Procurement Plan for Project Sint Maarten Emergency Recovery Project I (P167339) (This is only a sample with the minimum content that is required for disclosure on the Bank’s website in accordance with the guidelines. The Project Team will agree with the Client on a procurement plan which may contain additional information and may be prepared in a different format as desired by the Borrower. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary ) I. General 1. Project information: [ Example: Country, Borrower, Project Name, Loan/Credit No., Project Implementing Agency (PIA) etc. The Project team may decide to have different sections to reflect projects with many PIAs ] 2. Bank’s approval Date of the procurement Plan [Original :………; Revision 1:…] 3. Date of General Procurement Notice: ……………….. 4. Period covered by this procurement plan: II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold 1. ICB and LIB (Goods) 2. NCB (Goods) 3. ICB (Works) 4. NCB (Works) 5. ICB (Non-Consultant Services) [Add other methods if necessary] 4. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5. Procurement Packages with Methods and Time Schedule [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 8 9 Ref. Contract Type Estimated Procuremen Prequalific Review Expected Comme No. (Description) Cost in t ation by Bank Bid-Opening s millions Method (yes/no) (Prior / Date USD Post) Repairing Works 6.00 RFB No Prior constructing water storage tanks Transformers Goods 1.20 RFB No Prior Pelican Key Goods 0.80 RFB No Prior Pumping station reconstructed Replace Goods 0.60 RFB Prior damaged water meters GIS Software and Goods 0.03 RFQ Post Hardware. Water system management and analysis Software III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) 2. Single Source (Firms) [Add specific methods if necessary] 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_______equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. No. Description Estimated Selection Review Expected Comments of Cost Method by Bank Proposals Assignment (Prior / Submissio Post) n Date Updating GEBE 0.60 QCBS Prior Business Plan PROCUREMENT St Maarten : Sint Maarten Emergency Recovery Project I PLAN General Information Country: St Maarten Bank’s Approval Date of the Original Procurement Plan: 2018-09-05 2021-01-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167339 GPN Date: Project Name: Sint Maarten Emergency Recovery Project I Loan / Credit No: TF / A8079 National Recovery Program Bureau Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SX-NRPB-156576-CW-RFB / Housing Repair and Public Single Stage - One 2020-12- Public Building Repairs: TF / A8079 Buildings Repair and Prior Request for Bids Open - International 5,000,000.00 0.00 Canceled 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 Envelope 19 Education Facilities Reconstruction Housing Repair and Public SX-NRPB-165115-CW-RFB / Single Stage - One 2,418,911.5 2021-01- TF / A8079 Buildings Repair and Post Request for Bids Limited 1,000,000.00 Signed 2020-03-25 2020-05-14 2020-03-30 2020-04-16 2020-05-11 2020-05-07 2020-06-10 2020-06-01 2020-07-15 2020-07-06 Rehabilitation of Shelters Envelope 4 11 Reconstruction Housing Repair and Public Under SX-NRPB-181992-CW-RFB / Single Stage - One 2021-05- TF / A8079 Buildings Repair and Prior Request for Bids Limited 1,500,000.00 0.00 Implementat 2020-07-14 2020-08-10 2020-07-19 2020-11-03 2020-08-30 2020-09-11 2020-09-29 2020-11-12 2020-11-03 Priority School Repairs Envelope 02 Reconstruction ion