PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Senegal : Senegal Inclusive and Sustainable Agribusiness Development Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2018-02-23 2020-11-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P124018 GPN Date: Project Name: Senegal Inclusive and Sustainable Agribusiness Development Project Loan / Credit No: IDA / 53340 Executing Agency(ies): AGRIBUSINESS DEVELOPMENT PROJECT WORKS Bid Evaluation Activity Reference No. Procurement Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract / Description Component Review Type Method Document Amount Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion Type (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned T-PDIDAS-001-2017 / Component 1: Support to Single Stage - One 2018-04- Travaux de serres de 3000 IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2017-09-04 2017-10-30 sector actors Envelope 28 m2 à Saint-Louis T-PDIDAS-002-2017 / Component 1: Support to Single Stage - One 2018-06- Travaux de réhabilitation IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 Annulé 2017-08-31 2017-09-05 2017-10-17 2017-11-16 2017-12-21 sector actors Envelope 19 de l'Agropole de MPAL T-PDIDAS-003-2017 / Component 1: Support to Single Stage - One En attente 2018-05- Travaux d'aménagement des IDA / 53340 A posteriori Demande de prix Limited 28,000.00 0.00 2017-09-10 2017-11-05 sector actors Envelope d'exécution 04 mares et toufndés T-PDIDAS-004-2017 / Component 1: Support to Single Stage - One En attente 2018-04- Travaux d'aménagement des IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-09-05 2017-10-31 sector actors Envelope d'exécution 29 pare feu T-PDIDAS-005-2017 / Component 1: Support to Single Stage - One En attente 2018-06- Travaux de matérialisation IDA / 53340 A posteriori Appel d'offres Open - National 220,000.00 0.00 2017-08-25 2017-08-30 2017-10-11 2017-11-10 2017-12-15 sector actors Envelope d'exécution 13 des POAS T-PDIDAS-006-2017 / Travaux de construction des Component 1: Support to Single Stage - One En attente 2017-10- IDA / 53340 A posteriori Appel d'offres Open - National 900,000.00 0.00 2016-12-23 2016-12-28 2017-02-08 2017-03-10 2017-04-14 bureaux fonciers des neuf sector actors Envelope d'exécution 11 communes cibles T-PDIDAS-007-2017 / Component 2: Development Travaux d'aménagement du of irrigation infrastructure Single Stage - One En attente 2018-06- IDA / 53340 A posteriori Appel d'offres Open - National 340,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 site pilote de Ngnith( and natural resources Envelope d'exécution 02 relance lots1,2 et 3) management T-PDIDAS-011-2017 / Travaux d'aménagement de Component 2: Development pépinière communautaire of irrigation infrastructure Single Stage - One En attente 2018-06- IDA / 53340 A posteriori Appel d'offres Open - National 160,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 par forêt ou réserve( and natural resources Envelope d'exécution 02 clôtures, points d'eau, management magasins etc.) T-PDIDAS-001-2018 / Component 2: Development Travaux du canal du shunt of irrigation infrastructure Open - Single Stage - One 14,257,539.8 En cours 2019-01- IDA / 53340 A priori Appel d'offres 0.00 2018-04-09 2018-06-13 2018-04-14 2018-05-26 2018-06-25 2018-07-30 et ouvrages associés dans and natural resources International Envelope 3 d'exécution 26 le cadre du PDIDAS management T-PDIDAS-002-2018 / Travaux de faucardage, de Component 2: Development curage et de génie civil of irrigation infrastructure Single Stage - One 11,771,595. 2018-10- IDA / 53340 A priori Appel d'offres Open - National 9,468,098.42 Signé 2017-12-24 2017-12-29 2017-12-29 2018-02-09 2018-02-22 2018-03-11 2018-03-01 2018-04-15 2018-07-23 pour la remise en eau du and natural resources Envelope 66 12 bassin du Ngalam incluant management la zone des trois marigots T-PDIDAS-024-2018 / Travaux de réfection de la Component 1: Support to Single Stage - One En attente 2019-02- salle d'archives du cadastre IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 sector actors Envelope d'exécution 16 et domaines de Saint-louis et Louga Component 2: Development T-PDIDAS-025-2018 / of irrigation infrastructure Single Stage - One En attente 2019-02- Travaux des infrastructures IDA / 53340 A posteriori Appel d'offres Open - National 2,200,000.00 0.00 2018-05-07 2018-05-12 2018-06-23 2018-07-23 2018-08-27 and natural resources Envelope d'exécution 23 d'irrigations secondaires management Component 2: Development T-PDIDAS-026-2018 / of irrigation infrastructure Single Stage - One En attente 2019-01- Travaux d'aménagement du IDA / 53340 A posteriori Appel d'offres Open - National 400,000.00 0.00 2018-03-20 2018-03-25 2018-05-06 2018-06-05 2018-07-10 and natural resources Envelope d'exécution 06 site pilote de Ngnith management T-PDIDAS-027-2018 / Travaux d'aménagement de Component 2: Development Pépinière communautaire of irrigation infrastructure Single Stage - One En attente 2019-01- IDA / 53340 A posteriori Appel d'offres Open - National 300,000.00 0.00 2018-03-28 2018-04-02 2018-05-14 2018-06-13 2018-07-18 par forêt ou réserve and natural resources Envelope d'exécution 14 (Clôtures, Points d'eau, management Magasins etc.) T-PDIDAS-028-2018 / Component 2: Development Travaux de matérialisation of irrigation infrastructure Single Stage - One En attente 2019-01- des limites des forêts et IDA / 53340 A posteriori Appel d'offres Open - National 190,000.00 0.00 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 and natural resources Envelope d'exécution 05 réserves (Bornage, management pancartage, etc.) T-PDIDAS-016-2017 / Travaux de construction des Component 1: Support to Single Stage - One En attente 2017-10- IDA / 53340 A posteriori Appel d'offres Open - National 900,000.00 0.00 2016-12-22 2016-12-27 2017-02-07 2017-03-09 2017-04-13 bureaux fonciers des 9 sector actors Envelope d'exécution 10 communes cibles T-PDIDAS-012-2017 / Component 2: Development Travaux de matérialisation of irrigation infrastructure Single Stage - One En attente 2018-06- des limites des forêts et IDA / 53340 A posteriori Appel d'offres Open - National 180,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 and natural resources Envelope d'exécution 02 réserves(Bornage, management pancartage etc.) Page 1 T-PDIDAS-029-2018 / Réalisation des travaux et de prestations de services Component 2: Development de la parcelle test goutte à of irrigation infrastructure Single Stage - One En attente 2019-02- goutte et d'aspersion par IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-07-03 2018-08-28 and natural resources Envelope d'exécution 24 solaire/Relance du lot 3 du management marché de travaux d'aménagement du site pilote de Gnith T-PDIDAS-001-2019 / Travaux de réfection de la Component 1: Support to Single Stage - One En cours 2019-12- salle d'archives du cadastre IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2019-03-04 2019-05-09 2019-03-09 2019-04-20 2019-05-20 2019-06-24 sector actors Envelope d'exécution 21 et domaines de st-louis et Louga T-PDIDAS-002-2019 / Component 2: Development Travaux du canal du shunt of irrigation infrastructure Open - Single Stage - One 14,000,000.0 En attente 2019-12- IDA / 53340 A priori Appel d'offres 0.00 2019-02-28 2019-03-05 2019-04-16 2019-05-16 2019-06-20 et ouvrages associés dans and natural resources International Envelope 0 d'exécution 17 le cadre du PDIDAS management Component 2: Development T-PDIDAS-003-2019 / of irrigation infrastructure Open - Single Stage - One 16,000,000.0 En attente 2020-02- Travaux des infrastructures IDA / 53340 A priori Appel d'offres 0.00 2019-04-16 2019-04-21 2019-06-02 2019-07-02 2019-08-06 and natural resources International Envelope 0 d'exécution 02 secondaires management Component 2: Development T-PDIDAS-004-2019 / of irrigation infrastructure Open - Single Stage - One 10,000,000.0 En attente 2019-12- Travaux des infrastructures IDA / 53340 A priori Appel d'offres 0.00 2019-03-12 2019-03-17 2019-04-28 2019-05-28 2019-07-02 and natural resources International Envelope 0 d'exécution 29 tertiaires management Component 2: Development T-PDIDAS-005-2019 / of irrigation infrastructure Single Stage - One En attente 2020-02- Travaux pour les sous IDA / 53340 A posteriori Appel d'offres Open - National 2,800,000.00 0.00 2019-04-23 2019-04-28 2019-06-09 2019-07-09 2019-08-13 and natural resources Envelope d'exécution 09 projets de st louis management Component 2: Development T-PDIDAS-006-2019 / of irrigation infrastructure Single Stage - One En attente 2020-02- Travaux pour les sous IDA / 53340 A posteriori Appel d'offres Open - National 1,600,000.00 0.00 2019-04-25 2019-04-30 2019-06-11 2019-07-11 2019-08-15 and natural resources Envelope d'exécution 11 projets de Louga management T-PDIDAS-008-2019 / Travaux de substitution Component 2: Development aux offres foncières de of irrigation infrastructure Single Stage - One En attente 2020-03- IDA / 53340 A posteriori Appel d'offres Open - National 682,000.00 0.00 2019-06-06 2019-06-11 2019-07-23 2019-08-22 2019-09-26 Yetty Yone ,Khatète and natural resources Envelope d'exécution 24 ,Khelcom Diop, Bidieum management Mouride et Gantour du PDIDAS. Component 2: Development T-PDIDAS-009-2019 / of irrigation infrastructure Open - Single Stage - One 30,246,475.7 31,886,141. 