Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 121 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Is pumped storage hydroelectric power right for Vietnam? (English)

The ability of pumped storage hydroelectric power (PSP) to supply large amounts of electricity at a moment’s notice provides a strong complement to the natural variability of wind and solar generation, potentially easing the integration of renewables into Vietnam’s burgeoning power system. ... See More +

Brief 120674 OCT 24, 2017

Disclosed

Lao People's Democratic Republic - Nam Theun 2 Hydropower Project update : revenue management (English)

This note explains recent updates on the Project’s Revenue Management Program, one of the five key areas of the Nam Theun 2 Social and Environment Project. ... See More +

Working Paper 121393 SEP 01, 2017

Disclosed

Regional program for hydromet services and resilience (English)

South Asia is highly prone to weather and water related disasters such as flooding, drought, thunderstorms and cyclones. The main objective of this Regional program for hydromet services and resilience is to strengthen institutions, facilitate knowledge exchange and enhance cooperation with respect to hydrometeorological risks and hydromet services between South Asian countries. ... See More +

Brief 117752 JUL 26, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des plans d’action environnementaux et sociaux (French)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transition compensation based on income losses (estimated for 6 months incomes of sand workers, and 3 months for canoe builders, and food sellers on sand mining sites; (2) establishment of a fund for affected councils, provisioned from royalties derived from industrial sand mining of the future reservoir; (3) implementation of an environmental management plan in the operational phase; and (4) community health plan to prevent, avoid, or when possible minimize negative impacts of the project on the health of local people during construction activities. ... See More +

Environmental Assessment 116788 JUN 01, 2017

Disclosed

Solomon Islands - Tina River Hydro Development Project (English)

The development objective of the Tina River Hydro Development Project (TRHDP) is to increase the share of renewable energy through hydropower in Solomon Islands.The World Bank Group has mobilized a range of resources and instruments to enable the Government to attract an experienced international hydropower developer to construct and operate the hydropower facility (HPF), and to enhance the quality and viability of the Project. ... See More +

Project Appraisal Document PAD2258 MAY 24, 2017

Disclosed

Solomon Islands - Tina River Hydro Development Project (English)

The development objective of the Tina River Hydro Development Project (TRHDP) is to increase the share of renewable energy through hydropower in Solomon Islands.The World Bank Group has mobilized a range of resources and instruments to enable the Government to attract an experienced international hydropower developer to construct and operate the hydropower facility (HPF), and to enhance the quality and viability of the Project. ... See More +

Project Appraisal Document PAD2258 MAY 24, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des etudes environnementales et sociales (French)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transportation of equipment to the site can be done by rail. ... See More +

Environmental Assessment 116787 MAY 23, 2017

Disclosed

Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment (English)

The development objective of the Upstream Nachtigal Hydroelectric Project for Cameroon is that the project development phase ends in 2017. Some of the negative impacts and mitigation measures include: (1) transportation of equipment to the site can be done by rail. ... See More +

Environmental Assessment 116787 MAY 23, 2017

Disclosed

Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project : procurement plan (English)

Procurement Plan 115086 MAY 16, 2017

Disclosed

Solomon Islands - Tina River Hydropower Facility (TRHPF) : environmental assessment : Environmental and social review summary (English)

The development objective of the Tina River Hydropower Facility (TRHPF) for Solomon Islands is a 15 megawatts hydropower scheme on the island of Guadalcanal, Solomon Islands, 30 km south of the capital Honiara. ... See More +

Environmental Assessment SFG3325 MAY 04, 2017

Johnson,Erik Caldwell Disclosed

Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 10) : Kế hoạch quản lý môI trường - Dự án thủy đIện mường khương tỉnh Lào cai (Vietnamese)

The objective of the Renewable Energy Development Project (REDP) is generating electricity with average output of 127.89 million kWh, in addition to contributing to improving infrastructure, creating revenues for local budget, restructuring the economy and promoting social and economic development locally. ... See More +

Indigenous Peoples Plan SFG2200 MAY 01, 2017

Vu,Huong Thi Thu Disclosed

Cameroon - Hydropower Development on the Sanaga River Technical Assistance Project (English)

The development objective of Hydropower Development on the Sanaga River Technical Assistance Project for Cameroon is to improve the Recipient's institutional capacity for a sustainable development of hydroelectric resources on the Sanaga River Basin. ... See More +

Project Appraisal Document PAD2234 APR 20, 2017

Disclosed

Tajikistan - First Phase of Nurek Hydropower Rehabilitation Project (English)

The objectives of the First Phase of Nurek Hydropower Rehabilitation Project for Tajikistan are to rehabilitate and restore the generating capacity of three power generating units of Nurek hydropower plant, improve their efficiency, and strengthen the safety of the Nurek dam. ... See More +

Project Appraisal Document PAD1565 APR 14, 2017

Disclosed

Small hydro resource mapping in Madagascar (Vol. 2) : Small hydro mapping report : phase 3 - production of a validated resource atlas (English)

Madagascar has enormous energy resources, particularly renewable ones (hydraulic, solar, wind, biomass), but national energy consumption is still very low, and is dominated by wood energy and its by-products. ... See More +

