayni, ZIRP-СQS- National, 140,000. СQS Post Shahriston, Devashtich and Panjakent 007 Open 00 districts ZIRP-СQS- National, 170,000. Detailed design for Panjakent districts СQS Post 011 Open 00 PROCUREMENT Tajikistan : Zarafshon Irrigation Rehabilitation and Management Improvement Project PLAN General Information Country: Tajikistan Bank’s Approval Date of the Original Procurement Plan: 2018-01-29 2021-02-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158576 GPN Date: 2018-01-30 Project Name: Zarafshon Irrigation Rehabilitation and Management Improvement Project Loan / Credit No: TF / A6507 P Executing Agency(ies): roject Management Unit for the “Fergana Valley Water Resources Management Project” WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZIRP-RFQ-W-003 / Repair of Rehabilitation of Irrigation Request for Single Stage - One 2019-04- TF / A6507 Post Open - National 35,000.00 33,184.31 Completed 2018-09-02 2018-10-28 2018-05-15 the office ZIRP Infrastructure Quotations Envelope 26 ZIRP-NCB-W-006 / Rehabilitation of pump station Rehabilitation of Irrigation Single Stage - One 2019-11- TF / A6507 Post Request for Bids Open - National 535,000.00 544,414.74 Completed 2019-02-05 2019-02-05 2019-02-10 2019-03-24 2019-03-11 2019-04-23 2019-03-14 2019-05-28 2019-03-20 Dupula and canal Dupula in Infrastructure Envelope 24 Panjakent district ZIRP-NCB-W-009 / Rehabilitation of pumping Rehabilitation of Irrigation Single Stage - One 2019-11- stations Navobod, Rudaki and TF / A6507 Post Request for Bids Open - National 300,000.00 274,959.99 Completed 2019-02-04 2019-02-04 2019-02-09 2019-03-23 2019-03-13 2019-04-22 2019-03-15 2019-05-27 2019-03-20 Infrastructure Envelope 23 Margedar-3 in Panjakent district ZIRP-NCB-W-010 / Rehabilitation of pumping Rehabilitation of Irrigation Single Stage - One 2019-11- TF / A6507 Post Request for Bids Open - National 415,000.00 398,449.30 Completed 2019-02-04 2019-02-10 2019-02-09 2019-03-23 2019-03-27 2019-04-22 2019-03-27 2019-05-27 2019-04-08 stations Yori 1 and Leningrad Infrastructure Envelope 23 -2 in Panjakent district ZIRP-NCB-W-012 / Repair of the building of a technical workshop for the repair of pumps, electric motors, machines, mechanisms and Rehabilitation of Irrigation Single Stage - One 2019-06- TF / A6507 Post Request for Bids Open - National 539,000.00 532,230.12 Completed 2018-09-05 2018-12-03 2018-09-10 2018-10-22 2018-08-20 2018-11-21 2019-02-01 2018-12-26 2018-08-28 the construction of the office Infrastructure Envelope 24 of the Zerafshan basin organization in Ayni district and the repair of the existing AMI building in Penjikent ZIRP-NCB-W-013 / Repair, restoration of shields and Rehabilitation of Irrigation Single Stage - One 2019-07- gates and installation of water- TF / A6507 Post Request for Bids Open - National 520,000.00 341,273.99 Completed 2018-09-14 2018-09-19 2018-10-31 2018-11-30 2019-01-04 2019-02-01 Infrastructure Envelope 03 measuring structures in Panjikent district COMMUNITY BASED CONTRACTS / Multilateral Pending contracts with manual Rehabilitation of Irrigation Community Driven 2019-06- TF / A6507 Post Direct 1,000,000.00 0.00 Implementat 2018-11-01 2018-11-06 2018-12-11 workers in Ayni, Shahriston, Infrastructure Development 09 ion Mastchohi kuhi, Devashtich and Panjakent districts ZIRP-NCB-W-002 / Rehabilitation of pumping Rehabilitation of Irrigation