SX-NRPB-183349-CW-RFQ / Housing Repair and Public Request for Single Stage - One 2021-03- SMHDF roof repairs, for TF / A8079 Buildings Repair and Post Limited 236,367.00 236,367.00 Signed 2020-07-13 2020-07-07 2020-09-07 2020-07-07 Quotations Envelope 06 retroactive finance Reconstruction SX-NRPB-202289-CW-RFB / Housing Repair and Public Pending Single Stage - One 2021-08- Batch 2: Schools and F&A TF / A8079 Buildings Repair and Prior Request for Bids Open - International 4,750,000.00 0.00 Implementat 2020-11-09 2020-11-14 2020-12-26 2021-01-25 2021-03-01 Envelope 28 Building Repairs Reconstruction ion Housing Repair and Public Pending SX-NRPB-202300-CW-RFB / Single Stage - One 2021-09- TF / A8079 Buildings Repair and Prior Request for Bids Open - International 6,500,000.00 0.00 Implementat 2020-11-16 2020-11-21 2021-01-02 2021-02-01 2021-03-08 SMHDF Repairs Phase 2 Envelope 04 Reconstruction ion Housing Repair and Public Pending SX-NRPB-202314-CW-RFB / Single Stage - One 2021-10- TF / A8079 Buildings Repair and Prior Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-01-11 2021-01-16 2021-02-27 2021-03-29 2021-05-03 Batch 3: School Repairs Envelope 30 Reconstruction ion Emergency measures for the Pending SX-NRPB-202332-CW-RFB / recovery of disaster first Single Stage - One 2021-12- TF / A8079 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-03-01 2021-03-06 2021-04-17 2021-05-17 2021-06-21 GEBE Trenching Batch 1 responders and preparedness Envelope 18 ion facilities Emergency measures for the Pending SX-NRPB-202333-CW-RFB / recovery of disaster first Single Stage - One 2022-08- TF / A8079 Prior Request for Bids Open - International 5,000,000.00 0.00 Implementat 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 GEBE Trenching Batch 2 responders and preparedness Envelope 20 ion facilities Housing Repair and Public Pending SX-NRPB-202315-CW-RFB / Single Stage - One 2022-02- TF / A8079 Buildings Repair and Prior Request for Bids Open - International 4,500,000.00 0.00 Implementat 2021-05-01 2021-05-06 2021-06-17 2021-07-17 2021-08-21 Expansion of the EOC Building Envelope 17 Reconstruction ion SX-NRPB-208747-CW-DIR / Housing Repair and Public Under 2021-07- Minor Repair Works to Homes: TF / A8079 Buildings Repair and Post Direct Selection Direct 27,772.18 28,065.55 Implementat 2020-12-09 2020-12-01 2020-12-14 2020-12-01 2021-01-18 17 Aluminum System Reconstruction ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Emergency measures for the SX-NRPB-136740-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 2,250,000.00 1,938,933.00 Signed 2019-10-01 2020-06-04 2019-10-01 2020-06-18 2019-11-05 2020-02-26 2020-05-03 Fire Trucks responders and preparedness facilities Emergency measures for the SX-NRPB-143339-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 15,000.00 15,120.00 Signed 2019-10-29 2020-05-27 2019-11-03 2020-06-15 2019-12-08 2020-01-08 2020-06-05 Safety Shoes Fire Department responders and preparedness facilities Emergency measures for the SX-NRPB-157539-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 20,000.00 17,690.00 Signed 2020-02-09 2020-02-04 2020-02-14 2020-03-19 2020-03-20 2020-03-27 2020-09-16 Diesel Water Pumps responders and preparedness facilities Emergency measures for the SX-NRPB-160723-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 60,000.00 52,355.72 Signed 2020-02-20 2019-12-11 2020-02-25 2020-03-10 2020-03-31 2020-04-14 2020-09-27 Ambulance: Spare Parts responders and preparedness facilities Emergency measures