Procurement Plan (Text Part) Bangladesh Insurance Sector Development Project (BISDP) Project information: (i) Country: Bangladesh (ii) Project Name: Bangladesh Insurance Sector Development Project (BISDP) (iii) P-Number: P156823 Project Implementation agency: Insurance Development and Regulatory Authority (IDRA) Period covered by this Procurement Plan: Entire Project Period 1. Preamble The Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. 2. Prior Review Thresholds Procurement Prior Review Thresholds (US$ millions) Type of Procurement High risk Substantial risk Moderate risk Low risk Works (including turnkey, supply & 5 10 15 20 installation of plant and equipment, and PPP) Goods, information technology and non- 1.5 2 4 6 consulting services Consulting services: 0.5 1 2 4 firms Consulting services: 0.2 0.3 0.4 0.5 individuals Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. Use of Standard Procurement Documents: For all procurements under the project, the Bank’s Standard Procurement Documents (or other documents agreed with the Bank) shall be used; 3. Request for Bids (Open-National) will be carried out under the Bank Procurement Guidelines following procedures for Open Tendering Method (OTM) of the People’s Republic of Bangladesh (Public Procurement Act, 2006 – PPA, 2006 and The Public Procurement Rules, 2008 – PPR, 2008 using standard bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply: a. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; b. Bids should be submitted and opened in public in one location immediately after the deadline for submission; c. Lottery in award of contracts shall not be allowed; d. Bidders’ qualification/experience requirement shall be mandatory; e. Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost and contract award shall be based on the lowest evaluated bid price of compliant bid from eligible and qualified bidder; and f. Single stage two (2) envelope procurement system shall not be allowed. 2. Prequalification. Not Applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Not Applicable 5. Any Other Special Procurement Arrangements: Not Applicable. 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Any Other Special Selection Arrangements: Not Applicable. PROCUREMENT Bangladesh : Bangladesh Insurance Sector Development Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-01-09 2020-02-04 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156823 GPN Date: 2019-04-03 Project Name: Bangladesh Insurance Sector Development Project Loan / Credit No: / , IDA / 59720 Executing Agency(ies): Insurance Development and Regulatory Authority WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G1-1 / IT & Supporting Project Implementation, Single Stage - One Equipment : Office / Management, and Post Request for Bids Open - National 80,000.00 52,937.96 Signed 2017-04-05 2017-04-10 2017-05-01 2017-05-31 2017-07-12 2017-10-10 Envelope Equipment Monitoring Improving the Capacity of G4-1 / Basic automation the Insurance Development Pending including ERP, HRMIS and Open - Single Stage - One / and Regulatory Authority Prior Request for Bids 4,000,000.00 0.00 Implementati 2017-06-25 2017-07-15 2017-09-03 2017-12-02 2018-01-13 2019-01-13 Enterprice E-mail System for International Envelope (IDRA) and the Bangladesh on IDRA & BIA Insurance Academy ( BIA) Modernization, G4-2 / Basic automation Strengthening and Pending including ERP, HRMIS and Open - Single Stage - One / Increasing the Efficiency of Prior Request for Bids 6,000,000.00 0.00 Implementati 2017-06-25 2017-07-15 2017-09-03 2017-12-02 2018-01-13 2019-01-13 Enterprise E-mail System at International Envelope the State-owned Insurance on SBC and JBC Corporations Modernization, G8 / Core Insurance Strengthening and Pending Open - Single Stage - One