Single Stage - One 2019-10- stations Varz 1-2, Sangiston, TF / A6507 Post Request for Bids Open - National 800,000.00 790,403.00 Completed 2018-12-20 2018-11-04 2018-12-25 2019-02-05 2018-12-24 2019-03-07 2019-04-11 2019-01-15 Infrastructure Envelope 08 canals and dyukers in the Ayni district ZIRP-NCB-W-003 / Rehabilitation of Khalifa- Rehabilitation of Irrigation Single Stage - One 1,761,965.7 2019-10- TF / A6507 Post Request for Bids Open - National 755,000.00 Completed 2018-12-28 2018-12-25 2019-01-02 2019-02-13 2019-01-28 2019-03-15 2019-02-01 2019-04-19 2019-02-11 Hasan canal of Panjakent Infrastructure Envelope 5 16 district ZIRP-NCB-W-001 / Rehabilitation of on-farm Rehabilitation of Irrigation Single Stage - One 2019-11- TF / A6507 Post Request for Bids Open - National 400,000.00 447,870.48 Completed 2019-01-13 2019-01-14 2019-01-18 2019-03-01 2019-02-20 2019-03-31 2019-02-28 2019-05-05 2019-03-11 pipelines and canals in Infrastructure Envelope 01 Mastchohi Kuhi district ZIRP-NCB-W-004 / Rehabilitation of water intake structure of headworks of Tuqsan -Korez and Eshon Rehabilitation of Irrigation Single Stage - One 2020-04- TF / A6507 Post Request for Bids Open - National 460,000.00 0.00 Canceled 2019-07-04 2019-07-09 2019-08-20 2019-09-19 2019-10-24 canals and Rehabilitation of Infrastructure Envelope 21 Tuqsan -Korez, Leningrad-1 and Eshon canals in Panjakent district ZIRP-NCB-W-008 / Rehabilitation of pumping Rehabilitation of Irrigation Single Stage - One 2020-02- stations and Rehabilitation of TF / A6507 Post Request for Bids Open - National 800,000.00 720,978.84 Signed 2019-05-03 2019-04-22 2019-05-08 2019-06-19 2019-05-31 2019-07-19 2019-06-21 2019-08-23 2019-07-11 Infrastructure Envelope 19 canals on Nilufar-1,2,3 in Panjakent district ZIRP-NCB-W-011 / Rehabilitation of Margedar, Margedar-3, Rudaki and Navobod canals and Rehabilitation of Irrigation Single Stage - One 2020-01- TF / A6507 Post Request for Bids Open - National 810,000.00 0.00 Canceled 2019-04-12 2019-04-17 2019-05-29 2019-06-28 2019-08-02 Rehabilitation of intake Infrastructure Envelope 29 structures on the Marghedar and Marghedar-3 canals in Panjakent district ZIRP-NCB-W-014 / Mechanized clearing of canals Khalifa Khasan, Tuxan Kores, Eshon, Sarazm, Nilufar-2, 3, Rehabilitation of Irrigation Single Stage - One 2019-09- TF / A6507 Post Request for Bids Open - National 600,000.00 530,594.42 Completed 2018-11-25 2018-10-01 2018-11-30 2019-01-11 2018-11-08 2019-02-10 2019-02-01 2019-03-17 2018-11-29 Margedar, Margedar-3, Infrastructure Envelope 13 Dupula, Yori -1,2, Leningrad, Navobod and Rudaki in Panjekent district Page 1 ZIRP-NCB-W-016 / Rahabilitation of vertical wells (9 pcs.) and shields of closures in the Shahriston district, Rehabilitation of Rehabilitation of Irrigation Single Stage - One 2020-02- vertical wells (23 pcs.), TF / A6507 Post Request for Bids Open - National 600,000.00 0.00 Canceled 2019-05-03 2019-05-08 2019-06-19 2019-07-19 2019-08-23 Infrastructure Envelope 19 Channels and pipelines (7 objects), gate panels in Devashtich district and Rehabilitation of pumping station Mehnat-3 ZIRP-RFQ-W-001 / Rehabilitation of Irrigation Single Stage - One 2019-08- Rehabilitation of Nilufar 1-2- TF / A6507 Post Request for Bids Open - National 200,000.00 0.00 Canceled 2018-11-06 2018-11-11 2018-12-23 2019-01-22 2019-02-26 Infrastructure Envelope 