for the SX-NRPB-160730-GO-DIR / recovery of disaster first FD&AD: Additional Radios and TF / A8079 Post Direct Selection Direct 100,000.00 61,381.67 Signed 2020-02-20 2018-06-07 2020-02-25 2020-03-23 2020-03-31 2020-03-23 2020-09-27 responders and preparedness Accessories facilities Emergency measures for the Under SX-NRPB-165436-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 1,500,000.00 0.00 Implementati 2020-03-19 2020-06-04 2020-03-24 2020-06-18 2020-04-28 2020-10-25 Type II Ambulances responders and preparedness on facilities Emergency measures for the Under SX-NRPB-167830-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 100,000.00 0.00 Implementati 2020-04-06 2020-03-05 2020-04-06 2020-05-11 2020-11-07 ProPac Isolation Capsules responders and preparedness on facilities Page 1 Emergency measures for the Under AN-NRPB-76471-GO-RFB / recovery of disaster first Single Stage - One TF / A8079 Prior Request for Bids Open - International 2,385,000.00 0.00 Implementati 2020-05-18 2020-06-18 2020-05-23 2020-09-14 2020-07-04 2020-09-23 2020-08-03 2020-12-10 2020-09-07 2021-03-06 General Vehicles responders and preparedness Envelope on facilities Emergency measures for the Under SX-NRPB-160728-GO-DIR / recovery of disaster first TF / A8079 Post Direct Selection Direct 100,000.00 0.00 Implementati 2020-02-20 2018-09-17 2020-02-25 2020-03-31 2020-09-27 FD: Spare Parts responders and preparedness on facilities Emergency measures for the SX-NRPB-160720-GO-DIR / recovery of disaster first TF / A8079 Prior Direct Selection Direct 170,000.00 0.00 Canceled 2020-02-20 2020-02-25 2020-03-31 2020-09-27 Submersible Water Pumps responders and preparedness facilities Emergency measures for the Under SX-NRPB-185662-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Prior Open - International 320,000.00 0.00 Implementati 2020-08-12 2020-10-07 2021-04-05 Crane Trucks (2) responders and preparedness Quotations Envelope on facilities Emergency measures for the Pending SX-NRPB-202345-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Post Open - National 35,000.00 0.00 Implementati 2020-12-06 2021-01-31 2021-07-30 MDS Goods responders and preparedness Quotations Envelope on facilities Emergency measures for the Pending SX-NRPB-202313-GO-RFQ / recovery of disaster first Request for Single Stage - One TF / A8079 Prior Open - International 630,000.00 0.00 Implementati 2020-11-20 2021-01-15 2021-07-14 Command Vehicles responders and preparedness Quotations Envelope on facilities Emergency measures for the SX-NRPB-202327-GO-RFQ / Pending recovery of disaster first Request for Single Stage - One MDS Automatic Weather TF / A8079 Post Open - International 350,000.00 0.00 Implementati 2021-06-06 2021-08-01 2022-01-28 responders and preparedness Quotations Envelope Stations and Tidal Gauges on facilities NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-160721-NC-DIR / Housing Repair and Public Under Emergency Mold Assessment TF / A8079 Buildings Repair and Prior Direct Selection Direct 150,000.00 0.00 Implementati 2020-02-20 2020-12-08 2020-02-25 2020-03-31 2020-09-27 and Remediation Action Plan Reconstruction on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-132867-CS-LCS / Institutional Support for Least Cost TF / A8079 Prior Open - National 150,000.00 0.00 Canceled 2019-09-05 2019-09-26 2019-11-09 2019-12-07 2020-01-06 2020-02-10 2020-03-16 2020-09-12 Audit Services NRPB Reconstruction Selection Institutional Support for Least Cost ERP_C_015 / Audit services TF / A8079 