Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
  • Showing 1 - 20 of 36 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Disclosable Version of the ISR - Electricity Sector Support Project - P125565 - Sequence No : 13 (English)

Implementation Status and Results Report ISR37304 DEC 06, 2019

Trimble,Christopher Philip Disclosed

Disclosable Version of the ISR - Burkina Faso Electricity Sector Support Project - P128768 - Sequence No : 11 (English)

Implementation Status and Results Report ISR39287 NOV 18, 2019

Madelain,Alexis Lucien Emmanuel Disclosed

Disclosable Version of the ISR - Network Reinforcement and Access Project - P166170 - Sequence No : 01 (English)

Implementation Status and Results Report ISR38471 OCT 03, 2019

Kapika,Joseph Mwelwa Disclosed

Disclosable Version of the ISR - OMVS - TRANSMISSION EXPANSION PROJECT - P147921 - Sequence No : 04 (English)

Implementation Status and Results Report ISR38454 SEP 23, 2019

Bah,Thierno Disclosed

World Bank Group Boards' Calendar (English)

This Board report acknowledges a World Bank Group Boards' calendar for August 2019, September 2019, and October 2019.

Board Report 140487 AUG 08, 2019

Disclosed

Guinea - Power Sector Recovery Project : additional financing - resettlement plan : Cadre de politique de réinstallation des populations (French)

Resettlement Plan SFG3901 DEC 01, 2017

Disclosed

The effects of carbon limits on electricity generation and coal production : an integrated planning approach applied to Poland (English)

Integrated planning analysis can provide evidence to support decision making and consensus building about sensitive issues in the energy sector. ... See More +

Brief 120676 OCT 24, 2017

Disclosed

Myanmar - Electric Power Project : indigenous peoples plan : ဌာနေတိုင်းရင်းသားများအစီအစဉ် (Burmese)

The objective of the Electric Power Project for Myanmar is to increase capacity and efficiency of gas-fired power generation, and, therefore, help reduce electricity shortages in the country. ... See More +

Indigenous Peoples Plan SFG3678 OCT 01, 2017

Lee,Alan David Disclosed

Productivity in the non-oil sector in Nigeria : firm-level evidence (English)

This paper examines the determinants of the productivity of Nigerian firms, using three waves of Enterprise Surveys from 2007, 2009, and 2014 and 7,670 firms. ... See More +

Policy Research Working Paper WPS8145 JUL 12, 2017

Herrera,Santiago; Kouame,Wilfried Anicet Kouakou Disclosed

Heterogeneous effects of rural electrification: evidence from Bangladesh (English)

Achieving universal access to electricity is one of the most important energy policy goals set by governments in the developing world. The recent empirical literature, however, paints a mixed picture about the economic viability of rural electrification. ... See More +

Policy Research Working Paper WPS8102 JUN 12, 2017

Samad,Hussain A.; Zhang,Fan Disclosed

Armenia - Power Transmission Network Improvement Project : restructuring (English)

The development objectives of the Power Transmission Network Improvement Project for Armenia are to improve the reliability of the power transmission network and system management, and support the Borrower's efforts in ensuring adequate electricity supply. ... See More +

Project Paper RES26030 JUN 08, 2017

Disclosed

Lao People's Democratic Republic - Customs and Trade Facilitation Project : implementation support mission - April 19 to 25, 2017 (English)

Aide Memoire 116827 APR 19, 2017

Nghardsaysone,Konesawang Disclosed

Vietnam - Distribution Efficiency Project : procurement plan (English)

Procurement Plan 114347 APR 04, 2017

Disclosed

Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project : additional financing - resettlement plan : Terms of reference for the resettlement action plan - Technical assistance for development of St Paul river and WAPP integration (English)

The development objectives West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project are (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase the technical integration of the WAPP network. ... See More +

Resettlement Plan SFG3087 FEB 01, 2017

Torres De Mastle,Clemencia Disclosed

Lebanon - PCB Management In The Power Sector Project : procurement plan (English)

Procurement Plan 108364 SEP 19, 2016

Disclosed

Richard Demuth (English)

