1 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1.0 WESTERN REGION SYSTEM 48 STRENGTHENING SCHEME-II (SET-A) BID DOCUMENT NO.-IV 1.1 C-33012-L195A-1 400 kV D/C Wardha-Parli (Quad) 936.05 19.50 ICB 30.01.07 14.02.07 02.04.07 23.05.07 19.06.07 27.07.07 28.04.08 C-33012-L195A-1/ JYOTI, INDIA APR'10 PRIOR Line Part-I - 121 kms. PACKAGE-D1 (S+I) 2501 1.2 C-33013-L195A-1 400 kV D/C Wardha-Parli (Quad) 844.68 17.60 ICB 30.01.07 14.02.07 02.04.07 23.05.07 19.06.07 27.07.07 28.04.08 C-33013-L195A-1/ JYOTI, INDIA APR'10 PRIOR Line Part-II - 121 kms.PACKAGE-D2 (S+I) 2503 1.3 C-33014-L195A-1 400 kV D/C Wardha-Parli (Quad) 882.89 18.39 ICB 30.01.07 14.02.07 02.04.07 23.05.07 19.06.07 27.07.07 28.04.08 C-33014-L195A-1/ JYOTI, INDIA APR'10 PRIOR Line Part-III - 121 kms. PACKAGE- (S+I) 2505 BID DOCUMENT NO.-V 1.4 C-33012-L175-1 Conductor Package (for Tower D1) 794.27 16.55 ICB 14.05.07 NA 16.05.07 11.04.08 18.06.08 N.A. 31.07.08 C-33012-L175-1/ JV OF GUPTA , DEC'09 POST REVIEW PACKAGE-E1 (S) 2603 APAR & DEEPAK 1.5 C-33013-L175-1 Conductor Package (for Tower D2) 749.36 15.61 ICB 14.05.07 NA 16.05.07 11.04.08 24.05.08 N.A. 08.08.08 C-33013-L175-1/ STERLITE, INDIA JAN'10 POST REVIEW PACKAGE-E2 (S) 2605 1.6 C-33014-L175-1 Conductor Package (for Tower D3) 764.16 15.92 ICB 14.05.07 NA 16.05.07 11.04.08 24.05.08 N.A. 08.08.08 C-33014-L175-1/ HIREN, INDIA JAN'10 POST REVIEW PACKAGE-E3 (S) 2606 BID DOCUMENT NO.-VI 1.7 C-33012-L179-1 Insulator Package (for Tower D1) 132.41 2.76 ICB 21.05.07 N.A. ** 23.05.07 21.04.08 13.08.08 NA 17.09.08 C-33012-L179-1/ ADITYA BIRLA, JAN'2010 POST REVIEW PACKAGE-F1 (S) 2644 INDIA 1.8 C-33013-L179-1 Insulator Package (for Tower D2) 128.56 2.68 ICB 21.05.07 N.A. ** 23.05.07 21.04.08 13.08.08 NA 22.09.08 C-33013-L179-1/ NANJING, CHINA JAN'2010 POST REVIEW PACKAGE-F2 (S) 2646 BID DOCUMENT NO.-VII 1.9 C-33015-L195A-1 400 kV D/C Bhadrawati-Parli Line 736.86 15.35 ICB 20.01.07 15.03.07 30.03.07 19.06.07 22.08.07 03.10.07 25.04.08 C-33015-L195A-1/ L&T, INDIA MAY'2010 PRIOR REVIEW Part-I - 190 kms. PACKAGE-G1 (S+I) 2488 1.10 C-33016-L195A-1 400 kV D/C Bhadrawati-Parli Line 994.64 20.72 ICB 20.01.07 15.03.07 30.03.07 19.06.07 22.08.07 03.10.07 25.04.08 C-33016-L195A-1/ L&T, INDIA MAY'2010 PRIOR REVIEW Part-II - 190 kms. and 400 kV D/C (S+I) 2490 Parli-Parli Line - 7kms. PACKAGE- G2 1.11 C-33017-L195A-1 400 kV D/C Raipur-Wardha Line Part- 1684.43 35.09 ICB 20.01.07 15.03.07 30.03.07 19.06.07 22.08.07 03.10.07 25.04.08 C-33017-L195A-1/ L&T, INDIA MAY'2010 PRIOR REVIEW I - 182 kms. PACKAGE-G3 (S+I) 2493 ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 2 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1.12 C-33018-L195A-1 400 kV D/C Raipur-Wardha Line Part- 1589.43 33.11 ICB 20.01.07 15.03.07 30.03.07 19.06.07 22.08.07 03.10.07 25.04.08 C-33018-L195A-1/ L&T, INDIA JUL'2010 PRIOR REVIEW II - 181 kms. PACKAGE-G4 (S+I) 2495 BID DOCUMENT NO.