Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
  • Showing 1 - 20 of 256 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Central Asia - Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB : P151363 - Implementation Status Results Report : Sequence 02 (English)

Implementation Status and Results Report ISR25398 NOV 22, 2016

Minasyan,Gayane Disclosed

Do the poor pay twice? Impact of corruption in the Kyrgyz Republic (English)

This study examines household perceptions and experiences with corruption in the Kyrgyz Republic. The aims of the study are two-fold: first, to assess the level of administrative corruption in public service agencies, and second, to assess the impact of corruption on different income groups. ... See More +

Working Paper 109235 OCT 14, 2016

Disclosed

AKF December 31, 2015 Financial Statements (English)

Financial Statement AUD0006427 SEP 13, 2016

Wasike,Moses Sabuni

Central Asia - Hydrometeorology Modernization Program Project : procurement plan for goods (English)

Procurement Plan 109368 SEP 01, 2016

Disclosed

Kyrgyz Republic - SOCIAL COHESION THROUGH COMMUNITY-BASED DEVELOPMENT : P132577 - Implementation Status Results Report : Sequence 02 (English)

Implementation Status and Results Report ISR22548 SEP 01, 2016

Plummer,Janelle

Exploratory assessment of factors that influence quality of local irrigation water governance in Uzbekistan : Исследовательская оценка факторов, влияющих на качество местных оросительной воды управления в Узбекистане (Russian)

Agriculture in Uzbekistan is almost entirely dependent on irrigation. However, despite reforms to institutional arrangements, much of Uzbekistan’s irrigation is reportedly caught in a vicious cycle of inadequate operation and maintenance, low cost recovery, and agricultural productivity that is often moderate or low; in addition, many farmers earn low incomes (World Bank, 2013).Few incentives exist to save water because farmers do not see the direct cost of water provision.This study was undertaken with the aim of contributing to better irrigation water management in Central Asia, beginning in Uzbekistan. ... See More +

Working Paper 108006 AUG 09, 2016

Swinkels,Robertus A; Romanova,Ekaterina; Kochkin,Evgeny Disclosed

Tajikistan-Central Asia Hydrometeorology Modernisation Project-Audit report for the year ended December 31, 2015 (English)

Auditing Document AUD0005815 JUL 31, 2016

Bazidova,Niso

Tajikistan-Central Asia Hydrometeorology Modernisation Project-Audit report for the year ended December 31, 2015 (English)

Auditing Document AUD0005815 JUL 31, 2016

Bazidova,Niso

Concept Integrated Safeguards Data Sheet-Integrated Safeguards Document - Central Asia Regional Links Program - Phase 3 - Kyrgyz Republic - P159220 (English)

Project Information and Integrated Safeguards Data Sheet PIDISDSC17197 JUL 26, 2016

CordulaRastogi

Kyrgyz Republic-Central Asia Road Links 1 (P132270-IDA5430, IDA H934)-Audit Report on Financial Statements for FY2014 and FY2015 (English)

Auditing Document AUD0005033 JUL 17, 2016

Sergeyan,Garik

Central Asia - Central Asia Road Links - Tajikistan : P145634 - Implementation Status Results Report : Sequence 04 (English)

Implementation Status and Results Report ISR24310 JUL 07, 2016

Rastogi,Cordula

Official Documents- Financing Agreement for Grant D094-7C (Closing Package) (English)

Financing Agreement JUL 01, 2016

Grinsteins,Gabriela Disclosed

Official Documents- Supplemental Letter Ref. Performance Monitoring Indicators for Grant D094-7C (Closing Package) (English)

Side Letter JUL 01, 2016

Grinsteins,Gabriela Disclosed

Central Asia - Central Asia Road Links - Kyrgyz Republic : P132270 - Implementation Status Results Report : Sequence 04 (English)

Implementation Status and Results Report ISR24187 JUN 30, 2016

Rastogi,Cordula

Central Asia - Road Links Project : procurement plan (English)

Procurement Plan 106843 JUN 28, 2016

Disclosed

Central Asia - Central Asia Hydrometeorology Modernization Project : P120788 - Implementation Status Results Report : Sequence 08 (English)

Implementation Status and Results Report ISR24320 JUN 28, 2016

Wang,Xiaolan

Official Documents- Disbursement Letter for Grant D094-7C (Closing Package) (English)

Disbursement Letter JUN 23, 2016

Grinsteins,Gabriela Disclosed

Concept Project Information Document-Integrated Safeguards Document - AF: Digital CASA 1 - P156894 (English)

Project Information and Integrated Safeguards Data Sheet PIDISDSC18341 JUN 21, 2016