2020-06- Travaux des infrastructures IDA / 53340 A priori Appel d'offres Signé 2019-08-16 2019-08-08 2019-08-21 2019-09-09 2019-10-02 2019-10-31 2019-11-01 2019-12-12 2019-12-06 2020-03-09 and natural resources International Envelope 9 40 03 secondaires et tertiaires management T-PDIDAS-001-2020 / Réalisation des travaux Component 2: Development d'infrastructures d'irrigation of irrigation infrastructure Single Stage - One En attente 2020-11- de substitution dans les IDA / 53340 A posteriori Appel d'offres Open - National 700,000.00 0.00 2020-02-05 2020-02-10 2020-03-23 2020-04-22 2020-05-27 and natural resources Envelope d'exécution 23 sites de Niet Yoon, management Gantour, Khatète, Khelcom Diop, Bidiem Mouride SN-PDIDAS-204880-CW- RFQ / Travaux de Component 2: Development substitution des sites de of irrigation infrastructure Single Stage - One En attente 2021-07- IDA / 53340 A posteriori Demande de prix Limited 600,000.00 0.00 2020-11-25 2021-01-20 Gantour et Khelcom ( and natural resources Envelope d'exécution 19 réalisation de mini forages management et faucardage etc..) GOODS Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual F- PDIDAS-002-2017 / Acquisition de matériaux et Component 1: Support to Single Stage - One de matériels pour la mise IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 Annulé 2017-07-31 2018-02-12 2017-08-05 2017-09-16 2017-10-16 2017-11-20 2018-05-19 sector actors Envelope en place de dispositif anti- corrosif F- PDIDAS-006-2017 / Component 1: Support to Single Stage - One Acquisition de mobilier de IDA / 53340 A posteriori Demande de prix Limited 2,600.00 0.00 Annulé 2017-08-13 2017-10-08 2018-04-06 sector actors Envelope bureau pour l'UEP APIX F- PDIDAS-007-2017 / Acquisition de boutures Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2017-08-16 2017-10-11 2018-04-09 (matériel végétal)pour sector actors Envelope l'ISRA F- PDIDAS-013-2017 / Component 1: Support to Single Stage - One En attente Acquisition de carburant IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2017-08-07 2017-10-02 2018-03-31 sector actors Envelope d'exécution pour les agents fonciers F- PDIDAS-014-2017 / Acquisition de matériels Component 1: Support to Single Stage - One En attente informatiques pour les IDA / 53340 A posteriori Demande de prix Limited 18,960.00 0.00 2017-08-19 2017-10-14 2018-04-12 sector actors Envelope d'exécution agents fonciers de l'UCP et la DHORT F- PDIDAS-015-2017 / Component 1: Support to Single Stage - One En attente Acquisition d'images IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-09-08 2017-11-03 2018-05-02 sector actors Envelope d'exécution satellitaires F- PDIDAS-016-2017 / Acquisition de 15 GPS de levées parcellaires, d'un Component 1: Support to Single Stage - One En attente GPS différentiel pour le IDA / 53340 A posteriori Appel d'offres Open - National 82,000.00 0.00 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 sector actors Envelope d'exécution cadastre de louga, de 15 GPS et tablettes pour les enquêteurs Page 2 F- PDIDAS-017-2017 / Acquisition d'une station Component 1: Support to Single Stage - One En attente totale pour le cadastre de IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-08-28 2017-10-23 2018-04-21 sector actors Envelope d'exécution louga pour la sécurisation foncière F- PDIDAS-018-2017 / Location de bureau pour Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 7,200.00 0.00 2017-08-27 2017-10-22 2018-04-20 l'équipe de la régularisation sector actors Envelope d'exécution foncière F- PDIDAS-019-2017 / Component 2: Development Acquisition d'équipements of irrigation infrastructure Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2017-08-09 2017-08-14 2017-09-25 2017-10-25 2017-11-29 2018-05-28 de pépinières and natural resources Envelope d'exécution communautaires management F- PDIDAS-020-2017 / Component 2: Development Acquisition de matériel of irrigation infrastructure Single Stage - One En attente d'inventaire et de géo IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2017-08-09 2017-08-14 2017-09-25 2017-10-25 2017-11-29 2018-05-28 and natural resources Envelope d'exécution référencement pour l'UEP management ANGMV F- PDIDAS-021-2017 / Component 2: Development Acquisition d'un logiciel of irrigation infrastructure Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 28,000.00 0.00 2017-08-21 2017-10-16 2018-04-14 TOMPRO multi projet et and natural resources Envelope d'exécution d'un logiciel MS PROJECT management F- PDIDAS-022-2017 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-09-06 2017-11-01 2018-04-30 de téléconférence et de Evaluation (GEF: US$0.5 Envelope d'exécution téléphonie million; IDA: US$6 million) F- PDIDAS-023-2017 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One En attente informatiques et de IDA / 53340 A posteriori Appel d'offres Open - National 80,000.00 0.00 2017-08-08 2017-08-13 2017-09-24 2017-10-24 2017-11-28 2018-05-27 Evaluation (GEF: US$0.5 Envelope d'exécution géolocalisation pour le suivi million; IDA: US$6 million) évaluation F- PDIDAS-024-2017 / Component 3: Coordination, Acquisition de matériels de Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 3,000.00 0.00 2017-08-15 2017-10-10 2018-04-08 bureau et bureautique pour Evaluation (GEF: US$0.5 Envelope d'exécution la DHORT million; IDA: US$6 million) F- PDIDAS-025-2017 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-08-23 2017-10-18 2018-04-16 informatiques pour la Evaluation (GEF: US$0.5 Envelope DAPSA million; IDA: US$6 million) Component 3: Coordination, F- PDIDAS-026-2017 / Impact Monitoring and Single Stage - One Acquisition d'outils de IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-09-11 2017-11-06 2018-05-05 Evaluation (GEF: US$0.5 Envelope collectes pour la DAPSA million; IDA: US$6 million) Component 3: Coordination, F- PDIDAS-027-2017 / Impact Monitoring and Single Stage - One Acquisition d'espace drop IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-08-25 2017-10-20 2018-04-18 Evaluation (GEF: US$0.5 Envelope box million; IDA: US$6 million) F-PDIDAS-029-2017 / Acquisition de petits matériels agricoles et de Component 2: Development laboratoire pour la of irrigation infrastructure Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 8,000.00 0.00 Annulé 2017-08-23 2017-10-18 2018-04-16 multiplication in vitro de la and natural resources Envelope variété Beauregard et des management variétés Covington, Rubina et Bostok par l'ISRA F-PDIDAS-030-2017 / Acquisition d'intrants,produits Component 2: Development chimiques et consommables of irrigation infrastructure Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2017-08-26 2017-10-21 2018-04-19 pour la multiplication in and natural resources Envelope vitro de la variété management Beauregard et des variétés Covington, Rubina et Bostok par l'ISRA Component 2: Development F-PDIDAS-031-2017 / of irrigation infrastructure Single Stage - One Fournitures de bureau IDA / 53340 A posteriori Demande de prix Limited 8,000.00 0.00 Annulé 2017-08-27 2017-10-22 2018-04-20 and natural resources Envelope destinées à l'ISRA management F-PDIDAS-032-2017 / Component 2: Development Acquisition d'intrants pour of irrigation infrastructure Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 243,619.00 0.00 Annulé 2017-08-24 2017-08-29 2017-10-10 2017-11-09 2017-12-14 2018-06-12 les 5 GIE du programme and natural resources Envelope pilote de Ngnith(200 ha) management F-PDIDAS-001-2018 / Component 1: Support to Single Stage - One En cours Fourniture et pose de IDA / 53340 A posteriori Demande de prix Limited 10,000.00 0.00 2018-04-02 2018-05-28 2018-11-24 sector actors Envelope d'exécution parcelle test F-PDIDAS-002-2018 / Fourniture et pose de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 324,000.00 159,650.19 Signé 2018-04-10 2018-11-12 2018-04-15 2018-05-27 2018-12-12 2018-06-26 2019-01-25 2018-07-31 2019-04-08 2019-01-27 parcelles de démonstration sector actors Envelope agro écologiques F-PDIDAS-003-2018 / Component 1: Support to Single Stage - One En cours Acquisition d'engrais IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-03-24 2018-05-19 2018-11-15 sector actors Envelope d'exécution biologiques F-PDIDAS-004-2018 / Component 1: Support to Single Stage - One En attente Acquisition d'échantillons de IDA / 53340 A posteriori Demande de prix Limited 2,000.00 0.00 2018-04-14 2018-06-09 2018-12-06 sector actors Envelope d'exécution foyers améliorés F-PDIDAS-005-2018 / Production de supports techniques (Présentations Component 1: Support to Single Stage - One En attente techniques, Brochures, IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2018-03-25 2018-05-20 2018-11-16 sector actors Envelope d'exécution cahiers, fiches produits..) en diverses langues par l'UEP de l'APIX Page 3 F-PDIDAS-006-2018 / Acquisition d'équipements Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 4,000.00 0.00 2018-03-26 2018-05-21 2018-11-17 et d'outils d'archivage pour sector actors Envelope d'exécution l'UCP et la DGID F-PDIDAS-007-2018 / Acquisition de onze (11) véhicules pick-up pour les Component 1: Support to Single Stage - One En cours IDA / 53340 A posteriori Appel d'offres Open - National 338,000.00 0.00 2018-03-30 2018-07-02 2018-04-04 2018-05-16 2018-08-03 2018-06-15 2018-10-16 2018-07-20 2019-01-16 neuf bureaux fonciers et les sector actors Envelope d'exécution cadastres de st-louis et Louga F-PDIDAS-008-2018 / Acquisition de divers Component 2: Development matériels informatiques of irrigation infrastructure Single Stage - One En attente (ordinateurs, appareil photo IDA / 53340 A posteriori