Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
  • Showing 1 - 20 of 44 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Disclosable Version of the ISR - Lebanon-Water Supply Augmentation Project - P125184 - Sequence No : 09 (English)

Implementation Status and Results Report ISR32451 MAY 30, 2018

Talbi,Amal Disclosed

Disclosable Version of the ISR - LB- GREATER BEIRUT WATER SUPPLY - P103063 - Sequence No : 17 (English)

Implementation Status and Results Report ISR32420 MAY 14, 2018

Talbi,Amal Disclosed

Project Information Document-Integrated Safeguards Data Sheet - Additional Financing for the Greater Beirut Water Supply Project - P165711 (English)

Project Information and Integrated Safeguards Data Sheet PIDISDSA24520 MAY 05, 2018

Talbi,Amal Disclosed

Lebanon - Greater Beirut Water Supply Augmentation Project : additional financing (Arabic)

Project Information and Integrated Safeguards Data Sheet PIDISDSA24520 MAY 04, 2018

Talbi,Amal English Disclosed

Dire straits : the crisis surrounding poverty, conflict, and water in the Republic of Yemen (Vol. 2) : executive summary (Arabic)

This report is part of a global set of Water, Sanitation, and Hygiene for All (WASH) diagnostics carried out in countries where WASH services for the poor are deficient and where their might be institutional constraints to improving coverage and services. ... See More +

Other Poverty Study 117111 FEB 01, 2018

Mumssen,Yogita; Tiwari,Sailesh; Abu-Lohom,Naif Mohammed; Talbi,Amal; Joshi,Sushant; Ward,Christopher S.; Al-Sabbry,Mohammad Disclosed

The water-energy-food nexus in the Middle East and North Africa : scenarios for a sustainable future (English)

Water, energy, and agriculture have been conventionally dealt with separately in investment planning. For each of these sectors, regulatory frameworks, organizations, and infrastructures have been put in place to address sector-specific challenges and demands. ... See More +

Working Paper 127749 JAN 01, 2018

Borgomeo,Edoardo; Jagerskog,Lars Anders; Talbi,Amal; Wijnen,Marcus Marinus Petrus; Hejazi,Mohamad; Miralles-Wilhelm,Fernando Disclosed

Disclosable Version of the ISR - Lebanon-Water Supply Augmentation Project - P125184 - Sequence No : 08 (English)

Implementation Status and Results Report ISR30371 NOV 30, 2017

Talbi,Amal Disclosed

Disclosable Version of the ISR - LB- GREATER BEIRUT WATER SUPPLY - P103063 - Sequence No : 16 (English)

Implementation Status and Results Report ISR30027 NOV 14, 2017

Talbi,Amal Disclosed

The Toll of war : the economic and social consequences of the conflict in Syria : خسائر الحرب: التبعات الاقتصادية والاجتماعية للصراع في سوريا (Arabic)

The Arab Spring protest marked the beginning of a new era in the Syrian Arab Republic in 2011. Minor public protests began almost immediately after the initial protests in Cairo in January 2011. ... See More +

Working Paper 117331 JUL 01, 2017

Onder,Harun; Hayati,Fayavar; Sayeed, Haneen Ismael; Dajani,Ibrahim Khalil; Mousley,Peter J.; Pande,Aakanksha; Al-Aghbari,Abdulhakim Ali Ahmed; Talbi,Amal; Jagerskog,Lars Anders; Petrelli,Andrea; Judaprawira,Andrew James; Elzir,Angela; Lisulo,Angela S.; Vodopyanov,Anya; Wee,Asbjorn Haland; Maseeh,Ashwaq Natiq; Hexeberg,Barbro E.; Letica,Bartol; Shamsiev,Bekzod; Bollag,Burton S.; Rossotto,Carlo Maria; Stephan,David Andrew; Robalino,David A.; Sharma,Dhiraj; Merotto,Dino Leonardo; De Waal,Dominick Revell; Verner,Dorte; Ozcelik,Ece Amber; Fuli,Ejona; Artuc,Erhan; Metreau,Eric Roland; Ozveren,Eyup; Yamaguchi,Hiromi; Fearon,James D.; Von Der Goltz,Jan; Huenteler,Joern Torsten; Valdes Martinez,Jose Pablo; Aoun,Joy-Fares; Osorio-Rodarte,Israel; Garber,Kent David; Salmon,Kinley Clemens; Hamilton,Kirk E.; Ueda,Kohei; Fares,Lina; Stewart,Lisa Ann; Quota,Manal Bakur N; Maourani,Mohamed Ali; Assaf,Nabila; Maherali,Natasha Karim Lutfali; Prettitore,Paul Scott; Mcconaghy,Peter; Shah,Phoram; Nasr,Rabie; Arshad,Raja Rehan; Garcia,Raffi Enmanuel; Jennings,Ray Salvatore; Zgheib,Sally; Mobasher Fard,Shahrzad; El Khalil,Soraya; Hassan,Syed Mehdi; Akbar,Tahir; Schneider,Tobias; Hart,Tracy; Nguyen,Trang Thi Thuy; Balkir,Tulu; El-Hanbali,Usaid I.; Tammaa,Waad; Mehchy,Zaki; El Nakat,Ziad Salim; Le Borgne,Eric English Disclosed