applications at SBC and / Increasing the Efficiency of Prior Request for Bids 7,500,000.00 0.00 Implementati 2018-04-22 2018-05-12 2018-07-01 2018-09-29 2018-11-10 2019-07-08 International Envelope JBC the State-owned Insurance on Corporations Improving the Capacity of G9-1 / Document the Insurance Development Pending Open - Single Stage - One Management System for / and Regulatory Authority Prior Request for Bids 2,000,000.00 0.00 Implementati 2018-05-23 2018-06-12 2018-08-01 2018-10-30 2018-12-11 2019-06-09 International Envelope IDRA & BIA (IDRA) and the Bangladesh on Insurance Academy ( BIA) Modernization, G9-2 / Document Strengthening and Pending Open - Single Stage - One Management System for / Increasing the Efficiency of Prior Request for Bids 3,000,000.00 0.00 Implementati 2018-05-23 2018-06-12 2018-08-01 2018-10-30 2018-12-11 2019-06-09 International Envelope SBC and JBC the State-owned Insurance on Corporations Improving the Capacity of the Insurance Development Pending G11 / Fraud detection and Open - Single Stage - One / and Regulatory Authority Post Request for Bids 700,000.00 0.00 Implementati 2018-06-28 2018-07-13 2018-09-01 2018-11-30 2019-01-11 2019-05-11 prevention system International Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Page 1 Improving the Capacity of the Insurance Development Pending G12 / Centralized rating Open - Single Stage - One / and Regulatory Authority Post Request for Bids 600,000.00 0.00 Implementati 2018-08-28 2018-09-12 2018-11-01 2019-01-30 2019-03-13 2019-07-11 system International Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Modernization, G14 / Call center & Strengthening and Pending Customer Relationship Open - Single Stage - One / Increasing the Efficiency of Prior Request for Bids 4,000,000.00 0.00 Implementati 2018-07-23 2018-08-12 2018-10-01 2018-12-30 2019-02-10 2019-08-09 Management system at SBC International Envelope the State-owned Insurance on and JBC Corporations Modernization, G10-2 / Business Strengthening and Pending Open - Single Stage - One Intelligence and data / Increasing the Efficiency of Prior Request for Bids 3,000,000.00 0.00 Implementati 2018-05-23 2018-06-12 2018-08-01 2018-10-30 2018-12-11 2019-06-09 International Envelope analytics at SBC and JBC the State-owned Insurance on Corporations G7-2 / Certification of Project Implementation, Pending Open - Single Stage - One employers of agents & / Management, and Post Request for Bids 500,000.00 0.00 Implementati 2018-04-22 2018-05-24 2018-07-17 2018-10-15 2018-11-26 2019-07-24 International Envelope brokers Monitoring on Improving the Capacity of G10-1 / Business the Insurance Development Pending Open - Single Stage - One Intelligence and data / and Regulatory Authority Post Request for Bids 1,600,000.00 0.00 Implementati 2018-05-23 2018-06-28 2018-08-21 2018-11-21 2019-01-02 2019-07-01 International Envelope analytics at IDRA & BIA (IDRA) and the Bangladesh on Insurance Academy ( BIA) Improving the Capacity of the Insurance Development Pending G13 / Motor road accident Single Stage - One / and Regulatory Authority Post Request for Bids Open - National 700,000.00 0.00 Implementati 2018-08-21 2018-09-12 2018-11-01 2018-12-31 2019-02-11 2019-06-11 database Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Project Implementation, Single Stage - One G1-2 / Furniture & Fixture IDA / 59720 Management, and Post Request for Bids Open - National 60,000.00 12,390.56 Signed 2019-03-15 2019-04-04 2019-05-24 2019-06-23 2019-08-04 2019-11-02 Envelope Monitoring Project Implementation, Single Stage - One G1-3 / IT Equipment IDA / 59720 Management, and Post Request for Bids Open - National 100,000.00 26,521.42 Signed 2019-02-25 2019-03-12 2019-05-01 2019-05-31 2019-07-12 2019-10-10 Envelope Monitoring Improving the Capacity