PLAN (GOS/WKS) PROCUREMENT PLAN FOR WORKS/GOODS WORLD BANK PROJECT (PHASE - I) - Implementing Agency - Bihar Rajya Pul Nirman Nigam (BRPNN), Govt. of Bihar WB LOAN / CREDIT NO……………… SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Submission of Date Invitation on Opened on D.P.R. (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Construction of H.L. 30.12.10 Infracon Pvt. Ltd. (Fifteen Months) 1/SBD-12/2012- Patna-800013 *PP 30.11.10 15.03.11 30.04.11 1-A Patliputra WBP/Ph-1/P- Package - 1 R.C.C. Bridge in 12th 19.01.2014 M/s Bharat 261.03 SAH Colony (Bihar) Km. of Karanpur- 2013 15 1 NCB - R1 Rajanpur road in Saharsa 261.03 17.08.11 17.09.11 15.09.11 No 23.12.2011 11.04.2012 12.04.2012 29.09.2012 - 25.10.2012 District A 11.04.2012 12.04.2012 29.09.2012 196.05 WBP/Ph-1/P-2/SBD- Construction of H.L. M/s Bharat Infracon 30.12.10 (Twelve Months) R.C.C. Bridge in 16th Patna-800013 13/2012-2013 *PP 30.11.10 15.03.11 30.04.11 1-A Patliputra Package - 2 19.10.2013 Km. of Karanpur- 243.72 Pvt. Ltd. Colony (Bihar) SAH Rajanpur road in Saharsa 12 NCB - R1 2 District 243.72 25.08.11 25.09.11 15.09.11 No 23.12.2011 11.04.2012 12.04.2012 29.09.2012 - 25.10.2012 A 11.04.2012 12.04.2012 29.09.2012 180.54 Construction of H.L. 30.12.10 Sincon Infrastructure Pvt. West Boring Canal Road, LG-1&2, Majestic Plaza, WBP/Ph-1/P-3/SBD- *PP R.C.C. Bridge in 22th 175.62 30.11.10 15.03.11 30.04.11 (Twelve Months) Km. of Karanpur- 260.79 Patna-800001 12/2013-2014 Package - 3 05.05.2014 Rajanpur road in Saharsa SAH Ltd., R1 District 260.79 19.08.11 19.09.11 15.09.11 No 05.11.2012 08.12.11 19.01.12 05.03.12 22.12.2012 12 NCB - 3 R2 09.04.2013 27.02.2013 09.04.2013 08.05.2013 A 09.04.2013 27.02.2013 09.04.2013 195.37 WBP/Ph-1/P-6/SBD-18/2013- WBP/Ph-1/P-5/SBD- WBP/Ph-1/P-4/SBD- Construction of H.L. Lakhibagh, Manpur, 30.12.10 (Twelve Months) Basant Vanijya R.C.C. Bridge in 25th 22/2012-2013 *PP 30.11.10 15.03.11 30.04.11 Gaya (Bihar) Package - 4 21.09.2013 Km. of Karanpur- 231.90 SAH Ltd., Rajanpur road in Saharsa 12 NCB - R1 4 District 231.90 25.08.11 25.09.11 15.09.11 No 23.12.2011 16.04.2012 17.04.2012 25.08.2012 - 02.01.2013 A 16.04.2012 17.04.2012 25.08.2012 152.83 Muzaffarpur-842001 Construction of H.L. Haque Construction 30.12.10 (Twelve Months) Sarai Syed Ali, R.C.C. Bridge in 32nd 21/2013-2014 *PP 241.49 30.11.10 15.03.11 30.04.11 Package - 5 12.06.2014 Km. of Karanpur- 354.00 SAH Co., Rajanpur road in Saharsa 12 NCB - R1 5 District 345.30 11.08.11 11.09.11 15.09.11 No 05.11.2012 16.01.2013 17.01.2013 21.03.2013 - 13.06.2013 A 16.01.2013 17.01.2013 21.03.2013 287.06 Construction of H.L. 30.12.10 R.C.C. Bridge in 36th Haque Construction Co., *PP 30.11.10 15.03.11 30.04.11 Km. of Karanpur- Muzaffarpur-842001 239.36 (Twelve Months) Sarai Syed Ali, Rajanpur road in Saharsa Package - 6 14.05.2014 R1 District 239.36 17.08.11 17.09.11 15.09.11 No 05.11.2012 08.12.11 19.01.12 05.03.12 22.12.2012 2014 SAH 12 NCB - 6 R2 26.02.2013 27.02.2013 10.04.2013 15.05.2013 865240v20PROP00n0of0Phase01000BRPNN.xls 1 SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Construction of H.L. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion WBP/Ph-1/P-7/SBD- WBP/Ph-1/P-6/SBD-18/2013- R.C.C. Bridge in 36th (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Haque Construction Co., Gr. No. Km. of Karanpur- Lac) (Date) T/S (Date) Document (Date / Value Award Currency) Muzaffarpur-842001 (Twelve Months) (Date)** / Currency (Date)** Sarai Syed Ali, Rajanpur road in Saharsa Package - 6 14.05.2014 District 2014 SAH Submission of Date Invitation on Opened on 12 NCB - 6 D.P.R. (Date) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 A 26.02.2013 27.02.2013 10.04.2013 179.02 Muzaffarpur-842001 Construction of Haque Construction 30.12.10 (Twelve Months) Sarai Syed Ali, H.L.R.C.C. Bridge in 11/2013-2014 *PP 428.45 30.11.10 15.03.11 30.04.11 Package - 7 02.05.2014 22nd Km. of Alamnagar- 340.67 SAH Co., Mali-Budhma road 12 NCB - R1 27 340.67 13.08.11 13.09.11 15.09.11 27.09.2012 01.12.2012 