The Toll of war : the economic and social consequences of the conflict in Syria : executive summary (English)

The Arab Spring protest marked the beginning of a new era in the Syrian Arab Republic in 2011. Minor public protests began almost immediately after the initial protests in Cairo in January 2011. ... See More +

Working Paper 117331 JUL 01, 2017

Onder,Harun; Hayati,Fayavar; Sayeed, Haneen Ismael; Dajani,Ibrahim Khalil; Mousley,Peter J.; Pande,Aakanksha; Al-Aghbari,Abdulhakim Ali Ahmed; Talbi,Amal; Jagerskog,Lars Anders; Petrelli,Andrea; Judaprawira,Andrew James; Elzir,Angela; Lisulo,Angela S.; Vodopyanov,Anya; Wee,Asbjorn Haland; Maseeh,Ashwaq Natiq; Hexeberg,Barbro E.; Letica,Bartol; Shamsiev,Bekzod; Bollag,Burton S.; Rossotto,Carlo Maria; Stephan,David Andrew; Robalino,David A.; Sharma,Dhiraj; Merotto,Dino Leonardo; De Waal,Dominick Revell; Verner,Dorte; Ozcelik,Ece Amber; Fuli,Ejona; Artuc,Erhan; Metreau,Eric Roland; Ozveren,Eyup; Yamaguchi,Hiromi; Fearon,James D.; Von Der Goltz,Jan; Huenteler,Joern Torsten; Valdes Martinez,Jose Pablo; Aoun,Joy-Fares; Osorio-Rodarte,Israel; Garber,Kent David; Salmon,Kinley Clemens; Hamilton,Kirk E.; Ueda,Kohei; Fares,Lina; Stewart,Lisa Ann; Quota,Manal Bakur N; Maourani,Mohamed Ali; Assaf,Nabila; Maherali,Natasha Karim Lutfali; Prettitore,Paul Scott; Mcconaghy,Peter; Shah,Phoram; Nasr,Rabie; Arshad,Raja Rehan; Garcia,Raffi Enmanuel; Jennings,Ray Salvatore; Zgheib,Sally; Mobasher Fard,Shahrzad; El Khalil,Soraya; Hassan,Syed Mehdi; Akbar,Tahir; Schneider,Tobias; Hart,Tracy; Nguyen,Trang Thi Thuy; Balkir,Tulu; El-Hanbali,Usaid I.; Tammaa,Waad; Mehchy,Zaki; El Nakat,Ziad Salim; Le Borgne,Eric Arabic Disclosed

The Toll of war : the economic and social consequences of the conflict in Syria (Vol. 2) : full report (English)

The Arab Spring protest marked the beginning of a new era in the Syrian Arab Republic in 2011. Minor public protests began almost immediately after the initial protests in Cairo in January 2011. ... See More +

Working Paper 117331 JUL 01, 2017

Onder,Harun; Hayati,Fayavar; Sayeed, Haneen Ismael; Dajani,Ibrahim Khalil; Mousley,Peter J.; Pande,Aakanksha; Al-Aghbari,Abdulhakim Ali Ahmed; Talbi,Amal; Jagerskog,Lars Anders; Petrelli,Andrea; Judaprawira,Andrew James; Elzir,Angela; Lisulo,Angela S.; Vodopyanov,Anya; Wee,Asbjorn Haland; Maseeh,Ashwaq Natiq; Hexeberg,Barbro E.; Letica,Bartol; Shamsiev,Bekzod; Bollag,Burton S.; Rossotto,Carlo Maria; Stephan,David Andrew; Robalino,David A.; Sharma,Dhiraj; Merotto,Dino Leonardo; De Waal,Dominick Revell; Verner,Dorte; Ozcelik,Ece Amber; Fuli,Ejona; Artuc,Erhan; Metreau,Eric Roland; Ozveren,Eyup; Yamaguchi,Hiromi; Fearon,James D.; Von Der Goltz,Jan; Huenteler,Joern Torsten; Valdes Martinez,Jose Pablo; Aoun,Joy-Fares; Osorio-Rodarte,Israel; Garber,Kent David; Salmon,Kinley Clemens; Hamilton,Kirk E.; Ueda,Kohei; Fares,Lina; Stewart,Lisa Ann; Quota,Manal Bakur N; Maourani,Mohamed Ali; Assaf,Nabila; Maherali,Natasha Karim Lutfali; Prettitore,Paul Scott; Mcconaghy,Peter; Shah,Phoram; Nasr,Rabie; Arshad,Raja Rehan; Garcia,Raffi Enmanuel; Jennings,Ray Salvatore; Zgheib,Sally; Mobasher Fard,Shahrzad; El Khalil,Soraya; Hassan,Syed Mehdi; Akbar,Tahir; Schneider,Tobias; Hart,Tracy; Nguyen,Trang Thi Thuy; Balkir,Tulu; El-Hanbali,Usaid I.; Tammaa,Waad; Mehchy,Zaki; El Nakat,Ziad Salim; Le Borgne,Eric Arabic Disclosed