25 3 canals in Panjakent rayon. ZIRP-RFQ-W-007 / Rehabilitation of Tuqsan - Rehabilitation of Irrigation Request for Single Stage - One 2019-06- TF / A6507 Post Open - National 150,000.00 0.00 Canceled 2018-11-06 2019-01-01 Korez, Leningrad-1 and Eshon Infrastructure Quotations Envelope 30 canals in Panjakent district ZIRP-RFQ-W-004 / Rehabilitation of pumping Rehabilitation of Irrigation Request for Single Stage - One 2019-08- TF / A6507 Post Open - National 200,000.00 0.00 Canceled 2018-12-08 2019-02-02 station Mehnat-3 and channel- Infrastructure Quotations Envelope 01 MK-4, in the area Devastich ZIRP-RFQ-W-005 / Rehabilitation of vertical wells Rehabilitation of Irrigation Request for Single Stage - One 2019-08- (23 pcs.), Channels and TF / A6507 Post Open - National 200,000.00 0.00 Canceled 2018-12-08 2019-02-02 Infrastructure Quotations Envelope 01 pipelines (7 objects), gate panels in Devashtich district ZIRP-RFQ-W-002 / Rehabilitation of vertical wells Rehabilitation of Irrigation Request for Single Stage - One 2019-08- (9 pcs.) and shields of TF / A6507 Post Open - National 200,000.00 0.00 Canceled 2018-12-08 2019-02-02 Infrastructure Quotations Envelope 01 closures in the Shahriston district. ZIRP-NCB-W-015 / Rehabilitation of pumping Rehabilitation of Irrigation Single Stage - One 2019-11- TF / A6507 Post Request for Bids Open - National 400,000.00 392,492.67 Completed 2019-01-17 2019-01-20 2019-01-22 2019-03-05 2019-02-25 2019-04-04 2019-02-28 2019-05-09 2019-03-12 stations Leningrad 1 and Yori Infrastructure Envelope 05 -2 in Penjikent district ZIRP-NCB-W-005 / Rehabilitation of Sarazm and Leningrad-2 canals and Rehabilitation of Irrigation Single Stage - One 2019-12- Sarazm, Mugulon, Shingak, TF / A6507 Post Request for Bids Open - National 480,000.00 0.00 Canceled 2019-03-07 2019-03-12 2019-04-23 2019-05-23 2019-06-27 Infrastructure Envelope 24 Kolkhozchiyon and Kurk- Damdaryo dams in Panchakent district ZIRP-NCB-W-007 / Rehabilitation of Irrigation Single Stage - One 2019-12- Rehabilitation of canals Yori- TF / A6507 Post Request for Bids Open - National 455,000.00 449,928.45 Completed 2019-02-22 2019-02-20 2019-02-27 2019-04-10 2019-03-28 2019-05-10 2019-04-02 2019-06-14 2019-04-05 Infrastructure Envelope 11 1,2 in Panjakent district ZIRP-NCB-W-017 / Construction and Rehabilitation of Irrigation Single Stage - One 2019-12- TF / A6507 Post Request for Bids Open - National 520,000.00 671,946.06 Completed 2019-03-10 2019-06-17 2019-03-15 2019-04-26 2019-07-18 2019-05-26 2019-07-24 2019-06-30 2019-07-30 rehabilitation of WUA Infrastructure Envelope 27 buildings in pilot project areas ZIRP-NCB-W-005-2 / Rehabilitation of Sarazm Rehabilitation of Irrigation Single Stage - One 2020-06- TF / A6507 Post Request for Bids Open - National 600,000.00 670,671.24 Completed 2019-08-15 2019-08-05 2019-08-20 2019-10-01 2019-09-13 2019-10-31 2019-09-20 2019-12-05 2019-09-28 embankment in Panjakent Infrastructure Envelope 02 district ZIRP-NCB-W-016-2 / Rehabilitation of vertical wells Rehabilitation of Irrigation Single Stage - One 2020-05- TF / A6507 Post Request for Bids Open - National 600,000.00 684,361.61 Completed 2019-07-25 2019-09-30 2019-07-30 2019-09-10 2019-11-05 2019-10-10 2019-11-11 2019-11-14 2019-11-28 in the Shahriston and Infrastructure Envelope 12 Devashish districts ZIRP-NCB-W-018 / Rehabilitation of Sarazm canal