03.12.2012 16.03.2013 - 04.05.2013 A 01.12.2012 03.12.2012 16.03.2013 273.5 Construction of WBP/Ph-1/P-8/SBD- 30.12.10 H.L.R.C.C. Bridge in 23rd (Fifteen Months) M/s Shiv Shakti Purnea-854031 01/2013-2014 *PP 617.64 30.11.10 15.03.11 30.04.11 Construction, Package - 8 Sastrinagar, Madhubani, Km. of Alamnagar-Mali- 02.07.2014 Budhma road 379.24 SAH 15 NCB - 28 R1 379.24 17.08.11 19.09.11 15.09.11 27.09.2012 05.12.2012 06.12.2012 16.03.2013 - 03.04.2013 A 05.12.2012 06.12.2012 16.03.2013 329.51 Construction of Basant Vanijya Ltd., WBP/Ph-1/P-9/SBD- Lakhibagh, Manpur, 30.12.10 H.L.R.C.C. Bridge in 24th (Fifteen Months) 13/2013-2014 *PP 526.62 30.11.10 13.03.11 30.04.11 Gaya (Bihar) Package - 9 02.08.2014 Km. of Alamnagar-Mali- Budhma road 547.73 SAH 15 NCB - 29 R1 547.73 24.08.11 24.09.11 15.09.11 27.09.2012 05.12.2012 06.12.2012 16.03.2013 - 12.05.2013 A 05.12.2012 06.12.2012 16.03.2013 488.67 Construction of P/Ph-1/P-13/SBD- WBP/Ph-1/P-12/SBD- WBP/Ph-1/P-11/SBD- WBP/Ph-1/P-10/SBD- Basant Vanijya Ltd., Lakhibagh, Manpur, 30.12.10 H.L.R.C.C. Bridge in 5th (Twelve Months) 14/2013-2014 *PP Package - 10 212.27 30.11.10 15.03.11 30.04.11 Gaya (Bihar) Km. of Simari- 02.05.2014 Bakhtiyarpur road 289.73 SAH 12 NCB - 30 R1 289.73 19.08.11 19.09.11 15.09.11 27.09.2012 06.12.2012 07.12.2012 16.03.2013 15.02.2013 12.05.2013 A 06.12.2012 07.12.2012 16.03.2013 245.93 Construction of Basant Vanijya Ltd., Lakhibagh, Manpur, 30.12.10 H.L.R.C.C. Bridge in 7th (Fifteen Months) 15/2013-2014 Package - 11 *PP 295.92 30.11.10 15.03.11 30.04.11 Gaya (Bihar) 02.08.2014 Km. of Simari- Bakhtiyarpur road 477.89 SAH 15 NCB - 31 R1 477.89 24.08.11 24.09.11 15.09.11 27.09.2012 06.12.2012 07.12.2012 16.03.2013 - 12.05.2013 A 06.12.2012 07.12.2012 16.03.2013 449.87 Construction of M/s Ram Naresh Roy, District-Samastipur 30.12.10 H.L.R.C.C. Bridge in 3rd (Twelve Months) Vill.- Tira, P.S.- 07/2013-2014 *PP Package - 12 291.15 30.11.10 15.03.11 30.04.11 26.04.2014 Km. of Fatehpur- Kalyanpur, Kashnagar road 318.85 SAH 12 NCB - 32 R1 381.85 24.08.11 24.09.11 15.09.11 27.09.2012 07.12.2012 08.12.2012 16.03.2013 - 27.04.2013 A 07.12.2012 08.12.2012 16.03.2013 275.47 Construction of tna-800 023 Bihar ad No. 1 (Private) 30.12.10 H.L.R.C.C. Bridge in 4th onstruction Co. ajbanshi Nagar welve Months) 16/2013-2014 *PP Package - 13 291.15 30.11.10 15.03.11 30.04.11 Km. of Fatehpur- 29.03.2014 M/s Sanjay 325.92 (India) SAH Kashnagar road 12 NCB - 33 865240v20PROP00n0of0Phase01000BRPNN.xls 2 SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Construction of WBP/Ph-1/P-15/SBD- WBP/Ph-1/P-14/SBD- WBP/Ph-1/P-13/SBD- Patna-800 023 Bihar Road No. 1 (Private) Submission of Date Invitation on Opened on H.L.R.C.C. Bridge in 4th Construction Co. Rajbanshi Nagar (Twelve Months) D.P.R. (Date) (Date) 16/2013-2014 Package - 13 Km. of Fatehpur- 29.03.2014 M/s Sanjay (India) SAH 1 2 Kashnagar road 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 12 NCB - 33 R1 325.92 24.08.11 24.09.11 15.09.11 27.09.2012 07.12.2012 08.12.2012 16.03.2013 - 13.05.2013 A 07.12.2012 08.12.2012 16.03.2013 302.61 Construction of H. L. Muzaffarpur-842001 Haque Construction 30.12.10 R.C.C. Bridge in 12th (Twelve Months) Sarai Syed Ali, 22/2013-2014 *PP Package - 14 212.27 30.11.10 15.03.11 30.04.11 Km. of Sour bazar- 19.06.2014 Samda-Saharsa Road 238.77 SAH Co., 12 NCB - 36 R1 238.77 17.08.11 17.09.11 15.09.11 27.09.2012 26.12.2012 27.12.2012 16.03.2013 - 20.06.2013 A 26.12.2012 27.12.2012 16.03.2013 196.44 Construction Pvt. Ltd. Construction of R.C.C. 30.12.10 14/441, Binodpur, (Twelve Months) H.L. Bridge in 16th Km. Katihar-854105 14/2012-2013 Package - 15 *PP 291.15 30.11.10 15.03.11 30.04.11 05.10.2013 Naraindas of Sonbarsa - Gwalpara SAH Road in the district of 356.00 12 NCB - 37 Saharsa R1 - - 15.09.11 23.12.2011 18.02.2012 21.02.2012 05.09.2012 - 31.10.2012 A 18.02.2012 21.02.2012 05.09.2012 291.67 Construction of 30.12.10 14/441, Binodpur, 16/SBD-15/2012- Construction Pvt. (Months Months) Katihar-854105 H.L.R.C.C. Bridge in 