Demande de prix Limited 39,400.00 0.00 2018-03-28 2018-05-23 2018-11-19 and natural resources Envelope d'exécution etc...) et de consommables management informatiques pour l'UCP et de l'ANGMV F-PDIDAS-009-2018 / Component 1: Support to Single Stage - One En attente Impression de formulaires IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2018-03-18 2018-05-13 2018-11-09 sector actors Envelope d'exécution et registres fonciers F-PDIDAS-010-2018 / Acquisition de carburant Component 1: Support to Single Stage - One En attente pour les véhicules des IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 0.00 2018-03-23 2018-03-28 2018-05-09 2018-06-08 2018-07-13 2019-01-09 sector actors Envelope d'exécution bureaux fonciers, de la DGID et de l'UCP F-PDIDAS-011-2018 / Acquisition de matériels informatiques et de communication Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-22 2018-06-17 2018-12-14 complémentaires selon le sector actors Envelope d'exécution modèle du Système d'Information Foncière(SIF) retenu F-PDIDAS-012-2018 / Acquisition Soft et Component 1: Support to Single Stage - One En attente Hardware selon le modèle IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2018-04-11 2018-04-16 2018-05-28 2018-06-27 2018-08-01 2019-01-28 sector actors Envelope d'exécution SIF et options technologiques retenues F-PDIDAS-013-2018 / Component 1: Support to Single Stage - One En cours Acquisition d'images IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2018-04-16 2018-04-21 2018-06-02 2018-09-18 2018-07-02 2018-10-10 2018-08-06 2019-02-02 sector actors Envelope d'exécution satellitaires F-PDIDAS-014-2018 / Acquisition de 02 stations GPS permanentes, de GPS Component 1: Support to Single Stage - One En attente de levés parcellaires et de IDA / 53340 A posteriori Appel d'offres Open - National 162,000.00 0.00 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-01-16 sector actors Envelope d'exécution tablettes pour la sécurisation foncière et bureaux fonciers F-PDIDAS-015-2018 / Acquisition de fournitures Component 1: Support to Single Stage - One En attente de bureau et de IDA / 53340 A posteriori Demande de prix Limited 22,000.00 0.00 2018-04-14 2018-06-09 2018-12-06 sector actors Envelope d'exécution consommables pour l'UCP et la DGID F-PDIDAS-016-2018 / Acquisition de matériels Component 1: Support to Single Stage - One En attente informatiques et de IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-16 2018-06-11 2018-12-08 sector actors Envelope d'exécution mobiliers de bureau pour la DGID F-PDIDAS-017-2018 / Component 2: Development Acquisition de supports de of irrigation infrastructure Single Stage - One En cours IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2018-04-17 2018-04-22 2018-06-03 2018-07-03 2018-08-07 2019-02-03 communication pour l'UCP and natural resources Envelope d'exécution et l'ANGMV management F-PDIDAS-018-2018 / Component 2: Development Acquisition de matériel of irrigation infrastructure Single Stage - One En attente d'inventaire et de géo IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-02-05 and natural resources Envelope d'exécution référencement pour management l'ANGMV Component 2: Development F-PDIDAS-019-2018 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériel IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2018-04-17 2018-06-12 2018-12-09 and natural resources Envelope d'exécution bureautique pour l'ANGMV management Component 2: Development F-PDIDAS-020-2018 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériels de IDA / 53340 A posteriori Demande de prix Limited 10,000.00 0.00 2018-04-23 2018-06-18 2018-12-15 and natural resources Envelope d'exécution jardin pour l'ANGMV management F-PDIDAS-021-2018 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2018-06-03 2018-07-29 2019-01-25 de téléconférence et de Evaluation (GEF: US$0.5 Envelope d'exécution téléphonie million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-022-2018 / Impact Monitoring and Single Stage - One En attente Acquisition de licence IDA / 53340 A posteriori Demande de prix Limited 2,000.00 0.00 2018-04-18 2018-06-13 2018-12-10 Evaluation (GEF: US$0.5 Envelope d'exécution antivirus million; IDA: US$6 million) F- PDIDAS-009-2017 / Acquisition de supports de communication(plaquette,flye Component 1: Support to Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 44,000.00 0.00 2017-08-20 2017-10-15 2018-04-13 rs,kakémono,enseignes,vidéog sector actors Envelope d'exécution ramme ...) pour l'UCP et l'ANGMV F-PDIDAS-014-2017 / Component 3: Coordination, Acquisition de matériels Impact Monitoring and Single Stage - One En cours informatiques pour les IDA / 53340 A posteriori Demande de prix Limited 18,960.00 0.00 2017-10-10 2017-12-05 2018-06-03 Evaluation (GEF: US$0.5 Envelope d'exécution agents fonciers de l'UCP et million; IDA: US$6 million) la DHORT Page 4 F-PDIDAS-017-2017 / Acquisition d'une station Component 1: Support to Single Stage - One En cours totale pour le cadastre de IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-10-10 2017-12-05 2018-06-03 sector actors Envelope d'exécution Louga pour la sécurisation foncière F-PDIDAS-016-2017 / Acquisition de 15 GPS à levés parcellaires, d'un (01) Component 1: Support to Single Stage - One En cours GPS différentiel pour le IDA / 53340 A posteriori Appel d'offres Open - National 92,000.00 0.00 2017-09-04 2017-09-15 2017-09-09 2017-10-21 2017-11-20 2017-12-25 2018-06-23 sector actors Envelope d'exécution Cadastre de Louga et de 15 tablettes pour les enquêteurs F-PDIDAS-010-2017 / Acquisition de véhicules et Component 1: Support to Single Stage - One En attente de motos pour la CFAHS, IDA / 53340 A posteriori Appel d'offres Open - National 199,600.00 0.00 2017-07-21 2017-07-26 2017-09-06 2017-10-06 2017-11-10 2018-05-09 sector actors Envelope d'exécution l'ANGMV, la DHORT et l'UCP F-PDIDAS-028-2017 / Acquisition de fournitures et de consommables Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-03-25 2017-05-20 2017-11-16 informatiques pour l'UCP, sector actors Envelope d'exécution DHORT, cadastre st-louis et Louga F- PDIDAS-012-2017 / Component 1: Support to Single Stage - One En attente Fourniture de formulaires IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-08-26 2017-10-21 2018-04-19 sector actors Envelope d'exécution et de registres fonciers Component 3: Coordination, F-PDIDAS-023-2018 / Impact Monitoring and Single Stage - One Acquisition d'un(01) logiciel IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2018-04-15 2018-08-30 2018-06-10 2018-12-07 Evaluation (GEF: US$0.5 Envelope MS-Project million; IDA: US$6 million) F-PDIDAS-001-2019 / Acquisition de matériels et Component 1: Support to Single Stage - One d'intrants pour la mise en IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 23,403.50 Achevé 2019-02-19 2019-11-13 2019-02-24 2019-11-18 2019-04-07 2019-12-19 2019-05-07 2019-12-26 2019-06-11 2020-02-07 2019-12-08 2020-07-02 sector actors Envelope œuvre du système de qualité F-PDIDAS-002-2019 / Acquisition de matériels informatique et de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 26,500.00 23,363.47 Achevé 2019-03-17 2019-08-26 2019-05-12 2019-10-15 2019-11-08 2019-12-05 communication sector actors Envelope complémentaires pour l'UCP et les agents SIF F-PDIDAS-003-2019 / Acquisition d'équipements Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 28,430.51 Achevé 2019-02-18 2019-11-12 2019-04-15 2020-01-08 2019-10-12 2020-05-06 et d'outils d'archivage pour sector actors Envelope l'UCP et la DGID F-PDIDAS-005-2019 / Acquisition d'équipements Component 1: Support to Single Stage - One des CTAF (matériels IDA / 53340 A posteriori Demande de prix Limited 10,000.00 21,892.51 Achevé 2019-03-23 2019-05-17 2019-05-18 2019-07-17 2019-11-14 2019-08-27 sector actors Envelope informatiques, fournitures de bureau et consommables) F-PDIDAS-006-2019 / Acquisition de carburant Component 1: Support to Single Stage - One En attente pour les véhicules des IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 0.00 2019-02-14 2019-02-19 2019-04-02 2019-05-02 2019-06-06 2019-12-03 sector actors Envelope d'exécution bureaux fonciers, de la DGID et de l'UCP F-PDIDAS-007-2019 / Acquisition Soft et Component 1: Support to Single Stage - One En attente Hardware selon le modèle IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-03-05 2019-03-10 2019-04-21 2019-05-21 2019-06-25 2019-12-22 sector actors Envelope d'exécution SIF et options technologiques retenues F-PDIDAS-008-2019 / Acquisition de 02 stations Component 1: Support to Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 140,000.00 83,223.63 Achevé 2019-02-28 2019-05-14 2019-03-05 2019-04-16 2019-06-14 2019-05-16 2019-08-01 2019-06-20 2019-09-09 2019-12-17 2020-03-27 GPS permanentes pour la sector actors Envelope DGID F-PDIDAS-009-2019 / Acquisition de fournitures Component 1: Support to Single Stage - One de bureau et de IDA / 53340 A posteriori Demande de prix Limited 16,000.00 14,110.29 Achevé 2019-03-10 2019-05-20 2019-05-05 2019-08-07 2019-11-01 2019-09-24 sector actors Envelope consommables pour l'UCP et la DGID F-PDIDAS-010-2019 / Acquisition de matériels Component 1: Support to Single Stage - One informatiques et de IDA / 53340 A posteriori Demande de prix Limited 40,000.00 38,571.53 Signé 2019-03-16 2019-02-08 2019-05-11 2019-04-12 2019-11-07 sector actors Envelope mobiliers de bureau pour la DGID Component 2: Development F-PDIDAS-011-2019 / of irrigation infrastructure Single Stage - One En attente Fourniture et pose de IDA / 53340 A posteriori Appel d'offres Open - National 160,000.00 0.00 2019-03-27 2019-04-01 2019-05-13 2019-06-12 2019-07-17 2020-01-13 and natural resources Envelope d'exécution clôture management Component 2: Development F-PDIDAS-012-2019 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériel IDA / 53340 A posteriori Demande de prix Limited 26,000.00 0.00 2019-03-11 2019-05-06 2019-11-02 and natural resources Envelope d'exécution bureautique pour l'ANGMV management F-PDIDAS-013-2019 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2019-03-25 2019-06-27 2019-05-20 2019-11-16 de téléconférence et de Evaluation (GEF: US$0.5 Envelope d'exécution téléphonie million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-014-2019 / Impact Monitoring and Single Stage - One Acquisition de licence IDA / 53340 A posteriori Demande de prix Limited 2,000.00 1,137.32 Signé 2019-03-18 2019-10-03 2019-05-13 2019-10-21 2019-11-09 Evaluation (GEF: US$0.5 Envelope antivirus million; IDA: US$6 million) Page 5 F-PDIDAS-015-2019 / Component 3: Coordination, Acquisition d'un (01) logiciel Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 16,000.00 0.00 2019-03-11 2019-05-06 2019-11-02 Office 365 intégrant MS- Evaluation (GEF: US$0.5 Envelope d'exécution Project million; IDA: US$6 million) F-PDIDAS-016-2019 / Acquisition de matériels Component 3: Coordination, bureautiques pour l'UCP et Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 17,000.00 10,494.04 Achevé 2019-03-12 2019-10-30 2019-05-07 2020-01-29 2019-11-03 2020-03-27 la DHORT (appareil photo Evaluation (GEF: US$0.5 Envelope numérique, imprimante et million; IDA: US$6 million) photocopieuse) F-PDIDAS-017-2019 / Component 3: Coordination, Acquisition d'espace dans Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-04-11 2019-04-16 2019-05-28 2019-06-27 2019-08-01 2020-01-28 les médias nationaux et Evaluation (GEF: US$0.5 Envelope d'exécution internationaux million; IDA: US$6 million) F-PDIDAS-004-2019 / Component 3: Coordination, Acquisition de supports de Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 53,662.61 Achevé 2019-05-06 2019-11-20 2019-07-01 2020-01-10 2019-12-28 2020-03-30 communication et de Evaluation (GEF: US$0.5 Envelope documents de capitalisation million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-025-2018 / Passation de Impact Monitoring and En attente Acquisition d'un logiciel MS IDA / 53340 A posteriori marché de gré à Direct 20,000.00 0.00 2018-12-06 2018-12-06 2019-01-10 2019-07-09 Evaluation (GEF: US$0.5 d'exécution Project gré million; IDA: US$6 million) F-PDIDAS-0006-2019 / Acquisition de carburant Component 1: Support to Single Stage - One pour les véhicules des IDA / 53340 A posteriori Demande de prix Limited 49,800.00 44,910.42 Signé 2019-06-01 2019-06-07 2019-07-27 2019-07-01 2020-01-23 sector actors Envelope bureaux fonciers, de la DGID et de l'UCP F-PDIDAS-100-2019 / Acquisition d'un GPS Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 80,000.00 38,282.98 Achevé 2019-09-21 2019-09-26 2019-11-16 2019-11-18 2020-05-14 2019-12-03 différentiel pour le sector actors Envelope Cadastre de Louga Component 3: Coordination, F-PDIDAS-001-2020 / Impact Monitoring and Single Stage - One Acquisition de mobiliers de IDA / 53340 A posteriori Demande de prix Limited 7,000.00 4,482.63 Achevé 2020-02-15 2020-02-04 2020-04-11 2020-03-16 2020-10-08 2020-05-12 Evaluation (GEF: US$0.5 Envelope bureau million; IDA: US$6 million) F-PDIDAS-002-2020 / Component 3: Coordination, Acquisition de Impact Monitoring and Single Stage - One consommables informatiques IDA / 53340 A posteriori Demande de prix Limited 10,000.00 19,711.57 Achevé 2020-02-10 2020-01-30 2020-02-28 2020-03-12 2020-03-13 2020-03-16 Evaluation (GEF: US$0.5 Envelope et bureautiques en deux million; IDA: US$6 million) (02) lots Component 3: Coordination, F-PDIDAS-003-2020 / Impact Monitoring and Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2020-03-03 2020-03-26 2020-12-31 Acquisition de carburant Evaluation (GEF: US$0.5 Envelope d'exécution million; IDA: US$6 million) SN-PDIDAS-183243-GO- RFQ / Acquisition Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 20,000.00 17,971.06 Signé 2020-07-13 2020-08-06 2020-09-07 2020-10-15 2021-03-06 d'équipements d'archivage sector actors Envelope et de bureau du Cadastre de Saint Louis SN-PDIDAS-183249-GO- RFQ / Acquisition Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 30,000.00 56,054.66 Signé 2020-07-13 2020-07-14 2020-09-07 2020-08-21 2021-03-06 d'ombrières pour la sector actors Envelope protection des plants et pépinières SN-PDIDAS-187447-GO- Component 3: Coordination, RFQ / Acquisition de pneus Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 14,723.05 Signé 2020-08-21 2020-08-21 2020-10-16 2020-10-12 2021-04-14 pour l'UCP et le parc Evaluation (GEF: US$0.5 Envelope automobile des bureaux million; IDA: US$6 million) fonciers Component 3: Coordination, F-PDIDAS-004-2020 / Impact Monitoring and Single Stage - One En cours Acquisition de supports de IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2020-04-21 2020-05-26 2020-11-22 Evaluation (GEF: US$0.5 Envelope d'exécution communication million; IDA: US$6 million) NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-PDIDAS-001-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente pour la couverture IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2017-08-19 2017-10-14 2018-04-12 Evaluation (GEF: US$0.5 Envelope d'exécution assurance maladie du million; IDA: US$6 million) personnel du PDIDAS S-PDIDAS-002-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2017-08-19 2017-10-14 2018-04-12 pour le gardiennage des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-003-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2017-08-19 2017-10-14 2018-04-12 pour le nettoiement des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-029-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-04 2018-05-30 2018-11-26 pour l'assurance maladie du Evaluation (GEF: US$0.5 Envelope d'exécution personnel du PDIDAS million; IDA: US$6 million) S-PDIDAS-030-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente pour le gardiennage des IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2018-04-02 2018-05-28 2018-11-24 Evaluation (GEF: US$0.5 Envelope d'exécution locaux PDIDAS à Saint- million; IDA: US$6 million) Louis et Dakar Page 6 S-PDIDAS-031-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2018-03-31 2018-05-26 2018-11-22 pour le nettoiement des Evaluation (GEF: US$0.5 Envelope d'exécution locaux PDIDAS à Saint- million; IDA: US$6 million) Louis F-PDIDAS-011-2017 / Sélection d'un consultant individuel pour la Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 2017-04-08 2017-06-03 2017-11-30 conception et le sector actors Envelope d'exécution développement d'un site web pour la CFAHS S-PDIDAS-0005-2019 / Component 1: Support to Single Stage - One En attente Impression de formulaires IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2019-03-18 2019-05-13 2019-11-09 sector actors Envelope d'exécution et registres fonciers S-PDIDAS-0001-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente pour l'entretien et IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-02-04 2019-02-09 2019-03-23 2019-04-22 2019-05-27 2019-11-23 Evaluation (GEF: US$0.5 Envelope d'exécution réparation des matériels million; IDA: US$6 million) roulants S-PDIDAS-0002-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-02-05 2019-02-10 2019-03-24 2019-04-23 2019-05-28 2019-11-24 pour l'assurance maladie du Evaluation (GEF: US$0.5 Envelope d'exécution personnel du PDIDAS million; IDA: US$6 million) S-PDIDAS-0003-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente pour l'entretien et IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2019-02-10 2019-04-07 2019-10-04 Evaluation (GEF: US$0.5 Envelope d'exécution nettoiement des locaux du million; IDA: US$6 million) PDIDAS S-PDIDAS-0004-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2019-02-12 2019-04-09 2019-10-06 pour le gardiennage des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-001-2020 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 16,000.00 0.00 2020-02-08 2020-04-04 2020-10-01 pour les services de Evaluation (GEF: US$0.5 Envelope d'exécution restauration million; IDA: US$6 million) S-PDIDAS-002-2020 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 24,000.00 0.00 2020-02-09 2020-04-05 2020-10-02 pour les services Evaluation (GEF: US$0.5 Envelope d'exécution d'hébergement million; IDA: US$6 million) S-PDIDAS.003-2020 / Sélection d'un prestataire Component 3: Coordination, pour l'entretien et la Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 2020-02-22 2020-04-18 2020-10-15 maintenance des Evaluation (GEF: US$0.5 Envelope d'exécution climatiseurs et autres million; IDA: US$6 million) équipements de froid SN-PDIDAS-160664-NC- Component 3: Coordination, RFQ / Sélection d'un Impact Monitoring and Single Stage - One En attente prestataire pour l'entretien IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 2020-02-22 2020-04-18 2020-10-15 Evaluation (GEF: US$0.5 Envelope d'exécution et la maintenance du million; IDA: US$6 million) matériel bureautique C-PDIDAS-002-2020 / Component 3: Coordination, Sélection d'un photographe Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 10,000.00 7,184.59 Achevé 2020-02-29 