Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 17042 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Vietnam/EAST ASIA AND PACIFIC- P110693- Vietnam New Model University Project - Procurement Plan (English)

Procurement Plan STEP11035 JUL 17, 2018

Disclosed

Uganda/AFRICA- P145037- Agriculture Cluster Development Project - Procurement Plan (English)

Procurement Plan STEP11036 JUL 17, 2018

Stephen Ojangole Disclosed

Disclosable Version of the ISR - Strengthening Service Delivery for Growth, Poverty Reduction and Enviromental Sustainability in the State of Cear? PforR - P127463 - Sequence No : 09 (English)

Implementation Status and Results Report ISR32743 JUL 17, 2018

Quijada Torres,Cristian Disclosed

Central African Republic/AFRICA- P162245- Water and Electricity Upgrading Project - Procurement Plan (English)

Procurement Plan STEP11044 JUL 17, 2018

Noël GBEBA Disclosed

Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects 33kv substations (English)

The objectives of the Grid Solar and Energy Efficiency Project for Nepal are to: (i) increase electricity supply to the NEA gridthrough grid-connected solar farms; and (ii) reduce NEA’s distribution losses in pilot distributioncenters. ... See More +

Environmental Assessment SFG4041 JUL 17, 2018

Disclosed

Argentina/LATIN AMERICA AND CARIBBEAN- P120211- Norte Grande Water Infrastructure - Procurement Plan (English)

Procurement Plan STEP11065 JUL 17, 2018

Sergio Sergio Daniel Lopez Disclosed

Indonesia/EAST ASIA AND PACIFIC- P096532- Dam Operational Improvement and Safety - Procurement Plan (English)

Procurement Plan STEP10984 JUL 16, 2018

Iman Ramdhani Disclosed

Pakistan/SOUTH ASIA- P155350- Sindh Resilience Project - Procurement Plan (English)

Procurement Plan STEP10992 JUL 16, 2018

Zahid Hussain Shaikh Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)

Some of the negative impacts and mitigation measures include: the local construction and environment inspectorates and communities have been notified of upcoming activities; the public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works); all legally required permits have been acquired for construction; the Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment; during interior demolition debris-chutes shall be used above the first floor; demolition debris shall be kept in controlled area and sprayed with water mist to reduce debris dust; during pneumatic drilling/wall destruction dust shall be suppressed by ongoing water spraying and/or installing dust screen enclosures at site; Construction noise will be limited to restricted times agreed to in the permit; during operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible; The approach to handling sanitary wastes and wastewater from building sites must be approved by the local authorities; before being discharged into receiving waters, effluents from individual wastewater systems must be treated to meet the minimal quality criteria set out by national guidelines on effluent quality and wastewater treatment; all recognized natural habitats, wetlands and protected areas in the immediate vicinity of the activity will not be damaged or exploited, all staff will be strictly prohibited from hunting, foraging, logging or other damaging activities; and a survey and an inventory shall be made of large trees in the vicinity of the construction activity, large trees shall be marked and cordoned off with fencing, their root system protected, and any damage to the trees avoided. ... See More +

Environmental Assessment SFG4504 JUL 16, 2018

Disclosed

Mekong Integrated Water Resources Management Project-Audited Financial Statement (8Aug16 to 31Dec17) (English)

Auditing Document AUD0013955 JUL 16, 2018

Pol,Vanna Disclosed

Mekong Integrated Water Resources Management Project-Audited Financial Statement (8Aug16 to 31Dec17) (English)

Auditing Document AUD0013953 JUL 16, 2018

Pol,Vanna Disclosed

AZ P109961 SNWSSP Audit Report 2017 (English)

Auditing Document AUD0013904 JUL 15, 2018

Jamalov,Tural Disclosed

AZ P109961 SNWSSP Audit Report 2017 (English)

Auditing Document AUD0013933 JUL 15, 2018

Jamalov,Tural Disclosed

LN8153-P114138- 2nd Water Conservation -Shanxi Audit Report 2017-Public (English)

Auditing Document AUD0013919 JUL 15, 2018

Wang,Yan-000180350 Disclosed

LN8456-P133117-Chongqing Small Towns Water-Chongqing Audit Report 2017-Public (English)

Auditing Document AUD0014045 JUL 15, 2018

Wang,Yan-000180350 Disclosed

Toward Great Dhaka : a new urban development paradigm eastward (English)