of the Insurance Development Pending G3-2 / Setting up Research Single Stage - One IDA / 59720 and Regulatory Authority Post Request for Bids Open - National 300,000.00 0.00 Implementati 2019-06-19 2019-07-09 2019-08-28 2019-11-26 2020-01-07 2020-05-06 Center Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Improving the Capacity of G5 / Distance learning the Insurance Development Pending Single Stage - One center with Videoconference IDA / 59720 and Regulatory Authority Post Request for Bids Open - National 600,000.00 0.00 Implementati 2020-04-11 2020-05-01 2020-07-05 2020-09-13 2020-10-25 2021-01-23 Envelope and audio visual facilities (IDRA) and the Bangladesh on Insurance Academy ( BIA) Improving the Capacity of G6 / Development and the Insurance Development Pending Single Stage - One Implementation of Interactive IDA / 59720 and Regulatory Authority Post Request for Bids Open - National 600,000.00 0.00 Implementati 2020-06-18 2020-07-06 2020-08-17 2020-11-08 2020-12-20 2021-06-18 Envelope Portal (IDRA) and the Bangladesh on Insurance Academy ( BIA) Improving the Capacity of the Insurance Development Pending G7-1 / Online approval of Open - Single Stage - One IDA / 59720 and Regulatory Authority Post Request for Bids 500,000.00 0.00 Implementati 2020-10-07 2020-11-07 2020-12-27 2021-04-06 2021-05-18 2022-01-13 agents International Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Page 2 Improving the Capacity of G2-1 / IT & Supporting the Insurance Development Pending Open - Single Stage - One Power Infrastructure at IDA / 59720 and Regulatory Authority Prior Request for Bids 5,000,000.00 0.00 Implementati 2019-07-16 2019-07-31 2019-08-04 2019-09-03 2019-10-15 2020-10-14 International Envelope IDRA & BIA (IDRA) and the Bangladesh on Insurance Academy ( BIA) Modernization, G2-2 / IT & Supporting Strengthening and Pending Power Infrastructure and Open - Single Stage - One IDA / 59720 Increasing the Efficiency of Prior Request for Bids 6,500,000.00 0.00 Implementati 2019-12-15 2020-01-04 2020-02-15 2020-03-16 2020-04-27 2021-04-27 Installation of Software at International Envelope the State-owned Insurance on SBC and JBC Corporations Modernization, Strengthening and G2-2-1 / Supply and Single Stage - One IDA / 59720 Increasing the Efficiency of Post Request for Bids Open - National 225,000.00 231,284.43 Signed 2019-04-14 2019-04-19 2019-05-10 2019-05-20 2019-06-24 2019-08-08 installation of IT equipment Envelope the State-owned Insurance Corporations Improving the Capacity of the Insurance Development Pending G3-1 / Modernization Single Stage - One IDA / 59720 and Regulatory Authority Post Request for Bids Open - National 500,000.00 0.00 Implementati 2019-12-24 2019-12-25 2020-01-08 2020-02-10 2020-03-19 2020-06-15 Classroom Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) Improving the Capacity of the Insurance Development Pending G15 / Supply of Training Request for Single Stage - One IDA / 59720 and Regulatory Authority Post Limited 6,250.00 0.00 Implementati 2020-01-21 2020-02-14 2020-02-29 Materials (Bag) Quotations Envelope (IDRA) and the Bangladesh on Insurance Academy ( BIA) G16 / Supply and Project Implementation, Pending Request for Single Stage - One Installation of IT Accessories IDA / 59720 Management, and Post Limited 6,250.00 0.00 Implementati 2020-01-26 2020-02-19 2020-02-22 Quotations Envelope for BISDP Monitoring on Project Implementation, Pending G18 / Supply of Computer, Request for Single Stage - One IDA / 59720 Management, and Post Limited 6,000.00 0.00 Implementati 2020-01-21 2020-02-16 2020-03-07 Laptop, Printer and UPS Quotations Envelope Monitoring on G19 / Supply of Digital Project Implementation, Pending Giant screen / LED Request for Single Stage - One IDA / 59720 Management, and Post Limited 