Côte d’Ivoire, Liberia, Sierra Leone, and Guinea - Power Interconnection Project : additional financing (English)

The development objectives of the Power Interconnection Project for Côte d'Ivoire, Liberia, Sierra Leone, and Guinea (CLSG) are: (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Cote d’Ivoire, and (ii) to increase the technical integration of the West African Power Pool (WAPP) network. ... See More +

Project Paper PAD2375 OCT 25, 2017

Disclosed

Appraisal Project Information Document-Integrated Safeguards Data Sheet - WAPP-APL4 (Phase 1): Côte d'Ivoire Liberia Sierra Leone and Guinea Regional Interconnector- Additional Financing - P163033 (English)

Project Information and Integrated Safeguards Data Sheet PIDISDSA21501 SEP 20, 2017

ClemenciaTorres De Mastle Disclosed

Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project : additional financing - resettlement plan : Terms of reference for the resettlement action plan - Technical assistance for development of St Paul river and WAPP integration (English)

The development objectives West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project are (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase the technical integration of the WAPP network. ... See More +

Resettlement Plan SFG3087 FEB 01, 2017

Torres De Mastle,Clemencia Disclosed

Africa - West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Regional Interconnector Project : additional financing : environmental assessment : Terms of reference for the environmental and social impact assessment (English)

The development objectives West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project are (i) to reduce the cost of and increase the electricity supply at utility level, and to increase the export capability of Côte d’Ivoire, and (ii) to increase the technical integration of the WAPP network. ... See More +

Environmental Assessment SFG3078 FEB 01, 2017

Torres De Mastle,Clemencia Disclosed