Exchange rate: September 22, 2017 1.642864 FLOODS EMERGENCY RECOVERY PROJECT - Procurement Plan for Republic of Srpska, Component A&2B Contractor Procureme Completed EUR (000) EUR (000) nt Method amount in amount in Disbursed Post/Prior Activity # Packages Contract Contract Contract Contract received Signed NOTE Issue Type Item: Bids No. Activity I. Componenta A: Emergency Disaster Recovery Goods RS I.A.4.2 Civil Protection Administration 1 I.A.4.2.2. NCB-032 Ambulances G NCB 1 Post 11.12.15. 11.01.16. 20.02.16. 30.06.16. "Auto Servis NV", Banja Luka Contract Completed 2 I.A.4.2.3. NCB-037 Rescue Equipment G NCB 1 Post 17.12.15. 15.01.16. 11.03.16. 20.07.16. "Mipex-Auto RS", Banja Luka Contract Completed 3 I.A.4.2.4. NCB-038 Terrain Vehicles G NCB 1 Post 17.12.15. 15.01.16. 20.02.16. 20.05.16. "Auto Servis NV", Banja Luka Contract Completed 4 I.A.4.2.5. NCB-039 Rescue Radio Equipment G NCB 1 Post 17.12.15. 15.01.16. 18.02.16. 18.04.16. "Global GPS", Banja Luka Contract Completed 5 I.A.4.2.6. ICB-035 Plastic Rescue Boats G 1 Prior 03.05.16. 16.09.16. "TM Zagreb", Zagreb, Croatia Contract Completed 6 I.A.4.2.7. ICB-036 Aluminium Rescue Boats G ICB 1 Prior 22.12.15. 23.02.16. 06.06.16. 12.09.16. "Vatropromet", Zagreb, Croatia Contract Completed II. Component 2B: Local infrastructure II.B.1 ÄŒelinac Mncp 7 II.B.1.1 NCB-018 Construction of Bridge Over JoÅ¡avka W NCB 1 Post 02.07.15. 30.07.15. 12.08.15. 21.12.15. JV "Inkoprom" & "GraÄ‘enje Contract Completed River Ä?urić", Banja Luka 8 II.B.1.2 NCB-021 Construction and Reconstruction of W NCB 1 Post 16.07.15. 14.08.15. 20.08.15. 16.03.16. "Niskogradnja", LaktaÅ¡i Contract Completed Storm Water Sewer 9 II.B.1.3 NCB-065 Rehabilitation of Landslides W NCB 1 Post 05.07.16. 07.10.16. "Prijedorputevi", Prijedor Works Completed 10 II.B.1.4 NCB-066 Cleaning and Regulation of Waterflows W NCB 1 Post 28.04.16. 19.05.16. 27.06.16. 17.10.16. "Niskogradnja", LaktaÅ¡i Contract Completed 11 II.B.1.5 NCB-073 Rehabilitation of Landslides W NCB 1 Post 17.08.16. 14.09.16. 14.10.16. 30.04.17. "Kozaraputevi", Banja Luka Contract Completed 24.08.16. 14.09.16. 19.10.16. 30.05.17. 12 II.B.1.6 NCB-093 Cleaning and Regulation of Waterflows W NCB 1 Post 17.08.16. 15.09.16. 14.10.16. 30.04.17. "Niskogradnja", LaktaÅ¡i Contract Completed 25.08.16. 15.09.16. 19.10.16. 28.06.17. 13 II.B.1.7 NCB-114 Rehabilitation of Town Streets and W NCB 1 Post 20.07.17. 10.08.17. 18.08.17. 20.11.17. "Bijeljina Put", Bijeljina On-going Local Roads 20.07.17. 10.08.17. 06.09.17. 14 II.B.1.8 NCB-115 Replacement of Damaged Bridge W NCB 1 Post 20.07.17. 10.08.17. 18.08.17. 17.11.17. "Kozaraputevi", Banja Luka On-going Constructing New Bridge 20.07.17. 10.08.17. 04.09.17. 15 II.B.1.9 NCB-116 Rehabilitation of Sports Hall W NCB 1 Post 20.07.17. 10.08.17. 15.09.17. 28.11.17. Evaluation Phase 20.07.17. 10.08.17. II.B.2 City of Banja Luka 16 II.B.2.1 NCB-019 Construction of Bridge Over Vrbanja W NCB 1 28.06.17. "Prijedorputevi", Prijedor Works Completed River in ÄŒesma Settlement Post 13.07.15. 