Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 36694 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Bosnia and Herzegovina/EUROPE AND CENTRAL ASIA- P152406- Federation Road Sector Modernization Project - Procurement Plan (English)

Procurement Plan STEP4524 JUL 16, 2018

Disclosed

TJ CAMP4ASB_P151363 IDA 5742 Dec 31 2017 Audit Report (English)

Auditing Document AUD0013956 JUL 16, 2018

Marufi,Valeriya Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 4) : Environmental and social management plan : construction a parking lot for servicing carsin the Gorayq Village (English)

The development objective of the Social Investment and Local Development Trust Fund Project for Armenia is to improve capacities of municipalities in Southern Armenia to provide sustainable public infrastructure and services to their citizens. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

UZ CAMP4ASB_P151363 IDA 5741 Dec 31 2017 Audit Report (English)

Auditing Document AUD0013959 JUL 16, 2018

Marufi,Valeriya Disclosed

EC IFAS CAMP4ASB_P151363 IDA D094-7 Dec 31 2017 Audit Report (English)

Auditing Document AUD0013981 JUL 16, 2018

Marufi,Valeriya Disclosed

Disclosable Version of the ISR - Employment Support Project for Syrians Under Temporary Protection and Turkish Citizens - P161670 - Sequence No : 01 (English)

Implementation Status and Results Report ISR32312 JUL 14, 2018

Ovadiya,Mirey Disclosed

Urbanization in Kazakhstan : desirable cities, unaffordable housing, and the missing rental marke (English)

Kazakhstan's cities are hubs of economic opportunity and prosperity. But despite the government's ambitious targets, the pace of urbanization remains slow. ... See More +

Policy Research Working Paper WPS8530 JUL 13, 2018

Seitz,William Hutchins Disclosed

Disclosable Version of the ISR - Pap-Angren Railway - P146328 - Sequence No : 06 (English)

Implementation Status and Results Report ISR31246 JUL 13, 2018

Kunth,Antoine Avedis Disclosed

Turkey/EUROPE AND CENTRAL ASIA- P162004- Education Infrastructure for Resilience (EU Facility for SuTP) - Procurement Plan (English)

Procurement Plan STEP10959 JUL 13, 2018

Ahmet Dumanoglu Disclosed

Georgia/EUROPE AND CENTRAL ASIA- P152441- Georgia National Innovation Ecosystem (GENIE) Project - Procurement Plan (English)

Procurement Plan STEP10935 JUL 12, 2018

Disclosed

Disclosable Version of the ISR - Belarus MSME Access to Finance Project - P152276 - Sequence No : 02 (English)

Implementation Status and Results Report ISR33362 JUL 12, 2018

Nicolaou,Natalie Disclosed

Disclosable Version of the ISR - Support to Ukrtransgaz PIU - P163065 - Sequence No : 01 (English)

Implementation Status and Results Report ISR33251 JUL 12, 2018

Bertholet,Fabrice Karl Disclosed

Disclosable Version of the ISR - Belarus Biomass District Heating Project - P146194 - Sequence No : 08 (English)

Implementation Status and Results Report ISR32299 JUL 12, 2018

Liu,Feng Disclosed

AZ P110679 ISWMP Audit Report 2017 (English)

Auditing Document AUD0013801 JUL 12, 2018

Jamalov,Tural Disclosed

Kyrgyz Republic/EUROPE AND CENTRAL ASIA- P160230- Digital CASA - Kyrgyz Republic - Procurement Plan (English)

Procurement Plan STEP10883 JUL 11, 2018

Disclosed

Disclosable Restructuring Paper - Education Infrastructure for Resilience (EU Facility for SuTP) - P162004 (English)

Project Paper RES31180 JUL 11, 2018

Erkan Orenbas,Esse Ayse Disclosed

Title Document Date Report No. Document Type Also available in
Bosnia and Herzegovina/EUROPE AND CENTRAL ASIA- P152406- Federation Road Sector Modernization Project - Procurement Plan (English)
See More +
JUL 16, 2018 STEP4524 Procurement Plan
TJ CAMP4ASB_P151363 IDA 5742 Dec 31 2017 Audit Report (English)
See More +
JUL 16, 2018 AUD0013956 Auditing Document
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 4) : Environmental and social management plan : construction a parking lot for servicing carsin the Gorayq Village (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
UZ CAMP4ASB_P151363 IDA 5741 Dec 31 2017 Audit Report (English)
See More +
JUL 16, 2018 AUD0013959 Auditing Document
EC IFAS CAMP4ASB_P151363 IDA D094-7 Dec 31 2017 Audit Report (English)
See More +
JUL 16, 2018 AUD0013981 Auditing Document
Disclosable Version of the ISR - Employment Support Project for Syrians Under Temporary Protection and Turkish Citizens - P161670 - Sequence No : 01 (English)
See More +
JUL 14, 2018 ISR32312 Implementation Status and Results Report
Urbanization in Kazakhstan : desirable cities, unaffordable housing, and the missing rental marke (English)
See More +
JUL 13, 2018 WPS8530 Policy Research Working Paper
Disclosable Version of the ISR - Pap-Angren Railway - P146328 - Sequence No : 06 (English)
See More +
JUL 13, 2018 ISR31246 Implementation Status and Results Report
Turkey/EUROPE AND CENTRAL ASIA- P162004- Education Infrastructure for Resilience (EU Facility for SuTP) - Procurement Plan (English)
See More +
JUL 13, 2018 STEP10959 Procurement Plan
Georgia/EUROPE AND CENTRAL ASIA- P152441- Georgia National Innovation Ecosystem (GENIE) Project - Procurement Plan (English)
See More +
JUL 12, 2018 STEP10935 Procurement Plan
Disclosable Version of the ISR - Belarus MSME Access to Finance Project - P152276 - Sequence No : 02 (English)
See More +
JUL 12, 2018 ISR33362 Implementation Status and Results Report
Disclosable Version of the ISR - Support to Ukrtransgaz PIU - P163065 - Sequence No : 01 (English)
See More +
JUL 12, 2018 ISR33251 Implementation Status and Results Report
Disclosable Version of the ISR - Belarus Biomass District Heating Project - P146194 - Sequence No : 08 (English)
See More +
JUL 12, 2018 ISR32299 Implementation Status and Results Report
Armenia/EUROPE AND CENTRAL ASIA- P155630- Implementation of the National Strategy Program for Strengthening of the National Statistical System - Procurement Plan (English)
See More +
JUL 12, 2018 STEP10923 Procurement Plan
AZ P110679 ISWMP Audit Report 2017 (English)
See More +
JUL 12, 2018 AUD0013801 Auditing Document
Kyrgyz Republic/EUROPE AND CENTRAL ASIA- P160230- Digital CASA - Kyrgyz Republic - Procurement Plan (English)
See More +
JUL 11, 2018 STEP10883 Procurement Plan
Disclosable Restructuring Paper - Education Infrastructure for Resilience (EU Facility for SuTP) - P162004 (English)
See More +
JUL 11, 2018 RES31180 Project Paper