Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
  • Showing 1 - 20 of 310 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Project Information Document (Appraisal Stage) - West Balkans Drina River Basin Management - P145048 (English)

Project Information Document PIDA54462 JAN 29, 2016

AnnaCestari

Integrated Safeguards Data Sheet (Appraisal Stage) - West Balkans Drina River Basin Management - P145048 (English)

Integrated Safeguards Data Sheet ISDSA16534 JAN 19, 2016

AnnaCestari

Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan (Vol. 3) : Resettlement policy framework for Serbia (English)

The World Bank (WB) is supporting the preparation of the West Balkans Drina River Basin Management (WBDRBM) Project (the Project), financed by the Global Environment Facility's (GEF) Special Climate Change Fund (SCCF), aimed at assisting Bosnia and Herzegovina (BiH), Montenegro and Serbia in capacity building, studies and investments to strengthen the capacity of their governments to plan and implement integrated, cooperative international management of the trans-boundary Drina River Basin (DRB) and address climate change adaptation in the DRB – based on ‘global best practices’ and within the framework of integrated water resource management (IWRM) involving extensive stakeholder consultations to ensure adequate public participation. ... See More +

Resettlement Plan SFG1621 DEC 23, 2015

Cestari,Anna

Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan (Vol. 2) : Resettlement policy framework for Montenegro (English)

The World Bank (WB) is supporting the preparation of the West Balkans Drina River Basin Management (WBDRBM) Project (the Project), financed by the Global Environment Facility's (GEF) Special Climate Change Fund (SCCF), aimed at assisting Bosnia and Herzegovina (BiH), Montenegro and Serbia in capacity building, studies and investments to strengthen the capacity of their governments to plan and implement integrated, cooperative international management of the trans-boundary Drina River Basin (DRB) and address climate change adaptation in the DRB – based on ‘global best practices’ and within the framework of integrated water resource management (IWRM) involving extensive stakeholder consultations to ensure adequate public participation. ... See More +

Resettlement Plan SFG1621 DEC 23, 2015

Cestari,Anna

Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan : Resettlement policy framework for Bosnia and Herzegovina (English)

The World Bank (WB) is supporting the preparation of the West Balkans Drina River Basin Management (WBDRBM) Project (the Project), financed by the Global Environment Facility's (GEF) Special Climate Change Fund (SCCF), aimed at assisting Bosnia and Herzegovina (BiH), Montenegro and Serbia in capacity building, studies and investments to strengthen the capacity of their governments to plan and implement integrated, cooperative international management of the trans-boundary Drina River Basin (DRB) and address climate change adaptation in the DRB – based on ‘global best practices’ and within the framework of integrated water resource management (IWRM) involving extensive stakeholder consultations to ensure adequate public participation. ... See More +

Resettlement Plan SFG1621 DEC 23, 2015

Cestari,Anna

West Balkans - Drina River Basin Management Project : environmental assessment : Environmental and social management framework (English)

The development objective of the Drina River Basin Management Project for West Balkans is to assist the countries of Bosnia-Herzegovina, Serbia, and Montenegro to achieve improved planning and implementation for integrated, cooperative management of the trans-boundary Drina river basin. ... See More +

Environmental Assessment SFG1616 DEC 22, 2015

Cestari,Anna

West Balkans - Drina River Basin Management Project : environmental assessment (Vol. 2) : Environmental and social management framework (English)

The development objective of the Drina River Basin Management Project for West Balkans is to assist the countries of Bosnia-Herzegovina, Serbia, and Montenegro to achieve improved planning and implementation for integrated, cooperative management of the trans-boundary Drina river basin. ... See More +

Environmental Assessment SFG1616 DEC 20, 2015

Cestari,Anna

Official Documents- Amendment No. 1 to the Implementation Agreement between IBRD and EBRD for TF072016 (English)

Agreement DEC 07, 2015

Margaret; Png,Margaret

Official Documents- First Restatement of the Disbursement Letter, TF019385 (English)

