Report No. 469a-IND FILE COPY Indonesia The Five Cities Water Supply Projects The Cities: Malang, Purwokerto and Banyuwangi in Java; Jambi in Sumatera; Samarinda in Kalimantan September 20, 1974 East Asia and Pacific Projects Department Water Supply Division Not for Public Use Document of the International Bank for Reconstruction and Development International Development Association This report was prepared for official use only by the Bank Group. It may not be published, quoted or cited without Bank Group authorization. The Bank Group does not accept responsibility for the accuracy or completeness of the report. CURRENCY EQUIVALENTS (As of Sept. 20, 1974) Currency Unit = Rupiah (Rp) US$1.00 = Rp 415 Rp 1 = US$0.0024 Rp 1,000 = US$2.41 Rp 1 million = US$2,410 US$1 million = Rp 415 million MEASURES AND EQUIVALENTS am = millimeter = 0.04 inches cm = centimeter * 0.39 inches m w meter = 3.28 feet km 2 kilometer = 0.62 miles km w square kilometer = 0.39 square miles ha e hectare = 10,000 square meters 3 or 2.47 acres m 3 cubic meter = 264 US gallons m /sec w cubic meters per second = 22.8 million US gallons per day 1 w liter = 0.26 US gallons 1/sec w liters per second = 22,800 US gallons per day 1/cd " liters per capita per day - 0.26 US gallons per capita per day PRINCIPAL ABBREVIATIONS AND ACRONYMS Government = Government of Indonesia BAPPENAS = National Development Planning Board Cipta Karya = Directorate General of Housing, Building, Planning and Urban Development DSE w Directorate of Sanitary Engineering WE = Water Enterprise (of the City specified) WHO = World Health Organization UNICEF = United Nations International Children's Emergency Fund FISCAL YEAR April 1 - March 31 January 1 - Deceber 31 for Samarinda INDONESIA APPRAISAL OF THE FIVE CITIES WATER SUPPLY PROJECTS TABLE OF CONTENTS Page No. SUMMARY AND CONCLUSIONS ........ .............*... ......... -i I. INTRODUCTION ............... ... .....o......o....*.... .o II. THE SECTOR .................................... . .... 2 Background ........... .... ....s .. . . ..... 2 Sector Organization and Management on National and Local Levels ...................... 3 Sector Needs and Development ................o. 3 III. THE BORROWER, THE IMPLEMENTING AGENCY AND THE BENEFICIARIES ..............................s... . . 5 The Borrower ............ ...... 5 The Directorate of Sanitary Engineering .......... 5 Existing Water Works Organizations and Water Supply Facilities in the Five Cities ........... 6 Proposed Water Enterprises ..........o............. 8 Required Management and Technical Assistance ..... 9 Audit .... . .. . . .. . .. ................... 9 IV. THE PROJECTS ...................... .. . .. ........ 10 Description ........ *....................0.......... 10 Cost Estimates ...... .. ..... ... . ............ 11 Amount of Proposed Loan .... ..... ................ 13 Design, Construction and Supervision of Construction ......... ... . .... ......... 14 Procurement ................ ........ ... 14 Disbursement .................. ......... 15 Ecological Aspects ............................... 15 V. JUSTIFICATION ......................................... 15 Project Objectives and Population and Demand Forecasts .................. ... . .. ........ 15 Least Cost Solution ..... .0........... ...to... 17 Return on Investment ............................ 17 This report was prepared by Messrs. L. Rasmusson and K.C. Smeltzer, and is based on information provided by the Government, the consulting engineers' reports and the findings of the field missions which visited Indonesia in April-May and November-Dece=ber 1973. -2- Page No. VI. FINANCIAL ASPECTS ....................PS............ 18 Record of Finances ................na............ 18 Transfers of Assets to Water Enterprises ......... 19 Financing Plan ............................ ...... 19 Financial Projections ...................... 22 Water Rates and Billings ......................... 22 Future Finances .......... ......... ...... ..... 26 VII. AGREEMENTS REACHED AND RECOMMENDATION ................. 27 LIST OF ANNEXES ANNEXES 1. Proposed Organization Chart for the Directorate of Sanitary Engineering 2. Descriptions of Existing Water Supply Systema 3. Proposed Organization Chart for the Water Enterprises 4. Description of the Projects 5. Project Cost Estimates 6. Implementation Schedule 7. Estimated Schedule of Disbursements 8. Population and Water Demand Projections 9. Internal Financial Rates of Return 10. Malang - Income Statements, Cash Flows, and Balance Sheets 1972-83 11. Purwokerto - " " 12. Banyuwangi - it 1 I" i " 13. Jambi - " " " "t " f " 14. Samarinda - " " " " " 1971-82 15. Assumptions for Financial Projections 16. Schedules of Water Rates 17. Forecast Performance Indicators MAPS IBRD 10870 - Location Map IBRD 10871 to 10875 - Existing Water Supply Systems and Proposed Projects INDONESIA APPRAISAL OF THE FIVE CITIES WATER SUPPLY PROJECTS SUMMARY AND CONCLUSIONS i. This report covers the appraisal of projects to increase water supply and extend the water distribution systems in five cities in Indonesia - Malang, Purwokerto and Banyuwangi in Java; Jambi in Sumatera; and Samarinda in Kalimantan. The projects are the first stage, covering the fiscal years 1975 through 1981, of a master plan for water supply in the five cities, whose present facilities are inadequate for meeting the needs of their existing and growing populations, now approximating one million. These cities, together with the cities of Cirebon and Jogjakarta whose water supply system extensions are currently proposed to be financed with the aid of the Swiss Government, were selected by the Government of Indonesia as a package for purposes of financing. The projects in this group of seven cities represent the first step under a new program by the Government to improve and extend water supply facilities in cities throughout Indonesia. ii. The Government of Indonesia will be the borrower, and the bene- ficiaries will be water enterprises responsible for water supply in the respective cities. The Directorate of Sanitary Engineering will be the agency of the Government responsible for project implementation and construc- tion supervision. The water supply facilities will be owned and operated by the water enterprises in the respective cities. The Directorate of Sanitary Engineering will employ consultants to assist and train its staff in the performance of its functions with respect to the projects and the national water supply program throughout Indonesia and to train the staffs of the water enterprises in operating and maintaining the extended facilities in the cities. iii. The objective of the projects is to provide piped water supply to the extent practicable in the first stage to areas of the cities which do not have public supplies of potable water and to provide facilities to ensure a continuous water supply and meet increasing water demands in the project areas. Present water demands are far in excess of the capacities of the existing systems, and large areas of the cities do not have public water supplies. Unless the projects are constructed, serious shortages will continue with increasing public health problems. The objective is also to develop the organizational structure and procedures of the national agency to enable it to administer effectively financial assistance to local water enterprises and a national water supply program for Indonesia. iv. The projects in the five cities include well drilling, cons- truction of river intake facilities, pumping stations, treatment plants, transmission and distribution facilities, the installation of new service connections, public standpipes and bathhouses, and the improvement of - ii - existing service. The total population of the five cities to be served with potable water as a result of the projects is estimated to increase from about 160,000 or 16% of total population, to 590,000 or 48% of total population. v. The projects in the five cities are estimated to cost a total of about US$22.8 million (Rp 9,442 million). The proposed loan of US$14.5 mil- lion includes US$12.3 million to cover about 54% of the total project cost in the five cities, which is the estimated foreign exchange component and cost of consultant services for detailed engineering and supervision. The balance of the construction costs will be financed by loans and contributions from the Government and internal cash generation. The cost of consultant services for management and technical assistance to the Directorate of Sani- tary Engineering and to the water enterprises and the cost of feasibility studies for the extension of water supply to a second package of cities in Indonesia are estimated at about US$2.6 million (Rp 1,100 million), against which US$2.2 million of the proposed loan will be disbursed. vi. All contracts for material and equipment needed for the projects will be awarded on the basis of international competitive bidding. Con- struction contracts will not be financed under the proposed loan and will be awarded on the basis of local competitive bidding. Most of the mate- rial and equipment will be imported, but some items such as small diameter pipes could be supplied by local manufacturers who will receive a prefer- ence of 15% or the prevailing tariff, whichever is lower. vii. The major elements of the program represent the least-cost solu- tion from among feasible alternatives at discount rates in the 10 to 12% range. The internal financial rate of return on the individual projects in the respective cities is estimated to vary from 0.4% to approximately 7%. These returns are calculated by measuring benefits by revenues with- out taking into consideration health and other related benefits. The wide variation in the returns is because of the large differences in existing water rates among the cities and the variations in the invest- ment and operating costs for each city. The existing rates are expected to be increased gradually over the years in line with the ability of con- sumers to pay. The substantive justification for the projects does not rest primarily on the financial forecasts which do not measure their con- tribution to the economic and social development of Indonesia, but rather on the fact that a modest level of water consumption is provided at least cost and that the health hazards of not doing so are serious. viii. The projects are suitable for an IBRD loan of US$14.5 million for a period of thirty years, including a grace period of 6 years. The Govern- ment of Indonesia will relend US$12.3 million of the proceeds of the loan to the respective beneficiaries at an interest rate of 9% per annum repay- able over 30 years, including a grace period of 6 years, during which in- terest will be waived. INDONESIA APPRAISAL OF THE FIVE CITIES WATER SUPPLY PROJECTS I. INTRODUCTION 1.01 The Government of Indonesia has requested a loan of US$14.5 million to finance the foreign exchange costs of projects to increase the water supply and extend the water distribution systems in five cities in Indonesia (Map IBRD 10870) - Malang, Purwokerto and Banyuwangi in Java; Jambi in Sumatera; and Samarinda in Kalimantan - and to finance services relating to the national water supply program in Indonesia. The Government will relend US$12.3 million of the proceeds of the loan to water enterprises which will own and operate the water systems in the respective cities. These projects are estimated to cost a total of US$22.8 million equivalent. The proposed IBRD loan includes US$2.2 million for services to, and training of, the national and local organizations by consultants in order to implement the projects and permit the Government to extend this program to other cities and to finance a feasibility study for a second package of water supply projects selected by the Government for financing. 1.02 The projects are part of a long-term plan for the development of water supply in the five cities. The projects in these cities, together with the cities of Cirebon and Jogjakarta which are proposed to be financed with the aid of the Swiss Government, were selected by the Government of Indonesia as a package for purposes of financing. This group of projects represents a first step by the Government of Indonesia in a program to improve and extend water facilities throughout Indonesia. 1.03 The Directorate of Sanitary Engineering will be the agency of the Government of Indonesia primarily responsible for the implementation of the projects. New water enterprises are being established in each of the five cities to operate and maintain the systems. 1.04 An IDA reconnaissance mission visited Indonesia in July-August 1970 and in February 1971 to identify the principal problems in the urban water supply and sewerage sector and to assess possible solutions. The report, issued on December 9, 1971 (PU-81), emphasized the need, recognized by the Government of Indonesia, to move the existing financing policy of the Government from a grant to a loan approach and to consideration of the entire water supply system requirements rather than only source and trans- mission facilities. The report also included recommendations for studies which would (a) identify and consider solutions to the problems involved in a change of policy from grants to loans in financing municipal water projects, (b) formulate the procedures to be followed, nationally and locally, in administering the loan program, (c) suggest the required changes in organ- ization and staffing required to implement the loan program, and (d) lead to the selection of five or six cities where preliminary engineering and feasibility studies could be carried out and which would serve as the pilot cities for initiating and testing of the loan program. - 2- 1.05 Following the sector study, the Government of Indonesia requested IDA assistance for feasibility and organizational studies as a first step in implementing the recommendations in the sector study, and consultant serv- ices for this purpose were financed under Technical Assistance Credit No. Cr. 216. In 1972-1973 the consultants prepared master plans and feasibility studies for water supplies in seven cities (Malang, Purwokerto, Banyuwangi, Jambi, Samarinda, Cirebon and Jogjakarta) and studies for developing ogani- zations at the national and local levels which could successfully undertake a water supply program. The studies were made by Nihon Suido Consultants Company, Ltd. of Tokyo, in association with James M. Montgomery Consulting Engineers Inc. of Pasadena; Sycip, Gorres, Velayo & Co. of Manila, manage- ment consultants; and Indonesian Contracting Engineering Service of Jakarta. The studies have been supervised and reviewed by IDA and form the basis for the projects included in this report. 1.06 A pre-appraisal mission composed of Messrs. V. Rajagopalan, L. Rasmusson and K.C. Smeltzer visited Indonesia in April-May 1973, and an appraisal mission of the latter two persons visited Indonesia in November- December 1973. In June 1973, the Swiss Government advised that it would finance the water supply projects for Cirebon and Jogjakarta and that the appraisal of these projects would be conducted by its representatives. Accordingly, the projects in the other five cities are the subject of this appraisal report. II. THE SECTOR Background 2.01 Indonesia, with a population of about 128 million and growing at an annual rate of more than 2%, is the world's fifth ranking country in population. It comprises over 3,000 inhabited islands which extend about 5,000 km east to west and 2,000 km north to south. The land area is about 1.9 million km2 and the four major islands are Java, Sumatera, Kalimantan and Sulawesi. The population density of Indonesia is about 65 inhabitants per km2. Java, which has 69% of the total population of Indonesia but only 7% of the land area, has a population density of 600 per km2, one of the highest in the world. Over 20 million of the population is urban, living in cities of more than 5,000 inhabitants, and urbanization of the country is accelerating. 2.02 Indonesia's economy is generally based on agriculture (about half of the national product), which provides employment and income for more than 70% of the population. Oil and gas are Indonesia's most important natural resources. Indonesia's general economic climate has improved over the past few years with a promising start on development. The Government's current development planning is based on an estimated growth of the economy of 7.5% annually. -3- 2.03 Indonesia is divided administratively into 23 provinces and 2 territories, which are in turn divided into regencies or districts. The cities, depending on their size, have their own municipal governments or are administered by the regency governments. Sector Organization and Management on National and Local Levels 2.04 Two ministries are responsible for national water supply and sewerage planning -- the Ministry of Public Works and Power for urban areas, defined as Municipalities with a population larger than 5,000, and the Ministry of Health for rural areas. The Ministry of Mines through its Geological Survey is in charge of groundwater exploration and relevant data collection. Funds made available for water supply and sewerage projects in Indonesia's annual development budget are allocated by the National Development Planning Board, BAPPENAS. 2.05 The Ministry of Health is organized into two units, General and Sanitary Engineering Division, and Directorate of Hygiene and Sanitation. Their responsibilities are mainly technical advisory services on water quality control, design, construction, and related aspects on environmental sanitation. Within the Ministry of Public Works and Power, the Directorate General of Water Sources deals mainly with water rights, allocations of water resources, and the development of water resources for agricultural purposes. The Directorate General of Housing, Building, Planning and Urban Development (Cipta Karya) is in charge of urban water supply and sewerage. 2.06 Cipta Karya through its Directorate of Sanitary Engineering (DSE) is the implementing agency for water supply and sewerage projects with the functions of project planning and project selection, fund allocations, preliminary and detailed engineering, construction supervision and, occasionally, operation and maintenance of water supply systems. 2.07 The municipalities or regencies are usually responsible for operation and maintenance of the water works and for extension of the distribution systems. The water works entities are usually a part of the municipal or regency government, and their organization and degree of dependency vary from city to city. The water revenues usually barely cover operation and maintenance costs, and very few replacements or extensions of the distribution systems have been carried out during the last 30 years. Sector Needs and Development 2.08 A considerable portion of the total urban population lives in cities with no public water supply, and where public water supply exists it is inadequate and serves only a small part of the population. Most people are dependent on dug wells, streams or rivers with attendant substantial health risks. Most existing water supply systems suffer from low pressure and intermittent supply, and safe water entering the system will not always remain uncontaminated. 2.09 The water supply needs of the rural population, living in more than 50,000 villages and comprising about 80% of the total population, pre- sent a formidable problem. Water is mainly obtained from dug wells, streams or rivers, which in most cases are contaminated. A verty limited program for organized and safe water supply is assisted by UNICEF/WHO, but a negligible percentage of the rural population is involved. 2.10 The urban population served by sewerage systems is very small. Human wastes are mainly discharged into septic tanks, latrines, surface drainage ditches, or directly into streams and rivers, and constitute a hazard for non public water supplies by pollution of wells, strea&s and rivers. 2.11 Between 1959 and 1965 very few water supply schemes were cons- tructed in Indonesia. Some have been constructed since 1965 ot have been under construction as part of the 5-year plan for fiscal yeats 1970 through 1974, instituted by the Government to implement a broad program of economic development. Many of these improvements will not supply more consumers because the works financed from national funds have been almot exclt"ively confined to supply and transmission facilities; municipalities or regencies do not have the funds needed to extend distribution sytteam. 2.12 The table below shows investments during 1970-74 by DSE on water supply and sewerage projects. The funds have been provided as grats. Inve9tmenhts - Five-Year Plan 1970-74 Rupiahs millions (US$ millions) Year ended March 31 1970 1971 1972 1973 1974 Total ------- Actual ---------- tetimated Water Supply 1,528.5 2,310.0 2,405.1 2,846.5 3,460.4 12,550.5 (3.683) (5.566) (5.795) (6.859) (8.338) (30.241) Sewerage 50.0 48.6 100.0 45.0 143.6 387.2 (0.120) (0.117) (0.241) (0.109) (0.346) (0.933) Total 1,578.5 2,358.6 2,505.1 2,891.5 3,604.0 12,937.7 (3.803) (5.683) (6.036) (6.968) (8.684) (31.174) At the levels of investment shown above the country may well lose ground in its attempts to supply a larger percentage of the population with safe water unless major changes are made. Only 3% of the five-year plan allocation has been spent on drainage and sewerage works, which hardly covers elementary needs. 2.13 The budget allocation for rural water supply in the five -year plan (1970-74) amounted to Rp 140 million (US$337,000). The cost of rural water supply construction in the five-year plan is estimated at less than US$1.0 million including the UNICEF/WHO contribution. The second five-year -5- plan (1975-79) has greater provision for rural water supply, about US$4 to 5 million. This rate of investment will have only a small impact on the problem. However, the organization to carry out a massive program efficiently does not yet exist, even if all the funds required were to be provided. III. THE BORROWER, THE IMPLEMENTING AGENCY AND THE BENEFICIARIES The Borrower 3.01 The Government of Indonesia through its Ministry of Finance will be the borrower and will relend the major part of the proceeds of the loan to the beneficiaries which will be the water enterprises (WE's) established to take over the responsibility for water supply in each of the five project cities. DSE will be the implementing agency. The Directorate of Sanitary Engineering 3.02 DSE is responsible for the national water supply program includ- ing investigation, planning, design and construction supervision of urban water supply and sewerage projects. The responsibility for extension of distribution systems rests in the local authorities, but will be taken over by the WE's. 3.03 DSE's present organization is composed of four divisions - Planning Survey and Design, Water Supply, Sewerage, and Logistics - and three organizational units - Project Aid, Secretariat, and Project Manage- ment for construction supervision. The divisions and units are further subdivided into sections. The total number of staff in FY 1973 was 137, including 27 qualified engineers of whom 14 have overseas training. Another 33 staff members have lower engineering degrees. There are numerous vacancies in the organization due to recruitment difficulties and the necessity for use of engineers in the field for construction supervision and water system operation and maintenance. The staff members have generally good theoretical background but lack practical planning and design experience. 3.04 The consultants, financed under the Technical Assistance Credit (para 1.05), reviewed the existing organization of DSE, and recommended changes to enable it to cope with the increased work load and responsibilities under the program. The organization will be restructured substantially in accordance with the recommendations and a chart of the proposed organization is shown in Annex 1. The new organization will comprise five divisions: Planning and Evaluation, Survey and Design, Construction, Logistics, and Technical Assistance. There will also be units for Special Staff and for Finance and Administration. The Survey and Design Division will be composed of three existing divisions to achieve a concentration of the design capacity. The Construction Division will be a new division subdivided geographically into three sections. The Logistics Division will be strengthened. The Technical Assistance Division will conduct training of staff members on the national and local levels through seminars or in-service training and will -6- assist in the establishment of WE's. The Planning and Evaluation Division will play an important role in the development of projects for the national water supply program. The present Secretariat will be strengthened to form the Finance and Administration Unit and will include a section for financial planning and loan administration. In the past, funds for development and extensions of water supply facilities have been given as grants from the national government to the local governments, but this procedure will be changed under the new program and all money allocations will be as loans and equity payments. External loans, such as the proposed IBRD one, -will also be channelled through DSE. 3.05 The restructured organization will require new working procedures for loan applications, awarding of contracts, fund releases and loan repay- ments. The Planning and Evaluation Division will review the water supply requirements in the cities, prepare feasibility reports and establish criteria for project selection. The Finance and Administration Unit will, inter alia, assist in the preparation of loan applications and subsidiary loan agreement documents. DSE will implement projects up to the stage of commissioning when they will be turned over to the local WE's. The Bank of Indonesia will be the channel for effecting financial transactions such as fund releases and loan repayments. 3.06 The changes in organization, working procedures and expected workload will require an increase in the number of staff and improvements in their performance. The total staff is projected to rise from the pres- ent 137 to 177 in 1980. Assistance from management and engineering con- sultants will be needed to implement the changes in organization and working procedures and to expand DSE's engineering capacity. Provision for neces- sary consultant services for this purpose is included in the proposed loan. 3.07 It was agreed during negotiations that the reorganization of DSE and the introduction of proposed working procedures will be implemented and additional staff will be recruited according to agreed time schedules. Existing Water Works Organizations and Water Supply Facilities in the Five Cities 3.08 The water works organizations in the five cities vary in their structure and degree of dependency. They are geared to operation and maintenance only, and construction works are confined mainly to minor extensions of distribution mains, pipe replacements and consumer connec- tions. The existing water works are described briefly below, in more detail in Annex 2, and are shown on Maps IBRD 10871 to 10875. 