Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

  • Showing 1 - 4 of 4 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Chittagong Strategic Urban Transport Master Plan (Vol. 2) : Short Term Plan (2019-2022) (English)

This Strategic Urban Master Plan (SUTMP) presents a plan for improving mobility in Chittagong between the years 2019 and 2030. The vision is to develop; ‘a transport system that provides integrated public transport with walking and cycling provision in a safe, accessible, efficient and environmentally friendly manner for the people of Chittagong.’ ... See More +

Report 135040 MAR 02, 2019

Sakaki,Shigeyuki Disclosed

Chittagong Strategic Urban Transport Master Plan : Main Report (English)

This Strategic Urban Master Plan (SUTMP) presents a plan for improving mobility in Chittagong between the years 2019 and 2030. The vision is to develop; ‘a transport system that provides integrated public transport with walking and cycling provision in a safe, accessible, efficient and environmentally friendly manner for the people of Chittagong.’ ... See More +

Report 135040 NOV 24, 2018

Sakaki,Shigeyuki Disclosed

Chittagong Strategic Urban Transport Master Plan : Road Improvements Pre-Feasibility Study (English)

This pre-feasibility study report seeks to define the potential form of road improvement works that can be undertaken in Chittagong in the short term. ... See More +

Report 135055 NOV 24, 2018

Disclosed

Chittagong Strategic Urban Transport Master Plan : Corridor Improvements Pre-Feasibility Study (English)

This pre-feasibility study report is the sixth deliverable under the Chittagong Urban Transport Master Plan project conducted for the World Bank coordinated by the Chittagong Development Authority. ... See More +

Report 135050 NOV 19, 2018

Sakaki,Shigeyuki Disclosed