Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
  • Showing 1 - 15 of 15 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Kiribati - Fourth Phase of the Pacific Regional Connectivity Program Project (English)

The development objective of the Fourth Phase of the Pacific Regional Connectivity Program Project for Kiribati is to reduce the cost and increase the availability of Internet services in Kiribati. ... See More +

Project Appraisal Document PAD2038 MAY 09, 2017

Disclosed

Yemen : information and communication technology (ICT) (Arabic)

This note is a part of a series of policy notes prepared by the World Bank in anticipation of a post-conflict transition in Yemen. These notes aimed to identify immediate priorities for stabilization, recovery and restoration of services and infrastructure in the aftermath of Yemen’s current conflict. ... See More +

Working Paper 120531 FEB 13, 2017

Halewood,Naomi J.; Decoster,Xavier Stephane Disclosed

South Sudan - Statistical Capacity Building Project : P144139 - Implementation Status Results Report : Sequence 04 (English)

Implementation Status and Results Report ISR24237 JUN 21, 2016

Pape,Utz Johann

Gabon - eGabon Project : environmental assessment (Vol. 3) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Franceville (French,English)

Environmental Assessment SFG1893 FEB 28, 2016

Rais,Tasneem Disclosed

Gabon - eGabon Project : environmental assessment (Vol. 2) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Libreville (French,English)

Environmental Assessment SFG1893 FEB 28, 2016

Rais,Tasneem Disclosed

Gabon - eGabon Project : environmental assessment (Vol. 2) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Libreville (French,English)

Environmental Assessment SFG1874 FEB 28, 2016

Rais,Tasneem Disclosed

Gabon - eGabon Project : environmental assessment : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Port-Gentil (French)

The eGabon project aims at promoting the digital transformation of Gabon through advancing a digital innovation ecosystem. The activities of the project will consist in works to make the premises compliant with applicable norms, in particular revamping plumbing and electricity, installing internal separations, removing of cement-block internal walls if needed, painting and setting up of co-working spaces. ... See More +

Environmental Assessment SFG1893 FEB 28, 2016

Rais,Tasneem Disclosed

Gabon - eGabon Project : environmental assessment : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Port-Gentil (French)

The eGabon project aims at promoting the digital transformation of Gabon through advancing a digital innovation ecosystem. The project is aligned with the Emerging Gabon Strategic Plan. ... See More +

Environmental Assessment SFG1874 FEB 28, 2016

Rais,Tasneem Disclosed

The potential of digital data : far can it advance financial inclusion? (Japanese)

This focus note highlights where and how potential benefits can be realized, recognizing there are challenges and risks. Some hold that digital data are not a full substitute for the richness of an in-person interaction to gather data on clients. ... See More +

Brief 95202 JAN 01, 2015

Chen,Gregory C.; Faz De Los Santos,Pedro Xavier French, Spanish Disclosed

Thailand - TH: Institutional Capacity Building on ICT Policies in Thailand : P120387 - Implementation Status Results Report : Sequence 03 (English)

Implementation Status and Results Report ISR12603 JAN 13, 2014

Pahlavooni,Seda

The loch ness model : can ICTs bridge the accountability gap? (English)

Can information and communication technologies (ICTs) empower through participation, transparency, and accountability and if so, under which conditions? ... See More +

Working Paper 90175 JAN 01, 2014

Gigler, Bjorn-Soren; Bailur, Savita; Anand, Nicole Disclosed

City Planning Labs (CPL) : a concept for strenghtening city planning capacity in Indonesia (English)

The cities that emerge from Indonesia’s rapid urbanization will be key determinants of the country’s overall economic development and competitiveness, as well as their inclusiveness and environmental sustainability. ... See More +

Working Paper 93689 JAN 01, 2013

Amindarbari, Reza; Sevtsuk,Andres; Yuwono,Thalyta Ernandya Disclosed

Thailand - TH: Institutional Capacity Building on ICT Policies in Thailand : P120387 - Implementation Status Results Report : Sequence 02 (English)

Implementation Status and Results Report ISR7252 JUL 11, 2012

Pahlavooni,Seda Disclosed

Vietnam - Vietnam - ICT Development : P079344 - Implementation Status Results Report : Sequence 08 (English)

Implementation Status and Results Report ISR5265 FEB 21, 2012

Bhatia,Deepak T. Disclosed

Title Document Date Report No. Document Type Also available in
Kiribati - Fourth Phase of the Pacific Regional Connectivity Program Project (English)
See More +
MAY 09, 2017 PAD2038 Project Appraisal Document
Yemen : information and communication technology (ICT) (Arabic)
See More +
FEB 13, 2017 120531 Working Paper
South Sudan - Statistical Capacity Building Project : P144139 - Implementation Status Results Report : Sequence 04 (English)
See More +
JUN 21, 2016 ISR24237 Implementation Status and Results Report
Gabon - eGabon Project : environmental assessment (Vol. 3) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Franceville (French,English)
See More +
FEB 28, 2016 SFG1893 Environmental Assessment
Gabon - eGabon Project : environmental assessment (Vol. 2) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Libreville (French,English)
See More +
FEB 28, 2016 SFG1893 Environmental Assessment
Gabon - eGabon Project : environmental assessment (Vol. 2) : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Libreville (French,English)
See More +
FEB 28, 2016 SFG1874 Environmental Assessment
Gabon - eGabon Project : environmental assessment : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Port-Gentil (French)
See More +
FEB 28, 2016 SFG1893 Environmental Assessment
Gabon - eGabon Project : environmental assessment : Etude relative aux sauvegardes environnementales et sociales pour la mise en place d’un incubateur a Port-Gentil (French)
See More +
FEB 28, 2016 SFG1874 Environmental Assessment
Study on the development of the potential of ICT in the water sector, sanitation and hygiene case study : Senegal : Etude sur la valorization du potential des tic dans le secteur eau, assainissement et hygiene etude de cas : Senegal (French)
See More +
NOV 01, 2015 107194 Working Paper
The potential of digital data : far can it advance financial inclusion? (Japanese)
See More +
JAN 01, 2015 95202 Brief French, Spanish
Thailand - TH: Institutional Capacity Building on ICT Policies in Thailand : P120387 - Implementation Status Results Report : Sequence 03 (English)
See More +
JAN 13, 2014 ISR12603 Implementation Status and Results Report
The loch ness model : can ICTs bridge the accountability gap? (English)
See More +
JAN 01, 2014 90175 Working Paper
City Planning Labs (CPL) : a concept for strenghtening city planning capacity in Indonesia (English)
See More +
JAN 01, 2013 93689 Working Paper
Thailand - TH: Institutional Capacity Building on ICT Policies in Thailand : P120387 - Implementation Status Results Report : Sequence 02 (English)
See More +
JUL 11, 2012 ISR7252 Implementation Status and Results Report
Vietnam - Vietnam - ICT Development : P079344 - Implementation Status Results Report : Sequence 08 (English)
See More +
FEB 21, 2012 ISR5265 Implementation Status and Results Report