3.09 In MALANG the water works is operated by three departments of the municipal organization: Public Works, Finance, and Local Enterprises Departments. The number of staff is about 130. The water works supplies about 23,000 m3/day and serves about 30% of the total population of 422,000 by 13,000 service connections or by standpipes. From two springs, Binangun and Karangan, the water gravitates to balancing storage tanks at Dinoyo and Betek, and then to the distribution system. The distribution system is subdivided into two pressure zones, each supplied from its storage tank. -7- 3.10 In PURWOKERTO the Public Works Department of the Regency operates the water works through two divisions, the Technical and the Administration Divisions. The number of staff is about 25. The water works supplies about 1,400 m3/day and serves about 3% of the total population of 211,000 by 1,300 service connections. From a spring at Kawung Carang the water after treatment gravitates to a balancing storage tank and then to the distribution system. 3.11 In BANYUWANGI water supply is the responsibility of a unit within the department of local enterprises of the Regency. The water works is sub- divided into a Technical Divison and an Administration and Cashier Unit.3 The number of staff is about 20. The water works supplies about 1,200 m / day and serves about 6% of the total population of 78,000 by 1,300 service connections. From the Gedor Spring the water gravitates to a break pressure tank and balancing storage tanks and then to the distribution system. The distribution system is subdivided into two pressure zones. 3.12 In JAMBI water supply is directly under the office of the Mayor and it is subdivided into five divisions, Administration, Collection, Tech- nical, Pumps, and Repairs Divisions. The number of staff is about 55. The water works supplies 650 m3/day and serves about 3% of the total population of 166,000 by 1,500 service connections. From the Batang Hari River the water is pumped to a treatment plant for chemical flocculation, sedimentation and rapid sand filtration. The treated water is pumped to an elevated storage tank for distribution to the service area. The immediate improvement program, currently under way, will increase the water supply by FY 1976 to about 2,500 m3/day. 3.13 In SAMARINDA water supply is directly under the office of the Mayor, but is supervised in technical matters by the Municipal Public Works Depart- ment. The water supply unit is subdivided into two divisions, the Adminis- tration and Financial and the Technical Divisions. The number of staff is about 25. The water works supplies 915 m3/day and serves about 14% of the total population of 106,000 by 1,000 service connections and standpipes. From the Mahakam River the water is pumped to a treatment plant for chemical flocculation, sedimentation and rapid sand filtration. The treated water is collected in a clear well from where it gravitates to the service area. The immediate improvement program, currently under way will increase the water supply by FY 1975 to about 3,100 m3/day. 3.14 The existing water supply systems in the five cities suffer from low or intermittent pressure. Many meters are in need of repair or replacement, and in Jambi and Samarinda services are not metered. The operation and maintenance of facilities have suffered from shortages of trained personnel because of the lack of funds and organization. The accounting systems are inadequate to provide meaningful financial state- ments or information for management control. Water rates have been suf- ficient only to cover current cash expenses and provide small surpluses which have been devoted to general uses without sufficient attention to the existing and expanding needs of the community for water supply. -8- 3.15 The five cities have very limited and rudimentary sewerage systems. Except for some septic tanks, there is no sewage treatment. The sewage is generally discharged into open channels, streams or rivers, polluting the water sources, including dug wells, on which most of the population depends. Proposed Water Enterprises 3.16 The implementation of the water supply program will considerably increase the responsibilities of the existing water works organizations in the five cities. As the supply areas are expanded, revenues from water sales will increase substantially, and effective operating procedures, accounting systems and management controls will be needed. To cope with such increased responsibilities in the five cities and in other cities which will have their water supply systems expanded, changes in organiza- tion and working procedures are needed. Studies have been carried out by the management consultant, SyCip, Gorres, Velayo & Co., under the Technical Assistance Credit (para 1.05) and they have recommended reorganization of the water works as shown in Annex 3. 3.17 The organizational structures for all cities will be substantially the same with minor variations to accommodate the differences in the water supply systems. The WE will be controlled by a water board to be composed of representatives of the local and national governments. The Board will appoint a Managing Director, who, with the assistance of the Finance and Administration Director and the Chief Engineer, will be responsible for implementing board policy and for day-to-day control. 3.18 Under the proposed organization, the WE's are being set up as entities (Perusahaan Daerah) separate from the local governments, accounting separately for their operations and retaining their own revenues from which they will meet operating and capital expenditures and debt service. General regulations for regional enterprises are spelled out in Act No. 5, Year 1962, and particular regulations or charters within this framework have been issued by the local governments for water works organizations. WE's have already been established for Malang, Purwokerto and Samarinda and will be established for Banyuwangi and Jambi before the proposed loan becomes effective. During negotiations it was agreed that (i) each municipality or regency will transfer to the appropriate WE the water works and all assets used in its operations, including all receivables and accrued assets and a sufficient amount of working capital to enable it to continue its operations; and (ii) each WE will enter into a project loan agreement, acceptable to IBRD, with the National Government for the related project. A condition of effectiveness of the proposed loan is that all five project loan agreements will have been signed. 3.19 The existing water systems have been operated under the supervision of chiefs of public works departments which have functions in addition to water supply. In view of this and the need for qualified financial and technical personnel, particularly at management levels, to operate the expanded -9- and modernized systems, recruitment of Managing Directors and Chief Engineers, and in most cases Finance and Administration Directors, will be required. During negotiations agreement was reached that in each case a Managing Director and Chief Engineer will be appointed before the project loan agree- ment is signed and that the Finance and Administration Director and accountant will be appointed within six months of the signing of the project loan agreement. However, it may be necessary to fill the posts of Chief Engineer and Finance and Administration Director on a temporary basis by seconding staff from DSE or the municipality concerned, to serve also as Managing Directors and accountants, respectively. Required Management and Technical Assistance 3.20 DSE will require assistance and advisory services of a consulting firm to ensure the effective implementation of the water supply program at both the national and local levels. Specialists will be needed in organization, management, accounting systems, finance, engineering, operation, maintenance and training in these areas. The consultant would assist with (a) organizing and training the DSE staff to implement proposed organizational changes; (b) the establishment of new working procedures, operating objectives and responsibilities, and training people to accomplish them; and (c) reorganizing municipal water works operations, and training personnel at the local level to operate and maintain effectively the individual water works system. Provi- sion for consultant services for three years is included in the proposed loan. DSE is currently negotiating a contract with SyCip, Gorres, Velayo & Co., which prepared the previous management and organizational studies (para 1.05), The engagement of consultants will be a condition of effectiveness of the proposed loan. The progress of the consultant's work will be reviewed by DSE and IBRD periodically, and any changes or revisions needed will be introduced. Audit 3.21 The accounts of the water works are not kept on a commercial accounting basis, and the usual financial statements for utility enterprises are not prepared. While there generally are periodic reviews of receipts and expenditures under the municipal systems by governmental authorities, audits are not made under generally accepted accounting standards. The accounts of each water enterprise will be audited annually by independent auditors acceptable to IBRD. The first audit will cover accounts for the fiscal year ending December 31, 1976, or March 31, 1977, as appropriate (See para 6.02), and the auditor's report and financial statements will be sent to IBRD not later than six months after the close of each fiscal year. - 10 - IV. THE PROJECTS Description 4.01 The projects are the first stage, covering the years 1975 through 1981, of a master plan prepared by the consultants for water supply in the five cities (para 1.05). Only about 16% of the total population in the project areas of the five cities is now served with potable water through service connections or standpipes by the existing water supply facilities. The first stage projects will increase the percentage of population served to 48% in 1981, and the master plan program contemplates a further increase to 75% in 2001. (Population and water demand projections for each city are shown in Annex 8). 4.02 The principal elements of the project in each city and of the consultant services at the national and local levels are listed below. The proposed works are described in detail in Annex 4 and the layout of each system is shown on Maps IBRD 10871 to 10875. Malang 1. Development of the Mendit Spring with collection structure, treatment plant, clearwell and booster pumping station; 2. about 58 km of transmission and distribution mains; 3. booster pumping station and service reservoir; and 4. test well drilling for possible ground water development for the second stage. Purwokerto 1. Groundwater development by construction of three deep wells; and 2. about 37 km of transmission and distribution mains. Banyuwangi 1. A break pressure tank with chlorination plant; and 2. about 19 km of transmission and distribution mains. Jambi 1. River intake with pumping station, force main, treatment works, clear well and booster pumping station; and 2. about 64 km of distribution mains and a balancing storage tank. Samarinda 1. River intake with pumping station, transmission mains, treatment works, clear well and booster pumping station; and - 11 - 2. about 37 km of distribution mains. General In addition, the project in each city will include service connections, public standpipes, public bathhouses, motor vehicles, laboratory equipment and staff housing and, where required, stores and office accommodation. Consultant Services 1. Detailed engineering design and construction supervision by foreign and local consultants for the projects; 2. management and technical assistance on the national and local levels for implementation of proposed changes in organizations and working procedures; and 3. feasibilities studies for a second package of seven water supply projects. Cost Estimates 4.03 The total estimated costs for the projects in the five cities and for consultant services are summarized in the table below. The project costs, subdivided into items and into the years in which they are projected to be spent, are shown in Annex 5. - 12 - % f % of sob-proJect Total RMillion US$ milliolls costa t al a y art- MALANG MIVI works 440.71 - 440.71 1.06 - 1.06 13 - 13 Material & Equipmewt - 1,025.96 1,025.96 - 2.47 g.47 - 31 31 Egineering 73.80 252.70 326.50 0.18 0.61 0.79 2 8 10 Contingencies 636.63 RTO5 1 513.15 1.54 2.11 3.65 47 Civil works 147.62 - 147.62 0.36 - 0.36 12 - 12 Material & Equipment - 402.27 402.27 - 0.97 0.97 - 33 33 Engineering 28.90 99.20 128.10 0.07 0.24 0.31 3 8 11 Contingencies 201.00 338.oo 539.0 0.48 0.81 1.29 16 28 U Total 37.5 BV.7:L,16.9~ 7T Ir M If 12 BANYUWANGI Civil works 79.20 - 79.20 0.19 - 0.19 22 - 22 Material & Equipment - 74.30 74.30 - 0.18 0.18 - 21 21 Engineering 8.30 28.00 36.30 0.02 0.07 0.09 2 8 10 Contingencies 106.62 61.88 168.50 0.26 0.14 0.4o 3 - 47 Total !t".2 16418 158r30 M. B71 M. ' tir I 3 JAMBI ivil works 612.97 - 612.97 1.48 - 1.48 25 - 25 Material & Equipment - 395.93 395.93 - 0.95 0.95 17 17 Engineering 48.00 164.30 212.30 0.11 0.40 0.51 2 7 9 Contingencies 826.37 342.46 1 168.83 1.99 0.83 2.82 14 49 Total T7673 9W - 0 190 61 77 23 SAMARINDA vil orks 466.19 - 466.19 1.12 - 1.12 21 - 21 Material & Equipment - 431.17 431.17 - 1.04 1.04 - 20 20 Engineering 48.00 163.80 211.80 0.12 0.39 0.51 2 8 10 Contingencies 682.31 79.23 1,061.54 1.6422.56 17 Total T796-50 97:7 7076 M 71 7 IX 4 2-1 SUMMARY FIVE CITIES Civil works 1,746.69 - 1,746.69 4.21 - 4.21 19 - 19 Mat. & Equipment - 2,329.63 2,329.63 - 5.61 5.61 - 25 25 Engineering, -Detailed Design 100.00 500.00 600.00 0.24 1.21 1.45 1 5 6 -Construction Supervision 107.00 208.00 315.00 0.26 0.50 0.76 1 2 3 Contingencies -Physical 436.67 582.41 1,019.08 1.05 1.40 2.45 5 6 11 -Price 2,016.26 1 ,15 68 3 431.94 4.86 3.41 8.27 21 15 36 Total Construction 43406.62 5o. , . l 192 1lT Tf717 TW 15 0 MNAGEIENT AND TECHNICAL ASSISTANCE 187.75 539.50 726.25 0.45 1.30 1.75 26 74 100 7 FEASIBILITY STUDIES SECOND PACKAGE 145.25 228.25 373.50 0.35 0.55 0.90 39 61 100 TOTAL PROJECT COST 4,738.62 .09 11.42 13.98 .40 5 100 100 jL. !t L _o ff - 13 - 4.04 The costs for civil works are consultant's estimates based on preliminary design for the water works, relevant unit prices in the respective cities, and unit prices for similar projects in other places duly adjusted to the particular local conditions in the five cities. The costs for equip- ment and material are based on consultant's estimates which were adjusted during appraisal to July 1973 prices. The physical contingency allowance of 25% of the 1973 costs is considered appropriate because of the nature of the works in making extensions to the distribution systems which constitute a major part of the projects. Price contingencies applied to the base prices and physical contingencies from July 1973 through the construction period are: for 1973 (July-December) 10% on foreign costs and 24% on local; for 1974 14% and 18%,.respectively; for 1975 11% and 15%; and for 1976 and thereafter 7.5% and 12% annually. The cost estimates do not include any duties or taxes on imported goods financed under the proposed loan, since DSE is exempted by the Government from such charges. 4.05 The costs for detailed engineering are based on a draft contract between DSE and the consultant,and the costs for construction supervision are consultant's estimates based on length of construction period and man- power requirements* The costs for management and technical assistance are based on a draft contract, and the costs for the next package feasibility studies are based on actual costs for the first package duly adjusted. Amount of Proposed Loan 4.06 An IBRD loan of US$14.5 million, equal to 57% of the total project cost of US$25.4 million, is proposed and would be allocated as follows: US$ million % (a) Equipment and material supply contracts subject to interna- tional competitive bidding 5.61 39 (b) Consultant costs for detailed engineering and construction 1 a supervision 1.90'- 13 (c) Contingencies 4.81 33 IBRD Loan for five cities 12.32 85 (d) Consultant costs for management /a and technical assistance 1.43-- 10 (e) Consultant costs for second package feasibility studies 7Y- 5 Total IBRD Loan 14.50 100 /a Foreign and local costs. - 14 - 4.07 In view of the urgency to commence the projects, the detailed engineering should be started as soon as possible. It is proposed that IBRD reimburse the expenditures after July 31, 1974, for consultant services. The total retroactive financing involved will not exceed US$0.4 million. Design, Construction and Supervision of Construction 4.08 A project implementation schedule is in Annex 6. DSE will be responsible for the implementation of the projects in the five cities. The water works will be handed over to the WE's after commissioning. However, in Samarinda and Jambi DSE will retain responsibility for operation for such time as is needed. DSE's planning, design and construction supervisory capacity is limited and consultants are proposed to be engaged for detailed engineering, preparation of bidding documents, bid evaluation and construction supervision. 4.09 The projects prepared by the consultants were substantially changed during the appraisal as a result of technical and economic evalua- tions. Although final designs are unlikely to be materially different, changes in details are expected. It was agreed during negotiations that the consultants will submit to DSE and IBRD the detailed designs for project components before preparing tender documents. 4.10 DSE is negotiating a contract with Nihon Suido Consultants Company Ltd., Japan, in association with James M. Montgomery Consulting Engineers Inc., U.S.A., which prepared the feasibility studies (para 1.05). Nihon Suido intends to sublet part of the consultant works to a local consultant firm, P.T. Sangkuriang, Bandung. This arrangement is satisfactory. 4.11 For the second package of feasibility studies, IBRD has reviewed terms of reference and has approved a short list of consultants. The consultants will be,employed on terms and conditions satisfactory to IBRD. Procurement 4.12 DSE will be in charge of all procurement. The procurement items financed by the loan, except consultant services, will be obtained by international competitive bidding in accordance with the Bank's Guidelines for Procurement. Material and equipment for the five projects will be grouped conveniently to attract a wide range of manufacturers and to get the advantages of bulk deliveries. For bid comparisons, a domestic preference of 15% of the C.I.F. cost or the applicable custom duties, whichever is lower, will be allowed. Local manufacturers are expected to compete for the supply of a few items such as PVC and steel pipes for the distribution systems. The amount involved would be about US$500,000. 4.13 It is proposed to award construction contracts on the basis of local competitive bidding according to Government regulations. These con- tracts will not be financed by the proposed loan. The grouping of the construction contracts could not conveniently be done for more than one city. - 15 - Contracts for pipeline laying works will likely be awarded to a number of smaller contractors in each city. Other construction works such as intake, treatment works and storage tanks could be grouped in one contract, which is not likely to be large enough to attract foreign bidders. In these circumstances, the contracting arrangement proposed for civil works is satisfactory. Disbursement 4.14 The estimated disbursement schedule in Annex 7 indicates that the loan would be disbursed in the five fiscal years 1975-79. It is proposed that the disbursement cover (a) 100% of the C.I.F. cost of imported, or 95% of ex-factory cost of locally manufactured, equipment and materials procured after international competitive bidding; (b) 100% of foreign costs for su- pervision of installation of equipment and material procured under (a); (c) 100% of foreign expenditures of foreign consultants; and (d) 75% of total cost of local consultants. Ecological Aspects 4.15 The provision of a safe water supply to a substantially greater proportion of the population and the construction of a large number of public bathhouses with facilities for washing, bathing and disposal of human wastes will reduce the dependence on contaminated water sources. Although the urgent need for reducing pollution of the streams and rivers is recognized, first priority in the allocation of scarce resources for the sector is considered to be extension Qf water supplies. -The project does not include the provision of sewerage facilities in the five cities as these cities could not provide the necessary funds nor the trained personnel for adequate maintenance for sewerage systems in addition to those required for the expanded water supply systems. DSE is aware that the sewerage and sewage disposal situation will have to be improved with the next stage of the water supply development. The terms of reference for the consultants to be employed on the feasibility studies for the second package will include an assessment of the needs for sewerage facilities in that group of cities. V. JUSTIFICATION Project Objectives and Population and Demand Forecasts 5.01 The five cities form a first package of water supply projects in a long range development plan for a National Water Supply Program. The Government's selection of the five cities was based on factors such as the relative adequacy of their present water supply systems, the availability of alternative sources of water such as private wells, the importance of the city as a provincial capital, trade or tourist center or seaport, and the development and economic potential of the city. - 16 - 5.02 The project objectives are (a) to reorganize and strengthen the national level organization, DSE, to provide it with the capability to implement effectively the National Water Supply Program; (b) to extend the water supply facilities of the five cities to the extent feasible in a first stage; and (c) to establish WE's and to train the staffs to operate and maintain the water systems. The long-range objective is to put the water supply program on a self-supporting basis using the projects assisted by the proposed loan as a vehicle. The funds included in the loan for feasibility studies will provide the means of bringing additional cities into the program. 5.03 Cholera, typhoid, dysentery and parasitic diseases transmitted by water are endemic to the general area. Many cases of paratyphoid and infectious hepatitis have been reported from Java and Sumatera, and cholera has been in evidence in Central Java. Medical care and public health programs are spread so thinly and are so deficient in funds and staff that meaningful data on the actual incidence of waterborne diseases are not available. It is evident, however, that diseases related to poor sanitation are among the principal causes of morbidity and mortality. 5.04 The first stage of the long-term master plan will provide, to the extent practicable, potable water supply to the cities by service connections or standpipes. The extent of the first stage program has been decided after consideration of such factors as the capacity of the implementing agency and of the construction industry, feasible phasing for extension of water production facilities, availability of alternative water sources which can be used in the absence of a public water supply, and fi- nancial constraints. In the service area, people who cannot afford service connections will be supplied frm standpipes to be provided as needed. 5.05 Annex 8 shows population and water demand projections for each of the five cities through 2001. The table below shows for each city the total population and the population served from the public water supply system in 1972 and projected for 1981. 1972 ('000) 1981 ('000) Population Served Population Served Total By Con- By Stand- Total By Con- By Stand- Popu- nections pipes Popu- nections pipes City lation No. % No. % lation No. % No. % Malang 422 98 23 30 7 542 226 42 68 12 Purwokerto 211 6 3 - - 258 45 17 46 18 Banyuwangi 78 5 6 - - 94 10 10 20 21 Jambi 166 5 3 - - 202 75 37 51 25 Samarinda 106 7 7 7 7 133 28 21 22 17 Total 983 121 12 37 4 1,229 384 31 207 17 5.06 As shown in Annex 8, the average annual historical (1961-1971) and projected (1972-1981) population increases in Indonesia are 2.12% and - 17 - 2.37%, respectively. For each city, three series of projections (low, medium and high) have been made and the applied growth rates, which are in the range of 2.25% to 2.93%, are based on historical growth, present trends, and development potentials. Of the total population in the five cities, 12% is presently served by service connections and 4% by standpipes; in 1981 these figures are projected.to increase to 31% and 17%; and in 2001 to 52% and 23%. If these projects are not implemented, the percentage of the total population of the five cities served from service connections and standpipes will steadily decrease from about 10% and 3% in 1981 to 6% and 2% in 2001. A considerable effort is obviously needed to keep pace with the growing population and to improve and extend the water supply service. 