and Mugulon, Shingak, Rehabilitation of Irrigation Single Stage - One 2020-05- TF / A6507 Post Request for Bids Open - National 520,000.00 528,985.08 Completed 2019-07-25 2019-08-26 2019-07-30 2019-09-10 2019-09-30 2019-10-10 2019-10-03 2019-11-14 2019-10-11 Kolkhozchiyon and Qurk- Infrastructure Envelope 12 Damdaryo embankments in Panjakent district GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZIRP-RFQ-003 / Procurement of computer and office Request for Single Stage - One TF / A6507 Project Management Post Open - National 42,000.00 39,904.08 Completed 2018-09-19 2018-11-14 2018-08-28 2019-05-13 2018-09-28 equipment for PMU and PCU Quotations Envelope offices intercom ZIRP-RFQ-G-004 / Rehabilitation of Irrigation Single Stage - One Procurement of furniture for TF / A6507 Post Request for Bids Open - National 70,000.00 62,790.00 Completed 2018-09-14 2018-06-12 2018-09-19 2018-10-31 2018-07-09 2018-11-30 2019-01-04 2018-08-13 2019-07-03 2018-09-24 Infrastructure Envelope PMU and PCU offices ZIRP-NCB-G-001 / Procurement and installation Rehabilitation of Irrigation Single Stage - One of equipment and software, TF / A6507 Post Request for Bids Open - National 230,000.00 240,528.24 Completed 2018-09-14 2018-09-03 2018-09-19 2018-10-31 2018-10-09 2018-11-30 2019-02-01 2019-01-04 2018-10-31 2019-07-03 2018-12-24 Infrastructure Envelope training for IWRM, MEW and AMI ZIRP-NCB-G-003 / Procurement for connection to Rehabilitation of Irrigation Single Stage - One the Internet and a VPN TF / A6507 Post Request for Bids Open - National 190,800.00 179,980.00 Completed 2018-10-20 2018-10-01 2018-10-25 2018-12-06 2018-10-31 2019-01-05 2019-02-01 2019-02-09 2018-11-15 2019-08-08 2019-01-30 Infrastructure Envelope channel at the national level for IWRM, MEW and AMI ZIRP-RFQ-002 / Procurement Request for Single Stage - One of vehicles for PMU and PCU TF / A6507 Project Management Post Open - National 100,000.00 110,240.00 Completed 2018-02-25 2018-04-22 2018-07-27 2018-10-19 2018-12-10 Quotations Envelope offices Page 2 ZIRP-NCB-G-004 / Procurement of equipment for Rehabilitation of Irrigation Single Stage - One smaller workshops of AMI for TF / A6507 Post Request for Bids Open - National 350,000.00 298,611.55 Completed 2019-02-20 2019-01-28 2019-02-25 2019-04-08 2019-03-01 2019-05-08 2019-03-11 2019-06-12 2019-03-20 2019-12-09 2019-08-16 Infrastructure Envelope the repair of pumps and engines ZIRP-RFQ-G-005 / Procurement of furniture for Rehabilitation of Irrigation Request for Single Stage - One Zerafshan basin organization TF / A6507 Post Open - National 80,000.00 71,731.90 Completed 2019-01-20 2019-03-17 2019-02-01 2019-09-13 2019-05-17 Infrastructure Quotations Envelope in Ayni district and for the existing AMI buildings ZIRP-RFQ-G-006 / Development and Procurement of building Strengthening of Irrigation Request for Single Stage - One TF / A6507 Post Open - National 90,000.00 81,767.90 Completed 2019-09-17 2019-11-12 2019-09-24 2020-05-10 2019-10-18 materials and tools (shovels, and Water Resources Quotations Envelope cuttings, ax, bucket, etc.) Management Institutions ZIRP-NCB-G-005 / Rehabilitation of Irrigation Single Stage - One TF / A6507 Post Request for Bids Open - National 740,000.00 750,000.00 Completed 2020-01-17 2020-01-27 2020-01-22 2020-03-04 2020-03-02 2020-04-03 2020-03-11 2020-05-08 2020-05-05 2020-11-04 2020-09-29 