-VIII 1.13 C-33015-L175-1 Conductor Package (for Tower G1) 637.06 13.27 ICB 25.05.07 14.06.07 26.06.07 13.05.08 30.07.08 01.10.08 NOA: 17.10.08 C-33015-L175-1/ JV of APAR, GUPTA APR'2010 PRIOR REVIEW PACKAGE-H1 (S) CA: 27.11.08 2675 & DEEPAK, INDIA 1.14 C-33016-L175-1 Conductor Package (for Tower G2) 682.91 14.23 ICB 25.05.07 14.06.07 28.06.07 13.05.08 30.07.08 01.10.08 04.11.08 C-33016-L175-1/ JV of HVPL & MAY'2010 PRIOR REVIEW PACKAGE-H2 (S) 2737 SMITA, INDIA 1.15 C-33017-L175-1 Conductor Package (for Tower G3) 1273.20 26.53 ICB 25.05.07 14.06.07 26.06.07 13.05.08 30.07.08 01.10.08 NOA: 17.10.08 C-33017-L175-1/ JV of APAR, GUPTA APR'2010 PRIOR REVIEW PACKAGE-H3 (S) CA: 27.11.08 2676 & DEEPAK, INDIA 1.16 C-33018-L175-1 Conductor Package (for Tower G4) 1255.64 ICB 25.05.07 14.06.07 28.06.07 13.05.08 30.07.08 01.10.08 22.10.08 C-33018-L175-1/ STERLITE, INDIA MAY'2010 PRIOR REVIEW PACKAGE-H4 (S) 2710 BID DOCUMENT NO.-IX 1.17 C-33015-L179-1 Insulator Package (for Tower G1 & 145.88 3.04 ICB 10.05.07 31.05.07 14.06.07 22.04.08 21.07.08 20.08.08 11.09.08 C-33015-L179-1/ BHEL, INDIA MAR'10 PRIOR REVIEW G2) PACKAGE- I 1 (S) 2640 1.18 C-33017-L179-1 Insulator Package (for Tower G3 & 251.48 5.24 ICB 10.05.07 31.05.07 14.06.07 22.04.08 28.07.08 05.12.08 11.12.08 C-33017-L179-1/ WSI, INDIA OCT'2010 G4) PACKAGE- I 2 (S) 2760 PRIOR REVIEW BID DOCUMENT NO.- XXVI (MBD) 1.19 C-33020-S162-1 Fixed Series Compensation Package 278.86 5.81 ICB 23.07.08 29.08.08 05.09.08 11.12.08 24.02.09 20.03.09 27.03.09 C-33020-S162-1/ BHEL, INDIA JUN'2010 at Wardha Sub-station for 400 kV (S+I) 3004 Wardha-Raipur D/C line PRIOR REVIEW BID DOCUMENT NO.- XXVII 1.20 C-33020-S117-1 Shunt Reactor Package 577.50 12.03 ICB 25.05.07 N.A. ** 18.06.07 10.04.08 18.06.08 NA 28.08.08 C-33020-S117-1/ CGL, INGIA MAY'10 POST REVIEW (S) 2601 BID DOCUMENT NO.- XXVIII 1.21 C-33019-S119A-1 400 kV Parli (New) S/S and extension 545.69 11.37 ICB 04.05.07 N.A. ** 04.05.07 16.04.08 17.09.08 NA 18.11.08 C-33019-S119A-1/ ABB, INDIA AUG'2010 POST REVIEW of 400 kV Bhadrawati PACKAGE-A (S+I) 2691 1.22 C-33020-S119A-1 Extension of 400 kV Seoni S/S, 400 436.14 9.09 ICB 04.05.07 N.A. ** 04.05.07 16.04.08 17.09.08 NA 12.11.08 C-33020-S119A-1/ SIEMENS, INDIA AUG'2010 POST REVIEW kV Parli (MSEB) S/s, 400 kV Wardha (S+I) 2731 S/s and 400 kV Raipur S/s PACKAGE-B ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 3 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 4 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2.0 WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-B) BID DOCUMENT NO.