IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes ADDITIONAL SCHEMES IN KOSASTHALAIYAR SUB BASIN Name of Zone : Chennai Region Name of Circle : Palar Basin Circle, Chepauk, Chennai.5. Name of Division : Kosasthalaiyar Basin Division, Thiruvallur Date of Contrct signing (Bank to Recommendation and Approval Evaluation and Contract award Bank's no objection to bidding Date of Commencement works Preparation of Bid Documents Bank No objection to contract Date of completion of works Appraisal / Revised / Actual Pre Review / Post Review Method of Procurement Bank WBR Number Bid Opening date Bid inviting date be informed) ICB/NCB/FA document Estimated award S. Package Description of work cost (Rs.in Remarks No. No. lakhs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 01/IAMW Appraisal ARM/WR Construction of 03.09.13 -- 18.09.13 07.11.13 07.12.13 NR 20.12.13 NR 25.12.13 24.09.14 D/Kos/Ad Check dam across Tender has been called dl Lava River near Post 1 573.84 NCB Revised -- -- -- -- -- -- -- -- -- -- vide Schemes pallipat village and Review Superintendi / works taluk of Thiruvallur ng Engineer, /2013- District Actual -- -- -- -- -- -- -- -- -- -- PWD, WRD, 2014) Palar Basin Circle, 02/IAMW Chennai Bid Construction of ARM/WR Appraisal 03.09.13 -- 18.09.13 07.11.13 07.12.13 NR 20.12.13 NR 25.12.13 24.09.14 invitaion no. Check dam across D/Kos/Ad 04 PBC / Kosasthalaiyar 2013- dl Post 2 River near 632.18 NCB 2014/2013 / Schemes Review Revised -- -- -- -- -- -- -- -- -- -- Nallathur village of Dated / 18.09.2013 Tiruttani taluk of works/20 Thiruvallur District Actual -- -- -- -- -- -- -- -- -- -- 13-2014) Rehabilitation of 03/IAMW Thamaraipakkam Appraisal 18.11.13 25.11.13 27.11.13 31.12.13 20.1.14 28.01.14 19.02.14 24.02.14 26.02.14 25.09.14 ARM/WR anicut and D/Kos/ replacement of Addl shutters in Prior 3 1345.70 NCB Schemes Thamaraipakkam Review Revised -- -- -- -- -- -- -- -- -- -- / works Anicut across /2013- Kosasthalaiyar 2014) river in Thiruvallur Actual -- -- -- -- -- -- -- -- -- -- District. IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes ADDITIONAL SCHEMES IN ARANIYAR SUB BASIN Name of Region : Chennai Region Name of Circle : Palar Basin Circle, Chepauk, Chennai.5. Name of Division : Araniyar Basin Division, Chennai-5 Date of Contrct signing (Bank to Recommendation and Approval Evaluation and Contract award Bank's no objection to bidding Date of Commencement works Preparation of Bid Documents Bank No objection to contract Date of completion of works Appraisal / Revised / Actual Pre Review / Post Review Method of Procurement Bank WBR Number Bid Opening date Bid inviting date be informed) ICB/NCB/FA document Estimate award S. d cost Package No. Description of work Remarks No. (Rs.in lakhs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 01/IAMWAR Rehabilitation of Appraisal 28.10.13 NR 06.11.13 27.12.13 22.01.14 NR 24.01.14 NR 27.01.14 26.09.14 M/WRD/ARN Araniyar anicut /Addl Post 1 at Uthukottai in 332.46 NCB Schemes / Review Thiruvallur Revised -- -- -- -- -- -- -- -- -- -- works/2013- District. 2014) Actual -- -- -- -- -- -- -- -- -- -- Rehabilitation Tender has been and moderni called vide zation of Appraisal 28.10.13 NR 08.11.13 27.12.13 22.01.14 NR 24.01.14 NR 27.01.14 26.09.14 Superintending damaged Engineer, PWD, dividing wall near WRD, Palar Basin 02/IAMWAR Old Head sluice Circle, Chennai Bid invitaion no. 07 PBC M/WRD/ARN of / 2013-2014/2013 / / Addl Lakshmipuram Post Revised -- -- -- -- -- -- -- -- -- -- Dated 06.11.2013 2 97.31 NCB Schemes / Anicut and Review works/2013- Apron of supply 2014) Channel feeding to Perumbedu tank in Ponneri Actual -- -- -- -- -- -- -- -- -- -- Taluk of Thiruvallur District. IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes