Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
  • Showing 1 - 20 of 14221 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Ukraine - The District Heating Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan (English)

The objective of the District Heating Energy Efficiency Project is to improve the energy efficiency and quality of service of selected Ukrainian district heating (DH) companies, improve their financial viability and decrease their CO2 emissions. ... See More +

Environmental Assessment SFG3760 AUG 01, 2018

Ukraine Disclosed

Ukraine - The District Heating Energy Efficiency Project : environmental assessment (Vol. 2) : Екологічний та соціальний план управління (Ukrainian)

The objective of the District Heating Energy Efficiency Project is to improve the energy efficiency and quality of service of selected Ukrainian district heating (DH) companies, improve their financial viability and decrease their CO2 emissions. ... See More +

Environmental Assessment SFG3760 AUG 01, 2018

Ukraine English Disclosed

Congo, Democratic Republic of - Growth with Governance in the Mineral Sector Project : environmental assessment : Cadre de gestion environnementale et sociale (French)

Environmental Assessment SFG4552 AUG 01, 2018

Congo, Democratic Republic of Disclosed

Africa Region - Great Lakes Trade Facilitation Project : environmental assessment (Vol. 2) : Cadre de gestion environnementale et sociale pour Burundi (French)

The development objective of the Great Lakes Trade Facilitation Project for Africa is to enhance the capacity for commerce and improve processes and conditions for cross-border trade at targeted border locations in the GLR. ... See More +

Environmental Assessment SFG4279 JUL 30, 2018

Africa Disclosed

India - Dam Rehabilitation and Improvement Project : additional financing - environmental assessment : Environmental impact assessment : construction of additional spillway at Hirakud Dam, in Sambalpur District, Odisha (English)

The main objectives of the Dam Rehabilitation and Improvement Project (DRIP) are to: improve the safety and performance of selected existing dams and associated appurtenances in a sustainable manner, and strengthen the dam safety institutional setup in participating states as well as at national level. ... See More +

Environmental Assessment SFG4542 JUL 27, 2018

Disclosed

India - Dam Rehabilitation and Improvement Project : additional financing - environmental assessment (Vol. 2) : Annexures (English)

The main objectives of the Dam Rehabilitation and Improvement Project (DRIP) are to: improve the safety and performance of selected existing dams and associated appurtenances in a sustainable manner, and strengthen the dam safety institutional setup in participating states as well as at national level. ... See More +

Environmental Assessment SFG4542 JUL 27, 2018

Disclosed

Cambodia - Agricultural Sector Diversification Project : environmental assessment : Environmental and social management framework (English)

The development objective of the agricultural sector diversification project for Cambodia are to facilitate the development of a diversified and competitiveness agriculture sector in selected geographical areas in Cambodia, and to provide immediate and effective response in case of an eligible crisis or emergency. some of the negative impacts are include: (i) dust generation or air pollution; (ii) noise and vibration; (iii) water pollution; (iv) drainage and sedimentation; (v) solid waste; (vi) chemical or hazardous wastes; (vii) disruption of vegetative coverand ecological resources; (viii) traffic management; (ix) interruption of utility services; (x) restoration of affected areas; (xi) worker and public safety; (xii) communication with local communities; (xiii) chance find procedures; some of the mitigation measures are include : (i) material loads covered and secured during transportation to prevent the scattering ofsoil, sand, materials, or dust; (ii) vehicles must have to avoid exceeding noise emission from poorly maintained machines; (iii) wastewater over permissible values set by relevant national technical standards/regulationsmust be collected in a conservancy tank and removed from site by licensed waste collectors; (iv)contractor shall follow the detailed drainage design included in the construction plans,to ensure drainage system is always maintained cleared of mud and other obstructions; (v) waste storage containers shall be covered, tip-proof, weatherproof and scavenger proof; (vi) used oil and grease shall be removed from site and sold to an approved used oil recycling company; (vii) prohibit cutting of any tree unless explicitly authorized in the vegetation clearing plan; (viii) Significant increases in number of vehicle trips must be covered in a construction plan previously approved. ... See More +

Environmental Assessment SFG4490 JUL 25, 2018

Cambodian Disclosed

Cambodia - Agricultural Sector Diversification Project : environmental assessment : ព្របខយណ្ឌ ព្គប់ព្គងបិាស ន វ ិង័ងមម្ (Cambodian)