- XXIX (MBD) 2.1 C-33021-S117-1 Shunt Reactor Package 593.50 12.36 ICB 06.03.07 09.05.07 22.05.07 27.06.08 17.09.08 31.10.08 12.12.08 C-33021-S117- CGL, INGIA AUG'2010 (S) 1/2761 PRIOR REVIEW 3.0 WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-C) BID DOCUMENT NO.- XXXI 3.1 C-33024-S162-1 Fixed Series Compensation Package 259.75 5.41 ICB 03.09.08 N.A. ** 05.09.08 04.12.08 28.01.09 N.A. ** 03.03.09 C-33024-S162-1/ SIEMENS, JUN'2010 at Rajgarh Sub-station for 400 kV (S+I) 2915 & 2916 GERMANY & Rajgarh-Karamsad D/C line SIEMENS, INDIA POST REVIEW BID DOCUMENT NO.- XXXII 3.2 C-33024-S119A-1 Extension of 400kV Rajgarh, 682.98 14.23 ICB 23.07.07 24.09.08 03.10.08 02.12.08 28.01.09 23.03.09 25.03.09 C-33024-S119A-1/ SIEMENS, INDIA SEPT'2010 Karamsad (GEB), 400 kV (S+I) 3018 Limbdi(GEB), 400 kV Zerda (GEB), 400 kV Ranchhodpura (GEB) & Birsingpur Sub-stations PRIOR REVIEW 4 EAST - WEST TRANSMISSION CORRIDOR 0.00 STRENGTHENING SCHEME BID DOCUMENT NO.- IV 4.1 C-46205-S162-1 Fixed & Variable Series 262.35 5.47 ICB 03.09.08 N.A. ** 04.09.08 01.12.08 11.02.09 N.A. ** 17.03.09 C-46205-S162-1/ ABB, SWEDEN & SEP'10 Compensation at Raipur Substation (S + I) 2905 & 2906 ABB, INDIA for 400 KV Raigarh - Raipur D/C Line POST REVIEW 5 EASTERN REGION STRENGTHENING SCHEME-I BID DOCUMENT NO.- III 5.1 C-46805-L195A-1 Re-conductoring of 400 kV D/C 2001.35 41.69 ICB 22.09.08 25.07.09 27.11.08 10.09.09 23.07.2010 03.09.2010 C-46805-L195A- JV of KEC & MAR'12 Siliguri - Purnea PACKAGE- A5 (S+I) (1st Stage) (1st Stage) 1/G1/CA-I/3452 & JPOWER 12.03.10 12.03.10 3453 (2nd Stage) (2nd Stage) ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 5 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PRIOR REVIEW BID DOCUMENT NO.- V 5.2 C-46801-L175-1 Conductor Package (for Tower A1 & 719.78 15.00 ICB C-46801-L175-1/ POLYCAB, INDIA A2) PACKAGE- C1 (S) 07.05.07 05.06.07 15.06.07 28.04.08 18.11.08 26.02.09 05.03.09 2955 MAR'09 PRIOR REVIEW 5.3 C-46803-L175-1 Conductor Package (for Tower A3 & 624.90 13.02 ICB 07.05.07 05.06.07 15.06.07 28.04.08 17.09.08 26.02.09 05.03.09 C-46803-L175-1/ JV of DEEPAK, A4) PACKAGE- C2 (S) 2956 APAR & GUPTA, INDIA JUL'09 PRIOR REVIEW 6 NORTHERN REGION STRENGTHENING SCHEME – XXIV (NRSS-XXIV) BID DOCUMENT NO.-I 6.1 CC-CS/128-NR1/TW- Transmission Line Tower 755.52 15.74 ICB 15.06.2011 NA 20.06.2011 05.09.2011 07.12.2011 NA 05.01.2012 CC-CS/128- JV of ISOLUX DE DEC'14 1279/1/G2 Package for 400kV D/C Dehradun (S+I) (PP) (PP) (PP) (PP) (PP) NR1/TW- MEXICO S.A. DE (PP) POST REVIEW – Abdullapur Transmission Line 18.04.2011 25.04.2011 28.06.2011 05.12.2011 1279/1/G2/NOA- CV , C&C Feb'14 (A) (A) (A) (A) NOA : I/4080; CC-CS/128- Construction (R) Tower Package - TW01 31.01.2012 NR1/TW- Limited,Man (A) 1279/1/G2/NOA- Structurals Pvt Ltd, CA: II/4081 Case Cold Roll 15.02.2012 Forming Limited (A) BID DOCUMENT NO.