5.07 The projected water consumption for each city is shown in Annex 8. The present daily per capita consumption in the five cities is estimated to range from about 60 to 110 1/cd for residential service connections and 8 to 10 1/cd for public standpipes. Consumption is projected for FY 1981 at about 100 to 155 1/cd for residential and 12 1/cd for standpipes, which is comparatively low for cities in tropical areas. The present consumption figures, which are based on available records and field surveys, are estimations because of the inadequate and intermittent water supply, absence of water meters in some cases, and large numbers of faulty meters in others. The projected demand figures for residential consumption have considered such factors as the introduction of a continuous water supply, the availa- bility of alternative water sources in dug wells, and consumers' ability to sustain the water rates. The projected demand figures in other consumer categories, such as commercial, industrial and institutional are based on surveys of these types of consumers carried out in each city. Unaccounted-for water has been assumed to go down gradually from the present 30% or more to 20% due to replacement of faulty water meters and old pipeline, the substantial addition of new distribution mains, and an active leakage detection program. The projected total water production in 1981 is subdivided among the various categories as: residential consumption 60%; commercial and industrial 8%; institutional and others 12%; and unaccounted-for water 20%. Least Cost Solution 5.08 In each city alternative water sources have been studied. Where applicable, present worth values have been computed for alternative arrange- ments, at discount rates in the 10-12% range, and least-cost solutions have been selected. In Jambi and Samarinda, there are no feasible alternatives to surface water development, and the sites for intakes and treatment works have been selected as most suitable from a technical and economical point of view. Return on Investment 5.09 The internal financial rates of return for the projects in the five cities, measuring benefits by the incremental revenues attributable to them, range from 0.4% to approximately 7%, as shown in Annex 9. The approximate rates of return for the individual projects, on the assumptions stated in the annex, are Malang 0.4%, Purwokerto 4%, Banyuwangi 1%, Jambi 7%, - 18 - and Samarinda 3%. These rates are low because of the generally low level of existing water rates. These water rates are to be increased gradually over the years under the proposed financing plan in accordance with consumers' ability to pay (para 6.17-6.20). 5.10 It is not possible to calculate a meaningful economic rate of return for the projects since the major public health benefits to be derived cannot be measured in monetary terms. The proposed program of works must be undertaken if the cities, with their increasing populations, are to alleviate even more serious water shortages and consequential health problems than those which now exist. 5.11 Important benefits will also be provided by the development of institutions to carry out sound water supply programs at both the national and local levels. The creation of organizations with the necessary powers and authority and the introduction of effective management and operating procedures are essential steps in advancing the program of water supply in Indonesia. VI. FINANCIAL ASPECTS Record of Finances 6.01 The accounts of the water supply units in the five cities have generally been parts of the municipal or regency systems and have been kept on a cash receipts and disbursements basis which do not account for such items as receivables, payables, inventories, fixed assets or depreciation. Review of the finances of the present systems and preparation of the normal financial statements and projections have been seriously constrained by the lack of basic data. The financial information presented is necessarily based to a considerable extent on assumptions which it will be necessary to test as the projects develop. 6.02 Income statements for the three fiscal years 1972-74 have been derived or estimated for each WE, based on statements of actual cash receipts and disbursements for the first one or two fiscal years prepared by the WE or municipality. Fixed assets were estimated for the initial balance sheets as described in para 6.03. The financial statements for the first three fiscal years were estimated on a cash basis, with allowances for depreciation, and on an accrual accounting basis thereafter. Annexes 10-14 contain for each WE for FY 1972-83 income and cash flow statements and balance sheets. Annex 15 details the basis and assumptions for these statements. (Throughout, Samarinda's fiscal years, which end on December 31, are one fiscal year earlier than those designated for the other WE's, which end on March 31. However, if a contemplated change in fiscal years is made to a December 31 basis for all WE's, certain commitments will be based on such fiscal years, as hereinafter indicated.) - 19 - 6.03 In view of the lack of records of historical costs and physical data, the amount of fixed assets in the initial balance sheet of each WE, as of March 31, 1972, was estimated by the consultants from available records and physical inspections at replacement cost, less allowance for depreciation. The WE's fixed assets are old, of uncertain age, and of small value in relation to the property additions proposed. 6.04 The financial statements show that revenues under existing water rate structures have exceeded cash operating expenses by only small margins or have resulted in deficits when allowance is made for the depreciation of fixed assets. Small cash surpluses provided by water supply operations have been devoted largely to the general uses of the local governments despite the pressing needs for improved and expanded water facilities. Any construc- tion expenditures in recent years have been made largely from grants by the National Government. This situation will be changed under the projects. The statements show an improving picture for the future, due largely to water rate increases assumed in the projections for FY 1977 and subsequent years and the use of internally generated funds for construction purposes. These are discussed below in connection with water rates. Transfers of Assets to WE's 6.05 A WE is being established in each of the five cities to take over the assets and liabilities and the functions of the unit of the municipal or regency government in that city which relate to water supply (paras 3.16- 3.19), and the initial equity will be owned by the municipality or regency. The WE, under the direction of its water board, will perform the water supply functions in the city and will account separately for its operations and finances. 6.06 Management consultants will assist each WE in preparing opening and periodic financial statements on a commercial accounting basis and in establishing and maintaining proper accounting and management systems. They will also assist in valuing and classifying the fixed assets for the opening balance sheet. Financing Plan 6.07 Projections of annual cash flow up to FY 1983 for the WE in each of the five cities are shown in Annexes 10-B to 14-B. The financing plan for each WE and combined for the five, for the project construction period FY 1975-81, as summarized from the cash flow projections for those years, is shown in the table below. - 20 - FINANCING PLAN FY 1975-1981 MALANG PUMOKERTO BANUWGI Hp.- US$ _,W Millions Millions L illions millions milli Millions Applications of Fnds Construction-Stage I 3,306.3 7.97 95.9 1,217.0 2.93 95.8 358.3 0.86 93.3 Working Capital 141.4 0.34 4.1 53.4 0.13 4.2 2Z6 0.07 6.7 Total Applications 3,4b7.7 8.31 100.0 1,270.4 3.06 100.0 383.9 0.93 100.0 Sources of Funds IBRD Loan Proceeds 2 ,199.0 5.30 63.8 830.0 2.00 65.3 166.0 0.40 43.2 National Gov't -oans 97.3 0.23 2.8 18.3 0.04 1.4 49.0 0.12 12.8 National Govit Equity 984.2 2.37 28.5 368.1 0.89 29.0 143.3 0.35 37.3 Less Repayments (771.0) (1.85)(22.3) (356.3) (0.86) (28.0) (108.9) (0.27) (28.3) Internal Cash Generation 701.4 1.69 20.3 248.8 0.60 19.6 110.9 0.27 28.9 Consumer Contributions 236.8 0.57 6.9 161.5 0.39 12.7 23.6 0.06 6.1 Total 8%urces 3,447.7 8.31 100.0 1L270.4 3.o6 100.0 383.9 0.93 100.0 JAMI SANARINDA FIVE CITIES COMBINED Ip. US$ ap. 135$ Rp. US$ Millions Millions L Millions Millions j Millions Millions Applications of Funds Construction-Stage I 2,390.0 5.76 93.0 2,170.7 5.23 92.9 9,442.3 22.75 94.3 Other Construction 50.0 0.12 1.9 50.0 0.12 2.1 100.0 0.24 1.0 Working Capital 130.1 0.31 5.1 116.0 0.28 5.0 466.5 1.13 4.7 Total Applications 2,570.1 6.19 100.0 2,336.7 5.63 100.0 10,008.8 24.12 100.0 Sources of PAmds IBRD Loan Proceeds 913.0 2.20 35.5 996.0 2.40 42.6 5,104.0 12.30 1 .0 National Gov't Loans 512.6 1.24 19.9 306.2 0.74 13.1 983.4 2.37 9.8 National Gov't Equity 950.3 2.29 37.0 868.2 2.09 37.2 3,314.1 7.99 33.1 Less Repayments (509.6) (1.23)(19.8) (389.1) (0.94) (16.7) (2,134.9) (5.15) (21.3) National Gov't Grant / 50.0 0.12 1.9 50.0 0.12 2.1 100.0 0.24 1.0 Local Gov't Equity 8.9 0.02 0.4 19.1 0.05 0.8 28.0 0.07 0.3 Internal Cash Generation 448.2 1.08 17.4 431.1 1.04 18.5 1,940.4 4.68 19.4 Consumer Contributions 196.7 0.47 7.7 55.2 0.13 2.4 673.8 1.62 6.7 Total Sources 2,570.1 6.19 100.0 2L336.7 5.63 100.0 10 008 8 24.12 100.0 agsmmn -==e::: - ::m:: = ..,.- ::m:: 1/ FY 1974-1980 for Satarinda. 2/ Repayments of loans commence in FY 1982 after the end of the grace period. / Estimated costs of immediate improvement programs in the first fiscal year are assumed to be met by grants from the National Government. - 21 - 6.08 The combined figures shown for the five WE's in the financing plan indicate that the proposed IBRD loan of US$12.3 million for the projects in the five cities is expected to provide about 54% of the project costs and 51% of total capital requirements. Government loans would provide about 10% of the project costs and total capital requirements. Internal cash gene- ration from operations would provide about 19% of total capital requirements, and 7% would be provided by consumer contributions for service connections. While National Government equity payments are made during the project period to the extent of about 33% of total capital requirements, about 21% of total capital requirements is expected to be repaid to the Government by the use of funds generated internally by the enterprises during the project period. 6.09 Comparable figures are shown in the financing plan for each WE individually. The proposed IBRD loan would provide amounts ranging from about 38% of project costs (35% of total capital requirements) for Jambi to 68% of project costs (65% of total capital requirements) for Purwokerto. The IBRED loan and Government loans together would provide 60% of the project costs (56% of total capital requirements) for each WE, except that for Malang and Purwokerto the percentages would be 70% and 67%, respectively. Internal cash generation would provide almost 20% of total capital requirements of each WE, except Banyuwangi for which it would provide about 29%. The balance of the capital requirements would be provided by the Government net equity payments and consumer contributions. The proposed financing plan for each WE is satisfactory. 6.10 The financing plan is based on the terms agreed at negotiations. The proceeds of the IBRD loan, together with other Government funds, will be loaned by the Government to the WE's at an annual interest rate of 9% and the loans will be repayable over 30 years, including a grace period of six years for the payment of principal and interest, during which the inte- rest will be waived. The Government will lend to each WE 60% of the project costs and will make available as equity the remaining 40% of the project costs, except that for Malang and Purwokerto such percentages will be 70% and 30%, respectively. Any surplus amounts which the WE is able to generate internally during the six-year grace period will be repaid annually to reduce the Government's equity. The Government's waiver of interest on the loans during the grace period will reduce the net equity payments which the Government would otherwise be required to make if such interest were paid in cash. The alternative of adding the interest to the principal of the loans would require increases in the water rates beyond those indicated in paras 6.16 to 6.20. 6.11 The estimates of project costs are based on the best information available at this time. However, should there be increases in project costs, the Government has agreed to provide any funds needed to complete the projects on time. The Government has also agreed to ensure that the WE's have suffi- cient funds to meet any of their obligations until 1981. - 22 - Financial Projections 6.12 The assumptions underlying the financial projections in Annexes 10-14 are detailed in Annex 15. 6.13 On the basis of the study of the organization of each WE made by the management consultants, increases in the number of staff are forecast over the project period to provide sufficient staff to implement the expan- sion and improvement program. Increases in rates of compensation designed to make them adequate under local conditions in each project area are also projected. However, in one of the cities compensation is presently based in part on a proportion of revenues. Since in the future considerable increase in revenues is expected, agreement was reached during negotiations that staff compensation of any WE will not be directly linked to the level of its revenues. 6.14 There is no insurance coverage on the properties of the water systems. Allowance has been made in the expense estimates for insurance premiums for property coverage, based on percentages of the cost of equip- ment and structures. Agreement was reached during negotiations that adequate provision will be made for insurance of the goods to be financed from the proceeds of the IBRD loan and to cover the water supply operations of the WE's consistent with appropriate practice. 6.15 The projected water production figures assume gradual reductions in unaccounted-for water as new facilities are placed in service and leakage detection measures are taken. The percentages for the individual WE's appear in the statements of income (Annexes 10-A to 14-A). In view of the existence in the water systems of defective meters and the lack of meters, the present loss percentages are rough estimates. The projects include provisions for bulk and customer meters, leakage detection equipment, meter repair shops, replacements of old pipeline, and on-the-job training by the consultants for a continuing program of leakage detection and repairs. Each WE will establish a leakage detection and waste control unit with the primary respon- sibility for detecting and repairing leaks and controlling waste and reporting to management periodically on the progress made toward the goals established in the projects for the reduction of unaccounted-for water. Water Rates and Billings 6.16 The schedule of existing water rates and related charges of each water system is shown in Annex 16. In most cases separate rates are specified for residential service and other classes of service such as commercial, industrial, government agencies and social and religious institutions. Rates are usually lowest for residential service, except for those charged to religious institutions, and the rates generally include a minimum charge and are graduated upward for increased use in order to.extend available supply - 23 - and reduce waste. The consultants have recommended a continuation and extension of these principles in their study. (See para 6.21). 6.17 It is clear from the financial statements and projections that sizeable rate increases will be required to enable the WE's to meet the needs of their proposed financing plans. The question of reasonable and sustainable future rate levels is one of the most difficult in view of the uncertainties even as to existing demand, income patterns and capabilities of paying for service. The problem is compounded in these cities by the availability to much of the population of alternative, although unsafe, sources of water from shallow wells and streams. However, the view was expressed by the Government and local managements that substantial rate increases can be sustained under a program of improved service, if introduced gradually over the period of years assumed. 6.18 The existing water rates, which will be continued through FY 1976, do little more than provide sufficient funds to pay current cash expenses including minimum maintenance. The proposed increases are designed to produce gradually the increased revenues needed to cover operating expenses and modest contributions to the construction program and to generate by FY 1982 sufficient funds to provide a 6% return on net fixed assets in service. They will also suffice to meet the debt service requirements commencing in that year. The projected increases are considered to be within the ability of the consumers to pay, as the average monthly residential billings for water would not exceed 4% of the estimated average household income. The consultants estimated the household income in the areas in which residential service is to be extended on the basis of interviews with district heads in the five cities. The proposals would increase the average rates in FY 1977 for Malang by approximately 170%, Purwokerto 140%, Banyuwangi 80%, Jambi 15%, and Samarinda 110%, with gradual increases each year thereafter. Before rate increases can be implemented they require the authorization of the municipal or regency assembly and are subject to confirmation by the governor of the province. 6.19 The major part of existing and prospective demand is for residential service, which is expected to increase to about 75% of total demand by 1981 as service is extended into additional residential areas. The average water rates per m3 shown for each year in the income statements in Annexes 10-A to 14-A are composite rates for all classes of service. The table below summarizes the existing and projected average water rates for various years for all classes of service and for residential service. -24- Average Water Rates - Rp/m3 /a Existing FY 1977 FY 1978 FY 1980 FY 1982 Malang - All classes 5.5 15 20 28 36 Residential 5 13 18 25 32 Purwokerto - All classes 12.5 30 35 45 55 Residential 12 23 27 35 42 Zanyuwangi - All classes 18.5 34 41 58 76 Residential 15 27 33 46 61 Jambi - All classes 50 58 67 84 101 Residential 50 50 55 69 83 Samarinda - All classes 20 50 68 114 140 Residential 18 35 48 80 98 /a The rupiah price per 3 may be converted for purposes of comparison into approximate US cents per 1,000 gallons by taking 90% of the rupiah price per m3 The fiscal years shown in the above table for Samarinda are 1976, 1977, 1979 and 1981, respectively. 6.20 The income statements in Annexes 10-A to 14-A show low rates of return on net fixed assets despite the projected water rate increases, building up to a 6% return.in FY 1982. For the reasons indicated in paras 6.17 and 6.18, these returns are considered acceptable. The Government has agreed to take all measures required to ensure that the WE's will increase average water rates at the beginning of each of the fiscal years 1977 and 1978 at least to the extent set forth in the income statements and will further increase water rates thereafter to provide revenues sufficient to produce rates of return on the value of net fixed assets in service (less consumer contributions) of at least 1% in FY 1979; 2% in FY 1980; 4% in FY 1981; and 6% in FY 1982. All references to fiscal years relate to the year ending Iarch 31 (except for Samarinda). During negotiations, however, the Indonesian officials indicated that the fiscal years of the WE's would probably be changed to a calendar year basis. If this occurs all references to fiscal years will relate to the preceding calendar year, e.g., FY 1977 will be taken as the year ending.December 31, 1976, and the loan documents have been prepared on the assumption that this change will be made. 6.21 In addition to the agreement on the water rate increases summarized in para 6.20, it was agreed by the Government that before September 30, 1975, DSE, in consultation with the WE's, will assess the conclusions of the consultant's national standard water rate study in relation to each WE and will formulate recommendations which will be sent to IBRD. Thereafter the - 25 - Government will ensure the prompt implementation of such recommendations as shall have been agreed with IBRD. The rate study deals with the structure of water rates, e.g., differences in rates among various classes of consumers and for varying quantities of use, rather than levels of water rates to be charged. It will serve as a guide for formulating water rate structures in the municipalities which will participate in the national water supply program. 6.22 The cash collections of the water works from customers relative to billings made to them for water service cannot be estimated closely because the water works' records are not adequate to permit comparisons of overall billings with collections for particular periods. Working meters are read and bills are rendered and collected monthly. There is considerable estimating of water use for billing purposes because of non-working meters and the entire lack of meters in two of the cities. Estimates of use may be made on the basis of past metered use or on an assumed quantity for the type of connection or for each person in the household. The estimated bills may be subject to waiver or negotiations where there has been little or no consumption because of interruptions in service. 6.23 Consumers in the municipalities accept the principle of paying for piped water supply. From checking of customers' accounts, it appears that payments of billings are made fairly promptly, collections are pursued diligently, and the threat of cutting off service which is occasionally required usually results in payment. The exception to this collection experience are certain government institutions which often pay bills only after delays of several years from the billing dates. These billings vary from about 5% to 25% of total billings in the respective cities and average about 15% of total billings, but these percentages will decline as residential service is increased in the program. Early in 1973, such payments for the previous five years were in arrears in two of the cities, and payments of arrears had recently been made in the other three cities. The WE's must receive prompt payments from government institutions as well as from others in order to meet their obligations, including payments of debt service to the Government. Agreement was reached during negotiations that the Government will pay promptly to the WE's all arrears for water supplied to Government institutions and in the future will ensure that all amounts for services will be paid promptly when due. 6.24 The program contemplates that lower-income areas in the cities will be served by public standpipes. While about 35% of the total popu- lation to be served by 1981 in the five cities will be served by standpipes, the demand to be satisfied through standpipes is estimated at only about 4% of total demand because of much lower per-capita consumption from standpipes. The standpipes will be metered, and water works authorities contemplate that water will be drawn for a consumer by the holder of a standpipe licence or by an employee of the WE. However, the necessity of purchasing small enough - 26 - quantities of water for consumers to carry away and the profit element in the licence holder's charges would not permit charges to be made at lowest scheduled rates and could result in excessive charges to the users. A more equitable and practical arrangement to serve the poorer population needs to be followed. To achieve this, agreement was reached during negotiations that either the municipality or regency will pay for the consumption metered through standpipes, or the amounts will be collected from the people of the neighborhood by the Rukun Tetangga (the neighborhood organization) on a monthly or quarterly basis using charges at the lowest residential rates. 6.25 In addition to the annual charges, residential consumers will be charged the initial cost of new service connections. So that they will be able to afford the connections, residential applicants will be permitted to pay about one-sixth of the cost upon installation and the balance in equal monthly installments over five years. The outlays by the WE's for the service connections have been included in the estimated costs of the projects. Future Finances 6.26 On the basis of the financial projections, the WE's will generate sufficient cash to finance about 20% of the construction program and to provide working capital and some additional cash funds at the end of the project period. Mhese funds will provide a cushion if projections should fall short of expectations, or they could be devoted to extensions of service beyond the first stage. 6.27 The projections show that the debt of the WE's will be relatively high, ranging for the individual WE's from approximately 50% to 90%, and averaging about 66%, of combined debt and equity in FY 1982. Debt service coverage would range from about 1.2 to 2.0 and average 1.5 in FY 1982 with the commencement of full debt amortization. 6.28 In viewing the future finances, the basis for the Government's decision on a program of financing water supply projects primarily by loans rather than to a large extent by net equity investments should be noted. This decision was based on consideration of the benefits to the Government's development program of the ultimate repayment of the loans to facilitate the financing of other essential needs in Indonesia, including the pressing needs of other cities for water supply. It was also influenced by the desirability of preserving in the local governments an equity ownership in the water works and the primary responsibility for their success. These considerations are important to the development of a successful program in Indonesia. There is reasonable prospect for gradual improvement in the finances of the WE's with the measures to be taken under the program. During the project period the performance of each WE will be monitored, and the performance indicators to be reviewed will include those set forth in Annex 17. - 27 - 6.29 With regard to any indebtedness which might be proposed by a WE other than under the projects, agreement was reached during negotiations that no WE will incur debts without the consent of IBRD unless net income before interest and depreciation is at least 1.5 times the maximum debt service in any future year. VII. AGREEMENTS REACHED AND RECOMMENDATION 7.01 During negotiations, agreement was reached on the following principal points: (a) the reorganization of DSE and the introduction of proposed working procedures will be implemented and additional staff will be recruited according to agreed time schedules (para 3.07); (b) with respect to the reorganization of the water undertakings (i) each municipality or regency will transfer to the appro- priate WE the water works and all assets used in its operations, including all receivables and accrued assets and a sufficient amount of working capital to enable it to continue its opera- tions, and (ii) each WE will enter into a project loan agreement, acceptable to IBRD, with the National Government for the completion of the related project (para 3.18); (c) the relending terms of IBRD funds and lending terms for the Government financing will be as assumed in the Financing Plan (para 6.10); (d) the WE's will apply annually internally generated cash to effect the reductions of the equity investments made by the National Government to meet project costs (para 6.10); (e) the WE's will increase average water rates at the beginning of each of the fiscal years 1977 and 1978 at least to the extent set forth in the income statements and will further increase water rates thereafter to provide revenues suffi- cient to produce rates of return on the value of net fixed assets in service (less consumer contributions) of at least 1% in FY 1979, 2% in FY 1980, 4% in FY 1981, and 6% in FY 1982 (para 6.20); and (f) before September 30, 1975, DSE, in consultation with the WE's, will assess the recommendations of the national standard water rate study, formulate recommendations and submit the findings to IBRD. Thereafter the Government will ensure the prompt - 28 - implementation of such recommendations as shall have been mutually agreed upon (para 6.21). 