2020-07-06 2020-04-25 2020-07-07 2020-10-22 2020-07-10 chargé de la réalisation de Evaluation (GEF: US$0.5 Envelope la capitalisation du projet million; IDA: US$6 million) CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Amount Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal (US$) Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C-PDIDAS-001-2017 / Sélection d'un cabinet pour Sélection fondée Component 1: Support to En attente la préparation de IDA / 53340 A priori sur la qualité et Open - National 200,000.00 0.00 2017-08-21 2017-09-11 2017-10-25 2017-11-22 2017-12-22 2018-01-26 2018-03-02 2019-03-02 sector actors d'exécution l'évaluation sociale des 13 le coût 400 ha C-PDIDAS-012-2017 / Sélection d'un consultant pour l'étude diagnostique Sélection fondée technique des infra Component 1: Support to Open - IDA / 53340 A posteriori sur la qualité et 40,000.00 0.00 Annulé 2017-08-24 2017-09-14 2017-10-28 2017-11-25 2017-12-25 2018-01-29 2018-03-05 2019-03-05 existantes et élaboration sector actors International le coût d'un programme de développement de l'Agropole de Fassstructures C-PDIDAS-013-2017 / Sélection d'un consultant Sélection fondée Component 1: Support to Open - pour la réalisation de IDA / 53340 A posteriori sur la qualité et 40,000.00 0.00 Annulé 2017-08-17 2017-09-07 2017-10-21 2017-11-18 2017-12-18 2018-01-22 2018-02-26 2019-02-26 sector actors International l'audit environnemental de le coût l'Agropole de Mpal C-PDIDAS-016-2017 / Component 2: Development Sélection fondée Sélection d'un consultant of irrigation infrastructure sur les En attente pour l'évaluation sociale du IDA / 53340 A posteriori Open - National 40,000.00 0.00 2017-08-14 2017-09-04 2017-10-18 2017-11-17 2017-12-22 2018-06-20 and natural resources qualifications des d'exécution processus foncier des offres management consultants foncières C-PDIDAS-017-2017 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure Open - En attente IDA / 53340 A priori sur la qualité et 1,476,030.00 0.00 2017-08-24 2017-09-14 2017-10-28 2017-11-25 2017-12-25 2018-01-29 2018-03-05 2019-03-05 des travaux des and natural resources International d'exécution le coût infrastructures primaires du management Ngalam Page 7 C-PDIDAS-018-2017 / Sélection d'un cabinet chargé de l'étude d'impact Component 2: Development Sélection fondée environnemental et social of irrigation infrastructure sur les En cours IDA / 53340 A posteriori Open - National 80,000.00 0.00 2017-08-16 2019-05-20 2017-09-06 2017-10-20 2017-09-19 2017-11-19 2018-02-16 2017-12-24 2018-06-22 des infrastructures and natural resources qualifications des d'exécution d'irrigation primaires management consultants incluant les trois marigots et le Gandiolais C-PDIDAS-019-2017 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure Open - En attente IDA / 53340 A priori sur la qualité et 800,000.00 0.00 2017-08-23 2017-09-13 2017-10-27 2017-11-24 2017-12-24 2018-01-28 2018-03-04 2019-03-04 des travaux des and natural resources International d'exécution le coût infrastructures d'irrigation management secondaires C-PDIDAS-020-2017 / Sélection d'un consultant Component 2: Development pour la réalisation de Sélection fondée of irrigation infrastructure En attente l'étude d'impact IDA / 53340 A posteriori sur la qualité et Open - National 120,000.00 0.00 2017-08-25 2017-09-15 2017-10-29 2017-11-26 2017-12-26 2018-01-30 2018-03-06 2019-03-06 and natural resources d'exécution environnemental et social le coût management des aménagements secondaires et tertiaires C-PDIDAS-021-2017 / Component 2: Development Sélection d'un consultant Sélection fondée of irrigation infrastructure En attente pour la réalisation de IDA / 53340 A priori sur la qualité et Open - National 200,000.00 0.00 2017-08-22 2017-09-12 2017-10-26 2017-11-23 2017-12-23 2018-01-27 2018-03-03 2019-03-03 and natural resources d'exécution l'audit environnemental le coût management détaillé du Delta C-PDIDAS-022-2017 / Sélection d'un consultant Component 2: Development pour la réalisation de Sélection fondée of irrigation infrastructure En attente l'étude d'actualisation du IDA / 53340 A posteriori sur la qualité et Open - National 40,000.00 0.00 2017-08-28 2017-09-18 2017-11-01 2017-11-29 2017-12-29 2018-02-02 2018-03-09 2019-03-09 and natural resources d'exécution plan d'exploitation et le coût management d'entretien des barrages de Diama et de Manantali C-PDIDAS-032-2018 / Sélection fondée Sélection d'un cabinet pour Component 1: Support to sur les En attente la préparation de IDA / 53340 A posteriori Open - National 154,000.00 0.00 2018-03-26 2018-04-16 2018-05-30 2018-06-29 2018-08-03 2019-01-30 sector actors qualifications des d'exécution l'évaluation sociale des 19 consultants 364 ha C-PDIDAS-039-2018 / Sélection d'un Consultant pour le diagnostic du Sélection fondée Component 1: Support to En attente Système d'Information sur IDA / 53340 A posteriori sur la qualité et Open - National 160,000.00 0.00 2018-04-23 2018-05-14 2018-06-27 2018-07-25 2018-08-24 2018-09-28 2018-11-02 2019-11-02 sector actors d'exécution le Foncier(SIF), études le coût architecturales et développement du SIF C-PDIDAS-043-2018 / Sélection d'un cabinet pour la réalisation de l'Étude Component 2: Development Sélection fondée d'impact environnemental et of irrigation infrastructure sur les En attente social et du Plan d'Action IDA / 53340 A posteriori Open - National 120,000.00 0.00 2018-04-17 2018-05-08 2018-06-21 2018-07-21 2018-08-25 2019-02-21 and natural resources qualifications des d'exécution de Réinstallation des management consultants infrastructures d'irrigation primaires incluant les trois marigots C-PDIDAS-044-2018 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure En cours IDA / 53340 A posteriori sur la qualité et Open - National 160,000.00 0.00 2018-04-02 2018-04-23 2018-06-06 2018-07-04 2018-08-03 2018-09-07 2018-10-23 2018-10-12 2019-10-12 des travaux des and natural resources d'exécution le coût infrastructures d'irrigation management secondaires C-PDIDAS-045-2018 / Sélection d'un consultant pour la réalisation de l'étude d'impact Component 2: Development Sélection fondée Environnemental et Social of irrigation infrastructure sur les En attente IDA / 53340 A posteriori Open - National 120,000.00 0.00 2018-04-10 2018-05-01 2018-06-14 2018-07-14 2018-08-18 2019-02-14 et évaluation sociale et du and natural resources qualifications des d'exécution Plan d'Action de management consultants Réinstallation des aménagements secondaires et tertiaires C-PDIDAS-046-2018 / l'audit environnemental et l'élaboration du schéma Component 2: Development d'aménagement et de Sélection fondée of irrigation infrastructure En cours gestion des ressources IDA / 53340 A posteriori sur la qualité et Open - National 200,000.00 0.00 2018-04-19 2018-05-10 2018-06-23 2018-07-21 2018-08-20 2018-09-24 2018-10-29 2019-10-29 and natural resources d'examen naturelles et de le coût management l'environnement dans le delta et la moyenne vallée du fleuve Sénégal C-PDIDAS-047-2018 / Sélection d'un consultant pour la réalisation de l'Etude sur les risques Component 2: Development Sélection fondée d'inondation et le of irrigation infrastructure En attente IDA / 53340 A posteriori sur la qualité et Open - National 448,059.54 0.00 2018-04-05 2018-04-26 2018-06-09 2018-07-07 2018-08-06 2018-09-10 2018-10-15 2019-10-15 déversement non contrôlé and natural resources d'exécution le coût des barrages de Diama et management de Manantali et le Plan de Préparation aux situations d'urgence C-PDIDAS-048-2018 / Sélection d'un consultant Component 2: Development pour la réalisation de Sélection fondée of irrigation infrastructure En attente l'Etude d'actualisation du IDA / 53340 A posteriori sur la qualité et Open - National 40,000.00 0.00 2018-05-23 2018-06-13 2018-07-27 2018-08-24 2018-09-23 2018-10-28 2018-12-02 2019-12-02 and natural resources d'exécution Plan d'exploitation et le coût management d'entretien des Barrages de Diama et Manantali C-PDIDAS-055-2018 / Component 3: Coordination, Sélection d'un consultant Sélection fondée Impact Monitoring and En attente pour l'établissement de la IDA / 53340 A posteriori sur la qualité et Open - National 60,000.00 0.00 2018-04-06 2018-04-27 2018-06-10 2018-07-08 2018-08-07 2018-09-11 2018-10-16 2019-10-16 Evaluation (GEF: US$0.5 d'exécution situation de référence du le coût million; IDA: US$6 million) carbone Page 8 C-PDIDAS-056-2018 / Component 3: Coordination, Sélection fondée Sélection d'un consultant Impact Monitoring and En attente IDA / 53340 A posteriori sur la qualité et Open - National 40,000.00 0.00 2018-04-09 2018-04-30 2018-06-13 2018-07-11 2018-08-10 2018-09-14 2018-10-19 2019-10-19 pour l'informatisation du Evaluation (GEF: US$0.5 d'exécution le coût système suivi-évaluation million; IDA: US$6 million) C-PDIDAS-042-2018 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure Open - En attente IDA / 53340 A priori sur la qualité et 1,520,000.00 0.00 2018-04-02 2018-04-23 2018-06-06 2018-07-04 2018-07-25 2018-08-29 2018-10-03 2019-10-03 des travaux des and natural resources International d'exécution le coût infrastructures primaires à management Ngalam C-PDIDAS-0001-2019 / Sélection d'un Consultant pour le diagnostic du Sélection fondée Component 1: Support to En attente Système d'Information sur IDA / 53340 A posteriori sur la qualité et Open - National 160,000.00 0.00 2019-02-22 2019-03-15 2019-04-28 2019-05-26 2019-06-25 2019-07-30 2019-09-03 