Post Open - National 150,000.00 131,998.00 Signed 2019-09-05 2019-02-13 2019-09-26 2019-09-18 2019-11-09 2019-04-25 2019-12-07 2019-07-11 2020-01-06 2019-07-11 2020-02-10 2019-07-11 2020-03-16 2019-09-25 2020-09-12 Reconstruction Selection SX-NRPB-160722-CS-LCS / Housing Repair and Public Least Cost Under Works Verification Audit TF / A8079 Buildings Repair and Post Open - National 25,000.00 0.00 2019-11-06 2020-01-30 2019-11-27 2020-01-10 2020-01-16 2020-02-07 2020-03-08 2020-04-12 2020-05-17 2020-11-13 Selection Implementation SMHDF Reconstruction AN-IRC-NRPB-88561-CS- Housing Repair and Public Consultant CQS / SMHDF Technical TF / A8079 Buildings Repair and Post Qualification Open - National 250,000.00 207,300.00 Signed 2020-10-15 2019-01-03 2020-11-05 2020-11-17 2020-12-19 2019-01-24 2021-01-18 2019-09-27 2021-02-22 2019-09-27 2021-08-21 Assessment and Design for Reconstruction Selection Phase 2 AN-IRC-NRPB-109549-CS- Housing Repair and Public Quality And Cost- Pending QCBS / Technical Assessment TF / A8079 Buildings Repair and Post Open - National 500,000.00 0.00 2020-11-03 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2022-05-15 Based Selection Implementation Single family Home Repairs 2 Reconstruction Emergency measures for the SX-NRPB-202330-CS-CQS / recovery of disaster first Quality And Cost- Pending Emergency Cell Broadcast TF / A8079 Prior Open - International 350,000.00 0.00 2020-11-20 2020-12-11 2021-01-24 2021-02-21 2021-03-23 2021-04-27 2021-06-01 2022-06-01 responders and preparedness Based Selection Implementation System facilities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SX-NRPB-124802-CS-INDV / Individual PROJECT COORDINATOR– Sint Institutional Support for TF / A8079 Post Consultant Open 180,000.00 267,983.36 Signed 2019-07-25 2019-07-25 2019-09-12 2019-10-18 2019-10-03 2019-11-25 2019-11-07 2020-05-29 2020-05-05 Maarten Digital Government Reconstruction Selection Project SX-NRPB-126135-CS-INDV / Individual Institutional Support for Under Procurement Assistant TF / A8079 Prior Consultant Open 60,000.00 0.00 2019-08-03 2019-08-07 2019-09-21 2019-11-21 2019-10-12 2020-07-07 2019-11-16 2020-05-14 Reconstruction Implementation Consultant Selection SX-NRPB-126138-CS-INDV / Individual Institutional Support for Under Procurement Specialist TF / A8079 Prior Consultant Open 90,000.00 0.00 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 Reconstruction Implementation Consultant Selection SX-NRPB-126137-CS-INDV / Individual Portfolio and Accounting Institutional Support for TF / A8079 Post Consultant Open 180,000.00 0.00 Canceled 2019-08-03 2019-08-07 2019-09-21 2019-10-12 2019-11-16 2020-05-14 Officer for Small Enterprise Reconstruction Selection Recovery Project SX-NRPB-126665-CS-CDS / Institutional Support for Interim Financial Management TF / A8079 Post Direct Selection Direct 14,000.00 12,150.00 Signed 2019-08-12 2019-09-01 2019-08-22 2019-08-08 2019-10-26 2019-09-01 2020-04-23 Reconstruction Officer Page 2 SX-NRPB-127209-CS-CDS / Institutional Support for Under Stakeholder Engagement TF / A8079 Post Direct Selection Direct 45,000.00 0.00 2019-08-14 2019-08-09 2019-08-24 2019-10-28 2020-04-25 Reconstruction Implementation Home Repairs SX-NRPB-128034-CS-INDV / Individual Institutional Support for Junior Communications TF / A8079 Post Consultant Open 80,000.00 43,436.52 Terminated 2019-08-20 2019-08-23 2019-10-08 2019-10-18 2019-10-29 2019-11-12 2019-12-03 2019-11-15 2020-05-31 Reconstruction Consultant Selection SX-NRPB-128036-CS-INDV / Individual Institutional Support for Financial Management TF / A8079 Post Consultant Open 40,000.00 27,000.00 Signed 2019-08-19 2019-08-22 2019-10-07 2019-11-19 2019-10-28 2019-11-26 2019-12-02 2019-11-26 2020-05-30 Reconstruction Assistant Selection Individual SX-NRPB-129158-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 80,000.00 61,699.24 Signed 2019-08-26 2019-08-30 2019-10-14 2019-11-13 2019-11-04 2019-11-18 2019-12-09 2019-11-19 2020-06-06 Executive Assistant Reconstruction Selection SX-NRPB-129299-CS-INDV / Individual Institutional Support for Jr Environmental Safeguards TF / A8079 Post Consultant Open 80,000.00 106,076.17 Signed 2019-08-30 2019-08-30 2019-10-18 2019-11-18 2019-11-08 2020-03-30 2019-12-13 2020-05-29 2020-06-10 Reconstruction Specialist Selection Individual SX-NRPB-134548-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 25,000.00 0.00 Canceled 2019-09-16 2018-12-10 2019-11-04 2019-11-25 2019-12-30 2020-06-27 Communications Specialist Reconstruction Selection Emergency measures for the SX-NRPB-144180-CS-CDS / recovery of disaster first Pending Design Fire Department TF / A8079 Prior Direct Selection Direct 100,000.00 0.00 2019-11-04 2019-11-04 2020-01-08 2020-07-06 responders and preparedness Implementation Renovation and Expansion facilities Individual SX-NRPB-146192-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 150,000.00 0.00 Canceled 2019-12-12 2019-12-12 2020-02-14 2020-03-06 2020-04-10 2020-10-07 Contract Manager Reconstruction Selection SX-NRPB-153308-CS-INDV / Individual Institutional Support for Project Manager Education TF / A8079 Post Consultant Open 150,000.00 108,000.00 Signed 2020-01-31 2020-01-24 2020-03-20 2020-06-11 2020-04-10 2020-06-24 2020-05-15 2020-06-24 2020-11-11 Reconstruction Project Selection SX-NRPB-154610-CS-CDS / Institutional Support for Under Mission Project Manager TF / A8079 Post Direct Selection Direct 8,000.00 0.00 2020-01-20 2020-01-21 2020-01-20 2019-10-18 2020-01-27 2020-02-17 Reconstruction Implementation Digital Government SX-NRPB-155761-CS-INDV / Individual Institutional Support for Project Manager Enterprise TF / A8079 Post Consultant Open 150,000.00 0.00 Canceled 2020-01-24 2020-03-13 2020-04-03 2020-05-08 2020-11-04 Reconstruction Recovery Project Selection SX-NRPB-156570-CS-CDS / Institutional Support for Pending Procurement Consultant TF / A8079 Prior Direct Selection Direct 320,000.00 0.00 2020-01-29 2020-01-29 2020-05-03 2020-10-30 Reconstruction Implementation Services SX-NRPB-146438-CS-INDV / Individual Institutional Support for Procurement Specialist TF / A8079 Prior Consultant Open 150,000.00 0.00 Canceled 2019-11-20 2020-01-08 2020-01-29 2020-03-04 2020-08-31 Reconstruction Consultant 2 Selection SX-NRPB-156572-CS-CDS / Project Manager ERP-1 This is a continuation of the Institutional Support for Pending TF / A8079 Post Direct Selection Direct 185,000.00 0.00 2020-01-29 2020-02-08 2020-04-13 2020-10-10 current contract. This contract Reconstruction Implementation will go into effect on April 1 - March 31 2021. SX-NRPB-146440-CS-INDV / Individual Institutional Support for Activity Manager School TF / A8079 Post Consultant Limited 50,000.00 57,975.00 Signed 2019-11-22 2019-11-27 2019-11-27 2020-01-20 2020-02-07 2020-03-09 2020-03-13 2020-03-09 2020-09-09 Reconstruction Repairs Selection SX-NRPB-159532-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 200,000.00 0.00 2020-02-13 2020-02-13 2020-04-17 2020-10-14 NRPB Legal Services Reconstruction Implementation