18th Package - 16 WBP/Ph-1/P- 581.92 30.11.10 15.03.11 30.04.11 02.10.2014 Naraindas *PP Km. of Sonbarsa - 778.00 2013 SAH Ltd. Gwalpara Road in the 18 NCB - 38 district of Saharsa R1 - - - 15.09.11 23.12.2011 23.02.2012 24.02.2012 05.09.2012 - 31.10.2012 A 23.02.2012 24.02.2012 05.09.2012 653.67 WBP/Ph-1/P-19/SBD- WBP/Ph-1/P-18/SBD- WBP/Ph-1/P-17/SBD- Construction of H.L. M/s Roy Engineer’s Sincon Infrastructure 30.12.10 West Boring Canal LG-1&2, Majestic (Fifteen Months) Bridge in 6th Km. Belthi- Patna-800001 09/2013-2014 *PP Package - 17 314.32 30.11.10 15.03.11 30.04.11 28.04.2014 Musharani (3x16.50) in Pvt. Ltd., 377.35 Plaza, Road, SAH Saharsa District. 15 NCB - R1 39 377.35 17.08.11 17.09.11 15.09.11 27.09.2012 21.12.2012 22.12.2012 16.03.2013 - 29.04.2013 A 21.12.2012 22.12.2012 16.03.2013 333.65 Construction of H.L. Basant Bihar Colony, Near Plastic Factory, 30.12.10 R.C.C. Bridge in 2nd Km (Twelve Months) Danapur, Patna- Raghunathpur, 05/2012-2013 *PP 131.25 30.11.10 15.03.11 15.04.11 Package - 18 R.P.S. Road of Sonbarsa-Baijnathpur 21.09.2013 242.85 801503 SAH road in the district of 12 NCB - 41 Saharsa R1 - - - 15.09.11 - 23.12.2011 25.02.2012 27.02.2012 24.08.2012 27.07.2012 22.09.2012 A 25.02.2012 27.02.2012 24.08.2012 189.07 Construction of H.L. M/s Laxman Kumar Ramnagari, Sec-IV 30.12.10 (Twelve Months) Ashiyana Nagar R.C.C. Bridge in 5th Km. Patna-800025 06/2012-2013 Package - 19 *PP 262.00 30.11.10 15.03.11 15.04.11 21.09.2013 of Sonbarsa-Baijnathpur SAH road in the district of 244.72 12 NCB 45 Saharsa R1 15.09.11 23.12.2011 25.02.2012 27.02.2012 24.08.2012 27.07.2012 22.09.2012 A 25.02.2012 27.02.2012 24.08.2012 209.88 Construction of H.L. 2, Majestic Plaza, 30.12.10 /Ph-1/P-20/SBD- on Infrastructure R.C.C. Bridge in 11th st Boring Canal *PP 84.00 30.11.10 15.03.11 15.04.11 welve Months) atna-800001 8/2013-2014 ackage - 20 Km. of Sonbarsa- 244.35 28.04.2014 Pvt. Ltd., Baijnathpur road in the Road, SAH 12 district of Saharsa NCB 48 865240v20PROP00n0of0Phase01000BRPNN.xls 3 SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Construction of H.L. Submission of Date Invitation on Opened on Construction Pvt. Ltd. Construction Pvt. Ltd. LG-1&2, Majestic Plaza, WBP/Ph-1/P-20/SBD- Sincon Infrastructure R.C.C. Bridge in 11th D.P.R. (Date) (Date) West Boring Canal (Twelve Months) Patna-800001 08/2013-2014 Package - 20 Km. of Sonbarsa- 28.04.2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Pvt. Ltd., Baijnathpur road in the Road, SAH 12 district of Saharsa NCB R1 48 15.09.11 23.12.2011 25.02.2012 27.02.2012 25.08.2012 27.07.2012 29.04.2013 A 25.02.2012 27.02.2012 25.08.2012 211.14 Construction of H.L. WBP/Ph-1/P-25/SBD- WBP/Ph-1/P-24/SBD- WBP/Ph-1/P-23/SBD- WBP/Ph-1/P-22/SBD- WBP/Ph-1/P-21/SBD- 30.11.10 14/441, Binodpur, .R.C.C Bridge in 18th (Fifteen Months) Katihar-854105 16/2012-2013 *PP Package - 21 477.25 30.10.10 15.02.11 30.03.11 02.01.2014 K.M. of Bathnaha- Naraindas Bhimnagar road in the 574.08 SUP 15 district of Supaul NCB 1 R1 574.08 17.08.11 17.09.11 15.09.11 23.12.2011 29.02.2012 01.03.2012 05.09.2012 - 31.10.2012 A 29.02.2012 01.03.2012 05.09.2012 442.19 Construction of 30.11.10 (Eighteen Months) 14/441, Binodpur, H.L.R.C.C Bridge in 22nd Katihar-854105 20/2013-2014 *PP 477.25 30.10.10 15.02.11 30.03.11 Package - 22 km of Bathnaha- 03.12.2014 Naraindas Bhimnagar road in the 700.00 SUP 18 district of Supaul NCB 2 R1 705.07 10.08.11 10.09.11 15.09.11 05.11.2012 19.01.2013 21.01.2013 21.03.2013 - 04.06.2013 A 19.01.2013 21.01.2013 21.03.2013 615.15 Construction of Patna-800 023 Bihar Road No. 1 (Private) 30.11.10 H.L.R.C.C Bridge in 36th Construction Co. Rajbanshi Nagar (Fifteen Months) 23/2013-2014 *PP Package - 23 359.50 30.10.10 15.02.11 30.03.11 km of Bathnaha- 19.09.2014 M/s Sanjay 503.07 (India) SUP Bhimnagar road in the 15 district of Supaul NCB 3 R1 503.07 17.08.11 17.09.11 15.09.11 05.11.2012 16.01.2013 17.01.2013 21.03.2013 - 20.06.2013 A 16.01.2013 17.01.2013 21.03.2013 429.97 Construction of Patna-800 023 Bihar