A unique strategic opportunity beckons Bangladesh. Dhaka, the economic powerhouse of the country, stands on the cusp of a dramatic transformation that could make it much more prosperous and livable. ... See More +

Publication 128324 JUL 12, 2018

Bird,Julia Helen; Li,Yue-000316086; Rahman,Hossain Zillur; Rama,Martin G.; Venables,Anthony J. Disclosed

Madagascar - Second Phase of the Integrated Growth Poles and Corridor Project : resettlement plan : PAR_Piste Haut Sambirano Final (French,English)

Resettlement Plan SFG4511 JUL 12, 2018

Feno,Paul-Jean Disclosed

Kenya/AFRICA- P156634- Water and Sanitation Development Project - Procurement Plan (English)

Procurement Plan STEP10894 JUL 11, 2018

Disclosed

Title Document Date Report No. Document Type Also available in
Vietnam/EAST ASIA AND PACIFIC- P110693- Vietnam New Model University Project - Procurement Plan (English)
See More +
JUL 17, 2018 STEP11035 Procurement Plan
Uganda/AFRICA- P145037- Agriculture Cluster Development Project - Procurement Plan (English)
See More +
JUL 17, 2018 STEP11036 Procurement Plan
Disclosable Version of the ISR - Strengthening Service Delivery for Growth, Poverty Reduction and Enviromental Sustainability in the State of Cear? PforR - P127463 - Sequence No : 09 (English)
See More +
JUL 17, 2018 ISR32743 Implementation Status and Results Report
Central African Republic/AFRICA- P162245- Water and Electricity Upgrading Project - Procurement Plan (English)
See More +
JUL 17, 2018 STEP11044 Procurement Plan
Nepal - Grid Solar and Energy Efficiency Project : environmental assessment (Vol. 2) : Environmental and social management plan of supply and installation of distribution projects 33kv substations (English)
See More +
JUL 17, 2018 SFG4041 Environmental Assessment
Argentina/LATIN AMERICA AND CARIBBEAN- P120211- Norte Grande Water Infrastructure - Procurement Plan (English)
See More +
JUL 17, 2018 STEP11065 Procurement Plan
Indonesia/EAST ASIA AND PACIFIC- P096532- Dam Operational Improvement and Safety - Procurement Plan (English)
See More +
JUL 16, 2018 STEP10984 Procurement Plan
Pakistan/SOUTH ASIA- P155350- Sindh Resilience Project - Procurement Plan (English)
See More +
JUL 16, 2018 STEP10992 Procurement Plan
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 3) : Environmental and social management plan : construction a parking lot for servicing cars in Tegh Community (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment (Vol. 2) : Environmental and social management plan : asphalting of the alternative road leading to Meghri (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Armenia - Social Investment and Local Development Trust Fund Project : environmental assessment : Environmental and social management plan : Meghri Consolidated Community, Syunik Region (English)
See More +
JUL 16, 2018 SFG4504 Environmental Assessment
Mekong Integrated Water Resources Management Project-Audited Financial Statement (8Aug16 to 31Dec17) (English)
See More +
JUL 16, 2018 AUD0013955 Auditing Document
Mekong Integrated Water Resources Management Project-Audited Financial Statement (8Aug16 to 31Dec17) (English)
See More +
JUL 16, 2018 AUD0013953 Auditing Document
AZ P109961 SNWSSP Audit Report 2017 (English)
See More +
JUL 15, 2018 AUD0013904 Auditing Document
AZ P109961 SNWSSP Audit Report 2017 (English)
See More +
JUL 15, 2018 AUD0013933 Auditing Document
LN8153-P114138- 2nd Water Conservation -Shanxi Audit Report 2017-Public (English)
See More +
JUL 15, 2018 AUD0013919 Auditing Document
LN8456-P133117-Chongqing Small Towns Water-Chongqing Audit Report 2017-Public (English)
See More +
JUL 15, 2018 AUD0014045 Auditing Document
Toward Great Dhaka : a new urban development paradigm eastward (English)
See More +
JUL 12, 2018 128324 Publication
Madagascar - Second Phase of the Integrated Growth Poles and Corridor Project : resettlement plan : PAR_Piste Haut Sambirano Final (French,English)
See More +
JUL 12, 2018 SFG4511 Resettlement Plan
Kenya/AFRICA- P156634- Water and Sanitation Development Project - Procurement Plan (English)
See More +
JUL 11, 2018 STEP10894 Procurement Plan