Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 10546 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Africa/AFRICA- P145566- Southern Africa Trade and Transport Facilitation Program - SOP2 - Procurement Plan (English)

Procurement Plan STEP11022 JUL 16, 2018

Isaac Kunkeyani Disclosed

LN8227-P124848-Fujian Meizhou Bay-Fujian Audit Report 2017-Public (English)

Auditing Document AUD0013873 JUL 15, 2018

Wang,Yan-000180350 Disclosed

PAEQ - Rapport Audit 2017 (English)

Auditing Document AUD0013923 JUL 15, 2018

Jabbour,Rock Disclosed

FY17_Audited financial statements_EN (English)

Auditing Document AUD0013977 JUL 15, 2018

Chu,Oanh Thi Kim Disclosed

FY17_Audited financial statements (English)

Auditing Document AUD0013988 JUL 15, 2018

Chu,Oanh Thi Kim Disclosed

MK P148023 PESR Audit Report Entity 2017 (English)

Auditing Document AUD0014019 JUL 15, 2018

Jamalov,Tural Disclosed

LN8337-P129401-Guiyang Rural Road-Guizhou Audit Report 2017-Public (English)

Auditing Document AUD0013824 JUL 12, 2018

Wang,Yan-000180350 Disclosed

Toward Great Dhaka : a new urban development paradigm eastward (English)

A unique strategic opportunity beckons Bangladesh. Dhaka, the economic powerhouse of the country, stands on the cusp of a dramatic transformation that could make it much more prosperous and livable. ... See More +

Publication 128324 JUL 12, 2018

Bird,Julia Helen; Li,Yue-000316086; Rahman,Hossain Zillur; Rama,Martin G.; Venables,Anthony J. Disclosed

China/EAST ASIA AND PACIFIC- P148129- China: Tianjin Urban Transport Improvement Project - Procurement Plan (English)

Procurement Plan STEP10862 JUL 11, 2018

Wenjie Qi Disclosed

China/EAST ASIA AND PACIFIC- P156507- GEF China Sustainable Cities Integrated Approach Pilot - Procurement Plan (English)

Procurement Plan STEP10871 JUL 11, 2018

Wenjie Qi Disclosed

Mozambique/AFRICA- P162621- National Statistics and Data for Development - Procurement Plan (English)

Procurement Plan STEP10842 JUL 10, 2018

Disclosed

Rapport Definitif - PROGEDE - 09052017_SIGNE (English)

Auditing Document AUD0013802 JUL 10, 2018

Sy,Fatim Seck Disclosed

CEA SAMEF_ Rapport d'audit (English)

Auditing Document AUD0013780 JUL 10, 2018

Sy,Fatim Seck Disclosed

Disclosable Version of the ISR - Tanzania - Intermodal Rail Development Project - P127241 - Sequence No : 10 (English)

Implementation Status and Results Report ISR33203 JUL 09, 2018

Mchomvu,Yonas Eliesikia Disclosed

Uganda/AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)

Procurement Plan STEP10790 JUL 09, 2018

Charles Tumwebaze Disclosed

Burkina Faso/AFRICA- P156892- BF-Transport Sector Modernization and Corridor Trade Facilitation Project - Procurement Plan (English)

Procurement Plan STEP10812 JUL 09, 2018

Pako Franck Olivier Toé Disclosed

Disclosable Version of the ISR - Ethiopia: Supporting Open Data Initiative - P156400 - Sequence No : 03 (English)

Implementation Status and Results Report ISR32974 JUL 08, 2018

Araya,Elsa Disclosed

LN8236-P126611-Liaoning Coastal Economic Zone-Liaoning Audit Report 2017-Public (English)

Auditing Document AUD0013459 JUL 08, 2018

Wang,Yan-000180350 Disclosed

Title Document Date Report No. Document Type Also available in
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Africa/AFRICA- P145566- Southern Africa Trade and Transport Facilitation Program - SOP2 - Procurement Plan (English)
See More +
JUL 16, 2018 STEP11022 Procurement Plan
LN8227-P124848-Fujian Meizhou Bay-Fujian Audit Report 2017-Public (English)
See More +
JUL 15, 2018 AUD0013873 Auditing Document
PAEQ - Rapport Audit 2017 (English)
See More +
JUL 15, 2018 AUD0013923 Auditing Document
FY17_Audited financial statements_EN (English)
See More +
JUL 15, 2018 AUD0013977 Auditing Document
FY17_Audited financial statements (English)
See More +
JUL 15, 2018 AUD0013988 Auditing Document
MK P148023 PESR Audit Report Entity 2017 (English)
See More +
JUL 15, 2018 AUD0014019 Auditing Document
LN8337-P129401-Guiyang Rural Road-Guizhou Audit Report 2017-Public (English)
See More +
JUL 12, 2018 AUD0013824 Auditing Document
Toward Great Dhaka : a new urban development paradigm eastward (English)
See More +
JUL 12, 2018 128324 Publication
China/EAST ASIA AND PACIFIC- P148129- China: Tianjin Urban Transport Improvement Project - Procurement Plan (English)
See More +
JUL 11, 2018 STEP10862 Procurement Plan
China/EAST ASIA AND PACIFIC- P156507- GEF China Sustainable Cities Integrated Approach Pilot - Procurement Plan (English)
See More +
JUL 11, 2018 STEP10871 Procurement Plan
Mozambique/AFRICA- P162621- National Statistics and Data for Development - Procurement Plan (English)
See More +
JUL 10, 2018 STEP10842 Procurement Plan
Rapport Definitif - PROGEDE - 09052017_SIGNE (English)
See More +
JUL 10, 2018 AUD0013802 Auditing Document
CEA SAMEF_ Rapport d'audit (English)
See More +
JUL 10, 2018 AUD0013780 Auditing Document
Disclosable Version of the ISR - Tanzania - Intermodal Rail Development Project - P127241 - Sequence No : 10 (English)
See More +
JUL 09, 2018 ISR33203 Implementation Status and Results Report
Uganda/AFRICA- P133590- Second Kampala Institutional and Infrastructure Development Project - Procurement Plan (English)
See More +
JUL 09, 2018 STEP10790 Procurement Plan
Burkina Faso/AFRICA- P156892- BF-Transport Sector Modernization and Corridor Trade Facilitation Project - Procurement Plan (English)
See More +
JUL 09, 2018 STEP10812 Procurement Plan
Disclosable Version of the ISR - Ethiopia: Supporting Open Data Initiative - P156400 - Sequence No : 03 (English)
See More +
JUL 08, 2018 ISR32974 Implementation Status and Results Report
LN8236-P126611-Liaoning Coastal Economic Zone-Liaoning Audit Report 2017-Public (English)
See More +
JUL 08, 2018 AUD0013459 Auditing Document