Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
  • Showing 1 - 17 of 17 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Macro poverty outlook for Botswana (English)

Botswana's economy recovered moderately in 2016. Further gains are expected for the medium-term, with real GDP growth of more-than 4 percent through 2019. ... See More +

Working Paper 113873 APR 01, 2017

Disclosed

Lao economic monitor : challenges in promoting more inclusive growth and shared prosperity - thematic section : financing the health sector in Lao PDR (English)

The Lao economy is estimated to have grown at around 7 percent in 2016, a slight moderation from 7.4 percent in the previous year. A marked increase in power sector contribution and some from the manufacturing sector was partly offset by slight moderation in construction, flat mining output, and stable public spending. ... See More +

Working Paper 115000 APR 01, 2017

Disclosed

Georgia - East-West Highway Corridor Improvement Project : resettlement plan (Vol. 2) : Resettlement action plan for section two : Zemo Osiauri – Chumateleti (English)

The objectives of the East-West Highway Corridor Improvement Project are to: (i) reduce road user costs along the section upgraded under the project; and (ii) strengthen the capacity of the Roads Department (RD) and the Ministry of Economy and Sustainable Development (MESD) to manage the road network and provide an enabling environment to improve logistics services. ... See More +

Resettlement Plan SFG3229 MAR 30, 2017

Le,Giang Thanh Huong Disclosed

Kenya - Nairobi Metropolitan Services Improvement Project : resettlement action plan (Vol. 3) : Resettlement action plan for the construction of Kihara Market in Kiambu County (English)

The development objective of the Nairobi Metropolitan Services Improvement Project for Kenya is to strengthen urban services and infrastructure in the Nairobi metropolitan region. ... See More +

Resettlement Plan SFG1093 MAR 03, 2017

Babijes,Roderick M. Disclosed

House construction : the good and the bad infrastructure - setting out, foundation, concrete works, walls, roof, floor, services (English)

Indonesia has experienced a number of natural disasters in the recent past that have damaged or destroyed large numbers of residential housing. ... See More +

Working Paper (Numbered Series) 114978 JAN 01, 2017

Heinz Unger, Ekart Hartmann dan; Herawati,Octaviera Ratna Disclosed

Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 3) : Environmental and social impact assessment for the rehabilitation and reconstruction of Al-Haronyah new and old bridges (English)

The development objective of Emergency Operation for Development Project (EODP) for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. ... See More +

Environmental Assessment SFG2335 OCT 02, 2016

Jabbour,Jocelyne Disclosed

Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 3) : Environmental and social management plan for rehabilitation and reconstruction of Imam Ways Bridges (4) and (7) in Diyala Governorate (English)

The development objective of Emergency Operation for Development Project (EODP) for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. ... See More +

Environmental Assessment SFG2336 SEP 19, 2016

Jabbour,Jocelyne Disclosed

Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 2) : Environmental and social management plan for the rehabilitation of a steel bridge anda concrete bridge in Nareen, Diyala Governorate (English)

The development objective of Emergency Operation for Development Project (EODP) for Iraq is to support the country in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. ... See More +

Environmental Assessment SFG2336 SEP 19, 2016

Jabbour,Jocelyne Disclosed

Georgia - Transmission Grid Strengthening Project : resettlement plan (Vol. 2) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line (English)

The development objectives of the Transmission Grid Strengthening Project for Georgia are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally, and socially sustainable electricity sector planning. ... See More +

Resettlement Plan SFG1908 AUG 11, 2016

Villegas,Jorge E. Disclosed

Albania - Project for Integrated Urban Economic Development : environmental assessment : Environmental and social management plan for the rehabilitation of the Saranda staircases (English)

The development objective of Project for Integrated Urban Economic Development (PIUED) for Albania is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism related local economic development in selected areas in the south of Albania. ... See More +

Environmental Assessment SFG2300 JUL 01, 2016

Hamilton,Delphine Alberta Disclosed

Kenya - Nairobi Metropolitan Services Improvement Project : procurement plan (English)

Procurement Plan 96944 JUN 02, 2015

Disclosed

Wood construction guide in Cameroon : Guide de la construction en bois au Cameroun (French)

Le présent guide a été conçu par les Éditions Techniques de l`Ingénieur pour répondre aux attentes des différents acteurs de la filière bois et de la construction au Cameroun. ... See More +

Working Paper 108186 JAN 01, 2015

Disclosed

Financial disclosure in Mexico : evidence from an audit study (English)

This note examines the extent to which financial disclosure policies are enough to protect consumers in Mexico. It highlights two questions that are the focus of an investigation: 1) what is the quality of information provided by financial institutions to low-income customers when choosing among credit and savings products? ... See More +

Brief 90902 JUL 01, 2014

Gine,Xavier; Martinez Cuellar,Cristina; Mazer,Rafael Keenan Disclosed

Macedonia FYR - Monthly economic developments (English)

GDP growth recovered in 2013. Labor market performance continued to improve. Youth unemployment remains stubbornly high.