-II 6.2 CC-CS/128-NR1/CD- Conductor Package for 400kV 500.61 10.43 ICB 16.08.2011 NA 19.08.2011 04.10.2011 03.01.2012 NA 27.01.2012 CC-CS/128- Gammon India Ltd MAR'14 1280/1/G2 D/C Dehradun – Abdullapur (S) (PP) (PP) (PP) (PP) (PP) NR1/CD- (GIL) (PP) POST REVIEW Transmission Line: Conductor 11.07.2011 18.07.2011 12.09.2011 05.12.2011 NOA : 1280/1/G2/NOA/40 SEP'13 (A) (A) (A) (A) 01.02.2012 82 (R) Package - CD01 (A) CA: 15.02.2012 (A) BID DOCUMENT NO.-III 6.3 CC-CS/128-NR1/INS- Disc/Porcelain Longrod Insulator 64.68 1.35 ICB 16.08.2011 NA 19.08.2011 04.10.2011 03.01.2012 NA 27.01.2012 CC-CS/128- SiChuan YiBin MAR'14 1281/1/G2 Package for 400kV D/C Dehradun (S) (PP) (PP) (PP) (PP) (PP) NR1/INS- Global Group Co. (PP) POST REVIEW – Abdullapur Transmission Line : 02.08.2011 09.08.2011 22.09.2011 09.02.2012 19.03.2012 1281/1/G2/NOA- Ltd. Oct'13 (A) (A) (A) (A) (A) I/4217; CC-CS/128- (R) Insulator Package - IS01 NR1/INS- 1281/1/G2/NOA- II/4218 ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 6 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 7 TRANSMISSION SYSTEM ASSOCIATED WITH SRSS-XVII BID DOCUMENT NO.-I (Part) 7.1 CC-CS/203-SR2/CD- ACSR 'Moose' Conductor Pkg P290- 740.05 15.42 ICB 10.04.12 NA 15.04.12 05.06.12 20.08.12 NA 05.09.12 NYA NYA Mar'14 1714/1/G3 CD 03 for 400 kV Line (part) (S) (PP) (PP) (PP) (PP) (PP) (PP) POST REVIEW 28.05.12 29.05.12 16.07.12 20.02.13 01.03.13 Jan'15 ( R) (A ) (A) (A ) ( R) (R ) 7.2 CC-CS/203-SR2/CD- ACSR 'Moose' Conductor Pkg P290- 740.05 15.42 ICB 10.04.12 NA 15.04.12 05.06.12 20.08.12 NA 05.09.12 NYA NYA Mar'14 1715/1/G3 CD 04 for 400 kV Line (part) (S) (PP) (PP) (PP) (PP) (PP) (PP) POST REVIEW 28.05.12 29.05.12 16.07.12 20.02.13 01.03.13 Jan'15 ( R) (A ) (A) (A ) ( R) (R ) BID DOCUMENT NO.-II 7.3 CC-CS/203-SR2/INS- Insulator Pkg P290: IS 01 for 765 kV 242.62 5.05 ICB 10.04.12 NA 15.04.12 05.06.12 20.08.12 NA 05.09.12 NYA NYA Mar'14 1428/1/G3 Tower Pkg TW01 & TW02 (S) (PP) (PP) (PP) (PP) (PP) (PP) POST REVIEW 04.06.12 05.06.12 30.07.12 20.02.13 01.03.13 Jan'15 ( R) (A ) ( A) (A ) ( R) (R ) BID DOCUMENT NO.-III 7.4 CC-CS/203-SR2/INS- Insulator Pkg P290: IS 02 for 400 kV 125.10 2.61 ICB 10.04.12 NA 15.04.12 05.06.12 20.08.12 NA 05.09.12 NYA NYA Mar'14 1716/1/G3 Tower Pkg TW02 & TW03 (S) (PP) (PP) (PP) (PP) (PP) (PP) POST REVIEW 04.06.12 05.06.12 30.07.12 20.02.13 01.03.13 Jan'15 ( R) (A ) ( A) (A ) ( R) (R ) BID DOCUMENT NO.