6,200.00 0.00 Implementati 2020-01-24 2020-02-14 2020-03-15 Television, Camera and Quotations Envelope Monitoring on Accessories Project Implementation, Pending G20 / Supply of Photocopier Request for Single Stage - One IDA / 59720 Management, and Post Limited 6,150.00 0.00 Implementati 2020-01-26 2020-02-21 2020-03-27 and Tablet Quotations Envelope Monitoring on NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Implementation, Pending G17 / Supply of Printing Request for Single Stage - One IDA / 59720 Management, and Post Limited 5,937.00 0.00 Implementati 2020-01-21 2020-02-13 2020-02-28 Document Quotations Envelope Monitoring on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 Modernization, Strengthening and S10-1 / Acturial Firm - Quality And Cost- Open - Pending / Increasing the Efficiency of Prior 1,000,000.00 0.00 2018-04-30 2018-05-21 2018-07-04 2018-08-01 2018-09-30 2018-11-04 2018-12-16 2020-12-15 Firm Based Selection International Implementation the State-owned Insurance Corporations Improving the Capacity of the Insurance Development S4 / Sector-wide Protection Quality And Cost- Open - Under / and Regulatory Authority Post 500,000.00 0.00 2017-10-17 2017-11-07 2017-12-26 2018-01-23 2018-04-01 2018-05-06 2018-06-17 2020-06-16 Gap study - Firm Based Selection International Implementation (IDRA) and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of S5 / Awareness and the Insurance Development Quality And Cost- Open - Under Insurance Literacy program - / and Regulatory Authority Post 600,000.00 0.00 2018-04-18 2018-05-09 2018-06-30 2018-07-28 2018-10-03 2018-11-07 2018-12-19 2021-12-18 Based Selection International Implementation Firm (IDRA) and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening and S7 / Review existing Quality And Cost- Open - Pending / Increasing the Efficiency of Post 500,000.00 0.00 2017-10-31 2017-11-21 2018-01-04 2018-02-01 2018-04-22 2018-05-27 2018-07-08 2020-06-27 product lines - Firm Based Selection International Implementation the State-owned Insurance Corporations Modernization, S12 / Life Insurance Strengthening and Quality And Cost- Open - Pending Distribution Network Expert / Increasing the Efficiency of Post 500,000.00 0.00 2018-04-30 2018-05-21 2018-07-15 2018-08-12 2018-10-11 2018-11-15 2018-12-27 2021-06-24 Based Selection International Implementation (Broker Agent) - Firm the State-owned Insurance Corporations Improving the Capacity of S2-1 / International the Insurance Development Quality And Cost- Open - Under Regulatory and Supervisor IDA / 59720 and Regulatory Authority Prior 2,000,000.00 0.00 2019-02-26 2019-03-28 2019-06-16 2019-06-18 2019-08-07 2019-09-04 2019-10-16 2022-10-15 Based Selection International Implementation Expert Firm (IDRA) and the Bangladesh Insurance Academy ( BIA) Improving the Capacity of the Insurance Development S2-2 / Legal and Quality And Cost- Open - Pending IDA / 59720 and Regulatory Authority Prior 1,000,000.00 0.00 2019-11-01 2019-12-16 2020-03-15 2020-05-04 2020-08-07 2020-09-18 2020-10-30 2022-10-30 Regulatory Expert - Firm Based Selection International Implementation (IDRA) and the Bangladesh Insurance Academy ( BIA) Modernization, Strengthening and S8-1 / Review of Financial Quality And Cost- Open - / Increasing the Efficiency of Post 400,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-07 Condition of SBC - Firm Based Selection International the State-owned Insurance Corporations Modernization, Strengthening and S8-2 / Review of Financial Quality And Cost- Open - / Increasing the Efficiency of Post 300,000.00 0.00 Canceled 2017-12-31 2018-01-21 2018-03-06 2018-04-03 2018-06-02 2018-07-07 2018-08-18 2020-08-17 Condition of JBC - Firm Based Selection International the State-owned Insurance Corporations S13-3-1 / Selection of