Documents & Reports

Search / Browse Documents


  

REFINE BY:

Specific Document Date Range

See More +
See More +
See More +
  • Showing 1 - 20 of 18969 results
  • Display results in sets of
  • 10
  • 20
  • 50
Download To Excel [x]
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (English)

This is a statement by Ms. Marie-Gabrielle Ineichen-Fleisch, State Secretary for Economic Affairs, Swiss Confederation at the eighty-ninth meeting of the Development Committee held on April 12, 2014. ... See More +

Board Report 86983 APR 12, 2014

Ineichen-Fleisch, Marie-Gabrielle

Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (English)

Environmental Assessment E4523 APR 07, 2014

Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (English)

The objective of the Emergency Water and Electricity Services Upgrading Project is: (i) to restore and increase the access of the population of Bissau to safe water and to improve the quality of water services; and (ii) to improve the reliability of electricity supply to the population of Bissau. ... See More +

Environmental Assessment E4519 APR 03, 2014

Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (English)

A 2013 scientific assessment of black carbon emissions and impacts found that black carbon is second to carbon dioxide in terms of its climate forcing. ... See More +

Working Paper 86485 APR 02, 2014

Minjares, Ray; Wagner, David Vance; Baral, Anil; Chambliss, Sarah; Galarza, Sebastian; Posada, Francisco; Sharpe, Ben; Wu, Grace; Blumberg, Kate; Kamakate, Fanta; Lloyd, Alan; Kojima, Masami; Hamilton, Kirk; Johnson, Todd; Kopp, Andreas; Hosier, Richard; Akbar, Sameer

Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (English)

The objective of the Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project for Pakistan is to enable the population along the project corridor to benefit from year round improved access and mobility through reconstruction of priority damaged roads and bridges in the conflict hit areas. ... See More +

Environmental Assessment E4526 APR 02, 2014

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (English)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... See More +

Environmental Assessment E4516 APR 01, 2014

Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (English)

The development objective of the Additional Financing for the Strategic Cities Project for Tanzania is to improve the quality of and access to basic urban services in seven elected participating local government authorities (LGAs). ... See More +

Environmental Assessment E4516 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (English)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... See More +

Environmental Assessment E4525 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (English)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... See More +

Environmental Assessment E4525 APR 01, 2014

Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (English)

The development objective of the Additional Financing for the Electricity Supply Reliability Project for Armenia is to increase the reliability and capacity of the transmission network. ... See More +

Environmental Assessment E4525 APR 01, 2014

Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (English)

The development objective of the Additional Financing for the Regional Disaster Vulnerability Reduction Project for Saint Vincent the Grenadines is to measurably reduce vulnerability to natural hazards and climate change impacts and to create some level of resilience at a national level. ... See More +

Environmental Assessment E4433 APR 01, 2014

Transport for health : the global burden of disease from motorized road transport (English)

This report summarizes the findings of a long and meticulous journey of data gathering and analysis to quantify the health losses from road deaths and injuries worldwide, as part of the path-finding Global Burden of Disease (GBD) study. ... See More +

Publication 86304 MAR 31, 2014

Bhalla, Kavi; Shotten, Marc; Cohen, Aaron; Brauer, Michael; Shahraz, Saeid; Burnett, Richard; Leach-Kemon, Katherine; Freedman, Greg; Murray, Christopher J. L.

Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (English)

Ratings for the Environmental and Social Capacity Building for the Energy Sector Project for Cameroon were as follows: outcomes were moderately unsatisfactory, the risk to development outcome was moderate, the Bank performance was moderately unsatisfactory, and the Borrower performance was also moderately unsatisfactory. ... See More +

Implementation Completion and Results Report ICR2285 MAR 31, 2014

Guyana - Secondary Education Improvement Project : environmental assessment and management plan (English)

The objective of the Guyana Secondary Education Improvement Project is to increase the 11th grade survival rate and the number of students that complete secondary education in Guyana's regions 3 and 4 (including Georgetown), by constructing and equipping schools, training teachers, and distributing learning materials. ... See More +

Environmental Assessment E4480 MAR 31, 2014

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (English)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... See More +

Environmental Assessment E4390 MAR 28, 2014

Georgian

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (Georgian)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... See More +

Environmental Assessment E4390 MAR 28, 2014

English

Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (English)