2020-09-02 sector actors d'exécution le Foncier(SIF), études le coût architecturales et développement du SIF C-PDIDAS-0002-2019 / Sélection d'un cabinet pour la réalisation de l'Étude Component 2: Development Sélection fondée d'Impact Environnemental of irrigation infrastructure sur les En cours et Social et du Plan IDA / 53340 A posteriori Open - National 97,000.00 0.00 2019-02-26 2019-05-13 2019-03-19 2019-05-02 2019-06-01 2019-07-06 2020-01-02 and natural resources qualifications des d'examen d'Action de Réinstallation management consultants des aménagements secondaires et tertiaires de la zone du lac de Guiers C-PDIDAS-0003-2019 / Sélection d'un cabinet pour la réalisation de l'Étude Component 2: Development Sélection fondée d'Impact Environnemental of irrigation infrastructure sur les En cours et Social et du Plan IDA / 53340 A posteriori Open - National 60,000.00 0.00 2019-03-09 2019-05-13 2019-03-30 2019-05-13 2019-06-12 2019-07-17 2020-01-13 and natural resources qualifications des d'exécution d'Action de Réinstallation management consultants des aménagements secondaires et tertiaires de la zone du Ngalam C-PDIDAS-0005-2019 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure En attente IDA / 53340 A posteriori sur la qualité et Open - National 700,000.00 0.00 2019-03-11 2019-04-01 2019-05-15 2019-06-12 2019-07-12 2019-08-16 2019-09-20 2020-09-19 des travaux des and natural resources d'exécution le coût infrastructures d'irrigation management tertiaires C-PDIDAS-0006-2019 / Sélection d'un consultant pour la réalisation de l'audit environnemental et Component 2: Development l'élaboration du schéma Sélection fondée of irrigation infrastructure En cours d'aménagement et de IDA / 53340 A posteriori sur la qualité et Open - National 200,000.00 0.00 2019-02-11 2019-09-14 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 and natural resources d'examen gestion des ressources le coût management naturelles et de l'environnement dans le delta et la moyenne vallée du fleuve Sénégal C-PDIDAS-0007-2019 / Sélection d'un consultant Component 2: Development pour la réalisation de Sélection fondée of irrigation infrastructure En attente l'Etude d'actualisation du IDA / 53340 A posteriori sur la qualité et Open - National 40,000.00 0.00 2019-03-26 2019-04-16 2019-05-30 2019-06-27 2019-07-27 2019-08-31 2019-10-05 2020-10-04 and natural resources d'exécution Plan d'exploitation et le coût management d'entretien des Barrages de Diama et Manantali C-PDIDAS-0008-2019 / Component 2: Development Sélection fondée Sélection d'un consultant of irrigation infrastructure sur les En cours IDA / 53340 A posteriori Open - National 20,000.00 0.00 2019-03-08 2019-03-29 2019-05-12 2019-06-11 2019-07-16 2020-01-12 pour le renforcement des and natural resources qualifications des d'exécution capacités sur le logiciel SIG management consultants C-PDIDAS-0009-2019 / Component 2: Development Sélection fondée Sélection d'un consultant of irrigation infrastructure sur les En cours pour la formation en IDA / 53340 A posteriori Open - National 20,000.00 0.00 2019-03-15 2019-05-17 2019-04-05 2019-05-19 2019-06-18 2019-07-23 2020-01-19 and natural resources qualifications des d'exécution hygiène Qualité Sécurité management consultants Environnement C-PDIDAS-0004-2019 / Sélection d'un cabinet de Component 2: Development Sélection fondée supervision et de contrôle of irrigation infrastructure En cours IDA / 53340 A priori sur la qualité et Open - National 1,000,000.00 0.00 2019-02-12 2019-12-09 2019-03-05 2019-04-18 2020-01-09 2019-05-16 2020-04-14 2019-06-15 2020-04-25 2019-07-20 2019-08-24 2020-08-23 des travaux des and natural resources d'exécution le coût infrastructures d'irrigation management secondaires SN-PDIDAS-145861-CS- Sélection fondée CQS / Sélection d’un Component 1: Support to sur les consultant pour la IDA / 53340 A posteriori Open - National 120,000.00 110,751.87 Signé 2019-11-24 2019-12-18 2019-12-15 2020-01-28 2020-01-28 2020-01-24 2020-02-27 2020-03-19 2020-04-02 2020-03-23 2020-09-29 sector actors qualifications des réalisation de l’étude et consultants l’analyse foncière dans la zone du PDIDAS SN-PDIDAS-145862-CS- CQS / Sélection d'un Component 2: Development Sélection fondée consultant individuel pour of irrigation infrastructure sur les En attente IDA / 53340 A posteriori Open - National 30,000.00 0.00 2019-11-24 2019-12-15 2020-01-28 2020-02-27 2020-04-02 2020-09-29 l’évaluation de l’impact and natural resources qualifications des d'exécution environnemental et Social management consultants des travaux d’infrastructures SN-PDIDAS-146486-CS- CQS / Sélection d'un consultant firme pour chargé de l'actualisation , Sélection fondée Component 1: Support to En cours le déploiement , la mise en IDA / 53340 A posteriori sur la qualité et Open - National 336,000.00 0.00 2020-02-20 2020-02-01 2020-03-12 2020-04-25 2020-05-23 2020-06-22 2020-07-27 2020-08-31 2021-08-31 sector actors d'exécution application et la connexion le coût du système d'information foncière des bureaux foncier du PDIDAS au NICAD INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Draft Negotiated / Description Component Review Type Method Amount Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 9 C-PDIDAS-002-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour la formation IDA / 53340 A posteriori Individuel Limited 32,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 sector actors d'exécution sur l'hygiène et la sécurité sanitaire des aliments C-PDIDAS-003-2017 / Sélection d'un consultant Component 1: Support to individuel pour la formation IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sector actors sur l'usage sécurisé des pesticides C-PDIDAS-004-2017 / Sélection d'un consultant individuel pour la Component 1: Support to En attente sensibilisation sur les IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sector actors d'exécution normes privées volontaires(GLOBAL GAP,BIO, etc.) C-PDIDAS-005-2017 / Sélection d'un consultant Component 1: Support to individuel sur la traçabilité IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sector actors et la mise en place de système de traçabilité C-PDIDAS-006-2017 / Sélection d'un consultant Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2017-08-18 2017-08-23 2017-09-13 2017-10-18 2018-04-16 individuel en infographie sector actors d'exécution pour l'UEP APIX C-PDIDAS-007-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour l'analyse de IDA / 53340 A posteriori Individuel Limited 24,000.00 0.00 2017-08-18 2017-08-23 2017-09-13 2017-10-18 2018-04-16 sector actors d'exécution la chaîne de valeurs patate douce C-PDIDAS-008-2017 / Sélection d'un consultant Component 1: Support to IDA / 53340 A posteriori Individuel Limited 24,000.00 0.00 Annulé 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 individuel pour l'analyse de sector actors la chaîne de valeurs oignon C-PDIDAS-009-2017 / Sélection d'un consultant individuel chargé de l'étude Component 1: Support to IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 Annulé 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 de faisabilité pour la mise sector actors en place d'une plateforme de services aux membres C-PDIDAS-010-2017 / Sélection d'un consultant individuel pour le Component 1: Support to renforcement du cadre de IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 sector actors dialogue permanent public privé autour de la filière patate douce C-PDIDAS-011-2017 / Sélection d'un consultant individuel pour la Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 conception et le sector actors d'exécution développement d'un site web pour la CFAHS C-PDIDAS-014-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 sector actors d'exécution l'actualisation du système d'information sur le foncier C-PDIDAS-015-2017 / Sélection d'un consultant pour la conception interface Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2017-08-30 2017-09-04 2017-09-25 2017-10-30 2018-04-28 de l'observatoire sur le sector actors d'exécution foncier(PM 1.2 formation et recherche appliquée) C-PDIDAS-023-2017 / Sélection d'un consultant Component 2: Development individuel pour la of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 14,600.00 0.00 Annulé 2017-08-29 2017-09-03 2017-09-24 2017-10-29 2018-04-27 classification and natural resources environnementale des sous management projets(screening) C-PDIDAS-024-2017 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente individuel pour les études IDA / 53340 A posteriori Individuel Limited 60,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 and natural resources d'exécution APD-EPI et évaluation management environnementale et sociale C-PDIDAS-025-2017 / Component 2: Development Sélection d'un consultant of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-08-23 2017-08-28 2017-09-18 2017-10-23 2018-04-21 individuel en appui and natural resources technique en communication management Component 3: Coordination, C-PDIDAS-026-2017 / Impact Monitoring and En cours Sélection d'un auditeur IDA / 53340 A priori Individuel Limited 48,000.00 0.00 2017-08-14 2017-08-19 2017-09-09 2017-10-14 2018-04-12 Evaluation (GEF: US$0.5 d'exécution interne million; IDA: US$6 million) C-PDIDAS-027-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 pour l'évaluation du Evaluation (GEF: US$0.5 d'exécution personnel du PDIDAS million; IDA: US$6 million) C-PDIDAS-028-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente pour la culture IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 Evaluation (GEF: US$0.5 d'exécution organisationnelle et le million; IDA: US$6 million) développement institutionnel Page 10 C-PDIDAS-029-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 Annulé 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 individuel formateur sur le Evaluation (GEF: US$0.5 Process de Communication million; IDA: US$6 million) C-PDIDAS-030-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 pour la formation en MS Evaluation (GEF: US$0.5 d'exécution Project million; IDA: US$6 million) C-PDIDAS-031-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 Annulé 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 pour l'appui à la revue à Evaluation (GEF: US$0.5 mi-parcours du projet million; IDA: US$6 million) C-PDIDAS-032-2017 / Sélection d'un consultant Component 3: Coordination, individuel pour l'élaboration Impact Monitoring and de la situation de référence IDA / 53340 A posteriori Individuel Limited 16,000.00 0.00 Annulé 2017-08-29 2017-09-03 2017-09-24 2017-10-29 2018-04-27 Evaluation (GEF: US$0.5 et base de données million; IDA: US$6 million) environnementales et sociales C-PDIDAS-033-2017 / Sélection d'un consultant Component 3: Coordination, pour les analyses Impact Monitoring and physicochimiques,biologiques, IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-08-31 2017-09-05 2017-09-26 2017-10-31 2018-04-29 Evaluation (GEF: US$0.5 bactériologiques et analyses million; IDA: US$6 million) toxicologiques et suivi épidémiologique et sanitaire C-PDIDAS-034-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and pour l'élaboration du IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-09-01 2017-09-06 2017-09-27 2017-11-01 2018-04-30 Evaluation (GEF: US$0.5 manuel de bonnes pratiques million; IDA: US$6 million) agricoles C-PDIDAS-035-2017 / Sélection d'un consultant Component 3: Coordination, pour l'élaboration et Impact Monitoring and diffusion de supports de IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2017-09-05 2017-09-10 2017-10-01 2017-11-05 2018-05-04 Evaluation (GEF: US$0.5 communication pour la million; IDA: US$6 million) prévention des risques et dangers liés aux pesticides C-PDIDAS-036-2017 / Sélection d'un consultant Component 3: Coordination, pour la formation sur les Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-09-06 2017-09-11 2017-10-02 2017-11-06 2018-05-05 bonnes pratiques Evaluation (GEF: US$0.5 agroécologiques et les million; IDA: US$6 million) normes environnementales C-PDIDAS-037-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and pour la formation sur IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 Evaluation (GEF: US$0.5 l'utilisation et la gestion million; IDA: US$6 million) des pesticides et des OGM C-PDIDAS-038-2017 / Component 3: Coordination, Sélection d'un consultant en Impact Monitoring and En attente création et édition de IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 Evaluation (GEF: US$0.5 d'exécution supports de communication( million; IDA: US$6 million) infographie) pour l'UCP C-PDIDAS-033-2018 / Sélection d'un consultant individuel pour la formation Component 1: Support to En cours technique (Champ Ecole IDA / 53340 A posteriori Individuel Limited 16,000.00 0.00 2018-04-13 2018-04-18 2018-05-09 2018-06-13 2018-12-10 sector actors d'exécution Producteur CEP/Gestion Intégrée e la Production et des Prédateurs GIPD) C-PDIDAS-034-2018 / Sélection d'un consultant pour la formation en Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-27 2018-04-01 2018-04-22 2018-05-27 2018-11-23 gestion des conflits et en sector actors d'exécution gestion de stress des communautés C-PDIDAS-035-2018 / Sélection d'un consultant individuel pour l'appui aux Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-11 2018-04-16 2018-05-07 2018-06-11 2018-12-08 communautés à la sector actors d'exécution production de foyers améliorés C-PDIDAS-036-2018 / Sélection d'un consultant individuel pour l'appui aux Component 1: Support to En cours IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-16 2018-03-28 2018-04-21 2018-05-12 2018-06-16 2018-12-13 communautés à la sector actors d'exécution production de cultures fourragères C-PDIDAS-037-2018 / Sélection d'un consultant individuel chargé de la production de supports Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-13 2018-04-18 2018-05-09 2018-06-13 2018-12-10 techniques (présentations sector actors d'exécution techniques, brochures, cahiers, fiches produits...) en divers langues C-PDIDAS-038-2018 / Component 1: Support to En attente Sélection d'un consultant IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2018-04-06 2018-04-11 2018-05-02 2018-06-06 2018-12-03 sector actors d'exécution individuel en infographie C-PDIDAS-040-2018 / Component 1: Support to En attente Sélection de trois (03) IDA / 53340 A posteriori Individuel Limited 36,000.00 0.00 2018-03-28 2018-04-02 2018-04-23 2018-05-28 2018-11-24 sector actors d'exécution géomaticiens pour la DGID C-PDIDAS-041-2018 / Sélection de trois (03) Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 36,000.00 0.00 2018-03-29 2018-04-03 2018-04-24 2018-05-29 2018-11-25 techniciens pour le cadastre sector actors d'exécution de St louis et de Louga Page 11 C-PDIDAS-049-2018 / Component 2: Development Sélection d'un assistant of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2018-04-16 2018-04-21 2018-05-12 2018-06-16 2018-12-13 pour le suivi de la mise en and natural resources d'exécution œuvre du FFP management C-PDIDAS-050-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente individuel pour les études IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 2018-03-28 2018-04-02 2018-04-23 2018-05-28 2018-11-24 and natural resources d'exécution APD-EPI des sous projets management restants C-PDIDAS-051-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente individuel pour les études IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-26 2018-03-31 2018-04-21 2018-05-26 2018-11-22 and natural resources d'exécution EES des sous projets management restants C-PDIDAS-052-2018 / Sélection d'un consultant Component 2: Development individuel pour la mise en of irrigation infrastructure En attente place d'un dispositif IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 2018-04-12 2018-04-17 2018-05-08 2018-06-12 2018-12-09 and natural resources d'exécution cartographique pour les management agents forestiers et les communautés C-PDIDAS-053-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En cours individuel pour le suivi des IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-23 2018-05-17 2018-03-28 2018-04-18 2018-05-23 2018-11-19 and natural resources d'exécution travaux de bornage et management pancartage C-PDIDAS-054-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En cours individuel pour le suivi des IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-03-22 2018-05-16 2018-03-27 2018-04-17 2018-05-22 2018-11-18 and natural resources d'exécution travaux d'aménagement des management pépinières C-PDIDAS-057-2018 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente pour l'élaboration d'une des IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-04-18 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Evaluation (GEF: US$0.5 d'exécution PME spécialisées dans million; IDA: US$6 million) l'horticulture C-PDIDAS-058-2018 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente pour la réalisation d'une IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 Evaluation (GEF: US$0.5 d'exécution vidéo sur les bureaux million; IDA: US$6 million) fonciers C-PDIDAS-059-2018 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En cours pour la mise en place d'un IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 2018-04-10 2018-06-01 2018-04-15 2018-05-06 2018-06-10 2018-12-07 Evaluation (GEF: US$0.5 d'examen système de capitalisation million; IDA: US$6 million) au fil de l'eau C-PDIDAS-0010-2018 / Component 2: Development Sélection d'un assistant of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Open 15,400.00 0.00 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 pour le suivi de la mise en and natural resources d'exécution œuvre du FFP management C-PDIDAS-0011-2019 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En cours individuel pour les études IDA / 53340 A posteriori Individuel Open 20,000.00 0.00 2019-03-26 2019-05-20 2019-05-14 2019-06-04 2019-07-09 2020-01-05 and natural resources d'examen EIES des sous projets management restants C-PDIDAS-0012-2019 / Sélection d'un consultant Component 3: Coordination, individuel pour la mise à Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Open 5,100.00 0.00 2019-02-22 2019-04-12 2019-05-03 2019-06-07 2019-12-04 jour des logiciels de gestion Evaluation (GEF: US$0.5 d'exécution financière TOMPRO et million; IDA: US$6 million) TOMFIN C-PDIDAS-0013-2019 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 48,000.00 0.00 2019-04-09 2019-04-14 2019-05-05 2019-06-09 2019-12-06 pour la réalisation d'un Evaluation (GEF: US$0.5 d'exécution publi-reportage million; IDA: US$6 million) C-PDIDAS-0014-2019 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente pour la mise en place d'un IDA / 53340 A posteriori Individuel Open 12,000.00 0.00 2019-03-08 2019-04-26 2019-05-17 2019-06-21 2019-12-18 Evaluation (GEF: US$0.5 d'exécution système de capitalisation million; IDA: US$6 