Road No. 1 (Private) 30.11.10 (Fifteen Months) H.L.R.C.C Bridge in 38th Construction Co. Rajbanshi Nagar 03/2012-2013 *PP Package - 24 314.32 30.10.10 15.02.11 30.03.11 km of Bathnaha- 21.12.2013 M/s Sanjay 413.25 (India) SUP Bhimnagar road in the 15 district of Supaul NCB 4 R1 413.25 17.08.11 17.09.11 15.09.11 23.12.2011 02.03.2012 03.03.2012 14.09.2012 - 22.09.2012 A 02.03.2012 03.03.2012 14.09.2012 331.52 Construction of Sri Mukesh Kumar 30.11.10 Ekderwa Masuria (Fifteen Months) H.L.R.C.C Bridge in 40th District- Saran PO+Ps-Maker 08/2012-2013 Package - 25 *PP 314.86 30.10.10 15.02.11 30.03.11 24.01.2014 km of Bathnaha- 414.00 Singh SUP Bhimnagar road in the 15 NCB 5 district of Supaul R1 414.00 19.08.11 19.09.11 15.09.11 23.12.2011 29.02.2012 01.03.2012 14.09.2012 - 25.10.2012 A 29.02.2012 01.03.2012 14.09.2012 343.37 Construction of 30.11.10 14/441, Binodpur, 26/SBD-09/2012- Construction Pvt. (Fiften Months) Katihar-854105 H.L.R.C.C Bridge in 3rd WBP/Ph-1/P- Package -26 *PP 325.28 30.10.10 15.02.11 30.03.11 21.12.2013 Naraindas km of Balua-Baisi road in 503.25 2013 SUP Ltd. the district of Supaul 15 NCB 7 R1 503.25 02.09.11 01.10.11 15.09.11 23.12.2011 05.03.2012 06.03.2012 05.09.2012 - 22.09.2012 A 05.03.2012 06.03.2012 05.09.2012 387.43 1/P-27/SBD- Construction of tion Pvt. Ltd. 30.11.10 Binodpur, n Months) H.L.R.C.C Bridge in 5th r-854105 12-2013 *PP 185.27 30.10.10 15.02.11 30.03.11 age -27 2.2013 km of Balua-Baisi road in aindas 865240v20PROP00n0of0Phase01000BRPNN.xls 4 SUP the district of Supaul 15 NCB SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Submission of Date Invitation on Opened on D.P.R. (Date) (Date) WBP/Ph-1/P-31/SBD- WBP/Ph-1/P-30/SBD- WBP/Ph-1/P-29/SBD- WBP/Ph-1/P-28/SBD- WBP/Ph-1/P-27/SBD- Construction of Road No. 1 (Private) Construction Pvt. Ltd. 14/441, Binodpur, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 (Fifteen Months) H.L.R.C.C Bridge in 5th Katihar-854105 10/2012-2013 *PP 185.27 30.10.10 15.02.11 30.03.11 Package -27 21.12.2013 km of Balua-Baisi road in Naraindas 326.00 SUP the district of Supaul 15 NCB 8 R1 15.09.11 23.12.2011 05.03.2012 06.03.2012 05.09.2012 - 22.09.2012 A 05.03.2012 06.03.2012 05.09.2012 252.44 Construction of H.L. Patna-800 023 Bihar 30.11.10 (Fifteen Months) R.C.C Bridge in 4th km of Construction Co. Rajbanshi Nagar 04/2012-2013 *PP Package - 28 241.00 30.10.10 15.02.11 30.03.11 Saraigarh-Lalganj- 21.09.2013 M/s Sanjay 308.76 (India) SUP Ganpatganj Road in the 15 district of Supaul NCB 9 R1 306.76 11.08.11 11.09.11 15.09.11 23.12.2011 12.03.2012 13.03.2012 25.08.2012 - 22.09.2012 A 12.03.2012 13.03.2012 25.08.2012 250.44 Construction of H.L. Construction Pvt. Ltd. 30.11.10 R.C.C. Bridge in 8th km (Fifteen Months) Station road, B. 21/2012-2013 *PP 315.00 30.10.10 15.02.11 30.03.11 Package - 29 M/s Hardev 21.12.2013 of Sariagarh-Lalganj- Jharkhand Deoghar, Ganpatganj Road in the 368.24 SUP 15 district of Supaul NCB 10 R1 368.24 11.08.11 11.09.11 15.09.11 23.12.2011 12.03.2012 13.03.2012 25.08.2012 - 15.01.2013 A 12.03.2012 13.03.2012 25.08.2012 265.8 M/s Sona Construction Construction of 30.11.10 (Fifteen Months) H.L.R.C.C Bridge in 9th At- Chhapkahi, Supaul (Bihar) 07/2012-2013 *PP 306.58 30.10.10 15.02.11 30.03.11 Package - 30 km of Supaul Nebua road 21.12.2013 Basbitti, in the district of Supaul in 471.79 SUP 15 the district of Supaul NCB 11 R1 471.79 11.08.11 11.09.11 15.09.11 23.12.2011 12.03.2012 13.03.2012 25.08.2012 - 22.09.2012 A 12.03.2012 13.03.2012 25.08.2012 373.49 Construction of Brij Construction Pvt. Boring Road, Patna 30.11.10 (Fifteen Months) H.L.R.C.C Bridge in 2nd 26, Nageshwar 24/2012-2013 Package - 31 *PP 325.28 30.10.10 15.02.11 30.03.11 28.04.2014 km of Birpur-Basmatiya Colony, SUP road in the district of 485.15 Ltd. 15 NCB 12 Supaul R1 485.75 12.08.11 12.09.11 15.09.11 23.12.2011 13.03.2012 14.03.2012 25.08.2012 - 25.03.2013 A 13.03.2012 14.03.2012 25.08.2012 381.9 Construction of 14/441, Binodpur, 30.11.10 32/SBD-11/2012- Construction Pvt. (Fifteen