The Transmission Grid Strengthening Project for Georgia seeks to strengthen grid access for South Western Georgia by constructing an overhead power transmission line connecting the sub stations in Akhaltsikhe and Batumi, to ensure more stable electricity supply in the region. ... See More +

Environmental Assessment E4390 MAR 28, 2014

Georgian

Cabo Verde - Eighth Poverty Reduction Support Credit Program (English)

The objectives of the Eighth Poverty Reduction Support Credit Program for Cabo Verde are to: ensure the macro-fiscal stability and the efficiency of public expenditures; and improve the provision of infrastructure services and the investment climate, as well as enhance labor force skills and improve environmental protection. ... See More +

Program Document 73468 MAR 27, 2014

Title Document Date Report No. Document Type Also available in
Statement by Ms. Marie-Gabrielle Ineichen-Fleisch at the 89th meeting of the Development Committee held on April 12, 2014 (English)
See More +
APR 12, 2014 86983 Board Report
Kyrgyz Republic - Grant for Pasture and Livestock Management Improvement Project : Environmental assessment (Vol. 3 of 6) : minutes of the Chui province western districts roundtable discussion (English)
See More +
APR 11, 2014 E4534 Environmental Assessment
Tanzania - Partial Risk Guarantees in Energy Sector Project : Environmental Assessment (English)
See More +
APR 07, 2014 E4523 Environmental Assessment
Tunisia - Additional Financing for the Urban Water Supply Project : environmental assessment : Tunisie - Supplementaire de financement pour le projet d'approvisionnement en eau urbain : evaluation environnementale (French)
See More +
APR 04, 2014 E4521 Environmental Assessment
Guinea-Bissau - Emergency Water and Electricity Services Upgrading Project : environmental assessment : Environmental and Social Screening and Assessment Framework (ESSAF) (English)
See More +
APR 03, 2014 E4519 Environmental Assessment
Reducing black carbon emissions from diesel vehicles : impacts, control strategies, and cost-benefit analysis (English)
See More +
APR 02, 2014 86485 Working Paper
Pakistan - Multi Donor Trust Fund (MDTF) Khyber-Pakhtunkhwa (KP) Emergency Roads Recovery Project : environmental assessment (English)
See More +
APR 02, 2014 E4526 Environmental Assessment
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment for up-grading of Duga-airport road located in Tanga city (English)
See More +
APR 01, 2014 E4516 Environmental Assessment
Tanzania - Additional Financing for the Strategic Cities Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment for up-grading of Unga limited to Muriet road and Burka bridge located in Arusha city (English)
See More +
APR 01, 2014 E4516 Environmental Assessment
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 1 of 3) : Environmental management plan for rehabilitation of Charentsavan-3 substation (English)
See More +
APR 01, 2014 E4525 Environmental Assessment
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 2 of 3) : Environmental management plan for rehabilitation and expansion of Haghtanak substation (English)
See More +
APR 01, 2014 E4525 Environmental Assessment
Armenia - Additional Financing for the Electricity Supply Reliability Project : environmental assessment (Vol. 3 of 3) : Environmental management plan for rehabilitation of Vanadzor-1 substation (English)
See More +
APR 01, 2014 E4525 Environmental Assessment
Saint Vincent the Grenadines - Additional Financing for the Regional Disaster Vulnerability Reduction Project : environmental management framework (English)
See More +
APR 01, 2014 E4433 Environmental Assessment
Transport for health : the global burden of disease from motorized road transport (English)
See More +
MAR 31, 2014 86304 Publication
Cameroon - Environmental and Social Capacity Building for the Energy Sector Project (English)
See More +
MAR 31, 2014 ICR2285 Implementation Completion and Results Report
Guyana - Secondary Education Improvement Project : environmental assessment and management plan (English)
See More +
MAR 31, 2014 E4480 Environmental Assessment
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (English)
See More +
MAR 28, 2014 E4390 Environmental Assessment Georgian
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 2 of 3) : Environmental and social impact assessment main report (Georgian)
See More +
MAR 28, 2014 E4390 Environmental Assessment English
Georgia - Transmission Grid Strengthening Project : environmental assessment (Vol. 3 of 3) : Environmental and social impact assessment : annexes (English)
See More +
MAR 28, 2014 E4390 Environmental Assessment Georgian
Cabo Verde - Eighth Poverty Reduction Support Credit Program (English)
See More +
MAR 27, 2014 73468 Program Document