7.02 During negotiations it was agreed that before the loan becomes effective all the project loan agreements and the contract for the con- sultant services for management and technical assistance will be signed (paras 3.18 and 3.20). 7.03 The project is suitable for an IBRD loan of US$14,5 million for a term of 30 years, including a grace period of 6 years. September 20, 1974 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS PROPOSED ORGANIZATION CHART FOR DIRECTORATE OF SANITARY ENGINEERING DIRECTOR OF SANITARY ENGINEERING FINANCE AND SPECIAL STAFF ADMINISTRATION STAFF PLANNING AND SURVEY AND CONSTRUCTION LOGISTICSTEHCAFINEAD EVALUATION F IDESIGN DIVISION DIVISION DIVISION ASSISTANCE LOAN DIVISION F[DIVISION ADMINISTRATION PLANNING SURVEYAND WEST INDONESIA PROCUREMENT AECHNIC ADMINISTRATION EVALUATION INDONESIA WAREHOUSING TRAINING PERSONNEL SANITARY L EAST INDONESIA TRANSPORTATION ENGINEERING SECURITY LABORATORY To be geographically subdivided into a number of sections as appropriate World Bank-829SR) ANNEX 2 Page 1 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Descriptions of Existing Water Supply Systems 1. General data and existing water supply systems for each of the five cities are described below in Sections 2 to 6 and shown on Maps IBRD 10871-10875. 2. MALANG (Map IBRD 10871) 2.01 Malang is located in the central part of the province of East Java, longitude 112* 38' east and latitude 7* 59' south of the equator. The Municipality of Malang is administratively autonomous with its own local government and it is also the center of the government of the Regency of Malang. The economy of the municipality is primarily based on agri- cultural production from small and estate farms and small scale industries. The present population is about 422,000 of which 30% is supplied from the water works system. 2.02 The water sources are the springs of Binangun and Karangan, located 17 and 12 km from the city, from where the water gravitates to the storage tanks at Dinoyo and Betek and to the service area. The water is of good quality. The springs have a safe yield of 310 1/s, but only 262 1/s (22,637 m3/day) reaches the service area because of overflow waste at the springs and consumption and leakage along the pipeline routes. The water supply is insufficient and intermittent. 3The two storage tanks, Dinoyo and Betek, each with a capacity of 2,000 m , supply from different elevations two separated pressure zones in the service area. The total storage volume, 4,000 m3, represents 18% of the daily water supply. 2.03 The transmission mains have a total length of about 42.5 km in sizes from 0 200 to 0 350 mm. Primary and secondary mains in the dis- tribution system have a total length of about 134 km in sizes from 0 50 m to 0 300 mm. The distribution system is provided with' 24 standpipes, 183 fire hydrants, and about 13,000 service connections, and it covers a service area of 1,440 hectares. 3. PURWOKERTO (Map IBRD 10872) 3.01 Purwokerto is located in the southwestern part of Central Java, longitude 1090 15' east and latitude 7* 25' south of the equator. Purwokerto is a subdistrict of and an administrative center for the Banyumas Regency. It is a commercial city with major railway facilities and good road connec- tions. The present population is about 211,000 and approximately 3% is ANNEX 2 Page 2 supplied from the water works system. The service area covers Sukaraja and Kalibagor in addition to Purwokerto. 3.02 The water source is the Kawung Carang Spring, located about 6 km north of the city, from where the water gravitates to the storage tank and to the service area. The safe yield of the spring is 81 1/s (7,000 m /day). The water is corrosive and for treatment it passes through beds of marble chips. The intake works and treatment facilities have recently been extended to accommodate the total source capacity. 3.03 A new storage tank with a volume of 1,000 m3 has recently been completed as well as a new transmission main 0 350 m, length 3,600 m, between the spring and the storage tank. The water flow reaching the storage tank is 81 1/s while the capacity of the distribution system is limited to 25 1/s, with the difference overflowing at the storage tank. 3.04 The transmission mains have a total length of about 22.4 km in sizes from 0 100 to 0 350 mm. Primary and secondary mains in the dis- tribution system have a total length of about 22.0 km in sizes from 0 50 to 0150 mm. The distribution system has about 1,300 service connections and covers a service area of about 340 hectares. 4. BANYUWANGI (Map IBRD 10873) 4.01 Banyuwangi is located in the southwestern part of the province of Central Java, longtitude 114* 20' east and latitude 8* 10' south of the equator. Banyuwangi is a subdistrict of and an administrative center for the Banyuwangi Regency. Banyuwangi is a seaport at the Bali Strait, and new port facilities for accommodating bigger vessels are under con- struction 9 km from the city. Business establishments in the city are paper, coconut oil and fish canning factories. The present population is about 78,000 and approximately 6% of the population is supplied from the water works system. 4.02 The water source is the Gedor Spring, from where the water gravitates to the storage tanks at Penataban and Bojolangu and to the distribution system. The water quality is good and only chlorination is required. The safe yield of the spring is 110.5 1/s of which 100.4 1/t (8,675 m3/day) is conveyed in two transmission mains, one old 0 125 um and one recently completed 0 250 mm, to a break pressure tank at Bojolangu, elevation + 80 m and capacity 30 m3, and to storage tanks at Penataban, elevation + 50 m and capacity 1,400 m3. The break pressure tank and the storage tanks supply a high and a low zone in the service area. At Penataban an old storage tank, 500 m3, has recently been supplemented with a new tank, 900 mg. 4.03 The water flow reaching the break pressure and storage tanks is 100.4 1/s while the capacity of the distribution system is limited to 27.4 1/s with the difference overflowing at the storage tanks. The ANNEX 2 Page 3 storage capacity 1,400 m3 corresponds to 60% of the present daily con- sumption and is quite adequate. The transmission mains and the primary and secondary mains in the distribution system have a total length of about 41.8 km in sizes from 0 50 to 0 250 mm. The distribution system has about 1,300 service connections. 5. JAMBI (Map IBRD 10874) 5.01 Jambi is located on Sumatera in the Province of Jambi, longitude 103* 25' east and latitude 1* 40' south of the equator. The Municipality of Jambi is administratively autonomous with its own local government and it is also the center for the province. The economy of Jambi is mainly dependent on its harbor, where most of the products coming from and going to Middle Sumatera are loaded and unloaded. The present popula- tion is about 166,000 and approximately 3% is supplied from the water works system. 5.02 The water source is the Batang Hari River. The water is colored, polluted, and contains high turbidity so that full treatment is required. There are two existing intakes, one pumps directly to a separated part of the distribution system, which presents a constant health hazard, and the other pumps to the treatment works. 5.03 The treatment works are about 40 years old and provide for chemical flocculation, sedimentation3and rapid sand filtration, with a production capacity of 10.5 1/s (907 m /day). The various components are: (i) 2 primary circular settling tanks, total volume 777 m3, detention time 26 hours; (ii) flocculation channel, volume 18.3 m3, detention time 0.7 hours; (iii) 2 circular settling tanks, total volume 174 m3, surface area 58 m2, detention time 6.5 hours, settling rate 0.5 m/h; (iv) 4 sand filters, surface area 24 m2, filter rate 1.1 m/h; (v) 2 clear wells, total volume 3336 md, detention time 12 hours; and (vi) elevated storage tank, volume 294 m , detention time 11 hours. The raw water is pumped to the primary settling tanks, from where it is boosted to the flocculation channel and gravitates through the settling and filter tanks to the clear wells. From the clear wells the water is boosted to the elevated tank, which is located within the treatment works compound, for gravity distribution to the service area. The treatment works are in poor condition and the operation and maintenance are deficient. 5.04 The distribution system is subdivided into two separated zones, one serving treated water and one raw water. The system serves mainly the central area of the city, and it has about 1,500 service connections, none of which are metered. 5.05 The immediate improvement program, currently under way, includes the following works: (i) new intake pumping station; (ii) replacement of existing raw water main; (iii) rehabilitation of the treatment works and certain parts of the distribution system; and (iv) drilling of a ANNEX 2 Page 4 borehole. The borehole is expected to increase the water supply by 3 1/s (260 m3/day) and it will serve the provincial government area. The new intake and proposed rehabilitation works are 3projected to increase the total production capacity to 29 1/s (2,500 m /day) by FY 1976. 6. SAMARINDA (Map IBRD 10875) 6.01 Samarinda is located in the eastern part of Kalimantan, longitude 1170 O' east and latitude 0 30' south of the equator. The Municipality of Samarinda is administratively autonomous with its own local government. Samarinda's economy is based on its harbor and its position as timber center for the province. The present population is about 106,000 and approximately 14% is supplied from the water works system. 6.02 The water source is the Mahakam River. The water is colored, polluted and contains high turbidity so that full treatment is required. There are two intakes but only one (Teluk Lerong) is in operation. The intake pumps for pumping to the treatment works will be replaced with new pumps in 1974 in order to cope with the increased treatment capacity. A new raw water main, 0 250 mm, has recently been laid, but it has yet to be commissioned. 6.03 The old treatment works were constructed in 1932, and at the same site new treatment works are currently under construction, scheduled for completion in 1974. The old treatment works with a capacity of 10.6 1/s (916 m3/day) consist of: (i) 2 primary settling basins, total volume 800 m3, detention time 22 hours; (ii) dosing and flocculation tanks; (iii) 2 vertical flow settling tanks, total volume 130 m3, detention time 3.2 hours; (iv) 3 rapid sand filters, total area 12 m2, filtration rate 3 m/h; and (v) clearwell, capacity 360 m3, detention time 9.4 hours. From the clearwell the water gravitates to the distribution system except for a small portion (2.2 l/s) that is boosted to Hotel Lamin Indah. The water supply is insufficient and intermittent. 6.04 The treatment works under construction are designed for a capacity of 50 1/s (4,320 m3/day) and consist of: (i) existing 2 primar settling basins also be to be used for the new plant, total volume 8003 m3, detention time 5.5 hours at 60 1/s; (ii) flocculation tank, volume 47 m , det ntion time 0.2 hours; (iii) 2 tube-type settling tanks, total volume 31 m and area 23.5 i2, detention time 0.2 hours, settling rate 7.6 m/h; (iv) 5 rapid sand filter tanks, total area 37.5 m2, filtration rate 4.8 m/h; and (v) a clear well, capacity 987.5 m3, detention time 5.5 hours. The tube settling tanks are yet untested in Indonesia and the detention time might be too low and the settling rate too high. The design of the filter tanks requires modifications, and flow regulating devices have to be added. The treatment works are assumed to be in operation in 1975 but due to the above uncer- tainties the capacity is assumed to be limited to 25 1/s (2,160 m /day). With completion of the new treatment works the total production capacity will3 be increased to 35 1/s (3,020 m3/day) and the clearwell capacity to 1,347.5 m ANNEX 2 Page 5 6.05 The distribution system serves primarily the compercial and government establishments a4ong the water front. The system consistipg of about 17 km pipes in sig from 0 50 to '0 150 mmas h44d little replacement or improvement since its origipal installa A_sk moe than 40 yearp ago. The number of service connections is aboUt 1,000, po l t which ar, metered. In,#ke immediate improvement program, repl#qens 4 exteri.,ons are proposed to the extent of about 15 km with pipes in sigg, 75 sto 0 300 mm. September 9, 1974 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS PROPOSED ORGANIZATION CHART FOR WATER ENTERPRISES WATERWORKS BOARD MANGIGEDRETO ADM ASAAMIO INAC NEDCUSTOME AF. OSUMNolo rND DIVISION ACCEOWuNATER TU SL ONT D c&DISTRIDUTION FN NC NCIA GENERAL NoteND L BUGEIG CCENAAG CANTR TIN BILNG CLLCIO.ASIR.GPESNNL CLS LCN POURMNT WREOSIG CFSN G e a oSEtrcALInNGstint dt LANNIeNc rS c-Ia waterCE supply sysERIem ANNEX 4 Page 1 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Description of the Projects 1. GENERAL 1.01 The master plan covers a period through 2001 and it has been subdivided into two phases, Phase I (1975-1986) and Phase II (1987-2001). The phases have been subdivided into stages, which for Phase I are Stage I (1975-1981) and Stage II (1982-1986). The five cities water supply projects comprise extension of Stage I water supply facilities and related consultant services. The various water supply components for each of the five cities are described below in sections 2 to 6 and shown on Maps IBRD 10871 to 10875. 1.02 The designs of the water works are based on population and water demand projections shown in Annexes 8-A and B. For the water works compo- nents the following design criteria have been applied. Water production facilities are designed for maximum day demand and distribution systems for peak hour supply. Intake structures for surface water (Jambi and Samarinda) and submarine main (Samarinda) are designed for the master plan period due to their complexity. Production facilities such as treatment works, clear wells and transmission mains are designed for 1986 except in Malang where present allocation from the Mendit spring is sufficient only up to 1983. The extensions of the distribution systems are designed for the projected water demand in 1981, but individual distribution mains are designed for a water demand beyond 1981 where appropriate. Balancing storage tanks and pumping plants are generally designed for the require- ments in 1986. 2. MALANG (Map IBRD 10871) 2.01 The water supply from existing spring sources, Binangun and Karangan (262 1/s), can only be increased by adding water currently overflowing, which is insignificant. The Sumber Sari Spring with an available yield of about 29 1/s could, after installation of equipment for chlorination, be reconnected to the city water supply system. However, that would require certain reinforcement of the transmission mains which is not economically justified at the present stage. Alter- natives of groundwater and the Mendit Spring have been studied as sources of additional water. 2.02 A soil resistivity survey has indicated a groundwater potential more remote from the city area than was preliminarily assumed. The Mendit Spring, located about 5 km from the city has a safe yield of 2 to 3 m3/s. ANNEX 4 Page 2 The Spring was initially authorized for use for recreational purposes only, but the Directorate of Water Resources has recently allocated 500 1/s of its yield to the city water supply. After analysis of the two alternatives the Mendit Spring has proved to be the least cost solution. 2.03 With the development of the Mendit Spring, the distribution system will be served from two directions, The present water supply from Binangun and Karangan will feed the upper zone of the distribution system, while the Mendit Spring, due to its lower elevation and pumping requirements, will feed the lower zone. Binangun and Karangan cannot, however, satisfy the projected water demand in the upper zone, and boosting from the lower zone will be needed. 2.04 The available yield from all the springs, 762 Is, corresponds to the projected maximum day demand in 1983. For the water source devel- opment in Stage II, groundwater versus additional extension of the Mendit Spring will be evaluated, if the Directorate of Water Resources agrees to increase the allocation from the Mendit Spring to the city water supply. A test well drilling program will be carried out in Stage I to ascertain the availability of groundwater as to quantity and quality. The Mendit Spring water is corrosive and treatment by aeration is required. 2.05 The following components are included in the Stage I project: (a) Water works at the Mendit Spring comprising intake structure with collection chamber; pumping station for boosting to the aeration chamber, four pumps to be installed, each with a capacity of 170 1/s; aeration chamber; clear well; amd pumping station for boosting to the low zone of the distribution system with pumps as above; (b) transmission main 0 700 mm, length about 5,200 m; (c) pumping station with three pumps, each with the capacity of about 120 1/s, for boosting from the low to the high zone; (d) a 2,000 m3 capacity storage tank for the high zone; (e) distribution system with service connections and water meters; and (f) miscellaneous such as motor vehicles, public bath- houses, warehouses, maintenance shop, laboratory building, staff houses, and test well drilling for Stage II water source development. ANNEX 4 Page 3 The water supply capacity will be increased from 262 1/s to 762 1/s and the distribution capacity to 755 1/s. Stage I will increase the percentage of the population served by connections from 23% to 42% and by standpipes from 7% to 12%. 2.06 Balancing storage capacity required in 1986 is 10,000 m3 representing about 12% of the projected maximum day demand. The storage needed for the high zone is about 6,000 m3 and for the low zone 4,000 m3. Additional storage of 2,000 a3 is needed for the high zone in Stage I, while extension of the storage capacity for the low zone can be deferred to Stage II. 2.07 The Stage I project includes about 52.3 km of distribution mains in sizes varying from 75 to 500 mm diameters. Actual sizes a4 lengths of mains will be decided during detailed design. The distribution system will provide for 28 new or rehabilitated public bath houses, 89 additional standpipes and 50 fire hydrants, and the number of service connections will increase from about 13,000 to 26,000. 3. PURWOKERTO (Map IBRD 10872) 3.01 The present water source, the Kawung Carang Spring, will be supplemented in the Stage I project to meet the projected water demand. A soil resistivity survey indicated the availability of groundwater and the quantity and quality has recently been confirmed by drilling and pumping tests. Two additional boreholes will be added in Stage I. 3.02 Water will be supplied from two sources, the boreholes and the spring. The spring water gravitates to the distribution system while the groundwater will need pumping. The spring source will be used to its maximum capacity and supplemented with groundwater as water demand increases. The groundwater will be pumped to the existing storage tank, and if treatment is needed it will be provided near the storage tank. 3.03 The following components are included in the Stage I project: (a) Two boreholes; (b) pumping equipment for the new boreholes and the test well, each with an expected capacity of 25 l/s; (c) transmission mains from boreholes to the storage tank and to the distribution system; (d) treatment works, if needed, for the groundwater; (e) distribution system with service connections and water meters; and ANNEX 4 Page 4 (f) miscellaneous such as motor vehicles, laboratory equipment and meter test bench, public bathhouses, water works office, laboratory, warehouses, and staff houses. With the completion of the Stage I project the production capacity will increase from 81 1/s to 156 1/s (13,500 m3/day) and the distribution system capacity from 25 1/s to 196 1/s. Stage I will increase the percentage of the population served by connections from 3% to 17% and by standpipes from 0% to 18%. 3.04 Required balancing storage is 2,500 m3 in 1986 and 1,400 m3 in 1981, which corresponds 3to about 12% of the related maximum day demand. Present storage 1,000 m will be too small at the end of the Stage I period, but it is assumed to be offset by expected excess capacity from the boreholes. 3.05 The Stage I project includes about 36.6 km of transmission and distribution mains in sizes varying from 75 mm to 450 mm diameter. Actual sizes and lengths of mains will be decided during detailed design. The distribution system will provide for 3 public bathhouses, 54 standpipes and 80 fire hydrants, and the number of service connections will increase from about 1,300 to 7,400. 4. BANYUWANGI (Map IBRD 10873) 4.01 The yield of the existing Gedor Spring, will be sufficient to meet the projected water demand beyond 1990. Any extension of the water production facilities will not be needed prior to Phase II. The Stage I project will provide for additional distribution capacity and for improved water pressure in the high zone of the service area by the construction of a new break pressure tank. 4.02 The following components are included in the Stage I project: (a) break pressure tank 200 m3 with chlorination plant; (b) transmission mains, 0 250 mm, length 2,100 m; (c) distribution system with service connections and water meters; and (d) miscellaneous such as motor vehicles, laboratory equipment and meter test bench, public bathhouses, laboratory, warehouses, and staff housing. With completion of the Stage I project the distribution system capacity will be increased from 24.7 1/s to 61.3 1/s with a corresponding increase in the percentage of the population served by connections from 6% to 10% and by standpipes from 0% to 21%. ANNEX 4 Page 5 4.03 The high zone in the service area will be supplied from the break pressure tank. The high zone will not need any balancing storage since the total spring water supply passes the break pressure tank and exceeds the high zone peak hour demand. The storage tanks for the low zone will instead function as balancin storage for the total service area and their existing capacity of 1,600 m would be adequate beyond 1990. 4.04 The Stage I project includes about 16.4 km of distribution mains in sizes varying from 50 mm to 250 mm diameter. Actual sizes and lengths of mains will be decided during detailed design. The distribution system will provide for 4 public bathhouses, 25 standpipes and 65 fire hydrants, and the number of service connections will increase from about 1,300 to 2,200. 5. JAMBI (Map IBRD 10874) 5.01 A preliminary hydrogeological survey has indicated that ground- water development for the projected water demand is not feasible, and there- fore the Batang Hari River will remain the water source. Existing sites for intake and treatment works are not suitable for extensions, and new sites for the Stage I project have been selected. Materials and equipment for an intake, pumping station and treatment works, which were purchased in 1970 at a cost of about US$380,000, will be incorporated in the project but there will be no disbursement from the loan against these costs. The elevated tank at the site of the existing treatment works will be supplemented with a new elevated tank, since the old one does not provide sufficient pressure in the distribution system or adequate balancing capacity. After completion of the Stage I Project the distribution system will be separated into two zones to be supplied from the existing and the proposed production facilities. The settlements on the north side of the Batang Hari River will be supplied by groundwater, and related development works will be executed by Cipta Karya as a separate project. 5.02 The following components are included in the Stage I project: (a) raw water intake with pumping station, three pumps to be installed each with a capacity of 135 1/s; (b) raw water transmission main 0 450 mm, length 1,000 m; (c) treatment works, capacity 270 1/s, including clear well and booster pumping station; (d) distribution system with service connections and water meters; (e) elevated storage tank, capacity 1,000 m 3; and (f) miscellaneous such as motor vehicles, public bath- houses, warehouses, maintenance shop, water works office, laboratory building and staff housing. ANNEX 4 Page 6 The capacity of the existing works including those in the immediate improve- ment program is 29 1/s (2,500 m3/day). With completion of the Stage I 3 project the total production capacity will increase to 299 1/s (25,900 m /day) and the distribution capacity to 230 1/s (19,800 m3/day). The Stage I project will increase the percentage of population served, compared to 1976, by connections from 3% to 37% and decrease the population served by stand- pipes from 33% to 25%. 5.03 The new intake will be located further upstream than the existing one. The site is upstream from present industrial and residential settle- ments and is suitable for construction, but is located on an island with- out any land access. The construction of the intake is not expected to be significantly hampered by the lack of land access, and the water separating the island from the mainland is narrow and shallow during the dry season, which should not provide any difficulties for crossing of a raw water main. 5.04 The treatment works will provide for chemical flocculation, sedimentation and rapid sand filtration, and the various components are: (a) two circular clariflocculators with compartments for flocculation and settling and with mechanical equipment for stirring and scraping; (b) three rapid sand filters for a filtration rate of about 5 m/h; 3 (c) clear well, capacity 3,000 m; (d) booster pumping station with 3 pumps, one of which is standby, each with a capacity of 135 1/, and 1 smaller pump with a capacity of 50 l/s; and (e) buildings for chemical handling and administration, and yard piping. Alum will be used for flocculation, lime for pH adjustment, and chlorine or calcium hypochloride for disinfection. 