10.08.15. 22.09.15. 17 II.B.2.2 NCB-024 Construction and Modernization of NCB 1 30.04.16. "Kozaraputevi", Banja Luka Contract Completed Street (Veljko MlaÄ‘enović St) 18 II.B.2.3 NCB-020 Supervision of Contruction Works (on CS LCS 1 Post 13.07.15. 23.07.15. 19.10.15. 28.06.17. "IG", Banja Luka Works Completed Bridge Over Vrbanja River) 19 II.B.2.4 NCB-117 Demolition of Bridge (over Vrbanja W NCB 1 Post 20.07.17. 10.08.17. 15.09.17. 20.10.17. "Kozaraputevi", Banja Luka Contract Signature River) 20.07.17. 11.08.17. 20 II.B 2.5.1 NCB-124 Rehabilitation of City Streets - Lot 1 W NCB 1 Post 02.10.17. 24.10.17. 07.11.17. 01.06.18. Preparation Phase (Rehabilitation of Petar Veliki St) 21 II.B 2.5.2 NCB-124 Rehabilitation of City Streets - Lot 2 W NCB 1 Post 02.10.17. 24.10.17. 07.11.17. 01.06.18. Preparation Phase (Rehabilitation of Stormwater Sewage System in PriÅ¡tina St) II.B.3. City of Prijedor 22 II.B.3.1 NCB-042 Reconstruction of City Streets and W NCB 1 Post 29.01.16. 19.02.16. 28.03.17. 14.07.17. "Hidro-Kop", Banja Luka Works Completed Local Road 23 II.B.3.2 NCB-041 Rehabilitation of Sewage System W NCB 1 Post 29.01.16. 19.02.16. 05.07.16. 30.04.17. JV "Prijedorputevi", Prijedor, & Works Completed "Niskogradnja", Teslić 24 II.B.3.3 NCB-118 Rehabilitation of City Street and Local W NCB 1 Post 20.07.17. 10.08.17. 18.09.17. 01.12.17. Evaluation Phase Road 20.07.17. 11.08.17. 25 II.B.3.4 NCB-123 Reconstruction of Water Supply System W NCB 1 Post 02.10.17. 23.10.17. 06.11.17. 01.06.18. Preparation Phase (Ivo Andrić St) II.B.4. Teslić Mncp 26 II.B.4.1 NCB-026 Reconstruction of Bridge (in Žarkovina W NCB 1 Post 24.08.15. 14.09.15. 18.09.15. 12.12.15. "Niskogradnja", Teslić Contract Completed Settlement) Contractor Procureme Completed EUR (000) EUR (000) nt Method amount in amount in Disbursed Post/Prior Activity # Packages Contract Contract Contract Contract received Signed NOTE Issue Type Item: Bids No. Activity I. 27 II.B.4.2 A: Componenta Emergency NCB-049 Disaster Recovery Rehabilitation Goods RS of River Banks W NCB 1 Post 18.02.16. 10.03.16. 12.07.16. 31.10.17. JV "Niskogradnja", Teslić, & On-Going "Prijedorputevi", Prijedor 28 II.B.4.3 NCB-126 Rehabilitation of River Banks (0+474 W NCB 1 Post 02.10.17. 25.10.17. 08.11.17. 29.06.18. Preparation Phase km from Town Bridge+740 m down the river) II.B.5. Å amac Mncp 29 II.B.5.1 NCB-025 Rehabilitation of Town Streets W NCB 1 Post 24.08.15. 14.09.15. 21.09.15. 10.12.15. "Geokop", Derventa Contract Completed 30 II.B.5.2 NCB-029 Reconstruction of Part of Town W NCB 1 Post 25.09.15. 16.10.15. 30.10.15. 06.04.16. "Rasimgradnja", GradaÄ?ac Contract Completed Stadium 31 II.B.5.3 NCB-043 Rehabilitation of Town Streets W NCB 1 Post 01.02.16. 22.02.16. 07.04.16. 15.06.16. "Geokop", Derventa Contract Completed 32 II.B.5.4 NCB-057 Rehabilitation of Fences W NCB 1 Post 06.06.16. 05.09.16. "Rasimgradnja", GradaÄ?ac Works Completed 01.04.16. 