Months) Katihar-854105 H.L.R.C.C Bridge in 9th Package - 32 WBP/Ph-1/P- *PP 511.11 30.10.10 15.02.11 30.03.11 21.12.2013 Naraindas K.M. of Pratapganj- 698.00 2013 SUP Ltd. 15 Chhatapur Road in the NCB 13 district of Supaul R1 698.00 13.08.11 13.09.11 15.09.11 23.12.2011 14.03.2012 15.03.2012 05.09.2012 - 22.09.2012 A 14.03.2012 15.03.2012 05.09.2012 542.72 Construction of 30.11.10 (Eighteen Months) 14/441, Binodpur, 33/SBD-19/2013- Construction Pvt. Katihar-854105 *PP H.L.R.C.C Bridge in 8th 511.11 30.10.10 15.02.11 30.03.11 Package - 33 WBP/Ph-1/P- 03.12.2014 Naraindas K.M. of Ganpatganj- 805.00 2014 SUP Gaddi-Diwanganj- Ltd. 18 NCB R1 14 Partapganj Road in the 805.00 10.08.11 10.09.11 15.09.11 05.11.2012 25.01.2013 28.01.2013 21.03.2013 - 04.06.2013 district of Supaul A 25.01.2013 28.01.2013 21.03.2013 677.92 Construction of /P-34/SBD- gh, Patna- alaji Earth 10.09.10 .C.Colony, n Months) H.L.R.C.C Bridge in 9th Pvt. Ltd. 13-2014 *PP ge - 34 511.11 30.07.10 25.11.10 20.01.11 K.M. of Raghopur- 0.2014 865240v20PROP00n0of0Phase01000BRPNN.xls 5 0020 SUP Maktab Chowk- 18 NCB SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Submission of Date Invitation on Opened on D.P.R. (Date) (Date) Construction of WBP/Ph-1/P-37/SBD- WBP/Ph-1/P-36/SBD- WBP/Ph-1/P-35/SBD- WBP/Ph-1/P-34/SBD- Kankarbagh, Patna- Tirupati Balaji Earth A/230, P.C.Colony, (Eighteen Months) 1 2 H.L.R.C.C Bridge 3 in 9th 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Work Pvt. Ltd. 06/2013-2014 *PP Package - 34 511.11 30.07.10 25.11.10 20.01.11 K.M. of Raghopur- 03.10.2014 765.89 800020 SUP Maktab Chowk- 18 Sukhanagar in the district NCB 15 R1 of Supaul 765.890 02.09.11 01.10.11 15.09.11 05.11.2012 28.01.2013 29.01.2013 21.03.2013 - 06.04.2013 A 28.01.2013 29.01.2013 21.03.2013 625.65 Construction of Ground Floor, Prem Bhagalpur-2 (Bihar) 15.12.10 H.L.R.C.C. Bridge in 6th (Twelve Months) Kunj Apartment, 02/2013-2014 *PP Package - 35 240.99 15.11.10 28.02.11 15.04.11 Naya Bazar, M/s Sri Ram Enterprises, km of Kishanganj- 31.03.2014 Chausa Raod in the 305.66 MAD 12 district of Madhepura NCB 2 R1 305.60 16.08.11 08.12.11 15.09.11 27.09.2012 21.12.2012 22.12.2012 16.03.2013 - 04.04.2013 A 21.12.2012 22.12.2012 16.03.2013 281.02 Construction of Kankarbagh, Patna- Tirupati Balaji Earth 15.12.10 A/230, P.C.Colony, (Twelve Months) H.L.R.C.C Bridge in 1st (I Work Pvt. Ltd. 01/2012-2013 *PP 240.99 15.11.10 28.02.11 15.04.11 Package - 36 28.09.2013 st Cutting) of Karama 295.07 800020 MAD Chowk to Alamnager 12 Road near tower in the NCB 3 R1 district of Madhepura in 295.07 19.08.11 19.09.11 15.09.11 23.12.2011 20.03.2012 21.03.2012 25.08.2012 - 29.09.2012 the district of Madhepura A 20.03.2012 21.03.2012 25.08.2012 235.45 Construction of Kankarbagh, Patna- Tirupati Balaji Earth A/230, P.C.Colony, 15.12.10 (Twelve Months) H.L.R.C.C. Bridge in 1st Work Pvt. Ltd. 02/2012-2013 Package - 37 *PP 110.00 15.11.10 28.02.11 15.04.11 30.09.2013 (II nd Cutting) of Karama 800020 MAD Chowk to Alamnager 226.57 12 NCB 4 Road near tower in the R1 district of Madhepura 226.57 18.08.11 19.09.11 15.09.11 23.12.2011 20.03.2012 21.03.2012 25.08.2012 - 01.10.2012 A 20.03.2012 21.03.2012 25.08.2012 181.9 Construction of H.L. Ground Floor, Prem Bhagalpur-2 (Bihar) 15.12.10 38/SBD-03/2013- (Twelve Months) Kunj Apartment, R.C.C Bridge in 5th km Package - 38 WBP/Ph-1/P- Naya Bazar, M/s Sri Ram *PP 262.50 15.11.10 28.02.11 15.04.11 Enterprises, 31.03.2014 of Khurhan-Parail- 273.66 2014 MAD Ratwara-Kapasiya Road. 12 NCB 5 in the district of R1 273.66 16.08.11 08.12.11 15.09.11 27.09.2012 21.12.2012 22.12.2012 16.03.2013 - 04.04.2013 Madhepura A 21.12.2012 22.12.2012 16.03.2013 233.39 Construction of H.L. M/s Roy Engineer’s 15.12.10 39/SBD-17/2013- (Twelve Months) Danapur, Patna- Factory, R.P.S. Raghunathpur, R.C.C Bridge in 6th km Package - 39 WBP/Ph-1/P- Basant Bihar *PP 346.50 15.11.10 28.02.11 15.04.11 Near Plastic 05.05.2014 of Khurhan-Parail- Colony, 275.88 Road 2014 MAD Ratwara-Kapasiya Road. 12 NCB 6 in the district of