The development objective of the agricultural sector diversification project for Cambodia are to facilitate the development of a diversified and competitiveness agriculture sector in selected geographical areas in Cambodia, and to provide immediate and effective response in case of an eligible crisis or emergency. some of the negative impacts are include: (i) dust generation or air pollution; (ii) noise and vibration; (iii) water pollution; (iv) drainage and sedimentation; (v) solid waste; (vi) chemical or hazardous wastes; (vii) disruption of vegetative coverand ecological resources; (viii) traffic management; (ix) interruption of utility services; (x) restoration of affected areas; (xi) worker and public safety; (xii) communication with local communities; (xiii) chance find procedures; some of the mitigation measures are include : (i) material loads covered and secured during transportation to prevent the scattering ofsoil, sand, materials, or dust; (ii) vehicles must have to avoid exceeding noise emission from poorly maintained machines; (iii) wastewater over permissible values set by relevant national technical standards/regulationsmust be collected in a conservancy tank and removed from site by licensed waste collectors; (iv)contractor shall follow the detailed drainage design included in the construction plans,to ensure drainage system is always maintained cleared of mud and other obstructions; (v) waste storage containers shall be covered, tip-proof, weatherproof and scavenger proof; (vi) used oil and grease shall be removed from site and sold to an approved used oil recycling company; (vii) prohibit cutting of any tree unless explicitly authorized in the vegetation clearing plan; (viii) Significant increases in number of vehicle trips must be covered in a construction plan previously approved. ... See More +

Environmental Assessment SFG4490 JUL 25, 2018

Pol,Vanna English Disclosed

Nigeria - Second Phase of the Rural Access and Mobility Project : environmental assessment : Environmental and social management plan for rehabilitation and construction of prioritized rural roads and river crossings in Osun State (English)

The objective of the Second Phase of the Rural Access and Mobility Project for Nigeria are as follows: to support the improvement of rural access and mobility in the participating states by: (a) providing improved all-weather access road networks in selected and prioritized rural development areas; and (b) supporting the institutional reform in the transport sector in the states to improve management of the state-wide road network. ... See More +

Environmental Assessment SFG4541 JUL 25, 2018

Disclosed

Samoa - Pacific Resilience Program Project : environmental assessment : Regional environmental and social management framework (English)

The development objective of the Pacific Resilience Program Project for Samoa is to strengthen early warning, resilient investments and financial protection of Samoa. ... See More +

Environmental Assessment SFG4539 JUL 24, 2018

Samoa Disclosed

India - Shared Infrastructure for Solar Parks Project : environmental assessment (Vol. 2) : Environmental and social assessment for internal evacuation infrastructure and associated transmission lines of Mandsaur Solar Project of (Neemuch) Mandsaur Park phase one: Madhya Pradesh, India (English)

The objective of the Shared Infrastructure for Solar Parks Project for India is to establish India as a global leader in solar energy, by creating the policy conditions for its large scale diffusion across the country as quickly as possible. ... See More +

Environmental Assessment SFG2561 JUL 23, 2018

Disclosed

India - Shared Infrastructure for Solar Parks Project : environmental assessment (Vol. 3) : Environmental and social assessment for internal evacuation infrastructure and associated transmission lines of Mandsaur Solar Project in (Neemuch) Mandsaur Solar Park phase two: MadhyaPradesh, India (English)

The objective of the Shared Infrastructure for Solar Parks Project for India is to establish India as a global leader in solar energy, by creating the policy conditions for its large scale diffusion across the country as quickly as possible. ... See More +

Environmental Assessment SFG2561 JUL 23, 2018

Disclosed

Sri Lanka - National Agency for Public Private Partnership Project : environmental assessment : Framework development and infrastructure financing to support public private partnerships : environmental assessment and management framework (English)

The development objective of the National Agency for Public Private Partnership Project for Sri Lanka is to improve the institutional, policy and legal framework conducive for the financing of PPP projects. ... See More +

Environmental Assessment SFG4315 JUL 18, 2018

Disclosed

Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects (33kv substations (English)

The objectives of the Grid Solar and Energy Efficiency Project for Nepal are to: (i) increase electricity supply to the NEA gridthrough grid-connected solar farms; and (ii) reduce NEA’s distribution losses in pilot distributioncenters. ... See More +

Environmental Assessment SFG4041 JUL 17, 2018

Disclosed

China - Gansu Rural-Urban Integration Project : environmental assessment (Vol. 2) : Atmospheric and noise prediction (English)