SX-NRPB-161524-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 8,000.00 0.00 2020-02-26 2020-03-07 2020-05-11 2020-11-07 Airport Benchmark Study Reconstruction Implementation SX-NRPB-165435-CS-CDS / Institutional Support for Under TF / A8079 Post Direct Selection Direct 225,000.00 0.00 2020-03-19 2019-07-09 2020-03-29 2020-06-02 2020-11-29 Engineer Reconstruction Implementation SX-NRPB-166957-CS-CDS / Institutional Support for Project Coordinator Digital TF / A8079 Post Direct Selection Direct 16,000.00 0.00 Under Review 2020-03-30 2019-12-01 2020-04-09 2020-06-13 2020-12-10 Reconstruction Government INTERIM SX-NRPB-168099-CS-CDS / Institutional Support for TF / A8079 Post Direct Selection Direct 150,000.00 30,000.00 Signed 2020-04-08 2020-07-31 2020-04-18 2020-04-07 2020-06-22 2020-08-13 2020-12-19 Social Safeguards Specialist Reconstruction SX-NRPB-168800-CS-CDS / Institutional Support for Under Design Rehabilitation of TF / A8079 Post Direct Selection Direct 120,000.00 0.00 2020-04-15 2020-06-12 2020-04-25 2020-06-29 2020-12-26 Reconstruction Implementation Shelters Individual SX-NRPB-173096-CS-INDV / Institutional Support for TF / A8079 Post Consultant Open 60,000.00 7,824.54 Signed 2020-05-11 2019-10-01 2020-06-29 2020-05-15 2020-07-20 2020-06-19 2020-08-24 2020-06-19 2021-02-20 Jr Communication Officer 2 Reconstruction Selection SX-NRPB-167363-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 30,000.00 0.00 2020-04-02 2021-01-12 2020-04-12 2020-06-16 2020-12-13 MP: Procurement Consultant Reconstruction Implementation SX-NRPB-167376-CS-CDS / Institutional Support for TF / A8079 Prior Direct Selection Direct 30,000.00 111,750.00 Signed 2020-04-02 2020-07-22 2020-04-12 2020-04-02 2020-06-16 2020-04-23 2020-12-13 SI: Procurement Consultant Reconstruction SX-NRPB-186632-CS-CDS / Housing Repair and Public Under Twenty Schools and F&A TF / A8079 Buildings Repair and Prior Direct Selection Direct 820,600.00 0.00 2020-07-30 2020-08-19 2020-08-09 2020-05-19 2020-10-13 2021-04-11 Implementation building Design Consulting Reconstruction SX-NRPB-186392-CS-CDS / Housing Repair and Public Asbestos Assessment TF / A8079 Buildings Repair and Post Direct Selection Direct 25,000.00 33,950.00 Signed 2020-07-29 2020-07-29 2020-08-08 2020-08-23 2020-10-12 2020-09-15 2021-04-10 Consulting Services ROBERTO Reconstruction DAVIDOVICH Individual SX-NRPB-189349-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 85,000.00 0.00 2020-08-18 2019-11-14 2020-10-06 2020-10-27 2020-12-01 2021-05-30 HR Consultant Reconstruction Implementation Selection Page 3 SX-NRPB-189691-CS-CDS / Emergency measures for the Land Negotiation for Link 6 recovery of disaster first TF / A8079 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2020-08-20 2020-08-28 2020-08-30 2020-09-23 2020-11-03 2021-05-02 Road-Hubert Lopez HISMAR responders and preparedness NV facilities SX-NRPB-191068-CS-CDS / Institutional Support for Pending TF / A8079 Prior Direct Selection Direct 125,000.00 0.00 2020-08-28 2020-09-07 2020-11-11 2021-05-10 SGS Procurement Service Reconstruction Implementation SX-NRPB-196201-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 30,000.00 0.00 2020-09-25 2020-10-05 2020-12-09 2021-06-07 FMO Consultant Home Based Reconstruction Implementation Individual SX-NRPB-197284-CS-INDV / Institutional Support for Pending TF / A8079 Post Consultant Open 180,000.00 0.00 2020-10-01 2020-11-19 2020-12-10 2021-01-14 2021-07-13 DL - Contract Manager Reconstruction Implementation Selection Individual SX-NRPB-198813-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Open 150,000.00 0.00 2020-10-15 2020-11-19 2020-12-03 2020-12-24 2021-01-28 2021-07-27 AR - Contract Manager Reconstruction Implementation Selection SX-NRPB-126986-CS-CDS / Institutional Support for Pending Corporate Governance Lawyer TF / A8079 Post Direct Selection Direct 85,690.