R1 275.88 16.08.11 08.12.11 15.09.11 27.09.2012 26.12.2012 27.12.2012 16.03.2013 - 13.05.2013 Madhepura A 26.12.2012 27.12.2012 16.03.2013 228.55 WBP/Ph-1/P-40/SBD- Construction of H.L. Brij Construction Pvt. Boring Road, Patna ----- (Fifteen Months) Bridge in 7th km of 26, Nageshwar 10/2013-2014 *PP Package - 40 28.04.2014 Khurhan-Parel-Ratwara 375.42 Colony, MAD Road in between Ltd. 15 NCB R1 7 Bargania an Narayanpur- 275.42 19.08.11 19.09.11 15.09.11 23.12.2011 22.03.2012 23.03.2012 17.10.2012 - 02.05.2013 Basa-Gaon in the district A of Madhepura 22.03.2012 23.03.2012 17.10.2012 307.71 Construction of H.L. ction Pvt. Ltd. war Colony, ----- /P-41/SBD- Bridge in 9th km of Kodar ad, Patna *PP Months) Ghat in Khurhan-Parel- 2-2013 ge - 41 .2014 Ratwara in the district of 865240v20PROP00n0of0Phase01000BRPNN.xls 6 MAD Madhepura 5 NCB SL No. Package Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) (Date)** / Currency (Date)** Submission of Date Invitation on Opened on D.P.R. (Date) (Date) Construction of H.L. Brij Construction Pvt. Ltd. 26, Nageshwar Colony, WBP/Ph-1/P-41/SBD- Bridge in 9th3km of Kodar Boring Road, Patna 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 *PP (Fifteen Months) Ghat in Khurhan-Parel- 23/2012-2013 Package - 41 28.04.2014 Ratwara in the district of 387.63 MAD Madhepura 15 NCB R1 8 387.63 19.08.11 19.09.11 15.09.11 23.12.2011 27.03.2012 28.03.2012 25.08.2012 - 19.03.2013 A 27.03.2012 28.03.2012 25.08.2012 306.19 Construction of H.L. WBP/Ph-1/P-43/SBD- WBP/Ph-1/P-42/SBD- Ground Floor, Prem Bhagalpur-2 (Bihar) ----- (Fifteen Months) Bridge in 11th Km of Kunj Apartment, 04/2013-2014 *PP Package - 42 Naya Bazar, M/s Sri Ram Enterprises, Khurhan-Parel-Ratwara 30.06.2014 road near khapur high 425.24 MAD 15 school in the district of NCB 9 R1 Madhepura 425.24 19.08.11 19.09.11 15.09.11 27.09.2012 27.12.2012 28.12.2012 16.03.2013 - 04.04.2013 A 27.12.2012 28.12.2012 16.03.2013 362.91 Construction of H.L. Ground Floor, Prem Bhagalpur-2 (Bihar) ----- (Fifteen Months) Kunj Apartment, Bridge in 12th Km of 05/2013-2014 Package - 43 Naya Bazar, M/s Sri Ram *PP Enterprises, 30.06.2014 Khurhan-Parel-Ratwara MAD between Khapur and 476.60 15 NCB 10 Ratwara in the district of R1 Madhepura 476.60 24.08.11 24.09.11 15.09.11 27.09.2012 22.12.2012 24.12.2012 16.03.2013 - 04.04.2013 A 22.12.2012 24.12.2012 16.03.2013 408.21 1. Construction of 30.12.10 R.C.C. Culvert in 7th Km. of Karanpur- Rajanpur Road in Saharsa District *PP 30.11.10 23.12.2011 15.03.11 30.04.11 315.80 2. Construction of R.C.C. Culvert in 8th Km. of Karanpur- Rajanpur Road in Saharsa District 3. Construction of WBP/Ph-1/P-44/SBD-18/2012-2013 M/s K.D Company, At+Po-Supaul, R.C.C. Culvert in 9th Km. of Package No. - 44 Karanpur- Rajanpur Road in (Twelve Months) R1 263.35 17.08.11 17.09.11 15.09.11 No - 30.03.2012 31.03.2012 25.08.2012 - District-Supaul 21.09.2013 Saharsa District 17.12.2012 12 NCB - 4. Construction of R.C.C. Culvert in 190.54 10th Km. of Karanpur- Rajanpur Road in Saharsa District 5. Construction of R.C.C. Culvert in 13th Km. of Karanpur- Rajanpur Road in Saharsa District 865240v20PROP00n0of0Phase01000BRPNN.xls 7 Saharsa District 3. Construction of WBP/Ph-1/P-44/SBD-18/2012-2013 M/s K.D Company, At+Po-Supaul, R.C.C. Culvert in SL No. Package Description 9th Km. ofof Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of Package No. - 44 No. Karanpur- Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Rajanpur Road in (Twelve Months) District-Supaul Gr. No. Lac) (Date) T/S (Date) Document (Date / Value Award Currency) 21.09.2013 Saharsa District (Date)** / Currency (Date)** 17.12.2012 12 NCB - 4. Construction of R.C.C. Culvert in Submission of Date Invitation on Opened on 190.54 D.P.R. (Date) (Date) 10th Km. of Karanpur- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Rajanpur Road in Saharsa District 5. Construction of R.C.C. Culvert in 13th Km. of Karanpur- Rajanpur Road in Saharsa District A - 30.03.2012 31.03.2012 25.08.2012 6. Construction of R.C.C. Culvert