Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
  • Showing 1 - 20 of 31 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Understanding and Assessing Impact of Transmission and Distribution Projects on Electricity Access (English)

The North Eastern Region (NER) of India stretches across the eastern foothills of the Himalayan mountain range. Geographically, the region is connected to the other parts of the country through a small ‘chicken neck’ corridor in the state of West Bengal. ... See More +

ESMAP Paper 134234 JAN 30, 2019

Mittal,Rohit; Gupta,Amol; Gaba,Kwawu Mensan Disclosed

Mainstreaming Disruptive Technologies in Energy (English)

The development community needs innovative ways to collect systematic and geographically precise data about electrified regions to identify focus areas where collective actions from policymakers and other stakeholders can make a real and lasting impact on electricity access. ... See More +

Report 138943 JAN 01, 2019

Min,Brian; Baugh,Kimberly; Gaba,Kwawu Mensan; Veerman,Olaf Disclosed

Practical guidance for defining a smart grid modernization strategy (English)

There is no one definition of the smart grid concept. Instead, smart grids are defined differently around the world to reflect local requirements and goals. ... See More +

Working Paper 113553 MAR 14, 2017

Madrigal,Marcelino; Uluski,Robert William; Gaba,Kwawu Mensan Disclosed

Distribution automation : an opportunity to improve reliability and quality (English)

The control systems of today’s smart power-distribution grids have evolved significantly. Such systems improve system reliability by reducing the frequency and duration of outages. ... See More +

Brief 107122 JUL 01, 2016

Nangia,Varun Ravi; Oguah,Samuel Kwesi Ewuah; Gaba,Kwawu Mensan Disclosed

Can utilities realize the benefits of advanced metering infrastructure? Lessons from the World Bank’s portfolio (English)

Advanced metering infrastructure (AMI) provides significant benefits to utilities around the world. Although it is entering the mainstream, technical concerns, policy challenges, capacity, and will in the Bank’s client countries hinder wider adoption. ... See More +

Brief 107120 JUL 01, 2016

Nangia,Varun Ravi; Oguah,Samuel Kwesi Ewuah; Gaba,Kwawu Mensan Disclosed

Smartening the grid in developing countries : emerging lessons from World Bank lending (English)

Since fiscal year 2010 the World Bank has supported 20 smart grid projects in 19 countries and all six Bank regions. Valued at 960 million dollars - a quarter of all Bank support for transmission and distribution during the period — the projects have focused on advanced metering, distribution automation, and supervisory control and data acquisition for energy and distribution management systems. ... See More +

Brief 107123 JUL 01, 2016

Nangia,Varun Ravi; Oguah,Samuel Kwesi Ewuah; Gaba,Kwawu Mensan Disclosed

Managing the grids of the future in developing countries : recent World Bank support for SCADA/EMS and SCADA/DMS systems (English)

SCADA/EMS and SCADA/DMS systems ensure that power grids are efficient, resilient, and able to adapt to changes in generation, transmission, and distribution. ... See More +

Brief 107121 JUL 01, 2016

Nangia,Varun Ravi; Oguah,Samuel Kwesi Ewuah; Gaba,Kwawu Mensan Disclosed

Lighting the way in Manipur : post unbundling reforms in distribution (English)

Simple economic principles tell us that investment begets investment and wealth creates wealth. Investment of money alone, however, is seldom enough to trigger this virtuous cycle, time, effort and substantial planning are also critical elements. ... See More +

Working Paper 107208 FEB 01, 2016

Mittal,Rohit; Saraswat,Kavita; Gupta,Amol; Gaba,Kwawu Mensan; Bucknall,Julia Disclosed

Big data innovation challenge : pioneering approaches to data-driven development (English)

Big data can sound remote and lacking a human dimension, with few obvious links to development and impacting the lives of the poor. Concepts such as anti-poverty targeting, market access or rural electrification seem far more relevant – and easier to grasp. ... See More +

Working Paper 107751 JAN 01, 2016

Fernandes,Erick C.M.; Jimenez,Daniel Regis; Delerce,Sylvain; Harten,Sven; Kaiser,Kai-Alexander; Kelm,Kathrine M.; Krambeck,Holly; Lemieux,Victoria Louise; Gaba,Kwawu Mensan; Newhouse,David Locke; Rodriguez,Camila; Villaveces,Andres; Wang,Wei Winnie; Adelman,Melissa Ann; Gonzalez,Alvaro S.; Hernandez Ore,Marco Antonio; Khokhar,Tariq Afzal; Kilic,Talip; Lozano Gracia,Nancy Disclosed

Rampur Hydropower Project : land acquisition, resettlement, and community development practices (English)

SJVN Limited (SJVNL), a mini ratna1 public sector undertaking of the Government of India (GoI), implemented the World Bank funded 412 megawatt (MW) run-of-the-river hydro power project at Rampur in Himachal Pradesh, immediately downstream of and in cascade operation with the 1500 MW Nathpa Jhakri Hydroelectric Project (NJHP). ... See More +

Working Paper 101039 OCT 01, 2015

Reddy,I. U. B.; Mittal,Rohit; Gaba,Kwawu Mensan Disclosed

India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 13 (English)

