Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects 33kv substations (English)

The objectives of the Grid Solar and Energy Efficiency Project for Nepal are to: (i) increase electricity supply to the NEA gridthrough grid-connected solar farms; and (ii) reduce NEA’s distribution losses in pilot distributioncenters. ... See More +

Environmental Assessment SFG4041 JUL 17, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)

The development objective of Business Models for Private Sector-led Mini-grid Energy Access Project for Nepal is to increase electricity delivery from renewable energy mini-grids by mobilizing private energy service company (ESCO). ... See More +

Environmental Assessment SFG4505 JUL 16, 2018

Disclosed

FY2017_Audit Report_UBCAP (English)

Auditing Document AUD0014270 JUL 16, 2018

Ayush,Erdene Disclosed

Tunisia - Italy Power Interconnection Project - Project Preparation Technical Assistance : environmental assessment : Stakeholder engagement plan (English)

The objective of the Italy Power Interconnection Project - Project Preparation Technical Assistance is to support the Government of Tunisia in evaluating the feasibility of the Tunisia Italy interconnector. ... See More +

Environmental Assessment SFG4480 JUL 05, 2018

Disclosed

Kenya - Social and Economic Inclusion Project : indigenous peoples plan : Vulnerable and marginalised group framework (English)

The development objective of Social and Economic Inclusion Project for Kenya is to enhance access of poor and vulnerable to integrated social and economic inclusion as well as shock-responsive social protection. ... See More +

Indigenous Peoples Plan SFG4483 JUL 01, 2018

Disclosed

Disclosable Version of the ISR - Power Recovery Project - P144029 - Sequence No : 06 (English)

Implementation Status and Results Report ISR33395 JUN 29, 2018

Chavapricha,Rome Disclosed

India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)

Procurement Plan STEP10531 JUN 25, 2018

Balamurali D Disclosed

Bhutan/SOUTH ASIA- P162196- PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT - Procurement Plan (English)

Procurement Plan STEP10525 JUN 25, 2018

Sonam Penjor Disclosed

Disclosable Version of the ISR - Mali Obsolete Pesticides Disposal and Prevention Project - P146247 - Sequence No : 04 (English)

Implementation Status and Results Report ISR32900 JUN 23, 2018

Menang Evouna,Emeran Serge M. Disclosed

Bhutan/SOUTH ASIA- P155513- Food Security and Agriculture Productivity Project - Procurement Plan (English)

Procurement Plan STEP10492 JUN 22, 2018

Disclosed

Bhutan/SOUTH ASIA- P155513- Food Security and Agriculture Productivity Project - Procurement Plan (English)

Procurement Plan STEP10502 JUN 22, 2018

Disclosed

Disclosable Version of the ISR - NHAI Technical Assistance Project - P121515 - Sequence No : 16 (English)

Implementation Status and Results Report ISR30566 JUN 22, 2018

Bandyopadhyay,Arnab Disclosed

Indonesia - Investing in Nutrition and Early Years Program for Results : chair summary (English)

Board Summary 127761 JUN 21, 2018

Disclosed

Cambodia - Health Equity and Quality Improvement Project (H-EQIP) : additional financing : Resettlement policy framework (English)

The Health Equity and Quality Improvement Project (H-EQIP) will build on the innovations supported in the Second Health Sector Support Program (HSSP2), particularly HEFs and SDGs, and aims to increase the sustainability of these innovations by improving their resourcing and management as envisaged in the RGC’s HSP-3. ... See More +

Environmental Assessment SFG4445 JUN 19, 2018

Disclosed

India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 13) : Environment and social impact assessment report (additional scheme 3, volume 1) (English)

The development objective of the Jharkhand Power System Improvement Project for India is to increase the transmission capacity of electricity network in the state of Jharkhand and strengthen the institutional capacity of state-owned power transmission and distribution utilities. ... See More +

Environmental Assessment SFG4129 JUN 18, 2018

Disclosed

India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 15) : Environment and social impact assessment report (scheme F, volume 1) (English)

The development objective of the Jharkhand Power System Improvement Project for India is to increase the transmission capacity of electricity network in the state of Jharkhand and strengthen the institutional capacity of state-owned power transmission and distribution utilities. ... See More +

Environmental Assessment SFG4129 JUN 18, 2018

Disclosed

India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 18) : Environment and social impact assessment report (scheme O, volume 1) (English)