RajendraSingh

Exploratory assessment of factors that influence quality of local irrigation water governance in Uzbekistan (English)

Agriculture in Uzbekistan is almost entirely dependent on irrigation. However, despite reforms to institutional arrangements, much of Uzbekistan’s irrigation is reportedly caught in a vicious cycle of inadequate operation and maintenance, low cost recovery, and agricultural productivity that is often moderate or low; in addition, many farmers earn low incomes (World Bank, 2013).Few incentives exist to save water because farmers do not see the direct cost of water provision.This study was undertaken with the aim of contributing to better irrigation water management in Central Asia, beginning in Uzbekistan. ... See More +

Working Paper 108006 JUN 01, 2016

Swinkels,Robertus A; Romanova,Ekaterina; Kochkin,Evgeny Russian Disclosed

Title Document Date Report No. Document Type Also available in
Central Asia - Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB : P151363 - Implementation Status Results Report : Sequence 02 (English)
See More +
NOV 22, 2016 ISR25398 Implementation Status and Results Report
Do the poor pay twice? Impact of corruption in the Kyrgyz Republic (English)
See More +
OCT 14, 2016 109235 Working Paper
AKF December 31, 2015 Financial Statements (English)
See More +
SEP 13, 2016 AUD0006427 Financial Statement
Central Asia - Hydrometeorology Modernization Program Project : procurement plan for goods (English)
See More +
SEP 01, 2016 109368 Procurement Plan
Kyrgyz Republic - SOCIAL COHESION THROUGH COMMUNITY-BASED DEVELOPMENT : P132577 - Implementation Status Results Report : Sequence 02 (English)
See More +
SEP 01, 2016 ISR22548 Implementation Status and Results Report
Exploratory assessment of factors that influence quality of local irrigation water governance in Uzbekistan : Исследовательская оценка факторов, влияющих на качество местных оросительной воды управления в Узбекистане (Russian)
See More +
AUG 09, 2016 108006 Working Paper
Tajikistan-Central Asia Hydrometeorology Modernisation Project-Audit report for the year ended December 31, 2015 (English)
See More +
JUL 31, 2016 AUD0005815 Auditing Document
Tajikistan-Central Asia Hydrometeorology Modernisation Project-Audit report for the year ended December 31, 2015 (English)
See More +
JUL 31, 2016 AUD0005815 Auditing Document
Concept Integrated Safeguards Data Sheet-Integrated Safeguards Document - Central Asia Regional Links Program - Phase 3 - Kyrgyz Republic - P159220 (English)
See More +
JUL 26, 2016 PIDISDSC17197 Project Information and Integrated Safeguards Data Sheet
Kyrgyz Republic-Central Asia Road Links 1 (P132270-IDA5430, IDA H934)-Audit Report on Financial Statements for FY2014 and FY2015 (English)
See More +
JUL 17, 2016 AUD0005033 Auditing Document
Tajikistan - Central Asia Road Links Project : procurement plan : Таджикистан - Центральная Азия Проект Дорога Ссылки : План Закупок (Russian,English)
See More +
JUL 14, 2016 107135 Procurement Plan
Central Asia - Central Asia Road Links - Tajikistan : P145634 - Implementation Status Results Report : Sequence 04 (English)
See More +
JUL 07, 2016 ISR24310 Implementation Status and Results Report
Official Documents- Financing Agreement for Grant D094-7C (Closing Package) (English)
See More +
JUL 01, 2016 Financing Agreement
Official Documents- Supplemental Letter Ref. Performance Monitoring Indicators for Grant D094-7C (Closing Package) (English)
See More +
JUL 01, 2016 Side Letter
Central Asia - Central Asia Road Links - Kyrgyz Republic : P132270 - Implementation Status Results Report : Sequence 04 (English)
See More +
JUN 30, 2016 ISR24187 Implementation Status and Results Report
Central Asia - Road Links Project : procurement plan (English)
See More +
JUN 28, 2016 106843 Procurement Plan
Central Asia - Central Asia Hydrometeorology Modernization Project : P120788 - Implementation Status Results Report : Sequence 08 (English)
See More +
JUN 28, 2016 ISR24320 Implementation Status and Results Report
Official Documents- Disbursement Letter for Grant D094-7C (Closing Package) (English)
See More +
JUN 23, 2016 Disbursement Letter
Concept Project Information Document-Integrated Safeguards Document - AF: Digital CASA 1 - P156894 (English)
See More +
JUN 21, 2016 PIDISDSC18341 Project Information and Integrated Safeguards Data Sheet
Exploratory assessment of factors that influence quality of local irrigation water governance in Uzbekistan (English)
See More +
JUN 01, 2016 108006 Working Paper Russian