ESMAP Paper 119399 APR 01, 2017

French Disclosed

Small hydro resource mapping in Madagascar (Vol. 2) : Small hydro mapping report : phase 3 - production of a validated resource atlas (French)

Madagascar has enormous energy resources, particularly renewable ones (hydraulic, solar, wind, biomass), but national energy consumption is still very low, and is dominated by wood energy and its by-products. ... See More +

ESMAP Paper 119399 APR 01, 2017

English Disclosed

Small hydro resource mapping in Madagascar (Vol. 3) : Hydropower atlas : final report (French)

Madagascar has enormous energy resources, particularly renewable ones (hydraulic, solar, wind, biomass), but national energy consumption is still very low, and is dominated by wood energy and its by-products. ... See More +

ESMAP Paper 119399 APR 01, 2017

English Disclosed

Small hydro resource mapping in Madagascar (Vol. 3) : Hydropower atlas : final report (English)

Madagascar has enormous energy resources, particularly renewable ones (hydraulic, solar, wind, biomass), but national energy consumption is still very low, and is dominated by wood energy and its by-products. ... See More +

ESMAP Paper 119399 APR 01, 2017

French Disclosed

Cameroon - Hydropower Development on the Sanaga River Project : indigenous peoples plan : Pour l’elaboration Cadre de Planification des Peuples Autochtones (CPPA) (French)

Indigenous Peoples Plan SFG3097 MAR 02, 2017

Ha,Thanh Lu Disclosed

Cameroon - Hydropower Development on the Sanaga River Project : environmental assessment : Termes de référence Plan d’urgence et de préparation du barrage (French)

Environmental Assessment SFG3113 MAR 02, 2017

Ha,Thanh Lu Disclosed

Title Document Date Report No. Document Type Also available in
Is pumped storage hydroelectric power right for Vietnam? (English)
See More +
OCT 24, 2017 120674 Brief
Lao People's Democratic Republic - Nam Theun 2 Hydropower Project update : revenue management (English)
See More +
SEP 01, 2017 121393 Working Paper
Regional program for hydromet services and resilience (English)
See More +
JUL 26, 2017 117752 Brief
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des plans d’action environnementaux et sociaux (French)
See More +
JUN 01, 2017 116788 Environmental Assessment
Solomon Islands - Tina River Hydro Development Project (English)
See More +
MAY 24, 2017 PAD2258 Project Appraisal Document
Solomon Islands - Tina River Hydro Development Project (English)
See More +
MAY 24, 2017 PAD2258 Project Appraisal Document
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment : Resume des etudes environnementales et sociales (French)
See More +
MAY 23, 2017 116787 Environmental Assessment
Cameroon - Upstream Nachtigal Hydroelectric Project : environmental assessment (English)
See More +
MAY 23, 2017 116787 Environmental Assessment
Nepal - Kali Gandaki A Hydropower Plant Rehabilitation Project : procurement plan (English)
See More +
MAY 16, 2017 115086 Procurement Plan
Solomon Islands - Tina River Hydropower Facility (TRHPF) : environmental assessment : Environmental and social review summary (English)
See More +
MAY 04, 2017 SFG3325 Environmental Assessment
Vietnam - Renewable Energy Development Project : indigenous peoples plan (Vol. 10) : Kế hoạch quản lý môI trường - Dự án thủy đIện mường khương tỉnh Lào cai (Vietnamese)
See More +
MAY 01, 2017 SFG2200 Indigenous Peoples Plan
Cameroon - Hydropower Development on the Sanaga River Technical Assistance Project (English)
See More +
APR 20, 2017 PAD2234 Project Appraisal Document
Tajikistan - First Phase of Nurek Hydropower Rehabilitation Project (English)
See More +
APR 14, 2017 PAD1565 Project Appraisal Document
Small hydro resource mapping in Madagascar (Vol. 2) : Small hydro mapping report : phase 3 - production of a validated resource atlas (English)
See More +
APR 01, 2017 119399 ESMAP Paper French
Small hydro resource mapping in Madagascar (Vol. 2) : Small hydro mapping report : phase 3 - production of a validated resource atlas (French)
See More +
APR 01, 2017 119399 ESMAP Paper English
Small hydro resource mapping in Madagascar (Vol. 3) : Hydropower atlas : final report (French)
See More +
APR 01, 2017 119399 ESMAP Paper English
Small hydro resource mapping in Madagascar (Vol. 3) : Hydropower atlas : final report (English)
See More +
APR 01, 2017 119399 ESMAP Paper French
Tajikistan - Hydrometeorology Modernization Project : procurement plan : Таджикистан - Проект модернизации гидрометеорологии : план закупок (Russian,English)
See More +
MAR 31, 2017 115191 Procurement Plan
Cameroon - Hydropower Development on the Sanaga River Project : indigenous peoples plan : Pour l’elaboration Cadre de Planification des Peuples Autochtones (CPPA) (French)
See More +
MAR 02, 2017 SFG3097 Indigenous Peoples Plan
Cameroon - Hydropower Development on the Sanaga River Project : environmental assessment : Termes de référence Plan d’urgence et de préparation du barrage (French)
See More +
MAR 02, 2017 SFG3113 Environmental Assessment