The development objective of the Gansu Rural-Urban Integration Infrastructure Project for China is to provide residents in select areas of Wuwei municipality and Linxia County with expanded all-weather access to rural and urban areas. ... See More +

Environmental Assessment SFG4497 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 4) : Environmental and social management plan : construction a parking lot for servicing carsin the Gorayq Village (English)

The development objective of the Social Investment and Local Development Trust Fund Project for Armenia is to improve capacities of municipalities in Southern Armenia to provide sustainable public infrastructure and services to their citizens. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)

The development objective of Business Models for Private Sector-led Mini-grid Energy Access Project for Nepal is to increase electricity delivery from renewable energy mini-grids by mobilizing private energy service company (ESCO). ... See More +

Environmental Assessment SFG4505 JUL 16, 2018

Disclosed

Title Document Date Report No. Document Type Also available in
Ukraine - The District Heating Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan (English)
See More +
AUG 01, 2018 SFG3760 Environmental Assessment
Ukraine - The District Heating Energy Efficiency Project : environmental assessment (Vol. 2) : Екологічний та соціальний план управління (Ukrainian)
See More +
AUG 01, 2018 SFG3760 Environmental Assessment English
Congo, Democratic Republic of - Growth with Governance in the Mineral Sector Project : environmental assessment : Cadre de gestion environnementale et sociale (French)
See More +
AUG 01, 2018 SFG4552 Environmental Assessment
Africa Region - Great Lakes Trade Facilitation Project : environmental assessment (Vol. 2) : Cadre de gestion environnementale et sociale pour Burundi (French)
See More +
JUL 30, 2018 SFG4279 Environmental Assessment
India - Dam Rehabilitation and Improvement Project : additional financing - environmental assessment : Environmental impact assessment : construction of additional spillway at Hirakud Dam, in Sambalpur District, Odisha (English)
See More +
JUL 27, 2018 SFG4542 Environmental Assessment
India - Dam Rehabilitation and Improvement Project : additional financing - environmental assessment (Vol. 2) : Annexures (English)
See More +
JUL 27, 2018 SFG4542 Environmental Assessment
Cambodia - Agricultural Sector Diversification Project : environmental assessment : Environmental and social management framework (English)
See More +
JUL 25, 2018 SFG4490 Environmental Assessment Cambodian
Cambodia - Agricultural Sector Diversification Project : environmental assessment : ព្របខយណ្ឌ ព្គប់ព្គងបិាស ន វ ិង័ងមម្ (Cambodian)
See More +
JUL 25, 2018 SFG4490 Environmental Assessment English
Nigeria - Second Phase of the Rural Access and Mobility Project : environmental assessment : Environmental and social management plan for rehabilitation and construction of prioritized rural roads and river crossings in Osun State (English)
See More +
JUL 25, 2018 SFG4541 Environmental Assessment
Samoa - Pacific Resilience Program Project : environmental assessment : Regional environmental and social management framework (English)
See More +
JUL 24, 2018 SFG4539 Environmental Assessment
India - Shared Infrastructure for Solar Parks Project : environmental assessment (Vol. 2) : Environmental and social assessment for internal evacuation infrastructure and associated transmission lines of Mandsaur Solar Project of (Neemuch) Mandsaur Park phase one: Madhya Pradesh, India (English)
See More +
JUL 23, 2018 SFG2561 Environmental Assessment
India - Shared Infrastructure for Solar Parks Project : environmental assessment (Vol. 3) : Environmental and social assessment for internal evacuation infrastructure and associated transmission lines of Mandsaur Solar Project in (Neemuch) Mandsaur Solar Park phase two: MadhyaPradesh, India (English)
See More +
JUL 23, 2018 SFG2561 Environmental Assessment
Sri Lanka - National Agency for Public Private Partnership Project : environmental assessment : Framework development and infrastructure financing to support public private partnerships : environmental assessment and management framework (English)
See More +
JUL 18, 2018 SFG4315 Environmental Assessment
Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects (33kv substations (English)
See More +
JUL 17, 2018 SFG4041 Environmental Assessment
China - Gansu Rural-Urban Integration Project : environmental assessment (Vol. 2) : Atmospheric and noise prediction (English)
See More +
JUL 16, 2018 SFG4497 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 4) : Environmental and social management plan : construction a parking lot for servicing carsin the Gorayq Village (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)
See More +
JUL 16, 2018 SFG4505 Environmental Assessment