3 5.05 Balancing storage capacity to be required in 1986 is 4,000 m3 Existing elevated storage tank has a capacity of only 294 m3. Additional storage is needed for convenient operation of the system and, because of the terrain conditions, the tank will be elevated at a location to be decided upon during the detailed design. An elevated tank represents a considerable cost, and since the site for treatment works and clear well is within the service area the clear well could feasibly contain a part of the balancing storage. To facilitate operation during hours of low consumption, the pumping equipment presently in store will be supplemented with one smaller pump with a capacity of 50 1/s. ANNEX 4 Page 7 5.06 The Stage I project includes about 64.4 km of distribution mains in sizes varying from 50 mm to 400 mm diameter. Actual sizes and lengths of mains will be decided during detailed design. The distribution system will provide for 3 public bathhouses, 18 additional standpipes and 130 five hydrants, and the number of service connections will increase from about 1,500 to 10,800. 6. SAMARINDA (Map IBRD 10875) 6.01 A preliminary hydrogeological survey has indicated that ground- water development for the projected water demand is not feasible, and therefore the Mahakam River will remain the water source. Existing sites for intake and treatment works are not suitable for extensiAms, and new sites for the Stage I project have been selected. In the present system the raw water is pumped to the treatment works located on a hill, and after treatment and collection in a clear.well the water gravitates to the service area. In the Stage I project the treated water will be boosted to the distribution system and the existing clear well. A sub- marine pipeline will cross the Mahakam River to supply the southern side, which is expected to become a developing area because of a new road con- nection with Balikpapan. 6.02 The following components are included in the Stage I project: (a) raw water intake with pumping station with installa- tion of three new pumps each with a capacity of 80 1/s, and of two pumps to be removed from the existing intake; (b) raw water transmission mains, 0 300 m, length 800 m, and 0 250 m, length 750 m; (c) treatment works with a capacity of 157 1/s, including clear well and booster pumping station; (d) transmission and distribution mains with service connections and water meters; and (e) miscellaneous including motor vehicles, public bath- houses, warehouse, maintenance shop, laboratory building and staff houses. The capacity of existing water works and those under extension have been assumed to be 35 1/s (3,024 m3/day). With completion of the Stage I project the water production capacity will be increased to 192 1/s (16,589 m3/day) and the distribution capacity to 134 1/s (11,578 m3/day). The Stage I project will increase the percentage of population served, compared to 1976, by connections from 7% to 21% and by standpipes from 8% to 17%. ANNEX 4 Page 8 6.03 The new intake is proposed to be located upstream from the exist- ing one and also upstream from the oil harbor, but it will still be located in a congested area with polluted river water. Preferably the intake site should be moved another 6.0 km upstream to avoid interference with resi- dential settlements and harbor and industrial activities, but under the circumstances the additional investment costs would not offset the possible inconvenience of the chosen site. The pumping station will accommodate, apart from three new pumps, two pumps to be removed from the existing intake to be abandoned subsequently. 6.04 The treatment works will provide for chemical flocculation, sedimentation and rapid sand filtration, and the various components are: (a) two flocculation and sedimentation tanks; (b) three rapid sand filters for a filtration rate of about 5 m/h; (c) clear well, capacity 1,500 m3 (d) booster pumping station with three pumps each with a capacity of 80 I/s; and (e) buildings for chemical handling and administration, and yard piping. Alum will be used for flocculation, lime for pH adjustment and chlorine or calcium hypochloride for disinfection. 6.05 For flocculation and settling tanks, tenders will be invited for mechanical and electrical equipment and the tenders will be evaluated considering offered equipment and estimated costs for related civil works. Accordingly, the civil works construction will be adapted to suit selected equipment. Rapid sand filters with dual media are proposed for filtration. 3 6.06 3 Balancing storage capacity required in 1986 is 1,750 m , of which 1,200 m is existing. Additional storage in the distribution system, will not be needed in Stage I. 6.07 The Stage I project includes about 37.2 km of distribution mains in sizes varying from 75 mm to 400 mm diameter. Actual sizes and lengths of mains will be decided during detailed design. The distribution systan will provide for 2 public bathhouses, 10 additional standpipes and 70 fire hydrants. The number of service connections will increase from about 1,000 to 3,500. September 20, 1974 om IN11p@SIA Я3У8 СIТц3 вАТев 3l1PPLY PACJBCIS РвОJвСТ СС8Т ESTIDIATE6 Иц.лхС ЯtRWW�HTO BцMTAAHGI г,агц мопlgп Tote1 шсвl еотеiрд тогвl р, оУ Iиса1 Pvrelga Tota1 ioul Foxfgn дrtвl ¢ оУ г,опнl Poпiga Тоtв1 Loeo1 Foтсlgn тоtьl ¢ of бталд Tota1 Gкапд Tota1 Gra¢д Tots1 1вЪв тШ и в5 вд в т1 lion 1А цоп 1 2 Э 7 1 15 н 1 7 А. CIVII. fПТв 9ВН вПffiцАL АtФ ВФПвМввТ П.1 цrtеУе 74.80 ц,50 86,30 0.18 0,0д 0.21 .2 воreъоцв 41.79 21.85 63.64 о.1о о.05 о.15 .3 тк%cment ,.огкв 14.о8 37.38 51.46 о.о3 о.о9 о.]г 5.73 6.33 1г.06 о.о1 о.Ог О.о3 .4 Сйвг ие11в .5 Pusplvg etatlan 24.20 51,6k 75.84 0,06 0.1г 0.18 .6 3torege гдуtа 38.28 Э.57 41.85 0.09 0.01 0.10 7.48 З.Е8 ц.16 0.02 0.01 0.03 ,7 Tranemlaвloe ик1т 55.Ь7 369.Ю 4г5.17 о.1й о.89 1.03 9.79 95.68 1о5.47 о.о3 о.23 о.гб о,99 15.18 16.17 о.00 о,о4 о.о4 .8 nlвснЬвtlлп вувtт ц6.53 Зц.б7 Иг8.го o,z8 о.75 1.о3 44.9Э 171.58 и6.57 о.ц о.41 о.52 32.ш 36.99 71.ц о.ов о.о9 о.17 .9 Se� п coneectloлs , �ш ивест тецх 15.4о 2ао,45 z15.85 о_Огь о_48 0.5г 7.7о 10о.г2 1ог,9z о_се о_г4 о.гб о_q7 9-8д 1о.бб о_оо а_сг о_аг � таrлr> л 338.96 9в5.71 1,32k,67 о.82 2.Э7 3.19 4о 11о.оо Э95.бб 5о5.б6 о.27 о.95 г.22 41 41.36 Вi.7ч 1о9.1о о.1о о.16 о,гб Э1 Н. MLSCELiA860113 . в.1 вогог чгьlаlгв 1о,з5 1a.3s о.се о.се 4.88 й.вв о.щ о.щ 5.98 5.98 о.01 О.о1 .2 Ieboгatory equlpmeat е.ыi meter teвt ЪепгЪ 1.65 1.ц z.8o о,оо о.о1 О.о1 1.в7 г,73 з.бо а.щ о,щ o.oz 1.65 о,58 г.гз о.о1 о.о1 о,ог .з wицс ьаш ьлоаев ц.4о 4.4о о.т o.rn 3.30 з.зо о.щ о.т 5.га 5.ze о.ц о.щ ,4 water wrkв оеггсе, laboratary, vвгеliапвев 16.50 16,50 0,04 0.04 5.5� 5.50 0.01 0.01 j.g6 З,дб 0.01 О,о1 -5 stьff ьоиаlпе 4о.7о 40.70 о.го 0.1о а6.95 г6,95 о.об о.об в6.95 26.95 о.об о.об .6 огьвгв Э8.5о г8.75 67.25 0.о9 о.% 0.16 _ _ _ _ ToTAL В 1щ.75 4о_г5 142.оо а.24 о.1о о.Э4 4 37.6г 6.61 44.гЭ о,�го о_о2 о_11 4 37_54 6_56 44.40 0_оэ 0_С¢ 0_11 12 mrAL А+ в 440.71 1,025.96 1,р66,67 1.о6 г.47 3.53 44 147.62 4гуг.г� 549.86 о.36 о.97 1.ЭЗ 45 79.20 74.30 153.50 0.19 0.18 0.37 43 С. %NGЛПFRIDG С.1 Detalled englreering 35•70 17В.50 214.20 0.09 0.4З 0.5г 13.9о 70.10 84,00 O.Oj 0.17 0.20 4.00 19.до 2Э.д0 о.01 О.оS а,06 ,2 Сопвtгвсtlпп 3uцervtalm 38.10 74.20 112.30 О.�О O�IB 0_27 15_Оо г9_10 Ч4.10 Oi04 0_о'/ о_11 4_30 8_20 12_50 С_01 0_Ог 0_03 тохаТ, с 73.д0 г5г,7о 3гб.5о о_iB о.61 о.79 �0 г8_9о 99_га 1г8,1о о_% о.24 о_Э1 ц 8.30 28_оо ЗЬ_Эо оуо2 о.а/ о_о9 1о ТоТц. А+ е+ с А4,51 1,г7В,б6 1,793.17 1,24 З.ое k.Эг 54 176.5г 5o1.4v 677,99 о.43 1,г1 1.64 56 87.5о 1се.зо 169.80 о.ц о.г5 о.4Е 5Э n. CONTIIКшNCIE3 n.1 wгРSlиг цо.1а г56.4д Збб.б7 о.г7 с.бг о.89 36,92 1о0.57 137,47 о.а9 с.2ц 0.32 19.2С 1в.58 Э3.ЗВ о.с5 о.о4 о.о9 .г ртiос 5гб.ц5 бго.о3 11�.49 1.г7 1_49 г_?6 164.1о г3'Г.43 4ц.53 о_Чо с.57 о_97 86.Вг 4Э_9о 1ао.1г о.гг с.1о о_31 трТду D бзб.бд 876.5? 1 S�З.ц 1_54 г.1г Э_65 46 гоl.ое ЗЭв.о0 539.оо о_4В о_81 1.г9 4'ч 1об.бг Ы_8б 16б.5о о.гб о_i4 о_Чо 47 СмПт� 1[чгхL А+ ь+ с+ D 1,151.14 г 1, 55•18 3 3�.0г г�',`В 5�1Ч 7.97 100 37г.5г 83�.47 1�_�6.99 o.�i г.ог 2.Q3 1оо _у4.12 16L,1& 358.3о о.47 og39 og86 10о SAF@I i4MAHГiOA S1П'NARY цкаl Foтс11}+ Tota1 Тлса1 Poгelgn Лаtа1 ¢ оУ Loce1 Foxelgn Io'.н1 Locб Foreign 1ate1 ¢. о= ц�св1 _огеlg. 1bta1 Lосв1 FbYelgn 1btв1 ¢ оУ огьпЭ тоtц .тап9 TcLa1 .>гвпд Tcta Ruplehe m111iort lЭ тllцоv F lвhв гцllоп U8 а1111оп F ei111o� U5 тlцlоп гг еЭ г5 г г7 2 Зо 31 "s2 ЭЗ 3 �н Э' 39 о 1 0.. CrЧSL `i0Rt6 WITA RE1AT%0 МА'IItLц, д1L Е� а.1 тгаке J9.63 9.7З 59.61 С,1г O.cz о.14 ko.15 19.55 5Э.7о о.о9 о.а о.�4 154,78 Lo,83 2о5.61 о.Э9 0.10 о.49 .2 Boreholea 41,7Э 21,35 63.64 о.1о о.о5 0.15 .3 тгевt,вгаъ Wоткв 167.^5 2г.60 195.35 о.4о о.о7 о.4? цг.75 1г9.Сц г4г.з6 о.г7 0.3г о.58 зОо.31 г0о.9г 5ог.г3 о.д о.49 г.го .4 сlев_- чre11в 99.о0 99.no с.г4 О.г4 47.85 1о.35 58.го o.1z с.с¢ о._4 1дG.д5 1о,35 15�.го о,36 е.ог о.38 .5 и�тдiпС вьагlог- 7.7г 19.55 г7.25 о.с� о.о5 о.о7 7.4В 31.74 Э9.гг о.о2 с.о5 о.1а 39.38 1оz.Э3 142.31 о.1о о.г5 о.35 .6 storage св-.ив 110.СС ц0.оо о.27 о.г7 155•76 7.25 гЕ3.01 о,38 о.ог а.4о .7 тгвввтlввlоп пе 1.е4 1o.ys г�.вг о.о o.os о.оь 75.75 ац.оо 1>9.7; п.1а o.zo о.з8 14,,о4 sв3.34 7зо.зэ о.з6 1.41 1.77 .е olsгrlзuti» sstem гс8.7F г66,75 275.51 о.гб о.4а о.бб 12э.11ы го.88 г49.о2 о.31 �.2Э о.Ео 43о,54 8оЭ,87 г,г40.41 1.дь 1,94 г.99 .9 ееттlсе соппессlепs wltn -ивtвг твгетк ц.ог 143.46 ц4.48 С_оз 0_34 о_37 ?zo z8.64 ?0.84 о_о1 о.ог о_о8 37.с9 ИВг.бб А9.75 о.1о 1_i5 1.г5 тетц. а 558.90 386.г2 945.oz 1.35 о•ЭЗ г•2в 39 114.3г 424.77 839.о9 1.оо 1,oz �...� Э9 1,463.54 г,26о.оо 3,�г3.54 Э.54 5.4Э 8.97 39 в. мlsсег.гдгоеоиs в.1 исгот vепlгlен 8.г6 8.26 О.о1 о.с1 5.'Д 5.о9 о.ог О.о2 34.55 _4.55 о.% о.% .г Laboretory equlpment апд ,овtег �евг ъвпсп 1.г7 1.55 г.В2 о.ао о.С1 о.Ог г.3� 1.32 3.69 о.л о.оо о.о1 8.81 6.33 15.14 о.о3 o.W о.% ,j РиЪцс baiЪ houseв 3,Эо Э,ЗО С.01 0.о1 ?.ЗО 3.30 O.G1 0.01 19.5в 1Э•58 0.05 0.05 ,4 ивtет �откв orrice, laboratorv, нвхьо�,вев 8.8С В.Во о.се о.о2 5.5о 5•5о о.ог С.о1 4о,г6 4о.г6 о.о9 о.о9 .5 Sгare ьo�ui-�g Чс,7о 4о,7о о.1о о.1а Ьо.7о цо.7о о.о? о7од 176.оо 176.00 оА1 о.41 .6 aьers _ _ _ _ _ _ , _ _ _ _а.5о ге.75 67.г5 0_о9 о.% о_16 Г?vш в 5=.% 9.61 63.88 о_13 0_Ог о.15 3 51.87 б.40 5BZ7 Оу1г о_ог О•14 е г83.15 69.63 35г,78 о•67 о.18 С.85 4. теч.,г и+ в 61г.9',° 395.93 1,0�.9о ..1б о.95 г•43 Чг 466.19 431._7 8g+.36 1.1г 1.с4 г.16 ц 1,746,69 2,3г9.63 k,V76.32 4.21 5.61 9•8г 4Э с. вхсп�еевгис с.1 xtвilea егвiмегl $ г3.го цб.оо 139•'-о о.о5 о.г° о.Эз 2Э.го ц5.б0 1ЭВ.Во o.oG о.г8 С.34 1ос.оо 5оо.оо Ьоо.оо о.г4 1.гг 1.45 ,2 Cortвtxuctlert 3upeniвior. г4.В0 49.30 73.10 0_ОЬ 0_12 0_Ji 2k.80 48.20 73.00 0_W 0_ц о_17 107.00 "сС8.00 Э15•00 0_26 0.50 0_76 тотrs с 45.оо 164.Зо г1г.Эо 0.11 о_Чо 0_51 9 й8•оо 163.8о 2]1.ео о_12 а_Э9 о.51 1о го7.оо 708.ао 915.00 о.5о 1.71 2_21 1о т�тrг л+ в+ с 660.97 56о.гЭ 1,гц.г0 1.59 г.35 2.Эч 51 514.i9 594.Г 1,1о9.16 1.24 1.43 г.б7 51 1,95Э.69 3r037.63 ч,991.3г 4.71 7.3г 12.о3 53 n. соихпiселс�s n.1 гьувlсеl 153.г4 98.98 25г.гг О•37 о,24 о.61 ц6.55 г�.7Э 224.34 0.28 о.26 о.5ч 43Ь,67 582,41 1,о'.9.о6 1.05 1.40 г•45 .г нУсе 673•13 г43,ч8 916.бг 1_бг о_59 г.21 565.76 г,г.4ц в37.г0 1.36 0_66 г_ог 2 о� 16.26 1,415-68 3 k3�?.94 4_Вб Э.йг 8.27 тотц, D 3г6.3'+ 34г•46 1 16iд.а3 1_Э9 о`д3 ?.Вг � 6_г.31 73 9.=3 1,о61.54 1_64 о_9г г.56 49 г 4уг.9? 1,99Э.о9 4 4� 51.о2 5_91 4_81 1о_7г k7 cлrtm ^отА�. д+ в• с+ D 1 4�87.3+ 90�.69 г 3. 9�о.оз 3•�5в г.18 5.7Ь 1ао 1 1 .50 97�.го 2 1 о.7о 2.�0 гп35 SпгЗ _1ос 4 4� 5 о3�5.7г 9 4��•34 10®62 12я13 г2�75 1о0 гwе 3, гд�4 I� тдо�sц � Fi•!6 СТТРБ ЧА^&R SWPLT PROJBCT: Мг0.ГгСТ COST ЕSТRцТЕS � - ИПt цVС Percentage F1sce1 Уеат Ending March Э1 1975 1J/6 1977 1978 1979 1960 19В1 Tota1 1975 1%76 1дг7 1д(д 19^,9 1900 19В1 lbtai а Стапд Tata1 """""""""""""""""""""""""""""" х 1+ООо.000 """"""""""""."""""""""".""""""""""""""""""""". """""""""."""""'"".""""'"'""."""".' RпрlвЛв н 1�000,000 _'_""'__"___'"."""'""""_"""_"_"_"'""" """"""""""" """ '15� А. CIVIL WОАКБ АгФ aг�REGS�¢ А® 8Q-JSPME3'1' ы.1 тtвке гясвl 7,оо 528о 15.о0 74.8о о.ог о.1г о.о4 0.1В яотеlвп = ц_5о = ц_5о = С_оЭ _ °_0� тсгвl 7.�о 64.30 15.о0 вб.зо o.oz о.15 о.о4 о.г1 .г вотепоlав согвl гъrе:qп 1btв1 .3 Тгеагпепt тгкв госаl L3z 9.Эо г.86 14.се о.оо о.аг о.о1 о,оз еотеiеп _ 77_38 = 37.3Е _ � = о_о9 1bгы1 1.Эг 47.г8 г•86 51.46 0.00 0.11 0.01 0.1г .4 теех we11a йсвl PoreiSn Тоtв1 •5 яао•?1пе вгаеlоп 1лсв.1 7.9о 16.Эо гц.го e.oz О.о4 о.аб яогеi� 51_& _ 51_64 0.1г = о_1г тагsl 53-5ч 16.Зо Y5.G4 0.14 с.04 0.18 6 s+ягаае tапкв госаl 16,28 z2.oo 38.28 с.о4 о.о5 о.о9 aoreiBn 3.5'г _ 3_57 0_о1 = 0_ц тогы 19.65 2г.оо 41.85 0•о5 о.05 о.1о ,Т Тгвпвтlввlпп твlпв исвl 17.Ьа 38.о7 55-67 о,о4 о.1о о.14 яогеiеп 345.оо г4_5о 369.5о о_83 о_aG о_89 таtвl ?Ьг.60 6г.57 425.19 о.В7 о.16 1.о3 .в ➢ieeriьntloп sувгет тсаг 44.W 7г.53 ц6.53 0.11 о.17 о.г8 Еотеlаn г3о•о0 81_67 Эц.бт о_55 o.zo о.75 тсгц г74.оо 154.го 4г8.гс о.бб о.37 1.о3 ,9 5етйсе саnпееtlыв нlth ывtеr meteтs госаl 1.Зг 2.ц2 Э-Эо 3•30 3.09 1,9В 15.40 �.оо 0.01 О.т 0.01 0.01 0.00 O.W Forelar 1ао.гг = 1оо.г3 _ _ _ 2оо.45 о.24 = 0_г4 _ _ _ o.b8 тгtвl 1о1.54 г.42 3о3.5д 3.3о 3.� 1.98 215.85 о.г4 а.о1 О.г5 о.С1 o.J1 о оо 0-52 тохаг, ы гоепl Э•64 'Sо.9о 17о.�6 3.Зо 3�09 1.5В =38.96 o.oz о.36 о,42 о,о1 0.о1 0.оо о.0г .oreiqn 1oo.zz 679.ОЭ гоб.4о _ _ _ ,�'S.71 с.г4 1.63 о.5о _ _ = г_37 Тоса1 1о9•еЕ Бг9�99 л6.Ч6 З.Зо З.ое 1.98 1,??4.67 о.гб г.9Э о.9г О.т о.о1 о.оо 3.19 4о Н. [ц6CELLыIQ.+qIS г В.1 Mator пhlсlев Lогв1 - - - ' Forelan 1о,35 1о_35 о_се о_о2 Tota1 10.35 10.35 О.Ге 0.02 .2 Leb�oпEOry equlpлent апд цт *хвг nаьсп тогвl о.55 1.10 г.65 о.оо о.т о.оо гогеlап 1_ц = = 1.i5 о_т = = о_т тоtвl 1.15 о.55 1.1о г.8о О.о1 а.оо о.со 0.о1 .3 rаоцс ъьги nоvвев weal г.2о 2.го ц.4о о.оо о.о1 о.ог aoreiqn = _ _ _ _ - тгаl г.гс гго Ч.Чо о.оо о.т о.о1 .ц Waцr иотkа afflce, laborntory, иътсьоиsеs Loca1 2.г0 11.0о 3�3D 16.50 О.т 0.02 О.т о.04 Fотс:ел _ - - _ _ _ _ - Tota1 _.2о 11.00 З.ЗО t6.50 0.01 О.С2 0.01 О.С4 ,5 E3afe tюveing Loca1 11.ц� 19.ЭЗ 9.д0 цо.70 D.03 О.о4 0.0Э 0.1о Pore1� _ _ _ _ _ _ _ - To+s1 ц.ч7 ,ч.ад 9.to чо.7о о.о3 о.о4 о.о3 о.1о .6 оььетв юспl 38.5о 38.50 о.09 о.о9 Forci� 28-75 гв.УS о.Ог 0_о7 тооаl ___ _ 6+.?5 6�1.z5 0.16 о.16 ТОтлL Н 1аса1 l 1Э.67 33�68 54.ц0 С.04 0.06 O.1L 0.24 тогеl6а ц_5о _ z&.75 �4о.г5 с.о3 = О.о7 о.1о тоtаl s5.1г 33.63 83-15 14г.оо с.о7 о.Сб о.ц о.34 4 тотАг л+ в гьсвl гЭ.31 104.58 ггц.46 3•Эо Э•ое L98 44о.д о.об о.4г 0.56 о.о1 о.01 с.оо 1.о6 яотсlап 111.7z 679.оЭ га5.15 _ _ = 1 се� 5.96 о.г7 L63 с_57 = _ = г_4Т тсгвl 1?s р5. Р.63.67 4sv 61 Э.зо 3.о6 1.98 1,466.67 с.Э3 2.о5 1.13 с.о1 о.01 с.оо Э.SЭ 44 с. sяспаеенvис с.1 иггаllеа enEineercng еося.l Эо.35 5•35 35.70 о.� о.и1 о.09 яотiап 1828о 35_7о 178.5о о_34 0_09 о_4Э тоtяl 1ТЭ.15 ц1.о5 zlц.гс o.4z а.1о о.5г .г сопьtгисгlоп suдerviчlon госвl 3.54 14.25 го.31 ЗЭ.1о О.э1 о.о3 о.05 о.09 rогеl6п 7_49 3г_i3 34•5В 74.го с_ог а_о9 о_о9 0.18 тоtвl 11.а3 45.38 54.99 ц?.Зо о.93 о.ц о.1Э о.г7 тоrлl, с освl Зо.35 8.89 14.г5 го.31 va.8o о.о8 0 се о.о3 о.о5 о.1е Forel6n 14г.ео 43_19 3г_1Э 34_59 г5?.7о о_ЭЧ о_ц о_оВ о_а° о.61 токаl 1�3.15 5г.о9 46 ЭЕ 54..°9 '+26.5о о.4г о.13 о.ц о.1Э о.79 1о тсци, д+ g+ � тосвl Зо.35 Зг.го .1Э4.В3 z4L.7� 3.3о Э.05 '-.98 514.51 о.о5 о.ое о.ц5 o.6i о.т о.а1 о.ос 1.г4 аопiаа 14г.8о 154.91 7ц.22 г69.73 = _ 4 1 гТ� 8.66 о_34 о_38 1_71 о.65 = _ = Э_Ов 1bt 1 17Э 15 187 1 9 � 0� - 4 5 3 30 Э-09 1.9в 1^93 17 0.42 0.46 г.16 1.26 0.01 0.01 0.00 И.Зг 54 D. COiЛ2йGf.RC1E5 ➢.1 Tqvыcal осеl 5.fl3 46.15 56.11 0.8г O.i7 0.$о 110.18 0.02 0.11 0.14 О.о0 О.М 0.00 0.г7 _oreign г7_9Э 169•77 56.79 = _ = 256•ц9 о.о7 о.41 о_i4 = _ _ о.52 тоtаl 33.76 г15.Эг 1�4.9о о.2г о,77 о.5о ЗЬЬ.67 о.о9 о.5г о.га о.�о о.оо о.о� с.89 2 Рг1се Loca1 19.73 1ql.:K� Эс0.28 5.10 5•30 4.L8 5г6.45 о.05 0.46 0.Т3 О.о1 О.С1 С.�1 1.27 � Fотеlдс 47_53 391.16 18:.34 _ _ _ бго.оЭ с_iг о,94 о_43 = _ = 1_49 тогвl Ьб.гб 583.гг +a1.6z 5.1о 5.90 4.че 1,146.48 1.4о 1.16 �.о1 о.с� с.о1 г.76 ^оРАг ➢ гьса_ г4.и6 295.21 35Ь,Э9 5�'12- 6.57 4.Ю ЬЭЬ.ЬЗ о.о7 о.5^ о.57 . о.о1 о.о1 1.5ч иrorеlал 75.ЬЬ 5Ео.93 гьо.1, _ _ _ В76.5г о._Э 1_Э5 о_57 _ _ _ г.i1 1bta1 1оа се 7�9 1'ц 596 52 5-9г 6.57 4.38 1,513-15 а.26 1.9г 1.4ц о.о1 о.о1 3.65 цб сдц® таг.w д+в�с+д tocal 3n,g=, 56.76 437.Сц бо1.,6 9.гг У.ЕS 6.96 1,15-.14 о.ед с.15 1.т 1.42 О.о2 о.ог о.о1 г.78 AoreiSn 142.в0 23a-i 127�2.15 509.г76 = _ = г'� 55.19 = С.57 3_оЬ 1.22 ^ _ _ 5_19 тогвl 173.�5 гв��.13 1,vод.1Э г.цl.ог 9.гг 9.65 6.96 5,?06.3'г о.4г �.7г 4.ов 2.7е o.yz о.ог о.о1 7.97 1оо Jапе З. 1ql4 �� IК➢ОЧЕSц FiVE CTTLrS ЧАТБR 5SIPPLY PPP16Ci5 РRОТгСТ С03Т �3TLTt4TF. вшгяо�к�го - гегеепъа¢е еlвгьг zear ennlna ювтсн 31 1gr5 13+6 1g/7 1Л8 197о 199о 1981 тtвl 1575 1Э7Ь -Э77 1978 1glэ 199о 1991 тсtьl ог Gта�А Tota1 _"___"""'_______' '__ Мг?lahs а 1.ОСО.000 _________________________""'.""""'_' _____'_______________________________ t1S� х 1.000.00о _____________'___' '_"_'_"_""""' А. CI4ZL ЧОАКS AWD 33iЛТФ MNTEIiLц, АЮ) ЕуЛРМЕ1iТ д.1 Intahe Оса1 Fпгеlqп Тоtв1 .2 вотепоlев rАсь1 г8.г5 7-15 6.39 41,^9 о.о/ о.� о.о1 о.1г Forelgn _ 21.85 _ 21.fi5 _ О,СS _ О.СS Тагь1 28.25 29�00 6.39 63.64 О.С7 0.% 0.01 0.15 .З 1'reatment works L°са1 0.78 4.у5 5: 3 о.00 0.01 0.01 г°ге1�п г.д8 _ 3�w5 6.33 о.с1 _ О.о1 о.се тоtьг z.38 о.78 8.40 12.о6 о.т о.0о о.ог О.оЭ .ц еlеет .ець гоеьl Fпrelg, т°хег .5 Am.Fing =tetiort "осаl _oreig� bkal .6 sгогеАе гьпкь 1осв.1. _°ге;�, тоtаl .7 Тгаытlввlм mai в Loce1 L,29 5.50 ?.79 О.е3 xoпiqn Эг.ое 3.69 Э5.Е8 с.гг С.с1 о.гз таtьl 96.г9 9.18 1�5.47 с.2Э о.о3 0.26 .9 ньгrl'оигlоп ьуьгеп 1пс �. 17.49 г7�5о 44.99 с.о4 о.с7 о.ц :oreign 161.00 1С.59 171.58 С.39 0.0'г П.41 TCtE1 1тА.49 ЭВ.оS ц6.57 ^.43 о.09 о.5г .9 5ervlce с мectio�s vrith яаЕет meters Loca1 1.10 1,9i г.Вб 1,10 П.бб 7,70 O.IX? 0.01 П.01 0.00 O,DO 0.02 _Огеi¢п 5о.ц = � _ = 1ос.гг o.r _ о_1г = _ 0_24 2ota1 51.г1 1.9° 52,97 1.10 О,бб 1С7.дг __ 0,2 0.01 0,13 0.00 С.ОО 0.г6 толr, л иеаl г9.35 Э1.69 47.го 1.1о о.Еб цо.оо О.о� о.оц о.12 о.оо О.оо о,.7 .oreiqn 52_99 г74.85 67_8г = = Э95.66 о_13 0_бб С_i6 = _ о�°5 'fot_1 8г.34 Э�Ь.54 ц5.02 _.1С 0.66 505.66 0.20 0.74 0.20 0.00 0.00 1.2г 41 Н. td12CEIгA1iE0o9 В.1 tMtar veЬicles 2оей s°геiНд 4_е8 4_88 о_о1 о_т Т°ta1 4.Пb 4.88 0.01 0.01 .2 LaSUratary алд иаtег metex teatlv5 equipaertt Wca1 0.77 1.10 1.б'7 0.00 0.01 0.01 Fore1�. 1.7Э = = 1.7? 0_01 = = о_01 Tota1 1.73 ..,'I '.1С 3.6G 0.01 О.ОС 0.01 0.02 .3 ruuiг гьгн .-о,.ьев гоглl z.zo 1.1о З.ЭС о,т о.оо 0.01 аокisп = _ _ _ _ _ тог�1 г.го 1.10 з.Эо о.ог а.с� о.о1 .4 w гет wогав ornce, ьlaбoaatory, хатЛ°исев Loca1 1.1� ?.ЗО 1.10 5�50 0.0о 0.01 0.00 о.01 Forelgn _ _ _ _ _ _ _ _ Тога1 1.10 ?.Зо 1.10 5•50 0.00 0.01 O.GO 0.01 i•5 sгьtк тыiпе 1.осц 9�Эо д.8о В.гS гБ.95 О.ог о.ог о.0г О.о6 ьътс.ц _ _ _ _ _ _ _ _ тоtьl Э.3о 2.Во 9.г=, г6.95 о.оё о.ог о.г2 о.об .6 Оспетг 1.пел1 1ч,геi2п Tota1 1YYSAL Н Lосц 11.00 15.ОГ 1г.55 Э7�Ьг 0.02 0.04 0.03 0.с9 а°т дп 6_Ы _ _ 6_61 0_0? _ _ o.ez Тпtа1 17.Ы '_5��' ц�55 +4.г3 0.04 0.04 О.СЭ 0.11 4 1'0"4L F+ В Laca1 ц0.35 46.76 5� 75 1.10 О.Еб 1'л7.62 о.СЭ 0.12 0.15 O.DJ 0.00 С.36 lъгег9п 5_.бс г^4.85 67.д2 = = 4�.27 0_i5 0_бб о_iE _ _ с.�. xotsl 99-95 'г1.б1 126.57 1.1с а 66 5лЭ.85 о.��- 0.7% о,?1 С.оо 0.0о 1.3Э 45 С. E.YCПiEERI[ь'С С.1 Detsiled entiпeeгing i,°са1 11.32 2.Сб 13�1G 0.02 С.01 е.�3 аогеiад 56_оз 14_Ог 1о_io 0.14 с_о3 о_11 соtиl бг.Эо 16.1о 51,00 o.1b а.о4 с.го .г c�ns:гvctlc, suo_erviвl�n >.оса1 1.4о 5.61 7.99 15.00 с.оо о.02 п,Пг е.о4 яопlвп 2_W 1г_бо 1._56 г9_о D_о1 о_0=_ о_о3 П.о7 'btel 4.34 18.21 21.5j 44.10 С.01 0.05 0.05 G.11 ТотАi, с 'осг.1 ц.3г 3.48 5.61 7.99 2В.90 о,ог е.о1 �.ог О.Ог о.о7 _orefgn 56_оВ 1b_96 1г_Ео 19_56 99.го о_i4 о_о4 о.о3 о_03 о.?[. ^огг.1 67.9о ?о.4:� 1N.21 г_.55 25.1С с.16 о.о5 о.о5 о.05 о.3г ц TOTP.L A-B+L' Loca1 11.32 43�8Э 52.у7 ЕЬ.7Ч 1.10 0.66 '�6.52 О.Ог 0.1С 0.14 0.17 О.ОС D.O� 0.43 Forei2п 56_ое 7Ь_56 287.45 fl1,3S = = 5о1.47 о,14 о_i9 о.69 0_19 _ = 1_г1 ^ t 1 Ь^ 9о L'0 Эл З39 ez 148.1г 1_г 0.66 677.99 0.16 О.г9 О.а3 о.36 о.оо о.С� 1.& 56 ➢. CONTIHOEИCIES n.1 яW-ьiсц =ее1 1о.0Э ц.69 14.G9 о.г7 �.16 36.9о о.аг с.03 �.еЭ о.а0 о.оо о.о5 Norergu 14_70 68_т1 �6•$с _ = 10C.jT 0_CJ� С_16 0.= _ = 0.24 Т°ta_ 24.9Э 80.40 ц.65 c.2i 0.1Е 137.ii О.СЬ С.19 О.С? 0.00 О.ОС С.Эг .г rгice г9.7о 5о.гг 81.г6 1.Ьэ 1.�3 -б4.1с О.а7 0.1г 0.?� О.о1 О.сс о.40 Fore'_ул г5_� г58. L ji.aq = _ г39.43 0_ОЬ о.38 С_1Э = _ O.S1 Тоtв1 5�..71 2w".36 г35.У4 1.с3 1.г3 ао1.53 С.13 'П•33 о.о1 0.9г ТС'tAL ➢ 1лса1 39.79 ё1.91 Э5.95 1.95 1.39 ?01.00 0.09 0.15 С.гЭ о.0] 0.0о о.48 Forelgn 39.91 я26.95 _ _ = 338.00 с_]0 0.5Ч С_17 = _ 0.81 зroеьl 'I .70 28Е 76 16� 1о 1 96 � 39 53° 00 о 19 с.69 �.40 о.01 о.оо 1.г9 ч4 ГцSФ TOTPS, A-S+C+1: лсаl -1.В2 В?.с2 114.г8 162.Еу ?.06 г.05 37".5г 0.02 0.19 0.29 0.1Ю о.01 O.OJ О.Э1 Fore1� 56_С8 11Е_47 514.Э0 152_62 = _ ОЭу.4'/ 0_1д 0.29 __23 о_36 = = г_Oz 1'оtьl 67.90 2С0.09 Ь%6.5д 315.Э1 3.06 2.05 1�ц6.99 0,16 0.4В _.5г 0.76 0.01 0.00 2.93 100 � Лте Э, 1974 IHDO]iESSA й1VЕ cITIES WAT6R SVP�LY PRCSSC'f5 УА'vJEC_ С�Т Е5Т1МЛ'.Е5 3e1VYtMA1SCI п ge Р1вса1 rват п,а1пА мвтгь 31 1975 1916 1о?7 1о78 1979 1л9о 1дг1 хосаl гg+5 1gJ6 1Ч77 1gr8 19?Э гэдо 1Э31 тсгаl сг Gталд Tota1 _______________________________'___ АиРlаhв к 1,0ОО,ОП0 _-"'"-"-""""-'"_____""______________'___ ____"_"_______'"_"_"_"_"___""_"_"_"" US$ х 1.00о.000 -�--_-__..______._______________________ А. CIVIL WORK3 АtФ PSIЛ'LID :ATERTN. ANU EQLIPNEM1T А.1 Inteke ]исаl Роте£ап 1bta1 .2 8отсhрlев iясаl Иbreign Тоtв1 .Э тгевtгvепt нorks Sлев1 Porelgrt Tot%1 .4 C1ear нг11s Iяса1 Fceelgn То2в1 .5 1'iлnPlnq etatipп �ссв1 fъreign тпгаг .6 stcrasa гвг,кв госвl 1.1о 6.� 7.ч17 о.оа о.аг о.о2 Fоге]� _ Э_68 3-68 = о_оу о_о1 т�х,1 1._р 1р.о6 :1.16 о.оо о.оз о.С3 .г ттвпьАiььlт �,в1пв тсвl азз о.ЕЕ о.уэ е.ос о.ао р.По £ок1в, ц_i8 _ 15-18 о_оч = о_04 тпtвl 1i-51 о.бб 16.1? o.w о.ор э.о4 .8 ыьхпьнlпг, яувхв�а 1гсв1 ц.со г1.1г зг.12 о.о3 о.СS о•Ое Foreiert 34_5о 4_4Э 38_9Э о-� 0_о1 о_09 Tota1 45.5G 25.61 +1.11 0.11 о.0$ 0,17 .9 service с ceioua жен исвтетвtвтя ц�сва о.гг э.33 р.- о.7+ э.ос о.ре а.т О.оо roгelqrt 9_89 = _ 9_89 д.ог = _ о,о2 ^otal 10.11 0.Э3 0•г=_ 10.66 О..п О.оо о,т О,ог qorA;, д i,осц 1.3г 13.о4 гг.эо 41.35 o.W р,о5 П.оS о.1о Pore1Rn 9.99 53_ЭЕ 4_49 67.74 э.се о.13 о.о1 о.16 ^оияl 11.г1 г1.4о гЕ.49 109.1о p.oz р.1д о.06 о.гб 31 в. ид=сд,сnхео�г' в.1 иргог venlclea тосаl rorel$c � S.Эд с_о1 а.о1 mtal 5.98 5.98 о.о1 о.о1 ._ Lяboratory оиlрцпt вдд r�eter ;еьt ьепеъ Iосв1 1.65 1.65 о.о1 о.т Fom1� о.58 = с.58 о.о1 = о_о1 Tota1 о.5б 1.65 г-г3 0.о1 О.о1 O.CQ .3 3Чн1iс ьвth hынвв i�ocй Э.Зо 1.98 5.28 о.о1 о.Ор 0.01 £охе?gn _ _ _ _ _ _ Tata1 3-Зо 1.98 5.28 р.о1 О,ро 0-01 .4 water мтив afflce, lвtoretory, wвхеноивеа Loca1 0.8д Э-� 3.9Ь O.OD 0.о1 р-р1 Рогеi6Т _ _ _ _ _ _ Tota1 0,8д З.э�3 Э.9Е О.СО с.01 D.э_ ,5 sxьff rtо,вiпе госвl 9•эо е.ао а.г5 г6.95 р.02 p.az с.ог с.об FвтеlSл _ _ _ _ _ _ _ _ токвl 9-9о д.9о е.г5 26-95 о_ог p.oz о.ог о.об .6 оежга - са1 xorei� Tota1 тстАг в госаl го.78 16.В3 1о.г3 37.84 о.рг с.о5 о.ог о.о9 Fотецд 6_5Ь = = 6_56 р_рг _ _ с_ог тоtвl г7.34 16.83 1о.г3 �..4о о.о4 с.о5 о,ог э.ц 1z тСтпг А- в госвl 1г.1о 34•87 3г.г3 79.го р,ог о.1о р.о7 о.19 _огсiеп 16_45 53_36 4_49 г4.Эо о_о4 о_i3 о_о1 о_i0 rotel гд.55 д8.г3 36.7z 153.5о ].рб о.гЭ а пб о•37 43 С. 8ЯГП�Е"R2йр с.1 юtвцвi с��Еiггвт]пд госгl 3.4о о.бо 4.оо о.си о.а] о.о1 _oreign 15-б4 3_9Ь 19_ео о_оц п.о1 о_05 т�св1 1у.24 4.56 2Э•бо р.о5 р.о1 о.об .г сосвtтасtiм suцerviвioг_ госц о.4о 1.6i г.г9 +.Зо о.оо р.оо о.о1 о.П1 Torelgn 0_В3 3_55 3.62 8_20 о.оо э_о1 0_01 О.С2 Tota1 1.г3 5.16 б.ц 2.50 о.Со J.o1 0.02 о.о3 Tb_`AL С Loca1 3.40 1.о0 1.61 2.29 6,3о С.о1 0,00 П.СО о.01 0.02 яотвlдп 15.84 4.79 3_55 3_ег zd_ро o.cL о_о1 э.о1 о.о1 о.ог освl 19-2L 5.75 5.i6 6.11 36.Зс о.о5 о.о1 э.о1 о.ог о,о9 1о ^оТдL д+А+С Loca1 3.4о -3-1С 36.49 34.52 д?.5С о.01 С.Ог 0.1о О.о3 О.г1 яо _д. 15_д�. г1_24 56_д1 3=31 1ог.3с о.о4 0_С5 о.14 о_ez о_г5 о в1 19-г4 34.34 ?Э.39 �г.8З 19Э-Во р.о5 с.э7 o.zL о.1С о.46 :з D. :.OMCEП..ENCIEE д.1 YFцslcal Lоса1 3•р2 8.72 9.of. 1Э-80 O.D1 о.02 о.02 0.05 Foxeign L_11 13_34 1_1Э 19_58 С_о1 0=0Э 0_00 0_Nй тоtаl 7.13 2г.об э•1Ч Эд.38 о.ог э.СS о,ог р.о9 .г Рг1св Iиса1 д.69 35.4,. 4г.49 86.бг о.с2 о.о9 о._о о.г1 Pbreign Ь_91 31_1Ч 5_20 43-30 о.С2 0_э"j 0_01 0_1о Tota1 15.9П б6.63 47,6Э 13о-'г о.сц 0.16 о.11 о.31 тотлг д wcal 1i.91 44,16 5о.55 1о6.62 о.с3 o.�i_ С.1г о.гб eoreign ц_о2 44_53 6_33 61.д8 о_оЭ о__о п.о] о_i4 Tota1 гг.93 68.Е9 56.д3 1Е8.5о о.сс' о.13 о.4о 4'I САгнл тоцш д+в+с+д 1оев1 З.4о г5.ог bo.Cr'ь 95.С� 194.12 о.о1 о.о5 О.г1 С.20 �.47 Morelgn 15_С4 Зг_гб _ 1ц_64 1ёц.18 э_04 о.од а.г4 �� � тааl 19.г4 57.г7 16г.о8 99.71 358.Зо э.о5 о,1Э с.45 р-23 э.86 1оП 1� Swe 3, 1974 IcomгslA ххче clTгes wл^F,8 sиvez rнотсст= гяоЕст сwг ттгмптl':s тиnвх �вqТ лнсаl тевт ъа_ае мвт�Ъ 31 ч975 г9�6 i977 г978 _qv9 1��8о .эр1 яасвг 1975 -9г6 1Ч7г 19�9 i979 19Со 1991 тahel ах тогьl __"'.__'._'___'_______________'___ RuYiahн r 1�OOD.cOC __'__ _'__._____'_'_.,__'__"_'______ _________'_______`"_'__'___.'__'___ _'____'__ _ I15� >. ].000�000 ______'________ _'____ '___.'___.______,.'_ А. _IVIL WOiS6 АNП ]LIA1C➢ M4TERIAL 41V[i 84ГРМЕNТ а.1 х,свке [лсаг 16.д3 =_г.Ос ц.по 45.°i С.о4 С.оS О,с: о.1г иьтечвп = 9_7А _ о-�75 _ о.о2 _ о_о2 тогаl 1Е.33 31.78 1г.оо S'9.61 о.34 о,о7 o,oi о.14 .2 Horeholes Lогь1 Fогеlдп 1b;гi1 .9 rreatmeцt мг,:е wcal 46.75 9г.5о 33.5о 16^.75 О.ц о.2о о.Од о.4е Fomieц _ г7.бс _ z,�.б0 = с.о7 ` о.= YoW1 а6.75 110.10 ?Е.Sо 135.35 о.11 а.27 �.о9 о.47 ,L 3,,.ar w� 1е глевl 49.5о Ч3-50 Чд.оо О.гг O,L О.а4 еогеlъц - � - - � _ тоtь� 49.53 4о.5о 9о,о3 о.гг о.1г о.г4 ,5 1A:mP1ng ьtьtion Iяса1 2.гD З�Зо г.20 '.7о Э.Оl П,01 С.ОО 0.02 гогеlеп = 19_55 _ 19.55 = о_о5 , с;о5 тогаl z.го zz.8s г.го г7.г5 п.о1 п.об с.оо О.о7 .б sronrвqe свпка г,осаг W-.co 66,W 1?o.ro о.ц о.гb <,.27 готеlвц _ _ _ _ _ _ rokal 4L.OG 66.00 110.00 0.11 0.]Ь 0.27 ,7 rгсльтiьнlпn гоеlпн госвl 1.iu 3.3о ц.84 о.оо с.о1 о.Ог _n:e-e� г8_?Э _ :р_98 о_о5 = ��о5 тога_ 20.5г З.Зо 2,.8г О.СS 0.01 ..ОЬ .8 Diьtrlhцtlon ayetem 41.8о 66.96 119.7Ь 0,1о J.Й 0.г6 еы�еlцп 143.75 ?3_ао 1Е6.75 о.ЭЧ о_ОЬ о�4о точвl 185•55 В9-76 г75.51 о,4ц n-zz 3.66 .9 Scr��ce eм�ectinna ыlth наtег meters 1acs1 1.3г г-гг г-tiь 3.05 1.76 _1.С2 0.00 o.U1 О,о1 С,31 O,IXJ о.33 тгr_ге 7г_7Э _ г1_73 ` = 143.4Е п.17 = о.17 _ _ о_34 сЕа1 73.о5 2.22 а1.37 3.3Э 1.гЕ 154.Чр о.17 с,с1 о.18 О.а1 о,00 с.37 ;дгАL А Local 67.1о г46.е6 г4о.1о З.а4 1.76 55р�9"т о.16 о.бо 0.5д о.о1 о.0о г.35 Forelgn 7г.'ia п9.66 94.73 = = ЗЬЬ.1г о_17 о.53 о.г� _ = 0�93 Tota1 138.8Э �ьЬ6.Sг 331•БЗ 3.08 1.76 Э45.о2 о.3Э 1.1Э о.81 с,о1 о,оо г.28 Э9 е. М13СFtТЛ1д60'Г.i Н.1 Flotor чеЛiсlеа Iясе1 Forelgn 8.26 8.г6 С.01 O.G1 Potu1 8.26 9.26 О.С1 О.С1 .2 LвЪогв;огу equipnevt цд meter Eest bench Local 1.'£7 г.27 о.00 0,00 eoreidn 1.5' = 1.55 0.01 _ 0_01 тоЕа1 _55 1.л z.BZ о.т о.оо с.о1 .3 евъliс ъвеh ъольег, 1.го г.го ?.Э� о.о1 о.со о.ог eoreian � _ _ _ _ _ wчвl г.т zго 3-30 о.ц о.оо о,т .ц �двик= ы пггlе., lаъствtпsу, .-атеъоивен Iлге1 5•э0 3.Зо 8.so о.о1 е.в1 o.oz Forelen � _ � _ _ _ Tota1 5.50 "1.30 0.6о С.01 �.t.01 0.02 .5 scan чо�е�пд ?-го г7.05 1о.45 4�.vo 3.33 с.сч о.о3 о.10 е - - _ _ _ � - - Тоtя1 1Э.20 1'Г.оS 1D,4y 40.7П о,03 0.04 0.33 о.13 .