Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 107 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Brazil - Amazon Sustainable Landscapes Project : environmental assessment : Marco de gestao socioambiental (Portuguese)

Environmental Assessment SFG3584 AUG 23, 2017

Keller Neiva,Sofia Disclosed

Malawi - Shire Valley Irrigation Project : resettlement plan : Resettlement policy framework (English)

The development objective of Shire Valley Irrigation Project for Malawi is to provide access to reliable gravity-fed irrigation and drainage services, secure land tenure for smallholder farmers, and strengthen management of wetlands and protected areas in the Shire Valley.Some of the negative impacts and mitigation measures include: (i) land used for residence and assets affected.loss of business income, loss of rental income, loss of livelihood of those affected; (ii) full compensation for the loss of the structure and related structures, based on current replacement costs at market value/rates paid to the owner plus costs for relocation to the new home; (iii)costs of using and, if so required, adjusting, another building for the period the community building cannot be used; (iv) dependency on larger agri-business unit in decision making, profits, loss of individual land rights, land speculation from outsiders; (v) compensation for the loss of permanent land at irrigated value if the person opts out of the agri-business unit; (vi) land reallocated within same area (e.g. grazing land and/or irrigated land to grow fodder), and if not possible, animals will be moved elsewhere; (vi) bridges to maintain access to grazing land outside the irrigated areas is include in the technical design and tender documents; (vii) lump sum payment at replacement cost for erecting new shelters of the same or better quality plus a lump sum payment for moving to the new premises. ... See More +

Resettlement Plan SFG3554 AUG 10, 2017

Waalewijn,Pieter Disclosed

Pakistan - Punjab Land Records Management and Information Systems Project (English)

Ratings of Punjab Land Records Management and Information Systems Project for Pakistan were as follows: outcomes were satisfactory, risk to development outcome was low or negligible, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. ... See More +

Implementation Completion and Results Report ICR3719 JUN 21, 2017

Disclosed

Cote d'Ivoire - Land Policy Improvement and Implementation Project : environmental assessment : Cadre de gestion environnementale et sociale (French)

Environmental Assessment SFG3533 JUN 01, 2017

Bah,Dite Eulalie Marcelle Disclosed

Tajikistan - Real Estate Registration Project (English)

Ratings for the Real Estate Registration Project (RERP) for Tajikistan were as follows: outcomes were not applicable, risk to development outcome was not applicable, Bank performance was moderately satisfactory, and Borrower performance was moderately unsatisfactory. ... See More +

Note on Cancelled Operation NCO4089 APR 12, 2017

Disclosed

Serbia - Real Estate Management Project : environmental assessment : Environmental management plan for the construction of new archive depot building at Belgrade, Zemun for permanent storage and preservation of archival cadastral documents (English)

The development objective of the Real Estate Management Project is to improve the efficiency, transparency and reliability of Serbia’s real property management systems. ... See More +

Environmental Assessment SFG3155 MAR 01, 2017

Jordanovic,Olivera Disclosed

Gender-differentiated impacts of tenure insecurity on agricultural performance in Malawi's customary tenure systems (English)

Many African countries rely on sporadic land transfers from customary to statutory domains to attract investment and improve agricultural performance. ... See More +

Policy Research Working Paper WPS7943 JAN 18, 2017

Deininger,Klaus W.; Xia,Fang; Holden,Stein Terje Disclosed

China - Hunan Integrated Management of Contaminated Agricultural Land Project : environmental assessment (Vol. 3) : Environmental and Social Impact Assessment (ESIA) : Yongding District (English)

The objectives of Hunan Integrated Management of Contaminated Agricultural Land Project for China is to improve environmental management of agricultural land contaminated with heavy metals and other pollutants for safe agricultural production in selected counties in Hunan. ... See More +

Environmental Assessment SFG2651 JAN 12, 2017

Tian,Yunqing Disclosed

World development report 2017 : hybrid land regulation between the commons and the market land tenure in the Comoros (English)

Following a chaotic political decolonization, from 1975 to 2000, the Comoros failed to sustain the extension of private land ownership pursued since the beginning of the twentieth century and to implement land reform prepared with the assistance of the FAO and the UNDP but abandoned after the assassination of the President of the Republic in 1989. ... See More +

