Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 274 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Indonesia - Power Distribution Development Program-for-Results : P154805 - Implementation Status Results Report : Sequence 03 (English)

Implementation Status and Results Report ISR30912 FEB 09, 2018

Garnier,Stephan Claude Frederic Disclosed

Disclosable Version of the ISR - North Eastern Region Power System Improvement Project - P127974 - Sequence No : 04 (English)

Implementation Status and Results Report ISR30952 FEB 07, 2018

Mittal,Rohit Disclosed

Senegal - Electricity Sector Support Project : resettlement plan : Rapport final du plan d’action de réinstallation (PAR) (French)

Resettlement Plan SFG3989 FEB 02, 2018

Disclosed

Nigeria - Electricity Transmission and Access Project : environmental assessment : Environment environmental and social management plan for Package 1 – Lot 1 (English)

The project development objective of Electricity Transmission and Access Project for Nigeria is to increase the transfer capacity of the transmission network in the country. ... See More +

Environmental Assessment SFG3973 JAN 01, 2018

Disclosed

Western Africa - First Phase of the Inter-Zonal Transmission Hub Project of the WAPP (APL3) Program Project : restructuring (English)

The development objective of the First Phase of the Inter-Zonal Transmission Hub Project under the WAPP APL3 is to reduce the cost of and improve security of electricity supply to Burkina Faso, while increasing Ghana’s electricity export capacity. ... See More +

Project Paper RES31146 DEC 29, 2017

Eyison,Nash Fiifi; Muller,Cyril E Disclosed

Pakistan - First and Second Power Sector Reform Development Policy Credits Project (English)

Ratings for the First and Second Power Sector Reform Development Policy Credits (DPC) Project for Pakistan were as follows: outcomes were satisfactory, risk to development outcome was high, Bank performance was highly satisfactory, and Borrower performance was satisfactory. ... See More +

Implementation Completion and Results Report ICR4110 DEC 29, 2017

Disclosed

Building climate resilience into power system planning : the case of Bangladesh (English)

The objective of the analytical work reported here is to improve the analysis of power system resilience by developing and piloting an approach to incorporate climate-change considerations into power-system planning using Bangladesh and its power-system-planning models as a case study. ... See More +

Working Paper ACS23320 DEC 19, 2017

Bangalore, Mook; Hobbs, Benjamin; Spyrou, Evangelia; Vogt-Schilb,Adrien Camille; Du,Hua Disclosed

Myanmar - Electric Power Project : restructuring (English)

The development objective of the Electric Power Project for Myanmar is to increase the capacity and efficiency of gas-fired power generation in Myanmar and strengthen the institutional capacity of relevant agencies. ... See More +

Project Paper RES29098 DEC 01, 2017

Disclosed

Linking up: public-private partnerships in power transmission in Africa (French)

The 'Linking up: Public-Private Partnerships in Power Transmission in Africa' report examines private sector-led investments in transmission globally and how this approach is applicable in sub-Saharan Africa. ... See More +

Working Paper 115521 DEC 01, 2017

English Disclosed

Gambia, The - Electricity Restoration and Modernization Project : resettlement plan : Resettlement policy framework (English)

The development objective of Electricity Restoration and Modernization Project for Gambia is to increase the power generation capacity, and to improve the efficiency of National Water and Electricity Company's (NAWEC) transmission network and ability to absorb variable renewable energy. ... See More +

Resettlement Plan SFG3919 DEC 01, 2017

Disclosed

Tajikistan - Central Asia South Transmission Project : procurement plan (English)

Procurement Plan 121421 NOV 15, 2017

Disclosed

Côte d’Ivoire, Liberia, Sierra Leone, and Guinea - Power Interconnection Project : additional financing (English)

The development objectives of the Power Interconnection Project for Côte d'Ivoire, Liberia, Sierra Leone, and Guinea (CLSG) are: (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Cote d’Ivoire, and (ii) to increase the technical integration of the West African Power Pool (WAPP) network. ... See More +

Project Paper PAD2375 OCT 25, 2017

Disclosed

The effects of carbon limits on electricity generation and coal production : an integrated planning approach applied to Poland (English)

Integrated planning analysis can provide evidence to support decision making and consensus building about sensitive issues in the energy sector. ... See More +

Brief 120676 OCT 24, 2017

Disclosed

Myanmar - Electric Power Project : resettlement plan : Abbreviated resettlement action plan of the water pipelines and transmission line (English)

The objective of the Electric Power Project is to increase the capacity and efficiency of gas-fired power generation in Myanmar and strengthen the institutional capacity of the Ministry of Electric Power and the Myanmar Electric Power Enterprise. ... See More +

Resettlement Plan SFG3720 OCT 24, 2017

Lee,Alan David; Khaing,Aye Moe Moe Disclosed

Bangladesh - Enhancement and Strengthening of Power Network in Eastern Region Project : environmental assessment : Environmental impact assessment (English)

The development objective of the Enhancement and Strengthening of Power Transmission Network in Eastern Region Project is to increase transmission capacity and reliability of the grid network in the eastern region. ... See More +

Environmental Assessment SFG3701 OCT 01, 2017

Hossain,Md. Tafazzal Disclosed

Myanmar - Electric Power Project : indigenous peoples plan : ဌာနေတိုင်းရင်းသားများအစီအစဉ် (Burmese)