Region: Chennai Circle: Pennaiyar Basin ircle, Thiruvannamalai Division: Lower Pennaiyar Division, Villupuram. Evaluation & Contract Bank's WBR Number Bank's No objection Bank's No objection Date of Completion Appraisal/Revised to Contract Award Procurement NCB of Bid Documents to Bid Documents Recommendation Bid Opening Date Date of Contract Commencement Estimate of cost (Rs. In Lakhs) Bid Invitation Post Review Pre Review/ Preparation & Approval Method of of Works of Works Remarks signing /Actual Date of Award Date Sl. Package No. Description of Work No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Name of Sub Basin : Varahanadhi 01 / Rehabilitation and Appraisal 01.10.13 20.11.13 28.11.13 31.12.13 31.01.14 10.02.14 25.02.14 20.03.14 26.02.14 25.09.14 IAMWARM / Modernization of Revised -- -- -- -- -- -- -- -- -- -- WRD / VNSB Nandan Channel Prior 1 / from LS 12.40 km 961.78 NCB Review ADDL. to LS 37.88 km in Actual -- -- -- -- -- -- -- -- -- -- SCHEME / Gingee and WORKS / Villupuram Taluk of Appraisal 01.10.13 20.11.13 28.11.13 31.12.13 31.01.14 10.02.14 25.02.14 20.03.14 26.02.14 25.09.14 Bid document Sent to World on 08.10.2013 with Package No as Rehabilitation of 02 / 13 IAMWARM / WRD / Anicut across IAMWARM / Revised -- -- -- -- -- -- -- -- -- -- VNSB / ADDL. SCHEME / Thondiyar river WORKS / 2013-2014. But in GO WRD / near Rettanai Prior approved as 02 / IAMWARM / 2 VNSB / ADDL. 768.37 NCB Village in Review WRD / SCHEME / VNSB / ADDL. SCHEME / Tindivanam Taluk WORKS / WORKS / 2013-2014.Hence the of Villupuram 2013-2014 Actual -- -- -- -- -- -- -- -- -- -- package number approved in GO is District. now considered in Procurement plan 03 / Appraisal 01.08.13 N.R. 24.10.13 06.12.13 04.01.14 N.R. 19.01.14 N.R. 27.01.14 26.09.14 Tender has been called vide Rehabilitation and Special Chief Engineer, PWD, IAMWARM / Modernization of Revised WRD, Pennaiyar Basin Circle, WRD / Avvaiyarkuppam Post Thiruvannamalai Bid invitaion no. 3 VNSB / ADDL. 112.01 NCB 03 / PBC / Tvmalai / 2013- Tank in Tindivanam Review SCHEME / 2014/F.904-IAMWARM- Taluk of Villupuram Actual -- -- -- -- -- -- -- -- -- -- WORKS / ADDITIONAL SCHEMES / D5 / District. Dated 24.10.2013 2013-2014 IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes Region: Chennai Circle: Pennaiyar Basin Circle, Thiruvannamalai, Palar Basin Circle, Chennai Division: Middle Pennaiyar Division, Tiruvannamalai. Date of Completion Appraisal/Revised to Contract Award Procurement NCB of Bid Documents to Bid Documents Recommendation Bid Opening Date Commencement Date of Contract Estimate of cost Contract Award (Rs. In Lakhs) Bid Invitation Post Review Evaluation & Bank's WBR Pre Review/ Preparation & Approval Bank's No Bank's No Method of objection objection of Works of Works Number signing Date of /Actual Date Sl. Package No. Description of Work Remarks No Name of Sub Basin : Cheyyar Kiliyar Apprais 03.09.13 NR 18.09.13 07.11.13 07.12.13 NR 20.12.13 NR 25.12.13 26.09.14 al Construction of Check dam across Tender has been called vide 01/IAMWARM/ Kiliyar River near Superintending Engineer, WRD/CHY-KIL Revised -- -- -- -- -- -- -- -- -- -- KK pudur village in Post PWD, WRD, Palar Basin 1 / Addl Scheme 437.77 NCB Madhuranthagam Review Circle, Chennai Bid invitaion / works/ 2013- no. 04 PBC / 2013-2014/2013 taluk of 2014 / Dated 18.09.2013 Kancheepuram District Actual -- -- -- -- -- -- -- -- -- -- Bid document sent to World bank Package Appraisal 01.10.13 N.R. 25.11.13 24.12.13 20.01.14 N.R. 28.01.14 N.R. 26.02.14 25.09.14 on 20.09.2013, Bank has No.02 / suggested to consider it as post Rehabilitation of review, Package No. 15 / IAMWARM/W Thandarai Anicut IAMWARM/WRD/ RD/ Revised -- -- -- -- -- -- -- -- -- -- under Cheyyar Post CHR-KLR / ADDL. SCHEMES / 2 CHR-KLR / 695.72 NCB WORKS / 2013 - 2014. changed to Taluk of Review ADDL. Package No.02 / Thiruvannamalai SCHEMES / IAMWARM/WRD/ District CHR-KLR / ADDL. SCHEMES / WORKS / Actual -- -- -- -- -- -- -- -- -- -- 2013 - 2014 WORKS / 2013 - 2014. as approved in GO Package Appraisal 01.10.13 18.11.13 25.11.13 24.12.13 20.01.14 24.01.14 10.02.14 21.02.14 26.02.14 25.09.14 No.03 / Rehabilitation and IAMWARM lining the Thandarai Revised -- -- -- -- -- -- -- -- -- -- /WRD/CHR - Anicut left main canal Prior 3 1443.94 NCB KLR / ADDL. in Cheyyar Taluk of Review SCHEMES / Thiruvannamalai Actual -- -- -- -- -- -- -- -- -- -- WORKS / District 2013 - 2014 Name of Sub Basin : Thurinjalar Package Rehabilitation and Appraisal 01.08.13 N.R. 24.10.13 06.12.13 04.01.14 N.R. 19.01.14 N.R. 27.01.14 26.09.14 No.01 / Modernization of Revised -- -- -- -- -- -- -- -- -- -- IAMWARM / Nandan Channel from LS 0 km to LS WRD / Post 1 12.40 km convered 429.90 NCB TJR / ADDL. under Thurinjalar sub Review SCHEME / basin in Tender has been called vide WORKS / Thiruvannamalai Special Chief Engineer, PWD, 2013 - 2014 Taluk and District. WRD, Pennaiyar Basin Circle, Thiruvannamalai Bid invitaion no. Package Rehabilitation and No.01 / Modernization of IAMWARM / Nandan Channel from LS 0 km to LS WRD / Post 1 12.40 km convered 429.90 NCB TJR / ADDL. under Thurinjalar sub Review SCHEME / Actual -- -- -- -- -- -- -- -- -- -- basin in Tender has been called vide WORKS / Thiruvannamalai Special Chief Engineer, PWD, 2013 - 2014 Taluk and District. WRD, Pennaiyar Basin Circle, Thiruvannamalai Bid invitaion no. Name of Sub Basin : Pambanar Varattar 03 / PBC / Tvmalai / 2013- 2014/F.904-IAMWARM- Construction of check Appraisal 01.08.13 N.R. 24.10.13 05.12.13 04.01.14 N.R. 19.01.14 N.R. 25.01.14 24.09.14 ADDITIONAL SCHEMES / D5 / 01 / dam across Revised -- -- -- -- -- -- -- -- -- -- Dated 24.10.2013 IAMWARM / Pambanar river near WRD / Narayana kuppam Post 1 212.52 NCB PVR / ADDL. village in Review SCHEME / Thandarampattu Actual -- -- -- -- -- -- -- -- -- -- 2013 - 2014 Taluk of Thiruvanna malai District. IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes Region: Chennai Region, WRD., Circle: Pennaiyar Circle, Thiruvannamalai Division: Upper Pennaiyar Division, Dharmapuri. Recommendation Bid Opening Date Appraisal/Revise Date of Contract Commencement Estimate of cost Contract Award (Rs. In Lakhs) Bid Invitation Post Review Procurement Evaluation & Bank's WBR Pre Review/ Preparation Completion Documents Documents & Approval to Contract Bank's No Bank's No Method of objection objection of Works of Works Number signing Date of Date of /Actual Award of Bid to Bid Date Sl. Package No. Description of Work Remarks d No Name of Sub Basin : Pennaiyar Upto Krishnagiri Appraisal 01.08.13 N.R. 24.10.13 04.12.13 03.01.14 N.R. 18.01.14 N.R. 25.01.14 24.07.14 01 / Construction of IAMWARM / check dam in Revised -- -- -- -- -- -- -- -- -- -- WRD / Bellarapalli village Post 1 70.22 NCB PNK / ADDL. in Krishnagiri Taluk Review SCHEME / of Krishnagiri Actual -- -- -- -- -- -- -- -- -- -- 2013 - 2014 District. Name of Sub Basin : Pambar to Tirukoilur Construction of Appraisal 01.08.13 N.R. 24.10.13 04.12.13 03.01.14 N.R. 18.01.14 N.R. 25.01.14 24.07.14 01 / check dam across Revised -- -- -- -- -- -- -- -- -- -- Tender has been called vide IAMWARM/W Pambar river in SF Special Chief Engineer, PWD, RD/ No.34 of Post WRD, Pennaiyar Basin Circle, 1 55.91 NCB PTR / ADDL. Singarapettai Review Thiruvannamalai Bid invitaion no. SCHEME / village in Actual -- -- -- -- -- -- -- -- -- -- 03 / PBC / Tvmalai / 2013- 2013 - 2014 Uthankarai Taluk of 2014/F.904-IAMWARM- ADDITIONAL