World Development Report 112917 JAN 01, 2017

Le Roy,Étienne Disclosed

India - Assam Agribusiness and Rural Transformation Project : resettlement plan : Social assessment, resettlement framework and social mangament framework (English)

The development objective of the Assam Agribusiness and Rural Transformation Project for India is to increase value added and improve resilience in the production and processing of selected agricultural commodities and to support agriculture and livestock productivity (including value and incomes) through essential technology transfer in production and improved post-harvest and market operations, and also explore and pilot possible financing modalities to support entrepreneurship and agri-business. ... See More +

Resettlement Plan SFG2721 JAN 01, 2017

Pathy,Manivannan Disclosed

Marco de evaluación de la gobernanza de la tierra en el Perú LGAF 2013 (Spanish)

Working Paper 119643 JAN 01, 2017

Endo,Victor Disclosed

Bangladesh - Regional Connectivity Project : resettlement plan : Resettlement action plan (RAP) for Sheola Land Port (English)

The objective of the Regional Connectivity Project for Bangladesh is to lower trade transaction costs associated with complying with government regulatory requirements for import and export activities; reduce border crossing times at selected border crossing points; and enhance connectivity for trade along strategically important regional transport corridors. ... See More +

Resettlement Plan SFG2781 DEC 20, 2016

Kio-Michael,Tema Alawari Disclosed

Bangladesh - Trade and Transport Studies RETF and First Proposed Regional Connectivity Project : Request for Inspection (English)

On August 31, 2016, the Inspection Panel received a request for inspection of the Trade and Transport Studies RETF Project for Bangladesh. The request was submitted by members of indigenous communities in the Chittagong Hill Tracts (CHT) area of Bangladesh who claim to represent four indigenous communities living in the Rangamati district. ... See More +

Inspection Panel Notice of Registration 109444 OCT 20, 2016

Disclosed

Indonesia - Second Power Transmission Development Project : resettlement plan : Land acquisition and resettlement action plan (LARAP) of power station development project 150 kv Sepatan Ext. (English)

The development objective of the Indonesian Second Power Transmission Development (IPDT2)Group 2 is to fulfill the increase of electricity demand and to increase access to electricity sustain ably, by strengthening and increasing transmission network capacity of 150kV and 500 kV electricity in Sumatera, Java-Bali, Kalimantan and Sulawesi. ... See More +

Resettlement Plan SFG2511 AUG 01, 2016

Oktorini,Sri Bahasa (Indonesian) Disclosed

Cheaper, faster, and more than good enough : is GPS the new gold standard in land area measurement ? (English)

In rural societies of low- and middle-income countries, land is a major measure of wealth, a critical input in agricultural production, and a key variable for assessing agricultural performance and productivity. ... See More +

Policy Research Working Paper WPS7759 JUL 21, 2016

Carletto,Calogero; Gourlay,Sydney; Murray,Siobhan; Zezza,Alberto Disclosed

Research digest newsletter Vol. 10 (No. 4) (English)

This issue includes the following headings: Changes in Poverty and Female-Headed Households in Africa; Growth and Capital Inflows in Africa; Growth and Capital Inflows in Africa; Vulnerability to Climate Change in Coastal Bangladesh; Improving Agricultural Data for Better Policies; Enhancing Transparency of Large-Scale Land Acquisition; Explaining the Gender Gap in Agricultural Productivity; Changing Patterns of Growth and Poverty Reduction in India;Land Market Restrictions and Rural Labor Markets; Deforestation Prevention Programs and Community-Managed Forestry;Recent Policy Research Working Papers on IDA Countries. ... See More +