Implementation Status and Results Report ISR19654 JUL 24, 2015

Gaba,Kwawu Mensan

India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 08 (English)

Implementation Status and Results Report ISR17361 DEC 17, 2014

Gaba,Kwawu Mensan

India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 07 (English)

Implementation Status and Results Report ISR16535 NOV 05, 2014

Gaba,Kwawu Mensan

Tracking electrification in Vietnam using night time lights (English)

The authors report on a systematic ground-based validation of DMSP-OLS night lights imagery to detect rural electrification in Vietnam. Based on an original survey of village-level units in Vietnam, this study compares nighttime light output from the U.S. ... See More +

Journal Article 102491 OCT 09, 2014

Brian Min; Gaba,Kwawu Mensan Disclosed

Rampur Hydro Power Project - land acquisition, resettlement and community development practices (English)

SJVN Limited (SJVNL), a mini ratna1 public sector undertaking of the Government of India (GoI), is implementing the World Bank funded 412 MW run-of-the-river hydro power project at Rampur in Himachal Pradesh, immediately downstream of and in cascade operation with the 1500 MW Nathpa Jhakri Hydroelectric Project (NJHP). ... See More +

Working Paper 90134 AUG 01, 2014

Mittal, Rohit ; Reddy, I.U.B ; Mensan Gaba, Kwawu Disclosed

India - POWER SYSTEM DEVELOPMENT PROJECT IV : P101653 - Implementation Status Results Report : Sequence 13 (English)

Implementation Status and Results Report ISR15021 JUN 28, 2014

Gaba,Kwawu Mensan

India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 11 (English)

Implementation Status and Results Report ISR15022 JUN 28, 2014

Gaba,Kwawu Mensan

India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 06 (English)

Implementation Status and Results Report ISR14255 APR 27, 2014

Gaba,Kwawu Mensan

India - POWER SYSTEM DEVELOPMENT PROJECT IV : P101653 - Implementation Status Results Report : Sequence 12 (English)

Implementation Status and Results Report ISR13397 MAR 12, 2014

Gaba,Kwawu Mensan

India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 10 (English)

Implementation Status and Results Report ISR13383 MAR 12, 2014

Gaba,Kwawu Mensan

Title Document Date Report No. Document Type Also available in
Understanding and Assessing Impact of Transmission and Distribution Projects on Electricity Access (English)
See More +
JAN 30, 2019 134234 ESMAP Paper
Mainstreaming Disruptive Technologies in Energy (English)
See More +
JAN 01, 2019 138943 Report
Practical guidance for defining a smart grid modernization strategy (English)
See More +
MAR 14, 2017 113553 Working Paper
Distribution automation : an opportunity to improve reliability and quality (English)
See More +
JUL 01, 2016 107122 Brief
Can utilities realize the benefits of advanced metering infrastructure? Lessons from the World Bank’s portfolio (English)
See More +
JUL 01, 2016 107120 Brief
Smartening the grid in developing countries : emerging lessons from World Bank lending (English)
See More +
JUL 01, 2016 107123 Brief
Managing the grids of the future in developing countries : recent World Bank support for SCADA/EMS and SCADA/DMS systems (English)
See More +
JUL 01, 2016 107121 Brief
Lighting the way in Manipur : post unbundling reforms in distribution (English)
See More +
FEB 01, 2016 107208 Working Paper
Big data innovation challenge : pioneering approaches to data-driven development (English)
See More +
JAN 01, 2016 107751 Working Paper
Rampur Hydropower Project : land acquisition, resettlement, and community development practices (English)
See More +
OCT 01, 2015 101039 Working Paper
India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 13 (English)
See More +
JUL 24, 2015 ISR19654 Implementation Status and Results Report
India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 08 (English)
See More +
DEC 17, 2014 ISR17361 Implementation Status and Results Report
India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 07 (English)
See More +
NOV 05, 2014 ISR16535 Implementation Status and Results Report
Tracking electrification in Vietnam using night time lights (English)
See More +
OCT 09, 2014 102491 Journal Article
Rampur Hydro Power Project - land acquisition, resettlement and community development practices (English)
See More +
AUG 01, 2014 90134 Working Paper
India - POWER SYSTEM DEVELOPMENT PROJECT IV : P101653 - Implementation Status Results Report : Sequence 13 (English)
See More +
JUN 28, 2014 ISR15021 Implementation Status and Results Report
India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 11 (English)
See More +
JUN 28, 2014 ISR15022 Implementation Status and Results Report
India - Vishnugad Pipalkoti Hydro Electric Project : P096124 - Implementation Status Results Report : Sequence 06 (English)
See More +
APR 27, 2014 ISR14255 Implementation Status and Results Report
India - POWER SYSTEM DEVELOPMENT PROJECT IV : P101653 - Implementation Status Results Report : Sequence 12 (English)
See More +
MAR 12, 2014 ISR13397 Implementation Status and Results Report
India - Fifth Power System Development Project : P115566 - Implementation Status Results Report : Sequence 10 (English)
See More +
MAR 12, 2014 ISR13383 Implementation Status and Results Report