The Toll of war : the economic and social consequences of the conflict in Syria (Vol. 2) : full report (Arabic)

The Arab Spring protest marked the beginning of a new era in the Syrian Arab Republic in 2011. Minor public protests began almost immediately after the initial protests in Cairo in January 2011. ... See More +

Working Paper 117331 JUL 01, 2017

Onder,Harun; Hayati,Fayavar; Sayeed, Haneen Ismael; Dajani,Ibrahim Khalil; Mousley,Peter J.; Pande,Aakanksha; Al-Aghbari,Abdulhakim Ali Ahmed; Talbi,Amal; Jagerskog,Lars Anders; Petrelli,Andrea; Judaprawira,Andrew James; Elzir,Angela; Lisulo,Angela S.; Vodopyanav, Anya; Wee,Asbjorn Haland; Maseeh,Ashwaq Natiq; Hexeberg,Barbro E.; Letica,Bartol; Shamsiev,Bekzod; Bollag,Burton S.; Rossotto,Carlo Maria; Stephan,David Andrew; Robalino,David A.; Sharma,Dhiraj; Merotto,Dino Leonardo; De Waal,Dominick Revell; Verner,Dorte; Ozcelik,Ece Amber; Fuli,Ejona; Artuc,Erhan; Metreau,Eric Roland; Ozveren,Yasar Eyup; Yamaguchi,Hiromi; Fearon,James D.; Von Der Goltz,Jan; Huenteler,Joern Torsten; Valdes Martinez,Jose Pablo; Aoun,Joy-Fares; Osorio-Rodarte,Israel; Garber,Kent David; Salmon,Kinley Clemens; Hamilton,Kirk E.; Ueda,Kohei; Fares,Lina; Stewart,Lisa Ann; Quota,Manal Bakur N; Maourani, Mohamed Ali; Assaf,Nabila; Maherali,Natasha Karim Lutfali; Prettitore,Paul Scott; Mcconaghy,Peter; Shah,Phoram; Nasr, Rabie; Arshad,Raja Rehan; Garcia,Raffi Enmanuel; Jennings,Ray Salvatore; Zgheib,Sally; Mobasher Fard,Shahrzad; El Khalil,Soraya; Hassan,Syed Mehdi; Akbar,Tahir; Schneider,Tobias; Hart,Tracy; Huyen,Nguyen Thanh; Balkir,Tulu; El-Hanbali,Usaid I.; Tammaa,Waad; Mehchy,Zaki; El Nakat,Ziad Salim; Le Borgne,Eric English Disclosed

Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 15 (English)

Implementation Status and Results Report ISR28472 JUN 07, 2017

Talbi,Amal Disclosed

Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 14 (English)

Implementation Status and Results Report ISR28132 MAY 19, 2017

Talbi,Amal Disclosed

Lebanon - Lebanon-Water Supply Augmentation Project : P125184 - Implementation Status Results Report : Sequence 07 (English)

Implementation Status and Results Report ISR28138 MAY 19, 2017

Talbi,Amal Disclosed

Morocco - Strengthen capacity for an inclusive design of groundwater management contract for green growth. : P154280 - Implementation Status Results Report : Sequence 02 (English)

Implementation Status and Results Report ISR27148 MAR 10, 2017

Talbi,Amal Disclosed

Dire straits : the crisis surrounding poverty, conflict, and water in the Republic of Yemen (English)

This report is part of a global set of Water, Sanitation, and Hygiene for All (WASH) diagnostics carried out in countries where WASH services for the poor are deficient and where their might be institutional constraints to improving coverage and services. ... See More +