Procurement of machinery Infrastructure Envelope ZIRP-RFQ-G-007 / Development and Procurement of computer Strengthening of Irrigation Request for Single Stage - One TF / A6507 Post Open - National 100,000.00 93,028.79 Completed 2020-01-15 2020-03-11 2020-02-03 2020-09-07 2020-04-03 equipment, furniture and and Water Resources Quotations Envelope tools for WUAs Management Institutions ZIRP-NCB-G-006 / Development and Equipment for hydrological Strengthening of Irrigation Single Stage - One monitoring perfection in TF / A6507 Post Request for Bids Open - National 160,000.00 159,800.00 Completed 2020-02-10 2020-05-01 2020-02-15 2020-03-28 2020-06-12 2020-04-27 2020-06-16 2020-06-01 2020-06-24 2020-11-28 2020-09-03 and Water Resources Envelope irrigational systems of the Management Institutions Zarafshon River Basin NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZIRP-NCS-001 / Consulting Rehabilitation of Irrigation Request for Single Stage - One company for calibration and TF / A6507 Post Open - National 50,000.00 26,285.58 Completed 2019-05-25 2020-04-07 2019-07-20 2020-05-01 2020-01-16 2020-10-01 Infrastructure Quotations Envelope certification of water meters ZIRP-NCS-002 / Non- Consulting services for completion and adaptation of Development and the software for introduction Strengthening of Irrigation Request for Single Stage - One TF / A6507 Post Open - National 40,000.00 32,899.16 Completed 2019-12-24 2020-02-18 2020-01-08 2020-08-16 2020-07-31 of non-cash system of and Water Resources Quotations Envelope payment for irrigational water Management Institutions in the river basin of Zarafshan (Panjakent and Ayni districts) ZIRP-NCS-003 / Development and Procurement, installation and Strengthening of Irrigation Request for Single Stage - One implementation of 1C TF / A6507 Post Limited 10,000.00 7,861.50 Completed 2020-03-11 2020-04-15 2020-05-06 2020-05-11 2020-11-02 2020-09-30 and Water Resources Quotations Envelope accounting system of the Management Institutions Zarafshon River Basin CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZIRPCQS-003 / Consulting services for public awareness Consultant activities related to public Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 100,000.00 81,648.00 Completed 2018-02-11 2018-05-11 2018-03-04 2018-04-17 2018-05-30 2018-05-17 2018-06-13 2018-06-21 2018-06-18 2018-12-18 2020-12-30 works in 5 districts (Ayni, Infrastructure Selection Shahriston, Mastchohi kuhi, Devashtich and Panjakent) ZIRPCQS-005 / Consulting services for social Consultant mobilization in 5 districts Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 100,000.00 99,842.00 Completed 2018-05-11 2018-05-08 2018-06-01 2018-07-15 2018-05-30 2018-08-14 2018-06-04 2018-09-18 2018-06-18 2019-03-17 2020-12-30 (Ayni, Shahriston, Mastchohi Infrastructure Selection kuhi, Devashtich and Panjakent) ZIRPCQS-006 / Consulting services for assessment of Consultant Rehabilitation of Irrigation impact on environment TF / A6507 Post Qualification Open - National 75,000.00 69,488.00 Completed 2018-05-29 2018-05-29 2018-06-19 2018-08-02 2018-09-01 2018-07-05 2018-10-06 2018-07-12 2019-04-04 2020-12-31 Infrastructure (ecology) for all 5 project Selection districts ZIRPCQS-007 / Consulting services for designing and author supervision of rehabilitation of irrigation Consultant Rehabilitation of Irrigation systems within the