-IV 7.5 CC-CS/203-SR2/GIS- S/S Package : SS01 721.95 15.04 ICB 15.02.12 05.03.12 10.03.12 30.04.12 30.06.12 20.07.12 30.07.12 NYA NYA JUL'14 1414/1/G5 (i) 400 kV Narendra (GIS) with 1x125 (S+I) (PP) (PP) (PP) (PP) (PP) (PP) (PP) (PP) PRIOR REVIEW MVAR, 420 kV Bus Reactor 13.03.12 16.05.12 22.05.12 18.07.12 21.12.12 14.01.13 15.02.13 Feb'15 (ii) Extension of 400 kV Narendra (A) (A) (A) (A) (A) (A) (R) (R ) (existing) 7.6 CC-CS/203-WR1/GIS- S/S Package : SS02 720.24 15.01 ICB 15.02.12 05.03.12 10.03.12 30.04.12 30.06.12 20.07.12 30.07.12 NYA NYA JUL'14 1415/1/G5 (i) 400 kV Kolhapur (GIS) with 1x125 (S+I) (PP) (PP) (PP) (PP) (PP) (PP) (PP) (PP) PRIOR REVIEW MVAR, 420 kV Bus Reactor 13.03.12 16.05.12 22.05.12 18.07.12 21.12.12 14.01.13 15.02.13 Feb'15 (A) (A) (A) (A) (A) (A) (R) (R ) Bidding Documents (Slices): 4(6) 3290.01 68.55 ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded 7 of 7 INFORMATION ON PROCUREMENT PLAN FOR WORKS/GOODS UNDER ADDITIONAL FINANICING FOR PSDP-IV LOAN Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Estimated Method of Preparation Bank's No Bids Contract Bank's No Contract Signed Contract No. Name of Contractor/ No. Cost (Rs. in Cost (US$ in procurement of Bid Objection to Award Objection to (Date/ Nationality & ZIP Bidding Million) Million) ICB/NCB Document decided (Date/ Contract Value/ Code Documents (Date) Value/ Award (Date) Currency) (Date) Currency) Invitation Opened on (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Abbreviations: PP - target dates as per Procurement Plan; R - Revision; A - actual date; NA - Not applicable; NYA - Not yet awarded. Note: (i The Bid Document No.-I i.e. Bidding Document (BD) for Conductor Slices at Sl.No. 7.1 & 7.2 (also comprising Conductor Packages CD01 & CD02 covered under PSDP- V), will be prepared based on the Sample Bidding Document for Conductor Packages [Conductor Packages - CD01, CD02 & CD03 for System Strengthening Schemes in Northern Region for Sasan and Mundra UMPPs] as agreed with the Bank in case of its PSDP-V Loan incorporating Contract specific changes. (ii) The Bid Document No.-II & III i.e. Bidding Document (BD) for Insulator Contract at Sl.No. 7.3 & 7.4, will be prepared based on the Sample Bidding Document for Insulator Packages [Insulator Packages - IS01 & IS02 for System Strengthening Schemes in Northern Region for Sasan and Mundra UMPPs] as agreed with the Bank in case of its PSDP-V Loan incorporating Contract specific changes. (iv) The Bid Document No.-IV i.e. Bidding Document (BD) for 400 kV Substation Package at Sl.No. 7.5 & 7.6 will be prepared incorporating Contract specific changes based on the Sample Bidding Documents for 400/220kV Sikar (New) S/Stn, 400/220 kV Panchkula (New) S/Stn and 400 kV Jaipur S/Stn Extn.Package -P168-S1 for System Strengthening Schemes in Northern Region for Sasan and Mundra UMPPs under PSDP-V Loan. Exchange Rate considered; 1 US $ = Rs.48 ** These documents are post review and are ready based on prior review documents as approved by World Bank. PP - Target dates agreed as per Procurement Plan , R - Revivion 1,2 etc., A - Actual Dates, NA - Not Applicable, NYA - Not yet awarded