Modernization, International IT Consulting Strengthening and Quality And Cost- Open - Firm for review of IT IDA / 59720 Increasing the Efficiency of Prior 1,000,000.00 0.00 Under Review 2019-07-15 2019-08-05 2019-09-18 2019-10-16 2019-11-15 2019-12-20 2020-01-24 2022-07-12 Based Selection International requirements and the State-owned Insurance Implementation Support Corporations Modernization, Strengthening and S11 / Asset Liability Quality And Cost- Open - Under IDA / 59720 Increasing the Efficiency of Prior 1,000,000.00 0.00 2019-07-14 2019-08-04 2019-09-17 2019-10-15 2019-12-14 2020-01-18 2020-02-29 2022-08-31 Management Study - Firm Based Selection International Implementation the State-owned Insurance Corporations INDIVIDUAL CONSULTANTS Page 4 Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Implementation, Individual S1-7 / Finance Associate - Pending / Management, and Post Consultant Open 100,000.00 0.00 2016-12-08 2017-02-11 2017-03-04 2017-04-15 2023-03-15 Individual Implementation Monitoring Selection Improving the Capacity of the Insurance Development Individual S3 / Insurance Data Pending / and Regulatory Authority Prior Consultant Open 400,000.00 0.00 2017-05-28 2017-10-30 2017-11-20 2018-01-01 2019-06-25 Specialist/ non-life Actuary Implementation (IDRA) and the Bangladesh Selection Insurance Academy ( BIA) Modernization, Strengthening and Individual S9 / Non-Life Distribution Pending / Increasing the Efficiency of Prior Consultant Open 300,000.00 0.00 2017-12-31 2018-04-15 2018-05-06 2018-06-17 2020-06-16 Network Expert Implementation the State-owned Insurance Selection Corporations Project Implementation, Individual S1-3 / Senior Financial IDA / 59720 Management, and Post Consultant Open 265,000.00 179,062.51 Signed 2019-03-04 2019-04-08 2019-04-29 2019-06-10 2022-09-22 Management Specialist Monitoring Selection Project Implementation, Individual S1-9 / Project Associate - 4 Pending IDA / 59720 Management, and Post Consultant Open 210,000.00 0.00 2019-03-13 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Nos Implementation Monitoring Selection Project Implementation, Individual S1-2 / Scenior Procurement IDA / 59720 Management, and Post Consultant Open 240,000.00 219,953.81 Signed 2019-03-07 2019-05-11 2019-06-01 2019-06-15 2022-11-09 Specialist Monitoring Selection Project Implementation, Individual S1-4 / Monitoring & Under IDA / 59720 Management, and Post Consultant Open 240,000.00 0.00 2019-03-12 2019-05-16 2019-06-06 2019-07-18 2022-12-29 Evaluation Specialist Implementation Monitoring Selection Project Implementation, Individual Pending S1-6 / IT Specialist IDA / 59720 Management, and Post Consultant Open 210,000.00 0.00 2019-03-13 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Implementation Monitoring Selection Project Implementation, Individual S1-5 / Project Management Pending IDA / 59720 Management, and Post Consultant Open 240,000.00 0.00 2019-03-13 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Specialist- Individual Implementation Monitoring Selection Project Implementation, Individual S1-1 / Deputy Project / Management, and Prior Consultant Open 320,000.00 0.00 Canceled 2016-11-30 2017-02-03 2017-02-24 2017-04-07 2023-03-07 Director Monitoring Selection Improving the Capacity of the Insurance Development Individual S13-1 / ERP Specialist / and Regulatory Authority Prior Consultant Open 600,000.00 0.00 Canceled 2017-06-29 2017-10-12 2017-11-02 2017-12-14 2021-12-13 (IDRA) and the Bangladesh Selection Insurance Academy ( BIA) Modernization, Strengthening and Individual S13-4 / Document / Increasing the Efficiency of Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 Management Specialist the State-owned Insurance Selection Corporations Project Implementation, Individual S1-8 / Account Associate - Pending IDA / 59720 Management, and Post Consultant Open 240,000.00 0.00 2019-03-13 2019-05-17 2019-06-07 2019-07-19 2022-12-30 Individual Implementation Monitoring Selection Page 5 Improving the Capacity of the Insurance Development Individual S10-3-1 / Selection of Life IDA / 59720 and Regulatory Authority Prior Consultant Open 420,000.00 479,484.90 Signed 2019-03-11 2019-06-24 2019-07-15 2019-08-19 2022-12-01 Insurance Actuary (IDRA) and the Bangladesh Selection Insurance Academy ( BIA) Modernization, S6-3 / Resident Adviser Strengthening and Individual (Reinsurance/ Insurance / Increasing the Efficiency of Prior Consultant Open 500,000.00 0.00 Canceled 2017-07-31 2017-11-03 2017-11-24 2018-01-05 2021-12-15 Expert) the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual S10-3 / Life Insurance IDA / 59720 Increasing the Efficiency of Prior Consultant Open 600,000.00 0.00 Canceled 2019-02-26 2019-06-11 2019-07-02 2019-08-13 2024-08-11 Actuary the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual Pending S6-1 / Reinsurance Expert IDA / 59720 Increasing the Efficiency of Post Consultant Open 250,000.00 0.00 2019-06-27 2019-09-20 2019-10-11 2019-11-22 2021-11-11 Implementation the State-owned Insurance Selection Corporations Improving the Capacity of S2-3 / International the Insurance Development Individual Pending Regulatory/ Supervisory IDA / 59720 and Regulatory Authority Prior Consultant Open 350,000.00 0.00 2019-08-23 2020-02-04 2020-02-25 2020-04-07 2022-03-28 Implementation Expert (IDRA) and the Bangladesh Selection Insurance Academy ( BIA) Modernization, S13-1-1 / Selection of IT Strengthening and Individual Under Specialist IDA / 59720 Increasing the Efficiency of Post Consultant Open 180,000.00 0.00 2019-07-07 2019-08-25 2019-09-15 2019-10-20 2022-08-31 Implementation (Information/Cyber Security) the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual S13-2 / Data Analytics IDA / 59720 Increasing the Efficiency of Prior Consultant Open 420,000.00 0.00 Canceled 2019-08-22 2019-12-15 2020-01-05 2020-02-16 2022-02-15 Specialist the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual S13-3 / IT Specialist for / Increasing the Efficiency of Post Consultant Open 200,000.00 0.00 Canceled 2018-06-28 2018-08-27 2018-09-17 2018-10-29 2020-11-27 IDRA the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual S10-2 / Life Insurance Pending IDA / 59720 Increasing the Efficiency of Post Consultant Open 185,000.00 0.00 2019-11-08 2020-01-03 2020-01-24 2020-03-06 2022-08-31 Expert - Actuary Implementation the State-owned Insurance Selection Corporations Modernization, Strengthening and Individual S6-2 / Reinsurance/ Pending IDA / 59720 Increasing the Efficiency of Post Consultant Open 296,250.00 0.00 2020-01-03 2020-04-07 2020-04-28 2020-06-09 2022-05-30 Insurance Expert Implementation the State-owned Insurance Selection Corporations Improving the Capacity of S6-3-1 / Resident Adviser the Insurance Development Individual (Insurance and Reinsurance IDA / 59720 and Regulatory Authority Post Consultant Open 270,000.00 0.00 Canceled 2019-03-11 2019-06-24 2019-07-15 2019-08-19 2022-12-01 Expert) (IDRA) and the Bangladesh Selection Insurance Academy ( BIA) Modernization, S13-2-1 / Selection of IT Strengthening and Individual Specialist (Insurance Core IDA / 59720 Increasing the Efficiency of Post Consultant Open 180,000.00 0.00 Canceled 2019-07-22 2019-09-09 2019-09-30 2019-11-04 2022-08-31 applications) the State-owned Insurance Selection Corporations Page 6 S13-2-2 / Selection of IT Project Implementation, Individual Pending Specialist (Insurance Core IDA / 59720 Management, and Post Consultant Limited 180,000.00 0.00 2020-01-20 2020-01-30 2020-02-14 2020-03-13 2022-08-31 Implementation Applications) Monitoring Selection Page 7