irrigation TF / A6507 Post Qualification Open - National 100,000.00 93,346.45 Completed 2018-02-11 2018-05-10 2018-03-04 2018-04-17 2018-05-28 2018-05-17 2018-06-11 2018-06-21 2018-06-12 2018-12-18 2020-12-31 Infrastructure areas of the Canals Khalifa Selection Hasan, Nilufar 1,2,3, Tuksan Korez, Eshon and Leningrad-1 in Penjikent ZIRPCQS-010 / Consulting services for support and improvement of WUA's Consultant Rehabilitation of Irrigation potential, in the districts of TF / A6507 Post Qualification Open - National 340,000.00 479,955.50 Signed 2018-06-28 2018-06-25 2018-07-19 2018-09-01 2018-09-03 2018-10-01 2018-09-10 2018-11-05 2018-09-18 2019-05-04 Infrastructure Penjikent, Devastich, Selection Shahriston, Aini and Gorny Mastchakh ZIRPCQS-011 / Consulting services for designing and author supervision of rehabilitation of irrigation Consultant Rehabilitation of Irrigation systems within the irrigation TF / A6507 Post Qualification Open - National 105,000.00 86,972.95 Completed 2018-06-11 2018-06-04 2018-07-02 2018-08-15 2018-07-16 2018-09-14 2018-08-06 2018-10-19 2018-08-10 2019-04-17 2020-12-31 Infrastructure areas of the Canals Dupula, Selection Margedar, Margedar-3 and Yori-1 and 2 in Penjikent district Page 3 ZIRPCQS-012 / Consulting services for design and author supervision of the restoration Consultant of pumping stations Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 65,000.00 63,909.76 Completed 2018-05-11 2018-05-04 2018-06-01 2018-07-15 2018-06-06 2018-08-14 2018-06-11 2018-09-18 2018-06-13 2019-03-17 2020-12-31 Leningrad-1, Yori-2, Nilufar- Infrastructure Selection 1,2,3, Varz-1,2 and Sangiston in the districts of Panchaken and Ayni ZIRPCQS-013 / Consulting services for design and author supervision of the restoration Consultant of the canal and pumping Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 65,000.00 58,748.68 Completed 2018-06-08 2018-06-08 2018-06-29 2018-08-12 2018-06-26 2018-09-11 2018-07-09 2018-10-16 2018-07-13 2019-04-14 2020-12-31 stations Dupulla, Navobod, Infrastructure Selection Rudaki, Margedar-3, Yori-1, and Leningrad-2 in the Panchaken district ZIRPCQS-014 / Consulting services on design and supervision of the reconstruction of pumping Consultant Rehabilitation of Irrigation stations Mehnat 3, channel TF / A6507 Post Qualification Open - National 59,000.00 58,410.50 Completed 2018-06-08 2018-05-10 2018-06-29 2018-08-12 2018-07-20 2018-09-11 2018-08-27 2018-10-16 2018-09-03 2019-04-14 2020-12-31 Infrastructure MK-4, 32 pieces of vertical Selection wells and irrigation systems in the area of Devastich, Shahriston and Mastchokhi Kuhi ZIRPCQS-016 / Consulting Consultant Rehabilitation of Irrigation services for conducting TF / A6507 Post Qualification Open - National 30,000.00 17,901.30 Completed 2018-05-25 2018-05-21 2018-06-15 2018-07-29 2018-06-21 2018-08-28 2018-08-20 2018-10-02 2018-08-30 2019-03-31 2018-10-19 Infrastructure baseline survey Selection ZIRPCQS-017 / Consulting firm for inventory of irrigation Consultant systems in the Zerafshan river Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 310,000.00 310,346.00 Completed 2018-07-16 2018-03-01 2018-08-06 2018-09-19 2018-08-24 2018-10-19 2018-08-27 2018-11-23 2018-08-28 2019-05-22 2020-03-31 basin (in Penjikent, Ayni, Infrastructure Selection Gornaya Matcha, Shahristan and Devastich districts) ZIRP-CQS-014 / Consulting services