Е осЪеrв Forelgn Tuta1 топди в егаl 1Э.2С z4.qz 15.95 54.о7 о.о3 o.G6 о.04 о.13 Fпreiдn 9_81 _ _ 9_р1 о_о2 = _ о_о2 g3tц гз.т 2ч.9z .5.95 63�68 о.о5 о.о6 о.п1 о.ц 3 ТОгнг. h+ в Lcce.1 8С.;о 2�1.7В 256.35 Э.од 1.76 61г_.97 о.19 о.бб �.Е2 o.J1 �.ОС 1.L8 егг v,n ег.5 z19.б6 94.7Э = = Э95.9Э о_iv о.53 �_г3 = = о_95 г��,н1 161.84 о_.44 35о.78 З.ЗЬ 1: о ..008.Ча о.38 '.19 о.65 о.�1 е.оо г.13 4г С. �NGIM61йAIM; С.1 ЛеtвiТед е^3=пгетi7ьх Loca1 19-'/г Э.Ч] гЭ.20 :.W 3.о1 0.05 яотс�а: 9г.8с 2а.го 116.оо �_г3 о_о5 о_г8 Tote1 112.5г яЕ.6Е 13S �о 0.29 о.а5 о.33 .2 Conыructlx 8цperv�siпu Lnaa1 2.31 4�2Т 13-г� г4,дD О.С1 О.С2 0,03 О.Сб Sor g_ Е_ЭЕ 20_91 2г.51 48_а0 0_D? 0_05 OioS 0._ Toka1 х 7.19 30.1В 35.13 ТЭ.10 о.03 О.Р1 0.08 п.18 ^ОТ(� С L�ег1 19.-i2 5.79 o�zi 1Э�г2 '8-оо О.д- O.W 0.(Р о.03 0.11 Forelgn 9г.70 гУ;о5 2о_9' гг_51 1ЕЧ.Эо _ о.гn о.05 о_05 о.4о осаl 12.52 33_д� зо.19 5.�3 212.3о о.г7 п.о9 о.о7 о.гh п.,1 TOTAL А+В♦С 'лсп_ 19.7г 86.09 ?51.С5 2б9.27 3�02 1.76 66G.97 О.�Оь О.г1 О.Ь8 о.65 0.0- 3.00 1.59 Forei3: Эг.Во 1С5,Ег 24о.}7 _7.г4 _ = 550.23 о_гЭ о_гб 0_5р о.=8 _ = 1_35 тоцl г. г 195.71 ;21.6г 38о.51 3.�8 1 76 1 z�1 �о о.г7 ^ 4� 1 гЕ п 33 о 01 с оо г.94 ➢. сомlл�rvсгеs ➢.1 гпrвlсаl г3.о9 67.94 64.ог о.77 o.4L �°3.г4 о.о5 o.17 �.15 с.с� :;.оо о.37 _о ie =п_39 54.51 г,_68 ^ = 95.96 О.оS ].ц а.аб _ _, _ чоtвl 4о.47 I22.85 Ь�•Ь9 �- � С•44 ?5г.22 о.1о о.зо а..._ З.ао З...о с.�1 .2 eriro 58.?'4 '�.бг 33г.6. 4,76 ;.3- 673.�Э ' о.бб о.8о о.о1 о.01 i.E2 _опчбп у�_;е 1,�=.,9 7'1.ад _ = г4г.ц9 _о3 о_Зг с_1Э _ _ о.5ц тосаl 93 +ц �п4 ьо 4io 4о 4.-6 _�16 61 о,9р о.99 o.ol С.ог 2г_ ТОтАG n Lасв1 'г8.92 Э41.55 396.СЕ ^.53 3.,'S HN-3� 0--3 0_ВЗ о-95 п.01 О.о1 - гагеlдп 54.б9 �96.го 1ог.4г _ _ 3+=.46 �_i3 о_45 с.г5 � = с.д= гом,� 13з.а1 ��.cs '-Л-пэ csa_ а_.7s г,1Ее.гз с.9э 1.гв о.о1 г.е2 49 о.а+ гдяю� тотдг л-В.скn г�гвi 19,7г 165.�1 б2г.бс бо5.95 8.61 �.51 1,мг7.s4 o.4n - -.бп а.ог �.о1 3.5б Porelgn Эг,8о 1б4.51 4г6•Г,7 ц8.71 � _ 9о2.69 0_2Э J_39 1._3 а.53 i _ г_1д во.а1 112.52 Э29-52 '_.049•27 р84.бо 8.г�- 5-51 г�393•ОЗ о.2"I С.79 2.54 2.13 с.Ог 0.01 5.76 1о0 1� гипе _� ��4 LYp�NESTA �IVE �ITIES WATEA 3l1PPLY Р?ОЛйС'15 РRОЛ{СТ COiT C6TINATE6 БАИРRЛ�9д eiacal Уевг e.nding ➢есетьег 31 19?+ 1Э'S 1уё 1у^7 1у]? 19?у 1уПо ^otal 197Ч 17'+5 =Э^6 '_97'г 1� 1979 195D Tota1 Perceoftage гяпд Tota1 _.._____'.__.�_____________________`__ КиF1сль х 1.OW�C00 ____�___.'___._____.___________ Д '_____ _______________________________________".._ U5 х 1�000�000 _.____.___�.___.__.___..___ __"__'__.,.____.__ й. CIVIL йоАЧS AGD AEwT£L �� А.1 IntaRe 'освl 3.30 11.55 1�.6о 7.7э 4о,15 О.С1 �.оЭ �.04 0.01 П.09 .orelgc = 19_55 = = 19.55 _ ^_о5 = = о_о5 Тоtь1 Э.Эо Э1.1о 1].60 7.70 59.70 п.о1 0.05 0.04 0.01 о.14 .z югеиоlвь гоовi Foreigл Tnkв1 .Э Tseatment игогкв �оса1 Э5.75 55.о0 22.о0 :1г.75 с.09 о.13 о.05 д.27 _отв.аг. 7в.и ;7.5о _ г9.Ы о.17 о.1ц _ о.31 тоtвг 1о^,.еб 1�.50 гг.оо г42.36 O.z6 О.г7 о.05 о.58 .4 С1еаг к11в Loce1 13.г0 ??.5П '/.15 4�.05 С.ОЭ 0.% о.С2 o.1z .orelgr. 1о_35 _ - 10•35 П_02 _ _ 0_С¢ Tota1 2?.55 "г7.5о 7.15 58.20 О.оS 0.% O.re о.14 .5 тллт�пб ьгиг+.°п 1.9ti д.зо г.2о 7,48 o.on о.ог о.т о.ог Foтeign 31.?4 _ _ 31.71 С.06 _ _ 0.0$ Tota1 33-72 Э.Зо г.гС 39.гг о.09 о.о1 0.01 0.10 .6 stьгвБг tьпко се1 FarerEn Мtя1 .7 тгапьтlваl® тlпа госвl г8.45 47.3G 75.75 0.% о.11 о.1С гстеlбп ВЧ.оС _ В4.со э.го _ о.го ^огеl цг.4ry цl,3о 159.75 о.г7 о.ц п.38 .е маггlъиtlоп ьуыкт гасвз 44.54 БЗ.Ьо 1гВ.1L о.ц о.го 0.31 тогаеп 103•5о 17.38 1zo,88 o.z5 о_& с.г9 гоtаl 148.дь 10о.98 г�9.оz �.36 О.г4 о.бс .9 Бегvlт с мeetlons и1сЪ ивсет ыъетв гогаl о.эз э.66 о.ае О.гг о.ц z,zo о.оо э.оо о.о1 о,осэ о,о0 О.о1 яотеl� 14_Эг _ 1L_Зг _ _ г8_64 о_о4 ^ О.о3 = _ о.% Sota1 14.65 0.66 15•20 С.г2 0.11 Зо.ец С.04 0.00 0.04 0.00 о.00 0.0В тоТлi, й tocal 3-63 1ЭЬ.1Э ?35.1В Э9•"=7 о.ц 414.Э2 о.01 о.Э3 о.57 O.og 0.о0 1.оо Forelqп 14_Зг Зг1.25 85•20 в _ 424.^^ 0_ОЧ 0.77 0.21 = = 1_G2 Tota1 1Т.Э5 457.38 Эг4•38 39.27 О.ц 839.09 О.оS 1.г0 а.78 о.о9 О.оо 2.а2 З9 В. MSCELLAPEO[F в.1 tdotoe �кhlсlеа Loca1 Foreigд i_о9 5_0(' С_ог 0_о2 Тога1 5.09 5.� 0.02 0.02 ,2 Laboratory еqиlдпггt ал3 теггт гевг ьепеп гогаl о.17 2.го г.37 о.0о о,т о.о1 еогетБа 1_3г _ _ � 0_0о = = о.оо тогаl 1.Эг о.17 2.20 3.69 С.ао О.оо о.с1 о.о1 ,Э т'гкце ьагЪ поввек иоаl 1.1о г.га 3•зо о.оо О.т o.ai Fbтelgv = _ _ _ _ _ тотеl 1.1� г.2� Э-ЭО О.Оо О.сг О.о1 .4 wataт нcrks о£У�се, lаьогагогу, �л.геnоо.яев гогя,г 2го З.Зо 5.5о о.о1 о.оо о.о1 Foтсiбn _ _ _ _ ' _ 'ro:a1 2.20 3•30 5.50 0.о1 0.00 П-0- .5 Sиff иоив.пg хя1 ц.оJ 15�55 13-75 40.]0 О.С2 0.�4 �.о3 0.09 Poпiqn _ _ _ _ _ _ _ Totv1 ц.00 15.95 13-75 40.70 0.02 0.04 0.03 о-С9 .6 апгге госвl Poкeign Totai тстаi в wгаl ц.оо 19.цг г1.4у 51.Я7 о.:>z о.о5 о.о5 о.1г воге:дп 6_4о = _ 6_4о С�ог _ _ о_ог тоtаl 17.4о 1Э•4г г1.45 58.г7 е.04 О.оS о.о5 о.1ч г тт.Аг д+ в госаl 1b.63 155•55 г56.63 39•г? 0.11 466.19 о.о3 о.35 о.бг о.о9 п.оо 1.12 ястгlЕп гэ_7г згi.гs ы9.го = _ 43i.г7 0_о6 е.?? О.ц _ _ 1_04 ъгьl 35 35 Ч�Ь.8о 345 83 Эо г7 о.ц 99?.ЗЕ с.эЭ 1.15 о.83 о.о4 о.оо г.16 41 с. ех-1ие�енlпс С.1 Deta'1ед впglлеетlvg 19.'!? 3.48 23: 0 0•о5 0.01 0.06 FarelEn `}-'_.48 23_12 115-60 0.22 0_О6 П.28 чъгв.l ц2го z6.6o г38•Во �._ о.о? о.34 .г �опвtтигг>оп sидемвlоп гггьl г.31 9.гт z4.8o �.о1 о.ог о.СЭ о.сб ' Forei¢Л 4,97 г0_dq гг�46 48_2ri 0_01 0_05 0_05 O.L о-.ь1 7.18 3о.14 35.бб 73.�+ О.о2 о.ст/ O.JB о.17 TDЛAi 'ь Lосе1 19.�2 5-�9 9.г7 1г.гг 48.DD o.oS о.0г о.С2 O.D3 о.12 xcre1�. qz.4G г7_99 гС_С7 г2`46 16=.°о С_гг o.v7 о_о5 с_о5 о_39 'Nts1 1� со -3 '8 ЗО 14 Э5 65 -.80 0.27 0.09 о.% 0.05 0.51 1С TbfA1 .4.BrC Lacu1 19•7ё 20.4г 164.82 269.д5 Э9.г7 0.11 51л.1Э �•05 П.05 O.�iC С.65 �.09 0.00 1.24 ForeiEг �.46 48_71 y-2.L 111,66 = _ 5Э4.9Г о_22 0.13 п.82 э.гб = _ 1_43 тоtвl 1г: ^ ЬЭ 13 �об °4 �г1 51 '9 2" о.ц 1 109 w о.г7 о 18 1.гг С.о1 о.о9 о.оС г.б? S1 г. im^.1Усьхопчs п.1 иц•s1ca1 - 3•66 38.пб о4.16 9.8г o.G3 11G.55 о,�1 ..09 J.15 0.03 0.0� D.28 I�brelgn 5.18 8С_Э1 ?г`30 _ _ 1%.79 0_С1 C.2D С_э5 = = С._6 тotui 8.84 11Э.19 96.46 9.Вг 0.о3 гг4.ц� о.о< о.29 С.го о.а3 о.оС о.54 .2 Рг1се гагаl '1.Вп г55 ЕЭ Э33.34 6о.72 О.г' S65.96 о.оЭ '�.iЯ о.Но о.15 О.Оа 1.ЗЬ Fятеiдп Э_94 197_55 _ _ _ ^=.44 О.СЗ O.SS 0_18 = = 0_бб 1 n 7 347 �Ч 47� г9 бо �гг с г- дЗ� �0 о об с.�Э э 93 о.15 с.оС °.ог ^оТРг д госй 15.4Е 199.5� Э;Г.SU 'ГV.54 �.� 6°_2.31 О.с4 С.4] 0.95 0.18 а.о0 1.64 еогвiВп 15_1г 2h.36 :6.25 _. = 379.23 0_G4 G_6° 0.23 _ = 0_ц.' ^ га1 Зп 5Р +66.4� 4о� �5 ?о 5а о.г4 _ К1.5L .�Э 1.18 o.18 .С� г 5б 49 схлгт гагл?, А+в+с«n с.°т1 �9.72 35.8А 363-39 6В�.35 iп9.д� г.. �,196.50 о,о5 о.�у с.5� 1.Ео о.г7 с.оо г.89 Fогевьи 9?.ЧЧ 63-83 ЕоЭ.Э8 гэ�.а1 _ _ �'Гц.го _ г_'�] � � _ = 2_Э5 2осв1 = г.го 99.71 S;°.Э� ?]5.г6 1осз.а1 С.35 2,_7о.7о о.г? О.гб �.34 г.оЧ o.z7 о.о0 5.23 1оо � .�иое 3, 1Э74 -N➢цIE53A _IVE СТТ1В6 [i:,'�F SUPPLY PRG.IECTS FROJE'Л C�JST ESTIMA'>✓ 3UмАААУ Percoentege Fiscal °еаг епдiгггя МьтсИ 31 19;; 1976 1%7 1у7д 1%9 1980 19Р.1 Tota1 1%5 1д7Е 1д;7 1o7g 1%с 198J 1991 I¢tв] £ Ста¢д Тога1 ,___'-______'_______________ _ цР a:ie х � С., ________- ' _____________________ _______________________________ U` А, C2VII. NORP.2 WI^Н RF.Li1TEL ' IR1 ей➢ Е9ЛРАffi3Т А.1 intake Lпгт1 =7,1Э gE.35 ��3.60 7.'0 164.73 �.% 0.20 п.�1 0,01 р.Э4 гопiап = 40.63 ` = 1с,33 = с_io = = о.1с '_rotьl г7.13 327.18 43.5о 7.7о гС5.б1 o.G'7 0.30 с.ц о.С1 о.47 .2 АогеМцеs гос�1 гБ,г5 7.15 б.3Э 41.7у о.% 0.ог о.�1 0,1с Forelg¢ = 21_85 = 21_Ь5 - 0_05 У о,СS хогеl z8.25 г7.�0 6.39 ЬЭ.б4 о.С7 о.т с.о1 о.15 .� _гев.tтвпt ыотКа Loca1 4Ь.4"I 128.у3 101.31 г2.00 30о.31 J.11 G.31 0.24 с.05 D.71 ггrеlqг г_88 137.ОЭ 50.95 = гоа.э2 о.=1 а_3Э о.15 = O.L9 Тгtа1 5o,s5 26Е.ог 16г.ffi гг.о0 5о1.=_з �.1г с.64 о.39 о.о5 1,2о .4 тввт wо11ь 3ося.1 Ьг.7о 7г.со 7.15 116.В5 о.15 о.19 О.аг с,зб _отегt;п 1с_Э5 = = 10•Э5 о_ог = = о_ог motal 73.^5 77,о0 7,15 157.2� O.i7 С.19 �.сг o,3b .5 Fитv+г6 etat-on осзl г.2С 1Э�-д 21.80 2.г0 jгj,35 0.01 0.03 С.05 �,01 O,iO _oreign ` 1т.93 � = 102.93 _ _ _ _ о.г5 1Иtа1 2,20 '_'1.: 1 г=.бг. 2.20 14г.Э- 0.01 0.28 0.05 ].01 D,35 .6 5tora3e tanis пявl 1,1С 66.Ьб БЯ.Ос 155.76 �.00 0._7 0.21 0,38 FarciEV _ 7.25 � 7.25 _ 0_02 = 0.02 Sо4ч1 1,10 73.91 fl8.00 163.01 �.00 0.39 с: 1 0,40 .? Тгапвст.iввlоп тчiпь ' са1 5г,21 уь.83 147.�4 о,-г 0,>��� 0.36 есхеlЕд 555.16 гд.18 583.34 1.34 о.гr/ 1_41 тогц 6ог.Э7 >23•0'_ �3С,38 1,66 �.31 1.77 .8 nls�мtutl�п вув^.ет исаl 15!1.Р3 г71.71 д3о.54 о.Э9 с.65 1.о4 еотсiеп 5/z.'S 137.v до9.67 1_61 с_33 1;?4 тоtаl ЭЭ1,58 106.83 1,г4о.41 г.о� о.98 г.95 .9 rvlce с ect!ons еиги аач�ет теtегч l,ocal 4.zg ^,(ц 9.4о 7.7о y.G1 1.43 37.пЭ с.оо о.03 О.н' o,oz о.е1 с.оо о,1о яаге,Еп 2Ii6.z7 _ г36.39 � _ _ ч62.65 � _ о.=6 _ _ _ 1_15 т1ч1 25о.56 '+.61 гч6.2у г.'с }.б1 1.g�S 519.75 г�59 О.с3 г.бо о.ог о.о1 с оо 1.г- ^_oT4L А Lcca1 111.дь у3Э.Е2 �14.$L д6,7j 5,61 1.� 1,Ч63.54 С.>6 1.kг 1.74 О.ц 0.01 С.ОО 3.54 corel6n г4_,15 15�_3.г1 ��6г.64 = _ _ �_,оо с�60 3._;г 1_ц = _ = 5.46 хь4ц ЗЕо,19 г 1Э1.Nд 1,177.19 46.75 5.51 i.щ3 3 7г3•`,4 о.86 5.=+ 2.85 �.11 с.�г о.сС 8,9•а Эу р, nixscer.umO�mF F.1 Natпr кhiсlвг ев1 For=_igп 34.55 34.55 �.с"! 0.0'I Tots1 34.55 Зц.55 0.07 С.07 .2 L¢ЪопаLегу equlpment габ meter :est bench асаl 4,41 4.40 6.81 �.01 O.G2 0.03 яогеigл 6.Э3 _ _ 6.ЭЭ о.о4 _ _ о,04 тоtьl 6.33 4.4= 4.4о 15.14 с.о4 о.о� о.�г о,т, .3 £аъliс еьtд пошеа г,осьl 9•9о у•Ь`s 19�58 �.иЗ о.сг О,оS £о=в1�л _ _ _ _ _ _ хогаl у.у0 o,6g 19•56 о.С3 о.ог о.о5 .4 аьtег „�- ае£гсе, lьъоrегоrу, иarenouaes rлсаг 4.1В ц.пЭ 1�,Оо 4o.zG с.о1 о.с5 о.оз c.og Fот^1е� _ _ _ __ _ _ _ _ тсц 4.гb 25.uJ �,,.т� .�,.ш с.а1 ., п.�3 о.оч .5 Staf? Ъwа1¢Б Loca1 55.47 70.5Э 50.0о 1?6,о� С,12 0.16 С.13 U.41 Foreign ` ` _ _ _ _ _ _ 'гогв3. 55.4'7 70.;3 5о.оо 176.w п.12 о._6 о.13 о.41 .6 аьгтв госаl ?6.5� Эе.Sс о.о9 с,Су готеlЕп гг.75 г8.75 п.а✓ с.оГ тнаl 67.25 67.25 о,16 о.гб TOTAL р �cs1 5у.65 '-СЧ.9' 113.58 '_8Э.ц о,13 с_ с.г9 о.67 eoгeign Чо.88 � 28.75 Ь4.Ь3 С�ц _ О.о7 о.18 �иtа1 1о0.53 1:g.уг 142.33 35г.7`-` о.2ч о.2> о.36 с.35 L 1'о^гг ,� + в о�а1 1�о.ё4 ЬЭ3.54 ВгЕ.3г 46.75 5.Ы 1.98 1,746.бо о.3= 1.6'+ г.а3 о.11 с.01 О.с� ц.23 .Ore'цги 290.>3 1 5� Ц0.г1 4о�.39 = _ = г 3� 29•ЬЗ 0,71 З•'O- 1_18 = _ _ 5.61 тоtаl 4b0.�2 г,г41.75 1 319.51 46.?5 5.Ы 1.5v° �и,о76.32 1,1о 5.?9 3.21 п.01 о.оп у.9г 4д С. ENGL�GERItT' С.1 Dewiled ег6`nreriog Iooa'_ 85.Q� 14.Э4 1с0.0о 0.2С D,04 U.24 воrelдп 4оо.оо 1оо.�о 5с�.ос о_qr о._4 1.и ^огаl й85.о1 ц4.9Э боо.оо 1.17 о.г8 1.4g .г сопвгпгсг�оп sихгльiоп госвl 9.э6 4о.т 5г.оз s+7.oo о.аз о.оу о.1ц п,26 Fгreiqп 21_')1 9].ОЕ .ЭЗ 205.С0 С_с6 J_г2 с._22 о.50 '1ata1 Эо у7 1до.�7 15' 96 315.ос о.т о.31 0.36 0.76 тcrw с i�ca1 8=,.т г4.Ч5 4о.о1 57.с3 гг7.ое о.гс о.т, о.о9 о.14 о.5о eere!� 4оо.оо 1г1.оi 9о,об 96.9Э 7и:.оо с.д 0.3о о,гг о,гг 1.г1 ^пtя� 4В5.с1 145.76 13о.о7 г53.46 ог5.оо г.тг с_3'+ о.3г о.аб е,гг 1с xcrw н+ р+ с уогв.l а5.о1 �95.64 733.55 895.1, 46.75 5.б1 1.99 '1,95Э.69 о.го о.цб _?б г.1,' о.ц о.о1 с.о0 ц.7_ i<оre1Еп 40o.w 4ц.в4 163i е-г7 5=8•3'� � _ _ Э�_7•бз п_у7 1_о1 з�94 1._о = _ _ У_3г ^оtв.г Jd5.c1 бс6.59 г.37-.дг 1.473.4� �ь6.75 i.61 1.Э.5 4,9)1,3г 1.1? 1.47 5.7с 3.5Г о.11 о.л о.со 3г.о3 5Э n, соит::исва^хре п.1 rц nice_1 �гя1 4z.55 17336 го7.03 11.бе 1.4о 0.5о 436.67 о.г1 еАг о.4у О.�у о.оо С.о0 1.05 Fo-e'_� 72.51 387.W 1г2.26 = _ = 5д2.Л п,15 о_93 о._9 = _ _ _ Тоtц 115.19 560.дг Эг9.59 11.Е6 1.40 0.50 1,019•01 П.г9 1.35 0.^? С.С3 О.Сс О,ОС 2.ц; ,г Ргiгь глглl 1г�.9б !,W9.93 �._ 1G.55 4.48 г,о36.'_6 о.3-' 1.'1 's.6Э с.1� О.аг о.о1 4.дЕ вптгs 1'-3.N9 пЭS.=З 3i2 5Е _ _ _ 1 4�_5.68 о.3= 216 о_9ч _ _ _ З.ц тоtвl 2$1,д5 1 61С.г5 . 1-с'.54 'r2.,� 1о.55 4.ц3 5 ц?_.уц 0.6Э 3.б^ 3,5' о.17 0.02 с.о1 9.2'г тотыу n Р�i4.чо -,2%.п1 Э3.9; 11.95 4 5д г,45?.93 о.43 2.13 3.1г 0.2о .. _ о.о1 5.9- 'о.бц Fe-e:gn 1а6.+е 2s 96.г' 51`.4г � ^ _ _ ууВ.п 0_iiп З_0'-J 1,2Э __ _ _ �,_д1 тм.л1 367.�4 г 1�о.57 1 8_г+з ез.95 '-1.у5 1,у� 4 451.ог о.ц� 5 z2 i.,5 в.гс о.сг о,01 1с.�г 47 Glucs ТоТц, г. + 0+ С- D го^лг 85 о_ ЗЬЕ.26 1,6't7.Э5 2,1bг.16 13о-7с 17.56 6.W 4,4С6.Е2 о.'_о J.85 З.д? 5.'У 0.3' с.:'3 С.о1 1с.бг тлаiБп 4о0.оо 5%.44 г уг�.54 1-i0З.74 _ _ _ 5 о, д5.^г C.Z -_5с 7_СЭ г.63 = _ = L'_13 тtц 4L'S.о' >Гу,р- ц,у4г.49 3,�?5.9D 13с•7С t�.'>6 Ь.Эб 9,44я.3'� 1.37 г.35 �с.у 7.92 о.31 с.09 D,a3 г2.75 1оо 6 .гигв 3, 1%�i ANNEX 6 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS IMPLEMENTATION SCHEDULE CALENDAR YEARS 1974 1975 196 1917 197 Months 0 2 4 6 10 12 14 16 18 20 22 24 2 28 30 32 34 36 38 40 42 44 46 48 50 52'54 1. JAMBI - Intake and treatment works mvm as n uM OW".10 MIFm wra man vi:me '"M Ms" ss .mm wm"w mno onces: 2. SAMARINDA - Intake and treatment works Im Is M M w sea aW6 woma Wmaa MA 2MM MAW WRV AMM m M 3. SAMARINDA - Material and Equipment for r aa' flocculation and settling tanks '" er u 4. JAMBI, SAMARINDA - Material and Equipment for intake and treatment works s ....a... S. MALANG - Intake and treatment works .m memmm 6. PURWOKERTO - Driffing of boreholes I s 7. MALANG, PURWOKERTD - Material and Equipment -y mu rr. for treatment and pumping plants Igee 8. JAMBI, SAMARINDA, MALANG -Civil works for m mm asmaim. .aus: u transmission and distribution systems smamonmima r JAMBI, SAMARINDA, MALANG - Material supply M &K s.hWIWANrw 9. BANYUWANGI, PURWOKERTe -Civil works for mmlm M $a M transmissien and distribution systemsn BANYUWANGI, PURWOKERTO - Material supply .... A IAMob 10. FIVE CITIES -Civil works for storage tanks, bath m-' Amn . IWIe. w . v .av houses, office, warehouses, staff-houses "'mI,m ees-y : :I: W:W O WM A s.v if. FIVE CITIES - Water meters, motor vehicles, MrA W" laboratory equipment III eoil*II LEGEND L mlmNl Survey mamsl Preliminary Design 4 a 1i Detailed Design looAnpA4 Tender Documents easases Tendering AWAlf Evaluation, Approval & Award wm va Delivery of Equipment & Materials vooft) Construction & Installation World Bank-8536(R) ANNEX 7 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Estimated Schedule of Disbursements IBRD Cumulative Disbursements Fiscal Year at end of Quarter and Quarter Ending US$ Million 1975 March 31, 1975 0.40 June 30, 1975 0.60 1976 September 30, 1975 1.00 December 31, 1975 1.50 March 31, 1976 2.50 June 30, 1976 3.60 1977 September 30, 1976 3.95 December 31, 1976 4.20 March 31, 1977 5.35 June 30, 1977 7.30 1978 September 30, 1977 10.15 December 31, 1977 12.70 March 31, 1978 13.95 June 30, 1978 14.30 1979 September 30, 1978 14.35 December 31, 1978 14.40 March 31, 1979 14.45 June 30, 1979 14.50 September 9, 1974 ANNEX 8-A Page 1 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Population and Water-Demand Projections 1. Population Projections 1.01 For the population in Indonesia and its main islands, the Govern- ment's Central Bureau of Statistics, Jakarta, has provided information on actual and projected growth rates for the years 1961-1971 and 1972-1981. The actual and projected average annual population growth rates are shown in the table below. Average Annual Growth Rates Actual Projected 1961-1971 1972-1981 INDONESIA 2.12 2.37 Java-Madura 1.94 2.14 Sumatera 2.90 2.94 Kalimantan 2.34 2.67 Sulawesi 1.91 2.65 Other islands 2.02 2.53 1.02 For the population in the five cities and their provinces, sources of information on actual and projected growth rates were the Government's Central Bureau of Statistics, the provincial and local governments, urban development plans, where available, and a Regional Transport Survey con- ducted by the Asian Development Bank. The consultant has made three sets of projections for the population growth of each of the five cities, as de- scribed below. (a) Low series - The projections are based on the historical relationship (1961-1971) between the changes in the population in the city and in its province, i.e., the city would maintain the same percentage of the increases in population of its province as it did historically. (b) High series - The projections are based on the assumption that the population in the city in relation to the population in its province would increase faster than in the past. The increase ANNEX 8-A Page 2 reflects the growth potential of the city based on present trends, improvement of communication facilities, and expected industrial development. (c) Medium series - The projections are the arithmetic mean of the low and high series. 1.03 The table shows the projected average annual population growth rates for each city and its province for the period 1972-1981. Low Medium High Province Series Series Series MALANG 2.81 /a 3.59 4.36 East Java 2.62 PURWOKERTO 1.55 2.25 /a 2.95 Middle Java 2.59 BANYUWANGI 2.41 2.54 /a 2.66 East Java 2.62 JAMBI 2.51 2.62 /a 2.73 Middle Sumatera 2.63 SAMARINDA 2.41 2.93 /a 3.45 East Kalimantan 2.31 /a Indicates the selected growth rate. The consultant has, in agreement with the local and national governments, selected the growth rates indicated above for purposes of the water demand projections. The growth rates are assumed to follow the same pattern for the whole master plan period. Annex 8-B shows for the study area in each city the projected population during the master plan period, and it also shows the projected population in numbers and percentages to be served by service connections and standpipes. 2. Water Demand Projections 2.01 The consultant experienced difficulties in establishing reliable data for past and present water consumption in the five cities, due to insufficient and intermittent water supply, lack of water meters (Jambi ANNEX 8-A Page 3 and Samarinda), water meters out of order or inaccurate, and incomplete records. The study of existing records has been supplemented by field surveys which have covered relevant consumer classifications. For the field surveys a representative number of connections with working water meters and continuous water supply have been selected, and the results have given an indication of the average water consumption for the various consumer classifications. In cities without water meters the estimated consumption has been based on production, number of connections, number of people per household, and comparable data from other cities. The estimates of water consumption for people who are not connected to the water supply system have been based on collected data as to daily quanti- ties of water purchased by vendors or hauled from dug wells or other water sources. 2.02 Annex 8-B shows projected residential consumption in liters per capita per day (1/cd) for service connections and standpipes, average day consumption for various consumer classifications, unaccounted-for water, maximum day production and peak hour demand. Projected residential con- sumption in 1/cd for service connections varies from city to city and has been based on such factors as existing estimated consumption, availability of alternative water sources from dug wells, and the ability of the customers to sustain the water rates. The 1/cd consumption from standpipes projected in the feasibility reports varies for the cities, but since the variations could not be justified, the consumption is assumed to be the same in the five cities. For each of the other consumer classifications the unit demand has been studied and the projected daily consumption has been based on con- siderations of existing and future industrial, commercial and related activi- ties, including a survey of each type of consumer carried out in each city. In the feasibility studies, unaccounted-for water as a percentage of the water production varies from city to city but in view of the uncertainties it has been proposed to apply uniformly 30% for FY 1975 and 1976, 25% for 1977 and 1978 and 20% for the succeeding years. The decrease to 25% in 1977 should reflect the initial results from ongoing rehabilitation and leak detection works. 2.03 Maximum day consumption and peak hour supply are the base!s for the design of the water production facilities and the distribution system, respectively. The factors applied for computing maximum day consumption (Max. day: average day) and peak hour supply (peak hour: average hour) have been arrived at from field studies for Cirebon (to be included in the Swiss project). These factors were then adjusted to the particular conditions in each of the five cities, considering the variations in the consumption pattern and the relationship between different consumer classifications such as industrial and commercial versus residential. June 3, 1974 4 INDOЛ]ЕВц+ яихн:х 8_в FIVE CITIEB WАтЕА SUPPLY PAOJECT6 POPUTATION AflD WATER DEMAttD PHOJECTION6 Aesidentlal . Papulat+_on 5етчед Ву рет Неад Water Сопь umption and Productlon Coneumptlon _ AveTagc ➢ву тоtаl conneotlone staпa соп„еспопв соппес_ scana-� xealaentlal со�вегсlаl " pipea pthers Tota1 Cna.ccounted ppoduction . Factor Production Factor C1ty Уеах Populatlon апд Ьtапдрi ев tiц.s в Connections 5tand ipes алд Indvstrial Consumptlon Por г Snpp]у Nos of Noa оР Nos о о£ - J -2'Г total total- totel 1;�сд 11.7ед тЭ/д roduction 1°З�д produetion го3�д production т3Эа production °1 Гд productian 1°3�3 roduction т3�д �Г` Av. да�� n3�d 1�s Av. hourr� '17s 1 г 3 4 5 6 7 $ у 1о ц 12 13 14 15 гб 17 г8 19 2о 21 г2 z3 г4 г5 26 г? г8 г9 Зо [ЛALANG 1972 422,000 9$,10п 23 30,000 7 128,100 30 110 1D 10,791 47 300 2 930 4 2,999 13 15,014 66 7,623 34 22,637 262.0 76 k72,oo0 g8,1oo г1 37,7оо 8 135,8оо г9 115 го ц,z81 5о 377 г 949 4 3,239 14 15,846 7о 6,79г 3п 2г,637 вбг.о 1,11 г.3о Э4о.6 81 542,ооо z25,7o0 42 67,5оо 12 z93,го0 54 135 12 go,k7г 63 81о г 1,боб 3 5,777 гz 38,664 Ао 9,666 го 48,д3о 559.о 1,t3 54,бг0 632.о 1.35 755.о 86 6гг,о00 298,60о 48 1об,4оо 17 405,о00 65 15о г4 44,788 66 1,49о г 1,713 3 6,ko9 9 54,4оо 8о 13,боо 2о 68,ооо 787.о 1.15 78,1уо 905,о 1.ko 1,to2.o 91 713,о0о 41о,9оо 58 г43,100 го 554,ооо 78 1бо 16 65,747 68 2,г90 2 2,053 2 7,966 8 78,о56 8о 19,514 2о д/,570 ',129.о 1.18 115,100 1,ЭЗг.о 1.45 1,637.П 96 839,Оп0 513,400 61 167,800 г0 681,200 t31 168 18 86,258 Ь$ Э,020 2 2,324 2 9,438 8 101,040 80 25,260 20 126,300 1,462.0 1.19 150,300 1,?40,0 1.50 2,193.0 г0о1 935 оо0 617 zoo 66 187 00о го 8о4 гоп Вб 175 2о 1о$ о17 6$ 3 7цо z 2 528 г 13 395 8 �27 6$о 8о 31 9?о zo 159,бо0 1 847.о 1,z0 191 52о 2 2г7.о 1,55 г 86 .о оке 1 72 211,Ооо ,ооо 3 - - ,ооо 3 - 3 2 - - 3 5 г5 о 795 2 93 Э 1,z 15.о � 76 228,поо 1о,3оо 5 13,1оо 6 23,40о ц 8о 1о 8г5 38 131 6 431 2о 1г5 6 1,51г 70 648 81 г58,ооо 44, о0 17 45,8оо 1В 30 г,16о 25.о 1.15 г.3о 32.5 9 90,7оо 35 10о гг 4 493 47 55о 6 2,Збо г4 325 3 7,7г8 8о 1,932 го 9,66о ц2.о L 2л ц,720 139.о 1.50 19б.о 86 г94,0о0 72,600 25 67,у00 г_3 140,500 48 115 t4 8,35о 48 950 5 4,279 24 445 3 14,024 80 3,506 2D 17,530 203•0 1.20 20,010 2Ц4.0 1.50 Зоб•0 9� З33,о0о у3,7оо г 77,5о0 г3 171,гоо 5г 1г5 гб ц,71о 47 1,г4о 5 6,237 25 565 3 19,75г 80 4,938 2о ?4,690 274.о 1.2о 29,боо 344.0 1.5о 4г9,о 96 38о,ооо 11z,50n 3о 9г,2оо г4 2о4,7оо 54 14о 18 ц,75о 49 1,66о 5 7,В48 z4 686 г 25,944 80 6,486 г0 32,43о 376.о L го 38,96п 451.о 1.5о 563.о гооl 435 ооо 129 7оа 3о 118 Ооо гГ . гц7 7оо 57 155 го 2о,1оо 49 2,36о 6 9,387 23 841 2 3г 688 80 8 ц2 zo 40 Вбо 474.о L2o k9 1оо 567.о 1.5о 7г1.о лrvсl 197г 7,ооо 5,ооо - - 5,ооо 7 - 335 27 - - 1 г 13 z З о 7 о а 9г о �,г9г �.3 76 8г,9оо 5,1оо 6 5,2оо 6 �о,3оо 1г г33 1о 684 г9 5г 2 357 15 5б4 г4 1,65? 4 1.Зо 35.6 81 93,9оо 9,$о0 1а 19,боо ц 29,4о0 31 136 12 1,328 34 г35 6 617 16 916 гц 3 о96 8а ?10 Зо г,367 г7. 1.15 86 106,бпо 7 оо 13 26,боо г5 4о, оо 38 г4о 14 г,946 774 2о g,87o 44.7 1.17 4,528 52.4 1,37 бг.з 3,9 5 37 373 7 77г 15 1,125 ц ц,г16 8о �,п54 го 5,г7о бг.о 1.г9 6 271 72.5 1.44 87,8 у1 121,ооо г9,9оо 16 35,1оо г9 55,оо0 45 145 16 г,89г цг 56г 8 898 i_3 1,Э38 18 5,689 Ga 1,4г1 го 7,цо 8г 3 1.гг 8,бо3 9Э.5 1.А 124.2 96 137,5ос г7,80о гр 46,2оо g4 74,о0о 54 15о 18 4,164 44 832 у 1,о6г ц 1,590 16 'Г,б4В 8о 1,912 2о 9,56о цо.б L23 11,759 136.1 1.58 174.8 2001 155 7оо 37 Зо0 24 5 Ао0 38 97 10о 62 155 г0 5 786 46 1 196 9 1 z21 1а 1,925 15 1о 1г8 8о г 532 zo 12 ббо 1цб.5 г.25 �5,825 гВ3.1 1.65 241.7 ц,мвг г97г 1,ооо ,5оо 3 - - 5оо 3 75 - 33 - - го 76 г77>0о0 5>боо 3 58,4оо Э3 64,000 36 95 1о 53б ц 58ц 23 34о 14 294 12 г>754 7о 751 Зо 2,5п5 г9.о г.1о 1.Зп Э7.7 81 го2,п0о 74,боо 37 5о,800 25 125,4о0 62 1оо 12 'Г,457 56 610 5 г,375 1о 1,134 9 1о,576 Во 2,644 20 13,гг0 г53•0 L20 15,864 183.6 1.50 229.5 8б 23о,ооо 1п4,боо 45 65,1оо г8 169,7оо �4 ц5 г4 12,о27 56 912 4 2,787 13 1,514 7 г7,24о 80 ц,31о 2о 21,55о 249.0 L 2о 25,Е6о 3Со,о 1.50 374.0 91 261,оос 137,Эпп 53 б2,4оо 24 199,7оо 77 125 1б 17,164 55 999 4 4,Воо 15 1,837 6 г4,Воо 8о 6,2о0 20 31,000 359•о i,20 g7,20o 4Э1.о 1.5о 5Э8.о 96 г98,ооо г5о,г0о 51 6о,7оо го г10,gо0 71 140 18 21,огА 49 1,о9г З 9,$9о z3 2,о2г 5 34,о32 Во 8,508 2о 42,54о 49г,о г.го 5г,о5о 59о.о г.5о 739.о 2оо1 340 ооо го3 1оо бо 54,Зоо �6 257 4оо 76 155 2о 31 48г 54 1 О$Ь 2 l1 377 го 2,455 4 46 4оо 8о ц,боо го 58 ооо бд.о 1.2о 6 9,600 805.0 1.5о 1 оо?.0 SпмААггтА 1971 га оо0 7,ооо 7 7,ооо 7 1,ооо 1 7 531 - 5 - 7 - 335 - 1,ооо г5 цб,о0о 8,1па 7 9,8оо 8 17,9оо ц 15о 1о 1,218 4о - 98 Э г57 5 Ь8о гг 2,153 70 угЭ Зо з,аГб З5.6 1.16 1,3о ць 3 80 133,ооо г7,5оо ц г2,0оо 17 49,5оо Э9 154 12 4,г31 5о г64 Э 8г5 го 1,47г 17 6,792 8о 1,698 го 8,49о 98.3 1.17 9,93о ц4.9 1.36 133.i 85 15г,ооо ц5,4оо 30 28,боо 19 74,ооо ц9 16о 14 7,269 5г ц01 3 1,6zo 1г 1,86г 13 11,152 80 2,788 zo 13,94о 161.3 г.19 гб,59о 192.о 1.42 zz9,1 уо 1'74,ооо 63,500 36 35,поо г0 у8,5оо 56 167 16 �о,596 54 56о 3 2,449 1г г,гг8 ц 1$ 2 8о 8 го 1 г о 95 1у9,ооо 86,0оо 4 k3, оо гг г2 5, 3 3>95 9,790 г 9. 1.21 23,95о 277.г 1.49 341.3 3 9 9,уоо 65 172 tП 14,'(87 54 79о 3 3,695 13 г,76о го 22,о32 $о 5,5о8 гп 27,54о 318.8 1.23 33>В7о 39г,о �,57 50р.5 гоор г26 ооо 1о8 4оо 48 54,20о г4 16г 6оо 7г 175 2о 18 97о 53 1 о9ц З 4 988 г4 3>36Ь 1о 28 цо9 8о 7�oz го 35 51о h11.o, .у;л цц д 5i .$ i:6' 6'B.i тОтАг 197г 3,ооо 1го, 12 Опо 157, оо г - - 2,353 - 35 - 1, 3 3,7 7 1,о у 76 1,о75,500 г27,2оо 12 124,2oD 1г 25г,4оо г3 14,544 ц4 1,242 4 г,г34 7 4,9ог 15 22 92г 70 у 823 Зо 3�,745 379.о 493• Вг 1,г28,90о 382,500 31 205,7о0 17 588,2о0 48 47,gBO 57 г,469 3 6,783 8 9,Ьг4 12 66,856 8о 1б,7]4 го 83,57о 967.о у6,65г 1,ц9.0 1,37Е.о 86 1,4о4,боо 535,1оо 38 г94,боо zг 829,7оо 59 7ь,38о 3 11,17� 9 ц,355 9 101,о3г 8о г5,258 г0 1г6,29о 1,46г.о 146,Чц 1,7оо.о 59 4,126 2,099.0 91 1,бог,0оо 725,3оо 45 353,1оо гг 1,о78,4оо 67 1о$,108 бо 5,651 3 16,436 9 13,934 8 144,129 8о 36,о31 го 18о,16о 2,о85•о 214,453 г,48г.0 З,о7о,о 96 1,853,50о 889,90о 48 4го,8оо г2 1,30о,70о 70 г1+1,987 6о 7,394 3 г4,819 1о 16,496 7 190,696 8о 4?,674 20 z38,370 г,75Ч.С 285,я3я З,Зоя.о k,t7o,o 2оо1 г о91 7оо 1,о95 7оо 5г 473 3о0 гЭ г,56g о00 75 184 355 бо 9,466 3 г9 5о1 1о г1 982 7 245 Зо4 8о 61 326 2о ЗоЬ,63о 3 549.о 37о 435 4 гН7.о 5 5о1.о J vesr enaing маrеь 31 e=oept уеьт епа�пе nесетьег 31 гот samarlnaa, � Repreaent the populatioп оР Lhe study влеа on1y. тте 3, гg74 нwиех 9 а1т ge Т цVD0ЯE5IA FIVE CIT1E5 WАтЕА SUPPLY PROJECTS INTERPAL FINANCIAL RATES OF Р.ЕТUАЛI (1п тlцlоп Rupiвha) 19В7- FY 1д75 1976 г977 1978 1979 198а 1981 1982 1983 1984 1985 1986 2004 ЮALANC - Return 0.4% Project Cost 173.г гго.9 1,1гб.о 6г9•4 4.1 3•9 2•5 - - - - - - lncremeпtsl неvепие - - 9о.4 цzs 1зз.1 1зз.8 1зз•8 1зз.8 1зз•а 1зз.8 1зз.