22.04.16. 33 II.B.5.5 NCB-058 Rehabilitation of Building W NCB 1 Post 06.06.16. 15.09.16. "Rasimgradnja", GradaÄ?ac Works Completed 34 II.B.5.6 NCB-074 Rehabilitation of Secondary Water W NCB 1 Post 15.06.16. 06.07.16. 27.07.16. 09.09.16. "Higra", Bijeljina Contract Completed Supply System 16.06.16. 07.07.16. 02.08.16. 12.09.16. 35 II.B.5.7 NCB-085 Rehabilitation of Part of Local Road W NCB 1 Post 27.07.16. 17.08.16. 31.08.16. 22.10.16. "Geokop", Derventa Contract Completed 27.07.16. 17.08.16. 07.09.16. 23.09.16. 36 II.B.5.8 NCB-119 Rehabilitation of Town Streets W NCB 1 Post 20.07.17. 10.08.17. 18.09.17. 05.12.17. "Galax-Niskogradnja", BrÄ?ko On-Going 20.07.17. 11.08.17. 21.09.17. II.B.6. Novi Grad Mncp 37 II.B.6.1 NCB-027 Rehabilitation of Road W NCB 1 Post 28.08.15. 18.09.15. 29.09.15. 30.12.15. "Prijedorputevi", Prijedor Works Completed 38 II.B.6.2 NCB-028 Rehabilitation of Bridge (in Svodna LC) W NCB 1 Post 29.01.16. 19.02.16. 20.07.16. 27.04.17. "Prijedorputevi", Prijedor Works Completed 39 II.B.6.3 NCB-059 Rehabilitation of Landslide W NCB 1 Post 01.04.16. 22.04.16. 30.05.16. 16.11.16. "Niskogradnja Marjanović", Works Completed Prijedor 40 II.B.6.4 NCB-060 Rehabilitation of Local Roads W NCB 1 Prior 31.08.16. 11.10.16. 11.11.16. 25.04.17. "Prijedorputevi", Prijedor Contract Completed 13.09.16. 11.10.16. 12.01.17. 12.06.17. 41 II.B.6.5 NCB-075 Rehabilitation of Local Roads W NCB 1 Post 15.06.16. 06.07.16. 19.08.16. 07.12.16. JV "Niskogradnja Marjanović" & Works Completed 16.06.16. 07.07.16. 25.08.16. 01.12.16. "GraÄ‘enje Ä?urić" 42 II.B.6.6 NCB-122 Rehabilitation of Local Roads (Jablanica- W NCB 1 Post 02.10.17. 23.10.17. 06.11.17. 01.06.18. Preparation Phase Novska Planina; Rašće-BuÅ¡ević; KruÅ¡ke-Vejnovići; JajÄ?ani-Senići) II.B.7. City of Bijeljina 43 II.B.7.1 NCB-044 Rehabilitation of Building (Social Care W NCB 1 Post 01.02.16. 22.02.16. 09.03.16. 13.09.16. JV "Prizma" & "Eneco", Bijeljina Contract Completed Centre) 44 II.B.7.2 NCB-067 Rehabilitation of Water Source W NCB 1 Post 15.06.16. 07.07.16. 21.07.16. 01.04.17. "Bijeljina Put", Bijeljina Works Completed 16.06.16. 08.07.16. 15.09.16. 15.06.17. 45 II.B.7.3 NCB-068 Reconstruction of Bridge W NCB 1 Post 28.04.16. 19.05.16. 23.06.16. 21.09.16. "Papilon", ÄŒelić Works Completed 46 II.B.7.4 NCB-076 Rehabilitation of Local Roads W NCB 1 Post 15.06.16. 07.07.16. 21.07.16. 04.09.16. "Bijeljina Put", Bijeljina Contract Completed 16.06.16. 08.07.16. 20.07.16. 25.08.16. 47 II.B.7.5 NCB-077 Replacement of Damaged Bridge W NCB 1 Post 15.06.16. 07.07.16. 21.07.16. 14.11.16. "Bijeljina Put", Bijeljina Contract Completed Constructing of New Bridge 16.06.16. 08.07.16. 02.08.16. 22.11.16. 48 II.B.7.6 NCB-086 Rehabilitation of Streets and Local W NCB 1 Post 27.07.16. 17.08.16. 31.08.16. 29.11.16. "Bijeljina Put", Bijeljina Contract Completed Roads 27.07.16. 17.08.16. 15.09.16. 08.11.16. II.B.8. LaktaÅ¡i Mncp 49 II.B.8.1 NCB-045 Rehabilitation of Town Streets and W NCB 1 Post 01.02.16. 