for designing and author supervision for rehabilitation of pumping Consultant stations Mehnat-3, MK-4 Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 59,000.00 0.00 Canceled 2018-11-25 2018-05-07 2018-12-16 2019-01-29 2018-07-20 2019-02-28 2019-04-04 2019-10-01 canal, 32 no of vertical Infrastructure Selection boreholes, and irrigation systems inDevashtich, Shahriston and Mastchohi kuhi districts ZIRPCQS-015 / Design and architectural supervision of the repair of the building of Consultant the central office in the Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 15,000.00 22,322.00 Completed 2018-06-08 2018-05-10 2018-06-29 2018-08-12 2018-06-26 2018-09-11 2018-07-09 2018-10-16 2018-07-13 2019-04-14 2020-12-31 Panchakent district, the office Infrastructure Selection of the Zeravshan basin organization in the Ayni district ZIRP-CQS-009 / Consultant Improvement of irrigation Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 220,000.00 225,767.00 Signed 2018-11-30 2019-07-08 2018-12-21 2019-02-03 2019-08-09 2019-03-05 2019-08-21 2019-04-09 2019-08-22 2019-10-06 system and management in Infrastructure Selection Zerafshan river basin ZIRP-CQS-013 / Consulting services for designing and author supervision for Consultant Rehabilitation of Irrigation rehabilitation of pumping TF / A6507 Post Qualification Open - National 65,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 Infrastructure stations Dupula, Navobod, Selection Rudaki, Margedar-3, Yori -1,2 in Panjakent district ZIRP-CQS-012 / Consulting services for designing and author supervision for Consultant rehabilitation of pumping Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 65,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 stations Leningrad-1,2, Infrastructure Selection Nilufar-1,2,3, Varz-1,2 and Sangiston in Panjakent and Ayni districts ZIRP- CQS-011 / Consulting services for designing and author supervision of rehabilitation of irrigation Consultant Rehabilitation of Irrigation systems within the irrigation TF / A6507 Post Qualification Open - National 105,000.00 0.00 Canceled 2018-09-14 2018-10-05 2018-11-18 2018-12-18 2019-01-22 2019-07-21 Infrastructure areas of the Canals Dupula, Selection Margedar, Margedar-3 and Yori-1 and 2 in Penjikent district. ZIRP-CQS-006 / Consulting services for assessment of Consultant Rehabilitation of Irrigation impact on environment and TF / A6507 Post Qualification Open - National 75,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 Infrastructure social (ecology) for all 5 Selection project districts ZIRP-CQS-005 / Consulting Consultant services for social Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 mobilization in 2 districts Infrastructure Selection (Devashtich, Panjakent) ZIRP-CQS-017 / Consulting firm for inventory of irrigation systems in the Zerafshan river Consultant Rehabilitation of Irrigation basin (the districts of TF / A6507 Post Qualification Open - National 310,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 Infrastructure Penjikent, Ayni, Gornaya Selection Matcha, Shahristan and Devastich) ZIRP-CQS-003 / Consulting services for public awareness Consultant Rehabilitation of Irrigation in 5 districts (Ayni, TF / A6507 Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-05 2018-09-26 2018-11-09 2018-12-09 2019-01-13 2019-07-12 Infrastructure Shahriston, Mastchohi kuhi, Selection