в Incremental F.xpense _ ?.9 4.3 9•9 37.6 45•3 55.8 55.8 55.8 55.8 55•8 55.8 55.8 Net Incremental Revenue - (г•9) (4•3) (9•9) 52.8 67.2 77.3 78.0 78.0 78.0 78.0 78.0 78.0 Consumer Contrlbutions о.9 г.8 8.В 18.8 Зо.о 4о.8 47.5 39.3 39•3 28.8 i7.4 6.8 = иет �гт (172.3 (2и.о) (1 1� (6г0•5) 8г�.8 1о8.о 1г�4 ..8 ц7.3 11�.3 1о6.8 9�.4 84.8 78.о� 1987- 1ч 19г5 1g76 1977 1978 1979 198о 199У 1 г 19ВЭ 19В4 1995 1986 гоо4 ялгиокепто - неtитп 4.4� Project Cost 67.9 145.3 4г0.2 179.8 1.4 0.8 - - - - - - - Iпcremental Аечепие - 6.1 гВ.3 4о.9 5L 3 61.4 61.4 61.4 6L4 61.4 61.4 6L 4 Iпexemental Ехрепве = 1.6 3•0 6.8 9•5 11.8 14.3 14.4 14.4 14.4 14.4 14.4 14.4 Net Incremental Revenue - (1.6) 3•г 21.5 31.4 39.5 47.1 47.0 47.0 47.0 47.0 47.0 47.0 Сопаитег Contribntions о.7 4,6 1о.5 29.6 19.4 г9•4 17.9 15.4 11.9 5.1 г.3 о.б = нет веиеFгт (67.2) (142.3) 4�ОЬ•Ь) 12В.7) 49.4 58.1 65�.о �.4 58.9 5г�.1 49п.3 47.б 47.о г984- хУ 1975 г976 1q77 г978 1gl9 198о 1981 198г 1983 гоо4 BAflYUWAЛIGI - Retura 1.3М Project Совt 19•2 41.5 115.5 52.0 - - - - - - Incremental Revenue - 7.0 1о.б 13•3 16.4 16.4 16.4 16.k Incremental Ехрепве 0.4 1.2 1.7 3.4 4•5 5 А 6.4 6.4 6.4 6.4 Net Incremeпtal Reveпue (о.4) (1.2) (1.7) 3.6 6.1 8.3 10.0 10.0 10.0 10.0 Соnвитег Contributlonв 1.1 2.Э 2.8 2.3 2•2 г.3 1.7 0.6 иет вп�Агlт (19.6) (4�.6) (ц4.9) 4� 8.4 1o�.S 1г=.3 11�.7 1о�.б 1�.о 1987- Iч 1975 1976 1977 1978 1q19 г9Во 1981 1982 1983 1984 г985 1986 гоо4 JANIDI - Return 6.9£ Pro,�ect Coat 112.5 г36.2 644.5 474.г 3.9 2•2 - - - - - - - incгemental Revenue - 111.4 140.7 164.1 164.1 164.1 164.1 164.1 164,1 164.1 Eacxementяl Ехреnве = 0.2 3•2 8.5 г9•7 37.1 41.7 41.7 4i,7 41.7 41.7 41.7 41.7 неt гncremental не�епие - (о.г) (3.2) (8.5) 81.7 1о3.б 1гг.4 12z.4 1гг.4 1г2.4 1гг.4 1гг.4 1гг.4 consumer contriъutions 3•5 8.8 19.6 Зо.о 31.8 3о.5 г7.0 z3.z 15.6 6.9 1.9 = 1се�т вЕиеFхт (цг.5) г 2.9) (638.9) (46g.1) 1о.. 7�.8 133•г 15®.9 i49•4 145.6 138.о 1г9.3 12=.3 1г2�.4 г984- FY 1974 1g15 1976 i977 1978 1д)9 1980 1981 1982 1983 2003 SAMЛR2NDA - Returп 3.5`� Project coet 11г.2 78.о бг6.1 468.о 49.1 о.1 - - - - - Incremental Revenue - 63•8 85.5 1о7.4 цо.г цо.z цо.г 11о.2 mcremental sxpense ^ 0.3 1.8 6.2 19.4 г5.г 28.1 28.1 2В.1 28.1 28.1 Net Iпerementa.l Аечепие - (0.3) (1.8) (6.г) 44.4 60.Э 79.Э 82.1 82.1 82.1 82.1 сопsитех contributiona 1.7 5•7 8.2 6.6 6.3 6.3 5.4 г.8 а.3 в ивт в�Fгт 112.г) (7�.6) 62z.2 (466.о) 1.9 66.5 85•6 87•5 84.9 8�.4 8г.1 June 3, 1974 ANNEX 9 Page 2 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Assum2tions for EstimatiU the Internal Financial Rates of Return 1. The rate of return calculations take as benefits the incremental revenues earned by the projects and the consumer contributions for service connections. They take as costs the project costs and the incremental operating expenses net of depreciation and not including taxes. Benefits and costs are taken at 1973 price levels with the exceptions noted below to increase water rates and staff compensation rates net of the annual inflation factor (Annex 15, para 8), which is excluded. 2. The following assumptions have been made in the calculations shown on page I of this Annex: (a) Incremental revenues are based on the projections in Annexes 10-A to 14-A and are the additional revenues resulting from the projects taken at the projected increases in water rates after discounting such rates by the inflation factor applicable to the years in which the increases are effective. (b) Incremental operating expenses are based on the pro- jections in Annexes 10-A to 14-A and are the addi- tional expenses resulting from the project, excluding the inflation factor. They include the projected in- creases in rates of compensation made to upgrade the staffs of the water enterprises, to the extent such increases exceed the annual inflation factor. (c) Consumer contributions for service connections are based on the projections in Annexes 10-B to 14-B, reduced to 1973 prices by the elimination from con- nection costs of the allowance for price contingencies. (d) The project costs are as shown in Annex 5, less price contingencies. 3. The rate of return for each water enterprise on the basis of the above assumptions is set forth on Page 1 of this Annex opposite its name. These approximate returns are: Malang 0.4%; Purwokerto 4.4%; Banyuwangi 1.3%; Jambi 6.9%; and Samarinda 3.5%. 4. A significant factor in the low rates of return under the above assumptions is the generally low level of existing water rates and the ANNEX 9 Page 3 substantial discounting of the projected increased water rates by the annual compounded inflation factor. 5. Tests of the sensitivity of the rates of return to variations in the project cost and operating expense show that a 10% increase or decrease in the project cost would lower or raise the returns by percentages which are within a range of plus or minus 0.7% to 1.0%. A 10% increase or decrease in operating expense would lower or raise the returns by percentages which are within a range of plus or minus 0.2% to 0.5%. June 3, 1974 INDONESIA MALANG WATER ENTERPRISE INCOME STATEMENTS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 197B 1979 1980 1981 1982 1983 Actual/ ----- Estimate ----- ------------------------------------------------ Estimate ---------------------------------stimate------ .-.-.----- Water Produced (M3 000) 8,260 8,260 8,260 8,260 8,260 8,260 8,260 15,000 16,320 17,640 17,640 17,640 Water Sold (M3 000) 5,480 5,880 5,800 5,800 5,800 6,200 6,200 12,000 13,000 14,100 14,100 14,100 % Sales to Production 66 71 70 70 70 75 75 80 80 80 80 80 Number of Connections 12,190 12,500 13,300 13,500 14,loo 15,900 18,700 21,700 24,500 26,300 26,300 26,300 Average Water Rate Rp/M3 5.5 5.5 5.5 5.5 5.5 15.0 20.0 24.0 28.0 34.0 36.0 37.0 OPERATING REVENUE Water Sales 30.3 32.2 32.0 31.9 31.9 93.0 124.0 288.0 364.0 479.4 507.4 521.7 Other Fees 5.8 1.3 1.5 1.5 1.5 - - Total Billings 36.1 33.5 33.5 33.4 33.4 93.0 124.0 288.0 364.0 479.4 507.4 521.7 Less Provision for Bad Debts - - - 0.7 0.7 1.9 2.5 5.8 7.3 9.6 10.1 10.4 Total Operating Revenue 36.1 33.5 33.5 32.7 32.7 91.1 121.5 282.2 356.7 469.8 497.3 511.3 OPERATING EXPENSE Personnel 9.4 7.8 8.8 13.6 19.8 23.4 26.9 32.9 37.9 47.9 53.6 60.0 Electricity and Fuel - - - - - - - 25.4 36.0 55.0 61.6 69.0 Chemicals - - - 8.8 10.3 11.6 13.0 26.7 32.5 39.4 44.1 49.4 Repairs and Maintenance 6.1 3.5 3.6 4.1 4.6 6.4 13.3 23.4 29.1 31.3 33.6 36.1 Office Supplies 0.8 0.9 0.7 1.1 1.5 1.9 2.4 2.9 3.6 4.3 4.8 5.4 Insurance - - - 0.1 0.1 0.4 1.8 2.3 2.6 2.9 3.3 3.7 Taxes - - - - 5.5 0.9 15.1 22.1 40.5 - - Other 1.2 0.7 0.7 - - - - - - - - - Depreciation 16.0 16.0 16.0 16.0 16.0 23.6 59.4 106.1 124.7 125.0 125.1 125.1 Total Operating Expense 33.5 28.9 29.8 43.7 52.3 72.8 117.7 234.8 288.5 346.3 326.1 348.7 Income Before Interest 2.6 4.6 3.7 (11.0) (19.6) 18.3 3.8 47.4 68.2 123.5 171.2 162.6 Interest - - - - - - - - - - 2o6.o 203.3 Net Income (Loss) 2.6 4.6 3.7 ( 0 18.3 3.8 47.4 68.2 123.5 (34.8) Operating Expense as Percent of Operating Revenue 93 86 89 134 160 80 97 83 81 74 66 68 Average Net Fixed Assets in Service (Less Consumer Contributions) 388 372 356 339 320 521 1,543 2,836 3,230 3,043 2,853 2,666 Rate of Return (Percent) 0.7 1.2 1.0 - - 3.5 0.2 1.7 2.1 4.1 6.0 6.1 August 20, 1974 INDONESIA MALANG WATER ENTERPRISE CASH FLOW PROJECTIONS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 L974 1975 1976 1977 1978 1979 1980 1981 1982 1983 SOURCES OF CASH Internal Cash Generation Net Income Before Interest 2.6 4.6 3.7 (11.0) (19.6) 18.3 3.8 47.4 68.2 123.5 171.2 162.6 Depreciation 16.0 16.o 16.0 16.0 16.0 23.6 59.4 106.1 124.7 125.0 125.1 125.1 Increase in Accounts Payable 1.2 0.3 0.3 2.6 2.3 1.2 1.6 0.9 0.9 Consumer Contributions - 1 .4 4.5 14.o 29.8 47.5 64.5 75.1 62.3 62.3 Total 18.6 20.6 19.7 7.6 1.2 56.2 93.6 203.3 258.6 325.2 359.5 350.9 Loans from National Government (70%) - - - 121.2 201.0 1,196.4 777.7 - - - - - National Government Equity (30%) - - 52.0 86.1 512.8 333.3 - - - - - Total Sources 18.6 20.6 19.7 180.8 288.3 1,765.4 203.3 258.6 325.2 359.5 350.9 APPLICATIONS OF CASH Capital Expenditures Stage 1 Program - - - 173.2 287.1 1,709.2 1,111.0 9.2 9.6 7.0 - - Payments to National Government on Equity - - 21.1 0.5 34.5 52.0 134.2 231.3 297.4 - - Debt Service Interest - - -- - - - - - - 206.0 203.3 Principal - _ _ _ . - - - 29.0 31.7 Total Debt Service - - -- - - - - - 235.0 235.0 Increase in Accounts Receivable - - - 6.7 - 11.9 6.2 32.8 15.2 17.4 11.3 2.8 Increase in Inventories 1.0 1.0 0.4 2.8 - 9.2 34.2 22.4 0.2 0.1 - - Local Government Withdrawals 11.6 15.2 14.9 - - - - - - Total Applications 12.6 16.2 15.3 203.8 287.6 246.3 237.8 Increase (Decrease) in Cash 6.o 4.4 4.4 (23.0) 0.7 0.6 1.2 4.7 2.3 3.3 113.2 113.1 Cash at Beginning 10.5 16.5 20.9 25.3 2.3 3.0 3.6 4.8 9.5 11.8 15.1 128.3 Cash at End 16.5 20.9 25.3 2.3 3.0 3.6 4.8 9.5 11.8 15.1 128.3 241.4 Debt Service Coverage - - - - - - - - - - 1.26 1.22 August 20, 1974 INDONESIA MAIAlG WATER ENTERPRISE BALANCE SHEET PROJECTIONS 1972-1983 (in million Rupiahs) As of March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 L98 1982 1983 ASSETS Fixed Assets Buildings, Plant and Equipment 380.0 380.0 380.0 380.0 380.0 840.3 2,549.5 3,669.7 3,679.3 3,686.3 3,686.3 3,686.3 Less Accumulated Depreciation - 16.0 32.0 48.0 64.0 87.6 147.0 253.1 377.8 502.8 627.9 753.0 Net Fixed Assets 380.0 364.0 348.0 332.0 316.0 752.7 2,402.5 3,416.6 3,301.5 3,183.5 3,056.4 2,933.3 Construction in Progress - - 173.2 460.3 1,709.2 1,111.0 Total Fixed Assets 380.0 364.0 348.0 505.2 776.3 2,461.9 3,513.5 3,416.6 3,301.5 3,183.5 3,058.4 2,933.3 Current Assets Cash 16.5 20.9 25.3 2.3 3.0 3.6 4.8 9.5 11.8 15.1 128.3 241.4 Accounts Receivable - - - 6.7 6.7 18.6 24.8 57.6 72.8 90.2 101.5 104.3 Inventories 4.4 4.8 7.6 7.6 16.8 51.0 73.4 73.6 73.7 73.7 73.7 Total Current Assets 9 25.3 30.1 16.6 17-3 39.0 80.6 140.5 158.2 179.0 303.5 419.4 Total Assets 399.9 389.3 378.1 521.8 3.6 91.1 57.1 .7 . ?- .7 LIABILITIES AND EQUITY Equity National Government - - - 30.9 116.5 594.8 876.1 741.9 510.6 213.2 213.2 213.2 Local Government 397.3 382.1 367.2 367.2 367.2 367.2 367.2 367.2 367.2 367.2 367.2 367.2 Accumulated Surplus 2.6 7.2 10.9 (0.1) (12zy) (1.4) 2.4 49.8 118.0 241.5 206.7 166.0 Total Equity 399.9 389.3 378.1 398.0 464.0 960.6 1,245.7 1,158.9 995.8 821.9 787.1 746.4 Consumer Contributions - - - 1.4 5.9 19.9 49.7 97.2 161.7 236.8 299.1 361.4 Long-Term Debt Outstanding Debt - - - 121.2 322.2 1,518.6 2,296.3 2,296.3 2,296.3 2,296.3 2,267.3 2,235.6 Less Current Maturities - - - - - - - - - 31.7 . Total Long-Term Debt - - - 121.2 322.2 1,518.6 2,296.3 2,296.3 2,296.3 2,267.3 2,235.6 2,201.0 Current Liabilities Accounts Payable - - - 1.2 1.5 1.8 2.4 4.7 5.9 7.5 8.4 9.3 Current Debt Maturities - - - - - - - - - 29.0 31.7 34.6 Total Current Liabilities - - - 1.2 1.5 1.8 2.4 4.7 5.9 36.5 40.1 43.9 Total Liabilities and Equity 399.9 389.3 378.1 521.B 793.6 2 Debt as Percent of Total Debt and Equity - - - 23 41 61 65 66 70 74 74 75 August 20, 1974 a INDONESIA PURWOKERTO WATER ENTERPRISE INCOME STATEMENTS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 Actual/ Estimate ------------------------------------------------------ Estimate -------------------------------------------------------------- Water Produced (M3 000) 470 515 580 790 790 1,100 2,170 2,620 3,080 3,530 3,530 3,530 Water Sold (M3 000) 290 330 390 550 550 830 1,630 2,100 2,460 2,820 2,820 2,820 % Sales to Production 62 64 67 70 70 75 75 80 80 80 80 80 Number of Connections 1,295 1,300 1,300 1,400 2,000 3,200 5,600 6,600 7,200 7,400 7,400 7,4oo Average Water Rate Rp/M3 12.5 12.5 12.5 12.5 12.5 30.0 35.0 40.0 45.0 52.0 55.0 55.0 OPERATING REVENUE Water Sales 3.6 4.1 4.9 6.9 6.9 24.9 57.1 84.0 110.7 146.6 155.1 155.1 Other Fees 0.9 0.9 1.0 1.0 1.0 - - - - - - Total Billings 4.5 5.0 5.9 7.9 7.9 24.9 57.1 84.0 110.7 141.0 155.1 155.1 Less Provision for Bad Debts - - - 0.2 0.2 0.5 1.1 1.7 2.2 2.9 3.1 3.1 Total Operating Revenue 4.5 5.0 5.9 7.7 7.7 24.4 56.0 82.3 108.5 143.7 152.0 152.0 OPERATING EXPENSE Personnel 1.7 1.8 2.0 4.3 7.5 9.9 12.9 15.2 18.5 23.8 26.6 29.9 Electricity and Fuel - - - - - - - 0.9 2.2 4.1 4.6 5.1 Chemicals - - - 0.2 0.5 1.0 2.4 3.1 4.2 5.4 6.1 6.8 Repairs and Maintenance 0.3 0.3 0.3 0.5 0.6 1.4 4.1 7.5 9.2 9.8 10.6 11.3 Office Supplies -- - 0.1 0.3 0.3 0.3 0.4 0.6 0.7 1.0 1.1 Insurance - - 0.1 0.6 0.7 0.8 1.1 1.3 1.4 Taxes n- - 1.0 3.0 3.2 6.3 12.8 - - Other 0.2 0.2 0.2 - - - - ---- Depreciation 1.9 1.9 1.9 1.9 1.9 6.7 22.9 39.9 45.7 45.7 45.7 45.7 Total Operating Expense 4.1 4.2 4.4 7.0 10.8 20.4 46.2 70.9 87.5 103.4 95.9 101.3 Income Before Interest 0.4 0.8 1.5 0.7 (3.1) 4.0 9.8 11.4 21.0 40.3 56.1 50.7 Interest - - - 76.1 75.1 Net Income (Loss) o.4 0.8 1.5 0.7 (3.1) 4.0 9.8 11.4 21.0 40.3 (20.0) (24.4) Operating Expense as Percent of Operating Revenue 91 84 75 91 140 84 83 86 81 72 63 67 Average Net Fixed Assets in Service (Less Consumer Contributions) 52 50 48 46 41 157 559 962 1,049 975 903 836 Rate of Return (Percent) 0.8 1.6 3.1 1.5 - 2.5 1.8 1.2 2.0 4.1 6.2 6.1 August 20, 1974 INDONESIA PURWOKERTO WATER ENTERPRISE CASH FLOW PROJECTIONS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 SOURCES OF CASH Internal Cash Generation Net Income Before Interest 0.4 0.8 1.5 0.7 (3.1) 4.0 9.8 11.4 21.0 40.3 56.1 50.7 Depreciation 1.9 1.9 1.9 1.9 1.9 6.7 22.9 39.9 45.7 45.7 45.7 45.7 Increase in Accounts Payable - - - 0.2 0.2 0.1 0.3 0.4 0.3 o.4 0.2 0.2 Consumer Contributions - - - 1.1 7.3 16.6 46.9 30.6 30.6 28.4 24.4 18.9 Total 2.3 2.7 3.4 3.9 6.3 27.4 79.9 82.3 97.6 114.8 126.4 115.5 Loans From National Government (70%) - - - 47.5 140.1 44o.o 220.7 - - - - - National Government Equity (30%) - - - 20.4 60.0 188.6 94.6 - - - - - Total Sources 2.3 2.7 3.4 71.8 206.4 656.0 395.2 82.3 97.6 114.8 126.4 115.5 APPLICATIONS OF CASH Capital Expenditures Stage I Program - - - 67.9 200.1 628.6 315.3 3.1 2.0 - - Payments to National Government on Equity - - - 2.3 6.3 18.5 60.3 66.9 89.5 108.0 - - Debt Service - 76.1 75.1 Interest - - - - - - --- 7615. Principal - - - 10.7 11.7 Total Debt Service - - - - - - - - - 86.8 86.8 Increase in Accounts Receivable - - - 1.6 - 3.4 6.4 5.4 5.3 6.1 2.8 - Increase in Inventories - 1.0 - - - 5.4 12.6 6.3 0.1 - - Local Government Withdrawals 2.2 0.8 3.4 - - -- Total Applications 2.2 1.8 3.4 71.8 206.4 655.9 394.6 81.7 96. 114,1 89.6 86.8 Increase (Decrease) in Cash 0.1 0.9 - - - 0.1 0.6 0.6 0.7 0.7 36.8 28.7 Cash at Beginning - 0.1 1.0 1.0 1.0 1.0 1.1 1.7 2.3 3.0 3.7 40.5 Cash at end 0.1 1.0 1.0 1.0 1.0 1.1 1.7 2.3 3.0 3,7 40.5 69.2 Debt Service Coverage - - - - - - - - - - 1.17 1.11 August 20, 1974 bi INDONESIA PURWOKERTO WATER ENTERPRISE BALANCE SHEET PROJECTIONS 1972-1983 (in million Rupiahs) As of March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 ASSETS Fixed Assets Buildings, Plant and Equipment 51.0 51.0 51.0 51.0 51.0 319.0 947.6 1,266.0 1,268.0 1,268.0 1,268.0 1,268.0 Less Accumulated Depreciation - 1.9 3.8 5.7 7.6 14.3 37.2 77.1 122.8 168.5 214.2 259.9 Net Fixed Assets 51.0 49.1 47.2 45.3 43.4 304.7 910.4 1,188.9 1,145.2 1,099.5 1,053.8 1,008.1 Construction in Progress - - - 67.9 268.0 628.6 315.3 - - - - - Total Fixed Assets 51.0 49.1 47.2 113.2 311.4 933.3 1,225.7 1,188.9 1,145.2 1,099.5 1,053.8 1,008.1 Current Assets Cash 0.1 1.0 1.0 1.0 1.0 1.1 1.7 2.3 3.0 3.7 40.5 69.2 Accounts Receivable - - - 1.6 1.6 5.0 11.4 16.8 22.1 28.2 31.0 31.0 Inventories - 1.0 1.0 1.0 1.0 6.4 19.0 25.3 25.4 25.4 25.4 25.4 Total Current Assets 0.1 2.0 2.0 3.6 3.6 12.5 32.1 44.4 50.5 57.3 96.9 125.6 Total Assets 51.1 51.1 49.2 116.8 315.0 945.8 LIABILITIES AND EQUITY Equity National Government - - - 18.1 71.8 241.9 276.2 209.3 119.8 11.8 11.8 11.8 Local Government 50.7 49.9 46.5 46.5 46.5 46.5 46.5 46.5 46.5 46.5 46.5 46.5 Accumulated Surplus 0.4 1.2 2.7 3.4 0.3 4.3 14.1 25.5 46.5 86.8 66.8 42.4 Total Equity 51.1 51.1 49.2 68.0 118.6 292.7 336.8 281.3 212.8 145.1 125.1 100.7 Consumer Contributions - - - 1.1 8.4 25.0 71.9 102.5 133.1 161.5 185.9 204.8 Long-Term Debt Outstanding Debt - - - 47.5 187.6 627.6 848.3 848.3 848.3 848.3 837.6 825.9 Less Current Maturities - -- - - - - - 10.7 11.7 12.7 Total Long-Term Debt - - - 47.5 187.6 627.6 848.3 848.3 848.3 837.6 825.9 813.2 Current Liabilities Accounts Payable - - - 0.2 0.4 0.5 0.8 1.2 1.5 1.9 2.1 2.3 Current Debt Maturities - - - - - - - - 10.7 11.7 12.7 Total Current Liabilities - - - 0.2 0.4 0.5 0.8 1.2 1.5 12.6 13.8 15.0 Total Liabilities and Equity 51.1 51.1 49.2 116.8 315.0 945.8 1,257.8 ,23 11,133-7 Debt as Percent of Total Debt and Equity - - - 41 61 68 72 75 80 85 87 89 August 20, 1974 INDONESIA BANYUWANGI WATER ENTERPRISE INCCME STATEMENTS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 Actual/ Estimate --------------------------------------------------------- Estimate ------------------------st i---...----..-.---.ate.-----.---- Water Produced (m3 000) 450 585 860 860 860 1,150 1,240 1,320 1,410 1,410 1,410 Water Sold (M3 c00) 270 380 6cc 600 650 860 990 1,060 1,130 1,130 1,130 % Sales to Production 60 65 70 70 75 75 80 80 80 80 80 Number of Connections 1,140 1,300 1,300 1,300 1,500 1,800 2 000 2,100 2,150 2,200 2,200 2,200 Average water Rate Rp/M3 18.5 18.5 18.5 18.5 34.0 4±.0 50.0 58.0 70.0 76.0 78.0 OPERATING REVENUE Water Sales 3.2 5.0 7.0 11.1 11.1 22.1 35.3 49.5 61.5 79.1 85.9 88.1 Less Provision for Bad Debts - - - 0.2 0.2 0.4 0.7 1.0 1.2 1.6 1.7 1.8 Total Operating Revenue 3.2 5.0 7.0 10.9 10.9 21.7 34.6 48.5 60.3 77.5 84.2 86.3 OPERATING EXPENSE Personnel 0.9 1.6 2.6 4.5 6.8 9.2 11.7 14.3 17.3 22.3 24.9 27.9 Electricity and Fuel - - - 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.3 Chemicals 0.2 0.6 0.9 2.1 2.4 2.7 4.0 4.9 5.9 6.8 7.6 8.5 Repairs and Maintenance - 0.7 0.8 1.7 1.9 2.3 3.3 4.4 5.0 5.4 5.8 6.2 Office Supplies 0.2 0.2 0.2 0.2 0.3 0.3 0.5 0.5 0.6 0.9 1.0 1.1 Insurance - - - 0.1 0.1 0.1 0.3 0.4 0.4 0.5 0.5 0.6 Taxes - - - - - - 0.3 1.1 2.1 4.8 0.9 0.4 Other 0.3 0.3 0.5 - - - - - - - - - Depreciation 6.8 6.8 6.8 6.8 6.8 8.2 13.2 18.5 20.4 20.4 20.4 20.4 Total Operating Expense 8.4 10.2 11.8 15.5 18.4 22.9 33.5 44.3 51.9 61.3 61.4 65.4 Income Before Interest (5.2) (5.2) (4.8) (4.6) (7.5) (1.2) 1.1 4.2 8.4 16.2 22.8 20.9 Interest - - - - - - - - - - 19.3 19.1 Net Income (Loss) (5.2) (5.2) (4.8) (4.6) 4.2 8.4 16.2 3.5 Operating Expense as Percent of Operating Revenue 263 204 169 142 169 106 96 89 83 76 73 76 Average Net Fixed Assets in Service (Less Consumer Contributions) 161 155 148 141 133 161 276 397 422 397 373 350 Rate of Return (Percent) - - - - - - 0.4 1.1 2.0 4.1 6.1 6.0 August 20, 1974 INDONESIA BANYUWANGI WATER ENTERPRISE CASH FLOW PROJECTIONS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 SOURCES OF CASH Internal Cash Generation Net Income Before Interest (5.2) (5.2) (4.8) (4.6) (7.5) (1.2) 1.1 4.2 8.4 16.2 22.8 20.9 Depreciation 6.8 6.8 6.8 6.8 6.8 8.2 13.2 18.5 20.4 20.4 20.4 20.4 Increase in Accounts Payable - - - 0.4 0.1 0.1 0.2 0.2 0.2 0.3 0.2 0.2 Consumer Contributions - - - - 1.8 3.6 4.4 4.5 4.5 4.8 3.6 2.0 Total 1.6 1.6 2.0 2.6 1.2 10.7 18.9 27.4 33.5 41.7 47.0 43.5 Loans from National Government (60%) - - - 11.5 34.4 109.3 59.8 - - - - - National Government Equity (40%) - - - 7.7 22.9 72.8 39.9 - - - - - Total Sources 1.6 1.6 2.0 21.8 58.5 192.8 118.6 27.4 33.5 41.7 470 APPLICATIONS OF CASH Capital Expenditures Stage I Program - - - 19.2 57.3 182.1 99.7 - - - - - Other 1.1 - - - Payments on National Government Equity - - - - 0.5 6.7 12.1 22.2 29.0 38.4 - - Debt Amortization Interest - - - - - - - - - - 19.3 19.1 Principal - - - - - - - - - - 2.7 2.9 Total Debt Service - - - - - - - - - - 22.0 22.0 Increase in Accounts Receivable - - - 2.2 - 2.2 2.7 2.8 2.4 2.8 1.9 0.6 Increase in Inventories - - - 3.1 - 1.6 3.6 2.0 - - - - Local Government Withdrawals 0.5 0.6 - - - - - - - - - Total Applications 1.6 o.6 24.5 57.8 192.6 118.1 27.0 31.4 41.2 23.9 22.6 Increase (Decrease) in Cash - 1.0 2.0 (2.7) 0.7 0.2 0.5 0.4 2.1 0.5 23.1 20.9 Cash at Beginning - - 1.0 3.0 0.3 1.0 1.2 1.7 2.1 4.2 4.7 27.8 Cash at End - 1.0 3.0 0.3 1.0 1.2 1.7 2.1 4.2 4.7 27.8 8.7 Debt Service Coverage - - - - - - - - - - 1.96 1.90 August 20, 1974 INDONESIA BANYUWANGI WATER ENTERPRISE BALANCE SHEET PROJECTIONS 1972-1983 (in million Rupiahs) As of March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 ASSETS Fixed Assets Buildings, Plant and Equipment 158.0 158.0 158.0 158.0 158.0 234.5 416.6 516.3 516.3 516.3 516.3 516.3 Less Accumulated Depreciation - 6.8 13.6 20.4 27.2 35.4 48.6 67.1 87.5 107.9 128.3 148.7 Net Fixed Assets 158.0 151.2 144.4 137.6 130.8 199.1 368.0 449.2 428.8 408.4 388.0 367.6 Construction in Progress - - - 19.2 76.5 182.1 99.7 - .- Total Fixed Assets 158.0 151.2 144.4 156.8 207.3 381.2 467.7 449.2 428.8 408.4 388.0 367.6 Current Assets Cash - 1.0 3.0 0.3 1.0 1.2 1.7 2.1 4.2 4.7 27.8 48.7 Accounts Receivable - - - 2.2 2.2 4.4 7.1 9.9 12.3 15.1 17.0 17.6 Inventories - - - 3.1 3.1 4.7 8.3 10.3 10.3 10.3 10.3 10.3 Total Current Assets - 1.0 3.0 5.6 6.3 10.3 17.1 22.3 26.8 30.1 55.1 76.6 Total Assets 158.0 152.2 147.4 162.4 213.6 391.5 484.8 471.5 455.6 438.5 444.2 LIABILITIES AND EQUITY Equity National Government - - - 7.7 30.1 96.2 124.0 101.8 72.8 34.4 34.4 34.4 Local Government 163.2 162.6 162.6 162.6 162.6 162.6 162.6 162.6 162.6 162.6 162.6 162.6 Accumulated Surplus (5.2) (10.4) (15.2) (19.8) (27.3) (28.5) (27.4) (23.2) (14.8) 1.4 4.9 6.7 Total Equity 158.0 152.2 147.4 150.5 165.4 230.3 259.2 241.2 220.6 198.4 201.9 203.7 Consumer Contributions - - - - 1.8 5.4 9.8 14.3 18.8 23.6 27.2 29.2 Long-Term Debt Outstanding Debt - - - 11.5 45.9 155.2 215.0 215.0 215.0 215.0 212.3 209.4 Less Current Maturities - - - - - - - 2.7 2.9 3.2 Total Long-Term Debt - - - 11.5 45.9 155.2 215.0 215.0 215.0 212.3 209.4 206.2 Current Liabilities Accounts Payable - - - 0.4 0.5 0.6 0.8 1.0 1.2 1.5 1.7 1.9 Current Debt Maturities - - - - - 2.7 2.9 3.2 Total Current Liabilities - - - 0.4 0.5 o.6 0.8 1.0 1.2 4.2 4.6 5.1 Total Liabilities and Equity 158.0 152.2 147.4 162.4 213.6 391.5 484.8 471.5 455.6 438.5 443.1 444.2 Debt as Percent of Total Debt and Equity - - - 7 22 4o 45 47 49 52 51 51 August 20, 1974 INDONESIA JAMBI WATER ENTERPRISE INCOME STATEMENTS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 Actual/ Estimate ------------------------------------------------------- Estimate ------------------------------------------------------------ Water Produced (M3 000) 330 910 910 910 3,570 4,270 4,830 4,830 1,830 Water Sold (m3 oo) 190 170 170 230 640 680 680 2,860 3,420 3,860 3,860 3,860 %( Sales to Production 70 70 75 75 80 80 80 80 80 Number of Connections 1,400 1,500 1,600 1,6o0 2,200 3,400 5,800 8,600 10,200 10,80 10,800 10,800 Average Water Rate Rp/M3 25.0 37.5 50.0 50.0 50.0 58.0 67.0 75.0 84.0 94.0 101.0 io4.o OPERATING REVENUE Water Sales 4.8 6.4 8.5 11.5 32.0 39.4 45.6 214.5 287.2 362.8 389.9 401.4 Other Fees 0.3 0.3 0.3 0.3 0.3 - - - - - Total Billings 5.1 6.7 8.8 11.8 32.3 39.4 45.6 214.5 287.2 362.8 389.9 401.4 Less Provision for Bad Debts - - - 0.2 0.6 0.8 0.9 4.3 5.7 7.1 7.8 8.0 Total Operating Revenue 5.1 6.7 8.8 11.6 31.7 38.6 44.7 210.2 281.5 355.7 382.1 393.4 OPERATING EXPENSE Personnel 4.2 4.8 6.1 8.0 14.4 20.2 26.6 31.7 38.3 46.2 51.8 58.1 Electricity and Fuel - 0.7 0.7 0.9 3.3 3.7 4.2 19.5 26.7 33.7 37.8 12.3 Chemicals 0.7 0.7 0.7 1.1 3.4 3.9 4.3 19.3 25.9 32.6 36.5 40.9 Repairs and Maintenance 1.2 1.8 2.1 2.8 3.4 5.2 9.9 16.8 21.2 22.8 24.5 26.4 Office Supplies 0.3 0.3 0.3 o.11 0.8 1.2 1.9 3.4 4.2 11.8 5.3 6.o Insurance - - - 0.1 0.3 0.4 1.1 1.8 2.0 2.3 2.5 2.8 Taxes - - - - - - 8.0 15.3 27.8 - - Other 0.2 0.8 1.1 - - - - Depreciation 10.0 10.0 10.0 11.1 13.1 21.9 48.8 83.7 99.9 100.0 100.0 100.0 Total Operating Expense 16.6 19.1 21.3 24.4 38.7 56.5 96.8 184.2 233.5 270.2 258.4 276.5 Income Before Interest (11.5) (12.4) (12.5) (12.8) (7.0) (17.9) (52.1) 26.0 48.0 85.5 123.7 116.9 Interest- - 128.0 126.2 Net Income (Loss) (11.5) (12.4) (756.0 48.0 85.5 (4.3) (9.3) Operating Expense as Percent of Operating Revenue 325 285 242 210 122 146 217 84 78 70 68 70 Average Net Fixed Assets in Service (Less Consumer Contributions) 210 201 191 210 251 469 1,157 2,023 2,332 2,185 2,039 1,900 Rate of Return (Percent) - - - - - - - 1.3 2.1 1.0 6.1 6.2 August 20, 1974 INDONESIA JAMBI WATER ENTERPRISE CASH FLOW PROJECTIONS 1972-1983 (in million Rupiahs) Year ending March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 SOURCES OF CASH Internal Cash Generation Net Income Before Interest (11.5) (12.4) (12.5) (12.8) (7.0) (17.9) (52.1) 26.0 48.0 85.5 123.7 116.9 Depreciation 10.0 10.0 10.0 11.1 13.1 21.9 48.8 83.7 99.9 100.0 100.0 100.0 Increase in Accounts Payable - - - 0.6 0.5 0.3 0.6 1.9 1.0 1.0 0.7 0.8 Consumer Contributions - - - - 5.5 14.0 31.0 47.5 50.4 48.3 42.8 36.8 Total (1.5) (2.4) (2.5) (1.1) 12.1 18.3 28.3 159.1 199.3 234.8 267.2 254.5 Loans from National Government (60%) - - - 67.5 197.7 629.6 530.8 - - - - National Government Equity (40%) - - - 45.0 131.8 419.7 353.8 - - National Government Grants - - 60.0 50.0 - -- - Local Government Equity 2.9 2.8 2.5 8.9 - - - - - Total Sources 1.4 0.4 60.0 170.3 341.6 1,067.6 159.1 199.3 234.8 267.2 254.5 APPLICATIONS OF CASH Capital Expenditures Stage I Program - - - 112.5 329.5 1,049.3 884.6 8.6 5.5 - - - Other 1.2 - 60.0 50.0 - - - - - - Payments to National Government on Equity - - - - 6.0 7.2 5.1 95.1 177.0 219.2 - - Debt Service Interest - - - - - - - - - - 128.0 126.2 Principal - - - - - - - - - - 18.0 19.8 Total Debt Service - - - - - - - - - - 146.0 146.0 Increase in Accounts Receivable - - - 2.4 4.1 1.4 1.2 33.8 14.5 13.6 7.0 2.3 Increase in Inventories - - - 5.3 1.0 8.9 20.9 17.9 0.1 - - - Total Applications 1.2 - 60.0 170.2 340.6 911.8 155.4 197.1 232.8 153.0 148.3 Increase (Decrease) in Cash 0.2 0.4 - 0.1 1.0 0.8 1.1 3.7 2.2 2.0 114.2 106.2 Cash at Beginning 0.4 0.6 1.0 1.0 1.1 2.1 2.9 4.0 7.7 9.9 11.9 126.1 Cash at End 0.6 1.0 1.0 1.1 2.1 2.9 4.0 7.7 9.9 11.9 126.1 232.3 Debt Service Coverage - - - - - - - - - - 1.53 1.49 August 20, 1974 INDONESIA JAMBI WATER ENTERPRISE BALANCE SHEET PROJECTIONS 1972-1983 (in million Rupiahs) As of March 31 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 ASSETS Fixed Assets Buildings, Plant and Equipment 206.0 206.0 206.0 266.0 316.0 758.0 1,807.3 2,700.5 2,706.0 2,706.0 2,706.0 2,706.0 Less Accumulated Depreciation - 10.0 20.0 31.1 44.2 66.1 114.9 198.6 298.5 398.5 498.5 598.5 Net Fixed Assets 206.0 196.0 186.0 234.9 271.8 691.9 1,692.4 2,501.9 2,407.5 2,307.5 2,207.5 2,107.5 Construction in Progress - 60.0 162.5 442.0 1,049.3 884.6 - - - - Total Fixed Assets 206.0 196.0 246.0 397.4 713.8 1,741.2 2,577.0 2,501.9 2,407.5 2,307.5 2,207.5 2,107.5 Current Assets Cash 0.6 1.0 1.0 1.1 2.1 2.9 4.0 7.7 9.9 11.9 126.1 232.3 Accounts Receivable - - - 2.4 6.5 7.9 9.1 42.9 57.4 71.0 78.0 80.3 Inventories - - - 5.3 6.3 15.2 36.1 54.0 54.1 54.1 54.1 54.1 Total Current Assets 0.6 1.0 1.0 8.8 14.9 26.0 49.2 104.6 121.4 137.0 258.2 366.7 Total Assets 206.6 197.0 247.0 406.2 728.7 15474.2 LIABILITIES AND EQUITY Equity National Government - - - 45.0 170.8 583.3 932.0 836.9 659.9 440.7 440.7 440.7 National Government Grants - - 60.