Newsletter 106434 JUN 15, 2016

Disclosed

Title Document Date Report No. Document Type Also available in
Brazil - Amazon Sustainable Landscapes Project : environmental assessment : Marco de gestao socioambiental (Portuguese)
See More +
AUG 23, 2017 SFG3584 Environmental Assessment
Malawi - Shire Valley Irrigation Project : resettlement plan : Resettlement policy framework (English)
See More +
AUG 10, 2017 SFG3554 Resettlement Plan
Pakistan - Punjab Land Records Management and Information Systems Project (English)
See More +
JUN 21, 2017 ICR3719 Implementation Completion and Results Report
Cote d'Ivoire - Land Policy Improvement and Implementation Project : environmental assessment : Cadre de gestion environnementale et sociale (French)
See More +
JUN 01, 2017 SFG3533 Environmental Assessment
Tajikistan - Real Estate Registration Project (English)
See More +
APR 12, 2017 NCO4089 Note on Cancelled Operation
Serbia - Real Estate Management Project : environmental assessment : Environmental management plan for the construction of new archive depot building at Belgrade, Zemun for permanent storage and preservation of archival cadastral documents (English)
See More +
MAR 01, 2017 SFG3155 Environmental Assessment
Gender-differentiated impacts of tenure insecurity on agricultural performance in Malawi's customary tenure systems (English)
See More +
JAN 18, 2017 WPS7943 Policy Research Working Paper
China - Hunan Integrated Management of Contaminated Agricultural Land Project : environmental assessment (Vol. 3) : Environmental and Social Impact Assessment (ESIA) : Yongding District (English)
See More +
JAN 12, 2017 SFG2651 Environmental Assessment
World development report 2017 : hybrid land regulation between the commons and the market land tenure in the Comoros (English)
See More +
JAN 01, 2017 112917 World Development Report
India - Assam Agribusiness and Rural Transformation Project : resettlement plan : Social assessment, resettlement framework and social mangament framework (English)
See More +
JAN 01, 2017 SFG2721 Resettlement Plan
Marco de evaluación de la gobernanza de la tierra en el Perú LGAF 2013 (Spanish)
See More +
JAN 01, 2017 119643 Working Paper
Bangladesh - Regional Connectivity Project : resettlement plan : Resettlement action plan (RAP) for Sheola Land Port (English)
See More +
DEC 20, 2016 SFG2781 Resettlement Plan
Burkina Faso - Bagre Growth Pole Project : additional financing : resettlement plan (Vol. 2) : Plan d’action de reinstallation (PAR) des personnes affectees par le projet d’amenagement de 157,43km de pistes ameliorees et de pistes ordinaires (French)
See More +
DEC 01, 2016 SFG2898 Resettlement Plan
Burkina Faso - Bagre Growth Pole Project : additional financing : resettlement plan : Plan d’action de reinstallation des personnes affectees par le projet d’amenagement de 47,8 km de routes a bitumer dans le pole de croissance de Bagre (French)
See More +
DEC 01, 2016 SFG2898 Resettlement Plan
Burkina Faso - Bagre Growth Pole Project : additional financing : resettlement plan (Vol. 3) : Plan d’action de reinstallation (PAR) des personnes affectees par le projet d’amenagement de 51,5 km de routes en terre ordinaire (French)
See More +
DEC 01, 2016 SFG2898 Resettlement Plan
Madagascar - Sustainable Landscape Management Project : environmental assessment : Plan de gestion des pestes et pesticides dans quatre Régions de d’Analanjirofo (Iazafo, Soanierana Ivongo), SAVA (Andapa), SOFIA (Bealanana) et Boeny (Marovoay) (French)
See More +
NOV 01, 2016 SFG2830 Environmental Assessment
Bangladesh - Trade and Transport Studies RETF and First Proposed Regional Connectivity Project : Request for Inspection (English)
See More +
OCT 20, 2016 109444 Inspection Panel Notice of Registration
Indonesia - Second Power Transmission Development Project : resettlement plan : Land acquisition and resettlement action plan (LARAP) of power station development project 150 kv Sepatan Ext. (English)
See More +
AUG 01, 2016 SFG2511 Resettlement Plan Bahasa (Indonesian)
Cheaper, faster, and more than good enough : is GPS the new gold standard in land area measurement ? (English)
See More +
JUL 21, 2016 WPS7759 Policy Research Working Paper
Research digest newsletter Vol. 10 (No. 4) (English)
See More +
JUN 15, 2016 106434 Newsletter