SCHEMES / D5 / Krishnagiri District. Dated 24.10.2013 Name of Sub Basin : Markandeyanadhi Appraisal 01.08.13 N.R. 24.10.13 04.12.13 03.01.14 N.R. 18.01.14 N.R. 25.01.14 24.07.14 Construction of Revised -- -- -- -- -- -- -- -- -- -- 01 / check dam across IAMWARM / Nachikuppam river WRD / Post 1 in Viruppa 81.25 NCB MND / ADDL. Review sandiram village in Actual -- -- -- -- -- -- -- -- -- -- SCHEME / Krishnagiri Taluk of 2013 -2014 Krishnagiri District. Appraisal/Revised to Contract Award Procurement NCB of Bid Documents to Bid Documents Recommendation Bid Opening Date Date of Contract Commencement Estimate of cost Contract Award (Rs. In Lakhs) Bid Invitation Post Review Evaluation & Bank's WBR Pre Review/ Preparation Completion & Approval Bank's No Bank's No Method of objection objection of Works of Works Number signing Date of Date of /Actual Date Sl. Package No. Description of Work Remarks No Name of Sub Basin : Kambainallur Construction of Appraisal 01.08.13 N.R. 24.10.13 05.12.13 04.01.14 N.R. 19.01.14 N.R. 25.01.14 24.07.14 artificial recharge Revised -- -- -- -- -- -- -- -- -- -- 01 / structure across IAMWARM / Kambainallur river WRD / in S.F. No.130 of Post 1 113.12 NCB KBR / ADDL. Kambainallur Review SCHEME / village in Harur Actual -- -- -- -- -- -- -- -- -- -- 2013 - 2014 Taluk of Tender has been called vide Dharmapuri Special Chief Engineer, PWD, District. WRD, Pennaiyar Basin Circle, Thiruvannamalai Bid invitaion no. Name of Sub Basin : Kovilar Sub Basin 03 / PBC / Tvmalai / 2013- Construction of an 2014/F.904-IAMWARM- Appraisal 01.08.13 N.R. 24.10.13 05.12.13 04.01.14 N.R. 19.01.14 N.R. 25.01.14 24.07.14 ADDITIONAL SCHEMES / D5 / Artificial Recharge Dated 24.10.2013 01 / Structure across Revised -- -- -- -- -- -- -- -- -- -- IAMWARM / Kovilar river in -- -- -- -- -- -- -- -- -- -- WRD / S.F.No.63 of Post 1 80.39 NCB KOV / ADDL. Bairanaickampatti Review SCHEME / village in Harur Actual 2013 - 2014 Taluk of Dharmapuri District. IAMWARM PROJECT WATER RESOURCES DEPARTMENT Procurement Plan - Additional schemes Region: Chennai Region, WRD., Circle:Vellar Basin Circle,Cuddalore Division: Vellar Basin Division,Viridhachalam. Award Recommendation Date of Commencement Evaluation & Contract Bank's WBR Number Bank's No objection Bank's No objection Date of Completion to Contract Award Appraisal/Revised Procurement NCB of Bid Documents to Bid Documents Bid Opening Date Date of Contract Estimate of cost (Rs. In Lakhs) Bid Invitation Post Review Pre Review/ Preparation & Approval Method of of Works of Works signing /Actual Date Sl. Package No Description of Work Remarks No Name of Sub Basin : Gadilam Bid document Sent to World on 08.10.2013 with Package No. as Construction of Appraisal 06.11.13 26.11.13 29.11.13 31.12.13 21.01.14 28.01.14 07.02.14 18.02.14 25.02.14 24.09.14 09 / IAMWARM / WRD / 01 / check dam across GAD / ADDL. SCHEME / WORKS Revised -- -- -- -- -- -- -- -- -- -- / 2013-2014. But in GO approved IAMWARM / Gadilam river near as Package No. 01 / IAMWARM / WRD / Koothapakkam Prior WRD / 1 1579.80 NCB GDM / ADDL. Village in Review GDM / ADDL. SCHEME / WORKS SCHEME Cuddalore Taluk Actual -- -- -- -- -- -- -- -- -- -- / 2013-2014.Hence the package /Works and Cuddalore number approved in GO is nowconsidered in Procurement District. plan Name of Sub Basin : Gomukhinadhi Appraisal 04.11.13 NR 19.11.13 24.12.13 06.01.14 NR 22.01.14 NR 29.01.14 28.09.14 Protection works in the Upstream of Revised -- -- -- -- -- -- -- -- -- -- 01 / Vadakananthal IAMWARM / Anicut across WRD / Gomukhi River and Post 1 633.84 NCB GMN / ADDL. Rehabilitation of Review SCHEME Thengiya natham Actual -- -- -- -- -- -- -- -- -- -- /Works Supply Channel in Chinnasalem taluk of Villupuram Dist