Other Poverty Study 117111 JAN 01, 2017

Tiwari,Sailesh; Abu-Lohom,Naif Mohammed; Talbi,Amal; Joshi,Sushant; Ward,Christopher S.; Al-Sabbry, Mohammad; Mumssen,Yogita Disclosed

Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 13 (English)

Implementation Status and Results Report ISR25680 NOV 14, 2016

Talbi,Amal

Lebanon - Lebanon-Water Supply Augmentation Project : P125184 - Implementation Status Results Report : Sequence 06 (English)

Implementation Status and Results Report ISR25681 NOV 13, 2016

Talbi,Amal

Morocco - Strengthen capacity for an inclusive design of groundwater mangement contract for green growth. : P154280 - Implementation Status Results Report : Sequence 01 (English)

Implementation Status and Results Report ISR24573 AUG 12, 2016

Talbi,Amal

Title Document Date Report No. Document Type Also available in
Disclosable Version of the ISR - Lebanon-Water Supply Augmentation Project - P125184 - Sequence No : 09 (English)
See More +
MAY 30, 2018 ISR32451 Implementation Status and Results Report
Disclosable Version of the ISR - LB- GREATER BEIRUT WATER SUPPLY - P103063 - Sequence No : 17 (English)
See More +
MAY 14, 2018 ISR32420 Implementation Status and Results Report
Project Information Document-Integrated Safeguards Data Sheet - Additional Financing for the Greater Beirut Water Supply Project - P165711 (English)
See More +
MAY 05, 2018 PIDISDSA24520 Project Information and Integrated Safeguards Data Sheet
Lebanon - Greater Beirut Water Supply Augmentation Project : additional financing (Arabic)
See More +
MAY 04, 2018 PIDISDSA24520 Project Information and Integrated Safeguards Data Sheet English
Dire straits : the crisis surrounding poverty, conflict, and water in the Republic of Yemen (Vol. 2) : executive summary (Arabic)
See More +
FEB 01, 2018 117111 Other Poverty Study
The water-energy-food nexus in the Middle East and North Africa : scenarios for a sustainable future (English)
See More +
JAN 01, 2018 127749 Working Paper
Disclosable Version of the ISR - Lebanon-Water Supply Augmentation Project - P125184 - Sequence No : 08 (English)
See More +
NOV 30, 2017 ISR30371 Implementation Status and Results Report
Disclosable Version of the ISR - LB- GREATER BEIRUT WATER SUPPLY - P103063 - Sequence No : 16 (English)
See More +
NOV 14, 2017 ISR30027 Implementation Status and Results Report
The Toll of war : the economic and social consequences of the conflict in Syria : خسائر الحرب: التبعات الاقتصادية والاجتماعية للصراع في سوريا (Arabic)
See More +
JUL 01, 2017 117331 Working Paper English
The Toll of war : the economic and social consequences of the conflict in Syria : executive summary (English)
See More +
JUL 01, 2017 117331 Working Paper Arabic
The Toll of war : the economic and social consequences of the conflict in Syria (Vol. 2) : full report (English)
See More +
JUL 01, 2017 117331 Working Paper Arabic
The Toll of war : the economic and social consequences of the conflict in Syria (Vol. 2) : full report (Arabic)
See More +
JUL 01, 2017 117331 Working Paper English
Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 15 (English)
See More +
JUN 07, 2017 ISR28472 Implementation Status and Results Report
Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 14 (English)
See More +
MAY 19, 2017 ISR28132 Implementation Status and Results Report
Lebanon - Lebanon-Water Supply Augmentation Project : P125184 - Implementation Status Results Report : Sequence 07 (English)
See More +
MAY 19, 2017 ISR28138 Implementation Status and Results Report
Morocco - Strengthen capacity for an inclusive design of groundwater management contract for green growth. : P154280 - Implementation Status Results Report : Sequence 02 (English)
See More +
MAR 10, 2017 ISR27148 Implementation Status and Results Report
Dire straits : the crisis surrounding poverty, conflict, and water in the Republic of Yemen (English)
See More +
JAN 01, 2017 117111 Other Poverty Study
Lebanon - LB- GREATER BEIRUT WATER SUPPLY : P103063 - Implementation Status Results Report : Sequence 13 (English)
See More +
NOV 14, 2016 ISR25680 Implementation Status and Results Report
Lebanon - Lebanon-Water Supply Augmentation Project : P125184 - Implementation Status Results Report : Sequence 06 (English)
See More +
NOV 13, 2016 ISR25681 Implementation Status and Results Report
Morocco - Strengthen capacity for an inclusive design of groundwater mangement contract for green growth. : P154280 - Implementation Status Results Report : Sequence 01 (English)
See More +
AUG 12, 2016 ISR24573 Implementation Status and Results Report