Devashtich and Panjakent) Page 4 ZIRP- CQS-007 / Consulting services for designing and author supervision of rehabilitation of irrigation Consultant Rehabilitation of Irrigation systems within the irrigation TF / A6507 Post Qualification Open - National 100,000.00 0.00 Canceled 2018-09-17 2018-10-08 2018-11-21 2018-12-21 2019-01-25 2019-07-24 Infrastructure areas of the Canals Khalifa Selection Hasan, Nilufar 1,2,3, Tuksan Korez, Eshon and Sarazm in Penjikent ZIRP-CQS-008 / Consulting services for feasibility studies Shahriston-sai water capture Consultant Rehabilitation of Irrigation augmentation of irrigation TF / A6507 Post Qualification Open - National 230,000.00 230,123.77 Completed 2019-09-13 2019-11-07 2019-10-04 2019-11-17 2019-11-29 2019-12-17 2019-12-23 2020-01-21 2019-12-24 2020-07-19 2020-06-30 Infrastructure water supply and Selection rehabilitation of irrigation system in Shahriston district ZIRP-СQS-019 / Consulting services for the design of the Consultant rehabilitation and cleaning of Rehabilitation of Irrigation TF / A6507 Post Qualification Open - National 30,000.00 15,721.39 Completed 2020-02-20 2020-02-18 2020-03-12 2020-04-25 2020-03-13 2020-05-25 2020-03-13 2020-06-29 2020-03-16 2020-12-26 2020-08-31 channels in the districts of Infrastructure Selection Mastchohi Kuhi, Ayni and Penjikent Consultant ZIRP-СQS-004 / Project Rehabilitation of Irrigation Pending TF / A6507 Post Qualification Open - National 21,000.00 0.00 2021-02-23 2021-03-16 2021-04-29 2021-05-29 2021-07-03 2021-12-30 Impact Advisory Services Infrastructure Implementation Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZIRP-IC-INT-002 / Individual International consultant on Rehabilitation of Irrigation TF / A6507 Post Consultant Open 25,000.00 37,115.00 Completed 2018-09-05 2018-05-14 2018-10-24 2018-11-14 2018-07-16 2018-12-19 2018-07-20 2019-06-17 2018-11-30 provision and analysis of Infrastructure Selection baseline survey ZIRP-IC-INT-007 / Individual International consultant for Rehabilitation of Irrigation TF / A6507 Post Consultant Open 29,000.00 26,500.00 Completed 2018-09-14 2018-05-10 2018-11-02 2018-11-23 2018-07-12 2018-12-28 2018-07-18 2019-06-26 2019-06-30 support in irrigation system Infrastructure Selection design ZIRP-IC-INT-008 / Individual International consultant for Rehabilitation of Irrigation TF / A6507 Post Consultant Open 30,000.00 33,750.00 Signed 2018-12-03 2019-02-01 2019-01-21 2019-02-11 2019-02-07 2019-03-18 2019-02-18 2019-09-14 institutional support for ALRI Infrastructure Selection in irrigation management ZIRP-IC-INT-009 / Individual Rehabilitation of Irrigation Under International consultant for TF / A6507 Post Consultant Open 37,000.00 0.00 2020-06-01 2021-02-17 2020-07-20 2020-08-10 2020-09-14 2021-03-13 Infrastructure Implementation Project Impact Advisory Selection ZIRP-IC-L-062 / Local Individual Rehabilitation of Irrigation Under consultant mechanical TF / A6507 Post Consultant Open 15,000.00 0.00 2018-11-05 2018-12-24 2019-01-14 2019-02-18 2019-08-17 Infrastructure Implementation engineer Selection ZIRP-IC-INT-010 / Individual International Water Rehabilitation of Irrigation TF / A6507 Post Consultant Open 35,000.00 31,487.50 Completed 2019-01-07 2019-01-18 2019-02-25 2019-02-01 2019-03-18 2019-04-22 2019-02-04 2019-10-19 2020-02-04 Information System Infrastructure Selection Consultant Page 5