The development objective of the Jharkhand Power System Improvement Project for India is to increase the transmission capacity of electricity network in the state of Jharkhand and strengthen the institutional capacity of state-owned power transmission and distribution utilities. ... See More +

Environmental Assessment SFG4129 JUN 18, 2018

Disclosed

India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 14) : Environment and social impact assessment report (additional scheme 3, volume 2) (English)

The development objective of the Jharkhand Power System Improvement Project for India is to increase the transmission capacity of electricity network in the state of Jharkhand and strengthen the institutional capacity of state-owned power transmission and distribution utilities. ... See More +

Environmental Assessment SFG4129 JUN 18, 2018

Disclosed

Title Document Date Report No. Document Type Also available in
Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects 33kv substations (English)
See More +
JUL 17, 2018 SFG4041 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Nepal - Business Models for Private Sector-led Mini-grid Energy Access Project : environmental assessment : Environmental and social management framework (English)
See More +
JUL 16, 2018 SFG4505 Environmental Assessment
FY2017_Audit Report_UBCAP (English)
See More +
JUL 16, 2018 AUD0014270 Auditing Document
Tunisia - Italy Power Interconnection Project - Project Preparation Technical Assistance : environmental assessment : Stakeholder engagement plan (English)
See More +
JUL 05, 2018 SFG4480 Environmental Assessment
Kenya - Social and Economic Inclusion Project : indigenous peoples plan : Vulnerable and marginalised group framework (English)
See More +
JUL 01, 2018 SFG4483 Indigenous Peoples Plan
Western Africa - North Core and Dorsale Nord Regional Power Interconnector Project : resettlement plan : Cadre de politique de réinstallation des populations pour Burkina Faso (French)
See More +
JUL 01, 2018 SFG4540 Resettlement Plan
Disclosable Version of the ISR - Power Recovery Project - P144029 - Sequence No : 06 (English)
See More +
JUN 29, 2018 ISR33395 Implementation Status and Results Report
India/SOUTH ASIA- P144726- National Cyclone Risk Mitigation Project-II - Procurement Plan (English)
See More +
JUN 25, 2018 STEP10531 Procurement Plan
Bhutan/SOUTH ASIA- P162196- PFM-MDF FINANCED STRENGTHENING PUBLIC FINANCIAL MANAGEMENT PROJECT - Procurement Plan (English)
See More +
JUN 25, 2018 STEP10525 Procurement Plan
Disclosable Version of the ISR - Mali Obsolete Pesticides Disposal and Prevention Project - P146247 - Sequence No : 04 (English)
See More +
JUN 23, 2018 ISR32900 Implementation Status and Results Report
Bhutan/SOUTH ASIA- P155513- Food Security and Agriculture Productivity Project - Procurement Plan (English)
See More +
JUN 22, 2018 STEP10492 Procurement Plan
Bhutan/SOUTH ASIA- P155513- Food Security and Agriculture Productivity Project - Procurement Plan (English)
See More +
JUN 22, 2018 STEP10502 Procurement Plan
Disclosable Version of the ISR - NHAI Technical Assistance Project - P121515 - Sequence No : 16 (English)
See More +
JUN 22, 2018 ISR30566 Implementation Status and Results Report
Indonesia - Investing in Nutrition and Early Years Program for Results : chair summary (English)
See More +
JUN 21, 2018 127761 Board Summary
Cambodia - Health Equity and Quality Improvement Project (H-EQIP) : additional financing : Resettlement policy framework (English)
See More +
JUN 19, 2018 SFG4445 Environmental Assessment
India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 13) : Environment and social impact assessment report (additional scheme 3, volume 1) (English)
See More +
JUN 18, 2018 SFG4129 Environmental Assessment
India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 15) : Environment and social impact assessment report (scheme F, volume 1) (English)
See More +
JUN 18, 2018 SFG4129 Environmental Assessment
India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 18) : Environment and social impact assessment report (scheme O, volume 1) (English)
See More +
JUN 18, 2018 SFG4129 Environmental Assessment
India - Jharkhand Power System Improvement Project : environmental assessment (Vol. 14) : Environment and social impact assessment report (additional scheme 3, volume 2) (English)
See More +
JUN 18, 2018 SFG4129 Environmental Assessment