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation 1 SX-NRPB-126988-CS-CDS / Institutional Support for Pending Corporate Governance Legal TF / A8079 Post Direct Selection Direct 61,250.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation Support 1 SX-NRPB-126989-CS-CDS / Institutional Support for Pending Corporate Governance Legal TF / A8079 Post Direct Selection Direct 28,500.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation Support 2 SX-NRPB-126987-CS-CDS / Institutional Support for Pending Corporate Governance Lawyer TF / A8079 Post Direct Selection Direct 79,000.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 Reconstruction Implementation 2 SX-NRPB-199448-CS-CDS / Institutional Support for Contract Manager (DL) Home TF / A8079 Post Direct Selection Direct 23,750.00 23,684.00 Signed 2020-10-13 2020-11-19 2020-10-23 2020-02-06 2020-12-27 2020-10-28 2021-06-25 Reconstruction Based SX-NRPB-170435-CS-CDS / Institutional Support for Under Interim Environmental TF / A8079 Post Direct Selection Direct 20,000.00 0.00 2020-04-24 2020-05-04 2020-07-08 2021-01-04 Reconstruction Implementation Safeguards Specialist SX-NRPB-201640-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 95,000.00 0.00 2020-10-26 2020-10-29 2020-11-05 2021-01-09 2021-07-08 JB: Procurement Coordinator Reconstruction Implementation Individual SX-NRPB-201789-CS-INDV / Institutional Support for Under TF / A8079 Post Consultant Limited 25,000.00 0.00 2020-10-27 2020-10-27 2020-11-01 2020-11-22 2020-12-27 2021-06-25 Insurance Consultant Reconstruction Implementation Selection SX-NRPB-201788-CS-CDS / Institutional Support for Under UB: Activity Manager Home TF / A8079 Post Direct Selection Direct 155,000.00 0.00 2020-10-27 2020-10-21 2020-11-06 2021-01-10 2021-07-09 Reconstruction Implementation Repairs SX-NRPB-201795-CS-CDS / Institutional Support for Under TF / A8079 Prior Direct Selection Direct 200,000.00 0.00 2020-10-27 2020-11-24 2020-11-06 2021-01-10 2021-07-09 BB: ICT Helpdesk Reconstruction Implementation Individual SX-NRPB-205755-CS-INDV / Institutional Support for Pending TF / A8079 Post Consultant Open 50,000.00 0.00 2020-11-24 2021-01-12 2021-02-02 2021-03-09 2021-09-05 Copywriter Reconstruction Implementation Selection SX-NRPB-208921-CS-CDS / Mold Assessment Institutional Support for Under TF / A8079 Post Direct Selection Direct 50,000.00 0.00 2020-12-09 2020-12-07 2020-12-19 2021-02-22 2021-08-21 Consultancy: Farmer Reconstruction Implementation Environmental Group SX-NRPB-211337-CS-CDS / Institutional Support for Pending TF / A8079 Post Direct Selection Direct 350,000.00 0.00 2020-12-23 2021-01-02 2021-03-08 2021-09-04 Engineer Reconstruction Implementation SX-NRPB-214549-CS-CDS / Institutional Support for Pending TF / A8079 Prior Direct Selection Direct 50,000.00 0.00 2021-01-18 2021-01-28 2021-04-03 2021-09-30 JA: Procurement Consultant Reconstruction Implementation SX-NRPB-215465-CS-CDS / Housing Repair and Public Pending AC: Project Manager TF / A8079 Buildings Repair and Post Direct Selection Direct 200,000.00 0.00 2021-01-21 2021-01-31 2021-04-06 2021-10-03 Implementation Infrastructure Reconstruction Page 4