22.02.16. 18.04.16. 26.07.16. "Niskogradnja", LaktaÅ¡i Contract Completed Local Roads II.B.9. Kostajnica Mncp 556.46 50 II.B.9.1 NCB-046 Rehabilitation of Town Water Supply W 15.65 NCB 1 Post 04.07.16. 01.11.16. JV "Prijedorputevi", Prijedor, & Works Completed Source "Niskogradnja", Teslić 18.02.16. 10.03.16. 51 II.B.9.2 NCB-047 Rehabilitation of Local Sanitary Landfill W 13.20 NCB 1 Post 04.07.16. 01.11.16. "Prijedorputevi", Prijedor Works Completed 52 II.B.9.3 NCB-048 Rehabilitation of Local Roads W 418.94 NCB 1 Prior 31.08.16. 11.10.16. 11.11.16. 18.06.17. "Prijedorputevi", Prijedor Contract Completed 13.09.16. 11.10.16. 10.01.17. 20.06.17. 53 II.B.9.4 NCB-109 Rehabilitation of Street and Local W 54.46 NCB 1 Post 22.03.17. 12.04.17. 21.04.17. 05.07.17. "Niskogradnja Marjanović", Works Completed Roads Prijedor Contractor Procureme Completed EUR (000) EUR (000) nt Method amount in amount in Disbursed Post/Prior Activity # Packages Contract Contract Contract Contract received Signed NOTE Issue Type Item: Bids No. Activity 53 II.B.9.4 NCB-109 Rehabilitation of Street and Local W 54.46 NCB 1 Post "Niskogradnja Marjanović", Works Completed I. Componenta A: Emergency Disaster Recovery Goods RS Roads 16.03.17. 06.04.17. 03.05.17. 04.07.17. Prijedor 54 II.B.9.5 NCB-120 Rehabilitation of Local Road W 54.21 NCB 1 Post 02.08.17. 23.08.17. 15.09.17. 05.12.17. "Prijedorputevi", Prijedor On-Going 08.08.17. 29.08.17. 21.09.17. II.B.10. Petrovo Mncp 158.97 55 II.B.10.1 NCB-050 Rehabilitation of Town Square W 96.50 NCB 1 Post 13.06.16. 03.09.16. "Geokop", Derventa Contract Completed 08.03.16. 29.03.16. 56 II.B.10.2 NCB-051 Rehabilitation of Local Roads W 62.47 NCB 1 Post 04.05.16. 21.06.16. "Rial-Å ped", Doboj-Istok Contract Completed II.B.11. Kotor VaroÅ¡ Mncp 593.97 57 II.B.11.1.1 NCB-052 Rehabilitation of Bridges - Lot 1 W 27.98 NCB 1 Post 08.03.16. 29.03.16. 23.06.16. 31.10.16. "Niskogradnja", Teslić Contract Completed 58 II.B.11.1.2 NCB-052 Rehabilitation of Bridges - Lot 2 W 25.43 NCB 1 Post 08.03.16. 29.03.16. 23.06.16. 31.12.16. "Petrović", Kotor VaroÅ¡ Contract Completed 59 II.B.11.1.3 NCB-052 Rehabilitation of Bridges - Lot 3 W 30.39 NCB 1 Post 08.03.16. 29.03.16. 23.06.16. 31.03.17. "Petrović", Kotor VaroÅ¡ Contract Completed 60 II.B.11.1.4 NCB-052 Rehabilitation of Bridges - Lot 4 W 79.93 NCB 1 Post 08.03.16. 29.03.16. 11.05.16. 17.10.16. "Petrović", Kotor VaroÅ¡ Contract Completed 61 II.B.11.2.1 NCB-061 Rehabilitation of Landfalls and W 144.29 NCB 1 Post 28.04.16. 19.05.16. 14.07.16. 27.11.16. "Planum", Teslić Contract Completed Landslides - Lot 1 62 II.B.11.2.2 NCB-061 Rehabilitation of Landfalls and W 96.34 NCB 1 Post 28.04.16. 19.05.16. 14.07.16. 11.11.16. "Planum", Teslić Contract Completed Landslides - Lot 2 63 II.B.11.2.3 NCB-061 Rehabilitation of Landfalls and W 40.45 NCB 1 Post 28.04.16. 19.05.16. 14.07.16. 