The development objectives of Distributed Renewable Energy Scale-Up Project is to promote the scale-up of distributed renewable energy and greenhouse Gas (GHG) emission reduction in China through policy interventions and pilots.
... See More + This project has three components. 1) The first component, Policy Support, aims to involve carrying out selected studies to inform and develop policies and regulations at national or provincial level to scaling up distributed renewable energy (DRE). 2) The second component, Pilot Support, aims to involve acquisition of technical assistance, including carrying out selected studies, and support for pilots, both in relation to innovative and scalable use-cases of DRE. 3) The third component, Capacity Building and Project Management, aims to involve provision of support for: (a) carrying out studies and training, capacity building activities for key stakeholders in relation to DRE policies and regulations; (b) project management, implementation, and monitoring and evaluation activities; and (c) project-related donor and other key stakeholder coordination.
See Less -
The objective of the Distributed Renewable Energy Scale-Up Project is to support the scale-up of distributed renewable energy in China. The global environmental outcome associated with this PDO is to reduce greenhouse gas emissions.
... See More + Some of the negative impacts and mitigation measures include: use existing materials (cement, sand, wall board, steel beams, etc) supply companies with valid operating licenses; all delivery trucks carrying dust generating materials must be covered or water sprayed to prevent and reduce dust generation during transportation; avoid loading/unloading dust generation material in windy situation; on-site storage of dust generating material should be covered and/or water sprayed; waste materials (including scrap and packaging) that cannot be recycled or reused are to be disposed at sites/locations officially designated by the government; construction wastewaters, if any, are to be collected, pretreated and discharged into the municipal drainage system, or sent to temporary on-site storage facilities to be collected by companies licensed to receive and manage construction wastewaters; and for any utility disturbance (water, gas, electricity, internet etc.), prior notice shall be announced in the affected community/building, and timely restoration shall be conducted.
See Less -
The objective of the Distributed Renewable Energy Scale-Up Project is to support the scale-up of distributed renewable energy in China. The global environmental outcome associated with this PDO is to reduce greenhouse gas emissions.
... See More + Some of the negative impacts and mitigation measures include: use existing materials (cement, sand, wall board, steel beams, etc) supply companies with valid operating licenses; all delivery trucks carrying dust generating materials must be covered or water sprayed to prevent and reduce dust generation during transportation; avoid loading/unloading dust generation material in windy situation; on-site storage of dust generating material should be covered and/or water sprayed; waste materials (including scrap and packaging) that cannot be recycled or reused are to be disposed at sites/locations officially designated by the government; construction wastewaters, if any, are to be collected, pretreated and discharged into the municipal drainage system, or sent to temporary on-site storage facilities to be collected by companies licensed to receive and manage construction wastewaters; and for any utility disturbance (water, gas, electricity, internet etc.), prior notice shall be announced in the affected community/building, and timely restoration shall be conducted.