Disbursement Letter OCT 09, 2015

Shayne,Adam; Adam

Water and climate adaptation plan for the Sava river basin (Vol. 8) : Annex six - guidance note on economic evaluation of climate change impacts in the Sava River Basin (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 7) : Annex five - guidance note on adaptation to climate change for agriculture (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 6) : Annex four - guidance note on adaptation to climate change for navigation (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 5) : Annex three - guidance note on adaptation to climate change for hydropower (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 4) : Annex two : guidance note on adaptation to climate change for flooding (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 3) : Annex 1A : training on the use of the hydrologic model for the Sava river basin (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin (Vol. 2) : Annex one : development of the hydrologic model for the Sava river basin (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Water and climate adaptation plan for the Sava river basin : Main report (English)

This report presents the water and climate adaptation plan (WATCAP) developed for the Sava river basin (SRB) as result of a study undertaken by the World Bank. ... See More +

Working Paper 100525 AUG 01, 2015

Albania : Southeast Europe Catastrophe Risk Insurance Facility TA : integrated safeguards data sheet concept stage (English)

Integrated Safeguards Data Sheet 99112 JUL 20, 2015

Title Document Date Report No. Document Type Also available in
Project Information Document (Appraisal Stage) - West Balkans Drina River Basin Management - P145048 (English)
See More +
JAN 29, 2016 PIDA54462 Project Information Document
Integrated Safeguards Data Sheet (Appraisal Stage) - West Balkans Drina River Basin Management - P145048 (English)
See More +
JAN 19, 2016 ISDSA16534 Integrated Safeguards Data Sheet
Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan (Vol. 3) : Resettlement policy framework for Serbia (English)
See More +
DEC 23, 2015 SFG1621 Resettlement Plan
Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan (Vol. 2) : Resettlement policy framework for Montenegro (English)
See More +
DEC 23, 2015 SFG1621 Resettlement Plan
Europe and Central Asia - West Balkans Drina River Basin Management (WBDRBM) Project : resettlement plan : Resettlement policy framework for Bosnia and Herzegovina (English)
See More +
DEC 23, 2015 SFG1621 Resettlement Plan
West Balkans - Drina River Basin Management Project : environmental assessment : Environmental and social management framework (English)
See More +
DEC 22, 2015 SFG1616 Environmental Assessment
West Balkans - Drina River Basin Management Project : environmental assessment (Vol. 2) : Environmental and social management framework (English)
See More +
DEC 20, 2015 SFG1616 Environmental Assessment
Official Documents- Amendment No. 1 to the Implementation Agreement between IBRD and EBRD for TF072016 (English)
See More +
DEC 07, 2015 Agreement
South Eastern Europe and Balkans - Croatia & Bosnia & Herzegovina GEF Adriatic Sea Environmental Pollution Control Project (I) : P143921 - Implementation Status Results Report : Sequence 03 (English)
See More +
NOV 09, 2015 ISR21157 Implementation Status and Results Report
Official Documents- First Restatement of the Disbursement Letter, TF019385 (English)
See More +
OCT 09, 2015 Disbursement Letter
Water and climate adaptation plan for the Sava river basin (Vol. 8) : Annex six - guidance note on economic evaluation of climate change impacts in the Sava River Basin (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 7) : Annex five - guidance note on adaptation to climate change for agriculture (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 6) : Annex four - guidance note on adaptation to climate change for navigation (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 5) : Annex three - guidance note on adaptation to climate change for hydropower (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 4) : Annex two : guidance note on adaptation to climate change for flooding (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 3) : Annex 1A : training on the use of the hydrologic model for the Sava river basin (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin (Vol. 2) : Annex one : development of the hydrologic model for the Sava river basin (English)
See More +
AUG 01, 2015 100525 Working Paper
Water and climate adaptation plan for the Sava river basin : Main report (English)
See More +
AUG 01, 2015 100525 Working Paper
Albania : Southeast Europe Catastrophe Risk Insurance Facility TA : integrated safeguards data sheet concept stage (English)
See More +
JUL 20, 2015 99112 Integrated Safeguards Data Sheet
Official Documents- Implementation Agreement between IBRD and EBRD for Joint Actions in Flood Management in the Sava River Basin, TF072015 (English)
See More +
JUN 22, 2015 Agreement