12.12.16. "Planum", Teslić Contract Completed Landslides - Lot 3 64 II.B.11.2.4 NCB-061 Rehabilitation of Landfalls and W 49.71 NCB 1 Post 28.04.16. 19.05.16. 12.07.16. 15.04.17. "Kozaraputevi", Banja Luka Contract Completed Landslides - Lot 4 65 II.B.11.2.5 NCB-061 Rehabilitation of Landfalls and W 46.23 NCB 1 Post 28.04.16. 19.05.16. 14.07.16. 11.11.16. "Planum", Teslić Contract Completed Landslides - Lot 5 66 II.B.11.3 NCB-097 Rehabilitation of Landfall and Landslide W 53.22 NCB 1 Post 17.10.16. 10.11.16. 21.11.16. 15.04.17. "Kozaraputevi", Banja Luka Contract Completed 20.10.16. 10.11.16. 13.12.16. 15.05.17. 67 II.B.11.4 NCB-110 Rehabilitation of Town Street W 0.00 NCB 1 Post 12.04.17. 03.05.17. 12.05.17. 26.09.17. "Planum", Teslić On-Going 12.04.17. 03.05.17. 13.06.17. 68 II.B.11.5 NCB-125 Rehabilitation of Local Road (RaÅ¡tani- W 0.00 NCB 1 Post 02.10.17. 25.10.17. 08.11.17. 01.06.18. Preparation Phase Maslovare) II.B.12. City of Doboj 654.88 69 II.B.12.1 NCB-053 Reconstruction of City Street W 654.88 NCB 1 Post 08.03.16. 29.03.16. 18.05.16. 10.10.16. "Rial-Å ped", Doboj-Istok Contract Completed II.B.13. Bratunac Mncp 321.21 70 II.B.13.1 NCB-054 Rehabilitation of River Banks W 321.21 NCB 1 Post 08.03.16. 29.03.16. 11.05.16. 14.11.16. "Bijeljina Put", Bijeljina Contract Completed II.B.14. Kozarska Dubica Mncp 218.56 71 II.B.14.1 NCB-062 Cleaning of Channels W 141.28 NCB 1 Post 01.04.16. 22.04.16. 31.05.16. 28.12.16. "Niskogradnja Marjanović", Works Completed Prijedor 72 II.B.14.2 NCB-098 Rehabilitation of Landslide W 77.28 NCB 1 Post 17.10.16. 10.11.16. 21.11.16. 11.08.17. "Prijedorputevi", Prijedor Works Completed 20.10.16. 10.11.16. 09.12.16. 11.08.17. II.B.15. ModriÄ?a Mncp 744.72 73 II.B.15.1 NCB-063 Rehabilitation of Local Roads W 133.63 NCB 1 Post 23.05.16. 08.11.16. "Bijeljina Put", Bijeljina Contract Completed 01.04.16. 22.04.16. 74 II.B.15.2 NCB-064 Rehabilitation of Green Market W 379.77 NCB 1 Post 20.05.16. 23.11.16. "Geokop", Derventa Contract Completed 75 II.B.15.3 NCB-070 Rehabilitation of Local Roads W 231.32 NCB 1 Post 28.04.16. 20.05.16. 12.07.16. 21.12.16. "Bijeljina Put", Bijeljina Contract Completed 76 II.B.15.4 NCB-128 Rehabilitation of Stormwater Sewage W 0.00 NCB 1 Post 02.10.17. 26.10.17. 09.11.17. 29.06.18. Preparation Phase System II.B.16. Å ekovići Mncp 221.38 77 II.B.16.1 NCB-071 Rehabilitation of Local Roads W 96.29 NCB 1 Post 28.04.16. 20.05.16. 14.06.16. 26.08.16. "Zvornikputevi", Zvornik Works Completed 78 II.B.16.3 NCB-089 Rehabilitation of Town Cemetery W 40.85 NCB 1 Post 27.07.16. 18.08.16. 01.09.16. 09.12.16. "Tehnometal", Vlasenica Works Completed Entrance 28.07.16. 18.08.16. 27.09.16. 16.11.16. 79 II.B.16.4 NCB-090 Cleaning of Riverbed W 33.72 NCB 1 Post 27.07.16. 18.08.16. 01.09.16. 10.01.17. "Tehnometal", Vlasenica Works Completed 28.07.16. 18.08.16. 27.09.16. 13.12.16. 80 II.B.16.5 NCB-099 Construction of Pedestrian Bridge W 39.29 NCB 1 Post 17.10.16. 10.11.16. 21.11.16. 03.06.17. "Zvornikputevi", Zvornik On-Going 20.10.16. 10.11.16. 11.01.17. 