Working Paper 108515 MAR 01, 2014

Disclosed

Automating Kenya's permits system (English)

The Kenya Investment Climate Program has assisted the government with implementing regulatory reforms since 2005. After unnecessary licensing requirements were eliminated, the government introduced a searchable e-registry of licenses. ... See More +

Brief 90706 AUG 09, 2013

Twagira,Frank Abner Disclosed

Construction permits process in Poland (English)

On the ease of dealing with construction permits, Poland ranks 164th among all the countries in the report and 30th among the 30 Organization for Economic Co-operation and Development (OECD) countries. ... See More +

Working Paper 111924 NOV 01, 2010

Artemiev,Igor E. Polish Disclosed

Construction permits process in Poland : Procedura uzyskiwania pozwolenia na budowę w Polsce (Polish)

On the ease of dealing with construction permits, Poland ranks 164th among all the countries in the report and 30th among the 30 Organization for Economic Co-operation and Development (OECD) countries. ... See More +

Working Paper 111924 NOV 01, 2010

Artemiev,Igor E. English Disclosed

Title Document Date Report No. Document Type Also available in
Macro poverty outlook for Botswana (English)
See More +
APR 01, 2017 113873 Working Paper
Lao economic monitor : challenges in promoting more inclusive growth and shared prosperity - thematic section : financing the health sector in Lao PDR (English)
See More +
APR 01, 2017 115000 Working Paper
Georgia - East-West Highway Corridor Improvement Project : resettlement plan (Vol. 2) : Resettlement action plan for section two : Zemo Osiauri – Chumateleti (English)
See More +
MAR 30, 2017 SFG3229 Resettlement Plan
Kenya - Nairobi Metropolitan Services Improvement Project : resettlement action plan (Vol. 3) : Resettlement action plan for the construction of Kihara Market in Kiambu County (English)
See More +
MAR 03, 2017 SFG1093 Resettlement Plan
House construction : the good and the bad infrastructure - setting out, foundation, concrete works, walls, roof, floor, services (English)
See More +
JAN 01, 2017 114978 Working Paper (Numbered Series)
Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 3) : Environmental and social impact assessment for the rehabilitation and reconstruction of Al-Haronyah new and old bridges (English)
See More +
OCT 02, 2016 SFG2335 Environmental Assessment
Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 3) : Environmental and social management plan for rehabilitation and reconstruction of Imam Ways Bridges (4) and (7) in Diyala Governorate (English)
See More +
SEP 19, 2016 SFG2336 Environmental Assessment
Iraq - Emergency Operation Development Projects (EODP) : environmental assessment (Vol. 2) : Environmental and social management plan for the rehabilitation of a steel bridge anda concrete bridge in Nareen, Diyala Governorate (English)
See More +
SEP 19, 2016 SFG2336 Environmental Assessment
Georgia - Transmission Grid Strengthening Project : resettlement plan (Vol. 2) : Resettlement action plan for construction of Akhaltsikhe-Batumi 220kv double circuit power transmission line (English)
See More +
AUG 11, 2016 SFG1908 Resettlement Plan
Albania - Project for Integrated Urban Economic Development : environmental assessment : Environmental and social management plan for the rehabilitation of the Saranda staircases (English)
See More +
JUL 01, 2016 SFG2300 Environmental Assessment
Kenya - Nairobi Metropolitan Services Improvement Project : procurement plan (English)
See More +
JUN 02, 2015 96944 Procurement Plan
Wood construction guide in Cameroon : Guide de la construction en bois au Cameroun (French)
See More +
JAN 01, 2015 108186 Working Paper
Financial disclosure in Mexico : evidence from an audit study (English)
See More +
JUL 01, 2014 90902 Brief
Macedonia FYR - Monthly economic developments (English)
See More +
MAR 01, 2014 108515 Working Paper
Automating Kenya's permits system (English)
See More +
AUG 09, 2013 90706 Brief
Construction permits process in Poland (English)
See More +
NOV 01, 2010 111924 Working Paper Polish
Construction permits process in Poland : Procedura uzyskiwania pozwolenia na budowę w Polsce (Polish)
See More +
NOV 01, 2010 111924 Working Paper English