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Local Government 218.1 220.9 223.4 232.3 232.3 232.3 232.3 232.3 232.3 232.3 232.3 232.3 Accumulated Surplus (115 (23.9) (36.) (9.2 (2) (74.1) (126.2) (100.2) (52.2) 33.3 29.0 19.7 Total Equity 206.6 197.0 247.0 338.1 456.9 851.5 1,148.1 1,079.0 950.0 816.3 812.0 802.7 Consumer Contributions - - - - 5.5 19.5 50.5 98.0 148.4 196.7 239.5 276.3 Long-Term Debt Outstanding Debt - - - 67.5 265.2 894.8 1,425.6 1,425.6 1,425.6 1,425.6 1,407.6 1,387.8 Less Current Maturities - - _ - - - - - - 18.0 19.8 21.5 Total Long-Term Debt - - - 67.5 265.2 894.8 1,425.6 1,425.6 1,425.6 1,407.6 1,387.8 1,366.3 Current Liabilities Accounts Payable - 0.6 1.1 1.4 2.0 3.9 4.9 1 6.6 7.4 Current Debt Maturities - -- - - - 18.0 19.8 21.5 Total Current Liabilities - - - 0.6 1.1 1.4 2.0 3.9 4.9 23.9 26.4 28.9 Total Liabilities and Equity 206.6 197.0 247.0 406.2 728.7 1,767.2 zg Q 26. 2,, Debt as Percent of Total Debt and Equity - - - 17 37 51 55 57 60 63 63 64 August 20, 1974 INDONESIA SAMARINDA WATEE ENTERPRISE INCOME STATEMENTS 1971-1982 (in million Rupiahs) Year ending December 31 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 Actual/E simt - Estimate - -------------------------------------------------- Estimate ---------------------------------------------------- Estimate Water Produced (M3 000) 330 1,120 1,120 1,120 2,450 2,770 3,100 3,100 3,100 Water Sold (M3 oo) 335 365 300 230 790 840 840 1,960 2,220 2,480 2,480 2,480 % Sales to Production 70 70 75 75 80 80 80 80 80 Number of Connections 950 950 1,000 1,300 1,600 2,400 3,200 3,500 3,700 3,800 3,800 3,800 Average Water Rate Rp/M3 20.0 20.0 20,0 20.0 23.5 50.0 68.0 88.0 114.0 130.0 140.0 143.0 OPERATING REVENUE Water Sales 6.7 7.3 6.0 4.6 18.6 42.0 57.1 172.5 248.6 322.4 347.2 354.6 Less Provision for Bad Debts - - - 0.1 0.4 0.8 1.1 3.5 5.0 6.4 6.9 7.1 Total Operating Revenue 6.7 7.3 6.0 4.5 18.2 41.2 56.0 169.0 243.6 316.0 340.3 347.5 OPERATING EXPENSE Personnel 2.0 2.2 2.8 5.8 9.6 13.3 20.9 26.8 36.9 43.2 48.4 54.2 Electricity and Fuel 0.8 2.4 2.7 3.1 11.0 13.5 16.5 18.5 20.7 Chemicals 1.5 5.2 5.9 6.6 16.1 20.2 25.6 28.6 32.1 Repairs and Maintenance 1.3 0.7 1.5 2.6 3.6 4.4 8.2 13.9 18.2 19.9 21.4 23.0 Office Supplies 0.1 0.3 0.3 0.5 0.5 0.8 0.9 1.0 1.1 Insurance - - - 0.2 0.3 0.3 1.0 1.6 1.8 2.0 2.3 2.6 Taxes - - - - - - - 5.8 14.6 28.0 1.9 0.9 Supplies and Fuel 1.6 1.9 2.0 Water Treatment * 2.0 0.2 1.5 Pumpi4 Expenses 2.5 2.8 3.0 Other 0.7 0.3 0.5 Depreciation 8.5 8.5 8.5 11.2 14.8 19.5 4o.9 74.1 91.9 93.9 93.9 93.9 Total Operating Expense 18.6 16.6 19.8 22.2 36.2 46.4 81.2 149.8 197.9 230.0 216.0 228.5 Income Before Interest (11.9) (9.3) (13.8) (17.7) (18.0) (5.2) (25.2) 19.2 45.7 86.0 124.3 119.0 Interest - - - - - - - - - - 116.8 115.4 Net Income (Loss) ((93) (13.8) _ (.2) 19.2 45.7 86.0 7.5 3.6 Operating Expense as Percent of Operating Revenue 278 227 330 493 199 113 145 89 81 73 63 66 Average Net Fixed Assets in Service (Less Consumer Contributions) 185 177 168 233 319 427 978 1,834 2,233 2,185 2,082 1,982 Rate of Return (Percent) - - - - - - - 1.0 2.0 4.0 6.0 6.0 These items are classified as above in years after 1973. August 20, 1974 INDONESIA SAMARINDA WATER ENTERPRISE CASH FLOW PROJECTIONS 1971-1982 (in million Rupiahs) Year ending December 31 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 SOURCES OF CASH Internal Cash Generation Net Income Before Interest (11.9) (9.3) (13.8) (17.7) (18.0) (5.2) (25.2) 19.2 45.7 86.o 124.3 119.0 Depreciation 8.5 8.5 8.5 11.2 14.8 19.5 40.9 74.1 91.9 93.9 93.9 93.9 Increase in Accounts Payable - - - 0.5 0.4 0.2 0.6 1.2 0.9 0.7 0.5 0.6 Consumer Contributions - - - - 2.8 9.0 13.0 10.4 10.0 10.0 8.5 4.5 Total (3.4) (0.8) (5.3) (6.0) - 23.5 29.3 104.9 148.5 190.6 227.2 218.0 Loans from National Government (60%) - - - 67.3 59.8 584.0 525.2 65.9 - - - - National Government Equity (40%) - - - 44.9 39.9 389.4 350.1 43.9 - - - - National Government Grants - - 150.0 50.0 - - - - - - - - Local Government Equity 2.2 0.8 5.3 14.5 4.6 - - - - - - - Total Sources _- 150.0 170.7 104.3 996.9 94.6 214.7 148.5 190.6 227.2 218.0 APPLICATIONS OF CASH Capital Expenditures Stage I Program - - - 112.2 99.7 973.4 875.3 109.8 0.3 - - - Other - - 150.0 50.0 - - - - - - - - Payments on National Government Equity - - - - - 14.1 5.7 62.7 131.7 174.9 - - Debt Service Interest - - - - - -- - - - 116.8 115.4 Principal - - - - - 16.6 18.0 Total Debt Service - - - - - - - - - - 133.4 133.4 Increase in Accounts Receivable - - - 0.9 2.8 4.7 3.0 22.3 12.5 14.3 8.9 1.5 Increase in Inventories - - - 6.6 1.0 4.3 19.4 17.5 2.2 - - - Total Applications 150.0 169.7 103.5 996.5 903.4 212.3 146.7 189.2 142.3 134.9 Increase (Decrease) in Cash (1.2) - - 1.0 0.8 0.4 1.2 2.4 1.8 1:4 84.9 83.1 Cash at Beginning 1.2 - - - 1.0 1.8 2.2 3.4 5.8 7.6 9.0 93.9 Cash at End - - - 1.0 1.8 2.2 3.4 5.8 7.6 9.0 93.9 177.0 Debt Service Coverage - - - - - - - 1.64 1.60 August 20, 1974 INDONESIA SAMARINDA WATER ENTERPRISE BALANCE SHEET PROJECTIONS 1971-1982 (in million Rupiahs) As of December 31 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 ASSETS Fixed Assets Buildings, Plant and Equipment 181.0 181.0 181.0 331.0 381.0 592.9 1,566.3 2,641.6 2,551.7 2,551.7 2,551.7 2,551.7 Less Accumulated Depreciation - 8.5 17.0 28.2 43.0 62.5 103.4 177.5 269.4 363.3 457.2 551.1 Net Fixed Assets 181.0 172.5 164.0 302.8 338.0 530.4 1,462.9 2,264.1 2,282.3 2,188.4 2,094.5 2,000.6 Construction in Progress - - 150.0 162.2 211.9 973.4 875.3 109.8 - - - - Total Fixed Assets 181.0 172.5 314.0 465.0 549.9 1,503.8 2,338.2 2,373.9 2,282.3 2,188.4 2,094.5 2,000.6 Current Assets Cash - - - 1.0 1.8 2.2 3.4 5.8 7.6 9.0 93.9 177.0 Accounts Receivable - - - 0.9 3.7 8.4 11.4 33.7 46.2 60.5 69.4 70.9 Inventories - - 6.6 7.6 11.9 31.3 48.8 51.0 51.0 51.0 51.0 Total Current Assets - - - 8.5 13.1 22.5 46.1 88.3 104.8 120.5 214.3 298.9 Total Assets 161.0 172.5 314.0 473.5 563.0 1,526.3 2 299.5 LIABILITIES AND EQUITY Equity National Government - - - 44.9 84.8 460.1 804.5 785.7 654.0 479.1 479.1 479.1 National Government Grants - - 150.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 Local Government 192.9 193.7 199.0 213.5 218.1 218.1 218.1 218.1 218.1 218.1 218.1 218.1 Accumulated Surplus (11.9) (21.2) (35.0) (52.7) (70.7) (75.9) (101.1) (81.9) (36.2) 49.8 57.3 60.9 Total Equity 181.0 172.5 314.0 405.7 432.2 802.3 1,121.5 1,121.9 1,035.9 947.0 954.5 958.1 Consumer Contributions - - - 2.8 11.8 24.8 35.2 45.2 55.2 63.7 68.2 Long-Term Debt Outstanding Debt -- - 67.3 127.1 711.1 1,236.3 1,302.2 1,302.2 1,302.2 1,285.6 1,267.6 Less Current Maturities -- - - - - - - - 16.6 18.0 19.8 Total Long-Term Debt - - - 67.3 127.1 711.1 1,236.3 1,302.2 1,302.2 1,285.6 1,267.6 1,247,.8 Current Liabilities Accounts Payable -- - 0.5 0.9 1.1 1.7 2.9 3.8 4.5 5.0 5.6 Current Debt Maturities - - - - - - - - - 16.6 18.0 19.8 Total Current Liabilities - - - 0.5 0.9 1.1 1.7 2.9 3.8 21.1 23.0 25.4 Total Liabilities and Equity 161.0 172.5 314.0 473.5 563.0 1,56. 2,8. 2 462. Z&2 22, Debt as Percent of Total Debt and Equity - - - 14 23 47 52 54 56 58 57 57 August 20, 1974 ANNEX 15 Page 1 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS Assumptions for Financial Projections General 1. The financial statements in this report cover the water supply operations in.each of the five cities in Annexes 10 through 14. These annexes are each divided into part A - income statements, B - cash flow statements, and C - balance sheets. The accounts of the water supply units have generally been parts of the municipal or regency systems and have been kept on a cash receipts and disbursements basis. They do not account for such items as receivables, payables, inventories, fixed assets or depreciation, and reliable information to supplement them is for the most part lacking. The annex statements for the first three fiscal years have therefore been derived or estimated on a cash receipts and disburse- ment basis, using actual statements available for the first fiscal year or years, as indicated below. The statements for the succeeding fiscal years have been projected on an accrual accounting basis. Income Statements 2. The income statements for the first one or two fiscal years, as denoted by the column heading "Actual/Estimate", are based on statements of actual cash receipts and disbursements prepared by the WE or munici- pality. The revenues and expenses in the income statements are the cash receipts and disbursements, respectively, and an allowance for depreciation has been included (para 13). The other data on water production, water sales, connections, and average water rates are estimated, and the omis- sion of a figure indicates that there is insufficient basis for an esti- mate. 3. Water production for each WE is based on the lower of the pro- jected water demand rates of the population to be served or the projected production capacity of the WE. 4. Unaccounted-for water is projected to decrease from existing levels to about 30% of water production in fiscal years 1975-1976, 25% in 1977-1978, and 20% thereafter, as substantial new facilities are placed in service and leakage detection measures are taken. 5. Continuation of the existing water rates of the WE's, except Samarinda, is assumed through FY 1976 and through FY 1975 for Samarinda. ANNEX 15 Page 2 (This distinction is made because the fiscal year of Samarinda ends on December 31 and those of the others end on March 31.) The following in- creases in the present average water rates are assumed to apply for the entire FY 1977 (FY 1976 for Samarinda): Ilalang 170%, Purwokerto 140%, 3anyuwangi 80%, Jambi 15%, and Samarinda 110%. Thereafter, the water rates reflect each year gradual increases so that in FY 1982 (FY 1981 for Samarinda) returns of 6% of net fixed assets in service (less consumer contributions) will be achieved. 6. Meter rentals or other charges under existing rate schedules are included in other fees where shown separately in the statements of the WE. Charges for metered consumption are assumed to constitute all of the reve- nues when the above program of water rate increases is put into effect, pending a study of water rate structures to be completed by that time. Consumer payments for the cost of new connections are included in con- sumer contributions in the balance sheet and cash flow projections (para 20). 7. It is assumed that with increased levels of water sales and rates, 2X of annual water sales will be written off as bad debts. 8. Operating expenses are assumed at substantially increasing levels considered necessary to operate and maintain the systems adequately and to provide for expanding volume of production and sales. Price increases are assumed at the annual rates of 18% in FY 1975, 15% in FY 1976, and 12% in FY 1977 and thereafter ("inflation factor"), except where otherwise indi- cated. 9. Personnel costs are based on increased numbers of staff recom- mended by the management consultants to implement the improvement program and on increased rates of personnel compensation designed to upgrade the staffs and provide comparability under local conditions. The projected increases in rates of compensation from FY 1974 to 1980, including the in- flation factor, average on an annual basis approximately 24% for Malang, 18% for Purwokerto, 22% for Banyuwangi, 25% for Jambi, and 27% for Samarinda. After 1980, a 12% annual increase in average rates of compensation is assumed. 10. Electricity costs are based on the volume of water produced, an expected electric rate increase in FY 1974 from Rp 4 to Rp 6 per KWH for electricity consumed, and increases in electric rates at the inflation factor thereafter. At present Malang, Purwokerto and Banyuwangi do not incur significant electricity expenses. Chemical expenses are based on the chemical requirements for volume of water to be treated, and prices are increased at the inflation factor. 11. Office supplies expense is estimated to increase in proportion to the number of customers. Insurance expense is estimated on the basis of 0.25% of the cost of buildings and 5% of office, transportation and laboratory equipment. Price increases in both of these categories of expense are assumed at the inflation factor. ANNEX 15 Page 3 12. Repairs and maintenance expense, in addition to labor included in the item of personnel costs, is estimated at approximately 0.6% of the gross value of average fixed assets in service each year. Price increases are reflected for maintenance of existing fixed assets, and of new fixed assets from the end of construction, at annual rates assumed for foreign costs, i.e., 14% in FY 1975, 11% in FY 1976, and 7.5% in FY 1977 and there- after. 13. Depreciation of existing fixed assets is calculated on the basis of an assumed remaining average useful life of 20 years, or an annual rate of 5%. Depreciation of new fixed assets is calculated at a composite rate developed for each WE on the basis of the estimated useful life of each type of its property. These composite rates, which are applied to average fixed assets in service each year, are 3.3% for Malang; 3.6% for Purwokerto, Jambi and Samarinda; and 3.8% for Banyuwangi. 14. Taxes on income payable to the Government by each WE as a Perusahaan Daerah are assumed at annual rates of 20% of the first Rp 10 million of net income and 25% of net income exceeding that amount. Tax- able net income is operating revenue less operating expense (including depreciation but excluding taxes on income) and less interest on indebt- edness. Other taxes are assumed not to be significant. Balance Sheets and Cash Flow Statements 15. In view of the lack of records of historical costs and physical data, the amount of fixed assets in the initial balance sheet of each WE as of March 31, 1972 (December 31, 1971 for Samarinda) has been estimated by the consultants from available records and physical inspections at re- placement cost at that date, less allowance for depreciation to reflect the remaining useful lives of the properties. The depreciation allowance in the income statement for FY 1972 (FY 1971 for Samarinda) has been omit- ted from accumulated depreciation in the initial balance sheet, since fixed assets at the end of that year is stated net of depreciation. Available information indicates no loan indebtedness at that date and, in some cases, cash balances of the water supply units, which are reflected in the initial statements. In the absence of current information on receivables, other assets or liabilities, which are not believed to be significant for purposes of the projections, the statements for the first three fiscal years have been estimated on a cash receipts and disbursement basis, with allowances for depreciation, and on an accrual accounting basis thereafter. 16. Cash balances are projected at a minimum of Rp 1 million or one month's cash operating expenses, whichever is larger. 17. Accounts receivable are estimated at 20% of billings, which is considered reasonable in the light of present and proposed billing pro- cedures, indicated payment practices of consumers, the projected volume of sales, and proposed loan covenants invoking prompt payment procedures for government agencies. ANNEX 15 Page 4 18. Inventories are estimated at 2% of the amount of gross fixed assets in service at the end of each year. 19. Accounts payable are estimated at one-half month's cash operating expenses. 20. Costs of new connections are included in fixed assets, and payments received from consumers for connections are credited to consumer contribu- tions. An average cost per connection, including allowances for price and physical contingencies, of Rp 30,000 is assumed, payable upon installation by consumers other than residential and payable by residential users on the basis of Rp 5,000 upon installation and the balance of Rp 25,000 in equal monthly installments over a five-year period at an annual interest rate of 7-1/2%. The estimated receipts of payments for connections have been re- flected in the projections on a cash basis. In practice, under the account- ing system to be installed, receivables from consumers who are to pay in installments will be recorded and will be credited as the payments are re- ceived. 21. The proceeds of the IBRD loan, together with other Government funds, will be loaned by the Government to the WE's. The terms of the loans and the related aspects of the financing plan, which were agreed at negotiations, are as follows: (a) Interest rate of 9% annually. (b) The loans to each WE will be repayable in 48 equal semi-annual installments of principal and interest following a 6-year period of grace from the date of the project loan agreement, which the projections assume will be the first day of the WE's next fiscal year, i.e. April 1, 1975 (January 1, 1975 for Samarinda). Under- this assumption, the grace period would be the six fiscal years 1976 to 1981, inclusive (FY 1975-1980 for Samarinda). Interest will be waived during the grace period, and the first payment of principal and interest will become due in FY 1982 (FY 1981 for Samarinda). (c) The Government will lend to each WE 60% of the project costs and will make available as equity the remaining 40% of project costs, except that for Malang and Purwokerto such percentages will be 70% and 30% respectively. Any surplus amounts which the WE is able to generate internally from its operations during the 6-year grace period will be repaid annually to re- duce the Government's equity. 22. It is assumed that the estimated costs of immediate improvement programs in Jambi (FY 1974 and 1975) and Samarinda (FY 1973 and 1974) are met by Government grants. These amounts are shown as other capital expendi- tures in the cash flow statements and as Government grants in the balance sheets. ANNEX 15 Page 5 23. It is assumed that any additional external funds which may be required by a WE for its operations in any year in which project construc- tion costs have been met by Government loans and equity, will be met by local government equity. This occurs in the projections only to a rela- tively small extent for Jambi in FY 1975 and Samarinda in FY 1974 and 1975. August 20, 1974 ANNEX 16-A INDONESIA FIVE CITIES WATER SUPPLY PROJECTS NALANG - WATER RATE SCHEDULE Effective April 1968 A. Water Consumption: Single-Step Multiple-Step Charge Charge Step 1 Step 2 Step 3 Rate Min. 2 Rate MinJ. 2 Rate Am t Rate er M3 in M per M3 in M3 per M in M3 per M3 (Rp) TEP7(Rp) (Rp7 1. Residential 5 15 - - - - - 2. Company housing 5 15 - - - - - 3. Boarding houses and convents 5 30 - - - - - 4. Military and prison 6 - - - - - - 5. Schools 6 3 b/ 6. Offices and shops 6 25 - - - - - 7. Swinning pools 6 - - - - - - 8. Hospitals 6 - - - - 9. Hotels 12 So/ 16 50 c/ 20 10. Restaurants 12 30 16 30 20 11. Other trade 12 50 16 50 20 12. Charitable and juv. reform. free 50 - - 1 13. Main mosques free 50 - - 3 14. Other mosques free 15 - - 3 B. Non-recurring Charges: 1. Disconnection and reconnection charge Rp 25. / Minimum consumption for which monthly charge is made. b/ Per classroom. c/ Per bedroom. March 15, 1974 ANNEX 16-B INDONESIA FIVE CITIES WATER SUPPLY PROJECTS PURWOKERTO - WATER RATE SCHEDULE Effective May 1971 A. Water Consumption: Minimum Consumption Rate per M Rate Consumption in Excess per M3 in M3L/ of Minimum (Rp) TRp) 1. Residential household: a. 1 to 5 persons 10 10 15 b. 6 to 10 persons 10 15 15 c. 11 persons and over 10 20 15 2. Shops and atores 12.5 15 15 3. Schools and Gov't offices 15 20 15 4. Industrial, hotels and motels 15 50 15 5. Mosques, churches and social institutions 5 20 15 B. Other Monthly Charges: 1. Monthly maintenance charge Rp 25. 2. Monthly meter rental charge Rp 50. C. Non-recurring Charges and Deposits: 1. Guarantee deposit Rp 300-750, except Rp 1,000 for schools and government offices and Rp 2,000 for industrial, hotels and motels. 2. Excavation cost Rp 1,000-5,000 depending on type of road. 3. Disconnection and reconnection charge Rp 500. 4. Meter testing fee Rp 100. 5. Penalties Rp 5,000. a/ Minimum consumption for which monthly charge is made. March 15, 1974 ANNEX 16-c INDONESIA FIVE CITIES WATER SUPPLY PROJECTS BANYUWANGI - WATER RATE SCHEDULE Effective April 1972 A. Water Consumption: Rate perM (Minimum monthly charge is made for 15 M3) 1. Residential, government, schools and sports centers Rp 15 2. Social institutions, such as mosques, orphanages and hospitals 10 3. Commercial and industrial customers outside port area 30 h. Commercial and industrial customers and government offices inside port area 35 At the Rogojampi well, the charge for water ii Rp 1-1/2 per tin of about 20 liters, equivalent to about Rp 75 per m B. Other Monthly Charges: 1. Monthly meter rental of Rp 125 for residential-size meter, up to maximum of Rp 250 for larger meters. C. Non-recurring Charges and Deposits: 1. Connection or transfer to another person Rp 100. 2. Disconnection and reconnection charge Rp 100. 3. Guarantee deposit Rp 500, except commercial and industrial customers and government offices inside the port area are charged Rp 1,000. 4. Customers are charged labor costs for installation or repair of fix-bures on their premises according to a fixed schedule. 5. Customers are charged a 10% penalty for payments of water bills made after the monthly due date and, in addition, are charged the disconnection and reconnection fee of Rp 100 after a bill is over- due more than five days. March 15, 1974 ANNEX 16-D INDONESIA FIVE CITIES WATER SUPPLY PROJECTS JAMBI - WATER RATE SCHEDULE Effective March 1970 As Revised October 1972 A. Water Consumption: 1. Rp 25 per m3 for all customers until October 1, 1972. Rp 50 per m3 for all customers after October 1, 1972. B. Other Monthly Charges: 1. Monthly meter rental charge Rp 10. 2. Monthly pipe connection charge Rp 25. The service in Janbi is not metered. Billings are based on records of consumption in 1962 when there were some meters, as carried forward each month and adjusted to current estimates. If a customer has received little or no water because of supply shortages during the month, payment of the bill is waived or the amount to be paid is nego- tiated. March 15, 1974 ANNEX 16-E INDONESIA FIVE CITIES WATER SUPPLY PROJECTS SAMARTNDA - WATER RATE SCHEDULE Effective 1969 A. Water Consumption: Minimum Consumption Rate per M Rate Consumption in Excess per M3 in M3 .a of Minimum (IT) (Rp) 1. Residential 17 10 20 2. Standpipes 20 60 60 3. Stores 40 30 90 4. Hotels and motels 35 40 80 B. Other Monthly Charges: 1. Monthly fixed charge of Rp 75 for residential customers; Rp 300 for standpipes and stores; and Rp 500 for hotels and motels. With respect to A and B above, since service in Samarinda is not metered, monthly billings are estimated by the waterworks. These estimates are based on such factors as the number of persons in a household, the assuned consumption per person, the adequacy of water supply to the customer, and the type and size of non-residential customers. C. Non-recurring Charges and Deposits: 1. Set on a case-by-case basis. Guarantee deposits range from about Rp 2,500 to 30,000. Connection charges average about Rp 10,000 for enlargement of size of connection and Rp 60,000 for new connection. a/ Minimum consumption for which monthly charge is made. March 15, 1974 ANNEX 17 INDONESIA FIVE CITIES WATER SUPPLY PROJECTS FORECAST PERFOEKANCE INDICATORS FY 1975-1982 1. The following indicators will assist in monitoring the performance of the water enterprises in the five cities. Each enterprise will be asked to include these indicators in its reporting and to compare its achievements with the forecast. 2. Following are the forecast performance indicators, using Malang as an example. Year ending March.3L-1975 1976 1977 1978 1979 1980 1981 1982 Water produced (M3 000) 8,300 8,300 8,300 8,300 15,000 16,320 17,640 17,640 Water sold (M3000) 5,800 5,800 6,200 6,200 12,000 13,000 14,100 14,100 % sales to production 70 70 75 75 80 80 80 80 Number of connections 13,500 14,100 15,900 18,700 21,700 24,500 26,300 26,300 Pop.served-residential 94,000 98,100 110,800 130,000 186,500 210,000 225,700 225,700 Pop. served-standpipes 37,700 37,700 37,700 37,700 67,500 67,500 67,500 67,500 L/cd - residential 111 115 119 123 127 131 135 135 L/cd - standpipes 10 10 11 11 11 12 12 12 Rate of return (%) 1 2 4 6 Operating ratio (%) 83 81 74 66 August 20, 197h 18RD 10870 Тн41L•6+ND '��. ��,, • „ �,5�• г ,•,,; , �� '• �Hi�iFFi� �м;�•'' ' ' • 1NDONES 1 А ���,,,,,, I уеИ0= лг�iн � .� `а г • " , • r. ь _ Г � - , • , , - •ц-Ч. _ � F1VE C1T1ES WATER SUPPLY PROJEГ_TS • , . - , • �"�,�г�~� • • • . � � � LOCATION МА .. . • ` � гы. ••�:��;'�• •� г,е,..г., :а,,,:,.; .,��. • • д ` N У 5 1 .. f а�, �.н . , .' • • . . � � . .- ., с . .- ] - - �г.г."И, i . и�..�г.��. . ; , �г ^ �.1h...ir�.nr. \; • . • i ••� +� � iиЧ:i.н. 'J ` 1� •vi о .� н �LП1нНЕ�:. лl< ,;м .г,.. К.. � � М� 1д i � г•1 ,� �• г ..,га�:. т• (В•,гг�еоl �.г,,., �.., ,. .ь SUL�:.rt`I 1�г1�Ьь� 1 �tliмГ�1 1k1:�N 1-.•lм 5° ��гл, ] . r 7 м:г. rii.���i. . .. г . _ � ? ] "' ).7 . . � ��/Ci:iG � н[k.ih 1 ь; А г,а-ь�,. ��.е. �„ .�,,, ��..•,. E.�L � SUМЕнЛ, av о� _ ,. _ �. . ��� ,i,� , уг� . • �ОглЕ�_,к F���RtS v• с т�мGR 10" . . � U[� �дИ" � i�P �..� • � 3G i л From exishng rings &angun Aarangan 0 ¶AMBIN torage Strageptank Bet Treatment plant pnsr torag I. s ,n~< pring source Storage tank L+484f deep wes IY -5L SONtorage tStgeankSagsPAS EL +480- Stho 's tion, doetr n ilmees II IsIN IO SEIeA -FIVE CITIES WATER SUPPLY PROJECTS MAL ANG EX TINE FIRST PHASE SECOND CONSTRUCTION IstStage 2ndStage PHASE Transmission and distribution - -- - -mains (djamneters in millimeters) Service areas Spring source Treatment plant Vd Storage tanks Pumping station Roads Railways -t pRivers .r...... Zone partition line KILOMETERS . r MILES 00 _____ ___ _________- _4 IBRD 10872 To Bsaturaden MARCH 1974 INDON E SIA FIVE CITIES WATER SUPPLY PROJECTS Kawun Carang PURWOKERTO Spring ource El 15500) EXIST ING FIRST PHASE SECOND OA UN DER CONSTRUCTION ist Stage 2nd Stage PHASE Transmission and distribution -Wmains (diameters in millimeters) NORTH WELL Service areas FIE LD kSpring source Deep wells Treatment plant 27+ Storage tanks Storu ank NORTHEAST ELO+ 127.0 \WELL FIELD Raliays Rivers EL80.00 i 2 3 4 KILOMETERS MILES - /1Ë . rst NE øl, I I -E J-- - - ---- ---r jo y -P d.N E -.o.nd- I I1To Banyurmas 少; 斗: o 1 2 KILOWETERS WILE Treatment p ¾ - - patment -- % - ~~~ ntalant,lJ T M Iur i r ' i i 4' I,V-. i. I . .r . I I I INDONESIA FIVE CITIES WATER SUPPLY PROJECTS SAMARINDA EXISTING FIRST PHASE SECOND TALN h OR UNDER Ist Stage 2nd StGge PHASE 3RLNI CONSTRUCTION Transmission and distributions2- -- ains (diameters in millimeters) SIGAPOIRE asm wraService areas KAlATN- 0 0 0 ~~~Treatmient plants ab aana IE E 2 Storage tank = = Intake Iodian . .ýVA< Banyuwangi Roaids Ocean ,, G The boudaTeUsTwOo th,s map doinn nrtb on 4-'n>5 Rivers plont e s n ep e en , ------ Study area boundaryI""i"