81 II.B.16.6 NCB-100 Rehabilitation of Truss Bridge W 11.23 NCB 1 Post 17.10.16. 10.11.16. 21.11.16. 03.05.17. "Zvornikputevi", Zvornik On-Going 20.10.16. 10.11.16. 15.02.17. II.B.17. Lopare Mncp 670.39 Contractor Procureme Completed EUR (000) EUR (000) nt Method amount in amount in Disbursed Post/Prior Activity # Packages Contract Contract Contract Contract received Signed NOTE Issue Type Item: Bids No. Activity I. 82 II.B.17.1 A: Componenta Emergency NCB-069 Disaster Recovery Rehabilitation of Town Goods Streets RS and W 139.53 NCB 1 Post 28.04.16. 20.05.16. 15.06.16. 25.07.16. "Bijeljina Put", Bijeljina Contract Completed Local Road 83 II.B.17.2 NCB-087 Rehabilitation of Local Roads W 166.99 NCB 1 Post 27.07.16. 17.08.16. 31.08.16. 25.11.16. "Bijeljina Put", Bijeljina Contract Completed 27.07.16. 17.08.16. 13.09.16. 04.10.16. 84 II.B.17.3 NCB-088 Rehabilitation of Bridge W 16.87 NCB 1 Post 27.07.16. 17.08.16. 31.08.16. 27.10.16. "Bijeljina Put", Bijeljina Contract Completed 27.07.16. 17.08.16. 13.09.16. 04.10.16. 85 II.B.17.4 NCB-094 Rehabilitation of Town Streets and W 226.99 NCB 1 Post 17.08.16. 07.09.16. 14.10.16. 13.12.16. "Bijeljina Put", Bijeljina Contract Completed Local Roads 25.08.16. 15.09.16. 30.09.16. 05.12.16. 86 II.B.17.5.1 NCB-101 Rehabilitation of Local Roads - Lot 1 W 44.09 NCB 1 Post 09.11.16. 30.11.16. 09.12.16. 04.05.17. "Bijeljina Put", Bijeljina Works Completed 22.11.16. 13.12.16. 25.01.17. 05.05.17. 87 II.B.17.5.2 NCB-101 Rehabilitation of Local Roads - Lot 2 W 75.92 NCB 1 Post 09.11.16. 30.11.16. 09.12.16. 04.05.17. "Bijeljina Put", Bijeljina Works Completed 22.11.16. 13.12.16. 25.01.17. 15.06.17. 88 II.B.17.6.1 NCB-129 Rehabilitation of Facilities - Lot 1 W 0.00 NCB 1 Post 02.10.17. 26.10.17. 09.11.17. 01.06.18. Preparation Phase (Rehabilitation of Streets and Local Roads (Streets in downtown; local road in Tobut LC; local road in Peljave LC; landslides in Pirkovci LC; local road in Lazići LC; local road in Tasovci LC)) 89 II.B.17.6.2 NCB-129 Rehabilitation of Facilities - Lot 2 W NCB 1 Post 02.10.17. 26.10.17. 09.11.17. 01.06.18. Preparation Phase (Rehabilitation of Roof on the Mncp building) II.B.18. Derventa Mncp 90 II.B.18.1 NCB-078 Rehabilitation of Town Street and Local W NCB 1 Post 15.06.16. 07.07.16. 21.07.16. 30.09.16. "Geokop", Derventa Contract Completed Roads 16.06.16. 08.07.16. 22.07.16. 30.09.16. 91 II.B.18.2 NCB-127 Rehabilitation of Roads and Bridge W NCB 1 Post 02.10.17. 25.10.17. 08.11.17. 01.06.18. Preparation Phase (Marko Kraljević St; local road in Lug LC; bridge in Gornji Detlak LC) Total Prior Review Thresholds (US$) Works >10,000,000 - All Contracts <5,000,000 - First two contracts Goods >2,000,000 - All Contracts <1,000,000 - First two contracts Consultant (Firms) >1,000,000 (QCBS) - All Contracts Consultant (Individuals) >300,000 (QCBS) - All Contracts Procurement Method Thresholds (US$) Works >5,000,000 - ICB <5,000,000 - NCB Goods >1,000,000 - ICB <1,000,000 - NCB