in 14th Km. of Karanpur- Rajanpur Road in Saharsa District 1.Construction of R.C.C. Culvert 30.12.10 in 17th Km. of Karanpur- Package No. - 45 Rajanpur Road in Saharsa District *PP 2.Construction of 30.11.10 - 15.03.11 R.C.C. Culvert in 19th Km. (Ist) of 340.69 Karanpur- Rajanpur Road in Saharsa District 3.Construction of R.C.C. Culvert in 19th (IInd) Km. of Karanpur- Rajanpur Road in Saharsa District WBP/Ph-1/P-45/SBD-19/2012-2013 M/s K.D Company, At+Po-Supaul, 4.Construction of R1 R.C.C. Culvert in 283.88 18.08.11 17.09.11 15.09.11 No 23.12.2011 30.03.2012 31.03.2012 25.08.2012 - 20th Km. of (Twelve Months) District-Supaul Karanpur- 21.09.2013 Rajanpur Road in 12 Saharsa District NCB 5. Construction of 17.12.2012 R.C.C. Culvert in 21st (Ist) Km. 210.24 of Karanpur- Rajanpur Road in Saharsa District 6. Construction of R.C.C. Culvert in 21st (IInd) Km. of Karanpur- Rajanpur Road in 865240v20PROP00n0of0Phase01000BRPNN.xls 8 Saharsa District Road in Saharsa District WBP/Ph-1/P-45/SBD-19/2012-2013 M/s K.D Company, At+Po-Supaul, SL No. Package 4.Construction of Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. R.C.C. Culvert in Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion 20th Km. of (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract (Twelve Months) District-Supaul Gr. No. Karanpur- Lac) (Date) T/S (Date) Document (Date / Value Award Currency) 21.09.2013 Rajanpur Road in (Date)** / Currency (Date)** 12 Saharsa District NCB Submission of Date Invitation on Opened on 5. Construction of D.P.R. (Date) (Date) 17.12.2012 R.C.C. Culvert 1 2 3 Km. in 21st (Ist) 4 5 6 7 8 9 10 11 12 13 14 210.24 15 16 17 18 19 of Karanpur- Rajanpur Road in Saharsa District 6. Construction of R.C.C. Culvert in 21st (IInd) Km. of Karanpur- Rajanpur Road in Saharsa District A - 30.03.2012 31.03.2012 25.08.2012 1. Construction of R.C.C. Culvert in 37th Km. of 30.12.10 Karanpur- Rajanpur Road in Saharsa District 2. Construction of Package No. - 46 R.C.C. Culvert in 38th Km. of Karanpur- Rajanpur *PP Road in Saharsa 30.11.10 23.12.2011 15.03.11 30.04.11 District 3. Construction of 508.90 R.C.C. Culvert in 39th Km. of Karanpur- Rajanpur Road in Saharsa District 4. Construction of R.C.C. Culvert in WBP/Ph-1/P-46/SBD-20/2012-2013 40th Km. of Karanpur- Rajanpur Road in Saharsa District M/s K.D Company, (Fifteen Months) District-Supaul At+Po-Supaul, 21.12.2013 5. Construction of 17.12.2012 R.C.C. Culvert in 15 NCB 41st Km. of 330.48 Karanpur- Rajanpur Road in Saharsa District 6. Construction of R.C.C. Culvert in 865240v20PROP00n0of0Phase01000BRPNN.xls 9 42nd Km. of Rajanpur Road in Saharsa District Description of SL No. Package 3. Construction of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of No. R.C.C. Culvert in Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion 39th Km. of (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract Gr. No. Karanpur- Lac) (Date) T/S (Date) Document (Date / Value Award Currency) Rajanpur (Date)** / Currency (Date)** Road in Saharsa District Submission of Date Invitation on Opened on D.P.R. (Date) (Date) 4. Construction of 1 2 3 in R.C.C. Culvert 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 WBP/Ph-1/P-46/SBD-20/2012-2013 40th Km. of Karanpur- Rajanpur Road in Saharsa District M/s K.D Company, (Fifteen Months) District-Supaul At+Po-Supaul, 21.12.2013 5. Construction of 17.12.2012 R.C.C. Culvert in 15 NCB 41st Km. of 330.48 Karanpur- Rajanpur Road in Saharsa District 6. Construction of R.C.C. Culvert in 42nd Km. of Karanpur- Rajanpur Road in Saharsa District R1 424.06 18.08.11 19.09.11 15.09.11 - 04.04.2012 05.04.2012 25.08.2012 - 7. Construction of R.C.C.Culvert in 43rd Km. of Karanpur- Rajanpur Road in Saharsa District 8. Construction of R.C.C. Culvert in 44th Km. of Karanpur- Rajanpur Road in Saharsa District A 04.04.2012 05.04.2012 25.08.2012 1. Construction of Box Culvert in 30.12.10 6th km in Fatehpur- Kashnagar- *PP Barhi (1/33/0) in 30.11.10 23.12.2011 15.03.11 30.04.11 Saharsa District 169.31 