Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
  • Showing 1 - 15 of 15 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Azerbaijan - Power Transmission Project (English)

Implementation Completion Report Review ICRR14005 JAN 14, 2013

Disclosed

Azerbaijan - Power Transmission Project (English)

The Power Transmission Project for Azerbaijan received a satisfactory outcome rating with moderate risk to development outcome. The Bank received a satisfactory performance rating while the Borrower received a moderately satisfactory outcome rating. ... See More +

Implementation Completion and Results Report ICR1140 JUN 26, 2012

Disclosed

Azerbaijan - Power Transmission Project : P083341 - Implementation Status Results Report : Sequence 11 (English)

Implementation Status and Results Report ISR4994 DEC 24, 2011

Rivera,Arturo S. Disclosed

Azerbaijan - Power Transmission Project : P083341 - Implementation Status Results Report : Sequence 10 (English)

Implementation Status and Results Report APR 14, 2011

Rivera,Arturo S.

Azerbaijan - Power Transmission Project : restructuring : Main report (English)

The primary objective of the Power Transmission Project is to improve the quality and cost-effectiveness of electricity supply in Azerbaijan by financing investments that improve the management and performance of the high-voltage transmission network. ... See More +

58369 DEC 22, 2010

Disclosed

Azerbaijan - Power Transmission Project : restructuring (Vol. 2) : Data sheet (English)

The primary objective of the Power Transmission Project is to improve the quality and cost-effectiveness of electricity supply in Azerbaijan by financing investments that improve the management and performance of the high-voltage transmission network. ... See More +

58369 DEC 21, 2010

Disclosed

Guarantee Agreement, L7294-AZ Conformed (English)

Guarantee Agreement NOV 08, 2005

Funahashi,Junko Disclosed

Azerbaijan - Power Transmission Project (English)

The Power Transmission Project for Azerbaijan aims to improve the efficiency of the power transmission operation in Azerbaijan through technical and institutional strengthening of the generation/transmission utility. ... See More +

Project Appraisal Document 31485 MAY 17, 2005

Disclosed

Azerbaijan - Power Transmission Project (English)

Integrated Safeguards Data Sheet 32104 APR 13, 2005

Disclosed

Azerbaijan - Power Transmission Project (English)

Project Information Document AB1208 FEB 11, 2005

Azerbaijan - Power Transmission Project (English)

Integrated Safeguards Data Sheet AC1121 FEB 09, 2005

Disclosed

Azerbaijan - Power Transmission Project (Vol. 2) : Environmental management plan : Musfiq substation (English)

This environmental assessment for the Azerbaijan Power Transmission Project sets forth the plan for mitigating potentially negative impacts. a) a local ecological expert will work with the construction team in selecting the best routes and construction techniques to avoid significant ecological disruptions; b) clearance from the Ministry of Culture or its equivalent certifying which routes of access roads do not infringe upon any area of cultural significance; c) temporary work camps are to provide facilities for garbage and sanitary waste management; d) any new equipment purchased shall limit electronic-magnetic field levels to within Azerbaijan standards and or in accordance with international practices; e) No pesticides will be used for any land clearing operations; all land clearing will be done by manual or mechanical methods; f) affected land and vegetation will be restored by filling holes, soil leveling and covering grass; finally, PCB contaminated soil shall be removed and treated by licensed contractors using internationally accepted methods. ... See More +

Environmental Assessment E1090 FEB 01, 2005

Azerbaijan - Power Transmission Project : Environmental management plan : 2nd Apsheron 500 kv transmisson line (English)

This environmental assessment for the Azerbaijan Power Transmission Project sets forth the plan for mitigating potentially negative impacts. a) a local ecological expert will work with the construction team in selecting the best routes and construction techniques to avoid significant ecological disruptions; b) clearance from the Ministry of Culture or its equivalent certifying which routes of access roads do not infringe upon any area of cultural significance; c) temporary work camps are to provide facilities for garbage and sanitary waste management; d) any new equipment purchased shall limit electronic-magnetic field levels to within Azerbaijan standards and or in accordance with international practices; e) No pesticides will be used for any land clearing operations; all land clearing will be done by manual or mechanical methods; f) affected land and vegetation will be restored by filling holes, soil leveling and covering grass; finally, PCB contaminated soil shall be removed and treated by licensed contractors using internationally accepted methods. ... See More +

Environmental Assessment E1090 FEB 01, 2005

Azerbaijan - Power Transmission Project (English)

Project Information Document AB265 AUG 21, 2003

Azerbaijan - Power Transmission Project (English)

Integrated Safeguards Data Sheet AC312 AUG 21, 2003

Disclosed

Title Document Date Report No. Document Type Also available in
Azerbaijan - Power Transmission Project (English)
See More +
JAN 14, 2013 ICRR14005 Implementation Completion Report Review
Azerbaijan - Power Transmission Project (English)
See More +
JUN 26, 2012 ICR1140 Implementation Completion and Results Report
Azerbaijan - Power Transmission Project : P083341 - Implementation Status Results Report : Sequence 11 (English)
See More +
DEC 24, 2011 ISR4994 Implementation Status and Results Report
Azerbaijan - Power Transmission Project : P083341 - Implementation Status Results Report : Sequence 10 (English)
See More +
APR 14, 2011 Implementation Status and Results Report
Azerbaijan - Power Transmission Project : restructuring : Main report (English)
See More +
DEC 22, 2010 58369
Azerbaijan - Power Transmission Project : restructuring (Vol. 2) : Data sheet (English)
See More +
DEC 21, 2010 58369
Guarantee Agreement, L7294-AZ Conformed (English)
See More +
NOV 08, 2005 Guarantee Agreement
Azerbaijan - Power Transmission Project (English)
See More +
MAY 17, 2005 31485 Project Appraisal Document
Azerbaijan - Power Transmission Project (English)
See More +
APR 13, 2005 32104 Integrated Safeguards Data Sheet
Azerbaijan - Power Transmission Project (English)
See More +
FEB 11, 2005 AB1208 Project Information Document
Azerbaijan - Power Transmission Project (English)
See More +
FEB 09, 2005 AC1121 Integrated Safeguards Data Sheet
Azerbaijan - Power Transmission Project (Vol. 2) : Environmental management plan : Musfiq substation (English)
See More +
FEB 01, 2005 E1090 Environmental Assessment
Azerbaijan - Power Transmission Project : Environmental management plan : 2nd Apsheron 500 kv transmisson line (English)
See More +
FEB 01, 2005 E1090 Environmental Assessment
Azerbaijan - Power Transmission Project (English)
See More +
AUG 21, 2003 AB265 Project Information Document
Azerbaijan - Power Transmission Project (English)
See More +
AUG 21, 2003 AC312 Integrated Safeguards Data Sheet