The objective of the Electric Power Project for Myanmar is to increase capacity and efficiency of gas-fired power generation, and, therefore, help reduce electricity shortages in the country. ... See More +

Indigenous Peoples Plan SFG3678 OCT 01, 2017

Lee,Alan David English Disclosed

Energy analytics for development: big data for energy access, energy efficiency, and renewable energy (English)

With unprecedented speed and scale, digital transformation is affecting multiple industries, including energy. A combination of technologies, and a more complex world demanding greater agility and new competences impact all aspects of the energy sector and manifest themselves in changing patterns of consumption, new ways of asset optimization, and cross-industry partnerships. ... See More +

ESMAP Paper 119685 SEP 01, 2017

Lerner,Karin Anna Maria; Dalphond, Zhenia Viatchaninova; Gee, Matthew; Plagge, Thomas Disclosed

Vietnam - Transmission Efficiency Project : resettlement plan (Vol. 12) : Resettlement plan for an Phuoc 220kv substation (English)

The development objective of the Transmission Efficiency Project (TEP) for Vietnam is to improve the technical and operational performance of national project training (NPT) in providing reliable and energy efficient electricity transmission services in Vietnam. ... See More +

Resettlement Plan SFG1163 SEP 01, 2017

Nguyen,Hoa Chau Disclosed

Report on visit to power plants (English)

The mission was informed that the discussion with the Original Equipment Manufacturer (OEM) of the power plant is ongoing to ensure the plant to operate in FGMO. ... See More +

Working Paper 117777 JUL 27, 2017

Iqbal,Ali M. Disclosed

Title Document Date Report No. Document Type Also available in
Indonesia - Power Distribution Development Program-for-Results : P154805 - Implementation Status Results Report : Sequence 03 (English)
See More +
FEB 09, 2018 ISR30912 Implementation Status and Results Report
Disclosable Version of the ISR - North Eastern Region Power System Improvement Project - P127974 - Sequence No : 04 (English)
See More +
FEB 07, 2018 ISR30952 Implementation Status and Results Report
Senegal - Electricity Sector Support Project : resettlement plan : Rapport final du plan d’action de réinstallation (PAR) (French)
See More +
FEB 02, 2018 SFG3989 Resettlement Plan
Nigeria - Electricity Transmission and Access Project : environmental assessment : Environment environmental and social management plan for Package 1 – Lot 1 (English)
See More +
JAN 01, 2018 SFG3973 Environmental Assessment
Western Africa - First Phase of the Inter-Zonal Transmission Hub Project of the WAPP (APL3) Program Project : restructuring (English)
See More +
DEC 29, 2017 RES31146 Project Paper
Pakistan - First and Second Power Sector Reform Development Policy Credits Project (English)
See More +
DEC 29, 2017 ICR4110 Implementation Completion and Results Report
Building climate resilience into power system planning : the case of Bangladesh (English)
See More +
DEC 19, 2017 ACS23320 Working Paper
Myanmar - Electric Power Project : restructuring (English)
See More +
DEC 01, 2017 RES29098 Project Paper
Linking up: public-private partnerships in power transmission in Africa (French)
See More +
DEC 01, 2017 115521 Working Paper English
Gambia, The - Electricity Restoration and Modernization Project : resettlement plan : Resettlement policy framework (English)
See More +
DEC 01, 2017 SFG3919 Resettlement Plan
Tajikistan - Central Asia South Transmission Project : procurement plan (English)
See More +
NOV 15, 2017 121421 Procurement Plan
Côte d’Ivoire, Liberia, Sierra Leone, and Guinea - Power Interconnection Project : additional financing (English)
See More +
OCT 25, 2017 PAD2375 Project Paper
The effects of carbon limits on electricity generation and coal production : an integrated planning approach applied to Poland (English)
See More +
OCT 24, 2017 120676 Brief
Myanmar - Electric Power Project : resettlement plan : Abbreviated resettlement action plan of the water pipelines and transmission line (English)
See More +
OCT 24, 2017 SFG3720 Resettlement Plan
Bangladesh - Enhancement and Strengthening of Power Network in Eastern Region Project : environmental assessment : Environmental impact assessment (English)
See More +
OCT 01, 2017 SFG3701 Environmental Assessment
Myanmar - Electric Power Project : indigenous peoples plan : ဌာနေတိုင်းရင်းသားများအစီအစဉ် (Burmese)
See More +
OCT 01, 2017 SFG3678 Indigenous Peoples Plan English
Gambia - Electricity Sector Support Project (Vol. 2) : Environmental and social management plan - Kanuma - Amdalai, Farafenni - Kerr Ali, Farafenni - Illiasa, and Diabugu Batapa - Tabanging Wollof transmission lines (English)
See More +
OCT 01, 2017 SFG1886 Environmental Assessment
Energy analytics for development: big data for energy access, energy efficiency, and renewable energy (English)
See More +
SEP 01, 2017 119685 ESMAP Paper
Vietnam - Transmission Efficiency Project : resettlement plan (Vol. 12) : Resettlement plan for an Phuoc 220kv substation (English)
See More +
SEP 01, 2017 SFG1163 Resettlement Plan
Report on visit to power plants (English)
See More +
JUL 27, 2017 117777 Working Paper