WBP/Ph-1/P-47/SBD-17/2012-2013 2 . Construction of Package No. - 47 M/s Arvind Kumar Singh R.C.C. Box District-Saharsa (Bihar) Gangjalla, Saharsa culvert Bridge in (Twelve Months) 3rd Km of 21.09.2013 Sonbarsa- 17.12.2012 12 Baijnathpur Road NCB R1 in the district of 141.09 18.08.11 19.09.11 15.09.11 - 08.12.11 02.02.12 30.03.12 - 108.61 Saharsa 3 . Construction of R.C.C. Box culvert Bridge in 4th Km (2nd cutting) of Sonbarsa- 865240v20PROP00n0of0Phase01000BRPNN.xls 10 Baijnathpur Barhi (1/33/0) in Saharsa District WBP/Ph-1/P-47/SBD-17/2012-2013 SL No. Package 2 . Construction of Description of Works Estimated Method of Design / Estimate Preparation Domestic Bank's No Bids Contract Bank's No Contract Signed Contract Name of Contractor / **WBR Date of Package No. - 47 M/s Arvind Kumar Singh R.C.C. Box District-Saharsa (Bihar) No. Cost Procurement Investigation Prepared & of Bid Preference Objection to Award Objection to (Date/ No. Nationality & ZIP Code No. completion Gangjalla, Saharsa culvert Bridge in (Rs. in ICB/NCB completed Sanctioned Document Yes / No Bidding decided Contract Value/ of Contract (Twelve Months) Gr. No. 3rd Km of Lac) (Date) T/S (Date) Document (Date / Value Award Currency) 21.09.2013 Sonbarsa- (Date)** / Currency (Date)** 17.12.2012 12 Baijnathpur Road NCB in the district of Submission of Date Invitation on Opened on 108.61 Saharsa D.P.R. (Date) (Date) 1 2 3 of 3 . Construction 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 R.C.C. Box culvert Bridge in 4th Km (2nd cutting) of A Sonbarsa- - 04.04.2012 05.04.2012 25.08.2012 Baijnathpur Road in the district of Saharsa 1 Construction of R.C.C. Box 30.12.10 culvert Bridge in 7th Km. of *PP Sonbarsa- 30.11.10 27.09.2012 15.03.11 15.04.11 Baijnathpur 259.99 Road in the district of Saharsa 2 Construction of R1 R.C.C. Box 216.640 18.08.11 19.09.11 15.09.11 - 27.12.2012 28.12.2012 16.03.2013 - WBP/Ph-1/P-48/SBD-25/2012-2013 Devraha Construction Pvt. Ltd., culvert Bridge in Gautam Nagar, Ward No.-1, Package No. - 48 9th Km. of Sonbarsa- (Twelve Months) Saharsa-852201 Baijnathpur Road 30.03.2014 in the district of 31.03.2013 12 Saharsa NCB 3 Construction of 201.70 R.C.C. Box culvert Bridge in 12th Km. of A Sonbarsa- - 27.12.2012 28.12.2012 16.03.2013 Baijnathpur Road in the district of Saharsa 4 Construction of Box Culvert (2/33/0) in 4th km of Gwalpara- Athalakha-Sonbarsa Road in the district of Madhepura *PP :Target dates agreed as per procurement Plan R:revision 1,2 etc. A:actual dates WBR No. :World Bank Reference Number ** Applicable in case of 'Prior Review' by Bank. Note : For Column 5, state ICB/NCB/Direct Contracting/Shopping as appropriate. For Column Nos. 6 to 19, fill the information for all the three elements i.e. PP, R and A, as aplicable against each contract. 865240v20PROP00n0of0Phase01000BRPNN.xls 11 PLAN (GOS/WKS) Expenditure incurred to Date 20 48.08 46.88 14.69 40.54 0.00 0.00 865240v20PROP00n0of0Phase01000BRPNN.xls 12 Expenditure incurred to Date 0.00 20 13.21 46.44 181.00 10.37 22.44 79.50 112.91 865240v20PROP00n0of0Phase01000BRPNN.xls 13 Expenditure incurred to Date 20 112.91 0.00 171.99 336.84 23.52 73.94 67.34 81.37 865240v20PROP00n0of0Phase01000BRPNN.xls 14 Expenditure incurred to Date 20 81.37 244.83 45.56 0.00 16.25 47.23 208.45 865240v20PROP00n0of0Phase01000BRPNN.xls 15 106.88 Expenditure incurred to Date 20 106.88 127.04 119.52 131.72 41.29 268.34 33.89 865240v20PROP00n0of0Phase01000BRPNN.xls 16 28.93 Expenditure incurred to Date 20 28.93 30.54 133.53 99.44 76.04 15.98 102.09 865240v20PROP00n0of0Phase01000BRPNN.xls 17 98.13 Expenditure incurred to Date 20 98.13 23.69 48.41 58.60 865240v20PROP00n0of0Phase01000BRPNN.xls 18 Expenditure incurred to Date 58.60 20 57.84 865240v20PROP00n0of0Phase01000BRPNN.xls 19 Expenditure incurred to Date 57.84 20 0.00 865240v20PROP00n0of0Phase01000BRPNN.xls 20 Expenditure incurred to Date 20 0.00 16.00 865240v20PROP00n0of0Phase01000BRPNN.xls 21 Expenditure incurred to Date 16.00 20 11.20 865240v20PROP00n0of0Phase01000BRPNN.xls 22