million) au fil de l'eau Component 3: Coordination, C-PDIDAS-0015-2019 / Impact Monitoring and En attente Sélection d'une agence pour IDA / 53340 A posteriori Individuel Open 50,000.00 0.00 2019-03-14 2019-05-02 2019-05-23 2019-06-27 2019-12-24 Evaluation (GEF: US$0.5 d'exécution la production audiovisuelle million; IDA: US$6 million) C-PDIDAS-016-2019 / Sélection d'un consultant individuel pour la Component 2: Development réalisation des études of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2019-05-20 2019-05-25 2019-06-15 2019-07-20 2020-01-16 environnementales and natural resources d'exécution sommaires pour les sous management projets des petits producteurs de la région de Louga C-PDIDAS-00009-2019 / Component 2: Development Sélection d'un consultant of irrigation infrastructure pour la formation en IDA / 53340 A posteriori Individuel Limited 20,000.00 22,871.18 Signé 2019-05-27 2019-08-15 2019-06-01 2019-09-06 2019-06-22 2019-12-24 2019-07-27 2019-12-24 2020-01-23 and natural resources hygiène Qualité Sécurité management Environnement C-PDIDAS-00008-2019 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2019-05-31 2019-06-05 2019-06-26 2019-07-31 2020-01-27 pour le renforcement des and natural resources d'exécution capacités sur le logiciel SIG management Component 3: Coordination, C-PDIDAS-018-2019 / Impact Monitoring and En cours Sélection d'un Spécialiste IDA / 53340 A posteriori Individuel Open 60,000.00 0.00 2019-07-12 2019-07-09 2019-08-30 2019-09-20 2019-10-25 2020-04-22 Evaluation (GEF: US$0.5 d'exécution en Communication million; IDA: US$6 million) Page 12 C-PDIDAS-019-2019 / Component 3: Coordination, Sélection d'un Spécialiste Impact Monitoring and En attente Mesures de Sauvegarde IDA / 53340 A posteriori Individuel Open 60,000.00 0.00 2019-01-30 2019-03-20 2019-04-10 2019-05-15 2019-11-11 Evaluation (GEF: US$0.5 d'exécution Sociale et Développement million; IDA: US$6 million) Communautaire C-PDIDAS-020-2019 / Sélection d'un consultant pour la réalisation du Plan Component 2: Development de Gestion of irrigation infrastructure En cours Environnementale et Sociale IDA / 53340 A posteriori Individuel Open 50,000.00 0.00 2019-08-25 2019-09-19 2019-10-13 2019-11-03 2019-12-08 2020-06-05 and natural resources d'exécution des infrastructures de management substitution dans les communes de Ronkh, Fass Ngom et Ndiébène Gandiole C-PDIDAS-017-2019 / Component 3: Coordination, Sélection d'un Spécialiste Impact Monitoring and En cours IDA / 53340 A posteriori Individuel Direct 80,000.00 0.00 2019-09-09 2019-09-10 2019-09-12 2019-09-12 2019-09-13 2020-12-31 Principal en Passation de Evaluation (GEF: US$0.5 d'exécution Marchés million; IDA: US$6 million) SN-PDIDAS-137800-CS- CDS / Contractualisation avec le cabinet IDYAL pour Sélection de le diagnostic du système Component 1: Support to En cours IDA / 53340 A posteriori consultants par Direct 336,000.00 0.00 2019-10-13 2019-10-11 2019-10-23 2019-12-27 2020-06-24 d'Information sur le Foncier sector actors d'exécution entente directe (SIF), l'élaboration des études architecturales et le développement du SIF SN-PDIDAS-142809-CS- CDS / Contractualisation avec le Centre de Suivi Component 3: Coordination, Écologique (CSE) pour le Sélection de Impact Monitoring and En cours renforcement des capacités IDA / 53340 A posteriori consultants par Direct 80,000.00 0.00 2019-10-27 2020-01-22 2019-11-06 2020-01-10 2020-07-08 Evaluation (GEF: US$0.5 d'exécution des acteurs à suivre les entente directe million; IDA: US$6 million) émissions de gaz à effet de serre dans les zones d'intervention du PDIDAS C-PDIDAS-001-2020 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente chargé de l'animation de IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2020-03-02 2020-03-07 2020-03-28 2020-05-02 2020-10-29 Evaluation (GEF: US$0.5 d'exécution l'atelier national de million; IDA: US$6 million) capitalisation Component 2: Development SN-PDIDAS-187449-CS- of irrigation infrastructure INDV / Recrutement d'un IDA / 53340 A posteriori Individuel Limited 80,000.00 41,316.42 Signé 2020-08-16 2020-08-13 2020-08-21 2020-08-25 2020-09-11 2020-10-12 2020-10-16 2020-10-12 2021-04-14 and natural resources consultant en Biodiversité management SN-PDIDAS-202790-CS- Component 2: Development INDV / Recrutement d'un of irrigation infrastructure En cours consultant chargé de la IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2020-11-16 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2021-07-15 and natural resources d'exécution formation sur les violences management basées sur le genre SN-PDIDAS-202798-CS- INDV / Recrutement d'un consultant chargé d'élaborer Component 2: Development des rapports d'analyse of irrigation infrastructure En cours environnementale initiale IDA / 53340 A posteriori Individuel Limited 60,000.00 0.00 2020-11-16 2020-11-07 2020-11-21 2020-12-12 2021-01-16 2021-07-15 and natural resources d'examen des infrastructures de management substitution ( approche Ministère de l'Environnement ) SN-PDIDAS-204881-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 2020-11-23 2020-11-28 2020-12-19 2021-01-23 2021-07-22 consultant individuel pour Evaluation (GEF: US$0.5 d'exécution l'évaluation d’impact du million; IDA: US$6 million) Projet SN-PDIDAS-204882-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour l'élaboration IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2020-11-23 2020-11-28 2020-12-19 2021-01-23 2021-07-22 Evaluation (GEF: US$0.5 d'exécution du rapport d’achèvement du million; IDA: US$6 million) Projet SN-PDIDAS-204885-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour la IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2020-11-25 2020-11-30 2020-12-21 2021-01-25 2021-07-24 Evaluation (GEF: US$0.5 d'exécution documentation et million; IDA: US$6 million) capitalisation des réalisations du projet SN-PDIDAS-204887-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour la IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 2020-11-26 2020-12-01 2020-12-22 2021-01-26 2021-07-25 Evaluation (GEF: US$0.5 d'exécution valorisation du modèle million; IDA: US$6 million) d’agrobusiness du PDIDAS SN-PDIDAS-204891-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour la Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 8,000.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 capitalisation de l'expérience Evaluation (GEF: US$0.5 d'exécution des bureaux fonciers et la million; IDA: US$6 million) sécurisation foncière SN-PDIDAS-204893-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour la IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 Evaluation (GEF: US$0.5 d'exécution capitalisation de million; IDA: US$6 million) l'accompagnement des communautés (PAC et FFP) SN-PDIDAS-204895-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour la IDA / 53340 A posteriori Individuel Limited 16,000.00 0.00 2020-11-25 2020-11-30 2020-12-21 2021-01-25 2021-07-24 Evaluation (GEF: US$0.5 d'exécution capitalisation des réalisation million; IDA: US$6 million) des Infrastructures d’irrigation SN-PDIDAS-204896-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour l'évaluation Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2020-12-03 2020-12-08 2020-12-29 2021-02-02 2021-08-01 de la prise en compte des Evaluation (GEF: US$0.5 d'exécution questions million; IDA: US$6 million) Environnementales et Sociales Page 13 SN-PDIDAS-204897-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour l'évaluation Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2020-12-08 2020-12-13 2021-01-03 2021-02-07 2021-08-06 du mécanisme de gestion Evaluation (GEF: US$0.5 d'exécution des plaintes (Violences million; IDA: US$6 million) Basées sur le Genre) SN-PDIDAS-204898-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En attente consultant pour mener les IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 2020-12-10 2020-12-15 2021-01-05 2021-02-09 2021-08-08 Evaluation (GEF: US$0.5 d'exécution études d'évaluation de la million; IDA: US$6 million) prise en compte du Genre SN-PDIDAS-204900-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour faire Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2020-12-11 2020-12-16 2021-01-06 2021-02-10 2021-08-09 l'analyse de la Evaluation (GEF: US$0.5 d'exécution communication et de million; IDA: US$6 million) l’inclusion sociale dans les activités du PDIDAS SN-PDIDAS-204901-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour mener les Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2020-12-15 2020-12-20 2021-01-10 2021-02-14 2021-08-13 études d'évaluation de Evaluation (GEF: US$0.5 d'exécution l'impact des financements million; IDA: US$6 million) du PDIDAS sur la création d’emplois SN-PDIDAS-204902-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour faire Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 15,000.00 0.00 2020-12-16 2020-12-21 2021-01-11 2021-02-15 2021-08-14 l'évaluation du Financement Evaluation (GEF: US$0.5 d'exécution du secteur privé dans le million; IDA: US$6 million) développement de l’Agrobusiness SN-PDIDAS-137825-CS- CDS / Sélection d'un Component 2: Development Sélection de consultant pour la of irrigation infrastructure En attente IDA / 53340 A posteriori consultants par Direct 60,000.00 0.00 2020-11-16 2020-11-26 2021-01-30 2021-07-29 supervision et le contrôle and natural resources d'exécution entente directe des travaux des management infrastructures de substitution Page 14