Demuth joined the Bank in 1946 as served as Assistant to the President under presidents Eugene Meyer, John J. McCloy and Eugene R. Black. He was Director of the Department of Technical Assistance and Liaison, which was responsible for planning, coordinating and giving general direction to the Bank's technical assistance activities, and for coordinating the Bank's relationships with other international agencies. ... See More +

Working Paper 104629 JAN 01, 2016

Disclosed

Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 04 (English)

Implementation Status and Results Report ISR12788 DEC 21, 2013

Junquera-Varela,Raul Felix

Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 03 (English)

Implementation Status and Results Report ISR9619 MAR 27, 2013

Friederike N. Koehler-Geib

Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 02 (English)

Implementation Status and Results Report ISR8022 OCT 06, 2012

Koehler-Geib,Friederike N. Disclosed

Title Document Date Report No. Document Type Also available in
Disclosable Version of the ISR - Electricity Sector Support Project - P125565 - Sequence No : 13 (English)
See More +
DEC 06, 2019 ISR37304 Implementation Status and Results Report
Disclosable Version of the ISR - Burkina Faso Electricity Sector Support Project - P128768 - Sequence No : 11 (English)
See More +
NOV 18, 2019 ISR39287 Implementation Status and Results Report
Disclosable Version of the ISR - Network Reinforcement and Access Project - P166170 - Sequence No : 01 (English)
See More +
OCT 03, 2019 ISR38471 Implementation Status and Results Report
Disclosable Version of the ISR - OMVS - TRANSMISSION EXPANSION PROJECT - P147921 - Sequence No : 04 (English)
See More +
SEP 23, 2019 ISR38454 Implementation Status and Results Report
World Bank Group Boards' Calendar (English)
See More +
AUG 08, 2019 140487 Board Report
Guinea - Power Sector Recovery Project : additional financing - resettlement plan : Cadre de politique de réinstallation des populations (French)
See More +
DEC 01, 2017 SFG3901 Resettlement Plan
The effects of carbon limits on electricity generation and coal production : an integrated planning approach applied to Poland (English)
See More +
OCT 24, 2017 120676 Brief
Myanmar - Electric Power Project : indigenous peoples plan : ဌာနေတိုင်းရင်းသားများအစီအစဉ် (Burmese)
See More +
OCT 01, 2017 SFG3678 Indigenous Peoples Plan
Productivity in the non-oil sector in Nigeria : firm-level evidence (English)
See More +
JUL 12, 2017 WPS8145 Policy Research Working Paper
Heterogeneous effects of rural electrification: evidence from Bangladesh (English)
See More +
JUN 12, 2017 WPS8102 Policy Research Working Paper
Armenia - Power Transmission Network Improvement Project : restructuring (English)
See More +
JUN 08, 2017 RES26030 Project Paper
Madagascar - Electricity Sector Operations and Governance Improvement Project : environmental assessment (Vol. 3) : Plan de gestion environnementale et sociale – Centrale thermique de Mahajanga (French)
See More +
MAY 01, 2017 SFG3612 Environmental Assessment
Lao People's Democratic Republic - Customs and Trade Facilitation Project : implementation support mission - April 19 to 25, 2017 (English)
See More +
APR 19, 2017 116827 Aide Memoire
Vietnam - Distribution Efficiency Project : procurement plan (English)
See More +
APR 04, 2017 114347 Procurement Plan
Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project : additional financing - resettlement plan : Terms of reference for the resettlement action plan - Technical assistance for development of St Paul river and WAPP integration (English)
See More +
FEB 01, 2017 SFG3087 Resettlement Plan
Lebanon - PCB Management In The Power Sector Project : procurement plan (English)
See More +
SEP 19, 2016 108364 Procurement Plan
Richard Demuth (English)
See More +
JAN 01, 2016 104629 Working Paper
Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 04 (English)
See More +
DEC 21, 2013 ISR12788 Implementation Status and Results Report
Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 03 (English)
See More +
MAR 27, 2013 ISR9619 Implementation Status and Results Report
Paraguay - Public Sector Reform Development Policy Loan : P117043 - Implementation Status Results Report : Sequence 02 (English)
See More +
OCT 06, 2012 ISR8022 Implementation Status and Results Report